VERSIONS GR GENERAL REQUIREMENTS GR-1 AS USED IN THESE GENERAL NOTES: "DRAWINGS" MEANS THE LATEST STRUCTURAL DESIGN DRAWINGS, UON. "SPECIFICATIONS" MEANS THE LATEST PROJECT SPECIFICATIONS, UON. “CONTRACT DOCUMENTS” IS DEFINED AS THE DESIGN DRAWINGS AND THE SPECFICATIONS “SER” IS DEFINED AS THE STRUCTURAL ENGINEER OF RECORD FOR THE STRUCTURE IN ITS FINAL CONDITION. “DESIGN PROFESSIONALS” IS DEFINED AS THE OWNER’S ARCHITECT AND SER. “MEP” INCLUDES, BUT IS NOT LIMITED TO MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION. “CONTRACTOR” IS DEFINED TO INCLUDE ANY OF THE FOLLOWING: GENERAL CONTRACTOR AND THEIR SUBCONTRACTORS, CONSTRUCTION MANAGER AND THEIR SUBCONTRACTORS, STRUCTURAL STEEL FABRICATOR OR STRUCTURAL STEEL ERECTOR. “BASE BUILDING STRUCTURE” IS DEFINED AS THE STRUCTURAL FRAME DESIGNED BY THORNTON TOMASETTI. “STRUCTURE IN ITS FINAL CONDITION”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’S TEMPORARY SUPPORTS AND BRACES. CONTRACTOR SHALL RETAIN A STRUCTURAL ENGINEER LICENSED IN THE STATE IN WHICH THE PROJECT IS LOCATED TO DESIGN TEMPORARY BRACING AND CONSTRUCTION SUPPORTS. GR-5 THE SPECIFICATIONS ARE AN INTEGRAL PART OF THE CONTRACT DOCUMENTS AND SHALL BE USED IN CONJUNCTION WITH THE STRUCTURAL DRAWINGS. GR-6 THE CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS AND COORDINATE WITH THE STRUCTURAL DRAWINGS, ARCHITECTURAL DRAWINGS, DRAWINGS FROM OTHER CONSULTANTS, PROJECT SHOP DRAWINGS AND FIELD CONDITIONS. GR-7 IN CASES OF CONFLICT BETWEEN DRAWINGS AND/OR SPECIFICATIONS AND OTHER DISCIPLINES OR EXISTING CONDITIONS, CONTRACTOR SHALL NOTIFY THE DESIGN PROFESSIONALS AND OBTAIN CLARIFICATION PRIOR TO BIDDING AND PROCEEDING WITH WORK. DE-5 THE CONTRACTOR IS FULLY RESPONSIBLE FOR THE MEANS AND METHODS OF DEMOLITION AND THE INTEGRITY AND STABILITY OF THE EXISTING STRUCTURE DURING DEMOLITION UNTIL THE WORK IS COMPLETED. THE CONTRACTOR SHALL PROVIDE SHORING IN REQUIRED LOCATIONS WHERE EXISTING CONSTRUCTION TO REMAIN WILL BE AFFECTED BY DEMOLITION. THE CONTRACTOR IS REPONSIBLE FOR REPAIRS TO ANY STRUCTURAL ELEMENTS WHICH ARE TO REMAIN AND THAT HAVE BEEN DAMAGED DURING THE DEMOLITION PROCESS TO THE COMPLETE SATISFACTION OF THE OWNER. THE REPAIRS SHALL BE AT NO EXPENSE TO THE OWNER. ALL REPAIR WORK SHALL BE DESIGNED BY A LICENSED STRUCTURAL ENGINEER IN THE STATE OF NEW JERSEY AND SUBMITTED TO THE STRUCTURAL ENGINEER OF RECORD FOR REVIEW AND APPROVAL PRIOR TO COMMENCING REPAIR WORK. ALL EXISTING FRAMING IS INDICATED FOR REFERENCE ONLY AND IS TO BE FIELD VERIFIED BY THE CONTRACTOR. VERIFY THE EXACT EXTENT OF DEMOLITION AT THE SITE. DETERMINE THE NATURE AND EXTENT OF DEMOLITION THAT WILL BE NECESSARY BY COMPARING THE CONTRACT DOCUMENTS WITH THE EXISTING CONSTRUCTION. THE CONTRACTOR SHALL USE THE STRUCTURAL CONTRACT DOCUMENTS IN CONJUNCTION WITH THE ARCHITECTURAL AND MEP DEMOLITION CONTRACT DOCUMENTS. IN THE EVENT OF CONFLICTS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND STRUCTURAL ENGINEER. THE CONTRACTOR SHALL USE QUALIFIED, EXPERIENCED PERSONNEL FOR DEMOLITION AND REMOVAL OPERATIONS. PERFORM DEMOLITION AND REMOVAL OPERATIONS IN A CAREFUL AND ORDERLY MANNER TO PREVENT HAZARDS TO PERSONS, DAMAGE TO PROPERTY, AND THE SPREADING OF DUST AND DEBRIS. DE-6 DO NOT PERMIT PORTIONS OF THE STRUCTURE TO FALL NOR DEBRIS TO DROP EXCEPT BY METHODS WHICH WILL INSURE INTEGRITY OF THE STRUCTURE. DE-7 PRIOR TO THE START OF WORK, VERIFY THAT THE SCOPE OF DEMOLITION INDICATED ON THE CONTRACT DOCUMENTS SHALL NOT DAMAGE, CUT OR DISRUPT SERVICE OF ANY MECHANICAL SYSTEM, ELECTRICAL SYSTEM OR UTILITY EMBEDDED IN THE EXISTING STRUCTURE. DE-8 DE-9 DO NOT REMOVE MORE OF THE