04-01-16 DEPARTMENT OF VETERANS AFFAIRS VHA MASTER SPECIFICATIONS TABLE OF CONTENTS Section 00 01 10 00 01 15 00 11 21 DIVISION 00 - SPECIAL SECTIONS DATE List of Drawing Sheets Request for Proposal to Design Build 07-15 11-15 DIVISION 01 - GENERAL REQUIREMENTS 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 01 00 32 32 32 32 32 33 35 42 45 57 58 74 81 81 81 81 81 00 16.01 16.13 16.15 16.16 16.17 23 26 19 29 19 16 19 13 13.01 13.02 13.11 13.21 01 91 00 General Requirements Architectural and Engineering CPM Schedules Network Analysis Schedule – Major Projects Project Schedules (Small Projects – Design/Bid/Build Network Analysis Schedules (Design-Build Only) Project Schedules (Small Projects – Design/Build) Shop Drawings, Product Data, and Samples Safety Requirements Reference Standards Testing Laboratory Services Temporary Environmental Controls Temporary Interior Signage Construction Waste Management Sustainable Construction Requirements Sustainability Certification Requirements – LEED NC V3 Sustainability Certification Requirements – LEED NC V4 Sustainability Certification Requirements – LEED HC V3 Sustainability Certification Requirements – GREEN GLOBES General Commissioning Requirements 11-15 01-11 09-15 04-13 02-15 04-11 07-15 10-14 07-15 06-15 01-11 07-15 09-13 09-15 09-15 09-15 09-15 09-15 10-15 DIVISION 02 – EXISTING CONDITIONS 02 02 02 02 02 02 02 02 02 02 21 41 65 82 82 82 82 82 82 83 00 00 00 11 13.13 13.19 13.21 13.31 13.41 33.13 Site Surveys Demolition Underground Storage Tank Removal Traditional Asbestos Abatement Glovebag Asbestos Abatement Asbestos Floor Tile and Mastic Abatement Asbestos Roofing Abatement Asbestos Transite Abatement Asbestos Abatement for Total Demolition Project Lead-Based Paint Removal and Disposal 05-13 02-15 05-13 09-15 09-15 09-15 09-15 09-15 04-15 08-11 DIVISION 03 – CONCRETE 03 23 00 03 30 00 Stressing Tendons Cast-in-Place Concrete 00 01 10-1 07-11 12-15 04-01-16 03 03 03 03 03 03 03 03 03 30 37 41 41 45 51 51 52 55 53 13 13 33 00 13 16 00 11 (Short-Form) Cast-in-Place Concrete Shotcrete Precast Concrete Hollow Core Planks Precast Structural Pretension Concrete Precast Architectural Concrete Cementitious Wood Fiber Decks Gypsum Concrete Roof Decks Lightweight Concrete Roof Insulation Gypsum Concrete Floor Decks 02-16 07-11 07-11 07-11 10-15 09-11 09-11 05-15 07-11 DIVISION 04 – MASONRY 04 04 04 04 04 01 05 05 20 72 00 13 16 00 00 Maintenance of Masonry Masonry Mortaring Masonry Grouting Unit Masonry Cast Stone Masonry 02-16 02-16 02-16 02-16 02-15 DIVISION 05 – METALS 05 05 05 05 05 05 05 12 21 31 36 40 50 51 00 00 00 00 00 00 00 Structural Steel Framing Steel Joist Framing Steel Decking Composite Metal Decking Cold-Formed Metal Framing Metal Fabrications Metal Stairs 02-16 03-10 02-16 10-15 07-11 07-14 10-15 DIVISION 06 – WOOD,PLASTICS AND COMPOSITES 06 10 00 06 16 63 06 20 00 Rough Carpentry Cementitious Sheathing Finish Carpentry 10-15 02-16 06-13 DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 07 07 07 07 07 07 07 07 07 07 07 07 07 07 07 01 08 11 12 13 13 14 18 21 21 22 24 27 27 31 31 50.19 00 13 00 00 52 21 13 13 23 00 00 26 27 13 26 Preparation for Re-Roofing Facility Exterior Closure Commissioning Bituminous