(Supplements UFC 4-211-01, Maintenance Hangar) DESIGN GUIDE (DG)

advertisement
DESIGN GUIDE (DG)
AIR FORCE
FIGHTER HANGAR/AMU FACILITY
(Supplements UFC 4-211-01,
Maintenance Hangar)
APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
DESIGN GUIDE (DG)
UNITED STATES AIR FORCE
FIGHTER HANGAR/AMU FACILITY
Any copyrighted material included in this DG is identified at its point of use.
Use of the copyrighted material apart from this DG must have the permission of the copyright
holder.
AIR FORCE CIVIL ENGINEER CENTER (Preparing Activity)
Record of Changes (changes are indicated by \1\ ... /1/)
Change No.
1
Date
Location
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
FOREWORD
Air Force Design Guides (DG) provide functional guidance (i.e., defined by users and
operational needs of a particular facility type) for the US Air Force, and are intended to
supplement published DoD Unified Facilities Criteria (UFC) as referenced in the title. DG
documents are applicable only to the DoD Component(s) indicated in the title, and do not
represent unified DoD guidance. Differences in functional guidance between DoD Components
may exist due to differences in policies and operational needs.
All construction outside of the United States is also governed by Status of Forces Agreements
(SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances,
Bilateral Infrastructure Agreements (BIA.) Therefore, the acquisition team must ensure
compliance with the most stringent of the DG, the SOFA, the HNFA, and the BIA, as applicable.
DG documents are coordinated with unified DoD technical requirements and formatted to
facilitate potential future unification as an element of the DoD UFC system applicable to specific
facility types. The UFC system is prescribed by MIL-STD 3007 and provides planning, design,
construction, sustainment, restoration, and modernization guidance, and applicable to the
Military Departments, Defense Agencies, and the DoD Field Activities. The UFC System also
includes technical requirements and functional requirements for specific facility types, both
published as UFC documents and Facility Criteria (FC) documents.
DGs are living documents and will be periodically reviewed, updated, and made available to
users as part of the Services’ responsibility for providing guidance for military construction.
Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering
Command (NAVFAC), and the Air Force Civil Engineer Center (AFCEC) are responsible for
administration of the UFC system. Defense agencies should contact the preparing service for
document interpretation and improvements. Technical content is the responsibility of the
cognizant DoD discipline working group. For Air Force DG documents, recommended changes
with supporting rationale should be sent to the following email address:
afcec.cft.workflow@us.af.mil.
DG is effective upon issuance and is distributed only in electronic media from the following
source:
• Whole Building Design Guide web site http://www.wbdg.org/.
i
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
AIR FORCE DESIGN GUIDE (DG)
NEW SUMMARY SHEET
Document: FIGHTER HANGAR/AMU FACILITY DG
Superseding: None
Description: This DG provides guidance for evaluating, planning, programming, and
designing Fighter Hangar/AMU (Aircraft Maintenance Unit) Facilities. The information in
this DG applies to the design of all new construction projects, to include additions,
alterations, and renovation projects in the continental United States (CONUS) and
outside the continental United States (OCONUS). It also applies to the procurement of
design/build services for the above-noted projects. Alteration and renovation projects
should update existing facilities to meet the guidance within budgetary constraints.
Reasons for Document: This DG is the initial release to provide guidance for the
Fighter Hangar/AMU Facility. It defines the guidance for determining appropriately
sized, flexible, cost-optimized, durable, quality-designed facilities on a lifecycle basis to
support the mission. These are concepts only and are primarily intended to
communicate functional user guides. A thorough compliance check of all other
applicable criteria is required.
Impact: This DG will facilitate and standardize the design of Fighter Hangar/AMU
Facilities throughout the Air Force.
•
It will provide more complete and consistent project guidance and will expedite
the programming and design of facilities and reduce initial design cost.
•
The improved performance-based guide will reduce design-build proposals.
Unification Issues: None
ii
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
CONTENTS
CHAPTER 1 INTRODUCTION ....................................................................................... 1
1-1
GENERAL INFORMATION .................................................................................. 1
1-2
GENERAL BUILDING REQUIREMENTS ............................................................ 1
1-3
REFERENCES ..................................................................................................... 2
1-4
INSTRUCTIONS................................................................................................... 2
1-4.1
Standard Facility Prototype Tools.................................................................. 2
1-4.2
Supplemental Facilities Guidance & Criteria ................................................. 2
1-4.2.1 Notional Site Plan ..................................................................................... 2
1-4.2.2 Composite Facility Adjacency Diagram(s)/Composite Floor Plan(s) ......... 2
1-4.2.3 Modules .................................................................................................... 3
1-4.2.4 Module Flexibility/Adjustments .................................................................. 3
1-4.2.5 Room Data Sheets .................................................................................... 4
1-4.3
Programming Sheet(s) .................................................................................. 4
1-4.4
Design Drawings – BIM ................................................................................. 4
1-4.5
Additions and Alterations ............................................................................... 4
1-4.6
Sustainability ................................................................................................. 4
CHAPTER 2 SITE AND OVERALL ADJACENCY ......................................................... 5
2-1
GENERAL FACILITY OVERVIEW....................................................................... 5
2-2
NOTIONAL SITE PLAN ....................................................................................... 5
2-2.1
Site Location and Orientation ........................................................................ 5
2-2.2
Vehicular and Pedestrian Circulation ............................................................ 6
2-3
COMPOSITE FACILITY ADJACENCY DIAGRAMS ........................................... 8
CHAPTER 3 FACILITY REQUIREMENTS AND GUIDES.............................................. 9
3-1
MODULE A – HANGAR BAY MODULE .............................................................. 9
3-1.1
Function and Adjacency ................................................................................ 9
3-1.2
Hangar Bay ................................................................................................. 11
3-1.3
Data Sheets................................................................................................. 12
3-2
MODULE B – HANGAR BAY SUPPORT MODULE ......................................... 13
3-2.1
Function and Adjacency .............................................................................. 13
3-2.2
Hangar Bay Support .................................................................................... 14
3-2.3
Data Sheets................................................................................................. 15
3-3
MODULE C – AMU ADMINISTRATION MODULE ............................................ 19
3-3.1
Function and Adjacency .............................................................................. 19
3-3.2
AMU Administration ..................................................................................... 20
3-3.3
Data Sheets................................................................................................. 21
iii
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-4
MODULE D – READY ROOM MODULE ........................................................... 26
3-4.1
Function and Adjacency .............................................................................. 26
3-4.2
Ready Room ............................................................................................... 27
3-4.3
Data Sheets................................................................................................. 28
3-5
MODULE E – FLIGHT LINE MANAGEMENT MODULE ................................... 36
3-5.1
Function and Adjacency .............................................................................. 36
3-5.2
Flight Line Management .............................................................................. 37
3-5.3
Data Sheets................................................................................................. 38
3-6
MODULE F – ENGINE SHOP MODULE ........................................................... 42
3-6.1
Function and Adjacency .............................................................................. 42
3-6.2
Engine Shop ................................................................................................ 43
3-6.3
Data Sheets................................................................................................. 44
3-7
MODULE G – TOOL AND PARTS SUPPORT MODULE .................................. 48
3-7.1
Function and Adjacency .............................................................................. 48
3-7.2
Tool and Parts Support ............................................................................... 49
3-7.3
Data Sheets................................................................................................. 50
3-8
MODULE H – BATTERY SHOP MODULE ........................................................ 57
3-8.1
Function and Adjacency .............................................................................. 57
3-8.2
Battery Shop................................................................................................ 58
3-8.3
Data Sheets................................................................................................. 59
3-9
MODULE I – WHEEL AND TIRE SHOP MODULE ............................................ 62
3-9.1
Function and Adjacency .............................................................................. 62
3-9.2
Wheel and Tire Shop ................................................................................... 63
3-9.3
Data Sheets................................................................................................. 64
3-10 MODULE J – EGRESS SHOP MODULE .......................................................... 66
3-10.1 Function and Adjacency .............................................................................. 66
3-10.2 Egress Shop ................................................................................................ 67
3-10.3 Data Sheets................................................................................................. 68
3-11 MODULE K – BUILDING SUPPORT MODULE ................................................ 73
3-11.1 Function and Adjacency .............................................................................. 73
3-11.2 Building Support .......................................................................................... 74
3-11.3 Data Sheets................................................................................................. 75
3-12 MODULE L – CIRCULATION ROOM MODULE................................................ 79
CHAPTER 4 ENGINEERING/TECHNICAL CRITERIA ................................................ 80
4-1
NOT USED. ........................................................................................................ 80
APPENDIX A REFERENCES ....................................................................................... 82
APPENDIX B PROGRAMMING SHEET LINK ............................................................. 88
iv
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