EXISTING STRUCTURE THAN INDICATED ON CONTRACT DOCUMENTS. DO NOT DAMAGE, MAR, CUT OR DEFACE THE REMAINING STRUCTURE OR MATERIALS TO BE REUSED. THE CONTRACTOR SHALL INCLUDE IN HIS BID THE COST OF REMOVING DEMOLISHED MATERIALS FROM THE SITE IN ACCORDANCE WITH ALL APPLICABLE LAWS, CODES, AND REGULATIONS. FN-1 FN-2 THE CONTRACTOR SHALL VERIFY FOUNDATION INSTALLATION AND CONSTRUCTION IS IN CONFORMANCE WITH THE RECOMMENDATIONS OUTLINED IN THE GEOTECHNICAL REPORT. FN-3 CONTRACTOR SHALL BE RESPONSIBLE TO ADEQUATELY PROTECT ALL EXCAVATION. WHERE NECESSARY, SHEET AND SHORE THE EXCAVATION WITH ALL REQUIRED TIEBACKS AND BRACING AS DETERMINED BY CONTRACTOR’S STRUCTURAL ENGINEER. FN-4 PROVIDE BRACING FOR ALL BASEMENT FOUNDATION WALLS PRIOR TO BACKFILLING. THIS BRACING SHALL REMAIN IN PLACE UNTIL ALL SLABS AND BEAMS FRAMING INTO WALL HAVE BEEN PLACED AND HAVE ATTAINED 100% OF THEIR DESIGN STRENGTH. CM CONCRETE MATERIALS CM-2 PROVIDE NORMALWEIGHT CONCRETE WITH CURED DENSITY OF 145 +/- 5 PCF, AND AGGREGATE CONFORMING TO ASTM C33, UON. WHERE INDICATED, PROVIDE LIGHTWEIGHT CONCRETE WITH CURED DENSITY OF 112+/-3 PCF AND AGGREGATE CONFORMING TO ASTM C330. CM-3 THE USE OF CALCIUM CHLORIDE AND OTHER CHLORIDE CONTAINING AGENTS IS PROHIBITED. THE USE OF RECYCLED CONCRETE IS PROHIBITED. PLACEMENT WITHIN AND CONTACT BETWEEN ALUMINUM ITEMS, INCLUDING ALUMINUM CONDUIT, AND CONCRETE IS PROHIBITED. RE CONCRETE REINFORCEMENT RE-1 ALL CONCRETE SHALL INCLUDE REINFORCEMENT. IF REINFORCEMENT IS NOT SPECIFICALLY INDICATED ON THE DRAWINGS VERIFY WITH THE STRUCTURAL ENGINEER. RE-2 REINFORCEMENT SHALL CONFORM TO THE FOLLOWING STANDARDS AND MATERIAL PROPERTIES UON: SU SUBMITTALS RE-4 WHERE A 90-DEG, 135 –DEG OR 180-DEG HOOK IS GRAPHICALLY INDICATED, PROVIDE CORRESPONDING ACI STANDARD HOOKS UON. GR-11 CENTERLINES OF COLUMNS AND FOUNDATIONS COINCIDE WITH GRID LINE INTERSECTIONS, UON. SU-1 GR-14 THE CONTRACTOR SHALL PROTECT EXISTING FACILITIES, STRUCTURES AND UTILITIES FROM DAMAGE. GR-15 THE CONTRACTOR SHALL VERIFY THAT CONSTRUCTION LOADS DO NOT EXCEED THE CAPACITY OF THE STRUCTURE AT THE TIME THE LOAD IS APPLIED. SU-2 GR-16 THE CONTRACTOR SHALL COORDINATE THE BOTTOM OF BASE PLATE ELEVATIONS WITH THE ASBUILT TOP OF SUPPORT ELEVATIONS. CD CODES AND DESIGN CRITERIA CD-1 PERFORM ALL CONSTRUCTION IN CONFORMANCE WITH THE BUILDING AND DESIGN CODES REFERENCED WITHIN THESE DOCUMENTS. THE PROJECT DOCUMENTS REFER TO THE FOLLOWING CODES AND STANDARDS, UON: DEFORMED BARS: WELDABLE DEFORMED BARS: WELDED WIRE REINFORCEMENT ASTM A615 Grade 60 ASTM A706 ASTM A1064 RE-5 DOWELS SHALL MATCH SIZE AND SPACING OF MAIN REINFORCEMENT UON. RE-6 REINFORCEMENT SHALL HAVE CONCRETE PROTECTION (CLEAR COVER) PER ACI 318 UNLESS OTHERWISE INDICATED ON THE DRAWINGS. RE-7 LAP REINFORCEMENT ONLY AT LOCATIONS AS SPECIFICALLY DETAILED ON THE DRAWINGS EXCEPT REINFORCEMENT MARKED AS CONTINUOUS CAN BE SPLICED AT LOCATIONS DETERMINED BY CONTRACTOR USING TENSION LAP SPLICES (LTS). SEE LAP SPLICE AND EMBEDMENT SCHEDULE. RE-8 UNLESS OTHERWISE NOTED ALL LAP SPLICES ARE TO BE TENSION LAP SPLICES PER LAP SPLICE AND EMBEDMENT SCHEDULE. RE-9 LAP WELDED WIRE REINFORCEMENT TWO PANEL SPACINGS, UON. ikon.5 architects 864 Mapleton Road Princeton, NJ 08540 609.919.0099 fax 609.919.0088 www.ikon5architects.com Professional License Number PROJECT TITLE: RAMAPO COLLEGE OF NEW JERSEY THE STRUCTURAL ENGINEER SHALL RETURN, WITHOUT COMMENT, SUBMITTALS WHICH THE CONTRACTOR HAS NOT STAMPED OR WHICH DO NOT MEET THE ABOVE REQUIREMENTS. THE STRUCTURAL ENGINEER' S REVIEW OF SUBMITTALS SHALL BE FOR GENERAL CONFORMANCE WITH THE DESIGN INTENT. NO WORK SHALL BE STARTED WITHOUT SUCH