m Los ANGELES COMMUNITY COLLEGE DISTRICT CITY• EAST• HARBOR• MISSION • PIERCE• SOUTHWEST• TRADE-TECHNICAL• VALLEY• WEST MEMO Date: May 19, 2014 To: Facilities Master Planning and Oversight Committee: Steve Veres, chair; Scott Svonkin, vice chair; Ernie Moreno, member •. From: James O'Reilly ~ 5,_...,..~,~ {) Chief Facilities Executive "1"~ RE: \ ·~-e· \\~ May 28, 2014 Facilities Master Planning and Oversight Committee Please find attached background materials for the Facilities Master Planning and Oversight meeting to be held on May 28, 2014. The included documents are in support of a presentation from Pierce College on its draft facilities master plan and a presentation on the LACCD food program (materials for which were provided to you under cover of a separate memo). I will be joined by staff at the meeting to discuss the item on the agenda. Please feel free to call me at (213) 891-2048 if you have any questions. C: Dr. Adriana Barrera, interim chancellor Dr. Kathleen Burke, president, Pierce College Thomas Hall, director, facilities planning and development Terri Mestas, director, LACCD bond program management office Ed Cadena, CPM director, Pierce College 770 WILSHIRE BLVD., LOS ANGELES, CALIFORNIA 90017-3896 * (213) 891-2000 Pierce College 2014 Draft D ft Facilities F iliti Master M t Plan Pl Update U d t May 28 2014 Facilities Master Planning and Oversight Committee [year] Facilities Master Plan Update 1 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Purpose of Facilities Master Plan Update • Maintain alignment with College Strategic Master Plan & Educational Master Plan. • Op Optimize e bu building d gu utilization a o ratios a os a and d maximize a e sstudent ude engagement. • Balance planning with funding availability: - Reduce scope of Auto Tech Education project. - Reduce scope of Horticultural project. g Arts & Media and integrate g - Reduce scope of Digital more shared, general-use classrooms. - Absorb Green Tech programs into existing p y classroom capacity. • Extend Estimated Completion Date of All Projects o 2015 0 5 to o 2019 0 9 from [year] Facilities Master Plan Update 2 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Reference Documents • 2011 Educational Master Plan (2012-2017) – Developed and implemented by the College – Acted as guiding document for the development of: • Facility Strategic Plan • Technology Plan • Plan for Enrollment Management – Approved by College: April 2012 [year] Facilities Master Plan Update 3 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Reference Documents • 2010 Long Range Facilities Master Plan (updated from 2002) – Reasons to Update Long-Range Facilities Master Plan • BOT rule l 2605.1 260 1 / Ad Admin i Reg R B-24 B 24 / Ed C Code d 70902 0902 • Update in response to Measure J opportunities – Developed with Sasaki S Associates, Inc. and implemented by the College – Date Completed: 2010 – Approved by Board of Trustees: 2010 – CEQA Approval: August 25, 2010 – Planning up to 2015 [year] Facilities Master Plan Update 4 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Approved 2010 Facilities Master Plan Update Legend & Status ) 0) [year] Facilities Master Plan Update 5 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Educational Master Plan Growth Factors 2010 MASTER R PLAN UPDATE 2002 MASTER R PLAN LONG TERM ENROLLMENT GROWTH Data Sources: (CEN_RDB): WSCH_STUDENT, Enrollment Projections calculated by the Office of Institutional Effectiveness Data Retrieved: Annually following Census Date Report compiled: Kate Astor Astor, Research Analyst; AstorKH@piercecollege.edu, AstorKH@piercecollege edu x4493 [year] Facilities Master Plan Update 6 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Educational Master Plan Growth Factors PERFORMANCE AND COMPETITIVENESS EFFICIENCY COLLEGE BASELINE DISTRICT BASELINE 42 40 $3946 $4149 AVG CLASS SIZE IN CREDIT CLASS COST FTES (ANNUAL) 3 YEAR CHANGE TEACHING / LEARNING FOR SUCCESS COLLEGE BASELINE DISTRICT BASELINE COLLEGE DISTRICT % NEW STUDENT COHORT COMPLETING 30 UNITS / 3 YEARS 68% 61% 2% 3% % NEW STUDENT COHORT COMPLETING 60 UNITS / 3 YEARS 34% 28% 4% -2% 3 YEAR CHANGE ACCESS / PREPARATION FOR SUCCESS COLLEGE BASELINE DISTRICT BASELINE COLLEGE DISTRICT PERSISTENCE: FALL TO SPRING 90% 87% 4% 2% PERSISTENCE: FALL TO FALL 79% 75% 4% 4% [year] Facilities Master Plan Update 7 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Educational Master Plan Growth Factors SURROUNDING HIGH SCHOOLS SUCCESS RATE High Schools Principal Contributing High Schools 2011-12 Graduates % Meeting CSU/UC Reqmts 5944* 2011-12 CA HS Lang Arts Exam Pass Rate 2011-12 HS Math Exam Pass Rate 44% * 5247** 86% ** 89% ** LAUSD 37,532 37% 76% 77% LA Total 104,785 40% 81% 82% CA 418 598 418,598 38% 83% 84% *Includes El Camino Real **Does not include El Camino Real (partial data set) [year] Facilities Master Plan Update 8 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Geographic Areas Served by the Campus COLLEGE OF THE CANYONS MOORPARK COLLEGE L.A. MISSION COLLEGE L.A. VALLEY COLLEGE PIERCE COLLEGE SANTA MONICA COLLEGE