APPENDIX C GLOSSARY ........................................................................................... 97
v
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
FIGURES
Figure 2-1 Notional Site Diagram................................................................................. 7
Figure 2-2 Functional Adjacency Diagram ................................................................... 8
Figure 3-1 Module A Adjacency Diagram .................................................................. 10
Figure 3-2 Module A Floor Plan and Axonometric ..................................................... 11
Figure 3-3 A1 Hangar Bay Room Data Sheet ............................................................ 12
Figure 3-4 Module B Adjacency Diagram .................................................................. 13
Figure 3-5 Module B Floor Plan and Axonometric ..................................................... 14
Figure 3-6 B1 IPA/HAZ Room Data Sheet................................................................. 15
Figure 3-7 B2 Laundry Room Data Sheet.................................................................. 16
Figure 3-8 B3 Zamboni Room Data Sheet................................................................. 17
Figure 3-9 B4 Aircraft Data Input Room Data Sheet .................................................. 18
Figure 3-10 Module C Adjacency Diagram ................................................................ 19
Figure 3-11 Module C Floor Plan and Axonometric ................................................... 20
Figure 3-12 C1 Assistant OIC/Chief/Super Room Data Sheet................................... 21
Figure 3-13 C2 AMU Administration Office Room Data Sheet .................................. 22
Figure 3-14 C3 Mechanical/Electrical Room Data Sheet ........................................... 23
Figure 3-15 C4 Toilet Room Data Sheet.................................................................... 24
Figure 3-16 C5 Entry Corridor Room Data Sheet ...................................................... 25
Figure 3-17 Module D Adjacency Diagram ................................................................ 26
Figure 3-18 Module D Floor Plan and Axonometric ................................................... 27
Figure 3-19 D1 Ready Room Data Sheet .................................................................. 28
Figure 3-20 D2 MIS Unclassified Room Data Sheet .................................................. 29
Figure 3-21 D3 Break/Galley Room Data Sheet ........................................................ 30
Figure 3-22 D4 Storage Room Data Sheet ................................................................ 31
Figure 3-23 D5 ALIS Classified Room Data Sheet .................................................... 32
Figure 3-24 D6 Toilet/Locker/Shower Room Data Sheet ........................................... 33
Figure 3-25 D7 Janitor Room Data Sheet.................................................................. 34
Figure 3-26 D8 Corridor Room Data Sheet ............................................................... 35
Figure 3-27 Module E Adjacency Diagram ................................................................ 36
Figure 3-28 Module E Floor Plan and Axonometric ................................................... 37
Figure 3-29 E1 Flight Line Management Room Data Sheet ...................................... 38
Figure 3-30 E2 Classified Maintenance Debrief Room Data Sheet ........................... 39
Figure 3-31 E3 Maintenance Debrief Room Data Sheet............................................ 40
Figure 3-32 E4 Conference Room Data Sheet .......................................................... 41
Figure 3-33 Module F Adjacency Diagram ................................................................ 42
Figure 3-34 Module F Floor Plan and Axonometric ................................................... 43
Figure 3-35 F1 Engine Shop Room Data Sheet ........................................................ 44
Figure 3-36 F2 Engine Shop Office Room Data Sheet .............................................. 45
Figure 3-37 F3 Tool Crib Room Data Sheet .............................................................. 46
Figure 3-38 F4 Engine Shop Storage Room Data Sheet ........................................... 47
Figure 3-39 Module G Adjacency Diagram ................................................................ 48
Figure 3-40 Module G Floor Plan and Axonometric ................................................... 49
Figure 3-41 G1 HAZMAT Room Data Sheet ............................................................. 50
Figure 3-42 G2 Shop Office Room Data Sheet ......................................................... 51
Figure 3-43 G3 Tool/Parts Storage Room Data Sheet .............................................. 52
Figure 3-44 G4 Assembly Room Data Sheet............................................................. 53
Figure 3-45 G5 Tool Issue Room Data Sheet............................................................ 54
vi
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-46 G6 Secure Vault Room Data Sheet ........................................................ 55
Figure 3-47 G7 TNB/FOM Room Data Sheet ............................................................ 56
Figure 3-48 Module H Adjacency Diagram ................................................................ 57
Figure 3-49 Module H Floor Plan and Axonometric ................................................... 58
Figure 3-50 H1 Battery Shop Room Data Sheet ........................................................ 59
Figure 3-51 H2 Shop Office Room Data Sheet .......................................................... 60
Figure 3-52 H3 Charging Room Data Sheet .............................................................. 61
Figure 3-53 Module I Adjacency Diagram.................................................................. 62
Figure 3-54 Module I Floor Plan and Axonometric .................................................... 63
Figure 3-55 I1 Wheel and Tire Shop Room Data Sheet ............................................ 64
Figure 3-56 I2 Office Room Data Sheet..................................................................... 65
Figure 3-57 Module J Adjacency Diagram ................................................................. 66
Figure 3-58 Module J Floor Plan and Axonometric .................................................... 67
Figure 3-59 J1 Egress Maintenance Room Data Sheet............................................. 68
Figure 3-60 J2 Administration/Ready Room Data Sheet ........................................... 69
Figure 3-61 J3 Egress Support CTK Room Data Sheet ............................................ 70
Figure 3-62 J4 Egress Storage Room Data Sheet .................................................... 71
Figure 3-63 J5 CAD/PAD Room Data Sheet ............................................................. 72
Figure 3-64 Module K Adjacency Diagram ................................................................ 73
Figure 3-65 Module K Floor Plan and Axonometric ................................................... 74
Figure 3-66 K1 Communications Room Data Sheet .................................................. 75
Figure 3-67 K2 Electrical Room Data Sheet .............................................................. 76
Figure 3-68 K3 Fire Pump Room Data Sheet ............................................................ 77
Figure 3-69 K4 Mechanical Room Data Sheet .......................................................... 78
Figure 3-70 Circulation Room Data Sheet ................................................................. 79
vii
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
CHAPTER 1 INTRODUCTION
1-1
GENERAL INFORMATION
This standard facility prototype design guidance was developed to assist Air Force
planners in preparing and validating DD Form 1391 requirements and to assist
architect-engineer (A-E) design professionals with the approved project-specific design
requirements. It is a source of basic programming and functional information for the
fighter hangar/AMU facility. This standard is consistent with Air Force Corporate Facility
Standards (AFCFS) and Unified Facilities Criteria (UFC). This standard, in conjunction
with the AFCFS, is intended to define Air Force expectations for project programming
and A-E design decisions.
The standard facility prototype design program defines consistent facility requirements
across the Air Force enterprise to expedite delivery of a facility. This standard was
designed in compliance with AFMAN 32-1084. The objective is to deliver appropriately
sized, flexible, cost-optimized, durable, quality-designed facilities on a lifecycle basis to
support the Air Force mission.
This standard facility prototype represents a shift in Air Force facility design philosophy
toward maximizing the use of open office space and systems furniture. This design
approach allows maximum flexibility to reconfigure the building space as mission needs
change. Where offices require sound attenuation and physical or visual separation,
evaluate the use of systems furniture or demountable partition walls in lieu of full-height
hard wall construction. Maximizing open office space may require more systems
furniture and funding must be listed on the DD Form 1391 as a furniture, fixtures, and
equipment (FF&E) cost. Comply with the latest Air Force policy on centralized
procurement of systems and other furniture.
1-2
GENERAL BUILDING REQUIREMENTS
Comply with UFC 1-200-01. UFC 1-200-01 provides applicability of model building
codes and government-unique criteria for typical design disciplines and building
systems, as well as for accessibility, antiterrorism, security, high-performance and
sustainability requirements, and safety. Use this DG in addition to UFC 1-200-01 and
the UFCs and government criteria referenced therein.
Lighting systems must meet ASHRAE 90.1; refer to UFC 1-200-02 for the ASHRAE
publication year. Note that the requirements included in this DG refer to ASHRAE 90.12010. When UFC 1-200-02 adopts a newer publication year of ASHRAE 90.1 it will
have precedence over these DG requirements.
Note: Often, the hangar bay portion of these facilities is designated as a low-occupancy
portion of the hangar. By structurally isolating the administrative or higher occupancy
area of the hangar from the low-occupancy hangar bay, the design is able to exempt the
hangar bay portion from the requirements of UFC 4-010-01.
1
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
1-3
REFERENCES
Appendix A contains a list of related documents and references to use in conjunction
with this DG. The publication date of the code or standard is not included. In general,
use the latest available issuance of the reference.
1-4
INSTRUCTIONS
The standard facility prototype was developed by determining personnel counts,
allowable/authorized space/room sizes, adjacency diagrams between the functional
spaces and the overall facility space requirements. It establishes Air Force guidance for
the facility type. Use these guides in conjunction with other Air Force policy and
regulations such as Air Force departmental publications, and UFCs when programming
and designing this facility type. Supplement this DG with a thorough review by individual
program managers and operations staff.
1-4.1
Standard Facility Prototype Tools
This standard facility prototype consists of four parts to be used by programmers and
designers:
•
•
•
1-4.2
DG for standard prototype (this DG document)
Interactive programming sheet
Facility Building Information Modeling (BIM) drawings
Supplemental Facilities Guidance & Criteria
The design guidance & criteria consist of three primary components:
•
•
•
1-4.2.1
Notional site plan
Composite facility adjacency diagram(s)/composite floor plan(s)
Modules with associated room data sheets
Notional Site Plan
The notional site plan diagram demonstrates key site development criteria. It is not a
site-specific solution. The information represents the land requirements to construct this
facility and includes associated antiterrorism/force protection (AT/FP) standoff and
parking. Utilization of existing or shared parking is allowable and may reduce the total
acreage required for the facility. Adapt the requirements to the specific site and location
and comply with the applicable Installation Development Plan (IDP) and Area
Development Plan (ADP) for facility siting.