REVIEW. INTERNATIONAL BUILDING CODE – NEW JERSEY EDITION, 2009 (IBC 2009) STRUCTURAL CONCRETE: "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE" THE AMERICAN CONCRETE INSTITUTE (ACI 318-08) SU-3 FOR COMPONENTS THAT REQUIRE ENGINEERING BY THE CONTRACTOR, PROVIDE A NOTE ON EACH SHOP DRAWING, WRITTEN AND SIGNED BY THE SUPPLIER' S ENGINEER, INDICATING THAT THE SHOP DRAWING IS IN CONFORMANCE WITH THE CALCULATIONS OF THE CONTRACTOR' S ENGINEER. SU-4 THE FOLLOWING ITEMS REQUIRE SUBMITTALS FOR STRUCTURAL REVIEW AS OUTLINED IN THE SPECIFICATIONS: STRUCTURAL STEEL: "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS”, 13TH EDITION CONFORMING TO THE PROVISIONS OF LOAD RESISTANCE FACTOR DESIGN, BY THE AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC-LRFD) CD-2 STRUCTURAL COMPONENTS ARE NOT DESIGNED FOR VIBRATING EQUIPMENT. MOUNT VIBRATING EQUIPMENT ON VIBRATION ISOLATORS. THE CONTRACTOR IS TO REVIEW EACH SUBMITTAL PRIOR TO FORWARDING TO ARCHITECT AND STRUCTURAL ENGINEER. THE CONTRACTOR IS TO STAMP EACH SUBMITTAL VERIFYING THAT THE FOLLOWING IS ADDRESSED: 1. THE SHOP DRAWING IS REQUESTED. 2. THE SHOP DRAWING IS BASED ON THE LATEST DESIGN. 3. THE ARCHITECT' S AND STRUCTURAL ENGINEER' S COMMENTS FROM ANY PREVIOUS SUBMITTALS ARE ADDRESSED. 4. THE WORK IS COORDINATED AMONG ALL CONSTRUCTION TRADES. 5. REVISIONS FROM PREVIOUS SUBMITTALS ARE CLEARLY MARKED BY CIRCLING OR CLOUDS. 6. SUBMITTAL IS COMPLETE. 7. SUBMITTAL DOES NOT INCLUDE SUBSTITUTION REQUEST 8. SUBMITTAL SHALL INCLUDE A STAMP INDICATING PROJECT NAME AND LOCATION, SUBMITTAL NUMBER, SPECIFICATION SECTION NUMBER. GR-17 ELEVATIONS INDICATED ON STRUCTURAL DRAWINGS ARE BASED ON A PROJECT DATUM INDICATED ON THE ARCHITECTURAL DRAWINGS. WOOD: "NATIONAL DESIGN SPECIFICATION FOR WOOD CONSTRUCTION" AMERICAN NATIONAL STANDARDS INSTITUTE / AMERICAN FOREST & PAPER ASSOCIATION (ANSI/AF&PA NDS-2005) TWENTY WORKING DAYS PRIOR TO SUBMITTING SHOP DRAWINGS, THE CONTRACTOR SHALL SUBMIT FOR STRUCTURAL ENGINEER' S REVIEW A SCHEDULE WHICH DETAILS THE ESTIMATED QUANTITY OF SHOP DRAWINGS AND THE DATE THE SHOP DRAWINGS WILL BE RECEIVED BY THE STRUCTURAL ENGINEER. THE STRUCTURAL ENGINEER SHALL HAVE THE OPPORTUNITY TO REVIEW THE PROPOSED SCHEDULE AND SUBMIT COMMENTS TO THE CONTRACTOR. THE FINAL SHOP DRAWING SCHEDULE SHALL BE DEVELOPED AND SUBMITTED TO THE STRUCTURAL ENGINEER. IN ACCORDANCE WITH THE SHOP DRAWING SCHEDULE, THE STRUCTURAL ENGINEER WILL RETURN THE SHOP DRAWING ITEMS WITHIN TEN WORKING DAYS AFTER HAVING RECEIVED THE REPRODUCIBLE SHOP DRAWING. Ramapo College of New Jersey 505 Ramapo Valley Road Mahwah, NJ 07430 P. 201.684.7500 CM-4 ALL CAST-IN-PLACE CONCRETE WILL EXPERIENCE DIFFERING VARIATIONS OF CRACKING. ANY ELEMENT EXPOSED TO DIRECT WEATHER AND/OR TEMPERATURE VARIATIONS DURING CONSTRUCTION OR IN THE FINAL CONDITION IS TO BE TREATED AND REGULARLY MAINTAINED TO PREVENT PROPAGATION OF CRACKS AND WATER PENETRATION. THE CONTRACTOR SHALL DEVELOP A REGULAR MAINTENANCE PROGRAM AND SUBMIT IT TO THE OWNER. DETAIL REINFORCEMENT BASED ON THE PROJECT REQUIREMENTS, ACI-318 AND ACI-315, UON. GR-13 CENTERLINES OF FRAMING MEMBERS COINCIDE WITH COLUMN CENTERLINES, UON. Issue for Bid 02-11-2016 CM-1 CONCRETE STRENGTH SHALL MEET THE 28-DAY COMPRESSIVE STRENGTHS (f' c), UON AS PER CALLED OUT ON PLANS. RE-3 GR-12 CENTERLINES OF GRADE BEAMS AND WALLS COINCIDE WITH CENTERLINES OF FOUNDATIONS, UON. 1 NET ALLOWABLE BEARING CAPACITY: 1500 PSF DESIGN VALUES SHALL BE FIELD VERIFIED BY QUALIFIED GEOTECHNICAL ENGINEER RETAINED BY THE OWNER. GR-10 ASSUME EQUAL SPACING BETWEEN ESTABLISHED DIMENSIONS, IF NOT INDICATED ON DRAWINGS. GR-9 ONLY USE DIMENSIONS