INTER-OFFICE CORRESPONDENCE LOS ANGELES COMMUNITY COLLEGES OFFICE OF THE CHANCELLOR TO: Members of the Board of Trustees FROM: Adriana D. Barrera, Interim Chancellor DATE: March 19, 2014 SUBJECT: BOARD LETTER FOR MARCH 26, 2014 MEETING Board Meeting Location Next week’s Board meeting will be held at the Educational Services Center. The meeting times and locations are as follows: Meetings Institutional Effectiveness & Student Success Committee Time 1:00 p.m. – 2:00 p.m. Location Board Room Break 2:00 p.m. – 2:15 p.m. Facilities Master Planning & Oversight Committee 2:15 p.m. – 3:15 p.m. Break 3:15 p.m. – 3:30 p.m. Convene Public Session 3:30 p.m. Board Room Recess to Closed Session Immediately Following Public Session Hearing Room Board Room The agenda includes an informative item on the change of location for the Board meeting to be held on April 23, 2014. The meeting had been scheduled to be held at Los Angeles Mission College. However, President Perez has informed me that the Campus Center is being renovated and not available for meetings. Institutional Effectiveness & Student Success Committee Meeting (Veres Chair, Field Vice Chair, Svonkin Member) The committee will meet from 1:00 p.m. to 2:00 p.m. in the Board Room. For the committee’s agenda refer to Attachment A. Facilities Master Planning & Oversight Committee Meeting (Veres Chair, Svonkin Vice Chair, Moreno Member) The committee will meet from 2:15 p.m. to 3:15 p.m. in the Board Room. For the committee’s agenda refer to Attachment B. Confidential Matters The attached correspondence is confidential and should not be shared with other persons. Office of General Counsel o Enclosed for your review is the District-related Litigation Report. (Refer to Attachment C) o Enclosed for your review is the Bond-related Litigation Report. (Refer to Attachment D) Board Letter – March 26, 2014 Page 2 of 2 Other Matters Chancellor’s Office o Enclosed for your review is the proposed calendar for Board of Trustees meeting to be held during the next fiscal year. (Refer to Attachment E) Facilities Planning and Development o Enclosed for your review is information regarding LACCD Bond Program Professional Services (Bench) Re-procurement Informational Paper, which will be the subject of a presentation before the Committee of the Whole. (Refer to Attachment F) o Enclosed for your review is information regarding the Firestone Education Center (FEC) Draft Subsequent Environmental Impact Report. (Refer to Attachment G) Due to its size, this document will be sent via U.S. mail. Please let me know should you have any questions regarding the meeting. ATTACHMENT “A” LOS ANGELES COMMUNITY COLLEGE DISTRICT BOARD OF TRUSTEES INSTITUTIONAL EFFECTIVENESS & STUDENT SUCCESS COMMITTEE Educational Services Center Board Room – First Floor 770 Wilshire Boulevard Los Angeles, CA 90017 Wednesday, March 26, 2014 1:00 p.m. – 2:00 p.m. Committee Members Steve Veres, Chair Mona Field, Vice Chair Scott J. Svonkin, Member Bobbi Kimble, Staff Liaison Felicito Cajayon, Staff Liaison Renee D. Martinez, College President Liaison Agenda (Items may be taken out of order) I. ROLL CALL II. PUBLIC SPEAKERS* III. REPORTS/RECOMMENDATIONS A. Report on Certificate Programs B. Accrediting Commission for Community and Junior Colleges (ACCJC) March 7, 2014 Training Debriefing IV. FUTURE INSTITUTIONAL EFFECTIVENESS & STUDENT SUCCESS COMMITTEE MEETING DATES V. NEW BUSINESS VI. SUMMARY – NEXT MEETING..........................................................................................................Steve Veres VII. ADJOURNMENT *Members of the public are allotted five minutes time to address the agenda issues. If requested, the agenda shall be made available in appropriate alternate formats to persons with a disability, as required by Section 202 of the American with Disabilities Act of 1990 (42 U.S.C. Section 12132), and the rules and regulations adopted in implementation thereof. The agenda shall include information regarding how, for whom, and when a request for disability-related modification or accommodation, including auxiliary aids or services may be made by a person with a disability who requires a modification or accommodation in order to participate in the public meeting. To make such a request, please contact the Executive Secretary to the Board of Trustees at 213/891-2044 no later than 12 p.m. (noon) on the Friday prior to the Committee meeting. Executive Summary LACCD Certificate Awards: 2010-11 to 2012-13 At the request of the Institutional Effectiveness Committee, District staff researched the number of certificates awarded by each college. The results span a three-year period, from 2010-11 through 201213, and cover more than 300 award areas. Details of each college’s awards are attached to this summary. The information presented in this report was verified by the individual colleges. Colleges were also asked for background information on programs identified as having low awards. Based on college responses, low award rates were attributed to a variety of factors which generally fell into six (6) categories: Staffing, Student Demand, Class Scheduling, Curriculum, Student Information, and Budget Reductions. These are summarized in the table below, which also describes actions colleges have taken – or plan to take – to address low awards. As a result of program review, viability studies or other internal review processes, many colleges were already in the process of addressing low award producing programs. It is recommended that colleges continue to implement planned actions, collaborate through existing committee structures to develop District-wide solutions (where appropriate), and report the status of college certificate programs and actions in the next college effectiveness cycle. Low Certificate Award Rates: Summary of Explanations and Actions Reason for Low Award Rate Lack of full-time faculty Staffing Staffing by adjunct faculty only Student Demand Low demand program Student can transfer without obtaining certificate AA-T degree has reduced demand for certificate Students are able to take state licensing exam without obtaining the certificate Employability can be attained by course completion; certificate not required Page 1 of 2 Action Taken or Planned Faculty hired Continue program (part-time program scheduled for 3-4 year completion) Restructure or eliminate program Restructure or eliminate program Restructure or eliminate program Restructure or eliminate program Restructure or eliminate program Reason for Low Award Rate Students not aware of certificate requirements Student Information Students lack awareness of and/or information about applying for certificate Students not aware that they can simultaneously complete certificate and degree requirements Class Scheduling Required classes not scheduled to support program completion New program or pathway Curriculum Budget Reductions and/or Reduced Course Offerings Action Taken or Planned Focused student advisement Track progress toward completion Student-directed marketing efforts (brochure, website) Faculty effort to encourage students to apply for certificate Student directed marketing and outreach efforts (brochure, website) Research course offerings and student enrollments Enrollment management/planning in progress to support completions Raise awareness; allow time for students to complete new programs Program is too similar to another program Consolidate certificate options Program requires too many courses/units Reduce unit and/or course requirements (based on Advisory Committee recommendations) Limited courses offered due to budget restrictions or departmental priorities Restore courses to class schedule as appropriate Page 2 of 2 Certificate Program Awards by College and Program College City East Program Title Administration of Justice Administrative Medical Office Assistant Electronic Systems Electronics: Basic Marketing Programming Languages Retail Management Automated Accounting Commercial