1-4.2.2
Composite Facility Adjacency Diagram(s)/Composite Floor Plan(s)
The composite facility adjacency diagram(s) represent ways to conceptually assemble
the functional areas (modules) into a cohesive whole. They demonstrate how the
various functional components of the facility type can be successfully placed together
into layout diagrams. Individual modules are represented by different colors. Composite
2
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
diagrams demonstrate acceptable ways the fixed modules can be placed together into
conceptual building plans. They are not intended to be definitive building designs.
Composite floor plans indicate definitive floor plans and represent the approved plan
solutions that fully satisfy all functional requirements. Effectively, the plan becomes a
“super module,” demonstrates a standard/approved building floor plan, and must be
used in total. Plan variation other than rotating, flipping, or reversing to fit the actual site
must be coordinated with and approved by AFCEC.
1-4.2.3
Modules
Spaces and rooms that are integrally related with a specific functional connection or
operational flow are grouped into a module. Modules and the associated room data
sheets identify specific criteria and additional details for each functional area of the
facility as outlined in the space programming sheets in Appendix B. Information is
provided in a standard presentation and data sheet format. The required space
adjacencies and modules are illustrated in figures.
The modules are a grouping of functional spaces and represent “Lego blocks” to be
used in a “kit-of-parts” design approach. Use the fixed modules as pre-assembled
pieces of the facility “puzzle.” Assemble them to comply with the required adjacencies
indicated in the diagrams and module plans. Arrange modules and create a
configuration/composite building layout/plan responding to the constraints and
opportunities of the specific site.
The resulting shape of the facility assembled from the standard facility prototype
modules must provide construction efficiencies obtained from building proportions and
overall configuration. The building footprint shall be organized and well composed. The
building design must comply with the Installation Facility Standards (Architectural
Compatibility Plan) and the AFCFS.
1-4.2.4
Module Flexibility/Adjustments
Modules must be used as designed to the greatest extent possible and shall not be
deconstructed or altered except as indicated herein. The intent of the standard facility
prototype criteria is to avoid manipulation of the composition, functional relationships,
adjacencies, and module sizes. Modules contain fixed attributes and must not be
arbitrarily changed. However, modules may be rotated, flipped, and reversed to
accommodate an overall composition or site issue. When the fixed modules cannot be
arranged to produce a constructible floor plan due to site constraints, it is permissible to
slightly adjust a module proportion to create a constructible plan. Manipulating the
module shape must not result in an overall increase in square feet or reduce the
functionality of any module or the composite plan.
Some modules are linked to space requirements that increase or decrease in size
based on the personnel count and equipment for a particular mission. In these cases,
increase or decrease the size of the module to match the revised scope calculation.
This may sometimes require minor adjustments in other adjacent modules so that they
properly fit together to create a constructible facility floor plan. Spaces must comply with
any critical dimensions indicated on the module plans. Manipulate as few modules as
3
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
possible to create a constructible facility. The resulting composite plan must respect the
established module adjacencies and must not exceed the authorized project scope.
1-4.2.5
Room Data Sheets
Specific requirements for each room, space, or area are provided on room data sheets
that are located following their respective module. Information contained on the data
sheets defines the functional and physical requirements for each of the spaces within
the facility type.
1-4.3
Programming Sheet(s)
This tool is provided in two formats. A programming sheet is provided in Appendix B as
a reference and reflects the baseline standard facility program. The additional
interactive programming sheet provides a tool for planners and programmers. It allows
the input of authorized personnel positions and special purpose spaces. Updated inputs
are automatically calculated and provide new required square footage for each space
and the estimated overall facility size. A link is provided in Appendix B for access to the
interactive tool.
1-4.4
Design Drawings – BIM
This component of the standard facility prototype tool includes both a Portable
Document Format (PDF) version and Revit version of the modules and rooms. The
spaces, rooms and modules shown reflect the programming sheet linked in Appendix B.
The drawings in this DG are exact copies of the larger BIM drawings and comply with
the program scope. The BIM drawings provide a starting point for the digitization of
building data and a starting point in the design/construction of a facility. BIM and PDF
documents are found at the link provided in Appendix B.
1-4.5
Additions and Alterations
For additions and alterations to existing facilities, use the adjacencies, sizing/scope, and
detailed requirements contained in the site diagrams, module drawings, and room data
sheets to the maximum extent possible. The functionality and adjacency of the modules
are still valid but may require some manipulation to fit into existing spaces. This
standard may be slightly modified to accommodate the existing structure. However,
proposed adjustments to the standard must be submitted to AFCEC for functional
issues and deviations from the core requirements. Move non-structural walls to the
greatest extent possible to open up space in the existing facilities to make them more
receptive to the placement of the modules. The planner and designer shall determine
the most efficient means to balance the placement of modules within existing spaces or
as a facility addition.
1-4.6
Sustainability
Meet the requirements of UFC 1-200-02, High Performance and Sustainable Building
Requirements, and achieve green building certification in accordance with the current
AF Sustainable Design and Development memo. See Appendix B for interactive
Sustainability Requirements Scoresheet.
4
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
CHAPTER 2 SITE AND OVERALL ADJACENCY
2-1
GENERAL FACILITY OVERVIEW
The Fighter Hangar/AMU Facility is typically a one-story structure but a two-story
scenario is envisioned if there are site constraints as well as a linear hangar scenario in
lieu of the tail-to-tail hangar scenario. The fighter hangar/AMU facility will serve as a
standalone facility on the flight line. This hangar houses increments of two fighter
aircraft in a tail-to-tail or wing-to-wing linear configuration. (The linear hangar scenario is
not the most desirable due to the additional area required for engine repair/replacement
and the additional travel distance to the AMU portion of the facility.) The F-22 footprint
was used as the basis of design but all fourth- and fifth-generation fighters, including the
F-15, F-16, and F-35, are being considered as possible candidates to receive this
facility type. The fighter hangar/AMU facility will consist of, but not be limited to, the
following modules: Hangar Bay Module (housing increments of two airframes; typically
six aircraft for a squadron), Hangar Bay Support Module, AMU Administration Module,
Ready Room Module, Flight Line Management Module, Engine Shop Module, Tools
and Parts Support Module, Battery Shop Module, Wheel and Tire Shop Module, Egress
Shop Module, and Building Support Module. The Battery Shop Module, Wheel and Tire
Shop Module, and Egress Shop Module will be added if there is more than one
squadron and/or if there is no separate building for these modules. There may be a
scenario where there is a standalone AMU facility without the fighter hangar component
and would consist of a Tools and Parts Support Module, AMU Administration Module,
Ready Room Module, Flight Line Management Module, and Building Support Module. A
standalone fighter hangar without an AMU component will have the same requirements
as a fighter hangar/AMU facility without the AMU-related modules.
AFCFS: Consult the AFCFS website at: http://afcfs.wbdg.org to determine the facility
requirements and quality standards for this facility group. This standard facility prototype
is in the Group 3 hierarchy.
Facility Users/Occupants: This facility is operated by Active Duty, National Guard, and
Reserve military personnel as well as contractor representatives from the aircraft types.
Operational Aspects: Hours of operation for this facility type are user driven and vary
up to two shifts, with approximately 30 personnel per shift.
2-2
NOTIONAL SITE PLAN
The site diagram represents a notional layout to reflect site development
requirements/criteria only. It is not an actual site design. Siting must comply with the
IDP and ADP.
2-2.1
Site Location and Orientation
Emphasis shall be placed on operation, function, and safety when siting the facility. The
preferred location for this facility is immediately adjacent to the flight line or in close
proximity. Other facility functions placed in close proximity may include engine
maintenance shops, squadron operations, and aircraft sunshades. Analyze and comply
5
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
with airfield clearances, building setback restrictions, and line-of-sight restrictions from
the adjacent flight line.
The preferred orientation for this facility is such that the aircraft maintenance bays and
associated hangar access aprons are provided direct access to the flight line operations
area for ease of access to the facility for aircraft, flight line vehicles, and equipment.
The approximate project area required for the fighter hangar/AMU facility is 5.0 acres,
which includes AT/FP standoff and parking.
2-2.2
Vehicular and Pedestrian Circulation
Convenient and safe vehicular access and circulation shall be provided for personal
vehicles and essential services, including operations, maintenance, deliveries, trash and
garbage collection, and emergency services.
Parking shall be provided to accommodate the largest shift size, plus an additional 40
percent for shift overlap.
Separate the service drives to the facility from the parking circulation areas.
Locate sidewalk networks to provide convenient and safe pedestrian circulation from
existing circulation elements of the project site to the new parking areas and doors of
the facility.