Dampproofing Built-Up Bituminous Waterproofing Sheet Waterproofing Modified Bituminous Sheet Waterproofing Latex Mastic Deck Covering Pedestrian Traffic Coatings Thermal Insulation Loose-Fill Insulation Roof and Deck Insulation Exterior Insulation and Finish Systems Fluid-Applied Membrane Air Barrier, Vapor Permeable Fluid-Applied Membrane Air Barrier, Vapor Retarding Asphalt Shingles Slate Shingles 00 01 10-2 02-16 06-13 02-16 09-11 04-13 09-11 05-15 05-15 02-16 02-16 02-16 02-16 02-16 02-16 02-16 02-16 04-01-16 07 07 07 07 07 07 07 31 32 40 51 51 51 52 29.13 13 00 00 00.11 00.13 16 07 52 16.13 07 07 07 07 07 07 07 07 07 07 07 07 07 07 53 54 54 54 56 57 60 61 71 72 81 84 92 95 23 16 19 23 00 13 00 16 00 00 00 00 00 13 Wood Shingles Clay Roof Tiles Roofing and Siding Panels Built-Up Bituminous Roofing Built-Up Bituminous Roofing, Hot-Applied Built-Up Bituminous Roofing, Cold-Applied Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing, Hot Applied Styrene-Butadiene-Styrene Modified Bituminous Membrane, Roofing, Cold Applied Ethylene-Propylene-Diene-Monomer Roofing Ethylene Interpolymer (KEE) Roofing Polyvinyl-Chloride (PVC) Roofing Thermoplastic Polyolefin (TPO) Roofing Fluid-Applied Roofing Sprayed Polyurethane Foam Roofing Flashing and Sheet Metal Batten Seam Copper Roofing Roof Specialties Roof Accessories Applied Fireproofing Firestopping Joint Sealants Expansion Joint Cover Assemblies 02-16 02-16 10-15 07-14 10-15 10-15 10-15 10-15 02-16 10-15 02-16 10-15 05-15 10-15 07-14 10-15 10-15 10-15 10-15 02-16 10-15 02-16 DIVISION 08 - OPENINGS 08 08 08 08 08 08 08 08 08 08 08 08 08 08 08 08 08 08 08 08 08 08 08 08 08 08 11 11 14 17 31 33 33 34 34 34 35 36 38 41 42 44 51 51 51 51 56 56 56 56 63 71 13 73 00 10 13 00 13 36 53 59 13.13 13 16 13 33 13 13 13.11 23 69.11 19 53 59 66 00 00 Hollow Metal Doors and Frames Sliding Metal Fire Doors Interior Wood Doors Integrated Door Assemblies Access Doors and Frames Coiling Doors and Grilles Coiling Counter Doors Darkroom Doors Security Doors and Frames Vault Doors and Day Gates Accordion Folding Doors Sectional Doors Flexible Traffic Doors Aluminum-Framed Entrances and Storefronts Revolving Door Entrances Glazed Aluminum Curtain Walls Aluminum Windows Side-Hinged Aluminum Windows Steel Windows Aluminum Storm Windows Pass Windows Blast Resistant Windows Service and Teller Window Units Detention Window Screens Metal-Framed Skylights Door Hardware 00 01 10-3 01-13 02-16 02-16 02-16 02-16 02-16 02-16 07-15 05-15 02-16 05-15 05-15 02-16 10-15 05-15 10-15 02-16 10-13 02-16 05-15 02-16 02-16 02-16 02-16 10-15 01-16 04-01-16 08 08 08 08 71 71 80 90 13 13.11 00 00 Automatic Door Operators Low Energy Power Assist Door Operators Glazing Louvers and Vents 02-16 12-13 10-15 05-15 DIVISION 09 – FINISHES 09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 09 05 06 22 23 24 26 29 30 51 54 63 63 65 65 65 66 66 67 67 16 00 16 00 00 00 00 13 00 23 13 40 13 16 19 13 16 23.20 23.30 09.67.23.40 09 67 23.50 09 67 23.60 09 68 00 09 68 21 09 69 00 09 72 16 09 72 31 09 84 33 09 91 00 09 94 19 09 96 59 Subsurface Preparation for Floor Finishes Schedule for Finishes Non-Structural Metal Framing Gypsum Plastering Portland Cement Plastering Veneer