Photography Computer Applications Specialist Finance and Banking Legal Office Assistant Management Real Estate: Marketing Administrative Office Assistant Business Administration Cinema / Video Production Real Estate: Finance Real Estate: Investment Photojournalism Photography Management: Small Business Accounting Technician Orchestrator/Arranger Television Production Music Copyist Instrumental Performer Child Development Master Teacher Human Services : Generalist Child Development Site Supervisor Dental Technology Dietetic Service Supervisor Human Services: Drug/Alcohol Child Development Teacher Cinema Production Associate Teacher IGETC CSU General Education Breadth Total by College: City Biological Applications of Electron Microscopy Business Management Color Printing and Processing Computer Science Information Technology--Programming Desktop Publishing Histotechnologist International Trade Internet Specialist Microcomputer Programming Specialist Photography & Digital Imaging Architectural Drafting Supervisor - 3 (Child Development Supervisor) CSI Technology--Microcomputers Office Systems Specialist Stage Management Architectural Computer-Aided Design Architectural Drawing Large Format Photography Arts Graphic Communication Page 1 of 6 Prepared by: LACCD Institutional Effectiveness Date Printed: 3/19/2014 Year Year Year Total: 2010-11 2010-11 2011-12 2012-13 to 2012-13 0 0 1 1 0 0 1 1 1 0 0 1 1 0 0 1 0 0 1 1 0 1 0 1 1 0 0 1 2 0 0 2 2 0 0 2 2 0 1 3 0 0 3 3 1 1 1 3 3 0 0 3 0 0 3 3 3 0 2 5 2 0 3 5 1 3 1 5 2 0 3 5 2 0 3 5 3 1 2 6 2 0 6 8 3 0 6 9 1 5 3 9 0 2 9 11 5 4 4 13 8 12 0 20 6 0 15 21 14 7 0 21 6 5 18 29 11 12 10 33 14 16 6 36 18 21 0 39 8 17 48 73 28 20 39 87 49 48 77 174 93 42 43 178 138 58 55 251 430 275 364 1,069 1 0 0 1 0 2 0 2 0 2 0 2 1 1 0 2 1 0 1 2 1 1 0 2 0 2 0 2 0 2 0 2 1 0 1 2 0 2 0 2 1 1 1 3 1 1 2 4 0 1 4 5 4 1 0 5 3 2 0 5 1 2 3 6 0 2 4 6 1 5 0 6 2 1 4 7 Certificate Program Awards by College and Program College Harbor Program Title Real Estate Broker Executive Assistant Health Information Clerk Typist Accounting Journalism Legal Secretary Studio Lighting and Techniques Word Information Processor Transcriber Architectural Design Digital Imaging Administrative Assistant Medical Billing Assistant Computer-Aided Drafting (CAD) Health Information Coding & Statistics Clerk Health Information Technology Automotive Technology Clerical Assistant Teacher II (Child Development Teacher) Administration of Justice: Sociological Respiratory Therapy Basic Police Academy Preparation Customer Service Representative Cooling System and Climate Control Specialist Drivetrain Specialist Licensed Vocational Nurse to Registered Nurse Chemical Dependency Counselor Engine Performance and Drivability Fire Technology/State Fire Marshall Core Classes Health Information Coding Specialist Forensic Crime Scene Investigation Chemical Dependency Specialist in Criminal Justice Office Assistant Administration of Justice Infant: Toddler Administration of Justice: Law IGETC CSU General Education Breadth Total by College: East Architectural Technology Electronic Music Fire Technology Legal Office Assistant Microcomputer Applications Music Arranging Music: Private Teaching Music: Recording Arts Drafting Medical Office Assistant Office Automation Accounting Clerk Office Administration Administration of Justice Business Administration Child Development Process Plant Technology Culinary Arts Page 2 of 6 Prepared by: LACCD Institutional Effectiveness Date Printed: 3/19/2014 Year Year Year Total: 2010-11 2010-11 2011-12 2012-13 to 2012-13 1 4 2 7 3 3 2 8 4 0 4 8 2 5 2 9 2 4 3 9 4 2 3 9 0 6 3 9 5 4 1 10 5 6 1 12 3 3 7 13 4 7 2 13 3 9 3 15 9 6 4 19 1 9 10 20 10 3 8 21 12 2 8 22 8 9 8 25 7 13 5 25 13 8 14 35 11 9 16 36 20 3 18 41 10 5 27 42 15 12 17 44 12 18 16 46 21 12 13 46 14 33 0 47 18 9 23 50 15 14 21 50 15 15 21 51 26 9 31 66 22 16 31 69 20 17 34 71 24 20 27 71 16 16 50 82 35 30 38 103 34 24 53 111 98 159 222 479 337 316 300 953 877 868 1,068 2,813 1 0 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 0 1 1 0 0 1 1 0 0 1 1 0 1 1 2 1 2 0 3 1 2 1 4 4 0 2 6 1 4 1 6 3 2 2 7 1 4 2 7 19 8 7 34 23 35 3 61 24 30 29 83 Certificate Program Awards by College and Program College Mission Pierce Program Title Total by College: Habor Advanced Skills in Video Production Multimedia: Design for Animation & Interactive Multimedia* Retail Management (WAFC) Teacher's Assistant Teacher's Assistant: Bilingual/Bicultural Child Development Certificate Specializing in School Age Child Care Microcomputer Applications Management Microcomputer Programming Child Development Certificate: Specializing in Infant & Toddler Office Assistant Child Development Certificate Specializing in Bilingual/Bicultural Preschool Culinary Arts Child Development Certificate Specializing in Preschool IGETC Legal Assisting (Paralegal) CSU General Education Total by College: Mission Floral Design and Management Horse Science Architectural Technology Administrative Professional Advanced Computer Applications Basic Internet General Administrative Web Site Construction and Maintenance Automotive Performance Applications Graphic Design for the Web Retail Management (WAFC) Desktop Publishing Legal Office Procedures Legal Office Skills Programming for Business Landscape Technician: Advanced Marketing Basic Computer Applications Technical Theatre Landscape Technician: Basic Website Development International Business Office Communications Networking Technology Gardening: Advanced Basic Word Processing: Microsoft Word for Windows Office Clerical Addiction Studies Basic Computerized Accounting Preschool Teacher Web Development, Programming and Scripting Electronics: Communications Electronics: Digital Electronics: Analog Personal Computer Service Technology Associate Teacher Tax Preparation School Age Child Care Teacher Page 3 of 6 Prepared by: LACCD Institutional Effectiveness Date Printed: 3/19/2014 Year Year Year Total: 2010-11 2010-11 2011-12 2012-13 to 2012-13 78 92 51 221 0 0 1 1 0 0 1 1 1 0 0 1 0 1 0 1 0 0 1 1 1 1 0 2 1 1 2 4 1 2 1 4 2 1 3 6 5 1 3 9 4 6 19 12 12 69 133 1 0 0 0 0 0 0 0 0 2 1 0 0 1 1 1 2 2 2 2 1 1 2 2 5 5 2 1 6 2 6 4 5 9 2 4 8 5 4 8 11 26 7 152 215 0 1 0 0 0 0 0 0 1 0 1 0 1 0 0 1 2 0 1 3 3 2 0 1 5 3 5 8 3 8 5 11 11 7 7 10 13 10 4 10 26 26 61 198 337 0 0 1 1 1 1 1 1 0 0 0 2 1 1 1 1 0 2 1 0 1 3 4 3 1 6 7 7 9 8 8 4 3 4 12 10 8 17 12 24 56 64 80 419 685 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 3 4 4 4 5 5 6 6 6 11 14 14 16 18 18 19 19 19 20 21 24 29 32 Certificate Program Awards by College and Program College Southwest Trade-Tech Program Title Automotive Service Technology Automotive Emission Specialist Preschool Director Infant Care Teacher Automotive Light Service Technician Automotive Powertrain Specialist CSU-General Education Preschool - Certificate A IGETC - General Education Total by College Pierce CSU General Education IGETC Management/Supervision Real Estate Broker Business Administration: Accounting/General Business Administration of Justice Chemical Dependency Counselor Program Total by College: Southwest ENERGY SYSTEMS TECHNOLOGY FUNDAMENTALS Marketing and Public Relations Mortgage Finance Solar PV Installation and Maintenance Technician Solid Waste Management Technology Supply Water Systems Technology Welding, Gas and Electric: Construction Technologies School Age Program Teacher Small Business Entrepreneurship Community Planning & Economic Development PARALEGAL STUDIES Real Estate Fashion Merchandising Fashion Technology Architectural Technology Management/Supervision Tailoring Comp App & Office Tech: Information Processing Specialist Plumbing: Construction Tech Process Technology Site Supervisor Teacher Comp App & Office Tech: Office Assistant-Clerical Teacher with Special Needs Infant/Toddler Teacher Computer Information Systems Skin Therapy Microcomputer Technician Accounting Clerk Motorcycle Repair Mechanics-Adjunct Medical Office Assistant Chemical Technology Sign Graphics Computer App & Office Tech: Administrative