6
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 2-1 Notional Site Diagram
7
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
2-3
COMPOSITE FACILITY ADJACENCY DIAGRAMS
The functional adjacency diagram (Figure 2-2) is of a prototypical fighter hangar/AMU
facility for six fighter aircraft. The Hangar Bay Module, Hangar Bay Support Module,
Support Module, Engine Shop Module, Ready Room Module, and Flight Line
Management Module are required to have access to the flight line, with the Ready
Room Module and the Flight Line Management Module to have direct access (and
visual access) to the flight line. The AMU Administration Module is to be located on the
land side of the facility, with direct access from the POV and visitor parking lot. There
are multiple points of entry to the facility from the flight line to accommodate the
missions of the modules and a single point of entry to the AMU Administration Module
on the land side.
Figure 2-2 Functional Adjacency Diagram
8
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
CHAPTER 3 FACILITY REQUIREMENTS AND CRITERIA
3-1
MODULE A – HANGAR BAY MODULE
3-1.1
Function and Adjacency
The Hangar Bay Module consists of a high bay space to accommodate increments of
two aircraft, with enough clearance between wingtips and tails to accommodate storage
requirements as identified by fighter maintenance crews. The bay is designed to fit the
fighter aircraft tail-to-tail, with the nose of the aircraft facing the hangar doors. Steel
sliding hangar doors and vertical lift fabric doors are the two acceptable hangar door
options. An alternate hangar bay configuration would be a linear concept where aircraft
fit into the hangar wing-to-wing with enough space as required at the aircraft tail for
engine removal/replacement. This alternate configuration would fit a scenario where
there is limited site area for a tail-to-tail configuration. The linear configuration is not the
most desirable due to an increased hangar bay size to accommodate engine
removal/replacement; in a tail-to-tail configuration this engine removal/replacement area
is shared.
9
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-1 Module A Adjacency Diagram
10
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-1.2
Hangar Bay
Figure 3-2 Module A Floor Plan and Axonometric
11
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-1.3
Data Sheets
Figure 3-3 A1 Hangar Bay Room Data Sheet
Maintenance hangar bay for fighter aircraft for aircraft inspections,
tests, repairs, training, etc.
Minimum 27’-0” unobstructed clearances and as required to meet UFC
3-260-01 clearances
Translucent wall panels for daylighting
Description/Usage
Ceiling Height
Windows
Type
Doors
Security/
Hardware
View Panels/
Kick Plates
Walls
Finishes
Floor
Base
Ceiling
Plumbing
Keyed lock set
View panels, 5” x 20” at all exterior doors
Kick plates on both sides of doors
CMU – painted wainscot 8’ above floor, pre-finished metal wall or liner
panels above to roof deck
Epoxy-non-slip (fuel resistant) or dry shake hardener
No base
Exposed structure –painted
No floor drains. Wall mounted hose stations and hose reels for cold
water. Compressed air drops with hose reels - coordinate with user on
quantity and location. Emergency shower and eyewash per UFC 3-42001.
Heating and ventilation. Exhaust directly outdoors. May require
overhead radiant heating. May require snow-melting system at hangar
door tracks in colder climates. Aircraft may require preconditioned air.
HVAC
Fire Protection / Life Safety
Power
Lighting
Communication
Horizontal sliding hangar doors or vertical lift fabric doors
Hollow metal personnel doors - 3'x7'
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
Special Requirements
Provide draft curtains. Low-level high-expansion foam system. Fire
separation between office and shop areas. Wet pipe or dry pipe
sprinkler system as required by UFC 3-600-01.
3-phase 480V 200A outlets in addition to UFC 3-520-01 required devices
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
Per program security requirements
N/A
Per program security requirements
Per UFC 3-450-01 for noise control
Two 10-ton bridge cranes spanning to support 3 aircraft each (in 6-plane
scenario); overhead fall protection railing is required over fuselage and
wings.
Bird intrusion system at hangar bay trusses, e.g., bird netting, sonic
devices, anti-roosting spikes, etc.
For F-35, need 32’ tail-to-tail clearance for engine removal/replacement.
12
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-2
MODULE B – HANGAR BAY SUPPORT MODULE
3-2.1
Function and Adjacency
The Hangar Bay Support Module consists of an aircraft data input room with seven
workstations; Zamboni room for hangar bay floor cleaning; a laundry room; and a
IPA/HAZ room for collecting hazardous materials. Each room serves the hangar bay or
the aircraft inside the hangar bay.
Figure 3-4 Module B Adjacency Diagram
13
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-2.2
Hangar Bay Support
Figure 3-5 Module B Floor Plan and Axonometric
14
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-2.3
Data Sheets
Figure 3-6 B1 IPA/HAZ Room Data Sheet
Description/Usage
Initial point of accumulation of hazardous materials.
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
Keyed lock set
No view panels
Kick plates both sides of door
CMU or gypsum board - painted
Sealer hardener
Resilient
Gypsum board – painted, or exposed structure - painted
Plumbing
Emergency shower and eyewash stations per UFC 3-420-01.
HVAC
Heating and ventilation. Exhaust directly outdoors through roof.
Fire Protection / Life Safety
Wet pipe sprinkler
Power
Lighting
Per UFC 3-520-01 and NFPA 70 NEC for hazardous locations
Per UFC 3-530-01 and NFPA 70 NEC for hazardous locations
N/A
N/A
N/A
N/A
N/A
N/A
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
Recessed floor for chemical spill containment. Requires space for seven
55-gallon barrels and space for one 25-gallon barrel.
15
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-7 B2 Laundry Room Data Sheet
Description/Usage
Laundry room adjacent to hangar bay
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, pair 3'-7'
Keyed lock set
No view panels
Kick plates on both sides of doors
CMU or gypsum board - painted
Sealer hardener
Resilient
Gypsum board –painted, exposed structure - painted
Plumbing
Hot and cold water to washer, floor drain
HVAC
Air conditioned, ventilation, heating; dryer vent to exterior
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01 in addition to power for washers and dryers
Per UFC 3-530-01
N/A
N/A
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
Washer and dryer
Special Requirements
N/A
16
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-8 B3 Zamboni Room Data Sheet
Description/Usage
Room for hangar floor cleaning machines (two minimum)
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Overhead coiling door, 8' x 8' power-operated
Keyed lock set
N/A
CMU - painted
Sealer hardener
No base
Gypsum board – painted, exposed structure - painted
Plumbing
Hot and cold water, small janitor sink, floor drain
HVAC
Air conditioned, ventilation, heating
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01 in addition to charger unit power for floor cleaner
Per UFC-3-530-01
N/A
N/A
N/A
N/A
N/A
N/A
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
Need space for three 55 gallon barrels.
17
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-9 B4 Aircraft Data Input Room Data Sheet
Description/Usage
Room for aircraft maintenance crew to log in aircraft maintenance data
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of door
CMU or gypsum board - painted
Sealer hardener
Resilient
Acoustical ceiling tile
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
Seven (7) workstations
Special Requirements
N/A
18
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-3
MODULE C – AMU ADMINISTRATION MODULE
3-3.1
Function and Adjacency
The AMU Administration Module will be located on the land side of the facility. The
module consists of (OIC)/Chiefs Office (open office for four); an AMU Administrative
Office; Corridors; Men’s and Women’s Toilets; and Mechanical/Electrical room. This
module serves the administrative needs of the AMU.
Figure 3-10 Module C Adjacency Diagram
[
19
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-3.2
AMU Administration
Figure 3-11 Module C Floor Plan and Axonometric
20
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-3.3
Data Sheets
Figure 3-12 C1 Assistant OIC/Chief/Super Room Data Sheet
Description/Usage
Open office with 4 workstations
Ceiling Height
Windows
9'-0" minimum
Exterior insulated AT/FP
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7’
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of door
Systems furniture, demountable partitions or gypsum board - painted
Carpet tile
Resilient
Acoustical ceiling tile or exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
Four (4) workstations
Special Requirements
N/A
21
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-13 C2 AMU Administration Office Room Data Sheet
Description/Usage
Office with one workstation
Ceiling Height
Windows
9'-0" minimum
Exterior insulated AT/FP
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of door
Systems furniture, demountable partitions or gypsum board - painted
Carpet tile
Resilient
Acoustical ceiling tile or exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
One (1) workstation
Special Requirements
N/A
22
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-14 C3 Mechanical/Electrical Room Data Sheet
Description/Usage
Mechanical/Electrical equipment
Ceiling Height
Windows
No ceiling, 9'-0 minimum clearance
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, single 3' x 7'
Keyed lock set
No view panels
Kick plates on both sides of doors
CMU - painted
Sealed concrete
No base
Exposed structure - painted
Plumbing
N/A
HVAC
Heating and ventilation
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
Per UFC 3-580-01
N/A
N/A
N/A
N/A
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
23
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-15 C4 Toilet Room Data Sheet
Description/Usage
Men's and Women's toilet
Ceiling Height
Windows
8'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3'x7'
Privacy lock set
No view panels
Kick plates on both sides of door
Gypsum board - painted
Porcelain tile or quartz epoxy
Porcelain tile or quartz epoxy
Gypsum board - painted
Plumbing
Water closets, urinals (Men's), lavatories. Floor drain in restroom area.
HVAC
Heating, ventilation, air conditioning. Exhaust directly outdoors.