Plastering Gypsum Board Ceramic/Porcelain Tiling Acoustical Ceilings Linear Metal Ceilings Brick Flooring Stone Flooring Resilient Base and Accessories Resilient Sheet Flooring Resilient Tile Flooring Portland Cement Terrazzo Flooring Terrazzo Floor Tile Resinous Epoxy Base With Vinyl Chip Broadcast (RES 2) Resinous (Epoxy Resin Composition)Mortar Flooring (RES3) Resinous Poured In Place Resilient Flooring (RES-4) Resinous (Epoxy Terrazzo) Flooring (RES-5) Resinous (Urethane and Epoxy Mortar) Flooring (RES-6) Carpeting Athletic Carpeting Access Flooring Vinyl-Coated Fabric Wall Covering Polypropylene Fabric Wall Covering Sound-Absorbing Wall Units Painting Multicolor Interior Finishing High-Build Glazed Coatings 02-15 04-15 10-14 10-15 10-15 10-15 11-14 09-15 12-15 10-15 02-16 10-15 02-16 02-16 12-15 10-15 10-15 07-14 07-14 07-14 07-14 07-14 10-15 10-15 10-15 10-15 05-15 10-15 01-16 05-13 07-14 DIVISION 10 – SPECIALTIES 10 10 10 10 10 10 10 10 10 10 11 11 13 14 21 21 21 22 22 22 13 23 00 00 13 16 23 13 19 26.13 Chalkboards and Markerboards Tackboards Directories Signage Toilet Compartments Shower and Dressing Compartments Cubicle Curtain Tracks Wire Mesh Partitions Demountable Partitions Accordion Folding Partitions 00 01 10-4 10-15 10-15 05-15 10-15 12-15 11-11 05-15 10-15 04-16 05-15 04-01-16 10 10 10 10 10 25 26 28 44 75 13 00 00 13 00 Patient Bed Service Walls Wall and Door Protection Toilet, Bath, and Laundry Accessories Fire Extinguisher Cabinets Flagpoles 10-15 10-15 02-16 08-14 02-16 DIVISION 11 – EQUIPMENT 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 11 05 12 17 26 27 40 40 41 41 44 48 53 53 53 53 53 71 71 73 78 78 79 82 12 00 36 00 00 11 21 00 21 00 00 13 23 53 61 71 01 02 00 00 13 13 19 General Motor Requirements for Equipment Parking Control Equipment Package Transfer Units Unit Kitchens Photographic Processing Equipment Custom Fabricated Food Service Equipment Food Service Equipment-Utility Distribution System Food Storage Equipment Walk-In Coolers and Freezers Food Cooking Equipment Cleaning and Disposal Equipment Laboratory Fume Hoods Laboratory Refrigerators Biological Safety Cabinets Laminar Airflow Stations Custom Fabricated Laboratory Equipment Solution Warming Cabinets Medical Washing and Sterilizing Equipment Laboratory Washing and Sterilizing Equipment Ceiling Mounted Patient Lift System Mortuary Equipment Mortuary Refrigerators Hydrotherapy Equipment Packaged Incinerators 11-11 02-16 02-13 11-11 11-11 11-11 11-11 11-11 05-15 11-11 11-11 05-15 11-11 01-11 11-11 11-11 02-11 10-11 09-14 11-11 11-11 11-11 11-11 DIVISION 12 – FURNISHINGS 12 12 12 12 12 12 12 12 12 22 24 24 31 32 34 35 36 56 16 00 21 00 00 00 70.21 00 70.11 Drapery Track and Accessories Window Shades Lightproof Shades Manufactured Metal Casework Manufactured Wood Casework Manufactured Plastic Casework Medication Cabinet Countertops Suspended Table 05-15 09-15 05-15 05-15 09-15 10-15 02-16 12-15 02-16 DIVISION 13 - SPECIAL CONSTRUCTION 13 05 41 13 13 13 13 13 17 17 19 21 34 23 23.11 13 29 19 Seismic Restraint Requirements for Non-Structural Components Therapeutic Pools Therapeutic Pool Accessories Kennel Enclosures and Gates Constant Temperature Rooms Metal Building Systems 00 