Asst Preschool Teacher Street Maintenance Technology Visual Communications Hybrid & Electric Plug-In Vehicle Technology Auto & Related Technology: Tune-Up Page 4 of 6 Prepared by: LACCD Institutional Effectiveness Date Printed: 3/19/2014 Year Year Year Total: 2010-11 2010-11 2011-12 2012-13 to 2012-13 3 10 20 33 8 20 22 50 9 24 26 59 14 34 31 79 10 33 40 83 8 33 47 88 35 43 48 126 64 88 84 236 132 141 147 420 368 549 595 1,512 0 0 1 1 0 0 1 1 0 1 0 1 1 0 0 1 0 2 1 3 6 9 1 16 16 18 18 52 23 30 22 75 0 0 1 1 0 0 1 1 1 0 0 1 0 0 1 1 0 0 1 1 0 1 0 1 0 0 1 1 0 0 2 2 0 1 1 2 2 0 1 3 0 0 3 3 1 1 1 3 4 0 0 4 0 4 0 4 1 0 4 5 1 2 2 5 0 2 3 5 0 4 3 7 3 0 4 7 2 1 4 7 0 0 8 8 3 2 3 8 0 3 6 9 0 0 9 9 0 0 12 12 5 5 5 15 0 0 16 16 4 8 6 18 9 6 4 19 3 4 13 20 12 7 9 28 12 5 13 30 4 12 15 31 8 12 16 36 11 15 11 37 7 16 14 37 15 6 17 38 21 8 10 39 0 0 41 41 Certificate Program Awards by College and Program College Valley Program Title Electronics Communications Machine Shop: CNC Automotive Collision Repair Diesel and Related Technology-Adjunct Welding, Gas and Electric Carpentry Labor Studies Electrical Construction & Maintenance: Construction Tech Powerline Mechanic Automotive and Related Technology Plumbing Preschool Associate Teacher Diesel and Related Technology Operation & Maintenance Engineering: Steam Plant Baking Professional Fashion Design Refrigeration & Air Conditioning Mechanics Cosmetology Electrical Construction and Maintenance Culinary Arts Total by College: Trade-Tech Broadcasting: Television Commercial Music: Instrumental/Vocal Performer Escrow Journalism: Magazine Journalism: Photojournalism Mechanical Drafting/Design Mechanical Engineering Technology Media Arts: Directing Media Arts: Post-Production Property Management Credit Administration Homeland Security Journalism: Newspaper CAOT: Computer Applications Specialist Media Arts: Producing Respiratory Therapy Sustainable Construction Management Theater Production CAOT: General Office Assistant CAOT: Administrative Assistant Commercial Music: Music Arranging Manufacturing Technology: Metal Machining Media Arts: Screenwriting Computer Science Programming Finance Fire Technology Manufacturing Technology: Numerical Control Electronics Technician Graphic Design Architecture Real Estate Business Management Child Development: Teacher Commercial Music: Music Technology Electronics: Biomedical Instrumentation Electronics Technology Page 5 of 6 Prepared by: LACCD Institutional Effectiveness Date Printed: 3/19/2014 Year Year Year Total: 2010-11 2010-11 2011-12 2012-13 to 2012-13 7 18 17 42 13 12 18 43 22 5 19 46 32 10 5 47 18 19 12 49 6 21 26 53 9 10 35 54 19 17 20 56 0 0 61 61 13 16 37 66 23 27 33 83 0 0 83 83 21 34 31 86 26 21 43 90 22 30 50 102 45 37 49 131 23 64 77 164 81 58 77 216 66 65 89 220 89 75 90 254 664 664 1,133 2,461 0 1 0 1 1 0 0 1 0 0 1 1 0 0 1 1 0 0 1 1 1 0 0 1 0 0 1 1 1 0 0 1 0 1 0 1 0 1 0 1 0 0 2 2 0 1 1 2 0 1 1 2 1 0 2 3 0 3 0 3 0 2 1 3 0 2 1 3 1 0 2 3 0 1 3 4 1 0 5 6 1 1 4 6 1 3 2 6 0 5 1 6 2 2 3 7 0 2 5 7 1 5 1 7 2 3 2 7 0 5 3 8 4 1 4 9 4 5 2 11 0 6 5 11 4 4 4 12 5 5 3 13 6 4 4 14 3 9 9 21 2 8 12 22 Certificate Program Awards by College and Program College West Program Title Administration of Justice Accounting Child Development: Director, Preschool (B) Child Development: Infant/Toddler Care Teacher (D) Child Development: School Age Programs Teacher Day Care (C) Child Development: Associate Teacher, Preschool ( A) IGETC CSU General Education Breadth Total by College: Valley Hospitality: Event & Convention Planning Management: Small Business Hospitality Hospitality: Hotel Sales & Marketing Computer Web Support & Database Administration Hospitality: Hotel Front Desk & Back Office Operations Business Travel: Advanced Accounting Computer Science Information Technology Fire Technology Business Application & Database Management Computer Network & Security Mgmt. Alcohol & Drug Studies Real Estate Child Development Web Support & Administration Computer Network Management Medical Assisting - Administrative Medical Assisting - Administrative and Clinical Medical Assisting - Clinical Legal Secretary Network & Information System Security Pharmacy Technician: Basic Aircraft Power Plant Technician Airframe Maintenance Technician Paralegal Film/TV Production Crafts Total by College: West Page 6 of 6 Prepared by: LACCD Institutional Effectiveness Date Printed: 3/19/2014 Year Year Year Total: 2010-11 2010-11 2011-12 2012-13 to 2012-13 9 14 9 32 10 23 14 47 17 23 33 73 31 45 12 88 37 44 19 100 139 151 68 358 122 157 153 432 147 348 336 831 553 886 730 2,169 0 1 0 1 0 1 0 1 0 2 0 2 0 2 0 2 1 0 2 3 0 2 1 3 1 3 0 4 2 1 1 4 3 0 3 6 1 1 4 6 1 2 3 6 4 3 1 8 5 7 5 17 5 4 11 20 8 6 7 21 5 3 14 22 4 4 15 23 5 3 16 24 0 0 26 26 0 0 26 26 0 0 26 26 12 4 12 28 6 8 21 35 42 0 1 43 21 23 25 69 21 24 24 69 21 28 26 75 1 31 45 77 169 163 315 647 ATTACHMENT “B’ LOS ANGELES COMMUNITY COLLEGE DISTRICT BOARD OF TRUSTEES FACILITIES MASTER PLANNING & OVERSIGHT COMMITTEE Educational Services Center Board Room – First Floor 770 Wilshire Boulevard Los Angeles, CA 90017 Wednesday, March 26, 2014 2:15 p.m. – 3:15 p.m. Committee Members Steve Veres, Chair Scott J. Svonkin, Vice Chair Ernest H. Moreno, Member James D. O’Reilly, Staff Liaison Nabil Abu-Ghazaleh, College President Liaison Agenda (Items may be taken out of order) I. ROLL CALL II. PUBLIC SPEAKERS* III. REPORTS/RECOMMENDATIONS/ACTIONS A. LEED™ and Parking Structure Projects – Presentation and Approval Los Angeles Harbor College – S.A.I.L.S. Student Union, Design-Build ($36.5 million) B. Presentations/Initiative Reviews Van de Kamp Innovation Center Occupancy Options IV. NEW BUSINESS V. SUMMARY – NEXT MEETING..........................................................................................................Steve Veres VI. ADJOURNMENT *Members of the public are allotted five minutes time to address the agenda issues. If requested, the agenda shall be made available in appropriate alternate formats to persons with a disability, as required by Section 202 of the American with Disabilities Act of 1990 (42 U.S.C. Section 12132), and the rules and regulations adopted in implementation thereof. The agenda shall include information regarding how, for whom, and when a request for disability-related modification or accommodation, including auxiliary aids or services may be made by a person with a disability who requires a modification or accommodation in order to participate in the public meeting. To make such a request, please contact the Executive Secretary to the Board of Trustees at 213/891-2044 no later than 12 p.m. (noon) on the Tuesday prior to the Board meeting. LO S AN G EL E S CO M M UN IT Y CO LL EG E D I S T RICT DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT SUSTAINABLE BUILDING PROGRAM FACILITIES MASTER PLANNING & OVERSIGHT COMMITTEE (FMP&OC) MEETING LEED PROJECT EXECUTIVE SUMMARY College Name: LACCD Project Name: LACCD Project Number: College Project Manager: Design Build Team: Harbor College S.A.I.L.S. - Student Union 33H.5350.02.01 ARCADIS Bernards/HMC Project Description: The Student Union Building will be a two story, 55,000 GSF (gross square feet) building located along the southwest corner of the campus’ student services zone, adjacent to the new Library Resource Center building, the existing Student Services building and the recently renovated Planetarium building. This location at the junction of the two main pedestrian paths that bisect the site will give the facility a strong presence on the campus while complementing the series of existing buildings within the student services zone. The building is a steel moment frame construction with durable, long-lasting exterior finish materials such as brick cladding, exterior cement plaster and composite metal panels which were selected to create visual harmony with the existing buildings on campus. A wide variety of programs are housed within the new Student Union including Student Dining and Food Service, Culinary