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
N/A
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
Water-resistant gypsum board throughout
24
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-16 C5 Entry Corridor Room Data Sheet
Description/Usage
Building entrance from land side and general circulation within module
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Aluminum entrance door with glass or hollow metal with full glass, 3'x7'
Keyed lock set
Side light, 12” wide
Kick plates both sides of door
Gypsum board – painted
Sealed concrete, stained concrete or tile
Resilient or tile
Acoustical ceiling tile or exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
N/A
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
25
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-4
MODULE D – READY ROOM MODULE
3-4.1
Function and Adjacency
The Ready Room Module includes a ready room with 21 four-person tables and wall
space for a computer counter with 12 computer docks; Maintenance Information System
(MIS) unclassified room with 21 workstations and wall space for copiers, printers,
storage cabinets, etc.; Autonomic Logistics Information System (ALIS) classified room;
storage room with a roll-up counter shutter to the ready room; a break/galley corridor
with a counter, microwaves, refrigerators, etc.; and a men’s and women’s
toilet/locker/shower area. This module must have direct access to the flight line.
Figure 3-17 Module D Adjacency Diagram
26
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-4.2
Ready Room
Figure 3-18 Module D Floor Plan and Axonometric
27
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-4.3
Data Sheets
Figure 3-19 D1 Ready Room Data Sheet
Description/Usage
Ready room for flight maintenance, with 21 four-person tables and
a data input counter with 12 workstations and chairs
Ceiling Height
Windows
9'-0" minimum
Exterior insulated AT/FP
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, full glass, 3'-7' (single and pair)
Keyed lock sets
View panels, 5” x 20”
Kick plates on both sides of doors
Gypsum board - painted
Sealed concrete, Stained concrete, Tile, Terrazzo or Quartz Epoxy
Resilient, tile, terrazzo or quartz epoxy
Acoustical ceiling tile or exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
Per user requirement
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
Tables, chairs, computer workstations
Special Requirements
N/A
28
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-20 D2 MIS Unclassified Room Data Sheet
Description/Usage
Room for 21 workstations, printers and file storage
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of door
Gypsum board - painted
Sealed concrete, Stained concrete, tile, terrazzo or quartz epoxy
Resilient, tile, terrazzo or quartz epoxy
Acoustical ceiling tile or exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
Per user requirement
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
29
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-21 D3 Break/Galley Room Data Sheet
Description/Usage
Small area in corridor with a counter, cabinets, sink, microwaves,
refrigerators, ice maker, and electric water cooler for maintenance staff
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
N/A
N/A
N/A
Gypsum board - painted
Sealed concrete, stained concrete, tile, terrazzo or quartz epoxy
Resilient, tile, terrazzo or quartz epoxy
Acoustical ceiling tile
Plumbing
Sink with disposal, electric water cooler. Water for ice machine.
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
N/A
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
Counter, cabinets
Special Requirements
N/A
30
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-22 D4 Storage Room Data Sheet
Description/Usage
Storage room adjacent to ready room with distribution counter with
counter shutter and counter with cabinets (8’ in length) and sink
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' - 7'
Counter shutter – 6’ x 4’, manually operated
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of door
Gypsum board - painted
Sealed concrete, Stained concrete, tile, terrazzo or quartz epoxy
Resilient, tile, terrazzo or quartz epoxy
Gypsum board – painted or exposed structure - painted
Plumbing
Sink
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
N/A
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
31
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-23 D5 ALIS Classified Room Data Sheet
Description/Usage
Classified room with two workstations
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
Electronic strike, card reader, X-09 lock
No view panels
Kick plates on both sides of door
Gypsum board - painted
Sealed concrete, stained concrete, tile, terrazzo or quartz epoxy
Resilient, tile, terrazzo or quartz epoxy
Gypsum board - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
Per program security requirements
N/A
Per program security requirements
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
32
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-24 D6 Toilet/Locker/Shower Room Data Sheet
Description/Usage
Men's/women's toilet, locker, showers serve all personnel in the facility;
on flight line side of facility
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Hollow metal, 3' x 7'
Push-pull
No view panels
Kick plates on both sides of doors
Walls
Ceramic tile or quartz epoxy full height at wet walls, showers, gypsum
board - painted
Floor
Base
Ceiling
Porcelain tile or quartz epoxy
Porcelain tile or quartz epoxy
Gypsum board - painted
Plumbing
Water closets, urinals (men's), lavatories, showers. Hot and cold water
for fixtures. Floor drains in restroom and locker areas.
HVAC
Heating, ventilation, air conditioning. Exhaust directly outdoors.
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
N/A
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
Water resistant gypsum board throughout. See RFP for accessories
requirements.
33
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-25 D7 Janitor Room Data Sheet
Description/Usage
Custodial room for general maintenance for flight line side of facility
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3'x7'
Keyed lock set
No view panels
Kick Plates both sides of door
Gypsum board - painted, ceramic tile at mop sink
Porcelain tile or quartz epoxy
Porcelain tile or quartz epoxy
Gypsum board - painted
Plumbing
Mop sink, floor drain
HVAC
Heating, ventilation, air conditioning. Exhaust directly outdoors.
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
N/A
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
Water resistant gypsum board throughout.
34
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-26 D8 Corridor Room Data Sheet
Description/Usage
General circulation within the module
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
Keyed lock set
View panels, 5” x 20”
Kick plates both sides of door
Gypsum board – painted
Sealed concrete, stained concrete or tile
Resilient or tile
Acoustical ceiling tile or exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
N/A
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
35
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-5
MODULE E – FLIGHT LINE MANAGEMENT MODULE
3-5.1
Function and Adjacency
The Flight Line Module includes a flight line management room, a maintenance debrief
room with six desks, a classified maintenance debrief room with six desks, and a
conference room. The open office has areas for specialist (six desks), weapons (four
desks), production (four desks), Air Force Engineering and Technical Services (AFETS)
(four desks), and crew chiefs (four desks) as well as space for storage cabinets and an
area for a small conference table (seats six). This module must have direct access to
the flight line.
Figure 3-27 Module E Adjacency Diagram
36
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-5.2
Flight Line Management
Figure 3-28 Module E Floor Plan and Axonometric
37
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-5.3
Data Sheets
Figure 3-29 E1 Flight Line Management Room Data Sheet
Description/Usage
Open office divided into 5 sections: AFETS (4 workstations); crew chiefs
(4 workstations); production pro-super/expeditors (4 workstations);
weapons (4 workstations); specialists (6 workstations, small conference
table)
Ceiling Height
Windows
9'-0" minimum
Exterior insulated AT/FP
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of doors
Gypsum board - painted
Sealed concrete, stained concrete, tile or carpet tile
Resilient or tile
Acoustical ceiling tile or exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
Per user requirement
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
38
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-30 E2 Classified Maintenance Debrief Room Data Sheet
Description/Usage
Classified open office with 6 workstations
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
Electronic strike, card reader, X-09 lock
No view panels
Kick plates both sides of door
Gypsum board - painted
Sealed concrete, stained concrete, tile or carpet tile
Resilient or tile
Gypsum board - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
Per program security requirements
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
39
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-31 E3 Maintenance Debrief Room Data Sheet
Description/Usage
Open office with 6 workstations
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of door
Gypsum Board - Painted
Sealed concrete, stained concrete, tile or carpet tile
Resilient or tile
Acoustical ceiling tile or exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
40
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-31 E4 Conference Room Data Sheet
Description/Usage
Conference room for module
Ceiling Height
Windows
9'-0" minimum
Exterior insulated AT/FP
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
Keyed lock set
View panels, 5” x 20” and side lite, 12” wide
Kick plates on both sides of door
Systems furniture, demountable partitions or gypsum board - painted
Carpet tile
Resilient
Acoustical ceiling tile or exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
Conference table for 12; 10 extra chairs at wall
Special Requirements
N/A
41
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-6
MODULE F – ENGINE SHOP MODULE
3-6.1
Function and Adjacency
The Engine Shop Module (intended for F-35 aircraft engines only) includes a large,
open workspace for two aircraft engines and two spare engines (broken into modules),
tool cribs with wire mesh partitions, a storage room with a Stanley stacking system, and
an engine shop office.
Figure 3-33 Module F Adjacency Diagram
42
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-6.2
Engine Shop
Figure 3-34 Module F Floor Plan and Axonometric
43
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-6.3
Data Sheets
Figure 3-35 F1 Engine Shop Room Data Sheet
Description/Usage
Engine repair, maintenance and storage; maintenance for engine
support equipment, including engine stands and trailers
Ceiling Height
No ceiling, 18'-0" minimum clearance or as required for 15'-0" hook
height for monorail crane
Windows
Translucent wall panels for daylighting
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, pair 3' x 7' to exterior, single 3’ x 7’ to corridor; overhead
insulated coiling door, 12' x 12' to exterior
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of doors
CMU - painted
Epoxy - non-slip or sealed concrete
No base
Exposed structure - painted
Plumbing
No floor drains. Compressed air drops with hose reels - coordinate with
users on number of drops and locations. Emergency shower/eyewash
station per UFC 3-420-01.