INDICATED ON THE DRAWINGS. DO NOT SCALE DRAWINGS. Description FOUNDATIONS HAVE BEEN DESIGNED BASED ON THE FOLLOWING DESIGN VALUES FROM THE GEOTECHNICAL REPORT: DE-10 WHERE NEW OPENINGS IN EXISTING CONCRETE SLABS OR WALLS ARE TO BE CREATED, THE DEMOLITION CONTRACTOR SHALL CORE HOLES AT THE OUTSIDE CORNERS OF THE NEW OPENING PRIOR TO DEMOLITION. SAW-CUT AND DEMOLISH SLAB OR WALL ONLY AFTER THE INSTALLATION OF ALL REQUIRED NEW STRUCTURAL FRAMING AND/OR REINFORCEMENT IN PLAN OR SECTION, UON. SAW CUTTING SHALL BE STRAIGHT AND SHALL NOT EXTEND INTO EXISTING SLAB OR WALL TO REMAIN NOR BEYOND THE HOLES CORED AT THE CORNERS OF THE NEW OPENING. GR-8 APPLY DETAILS, SECTIONS, AND NOTES ON THE DRAWINGS WHERE CONDITIONS ARE SIMILAR TO THOSE INDICATED BY DETAIL, DETAIL TITLE OR NOTE. No. Date FN FOUNDATIONS PADOVANO COLLEGE COMMONS RCNJ PROJECT No. 2016-26-01C SHEET TITLE: 031000 032000 033000 033000 051000 051000 S S CALC S S S CONCRETE FORMWORK CONCRETE REINFORCING LAYOUT CONCRETE MIX DESIGNS CONCRETE CONSTRUCTION JOINT LAYOUT STRUCTURAL STEEL STRUCTURAL STEEL CONNECTIONS GENERAL NOTES I S = SHOP DRAWINGS REQUIRED CALC = SUPPORTING CALCULATIONS REQUIRED, SIGNED AND SEALED BY A LICENSED PROFESSIONAL ENGINEER IN THE STATE IN WHICH THE PROJECT IS LOCATED. DATE: February 11, 2016 DRAWN BY: NR DRAWING NO.: S-001 VERSIONS SS STRUCTURAL STEEL SS-1 Description 1 Issue for Bid 02-11-2016 STEEL MATERIALS SHALL CONFORM TO THE FOLLOWING MINIMUM REQUIREMENTS UNLESS OTHERWISE NOTED ON THE CONTRACT DOCUMENTS: ROLLED SHAPES AND CHANNELS: MISCELLANEOUS ANGLES: HOLLOW STRUCTURAL SECTIONS: SEAMLESS PIPE: PLATES: SS-2 No. Date ASTM A572 OR A992, MIN. YIELD STRENGTH 50 KSI ASTM A36 ASTM A500 GRADE B, MIN YIELD STRENGTH 42 KSI FOR ROUND AND 46 KSI FOR RECTANGULAR HSS ASTM A53 GRADE B, TYPE S, MIN YIELD STRENGTH 35 KSI. ASTM A572 OR A529, MIN YIELD STRENGTH 50 KSI CONNECTION MATERIAL SHALL CONFORM TO THE FOLLOWING MINIMUM REQUIREMENTS OR AS NEEDED FOR CONNECTION DESIGN: ANGLES: WTs: PLATES: BOLTS: NUTS: WASHERS: ANCHOR RODS: WELD ELECTRODES: ASTM A36 ASTM A992 ASTM A36, MIN YIELD STRENGTH 36 KSI OR ASTM A572 OR A529, MINIMUM YIELD STRENGTH 50 KSI ASTM A325 OR A490 ASTM A563 ASTM F436 ASTM F1554 GRADE 55 WITH WELDABILITY SUPPLEMENT S1 E70XX SS-3 FOR STEEL MEMBERS AND EMBEDMENTS EXPOSED TO WEATHER, PROVIDE HOT-DIPPED GALVANIZED FINISH. SS-4 PROVIDE HOLES IN ALL STEEL AS REQUIRED TO PREVENT ANY ACCUMULATION OF WATER. ALL PENETRATIONS THROUGH MAIN MEMBERS SHALL NOT EXCEED 1 1/8" DIA. AND SHALL BE GROUND SMOOTH. THESE DRAINS MUST BE KEPT CLEAN AND OPEN. SS-5 SHOW ALL COPES, HOLES, OPENINGS AND MODIFICATIONS REQUIRED IN STRUCTURAL STEEL MEMBERS FOR ERECTION OR THE WORK OF OTHER TRADES ON THE SHOP DRAWINGS FOR APPROVAL BY THE ARCHITECT AND STRUCTURAL ENGINEER. SS-6 FIELD MODIFICATION OF STRUCTURAL STEEL IS PROHIBITED WITHOUT PRIOR APPROVAL OF THE ARCHITECT AND STRUCTURAL ENGINEER. Ramapo College of New Jersey 505 Ramapo Valley Road Mahwah, NJ 07430 P. 201.684.7500 PA POST-INSTALLED ANCHORS PA-1 ADHESIVE ANCHOR SYSTEMS USED FOR DESIGN: SEISMIC DESIGN CATEGORY A - F ADHESIVE: HILTI HIT-HY 200 HILTI, TULSA, OK THREADED ROD: HILTI HIT-Z OVERHEAD AND/OR CONSTANT TENSION ADHESIVE ANCHOR INSTALLATIONS NOT SHOWN ON THE DRAWINGS SHALL NOT BE PERMITTED UNLESS EACH CONDITION IS REVIEWED AND APPROVED IN WRITING BY THE SER. PA-2 PA-3 PROOF TESTING OF ADHESIVE ANCHORS SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. UNLESS NOTED OTHERWISE, ADHESIVE ANCHOR PROOF TENSION LOADS SHALL BE PER THE ADHESIVE ANCHOR PROOF TENSION SCHEDULES. ikon.5 architects 864 Mapleton Road Princeton, NJ 08540 609.919.0099 fax 