THE UNIVERSITY OF NORTH CAROLINA 2015-17 Capital Budget Priorities Six-Year Plan for Repairs and Renovations Projects Note: North Carolina School of Science and Mathematics shown below is an EXAMPLE to indicate the required level of information detail ONLY. Note: FCAP priority ratings listed below should be "escalated" as needed, based on elapsed time since previously reported. For example, a priority rating of "3" at the time of the report indicating needs to be addressed within 3 years, becomes a "0" (immediate priorty), 3 or more years later. Institution/R&R Category/Item Western Carolina University Roof repairs and replacements Roof Replacement - Hoey Building Roof Replacement - Facilities Management Building Roof Replacement - CAT Building (Regional Labor Force Dev) Roof Repair - Warehouse and Storage Roof Replacement (partial) - Reid Gym Structural repairs Exterior Wall Repair - Hunter Library, Walls and Elevated Walkways Dam Repair-Tuckaseegee River Water Plant Impoundment (Study) Concrete Floor Repair - Ramsey Activities Center Exterior Wall Repair - Forsyth Building Exterior Wall Repair - Killian Annex Building Exterior Wall Repair - McKee Building Bridge Replacement - Picnic Area and Ramsey & Athletic Center Creek Lot Exterior Wall Repair - Killian Building Exterior Wall Repair - Moore Building Exterior Repair and Replacement - H.F. Robinson Building Exterior Repair - Belk Entrance Bridge Exterior Repair - Stillwell Building Repairs and renovations to meet federal and state standards Repairs to electrical, plumbing and heating, ventilation, and air-conditioning systems Stage Rigging Repair - Hoey Auditorium HVAC Improvements - Natural Science Building Boiler Replacement - Jordan Phillips Fieldhouse Boiler Replacement - Camp Lab Building Boiler Replacement - Facilities Management Electrical Upgrades - Ramsey Regional Activiy Center Miscellaneous HVAC, Steam, and Electrical Repairs Institution Total and Category Sub-Total Item Cost FCAP Priority (0-immediate, 1-within 1 year) FCAP Deficiency Number(s) 0 0 0 0 0 00000012-0/08-G030 00000047-0/08-G083 00000137-0/08-G120 00000109-0/08-G117 00000014-0/08-G034 Description of Deficiencies 40,050,700 626,500 200,500 175,400 175,400 37,600 37,600 13,233,800 2,100,000 385,900 224,500 238,500 291,900 140,300 156,600 188,000 126,300 10,700,000 30,100 751,700 0 0 0 0 0 0 0 0 See Description See Description 00000106-0/08-G112 00000043-0/08-G069 00000039-0/08-G065 00000013-0/08-G032 51000000-0/04-G154 See Description 00000004-0/08-G016 See Description 00000044-0/08-G071 0000010-0/08-G027 Increasing concern to address brick joints and concrete & steel of elevated walkway Flood waters from recent hurricanes caused severe erosion & near breaching of right abutment. See Description 00000050-0/08-G088 See Description See Description 00000047-0/08-M042 00000106-0/08-E061 00000106-0/08-E062 See Description Recent issues with safety of rigging, lighting grid, etc. Not in 2008 FCAP Report but still needed Caulk joints at limestone panels, fascia and soffits have deteriorated. Exposed aggregate finish separating from precast wall panels. Wall panels need replaced. - 2,494,200 313,200 1,290,900 120,700 245,600 35,100 140,300 140,300 0 0 0 Page 1 of 4 Need to abandon UST fuel tanks and provide more efficient system. Need to abandon UST fuel tanks and provide more efficient system. To provide for deferred repair items (pumps, cooling towers, etc.). THE UNIVERSITY OF NORTH CAROLINA 2015-17 Capital Budget Priorities Six-Year Plan for Repairs and Renovations Projects Note: North Carolina School of Science and Mathematics shown below is an EXAMPLE to indicate the required level of information detail ONLY. Note: FCAP priority ratings listed below should be "escalated" as needed, based on elapsed time since previously reported. For example, a priority rating of "3" at the time of the report indicating needs to be addressed within 3 years, becomes a "0" (immediate priorty), 3 or more years later. Institution/R&R Category/Item Water Heater Replacement - Jordan-Phillips Fieldhouse Exhaust for Mechanical