Arts, Campus Bookstore, Student Activities / ASO, Business Office, and Commons Areas. It provides a social hub for student life and student services, by its presence at the center of the campus, and by the multi-functional program components housed within the facility. The fundamental site and building design concept is to create a facility that is permeable and provides a variety of access opportunities for students and staff to experience the dynamic programmatic and functional components of the facility. The building configuration takes the form of a shaped rectangle that shifts and recedes to create informal outdoor gathering areas in the form of outdoor terraces above ground level. A linear lobby is attached to this form to provide a main entry with multiple points of access while connecting the main pedestrian thoroughfare to the south and the courtyard to the east. Relevant Statistics: The goal of the Student Union is to consolidate a variety of program spaces that are currently spread out across campus in outdated facilities that lack modern technology, present a heavy maintenance burden, are not energy efficient and exhibit deficiencies with regard to universal accessibility. Through the unification of the programs previously described, the Student Union will provide a concentrated node of social activity and student services. In addition, this consolidation of programs will reduce the number of campus facilities, thereby increasing the campus open space, decreasing the maintenance load, and providing a focused state-of-the-art building for student life. This building is a part of the $67M design-build project funded by Measure J. The awarded contract for this building is $36,500,000. Schedule: Expected Design Phase Completion: Expected Construction Phase Completion: Expected Close-Out Phase Completion: Form DES-015-A January 2015 July 2016 October 2016 Page 1 of 2 Rev.02_24_14 LO S AN G EL E S CO M M UN IT Y CO LL EG E D I S T RICT DEPARTMENT OF FACILITIES PLANNING AND DEVELOPMENT SUSTAINABLE BUILDING PROGRAM Sustainable Features: The project is expected to achieve (39) LEED™ points for a LEED™ Silver rating. Some of the sustainable features include: 1. Project is built on a previously developed site. 2. Project is within ½ mile radius of 10 basic community services and a housing development of at least 10 units per acre. 3. Project enjoys proximity to two or more bus lines usable by occupants. 4. Project provides no new parking. 5. Implementation of a storm water management plan for 90% of average rainfall. 6. Use of site paving with an Solar Refelectance Index (SRI) of 29 or higher. 7. Use of energy smart Cool Roof Rating Council (CCRC) approved roof system. 8. Use of drought-tolerant, native landscaping with water efficient irrigation to reduce potable water consumption for irrigation by 50%. 9. Reduction of water use by 30% through fixture selection. 10. Reduction of building energy use below the simulated baseline building performance (EAc1). Energy strategies include efficient HVAC systems, occupancy sensors, use of natural daylight, minimization of glazing on east and west facades, exterior sun-shading to reduce heat gain, and offset of electrical use with photovoltaic. 11. Use of on-site renewable energy systems to provide up to 17.5% of the onsite energy needs. 12. Enhanced commissioning of the building. 13. Use of green power from renewable energy sources for 35% of the buildings electricity needs for at least the first two years of operation. 14. Construction waste management program to divert waste from landfills and towards recyclable uses. 15. Use high recycled content of materials.16. Use of regional materials extracted/harvested and manufactured within 500 miles of the site (MRc5) 17. Use of Forest Stewardship Council (FSC) certified wood 18. Monitoring of CO2 levels in mechanically and naturally ventilated spaces. 19. Implementing a construction indoor air quality management plan, during construction and before occupancy. 20. Use of low-emitting materials for adhesives, sealants, paints, coatings, carpet systems and composite woods. 21. Use of walk-off systems at regularly used entrances, negative pressurization, self-closing doors and deck to deck partitions in chemical use areas, and MERV 13 air filtration to minimize exposure of building occupants to pollutants. 22. Provide individual lighting and thermal controls for building occupants. 23. Implement green building education program. 24. Conduct post-occupancy evaluation to mitigate potential indoor environmental quality issues. 25 Implement green cleaning program. Form DES-015-A Page 2 of 2 Rev.02_24_14 11 09 07 08 13 16 13 12 19 06 18 10 05 LACE 14 FIGUEROA P 03 EEWAY 01 02 17 FR HARBOR L STREET 04 20 22 18 23 18 15 LEGEND 01. STUDENT UNION BUILDING 02. THEATER BUILDING 03. FINE ARTS BUILDING 04. TECHNOLOGY BUILDING 05. SCIENCE COMPLEX 06. CENTRAL PLANT 07. PARKING STRUCTURE 08. MUSIC BUILDING 09. CHILD DEVELOPMENT CENTER 10. CLASSROOM BUILDING 11. STUDENT SERVICES BUILDING 12. LIBRARY RESOURCE CENTER 13. NORTHEAST ACADEMIC BUILDING 14. NURSING BUILDING 15. PE/WELLNESS BUILDING 16. PLANETARIUM 17. M&O COMPLEX 18. SURFACE PARKING LOT 19. CENTRAL GREEN 20. LAUSD 21. STADIUM 22. BASEBALL FIELD 23. PRACTICE FIELD 21 VEHICLE ENTRY PROJECT LOCATION LAGOON DRIVE Los Angeles Harbor College STUDENT UNION CAMPUS MAP N LEED-NC Version 2.2 Registered Project Checklist March 11, 2014 SAILS - Student Union Building Harbor City College RC = RESPONSIBILITY CODE A= ARCHITECT; MEP= MECHANICAL, ELECTRICAL, PLUMBING; C= CIVIL; L=LANDSCAPE; O= OWNER; GC= CONTRACTOR Yes ? No 7 1 6 Y Sustainable Sites 14 Points Prereq 1 Required C Construction Activity Pollution Prevention RC Credit Requirements 1 C Credit 1 Site Selection 1 A 1 D Credit 2 Development Density & Community Connectivity 1 A D Credit 3 Brownfield Redevelopment 1 A D Credit 4.1 Alternative Transportation, Public Transportation Access 1 A D Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 1 A D Credit 4.3 Alternative Transportation, Low-Emitting and Fuel-Efficient Vehicles 1 A D Credit 4.4 Alternative Transportation, Parking Capacity 1 A D Credit 5.1 Site Development, Protect or Restore Habitat 1 A 1 1 1 1 1 1 1 D Credit 5.2 Site Development, Maximize Open Space 1 1 D Credit 6.1 Stormwater Design, Quantity Control 1 D Credit 6.2 Stormwater Design, Quality Control 1 1 1 D Credit 7.1 Heat Island Effect, Non-Roof 1 1 D Credit 7.2 Heat Island Effect, Roof 1 D Credit 8 Light Pollution Reduction 1 1 Yes ? 3 Water Efficiency 1 Credit 1.1 D 1 1 1 1 Credit 1.2 D Credit 2 D ? 9 8 Easy to obtain. Provide preferred parking equal to 5% of parking count for low-emitting and fuel efficient vehicles Parking not to exceed minimum zoning requirements, and provide car/van pool parking for 5% of parking total, OR provide no new parking. Limit site disturbance on Greenfields or restore or protect a minimum of 50% of site area. Option 1: Reduce development footprint and provide 25% more vegetated open space than local zoning requires. Option 2: Provide vegetated open space equal to building footprint Option 3: provide vegetated open space of 20% of site area Construction phase Done Done N/A Done No showers available within 200 yards Need to accommodate 4 spaces (5% of 71 FTEs); parking stall painting/stripes required with detail. Robert to discuss two parking options with client needs campus approval / scope add. Done No new parking Does not meet requirements Does not meet option 2 requirements Per Alysen Weiland: Stormwater treatment for the Option 1: Existing imperviousness is less than or equal to Student Union is going to be taken care of as part of 50%. Option 2: Existing imperviousness is greater than 50% the Central Green project ... we may need to provide Implement Stormwater Management Plan for 90% of average an exhibit with our point paperwork illustrating the C connection rainfall. Option 1: Provide strategy for 50% of site hardscape A Confirm paving material properties Option 2: Cover 50% of parking spaces A Use either cool roof, vegetated roof, or combination. Template done / Verify PVC type (Garland) Maximum candela from interior lighting not to exit windows, exterior lighting not to exceed 80%(exterior areas) / MEP Per MEP: Most likely not possible. 