01 10-5 01-14 05-15 05-15 02-16 11-11 01-13 04-01-16 13 49 00 Radiation Protection 02-16 DIVISION 14– CONVEYING EQUIPEMENT 14 14 14 14 14 14 14 14 14 12 21 21 24 24 24 26 91 91 11 00 11 00 11 24 26 33 82 Electric Dumbwaiters Geared Traction and Winding Drum Electric Traction Elevators Traction Cartlift Hydraulic Elevators Hydraulic Cartlift Renovation Hydraulic Elevator (Custom Written by VACO) Renovation Traction Elevator (Custom Written by VACO) Laundry and Linen Chutes Trash Chutes 05-11 09-11 06-11 05-11 06-11 06-12 06-12 DIVISION 21- FIRE SUPPRESSION 21 08 00 21 12 00 21 13 13 21 13 16 21-22-00 21-30-13 21-30-16 Commissioning of Fire Suppression System Manual Dry Standpipe Systems Wet-Pipe Sprinkler Systems Dry-Pipe Sprinkler Systems Clean Agent Fire Suppression Systems Electric-Driven, Fire Pumps Diesel-Driven, Fire Pumps 05-15 06-15 06-15 01-15 05-15 05-15 05-15 DIVISION 22 – PLUMBING 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 22 05 05 05 05 05 07 08 11 11 12 13 13 13 13 13 14 14 14 14 15 31 33 34 35 40 42 11 12 19 23 33 11 00 00 23 16 00 23 29 29.13 33 00 29 33 36 00 11 00 00 00 00 26 Common Work Results for Plumbing General Motor Requirements for Plumbing Equipment Meters and Gages for Plumbing Piping General-Duty Valves for Plumbing Piping Heat Tracing for Plumbing Piping Plumbing Insulation Commissioning of Plumbing Systems Facility Water Distribution Domestic Water Pumps Facility Elevated, Potable-Water Storage Tanks Facility Sanitary and Vent Piping Sanitary Waste Interceptors Sanitary Sewerage Pumps Wet-Pit Mounted, Vertical Sewerage Pumps Packaged, Submersible Sewerage Pump Units Facility Storm Drainage Sump Pumps Packaged, Pedestal Drainage Pump Units Packaged, Submersible, Drainage Pump Units General Service Compressed-Air Systems Water Softeners Electric Domestic Water Heaters Fuel-Fired Domestic Water Heaters Domestic Water Heat Exchangers Plumbing Fixtures Commercial Disposers 00 01 10-6 09-15 09-15 09-15 09-15 09-15 09-15 06-13 09-15 09-15 09-15 09-15 09-15 09-15 09-15 09-15 09-15 09-15 09-15 09-15 09-15 09-15 09-15 09-15 09-15 09-15 09-15 04-01-16 22 22 22 22 22 22 61 61 62 62 63 66 13.74 19.74 00 19.74 00 00 22 67 19.16 22 67 21 Dental Compressed-Air Piping Dental Compressed-Air Equipment Vacuum Systems for Laboratory and Healthcare Facilities Dental Vacuum and Evacuation Equipment Gas Systems for Laboratory and Healthcare Facilities Chemical-Waste Systems for Laboratory and Healthcare Facilities Reverse-Osmosis Water Equipment Water Dealkalizing System 09-15 09-15 09-15 09-15 09-15 09-15 09-15 09-15 DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) 23 05 10 23 05 11 23 05 12 23 05 41 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 23 05 05 07 08 08 09 09 10 11 21 21 21 22 22 23 25 31 34 36 37 38 40 50 51 52 52 52 56 57 64 65 72 73 51 93 11 00 11 11 23 00 23 11 13 23 13 23 00 00 00 00 00 00 13 00 11 00 25 33 39 00 33 00 00 00 00 Common Work Results for Boiler Plant and Steam Generation Common Work Results for HVAC General Motor Requirements for HVAC and Steam Generation Equipment Noise and Vibration Control for HVAC Piping and Equipment Noise and Vibration Control for Boiler Plant Testing, Adjusting, and Balancing for HVAC