609.919.0088 www.ikon5architects.com FIELD DRILLED EXPANSION ANCHOR SYSTEMS USED FOR DESIGN: SEISMIC DESIGN CATEGORY A - F KWIK BOLT TZ HILTI, TULSA, OK SEISMIC DESIGN CATEGORY A - B AT LOCATIONS SPECIFICALLY NOTED IN DETAILS ONLY KWIK BOLT 3 HILTI, TULSA, OK PA-4 PROOF TESTING OF EXPANSION ANCHORS SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. UNLESS NOTED OTHERWISE, EXPANSION ANCHOR PROOF TORQUE LOADS SHALL BE PER THE EXPANSION ANCHOR PROOF TORQUE SCHEDULES. PA-5 FIELD DRILLED THREADED SCREW ANCHOR SYSTEMS USED FOR DESIGN: HUS-EZ PA-6 HILTI, TULSA, OK ALTERNATIVE SYSTEM EQUIVALENT TO OR EXCEEDING THE PROPERTIES OF THE SYSTEMS ABOVE WILL BE CONSIDERED AS A SUBSTITUTION REQUEST. SEE PROJECT SPECIFICATIONS.. PA-7 ANCHORS ARE TO BE MINIMUM 3/4” DIAMETER WITH A MINIMUM EMBEDMENT OF 6", UON. PA-8 INSTALL ANCHORS TO MEET THE REQUIREMENTS INDICATED IN THE CONTRACT DOCUMENTS AND THE CURRENT MANUFACTURER'S PUBLISHED INSTALLATION INSTRUCTIONS (MPII). PA-9 Professional License Number PROJECT TITLE: RAMAPO COLLEGE OF NEW JERSEY PADOVANO COLLEGE COMMONS LOCATE, BY NON-DESTRUCTIVE MEANS, AND AVOID ALL EXISTING REINFORCEMENT PRIOR TO INSTALLATION OF ANCHORS. IF EXISTING REINFORCING LAYOUT PROHIBITS THE INSTALLATION OF ANCHORS AS INDICATED IN THE DRAWINGS, THE CONTRACTOR SHALL NOTIFY THE DESIGN PROFESSIONALS IMMEDIATELY. RCNJ PROJECT No. 2016-26-01C PA-10 INSTALL MASONRY ANCHORS IN SOLID MASONRY OR IN HOLLOW MASONRY THAT HAS BEEN GROUTED SOLID AT LEAST ONE COURSE ABOVE AND ONE COURSE BELOW THE ANCHOR, UON. SHEET TITLE: GENERAL NOTES II PA-11 SEE PROJECT SPECIFICATIONS FOR POST-INSTALLED ANCHOR INSPECTION REQUIREMENTS. DATE: February 11, 2016 DRAWN BY: NR DRAWING NO.: S-002 VERSIONS 3' - 8" 5' - 0" 2 S-201 TYP. 24' - 0" 21' - 0" 14' - 6" 14' - 6" RUBBLE WALL REINFORCEMENT TYP. 3 S-102 3 S-102 2 S-102 Description 1 Issue for Bid 02-11-2016 3' - 8" 2 S-102 2 TYP. S-201 2 S-102 EXIST. STEEL COLUMN Ramapo College of New Jersey 505 Ramapo Valley Road Mahwah, NJ 07430 P. 201.684.7500 5' - 0" 14' - 0" 21' - 0" No. Date EXIST. STEEL COLUMN SEE ADD ALTERNATE 1 SEE ADD ALTERNATE 1 17' - 0" 3 S-102 3 S-102 39' - 0" 17' - 0" EXISTING STONE RUBBLE WALL TO BE REMOVED,TYP. SEE ADD ALTERNATE 1 ikon.5 2 S-102 2 S-102 2 TYP. S-201 architects 864 Mapleton Road Princeton, NJ 08540 609.919.0099 fax 609.919.0088 SEE ADD ALTERNATE 1 SEE ARCHITECTURAL DRAWINGS FOR LOCATIONS AND DIMENSIONS www.ikon5architects.com EXISTING STONE RUBBLE WALL, TYP. 1 S-201 EXISTING BEARING PARTITION WALL TO BE REMOVED SEE NOTE 2 ON S-101 NEW 8" EXTERIOR SOG (f'c=4,000 psi) WITH #4 @ 12" OC. EW. NEW HSS 4X4 POST, TYP. 14' - 0" NO DAMAGE TO EXISTING COLUMN FOOTING EXIST. STEEL COLUMN 2 S-202 1' - 0" 1 FOUNDATION PLAN 1/4" = 1'-0" 1 S-202 3' - 0" RAMAPO COLLEGE OF NEW JERSEY PADOVANO COLLEGE COMMONS NEW 12'-0"x 4'-0"x 1'-6" FOOTING , TYP. 2' - 0" 2' - 0" 1' - 6" PROJECT TITLE: THICKENED SLAB EDGE 10' - 6" EXIST. STEEL COLUMN 1' - 0" TYP. Professional License Number 3' - 0" 3' - 0" 1' - 6" RCNJ PROJECT No. 2016-26-01C SHEET TITLE: PLAN NOTES: FOUNDATION PLAN 1. REFER TO ARCHITECTURAL DRAWINGS FOR EXTENT OF EXISTING SOG REMOVAL. 