50%(facades & landscape) of minimums specified by ASHRAE 90.1-2004 C No 2 Yes A Create and implement Erosion and Sedimentation Control (ESC) Plan. Avoid development of inappropriate sites. Build on a previously-developed site - either in a community with min. density of 60,000SF / acre OR with 1/2-mile radius proximity to 10 basic community services and to a residential area. Can only be obtained by SS Prerequisite by remediating the site. Proximity of 1/2 mile of existing/planned and funded rail option or 1/4 mile proximity of one or more stops for two or more bus lines usable by occupants. Bicycle storage within 200 yards of entrance for 5% or more of occupants above 3rd grade. Provide shower and changing facilities and dedicated bike lanes. Comments Credit 3.1 Credit 3.2 Water Efficient Landscaping, Reduce by 50% Water Efficient Landscaping, No Potable Use or No Irrigation 5 Points RC Credit Requirements 1 Comments Reduce potable water consumption for irrigation by 50%. L 1 Achieve WE1.1 and use only captured water or install landscaping that does not require permanent irrigation. Innovative Wastewater Technologies 1 Option 1: Reduce potable water use for sewage conveyance by 50% through water fixtures or non-potable water. MEP Option 2: Treat 50% of wastewater on-site to tertiary standards. Water Use Reduction, 20% Reduction Water Use Reduction, 30% Reduction 1 1 MEP Use 20% less water than baseline. Use 30% less water than baseline. Confirm if purple pipe exists; planned and funded? N/A Per MEP: 2 points anticipated No Energy & Atmosphere 17 Points RC Credit Requirements Designate Commissioning Authority (CxA) to oversee completion of commissioning. Owner shall document CxA Owner's Project Requirement. Designer shall develop Basis of Design. Mandatory provisions and prescriptive requirements of MEP ASHRAE/IESNA Standard 90.1-2004 Zero use of CFC-based refrigerants in HVAC&R systems. If MEP reusing HVAC equipment, complete phase-out conversion prior to completion. Comments Y C Prereq 1 Fundamental Commissioning of the Building Energy Systems Y D Prereq 2 Minimum Energy Performance Required Y D Prereq 3 Fundamental Refrigerant Management Required D Credit 1 Optimize Energy Performance 1 to 10 MEP Develop a whole building energy simulation. Per MEP: Current energy model shows 14% savings compared to baseline; Include PV farm contribution after initial analysis of energy performance 3 D Credit 2 On-Site Renewable Energy 1 to 3 A / On-site renewable energy systems to provide 2.5%, 7.5% or MEP 12.5% of onsite energy needs. Glumac estimated 255 PV panels needed for exemplary performance. Per Arcadis, we have ample panels available on campus to dedicate to this project. 1 C Credit 3 Enhanced Commissioning 1 A / Prior to start of construction documents phase, designate CxA independent CxA for commissioning processes. Coordinate with CxA 1 D Credit 4 Enhanced Refrigerant Management 1 1 C Credit 5 Measurement & Verification 1 C Credit 6 Green Power 1 4 6 1 Yes ? No 5 4 4 Y Materials & Resources D Prereq 1 1 Credit 1.1 1 Credit 1.2 1 Credit 1.3 1 Storage & Collection of Recyclables Building Reuse, Maintain 75% of Existing Walls, Floors & Roof Building Reuse, Maintain 100% of Existing Walls, Floors & Roof Building Reuse, Maintain 50% of Interior Non-Structural Elements Required 13 Points Required 1 1 C OK All mechanical equipment will use R410-A refrigerant. Confirm status of central plant refrigerant type. Confirm if phase out plan is required/in place. MEP to provide M&V plan. A / Provide at least 35% of building's electricity from renewable MEP sources in at least a two year renewable energy contract. Verify with client RC Credit Requirements Comments A Provide access to area dedicated to collection and storage of Done recyclables. 1 Requires reuse of existing building stock - not applicable to 100% new buildings. 1 N/A 1 Credit 2.1 Construction Waste Management, Divert 50% from Disposal 1 Credit 2.2 Construction Waste Management, Divert 75% from Disposal 1 Credit 3.1 Credit 3.2 Materials Reuse, 5% Materials Reuse,10% 1 1 C 1 Option 1: Do not use refrigerants MEP Option 2: Select refrigerants to minimize or eliminate harmful chemicals. Develop a Measurement & Verification Plan per IPMVP to MEP track building/energy performance. Procure CxA by 50% CD'S Recycle/salvage 50% of non-hazardous construction and A,GC demolition debris, with development of plan that identified materials to be diverted. Recycle/salvage 25% beyond Credit 2.1 of non-hazardous A,GC construction and demolition debris. A,GC confirm with Bernards- 5 permanent buildings, bungalows; determine how much we can salvage; where to stage salvaged demo; target of 95% construction waste management confirm with Bernards Use salvaged, refurbished or reused materials (based on cost confirm with Bernards of the total materials cost on the project.) Page 1 of 2 LEED-NC Version 2.2 Registered Project Checklist March 11, 2014 SAILS - Student Union Building Harbor City College RC = RESPONSIBILITY CODE A= ARCHITECT; MEP= MECHANICAL, ELECTRICAL, PLUMBING; C= CIVIL; L=LANDSCAPE; O= OWNER; GC= CONTRACTOR Yes ? No 1 1 1 1 1 Yes Credit 4.1 Credit 4.2 Credit 5.1 C Credit 5.2 Recycled Content, 10% Recycled Content, 20% Regional Materials, 10% Regional Materials, 20% 1 1 1 1 C Credit 6 Rapidly Renewable Materials 1 C Credit 7 Certified Wood 1 C 1 ? No 10 4 1 Indoor Environmental Quality 15 Points RC Credit Requirements MEP Y D Prereq 1 Minimum IAQ Performance Required Y D Prereq 2 Environmental Tobacco Smoke (ETS) Control Required 1 D Credit 1 Outdoor Air Delivery Monitoring 1 D Credit 2 Increased Ventilation 1 Construction IAQ Management Plan, During Construction 1 1 1 Credit 3.1 C 1 Credit 3.2 1 Credit 4.1 1 Credit 4.2 C 1 1 Construction IAQ Management Plan, Before Occupancy Low-Emitting Materials, Adhesives & Sealants Low-Emitting Materials, Paints & Coatings Use materials with recycled content (post-consumer + ½ preconsumer) (based on value of materials). confirm with Bernards- REQUIRES MATERIALS A,GC Use of materials extracted/harvested and manufactured BUDGET, REVIEW OF SPEC 013543; COMPLETION A,GC within 500 miles of the site (based on total project materials OF SUBMITTAL FORMS Use rapidly renewable materials (typically from plants A,GC harvested in a 10-year cycle or less) for 2.5% of all building materials and products based on cost. confirm with Bernards/Designer; wood slatted ceiling Use minimum of 50% of wood-based products that are FSC finish, casework, construction of stage?; finish certified for wood building components. Includes framing, floor?;REQUIRES MATERIALS BUDGET, REVIEW A,GC flooring, sub-flooring, doors and built-in furniture if OF SPEC 013543; COMPLETION OF SUBMITTAL consistently included in MR 3-7. FORMS A,GC Meet minimum requirements of ASHRAE 62.1-2004 to OK establish minimum indoor air quality performance. Prohibition of smoking in the building and within 25' of entries, OSA intakes and operable windows. May provide A designated smoking areas in the building, with provisions to Done contain, capture and remove tobacco smoke from the building. Monitoring of CO2 levels in mechanically and naturally MEP ventilated spaces. CO2 sensors will be linked to the Building Yes. Mechanical will provide monitoring equipment. Management System (BMS). MEP GC 1 1 Low-Emitting Materials, Carpet Systems 1 Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products 1 Increase outdoor air ventilation rates to 30% above ASHRAE Not pursued because it is contrary to energy 61.2-2004 minimum (mechanically ventilated spaces) OR design to recommendations by Carbon Trust 'Good Practice performance credit EAc1. Guide 237' (naturally