HVAC and Boiler Plant Insulation Commissioning of HVAC Systems Demonstrations and Tests for Boiler Plant Instrumentation and Control for Boiler Plant Direct-Digital Control System for HVAC Facility Fuel Systems Facility Natural-Gas Piping Boiler Plant Piping Systems Hydronic Piping Hydronic Pumps Steam and Condensate Heating Piping Steam Condensate Pumps Refrigerant Piping HVAC Water Treatment HVAC Ducts and Casings HVAC Fans Air Terminal Units Air Outlets and Inlets Commercial-Kitchen Hoods HVAC Air Cleaning Devices Boiler Plant Mechanical Equipment Breechings, Chimneys, and Stacks Low-Pressure Water Heating Boilers Water-Tube Boilers Fire-Tube Boilers Solar Energy Heating System Geothermal Energy – Direct Use (Heating Applications) Packaged Water Chillers Cooling Towers Air-to-Air Energy Recovery Equipment Indoor Central-Station Air-Handling Units 00 01 10-7 02-15 02-15 11-10 02-15 02-15 02-15 02-15 06-13 02-15 02-15 09-11 02-15 02-15 02-15 09-12 02-15 02-15 02-15 02-15 02-15 03-13 02-15 02-15 02-15 01-11 02-12 05-11 05-11 05-10 02-15 02-15 01-13 01-13 04-11 02-15 05-11 04-11 04-01-16 23 23 23 23 23 23 23 23 23 74 81 81 81 81 81 82 82 84 13 00 23 43 46 49 00 16 00 Packaged, Outdoor, Central-Station Air-Handling Units Decentralized Unitary HVAC Equipment Computer-Room Air-Conditioners Air-Source Unitary Heat Pumps Water-Source Unitary Heat Pumps Ground-Source Heat Pump Convection Heating and Cooling Units Air Coils Humidity Control Equipment 04-11 02-11 04-11 04-11 04-11 01-13 04-11 04-11 05-11 DIVISION 25 – INTEGRATED AUTOMATION 25 10 10 Advanced Utility Metering System 02-10 DIVISION 26 – ELECTRICAL 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 26 05 05 05 05 05 05 05 05 05 08 09 11 12 13 13 20 22 23 23 24 24 24 25 26 11 13 19 26 33 36 39 41 73 00 23 16 19 13 16 11 00 00 13 13 16 19 11 00 26 26 26 26 26 26 26 26 26 26 26 26 27 29 29 32 33 35 36 41 42 43 51 55 26 11 21 13 53 26 23 00 00 13 00 71 Requirements for Electrical Installations Medium-Voltage Cables Low-Voltage Electrical Power Conductors and Cables Grounding and Bonding for Electrical Systems Raceway and Boxes for Electrical Systems Wireways for Radiology Equipment Underfloor Raceways for Electrical Systems Underground Electrical Construction Overcurrent Protective Device Coordination Study Commissioning of Electrical Systems Lighting Controls Secondary Unit Substations Pad-Mounted, Liquid-Filled, Medium-Voltage Transformers Medium-Voltage Circuit Breaker Switchgear Medium-Voltage Fusible Interrupter Switches Isolated Power Systems Low-Voltage Transformers Low-Voltage Switchgear Generator Paralleling Controls Distribution Switchboards Panelboards Motor Control Centers Busways Power Distribution Units for Static Uninterruptible Power Systems Wiring Devices Motor Controllers Enclosed Switches and Circuit Breakers Engine Generators Static Uninterruptible Power Supply Harmonic Filters Automatic Transfer Switches Facility Lightning Protection Cathodic Protection Surge Protective Device Interior Lighting Medical and Surgical Lighting Fixtures 00 01 10-8 01-16 12-12 07-13 12-12 05-14 05-14 08-14 12-12 12-15 06-13 05-14 02-16 12-15 12-12 12-12 07-15 12-15 12-12 12-12 08-14 05-14 08-14 12-12 08-14 01-16 