2. PROVIDE TEMPORARY SUPPORT TO ALL EXISTING JOISTS PRIOR TO REMOVAL OF EXISTING BEARING PARTITION WALL. 3. SYMBOLS: INDICATES STONE RUBBLE WALL TO BE REMOVED FOR NEW DOOR ASSEMBLY. INDICATES EXISTING SLAB ON GRADE TO BE REMOVED AND PATCHED AFTER PIPE INSTALATION. DATE: February 11, 2016 DRAWN BY: NR DRAWING NO.: INDICATES EXISTING BEARING PARTITION WALL TO BE REMOVED. S-101 VERSIONS 21' - 0" 24' - 0" CEILING LEVEL EL = 11' - 7 1/8" 14' - 0" EXISTING 4x4 WOOD POST ABOVE 2 S-102 NEW 18" DEEP THREE 1 3/4" 2.0E GP LAM LVL SEE ADD ALTERNATE 1 3 S-102 2 S-102 2 S-102 NEW 18" DEEP THREE 1 3/4" 2.0E GP LAM LVL EXIISTING 2x10 @16" O.C. EXISTING W18 EXIISTING 2x10 @16" O.C. 39' - 0" EXISTING W18 NEW 18" DEEP THREE 1 3/4" 2.0E GP LAM LVL SEE ADD ALTERNATE 1 3 S-102 Ramapo College of New Jersey 505 Ramapo Valley Road Mahwah, NJ 07430 P. 201.684.7500 6 S-202 4 S-201 1' - 6" TYP. EXISTING RUBBLE WALL 2 S-102 CEILING LEVEL EL = 11' - 7 1/8" NEW 18" DEEP THREE 1 3/4" 2.0E GP LAM LVL NON SHRINK GROUT NEW 18" DEEP THREE 1 3/4" 2.0E GP LAM LVL Issue for Bid 02-11-2016 EXISTING 2-2X6 TOP PLATE 1/2" PLATE 3 S-102 1 2' - 0" EXISTING 2-2X6 TOP PLATE NEW 18" DEEP THREE 1 3/4" 2.0E GP LAM LVL SEE ADD ALTERNATE 1 Description 21' - 0" 2' - 0" 3 S-102 No. Date EXISTING RUBBLE WALL BEYOND #6 HOOKED DOWELS @ 2'-0" OC. SEE PLAN FOR ADDITIONAL INFORMATION 4" CONCRETE REINFORCEMENT ikon.5 #4 @ 12" OC. EACH WAY 6 S-201 5 S-201 2 S-102 architects 864 Mapleton Road Princeton, NJ 08540 609.919.0099 fax 609.919.0088 6" www.ikon5architects.com EXISTING SOG EL = 0' - 0" EXISTING SOG EL = 0' - 0" EXISTING 4x4 WOOD POST ABOVE EXISTING COLUMN BELOW NOTES: GC TO PROVIDE MEANS AND METHOD TO ENSURE STABILITY OF EXISTING RUBBLE WALL DURING CONSTRUCTION OF NEW CONCRETE REINFORCEMENT. EXISTING COLUMN BELOW Professional License Number PROJECT TITLE: NEW (2) 2x10 5 S-202 NEW 18" DEEP THREE 1 3/4" 2.0E GP LAM LVL 4 S-202 9" 14' - 0" EXISTING (2) 2X10 RAMAPO COLLEGE OF NEW JERSEY NEW (2) 2x10 EXISTING BEARING PARTITION TO BE REMOVED SEE NOTE ON S-101 2 SECTION AT JAMB 3/4" = 1'-0" 3 SECTION 3/4" = 1'-0" PADOVANO COLLEGE COMMONS EXISTING 2X8 @16" OC. RCNJ PROJECT No. 2016-26-01C SHEET TITLE: CEILING FRAMING PLAN AND SECTIONS 1 DATE: February 11, 2016 CEILING LEVEL FRAMING PLAN DRAWN BY: NR 1/4" = 1'-0" DRAWING NO.: S-102 VERSIONS SEE ADD ALTERNATE 1 3 S-102 SEE ADD ALTERNATE 1 SEE ADD ALTERNATE 1 Description 1 Issue for Bid 02-11-2016 SEE ADD ALTERNATE 1 3 S-102 2 S-102 No. Date 2 S-102 Ramapo College of New Jersey 505 Ramapo Valley Road Mahwah, NJ 07430 P. 201.684.7500 2 S-102 3 S-102 EXISTING 2x12 @16" O.C.WD RAFTERS SEE ADD ALTERNATE 1 EXISTING 2x12 @16" O.C. WD RAFTERS EXISTING 2x12 @16" O.C. WD RAFTERS EXISTING 2x12 @16" O.C.WD RAFTERS 3 S-102 ikon.5 architects SEE ADD ALTERNATE 1 2 S-102 864 Mapleton Road Princeton, NJ 08540 609.919.0099 fax 609.919.0088 www.ikon5architects.com Professional License Number PROJECT TITLE: RAMAPO COLLEGE OF NEW JERSEY PADOVANO COLLEGE COMMONS RCNJ PROJECT No. 2016-26-01C SHEET TITLE: ROOF FRAMING PLAN 1 ROOF LEVEL FRAMING PLAN 1/4" = 1'-0" DATE: February 11, 2016 DRAWN BY: NR DRAWING NO.: S-103 VERSIONS CL OF 2X6 FRAMING ABOVE No. Date Description 1 Issue for Bid 02-11-2016 4" 6" MIN. TYP. 5 1/4" EXISTING RUBBLE WALL 1' - 0" 6" MIN. NEW DOOR OPENING SEE PLAN,TYP. 1' - 0" . SEE PLAN 6" CONCRETE REINFORCEMENT f'c = 4000 psi EQ #6 X 1'-0" LONG EPOXY DOWELS WITH HILTI HITHY200 ADHESIVE @ 24" OC. NEW CONCRETE REINFORCEMENT . 6" MIN. TYP. 6 MIL VAPOR BARRIER OVER 6" CRUSHED STONE LINE OF 2X6 FRAMING ABOVE 1 TYPICAL PATCH DETAIL 2 1" = 1'-0" 1/2" SIDE PLATE NEW LVL LINTEL SEE PLAN 4" 1' - 0" SEE PLAN 3/4" BASE PLATE 6" MIN. EQ 6" BASE PLATE CL 1' - 6" NEW 6" SLAB ON GRADE WITH WWF6X6-W6XW6 (f'c = 4,000psi) 1' - 0" EXISTING SLAB ON GRADE. SEE PLAN EXISTING RUBBLE WALL 7 5/8" 3 5/8" Ramapo College of New Jersey 505 Ramapo Valley Road Mahwah, NJ 07430 P. 201.684.7500 2 3/4" TYPICAL WALL REINFORCEMENT DETAIL 3 1" = 1'-0" SECTION 1" = 1'-0" ikon.5 architects NEW NON-SHRINK GROUT EXISTING SLAB ON GRADE NEW CONCRETE REINFORCEMENT SEE PLAN TOP OF JOIST EL = 11' - 6 1/2" ARCHITECT TO PROVIDE DETAIL EXISTING RUBBLE WALL www.ikon5architects.com NEW WOOD SCREWS @ 12 " OC STAGGERED 1" MIN EMBED IN LVL 11 7/ 8" #4 X 2'-0" LONG EPOXY DOWELS WITH HILTI HIT-HY200 ADHESIVE CENTERED ON JOINT @ 12" OC. EXISTING RUBBLE WALL EXISTING SOG EL = 0' - 0" TYP. NEW BASE PLATE 3/4" X 8" X 2'-0" NON SHRINK GROUT TOP OF RUBBLE WALL EL = 8' - 11" NEW CONCRETE REINFORCEMENT SEE PLAN 1' - 6" Professional License Number . 