ventilated spaces) Meet SMACNA IAQ guidelines, protect absorptive materials from moisture damage, install MERV 8 filters at all return air grilles. confirm with Bernards; FILTERS AND PHOTOGRAPH DOCUMENTATION Pre-occupancy flush-out, OR pre-occupancy air testing 1 Credit 4.3 Comments GC Compliance with requirements of SCAQMD reference standard. Compliance with requirements of Green Seal and SCAQMD reference standard. Compliance of all installed carpet and cushion products with testing and product requirements of CRI Green Label Plus program. No use on the interior of the building of composite wood, agrifiber or on-site laminating products that contain ureaformaldehyde resins. confirm with Bernards- REQUIRES MATERIALS BUDGET, REVIEW OF SPEC 013543; COMPLETION OF SUBMITTAL FORMS Walk off mats to be designed by Brett (next phase) / door closers to be added to schedule in next phase / ventilation reqs ok per Glumac (HVAC will provide exhaust fans for polluted areas and MERV 13 on AHU's.) 1 D Credit 5 Indoor Chemical & Pollutant Source Control 1 6'-0" long entry mats, separation and exhaust of hazardous A/ gases and chemicals, MERV 13 or better filtration for MEP mechanically ventilated spaces. 1 D Credit 6.1 Controllability of Systems, Lighting 1 MEP Provide individual lighting controls for min. 90% of building occupants to allow adjustments per individual needs, AND provide lighting controllability for shared multi-occupant spaces to allow adjustments per group needs. 1 D Credit 6.2 Controllability of Systems, Thermal Comfort 1 MEP Provide individual controls for 50% of occupants to allow adjustments per individual needs (incl operable windows Pursued. within limitations) AND provide controllability for shared multioccupant spaces to allow adjustments per group needs. 1 D Credit 7.1 Thermal Comfort, Design 1 1 D Credit 7.2 Thermal Comfort, Verification 1 1 D Credit 8.1 Daylight & Views, Daylight 75% of Spaces 1 1 D Credit 8.2 Daylight & Views, Views for 90% of Spaces 1 Yes ? 5 2 Innovation & Design Process d/c Credit 1.1 1 d/c Credit 1.2 1 d/c Credit 1.3 1 d/c Credit 1.4 1 d/c Alternate 1 C Alternate 1 Yes C Credit 2 ? Maybe. The current indoor temperatures need to be reviewed. Only possible if Credit 7.1 can be achieved. Credit not likely Review whether credit is possible No 1 1 Design HVAC systems and building envelope to ASHRAE Standard 55-2004. Agree to implement a thermal comfort survey within 6 to 18 A / months after building occupancy, and agree to corrective MEP action if more than 20% of occupants express dissatisfaction with thermal comfort of the building. Achieve a min. glazing factor of 2% in a minimum of 75% of all regularly occupied spaces, OR demonstrate with computer A simulation a 25 FC minimum in 75% of spaces, OR demonstrate achievement of same via indoor light measurement. Achieve line of sight between 2'-6 and 7'-6" above floor level A to outdoor environment for 90% of occupants in all regularly occupied spaces. MEP Yes. Electricial will provide sufficient lighting controls. Exemplary Performance: SSc4.1 - Public Transportation Access Exemplary Performance: EAc2 Renewable Energy 5 Points RC Credit Requirements 1 A 200 bus rides per day 1 A Exceed EAc2 by next threshold level to 17.5% on-site energy see EAc2 above use provided by renewable energy Innovation in Design: Green Education Program and Building as a Learning Tool 1 A Interactive Information Kiosk Confirm with client ALSO CONSIDER COMPOSTING PROGRAM Innovation in Design:POE 1 A Conduct a POE 6-18 months after occupancy. Develop an analysis, summary and task list to be completed to mitigate any potential issues. To do 1 A Design Build team will work with the client to develop: a statement of purpose describing what the policy is trying to achieve from a health and environmental standpoint; requirements for operations; a set of acceptable performance level standards per Green Seal standard GS-37 or California Code of Regulations, Title 17 Section 94509, VOC standards Confirm with client for cleaning products; Documentation of the program’s housekeeping policies and environmental cleaning solution specifications. Products used in the project will be nonhazardous, have a low environmental impact and will meet the criteria set forth in the performance level standards mentioned above; Concentrated cleaning products will be utilized. 1 A,GC 1 A Innovation in Design: Green Cleaning Program Innovation in Design: 95% construction Waste Management LEED® Accredited Professional Recycle/salvage 25% beyond MR Credit 2.2 of nonhazardous construction and demolition debris. Include a LEED AP on the design team No 39 19 13 Comments Project Totals (pre-certification estimates) 69 Points Certified 26-32 points Silver 33-38 points Gold 39-51 points Platinum 52-69 points Page 2 of 2 Done Confirm with Bernards Done Board of Trustees ACTION Los Angeles Community College District Com. No. BT Division Subject: Board of Trustees Date: April 23, 2014 ADOPT 2014 – 2015 BOARD MEETING CALENDAR Adopt the following Board Meeting Calendar for the period covering July 2014 through July 2015. ATTACHMENT “E” Board Meeting Wednesday, July 9, 2014 (Annual Organizational Meeting) Wednesday, July 23, 2014 Wednesday, August 6, 2014 Wednesday, August 20, 2014 Wednesday, September 3, 2014 Wednesday, September 17, 2014 Wednesday, October 8, 2014 Wednesday, October 22, 2014 Wednesday, November 5, 2014 Wednesday, November 19, 2014 Wednesday, December 3, 2014 Wednesday, December 17, 2014 Wednesday, January 14, 2015 Wednesday, January 28, 2015 Wednesday, February 11, 2015 Wednesday, February 25, 2015 Wednesday, March 11, 2015 Wednesday, March 25, 2015 Wednesday, April 15, 2015 Wednesday, April 29, 2015 Wednesday, May 13, 2015 Wednesday, May 27, 2015 Wednesday, June 10, 2015 Wednesday, June 24, 2015 Wednesday, July 8, 2015 (Annual Organizational Meeting) Wednesday, July 22, 2015 Background: The proposed dates reflect the consideration of such factors as legal holidays, District holidays, religious holidays, Budget calendar, staff preparation time frames, and applicable Board Rules. The location sites will be determined and announced at a date in the future. Chancellor and Secretary of the Board of Trustees By ___________________________ Page 1 of 1 Pages Com. No. BT Date ________ Div. Eng _______________ Santiago ___________ Field _______________ Svonkin ___________ Moreno ____________ Veres _____________ Pearlman ___________ Griggs_____________ Board of Trustees Student Trustee Advisory Vote Date 4/23/14 Building for Tomorrow’s Leaders LACCD Program Management 515 S. Flower Street, Suite 900 Los Angeles, California 90071 www.build-laccd.org 213.593.8000 866.817.1051 tel fax Date: March 12, 2014 From: To: Terri Mestas, Program Director, BuildLACCD Adriana Barrera, (Interim) Chancellor, LACCD James O’Reilly, Chief Facilities Executive, LACCD Subject: LACCD BOND PROGRAM PROFESSIONAL SERVICES (BENCH) REPROCUREMENT INFORMATIONAL PAPER ATTACHMENT "F" The District currently utilizes a bench or staff augmentation contract model. This current model successfully supplies over 25% of the District’s bond program staffing. The following information is provided for further clarification of the model, its intent and benefits. 