08-14 12-12 07-15 12-12 08-14 12-12 12-12 12-12 12-12 08-14 11-14 04-01-16 26 56 00 Exterior Lighting 05-14 DIVISION 27 – COMMUNICATIONS 27 27 27 27 27 27 27 27 27 27 05 05 05 05 08 10 11 15 31 31 11 26 33 61 00 00 00 00 00 31 27 27 27 27 27 27 27 32 41 51 51 52 52 53 41 31 16 23 23 41 19 Requirements for Communications Installations Grounding and Bonding for Communications Systems Raceways and Boxes for Communications Systems Leased Space, Communication Equipment and Systems Commissioning of Communications Systems Control, Communication and Signal Wires Communications Equipment Room Fittings Communications Horizontal Cabling Voice Communications Switching and Routing Equipment Voice Communications Switching and Routing Equipment Extension Two-Way Radio Equipment and Systems Master Antenna Television Equipment and Systems Public Address and Mass Notification Systems Intercommunications and Program Systems Nurse Call and Code Blue Systems Miscellaneous Medical Systems Distributed Radio Antenna (Within Building) Equipment and System 06-15 06-15 06-15 06-15 06-15 06-15 06-15 01-16 06-15 06-15 10-15 06-15 10-15 06-15 10-15 06-15 09-12 DIVISION 28 – ELECTRONIC SAFETY AND SECURITY 28 05 00 28 05 13 28 05 26 28 05 28.33 28 28 28 28 28 28 28 28 28 08 13 13 13 16 23 26 31 52 00 00 16 53 00 00 00 00 31 Common Work Results for Electronic Safety and Security Conductors and Cables for Electronic Safety and Security Grounding and Bonding for Electronic Safety and Security Conduits and Backboxes for Electronic Safety and Security Commissioning of Electronic Safety and Security Systems Physical Access Control System Physical Access Control System and Database Management Security Access Detection Intrusion Detection System Video Surveillance Electronic Personal Protection System Fire Detection and Alarm Emergency Call System 09-11 09-11 09-11 09-11 06-13 10-11 09-11 09-11 10-11 09-11 09-11 10-11 06-15 DIVISION 31 – EARTHWORK 31 31 31 31 31 31 31 31 20 20 23 23 32 62 63 63 00 11 19 23.33 23 00 16 26 Earthwork Earthwork (Short Form) Dewatering Flowable Fill Pressure Grouting Soil Stabilization Driven Piles Auger Cast Grout Piles Drilled Caissons 00 01 10-9 10-12 10-12 10-12 10-12 10-12 10-12 10-12 10-12 04-01-16 DIVISION 32 – EXTERIOR IMPROVEMENTS 32 32 32 32 32 32 32 32 05 12 14 17 31 31 84 90 23 16 16 23 13 53 00 00 Cement and Concrete for Exterior Improvements Asphalt Paving Brick Unit Paving Pavement Markings Chain Link Fences and Gates Perimeter Security Fences and Gates Planting Irrigation Planting 05-13 09-15 04-10 04-10 05-13 05-13 10-11 10-11 DIVISION 33 – UTILITIES 33 33 33 33 33 33 33 08 10 30 40 46 51 63 00 00 00 00 13 00 00 Commissioning of Site Utility Systems Water Utilities Sanitary Sewer Utilities Storm Sewer Utilities Foundation Drainage Natural-Gas Distribution Steam Energy Distribution 06-13 01-14 06-13 10-11 10-11 10-11 06-13 DIVISION 34 – TRANSPORTATION 34 71 13 34 75 13.13 Vehicle Barriers Active Vehicle Barriers 05-13 05-13 DIVISION 48 – Electrical Power Generation 48 14 00 48 15 00 48 16 23 Solar Energy Electrical Power Generation System Wind Energy Electrical Power Generation System Geothermal Energy – Electricity Generation System 00 01 10-10 01-13 01-13 01-13