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
Per program security requirements
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
Overhead monorail crane – 4000-pound capacity, 15' minimum hook
height
44
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-36 F2 Engine Shop Office Room Data Sheet
Description/Usage
Engine shop office with two workstations
Ceiling Height
Windows
9'-0" minimum
Exterior insulated AT/FP if on exterior wall
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of door
Gypsum board - painted
Sealed concrete, stained concrete or tile
Resilient or tile
Acoustical ceiling tile or exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
45
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-37 F3 Tool Crib Room Data Sheet
Description/Usage
Tool storage for engine maintenance
Ceiling Height
Windows
No ceiling, 12' minimum clearance for tool storage
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Wire mesh fence 10’ height with gate, 8' x 8’ bi-parting
Gate locks
N/A
CMU - painted, wire mesh partitions
Epoxy - non-slip or sealed concrete
No base
Exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
Per program security requirements
N/A
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
46
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-38 F4 Engine Shop Storage Room Data Sheet
Description/Usage
Storage area for Stanley stacker system
Ceiling Height
Windows
No ceiling, minimum 12' clearance for stacker system
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Wire mesh fence 10’ height with gate, 8' x 8’ bi-parting
Gate locks
N/A
CMU - painted, wire mesh partitions
Epoxy - non-slip or sealed concrete
No base
Exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
N/A
N/A
N/A
Per program security requirements
N/A
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
47
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-7
MODULE G – TOOL AND PARTS SUPPORT MODULE
3-7.1
Function and Adjacency
The Tools and Parts Support Module includes a supply shop with a designated tool
transaction space, a supply TNB/FOM room, a HAZMAT storage space, and a supply
shop office supporting three to four personnel. The main function of this module is to
store aircraft parts and tools for distribution to the maintenance crews. TNB/FOM will
contain sensitive aircraft parts. The HAZMAT area is positioned so chemicals can exit
the bay and not re-enter. [top-right G5 in fig 3-38 is G7 in fig 3-39. G3 missing exit
in 3-38]
Figure 3-39 Module G Adjacency Diagram
48
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-7.2
Tool and Parts Support
Figure 3-40 Module G Floor Plan and Axonometric
49
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-7.3
Data Sheets
Figure 3-41 G1 HAZMAT Room Data Sheet
Description/Usage
Hazardous material storage with exterior access for small amounts of
aircraft paint, sanding equipment, supplies, etc.
Ceiling Height
Windows
No ceiling, 9'-0" minimum clearance
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, pair 3' x 7' to exterior, single 3’ x 7’ to assembly area
Keyed lock set
No view panels
Kick plates both sides of doors
CMU - painted
Sealed concrete
No base
Exposed structure - painted
Plumbing
Emergency shower/eyewash station per UFC 3-420-01
HVAC
Heated and ventilated. Exhaust directly outdoors.
Fire Protection / Life Safety
Wet pipe sprinkler system.
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
N/A
N/A
N/A
N/A
N/A
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
50
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-42 G2 Shop Office Room Data Sheet
Description/Usage
Open office with three workstations
Ceiling Height
Windows
9'-0" minimum
Exterior insulated AT/FP if room located on exterior wall
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of door
Gypsum board - painted
Sealed concrete, stained concrete or tile
Resilient or tile
Acoustical ceiling tile or exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
51
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-43 G3 Tool/Parts Storage Room Data Sheet
Description/Usage
Tools/parts storage with mezzanine
Ceiling Height
Windows
No ceiling, 18'-0" minimum clearance or as required for mezzanine
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
N/A
N/A
N/A
N/A
CMU - painted
Sealed concrete
No base
Exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
Per program security requirements
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
Full coverage mezzanine 10’-0” height with stairs and 2000-poundcapacity caged lift.
52
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-44 G4 Assembly Room Data Sheet
Tools/parts assembly area with exterior access and access to tool issue
with counter and counter shutter
Description/Usage
Ceiling Height
Windows
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
No ceiling, 12’ minimum clearance
N/A
Hollow metal, 3'-7' to exterior; overhead insulated coiling door, 8' x 12'
to exterior, 8’ x 4’ counter shutter, power operated
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of doors
CMU - painted
Sealed concrete
No base
Exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
53
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-45 G5 Tool Issue Room Data Sheet
Description/Usage
Tool/parts issuing area with access to hangar bay and flight line
Ceiling Height
Windows
No ceiling, 12’ minimum clearance
N/A
Hollow metal, pair 3' x 7' to exterior and to hangar bay, single 3’ x 7’ to
assembly area, overhead coiling, 8’ x 8’ to hangar and assembly area,
power operated
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Keyed lock sets
View panels, 5” x 20”
Kick plates on both sides of doors
CMU - painted
Sealed concrete
No base
Exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
Per program security requirements
N/A
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
54
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-46 G6 Secure Vault Room Data Sheet
Description/Usage
Classified storage
Ceiling Height
Windows
9'-0" minimum to underside of vault cap
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
39" x 78" minimum Class V vault door
Per UFC 4-215-01
N/A
N/A
CMU - painted
Sealed concrete
No base
Gypsum board - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
Per program security requirements
N/A
Per program security requirements
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
55
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-47 G7 TNB/FOM Room Data Sheet
Description/Usage
TNB/FOM storage
Ceiling Height
Windows
No ceiling, 9'-0" minimum clearance
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3'x7'
Keyed lock set
No view panels
Kick plates on both sides of door
CMU - painted
Sealed concrete
No base
Exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
56
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-8
MODULE H – BATTERY SHOP MODULE
3-8.1
Function and Adjacency
The Battery Shop Module includes a battery shop, a charging room and a shop office. A
series of battery shelves, work benches, and charging stations are utilized in this area.
Figure 3-48 Module H Adjacency Diagram
57
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-8.2
Battery Shop
Figure 3-49 Module H Floor Plan and Axonometric
58
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-8.3
Data Sheets
Figure 3-50 H1 Battery Shop Room Data Sheet
Description/Usage
Battery storage/crating
Ceiling Height
Windows
No ceiling, 9'-0" minimum clearance
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, pair 3' x 7' to exterior
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of doors
CMU - painted
Sealed concrete
No base
Exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation. Exhaust directly outdoors through side-wall.
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
N/A
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
Battery storage racks
Special Requirements
N/A
59
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-51 H2 Shop Office Room Data Sheet
Description/Usage
Battery Shop Office with one workstation
Ceiling Height
Windows
9'-0" minimum
Exterior insulated AT/FP
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of doors
CMU or gypsum board - painted
Sealed concrete, stained concrete or tile
Resilient or tile
Acoustical ceiling tile or exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkling system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
60
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-52 H3 Charging Room Data Sheet
Description/Usage
Battery charging room
Ceiling Height
Windows
No ceiling, 9'-0" minimum clearance
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
No door, cased opening, 4'x7'
N/A
N/A
N/A
CMU - painted
Sealed concrete
No base
Exposed structure - painted
Plumbing
Emergency shower/eyewash station per UFC 3-420-01. Sink with drain
to neutralization tank.
HVAC
Heating, ventilation, air conditioning. Exhaust from over charging
stations to outdoors through roof.
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
N/A
N/A
N/A
N/A
N/A
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
Charging stations to be low counter type, 30" height max.
61
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-9
MODULE I – WHEEL AND TIRE SHOP MODULE
The Wheel and Tire Shop Module consists of the wheel and tire shop with an open
layout and an office supporting three to four personnel. Space accommodations include
areas for bead breaking, parts cleaning, bearing, and inflation. This module needs
access to the exterior (preferably the flight line).
3-9.1
Function and Adjacency
Figure 3-53 Module I Adjacency Diagram
62
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-9.2
Wheel and Tire Shop
Figure 3-54 Module I Floor Plan and Axonometric
63
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-9.3
Data Sheets
Figure 3-55 I1 Wheel and Tire Shop Room Data Sheet
Description/Usage
Maintains and stores aircraft wheel and tire components; builds-up,
repairs, tests, stores, strips and degreases wheel and tire components
and disassembles for nondestructive inspection (NDI)
Ceiling Height
Windows
No ceiling, 12'-0" minimum clearance
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, pair 3' x 7' to exterior and single 3’ x 7’ to corridor;
overhead insulated coiling door, 10' x 10' to exterior
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of doors
CMU - painted
Epoxy - non-slip or sealed concrete
No base
Exposed structure - painted
Plumbing
Compressed air drops - coordinate with user on quantity and location.
Possibly nitrogen for filling tires.
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01 in addition to tire-changing equipment power
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
64
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-56 I2 Office Room Data Sheet
Description/Usage
Wheel and tire office with four workstations
Ceiling Height
Windows
9'-0" minimum
Exterior insulated AT/FP
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
keyed lock set
View panels, 5” x 20”
Kick plates on both sides of doors
Gypsum board - painted
Sealed concrete, stained concrete, tile
Resilient or tile
Acoustical ceiling tile or exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
65
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-10
MODULE J – EGRESS SHOP MODULE
3-10.1
Function and Adjacency
The Egress Shop Module consists of an administration/ready room supporting three to
four personnel, an egress support Consolidated Tool Kit (CTK) (tool distribution), an
egress maintenance room, an egress storage room, and a bomb/CAD/PAD room. All
cockpit egress maintenance will take place in this module before the assembled product
is taken to the bay.