1) Purpose and justification for the Professional Services procurement model. The bond program is in its last critical phase of the program. There is approximately $3B in bond funds remaining limited time remaining. Note that $1.46B of the funds remaining is not yet contracted. Effective, efficient and timely performance will be imperative to the successful conclusion of the program going forward. Past performance of the College Program Management (CPM) firms has been an area of concern, which includes: o Average project delay during construction is 5 years o Over $563M expended above original project budgets program-wide o $21M spent in project litigation and outside counsel fees to date o $30M spent in resolving poor quality construction Following Industry Best Practices, the final phase of a Building Program demands the flexibility to respond in an efficient, effective and timely manner to include: Rapidly changing workload and Program requirements by obtaining the best-suited talent for each position on the Program; Improved performance, responsibility, and accountability at the College and project level by moving exemplary staff from one site to another as needs arise; Channeling limited, remaining funds to prioritized projects while also generating savings; Continue to provide ample opportunities for small business participation. Expansion of the already existing bench contract, by adding Construction Management (“CM”) services, will allow the District to gain essential efficiencies, including: Streamlined shared functions and governance across the Program; Obtaining the best-suited talent for each position on a resume by resume basis; The flexibility to quickly meet changing college and program requirements; Consistently meet budgets and schedules thru accountability down to the position level; Reduction of claims and litigation thru best suited staffing providing optimal construction management; Realization of soft costs savings that will be applied to projects; Page 1 of 6 LACCD Bond Program Professional Services Re-procurement (Bench) Informational Paper March 12, 2014 Distinct lines of accountability facilitating clear, defined measurement of Key Performance Indicators (“KPI”) at the position level; and A more inclusive model providing more opportunity for small and local business participation. 2) Expiration of CPM contracts, responsibility, accountability, liability. The bond program is in its final critical phase of execution. There remains significant work to complete within a limited period of time. Performance, as stated above, is imperative to LACCD’s bond program’s success. In order to achieve the required performance to finish the program successfully (completing projects on time and within budget), it is critical to obtain the best talent suited to the positions and skills required. Past performance has demonstrated that the path the program is on will not lead to success. Therefore, change is required at this time. The Blue Ribbon Panel’s Report, commenting and making recommendations on “construction management” and the College Project Managers, states: “Further, it does not appear to the Panel that the requisite upstream (e.g., flowing from the college level to the District level) authority and responsibility have been clearly or completely delineated.” “Each college President, College Project Manager, and the Program Manager should be held accountable to meet these requirements. Each College President, College Project Manager, and the Program Manager should be evaluated based upon their ability to maintain established project budgets and schedules.” “Clarify and articulate specific management responsibility for all areas of the Building Program. Focus particularly on upstream responsibility for changes and changed circumstances. Ensure accountability at all levels.” “The College Project Managers at each of the nine colleges are, among other obligations, supposed to manage the construction process in such a manner as to best protect the owner’s interests (i.e., the District). Additionally, the College Project Managers should be routinely making recommendations to the owner to pass along extra expenses the owner incurs vis a vis the contractor to those other parties potentially responsible for such changes. While the Panel has concluded that many of the change orders issued across the Building Program to date have been owner (i.e., college level and end user group) driven, the College Project Managers at each college should have had better control of this process and at a minimum alerted the Program Manager and District of these substantial changes so as to provide the District, at the central level, with an opportunity to evaluate other possible options.” The re-procurement of construction management services and the streamlining of the model to a bench/staff augmentation model is designed to further implement these recommendations, tighten up the management of the projects at the campus level, and bring more accountability into the process. The Program Management Office (PMO) is working closely with Facilities and the Lead Construction Counsel, John Dacey (who Chaired the Blue Ribbon Panel), to achieve these needed requirements and in turn help ensure the bond program’s successful conclusion. Seven CPM contracts expire later this year and one CPM contract expires in October 2017. Contract language allows the ability to re-compete these services at any time if it is deemed in the best interest of the District. Page 2 of 6 LACCD Bond Program Professional Services Re-procurement (Bench) Informational Paper March 12, 2014 Responsibility and accountability are critical to completing this program successfully. To date, there has been very little accountability of the College Project Managers, despite very poor performance records. Accountability has, to date, been generally focused on the general contractor and design team level. CPM‘s have not been held liable or accountable for project issues. Traditionally industry wide, the construction manager is rarely held accountable. Under the expanded Bench/staff augmentation approach, accountability is determined at the position-level based upon specific obligations and deliverables. Requisite decision making authority will be given to perform the obligations. However, where augmented staff does not fulfill their required duties in the manner required of the position, those staff will be removed and replaced. Additionally, should augmented staff’s actions and/or omissions cause damage to the District, the company providing augmented staff will be held accountable for each individual’s performance and/or lack thereof. Individual and the providing firm liability will be based on contracts with specific deliverables and express obligations. Such contracts will also include defense and indemnity obligations by the providing firm. By replacing under-performing CPM’s, with augmented staff who are the best suited, highest performing candidates, the bond program will realize projects executed within budget and schedule. Note, that the construction management teams at each college will reduce as the work at each college reduces. This reduction will begin to occur in the next two years at some locations. The expanded bench/augmented staff model allows for high performing staff to move from one college to another college. The previous CPM model does not allow for this level of flexibility. This is a benefit to the colleges as well as the career growth of the individuals on the bench. 