3" 1'-6" EXTERIOR GRADE 1' - 8 7/ 8" 2" 1/4 TOP OF EXISTING SOG 1' - 0" 3' - 0" +/- 1" #6 X 1'-0" LONG EPOXY DOWELS WITH HILTI HITHY200 ADHESIVE @ 24" OC. 2" 1/2" X 7 1/2" X 1'-6" PLATE WITH (2) 3/4" DIA. THRU BOLTS @ 10" OC. 3" 3" EXISTING RUBBLE WALL CONSTRUCTION JOINT AS REQUIRED 18" DEEP LVL 3 S-201 1/2" Ø X 6" EMBEDMENT EPOXY ANCHOR HILTI HIT-Z WITH HILTI HIT-HY200 ADHESIVE @ 12" OC. #6 EPOXY DOWELS @ 12" OC. 1' - 6" EXISTING 2-2X6 TOP PLATE 864 Mapleton Road Princeton, NJ 08540 609.919.0099 fax 609.919.0088 6" . MIN PROJECT TITLE: REMOVE EXISTING SOG AND EXISTING UNDERLAIN FILL. FILL WITH LEAN CONCRETE (f'c=2,000psi) EXTENDING 1'-0" BEYOND NEW CONCRETE REINFORCEMENT FOOTPRINT. RAMAPO COLLEGE OF NEW JERSEY PADOVANO COLLEGE COMMONS UNDISTURBED SOIL BACKFILL AS REQUIRED 4 SECTION AT LINTEL SUPPORT 1 1/2" = 1'-0" 5 SECTION AT BASE OF EXISTING WALL REINFORCING NOT TO SCALE 6 SECTION AT NEW DOOR ENTRY 1" = 1'-0" RCNJ PROJECT No. 2016-26-01C SHEET TITLE: SECTIONS AND DETAILS DATE: February 11, 2016 DRAWN BY: NR DRAWING NO.: S-201 VERSIONS No. Date Description 1 Issue for Bid 02-11-2016 12' - 0" SEE PLAN SEE PLAN SEE PLAN SEE PLAN 1/4" CAP WITH GROOVE WELD ALL AROUND TYP. 1/4 2" 4" 4" TYP. SEE PLAN HSS4X2X1/4 (HORIZONTAL) HSS4X2X1/4 (HORIZONTAL) HSS4X2X1/4 (HORIZONTAL) HSS4X2X1/4 (HORIZONTAL) HSS4X2X1/4 (HORIZONTAL) 1' - 0" 1' - 0" HSS WITH 3/4"Ø A307 BOLTS WELDED @ 2'-0" OC. SEE ELEVATION EXTENT OF WOOD PLATE HSS 4X4 POST TYP. HSS 4X4X1/2 6' - 0" WOOD BLOCK BOLTED TO HSS SEE ARCHITECTURAL DRAWINGS NEW EXTERIOR SOG Ramapo College of New Jersey 505 Ramapo Valley Road Mahwah, NJ 07430 P. 201.684.7500 HSS4X2X1/4 (HORIZONTAL) HSS4X2X1/4 (HORIZONTAL) HSS4X2X1/4 (HORIZONTAL) HSS4X2X1/4 (HORIZONTAL) HSS4X2X1/4 (HORIZONTAL) 2' - 0" TOP OF NEW SOG 1' - 1 3/4" 8" EXTERIOR GRADE BASE PL 1/2" X 10" X 0'-10" WITH (4) 3/4" DIAMETER HOOKED ANCHOR BOLTS @ 7" OC. EW. 1/4 HSS WITH 3/4"Ø A307 BOLTS WELDED @ 2'-0" OC. SEE ELEVATION 1" NON-SHRINK GROUT T/FF 2' - 0" 1' - 6" 3 S-202 #5 @ 9" OC. EW. 1' - 0" SEE PLAN ikon.5 NOTE: architects PROVIDE HOT DIPPED GALVANIZED FINISH 1 WOOD FENCE POST ELEVATION 2 3/4" = 1'-0" SECTION AT WOOD FENCE POST 3 1" = 1'-0" SECTION AT WOOD FENCE POST 864 Mapleton Road Princeton, NJ 08540 609.919.0099 fax 609.919.0088 1 1/2" = 1'-0" www.ikon5architects.com SEE NOTE 2 ON S-101 FOR ADDITIONAL NOTES EXISTING ROOF JOIST BEYOND EXISTING CEILING JOIST OVER EXISTING 2X6 WALL EXISTING CEILING JOIST EXISTING W18 BEAM WITH WOOD BLOCK BOTH SIDES EXISTING CEILING JOIST WITH A23 BOTH SIDES NEW DOUBLE 2X10 EXISTING ROOF RAFTER Professional License Number NEW SIMPSON STRONG TIE HGB5 SIMPSON STRONG TIE A23 BOTH SIDES AT EACH JOIST PROVIDE SHIM AT BOTTOM OF EXISTING JOIST TO ENSURE TIGHT FIT AS REQUIRED PROJECT TITLE: (4) 10d TYP. RAMAPO COLLEGE OF NEW JERSEY EXISTING CEILING JOIST EXISTING 2-2X6 NEW SIMPSON STRONG TIE HUS210-2 NEW LVL LINTEL EXISTING STEEL POST NEW18" DEEP THREE 1 3/4" 2.0E GP LAM LVL, SEE PLAN. CENTERED ON EXISTING BEARING PARTITION TO BE REMOVED. DOUBLE 2X6 AT CORNER. PROVIDE NEW 2X6 (FULLFITTED) AS REQUIRED FOR CONNECTION PADOVANO COLLEGE COMMONS NEW 2X4 @ 16" OC WITH SIMPSON STRONG TIE A23 BOTH SIDES TO LVL NEW CEILING JOIST SUPPORT BEAM. SEE PLAN RCNJ PROJECT No. 2016-26-01C NOTES: 1) SUPPORT ROOF RAFTERS WITH HYDRAULIC JACKS. SHEET TITLE: EXISTING RUBBLE WALL BEYOND SECTIONS AND DETAILS 2) SUPPORT EXISTING HEADER/CEILING JOISTS TEMPORARILY DURING INSTALLATION OF NEW LINTEL. 