Figure 3-57 Module J Adjacency Diagram
66
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-10.2
Egress Shop
Figure 3-58 Module J Floor Plan and Axonometric
67
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-10.3
Data Sheets
Figure 3-59 J1 Egress Maintenance Room Data Sheet
Description/Usage
Space and utilities for tools, equipment and personnel for maintenance
of egress systems; work areas for repair, replacement, and inspection of
ejection seats and canopy
Ceiling Height
Windows
No ceiling, 10'-0" minimum clearance
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, pair 3' x 7' and single 3’ x 7’
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of doors
CMU - painted
Sealed concrete
No base
Exposed structure - painted
Plumbing
Compressed air drops - coordinate with users on number and location of
drops
HVAC
Heating, ventilation and air conditioning. Specialized exhaust systems
may be required. Exhaust directly outdoors.
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
Work benches with devices on each end to work on ejection seats.
Special Requirements
Grounding bus bars located around workspace where transparencies
and seats are being maintained.
68
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-60 J2 Administration/Ready Room Data Sheet
Description/Usage
Ready room with four work stations, tables/chairs, counter, sink,
cabinets, microwave, refrigerator
Ceiling Height
Windows
9'-0" minimum
Exterior insulated AT/FP
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, 3' x 7'
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of doors
Gypsum board - painted
Sealed concrete, stained concrete, tile
Resilient or tile
Acoustical ceiling tile or exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
Per user requirement
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
69
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-61 J3 Egress Support CTK Room Data Sheet
Description/Usage
Tool storage and issue area
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, pair 3' x 7'
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of doors
Gypsum board - painted
Sealed concrete
Resilient
Acoustical ceiling tile or exposed structure - painted
Plumbing
Hot and cold water for sink
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
70
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-62 J4 Egress Storage Room Data Sheet
Description/Usage
Egress storage of built-up seats
Ceiling Height
Windows
No ceiling, 10'-0" minimum clearance
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, pair 3' x 7'; overhead insulated coiling door, 8' x 8' to
exterior, overhead coiling door, 8’ x 8’ to egress maintenance
Keyed lock set
View panels, 5” x 20”
Kick plates on both sides of doors
CMU - Painted
Sealed concrete
No base
Exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation, air conditioning
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
N/A
N/A
N/A
N/A
Per UFC 3-450-01 for noise control
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
71
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-63 J5 CAD/PAD Room Data Sheet
Description/Usage
Secure storage room for canopy explosive charges and ejection seat
rocket motors
Ceiling Height
Windows
9'-0" minimum to underside of concrete cap
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
39" x 78" min. Class V vault door, secure
Per UFC 4-215-01
N/A
CMU - painted
Sealed concrete
no base
Concrete - painted
Plumbing
Compressed air drops - coordinate with users on number of drops and
location.
HVAC
Heating, ventilation, and air conditioning. Specialized exhaust systems
may be required. Exhaust directly outdoors. Humidifier/dehumidifier
may be required due to the presence of ordnance. Explosion-proof fan
motors may be required.
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
N/A
N/A
N/A
Per program security requirements
N/A
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
Explosive vaults for temporary of ejection seat and canopy explosives.
Special Requirements
N/A
72
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-11
MODULE K – BUILDING SUPPORT MODULE
The Building Support Module consists of a mechanical room, fire pump room (if
required), electrical room, and communications room. All rooms will have exterior
access (with the exception of the communications room, which may have interior
access). These modules will be located on the exterior wall adjacent to the utility
courtyard and accessible for maintenance.
3-11.1
Function and Adjacency
Figure 3-64 Module K Adjacency Diagram
73
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-11.2
Building Support
Figure 3-65 Module K Floor Plan and Axonometric
74
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-11.3
Data Sheets
Figure 3-66 K1 Communications Room Data Sheet
Description/Usage
Communications equipment
Ceiling Height
Windows
No ceiling, 9'-0 minimum clearance
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, single 3' x 7'
Keyed lock set
No view panels
Kick plates on both sides of door
CMU - painted
Sealed concrete
No base
Exposed structure - painted
Plumbing
N/A
HVAC
Heating, ventilation and air conditioning. Dedicated unit required.
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
Per UFC 3-580-01
Per UFC 3-580-01
N/A
N/A
Per BCE requirements
N/A
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
75
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-67 K2 Electrical Room Data Sheet
Description/Usage
Electrical equipment
Ceiling Height
Windows
No ceiling, 9'-0 minimum clearance
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, single or pair 3' x 7' to exterior
Keyed lock set
No view panels
Kick plates on both sides of doors
CMU - painted
Sealed concrete
No base
Exposed structure - painted
Plumbing
N/A
HVAC
Heating and ventilation
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
Per UFC 3-580-01
N/A
N/A
N/A
N/A
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
76
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-68 K3 Fire Pump Room Data Sheet
Description/Usage
Fire pump equipment
Ceiling Height
Windows
No ceiling, 9'-0" minimum clearance
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, pair 3' x 7' to exterior
Keyed lock set
No view panels
Kick plates on both sides of doors
CMU - painted
Sealed concrete
No base
Exposed structure - painted
Plumbing
Floor drains as required
HVAC
Heating and ventilation. Air conditioning required in foam equipment
room with releasing panel per UFC 3-600-01.
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
Per UFC 3-580-01
N/A
N/A
N/A
N/A
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
77
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
Figure 3-69 K4 Mechanical Room Data Sheet
Description/Usage
Mechanical equipment
Ceiling Height
Windows
No ceiling, 9'-0" minimum clearance
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Hollow metal, pair 3' x 7' to exterior
Keyed lock set
No view panels
Kick plates on both sides of doors
CMU - painted
Sealed concrete
No base
Exposed structure - painted
Plumbing
Floor drains as required
HVAC
Heating and ventilation
Fire Protection / Life Safety
Wet pipe sprinkler system
Power
Lighting
Per UFC 3-520-01
Per UFC 3-530-01
N/A
Per UFC 3-580-01
N/A
N/A
N/A
STC 45 assembly minimum between adjacent spaces
Communication
Tele.
Data
CCTV
CATV
Security
Acoustical
Furnishings / Equipment /
Casework
N/A
Special Requirements
N/A
78
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
3-12
MODULE L – CIRCULATION ROOM MODULE
The Circulation Room Module consists of general circulation or corridor space not
associated with individual modules. This space provides circulation among modules as
well as means of egress.
Figure 3-70 Circulation Room Data Sheet
Description/Usage
This data sheet is for general circulation or corridor spaces not
associated with individual modules.
Ceiling Height
Windows
9'-0" minimum
N/A
Type
Doors
Finishes
Security/
Hardware
View Panels/
Kick Plates
Walls
Floor
Base
Ceiling
Plumbing
HVAC
Fire Protection
Power
Lighting
Tele.
Data
Communication CCTV
CATV
Security
Acoustical Requirements
Hollow metal, 3’x7’ (egress)
Keyed lock set
N/A
Kick plates both sides of door
CMU – painted or gypsum board - painted
Sealed concrete, stained concrete or tile
Resilient or tile
Acoustical ceiling tile or exposed structure - painted
N/A
Heated and air conditioned
Wet pipe sprinkler system
Per UFC 3-520-01
Per UFC 3-530-01
N/A
N/A
N/A
N/A
N/A
N/A
Furnishings, Equipment and
Casework
N/A
Special Requirements
N/A
79
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
CHAPTER 4 ENGINEERING/TECHNICAL CRITERIA
4-1
NOT USED.
80
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
This Page Intentionally Left Blank
81
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
APPENDIX A REFERENCES
Use the latest available issuance of the reference.