3) Transition plan and transference of information. Staff transition is a critical aspect to any contract change, more so when a significant staffing change involved. Note that this CPM staffing change is required to occur this year regardless due to the 5 year contract expiration. A transition plan is currently under refinement to address this reprocurement. In addition, there have been several measures already taken to ensure a smooth transition. Those include: Development of web based standard operating procedures – to ensure uniformity and consistency of delivery; Budget reconciliation at each College – this defines the remaining budgets and validates the remaining funds at each college; Risk management plan identifies risks at the program and project level in order to facilitate risk mitigation early; Deployment of regional staff to all the colleges from the Program Management Office. This staff consists of a construction, design and program controls expert that visit the colleges numerous times a week; o This regional staff is intimately familiar with the projects and issues at each college; Enhancement of Data Collection – the aging district owned servers have been enhanced with storage capability to ensure integrity of data to include all project data; Development of PMIS (Project Management Information System) – this new web based collection and reporting system, requires all bond data to be reported in a consistent manner to the District and PMO, colleges and other stakeholders. This new system adds layers of detail missing from the previous reporting which allowed room for errors and misinterpretation; Shared services – many of the CPMs are already utilizing a shared group of accounting, scheduling and estimating professionals from the bench under the oversight of the PMO; Page 3 of 6 LACCD Bond Program Professional Services Re-procurement (Bench) Informational Paper March 12, 2014 Master Schedule – the PMO maintains a master schedule that tracks all projects which is continually updated; Project Validation Process – a validation process is required of all projects prior to commencement which identifies the necessary level of detail to identify risk, dependencies, cost and schedule to name a few. This validation process allows for increased project transparency and improved oversight throughout the project lifecycle; and PMO oversight of all procurements as well as all claims and project issues on behalf of the District. Note that it is likely that many individuals with LACCD program experience will come back on to the program thru this re-procurement. This experience and legacy knowledge is critical. Resumes shall be reviewed on a resume by resume basis, the most qualified and suited staff shall come on to the program or come back onto the program. The PMO staff consists of many staff members that have been on the program for over 5 years, some since program inception. The transition plan shall ensure adequate time for transition, required shadowing, training and staff onboarding processes. 4) Staff augmentation selection process and College administration staff input. The procurement for the expanded bench will go thru the standard district procurement processes followed by the bond program. The selection of the companies for the bench shall focus on the qualifications of the prime and sub-consultant firms. A panel shall be comprised to review the proposals and make the final selection. The makeup of this panel shall be presented to the district for approval. After award to the companies, a selection of each position shall occur. The staff selection process will be the same bond program process followed currently with some minor modifications. The current process consists of the following: o A request for resumes for select positions is sent to all companies on the bench; o Resumes are reviewed and shortlisted, interviews for the short listed candidates are scheduled; o An evaluation committee is assembled. For positions being filled at the colleges, college participation on the evaluation committee shall be ensured; and o The Evaluation Committee participates in the interviews, performs reference checks (as needed) and makes the final selection. 5) Conflict of Interest, Non-Collusion, Etc. All proposers for the professional services re-compete or expanded bench are required to sign both a conflict of interest, non-collusion, declaration, and a non-discrimination declaration. Firms currently providing services as Inspector of Record (“IOR”), Laboratory of Record (“LOR”), or Whole Building Commissioning are precluded from participating in this procurement. In this model, a company will not be assigned a college or a discipline. Each position will be filled on a resume by resume basis based on the best suited candidate. In this model, a conflict of interest is avoided as there are no competing tasks or conflicting levels of oversight. Page 4 of 6 LACCD Bond Program Professional Services Re-procurement (Bench) Informational Paper March 12, 2014 6) Cost Savings There are numerous opportunities for savings and cost avoidance with the expanded bench model. This re-procurement allows for a significant reduction in legal costs and costs associated with poor quality work Program-Wide by attaining the best talent to provide construction management services. The Program has spent to date over $50M dollars in litigation and the resolution of poor quality work, which could have been used to fund the many projects that remain to be constructed on the program. This cost breaks down as follows: Over $21M in claims and legal fees Over $30M related to poor quality work on past projects (i.e. water intrusion issues, structural issues, defective work, and/or work performed that did not meet approved plans and/or specifications). In addition, the current estimated program savings that will be realized under this expanded bench procurement is approximately $5M, this includes staffing efficiencies by utilizing shared resources across the program in areas such as accounting, project controls and administrative support. Note that phase one of the staffing efficiency effort has already been completed; this provided a savings of approximately $5M from December 2013 to June 2014. Therefore to date, the total savings of the staffing efficiency provided from this model, to include the savings noted in the paragraph above, will be approximately $10M. This does not include the potential significant cost avoidance noted above. 7) Management and subconsultant fees and/or mark-up. Compensation on the extended bench procurement will be comprised of a set competitive industry standard rates for each position for both prime firms and sub consultants. The rates in the contract are fully burdened rates to include OH/Profit. 8) Evaluation criteria and scoring. The procurement’s evaluation criteria will be weighted on the following: Firm’s history, experience and past performance in providing the services list in the RFP for public education design and construction programs and/or complex construction projects/building programs Firm’s ability to attract, retain, and train qualified candidates Firm’s transition plan Experience and ability of each subconsultant Firm’s methodology used to meet the District’s required Local, Small, Emerging, and Disabled Veteran (LSEDV) minimum participation of 30%. Conclusion In summary, this contract model is successfully used by the Bond Program at this time. This subject procurement will simply add CM services to the array of services provided by the current bench. The CPM contracts expire this year, and are required to be re-competed. The current model for CPM services has not provided the program or colleges with the required level of performance needed to execute projects on time or in budget. The program is in its last phase of the program with limited funds, and cannot afford to continue with the same model in place. The past performance cited in this paper demonstrates a need for improvement. Page 5 of 6 LACCD Bond Program Professional Services Re-procurement (Bench) Informational Paper March 12, 2014 This procurement will achieve more inclusivity, increased participation by local and small businesses and hold accountability down to the position level. The financial structure of this re-procurement will be competitive and fair as will the procurement processes. Selection of staff will be on a resume by resume basis, selecting the best suited candidates to fill each role. The candidate pool will be significantly larger than if the district were to assign a company to each college. The focus will be to get the best talent and skills on the program to secure a strong program finish and avoid unnecessary spending on poor quality and litigation. From the four outreach events held on this model, tremendous support has been expressed by industry, unions and other related organizations. The industry, to include small business, is very excited and positive about this expanded bench and looks forward to participating on this procurement. Please do not hesitate to contact me with any additional questions. Thank you. Page 6 of 6