4 SECTION AT NEW CEILING JOIST SUPPORT 1 1/2" = 1'-0" 5 SECTION AT NEW CONNECTION 1 1/2" = 1'-0" 6 SECTION AT NEW LVL LINTEL 1 1/2" = 1'-0" DATE: February 11, 2016 DRAWN BY: NR DRAWING NO.: S-202 REMARKS LOCATION: BUILDING STORAGE 129 SERVICE: 208 / 120 MAINS: GROUNDING: 400 VOLTS, 3 AMPS MAIN OVERCURRENT PROTECTION: GROUND BUS: YES 'MDP' MLO ISOLATED GROUND BUS: NO MOUNTING: SURFACE CKT TRIP NO. AMPS PANEL DESIGNATION: PHASE, 4 WIRE 10 kAIC SCCR RATING: LOAD (kVA) 1 20/3 AHU-1 1.0 PER PHASE (kVA) B A C 2.0 3 X X 1.0 2.0 5 X X 1.0 7 30/2 EUH 1.7 9 X X 1.7 11 60/2 ECUH 5.0 13 X X 5.0 15 15/2 ACCU-2 / FCU-1 1.5 17 X X 1.5 19 30/3 EWH-1 2.6 21 X X 2.6 23 X X 2.6 25 20/1 BOILER 0.5 27 20/1 AIR COMPRESSOR 0.8 REMARKS DESCRIPTION OF LOAD 29 20/1 SPARE 0.0 31 20/1 SPARE 0.0 33 20/1 SPARE 0.0 35 20/1 SPARE 0.0 37 100/3 PANEL RLP 9.8 39 X X 9.4 41 X X TOTAL LTG. TOTAL MISC. TOTAL REC. TOTAL HVAC TOTAL HTG 0.0 24.0 28.7 52.6 7.8 2.0 3.0 3.0 12.1 12.1 8.6 2.0 3.1 3.1 3.6 1.5 1.8 0.5 0.0 0.0 0.0 17.8 17.4 17.5 9.5 kVA kVA kVA kVA kVA DEMAND FACTOR 1.00 0.0 0.80 19.2 Per NEC 19.4 1.00 52.6 1.00 7.8 kVA kVA kVA kVA kVA TOTAL BY PHASE 39.5 35.9 37.7 A B C LOCATION: (BUILDING STORAGE) SERVICE: MAINS: GROUNDING: 208 / 120 VOLTS 100 AMPS 3 PHASE, 4 WIRE MOUNTING: SURFACE SCCR RATING: 1.3 EDH-1 1.3 X 7.1 ACCU-1 7.1 X 7.1 X 0.5 P-1 0.5 X 0.5 X 1.0 EX AERATOR FOR POND 1.0 X X 26 1.0 X X 28 0.5 EX AERATOR FOR POND 20/1 30 0.0 SPARE 20/1 32 0.0 SPARE 20/1 34 0.0 SPARE 20/1 36 8.0 PANEL KP 8.0 X 8.0 X TOTAL DEMAND TOTAL LOAD 98.9 123.6 2 X 4 X 6 20/2 8 X 10 80/3 12 X 14 X 16 20/3 18 X 20 X 22 30/3 24 100/3 38 X 40 X 42 1.25 344 AMPS PANEL DESIGNATION: 'RLP' LOAD (kVA) 1.2 0.9 GENERAL RECEPTACLES 20/1 1.1 1.9 0.8 GENERAL RECEPTACLES 20/1 4 0.8 RESTROOM 20/1 6 0.5 TIMECLOCK / INVERTER 20/1 8 0.8 OFFICE OUTLETS 20/1 10 0.8 FLOOR BOXES 20/1 12 0.8 FLOOR BOXES 20/1 14 0.8 FLOOR BOXES 20/1 16 0.5 EF-1 20/1 18 0.5 EF-2 20/1 20 0.5 DDC PANEL 20/1 22 0.5 DATA RACK QUAD 20/1 24 1.0 DRINKING FOUNTAIN 20/1 26 0.8 PROJECTOR / SCREEN 20/1 28 0.5 EX. EXHAUST FAN 20/1 30 0.6 ATTIC LIGHTING 20/1 32 0.0 SPARE 20/1 34 0.0 SPARE 20/1 36 0.0 SPARE 20/1 38 0.0 SPARE 20/1 40 0.0 SPARE 20/1 42 COMMON AREA LEDS 3 20/1 COMMON AREA INCAND. 5 20/1 LTG-TOILET/OFFICES 1.1 7 20/1 DOOR PUSHBUTTON 0.5 9 20/1 FIRE ALARM PANEL 1.0 11 20/1 REMOTE CHILLER (RC) 0.4 13 30/1 HAND DRYER 1.5 15 30/1 HAND DRYER 1.5 17 30/1 HAND DRYER 1.5 19 20/1 EBB (QTY 2) 1.2 21 20/1 EBB (QTY 2) 1.2 23 20/1 EBB (QTY 2) 1.2 25 20/1 EXTERIOR LIGHTING 0.5 27 20/1 EXTERIOR LIGHTING 0.5 29 20/1 EBB (QTY 2) 1.2 31 20/1 EBB (QTY 1) 0.6 20/1 EXTERIOR RECEPTACLES 0.4 35 20/1 SPARE 0.0 37 20/1 SPARE 0.0 39 20/1 SPARE 0.0 41 20/1 SPARE 0.0 5.4 1.3 8.9 8.0 0.0 20/3 PER PHASE (kVA) B A C 2.1 20/1 DEMAND FACTOR 1.00 0.65 Per NEC 0.70 1.00 kVA kVA SPARE FACTOR X TRIP CKT AMPS NO. 10 kAIC LOAD (kVA) DESCRIPTION OF LOAD kVA kVA kVA kVA kVA 1.0 X ISOLATED GROUND BUS: NO 1 5.4 2.0 8.9 11.4 0.0 X MLO TRIP AMPS TOTAL LTG. TOTAL MISC. TOTAL REC. TOTAL AHVAC TOTAL HTG RF-1 1.0 REMARKS 250A MCB MAIN OVERCURRENT PROTECTION: CKT NO. 33 1.0 DESCRIPTION OF LOAD REMARKS GROUND BUS: YES REMARKS LOAD (kVA) kVA kVA kVA kVA kVA TOTAL BY PHASE 1.9 1.0 1.8 1.2 2.3 2.3 2.0 1.7 1.7 1.7 1.5 1.3 1.7 1.2 0.4 0.0 0.0 0.0 0.0 9.8 9.4 8.5 A B C DESCRIPTION OF LOAD TOTAL DEMAND TOTAL LOAD 27.6 34.6 kVA kVA REMARKS SPARE FACTOR X TRIP CKT AMPS NO. 2 1.25 96 AMPS