Pierce College Educational MP 2008-2012 California Dept. of Education and US Dept. of Education – Pierce College addresses Basic Skills, General Education, CTE, Stem, Transfer, and Noncredit needs of the San Fernando Valley, serving: Business Health Services Child Development Automotive Technology Agriculture Arts/Media Arts Computer Science/IT Veterinary Care/ Animal Science Performing Arts [year] Facilities Master Plan Update Sciences 9 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Priorities & Changes Aligns with budget recovery plan Project Name Total Budget Scope 1 Horticulture $7.8 million Renovation Scope 2 Campus Wide Infrastructure $5 5 million $5.5 Infrastructural Support 3 Central Plant West Expansion $6.3 million Infrastructural Support 4 Auto Tech Expansion $34.3 million Lecture, Lab, Office and Infrastructure,, Roadways y 5 Various Space Improvements $2.2 million Utilization Enhancements 6 South of Mall Classrooms $11.5 million Lecture, Lab, Office 7 Digital & Media Arts $37 9 million $37.9 Lecture, Lab Lecture Lab, Office Office, Parking lots 5, 6 East 8 Campus Landscaping $5.9 million Infrastructural Support 9 Agricultural Education Center $4.8 million Pending Visioning 10 Village Road and Pierce Lane $2.8 million Infrastructural Support Total $119 million Red indicates changes to Approved 2010 Facilities Master[year] Plan Update Facilities Master Plan Update 10 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Priorities & Changes Aligns with budget recovery plan SF IN 2010 MASTER PLAN UPDATE SF IN 2014 FACILITIES MASTER PLAN UPDATE GREEN TECHNOLOGY 70,000 0 EXPANDED AUTO 20,000 20,000 DIGITAL ARTS AND MEDIA ARTS 70,000 26,000 HORTICULTURE 15,451 2,000 PROJECT [year] Facilities Master Plan Update 11 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here CEQA Conclusions Summary Plan development p reduced by y 127,000 , square q feet,, therefore no increase in student capacity from previous Facilities Master Plan. Historical Resources Quonset Hut has been determined not to be an historical resource. Traffic Mitigation g Traffic mitigation at Victory / Winnetka is not necessary. [year] Facilities Master Plan Update 12 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Horticulture [year] Facilities Master Plan Update 13 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Horticulture Detail HORTICULTURE $7.8 Million Demolish Existing Greenhouse & Utility Buildings Demolish Greenhouse & Sheds Clean site R Renovate t H Horticulture ti lt B Building ildi New Greenhouse Existing Maintenance & Operations Complex Construct new Greenhouse Renovate Horticulture Building Existing Demolition Renovation New [year] Construction Facilities Master Plan Update 14 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Central Plant Expansion [year] Facilities Master Plan Update 15 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Central Plant Expansion Detail CENTRAL PLANT EXPANSION $6.3 Million Central Plant Expansion Existing Central Plant Expansion of Central Plant to service new Measure ‘J’ facilities. Existing PE Building Existing North of Mall Complex Existing Demolition Renovation New Construction [year] Facilities Master Plan Update 16 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Auto Technology Education [year] Facilities Master Plan Update 17 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Auto Technology Education Existing Center for Sciences New Auto Tech Addition AUTO TECH EDU PROJECT 33,000 SF Renovated 19,400 SF New $34.3 Million Demolish Utility Buildings Minor Renovation Existing Auto Tech Complex Construct New Auto Tech Roadway Re-routing Auto Tech Renovation Existing Existing Weld/Machine Shop Demolition Renovation New Construction [year] Facilities Master Plan Update 18 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Digital & Media Arts [year] Facilities Master Plan Update 19 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Digital & Media Arts Art Gallery Fine Arts DIGITAL ARTS & MEDIA BLDG 28,000 SF New Music $37.9 Million Demolish Existing Library New ADA North/South Campus Access Parking Lot 6 East New Digital Arts & Media Building Demolish Existing / Vacated Library Parking New Media Arts Facility New ADA Access Linking Campus North/South Improve Parking 4 & 6 East Lot 4 Performing Arts Stadium Parking Lot 5 Existing Demolition New Construction Site Facilities Work Master Plan Update [year] 20 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Existing Built Conditions [year] Facilities Master Plan Update 21 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here 2014 Facilities Master Plan Update / Changes Green Tech Building Deleted from Plan (Programs Re-Distributed) [year] Facilities Master Plan Update 22 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here Campus Space Utilization-Cap Load Ratio 2019 FACILITIES MASTER PLAN UPDATE Laboratory Lecture Faculty & Administration Offices Reference: Fusion data as of January 2014 [year] Facilities Master Plan Update 23 Building for tomorrow’s leaders 11/08/13 – R8 Place Campus logo here