Room -- Old Student Union Building Glycol System Repair - CAT (Regional Labor Force Dev) Emergency Generator Replacement - Steam Plant Electrical Re-wiring -- Water Treatment Plant Electrical Panel Replacement - Reid Gym Electrical Panel Replacement - Ramsey Regional Activity Center Electrical Panel Replacement - Belk Building Institution Total and Category Sub-Total Improvements to meet the requirements of the Americans with Disabilities Act Continuation of Campus-wide Program Automatic Door Installation-Campus-wide Elevator - Old Student Union Building Elevator Replacement - Belk Building $1,826,600 Improvement to meet fire safety needs Fire Alarm System Panel Replacement -- Hunter and Coulter Fire Safety Renovations - Hunter Library Correct Fire Safety Deficiencies - Moore Building Sprinkler System Install - Belk Building Fire Alarm System - Grounds Maintenance Building 3,355,100 Egress Lighting - HF Robinson Building Egress Lighting - Regional Activity Center Exit Light Replacement -- Warehouse and Storage Building Improvements to existing facilities for energy efficiency Window Replacement - Reid Gymnasium Pool Improvements to remove asbestos, lead paint, and other contaminants, including the removal and replacement of underground storage tanks Continuation of Campus-wide Asbestos Abatement Program Improvements and renovations to improve use of existing space Item Cost 10,000 6,300 12,600 56,400 31,300 62,700 18,800 10,000 FCAP Priority (0-immediate, 1-within 1 year) 0 0 0 0 0 0 0 0 FCAP Deficiency Number(s) 00000049-0/08-M043 00000029-0/08-M029 00000137-0/08-M055 00000019-0/08-E023 00000030-0/08-E033 0000014-0/08-E015 00000106-0/08-E066 00000044-0/08-E038 Description of Deficiencies 563,800 140,300 420,900 701,600 0 See Description Provides funds to continually address ADA items in current ADA Transition Plan (2008) + FCAP. See Description To address ADA required corrective measure. See Description To address ADA required corrective measure. 00000044-0/08-G072 190,000 1,922,300 350,800 806,800 0 0 0 0 00000009-08-E007 00000009-0/08-M010 00000004-0/08-G013 00000044-0/08-M040 35,100 6,300 12,500 31,300 0 0 0 0 00000017-0/08-E018 00000017-0/08-E019 00000081-0/08-E048 00000106-0/08-E060 00000109-0/08-E067 406,900 0 $406,900 00000014-0/04G047 Not in 2008 FCAP Report 151,600 See Description 151,600 8,262,100 Page 2 of 4 Provide for abatement of ACM discovered during minor repairs and in-house projects. THE UNIVERSITY OF NORTH CAROLINA 2015-17 Capital Budget Priorities Six-Year Plan for Repairs and Renovations Projects Note: North Carolina School of Science and Mathematics shown below is an EXAMPLE to indicate the required level of information detail ONLY. Note: FCAP priority ratings listed below should be "escalated" as needed, based on elapsed time since previously reported. For example, a priority rating of "3" at the time of the report indicating needs to be addressed within 3 years, becomes a "0" (immediate priorty), 3 or more years later. Institution/R&R Category/Item Ground Floor Carpet Replacement - Hunter Library Flooring Replacement - Coulter Band Music Classroom Conversion of pool area to offices - Breese Gym Comprehensive Renovation - Graham Building Renovation - Chemical Storage Building Exterior Ticket Window - Ramsey Activity Center Back Porch Replacement - Bird Alumni House Miscellaneous Renovation - Window Replacement -- Old Student Union BuildingMinor Building Renovation Projects (reduced from 1,814,400) Various Historical restoration Improvements to roads, walks, drives, utilities infrastructure Sanitary Sewer System - Repair and Replacement Exterior Lighting Improvements Undersized Water Mains Replacement, Non-Functioning Valves and Upgrade Lines Upgrade Storm Drainage System - Campus-wide Electrical Distribution Lines Upgrade - Campus Wide Overhead Electric Distribution Replacement with Underground - University Outreach Center Building) Walk Repair and(Camp Replacement - Campus Wide Elevated Walkway - Buzzard Roost Road Steam Distribution System Replacement - Harrill and Albright-Benton Pavement Repair - Facilities Parking and Service Drive Pavement Repair - Chancellors Drive North Water Line installation for Dual Feed - Steam Plant Water Line to Greenhouse Replacement Pavement Repair - Picnic Shelter Drive Pavement Repiar - Joyner Drive Campus Wide Data Infrastructure Upgrade Drainage and landscape improvements Site Improvement and Irrigation System - Killian Quad Site Improvement and Irrigation System - Belk South Entry Landscape and Drainage Improvements-Miscellaneous Institution Total and Category Sub-Total Item Cost 414,600 250,600 1,503,400 3,928,800 140,300 140,300 77,200 62,700 1,744,200 FCAP Priority (0-immediate, 1-within 1 year) 0 0 0 FCAP Deficiency Number(s) See Description See Description See Description 00000020-0/08-G045 See Description See Description 00000032-0/08-G058 00000029-0/08-G056 See Description Description of Deficiencies Scheduled carpet replacement. Carpet flooring in need of replacing w/ hard surface for acoustic need -- band practice function Existing swimming pool equipment bad condition, therefore use space for offices - more important need. Major renovations needed in order to occupy building. Asbestos abatement already performed. To modify structure for general use and occupancy. To improve and increase speed of service for customers. To address minor building renovations as needs arise. 9,308,100 694,700 245,600 2,525,600 526,200 563,800 127,500 250,600 140,300 3,100,000 140,300 101,000 35,100 112,300 56,100 313,200 375,800 0 0 0 0 0 0 0 0 0 0 0 31000000-0/08-M056 31000000-0/08-M057 23000000-0/08-E074 32000000-0/08-M058 33000000-0/08-M060 44000000-0/08-E075 44000000-0/00-E048& 24000000-0/08-G126 00000086-0/08-G097 See Description 41000000-0/08-M061 22000000-0/08-G125 22000000-0/08-G125 See Description See Description 22000000-0/08-G125 See Description Not in 2008 FCAP Report To provide safe pedestrian access. To provide redundanct feed to Steam Plant. To replace deteriorated existing line. Pavement failing - improve storm drainage system 385,800 See Description See Description See Description 140,300 105,200 140,300 Page 3 of 4 Provides landscaping and irrigation for recently renovated building or area. Provides landscaping and irrigation for recently renovated building or area. Provides landscaping and irrigation for recently renovated building or area. THE UNIVERSITY OF NORTH CAROLINA 2015-17 Capital Budget Priorities Six-Year Plan for Repairs and Renovations Projects Note: North Carolina School of Science and Mathematics shown below is an EXAMPLE to indicate the required level of information detail ONLY. Note: FCAP priority ratings listed below should be "escalated" as needed, based on elapsed time since previously reported. For example, a priority rating of "3" at the time of the report indicating needs to be addressed within 3 years, becomes a "0" (immediate priorty), 3 or more years later. Institution/R&R Category/Item Highlands Biological Station Repairs to electrical, plumbing and heating, ventilation, and air-conditioning systems Complete Mechanical Renovation-Biodiversity Lab Emergency Generator Install-Coker Building Institution Total and Category Sub-Total FCAP Deficiency Number(s) 145,000 90,000 0 0 0000009-0/05-M006 0000001-0/03-E001 31,400 0 71000000-0/05-G018 81,200 11,600 0 0 00000010-0/05-G016 00000008-0/05-G013 0 0 0 0000002-0/05-G005 0000002-0/05-E005 0000002-0/05-M002 0000002-0/05-G004 00000010-0/05-G017 00000008-0/05-G013 Item Cost 1,061,200 235,000 Improvements to meet the requirements of the Americans with Disabilities Act ADA Study $31,400 Improvements to existing facilities for energy efficiency Window Replacement-Howell Administration Building Interior Architectural Renovations-Maintenance & Aquatics Lab $92,800 Improvements and renovations to improve use of existing space Renovation-Weyman Dining Hall (exterior repair, MEP and interior renovation) 702,000 Miscellaneous Renovation-Valentine Residence Interior Architectural Renovations-Maintenance & Aquatics Lab FCAP Priority (0-immediate, 1-within 1 year) 325,000 116,000 261,000 Page 4 of 4 Description of Deficiencies