AIR FORCE
AFI 31-101, Integrated Defense, http://www.e-publishing.af.mil/
AFI 32-1054, Corrosion Control, http://www.e-publishing.af.mil/
AFI 32-1062, Electrical Systems, Power Plants and Generators, http://www.epublishing.af.mil/
AFI 32-1065, Grounding Systems, http://www.e-publishing.af.mil/
AFMAN 32-1084, Facility Requirements, http://www.e-publishing.af.mil/
Air Force Corporate Facility Standards (AFCFS), http://afcfs.wbdg.org/index.html
ETL 02-15, Fire Protection Engineering Criteria – New Aircraft Facilities,
http://www.wbdg.org/ccb/browse_cat.php?o=33&c=125
ETL 04-3, Design Criteria for Prevention of Mold in Air Force Facilities,
http://www.wbdg.org/ccb/browse_cat.php?o=33&c=125
ETL 07-4, Air Force Carpet Standard,
http://www.wbdg.org/ccb/browse_cat.php?o=33&c=125
ETL 13-4, Standby Generator Design, Maintenance, and Testing Criteria,
http://www.wbdg.org/ccb/browse_cat.php?o=33&c=125
AMERICAN CONCRETE INSTITUTE
ACI 301-10, Specifications for Structural Concrete,
http://www.concrete.org/store/productdetail.aspx?ItemID=30110
ACI 318-14, Building Code Requirements for Reinforced Concrete and Commentary,
http://www.concrete.org/store/productdetail.aspx?itemid=31814
ACI 530.1-13, Specifications for Masonry Structures,
http://www.concrete.org/store/productdetail.aspx?ItemID=53013
ARCHITECTURAL BARRIERS ACT
ABA Accessibility Standard for Department of Defense Facilities, http://www.accessboard.gov/guidelines-and-standards/buildings-and-sites/about-the-abastandards/aba-standards
82
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
ARMY
EM 200-1-3, Requirements for the Preparation of Sampling and Analysis Plans,
http://oai.dtic.mil/oai/oai?verb=getRecord&metadataPrefix=html&identifier=ADA4022
24
ER 1110-1-263, Chemical Data Quality Management for Hazardous, Toxic, Radioactive
Waste Remedial Activities,
http://oai.dtic.mil/oai/oai?verb=getRecord&metadataPrefix=html&identifier=ADA4043
61
TI 800-01, Design Criteria, http://www.wbdg.org/ccb/browse_doc.php?d=3043
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ANSI/AISC-360-10, Specification for Structural Steel Buildings,
https://www.aisc.org/WorkArea/showcontent.aspx?id=39246
AMERICAN IRON AND STEEL INSTITUTE
AISI S100-12, North American Specification for the Design of Cold-Formed Steel
Structural Members, https://shop.steel.org/p/299/aisi-s100-12-north-americanspecification-for-the-design-of-cold-formed-steel-structural-members-and-aisi-s10012-c-commentary-on-the-specification-2012-edition
AMERICAN SOCIETY OF CIVIL ENGINEERS
ASCE/SEI 7-10, Minimum Design Loads for Buildings and Other Structures,
http://www.asce.org/templates/publications-book-detail.aspx?id=6725
AMERICAN SOCIETY OF HEATING, REFRIGERATING, AND AIR-CONDITIONING
ENGINEERS
ANSI/ASHRAE Standard 15-2013, Safety Standard for Refrigeration Systems,
https://www.ashrae.org/resources--publications/bookstore/standards-15--34
ANSI/ASHRAE Standard 62.1-2013, Ventilation for Acceptable Indoor Air Quality,
https://www.ashrae.org/resources--publications/bookstore/standards-62-1--62-2
ANSI/ASHRAE Standard 90.1, Energy Standard for Buildings Except Low-Rise
Residential Buildings, https://www.ashrae.org/resources-publications/bookstore/standard-90-1
ANSI/ASHRAE/USGBC Standard 189.1, Standard for the Design of High-Performance
Green Buildings, https://www.ashrae.org/resources-publications/bookstore/standard-189-1
83
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
AMERICAN WELDING SOCIETY
AWS D1.1/D1.1M-2010, Structural Welding Code –Steel,
DEPARTMENT OF DEFENSE
MIL-HDBK 1013/1A, Design Guidelines for Physical Security of Facilities,
http://www.wbdg.org/ccb/browse_doc.php?d=2813
UFC 1-200-01, General Building Requirements,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 1-200-02, High Performance and Sustainability Building Requirements,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 1-300-07A, Design Build Technical Requirements,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-120-01, Design: Sign Standards,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-190-06, Protective Coatings and Paints,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-220-04FA, Backfill for Subsurface Structures,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-220-08FA, Engineering Use of Geotextiles,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-250-01FA, Pavement Design for Roads, Streets, Walks and Open Storage
Areas, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-250-04, Standard Practice for Concrete Pavements,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-250-08FA, Standard Practice for Sealing Joints and Cracks in Rigid and Flexible
Pavements, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-250-11, Soil Stabilization for Pavements,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-260-01, Airfield and Heliport Planning and Design,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-260-17, Dust Control for Roads, Airfields, and Adjacent Areas,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-301-01, Design: Structural Engineering,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
84
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
UFC 3-400-02, Design: Engineering Weather Data,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-410-04N, Industrial Ventilation,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 4-211-01, Maintenance Hangar,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-450-01, Noise and Vibration Control,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-520-01, Interior Electrical Systems,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-520-05, Stationary Battery Areas,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-570-02A, Cathodic Protection,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-575-01, Lightning and Static Electricity Protection Systems,
http://www.wbdg.org/ccb/DOD/UFC/ufc_3_575_01.pdf
UFC 3-580-01, Telecommunications Building Cabling Systems Planning and Design,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 3-600-01, Fire Protection Engineering for Facilities,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 4-022-01, Security Engineering: Entry Control Facilities / Access Control Points,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 4-022-02, Selection and Application of Vehicle Barriers,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 4-022-03, Security Fences and Gates,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 4-023-03, Design of Buildings to Resist Progressive Collapse,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
UFC 4-215-01, Armories and Arms Rooms,
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
85
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
ENERGY INDEPENDENCE AND SECURITY ACT
EISA Section 438, Stormwater Management for Federal Facilities under Section 438 of
the Energy Independence and Security Act,
http://water.epa.gov/polwaste/nps/section438.cfm
ENERGY POLICY ACT
EPACT, http://energy.gov/sites/prod/files/2013/10/f3/epact_2005.pdf
ENVIRONMENTAL PROTECTION AGENCY
National Pollutant Discharge Elimination System (NPDES) for Construction Activities
(varies by state), http://water.epa.gov/polwaste/npdes/
FEDERAL AVIATION ADMINISTRATION
FAA AC 70/7460-1K, Obstruction Marking and Lighting,
http://www.faa.gov/documentLibrary/media/Advisory_Circular/AC%2070%2074601K.pdf
FAA AC 150/5320-5D, Airport Drainage Design,
http://www.faa.gov/documentLibrary/media/Advisory_Circular/150_5320_5d.pdf
FAA AC 150/5345-43G, Specification for Obstruction Lighting Equipment,
http://www.faa.gov/documentLibrary/media/Advisory_Circular/150_5345_43g.pdf
FAA AC 150/5370-2F, Operational Safety on Airports During Construction,
http://www.faa.gov/documentLibrary/media/Advisory_Circular/150_5370_2f.pdf
FEDERAL HIGHWAY ADMINISTRATION
Manual on Uniform Traffic Control Devices (MUTCD), http://mutcd.fhwa.dot.gov/
ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA
IESNA, The Lighting Handbook, http://www.ies.org/handbook/
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS
IEEE C2, National Electrical Safety Code,
http://standards.ieee.org/findstds/standard/C2-2012.html
INTERNATIONAL CODE COUNCIL
International Fuel Gas Code (IFC),
http://publicecodes.cyberregs.com/icod/ifgc/index.htm
International Mechanical Code (IMC),
http://publicecodes.cyberregs.com/icod/imc/index.htm
86
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
International Plumbing Code (IPC),
http://publicecodes.cyberregs.com/icod/ipc/index.htm
NATIONAL FIRE PROTECTION ASSOCIATION
NFPA 70, National Electrical Code (NEC), http://www.nfpa.org/codes-andstandards/document-information-pages?mode=code&code=70
NFPA 780, Standard for the Installation of Lightning Protection Systems,
http://www.nfpa.org/codes-and-standards/document-informationpages?mode=code&code=780
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
OSHA regulations, https://www.osha.gov/law-regs.html
US GREEN BUILDING COUNCIL
USGBC LEED-NC, LEED 2009 for New Construction and Major Renovations Rating
System (U.S. Green Building Council),
http://www.usgbc.org/Docs/Archive/General/Docs5546.pdf
87
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
APPENDIX B PROGRAMMING SHEET LINK
See the link below for access to the interactive programming sheet:
http://www.wbdg.org/references/afbim_tools.php
This Page Intentionally Left Blank
88
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
B-1
PROGRAMMING SHEET
89
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
This Page Intentionally Left Blank
90
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
B-2
PDF FLOOR PLANS AND BIM DRAWINGS LINK
The PDF floor plans and BIM drawings can be found on the Whole Building Design
Guide at http://www.wbdg.org/references/afbim_tools.php
91
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
This Page Intentionally Left Blank
92
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
B-3
AIR FORCE MILCON SUSTAINABILITY REQUIREMENTS
SCORESHEET
The interactive score sheet can be found on the Whole Building Design Guide at:
http://www.wbdg.org/ccb/browse_cat.php?c=265.
93
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
94
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
95
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
96
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
APPENDIX C GLOSSARY
ADP
Area Development Plan
A-E
architect-engineer
AFCEC
Air Force Civil Engineering Center
AFCFS
Air Force Corporate Facility Standards
AFETS
Air Force Engineering and Technical Services
AFMAN
Air Force Manual
ALIS
Autonomic Logistics Information System
AMU
aircraft maintenance unit
ASHRAE
American Society of Heating, Refrigerating, and Air-Conditioning
Engineers
AT/FP
antiterrorism/force protection
BIM
Building Information Modeling
CAD/PAD
Cartridge Actuated Device / Propellant Actuated Device
CATV
cable television
CCTV
closed-circuit television
CMU
concrete masonry unit
CTK
Consolidated Tool Kit
DG
Design Guide
DOD
Department of Defense
ETL
Engineering Technical Letter
HVAC
heating, ventilating, air conditioning
IDP
Installation Development Plan
MIS
Maintenance Information System
PDF
Portable Document Format
RFP
request for proposal
97
DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY
1 AUG 2015
SF
square feet
STC
Sound Transmission Class
TNB/FOM
Tail Number Bin/Facilitate Other Maintenance
UFC
Unified Facilities Criteria
98