DESIGN GUIDE (DG) AIR FORCE FIGHTER HANGAR/AMU FACILITY (Supplements UFC 4-211-01, Maintenance Hangar) APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 DESIGN GUIDE (DG) UNITED STATES AIR FORCE FIGHTER HANGAR/AMU FACILITY Any copyrighted material included in this DG is identified at its point of use. Use of the copyrighted material apart from this DG must have the permission of the copyright holder. AIR FORCE CIVIL ENGINEER CENTER (Preparing Activity) Record of Changes (changes are indicated by \1\ ... /1/) Change No. 1 Date Location DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 FOREWORD Air Force Design Guides (DG) provide functional guidance (i.e., defined by users and operational needs of a particular facility type) for the US Air Force, and are intended to supplement published DoD Unified Facilities Criteria (UFC) as referenced in the title. DG documents are applicable only to the DoD Component(s) indicated in the title, and do not represent unified DoD guidance. Differences in functional guidance between DoD Components may exist due to differences in policies and operational needs. All construction outside of the United States is also governed by Status of Forces Agreements (SOFA), Host Nation Funded Construction Agreements (HNFA), and in some instances, Bilateral Infrastructure Agreements (BIA.) Therefore, the acquisition team must ensure compliance with the most stringent of the DG, the SOFA, the HNFA, and the BIA, as applicable. DG documents are coordinated with unified DoD technical requirements and formatted to facilitate potential future unification as an element of the DoD UFC system applicable to specific facility types. The UFC system is prescribed by MIL-STD 3007 and provides planning, design, construction, sustainment, restoration, and modernization guidance, and applicable to the Military Departments, Defense Agencies, and the DoD Field Activities. The UFC System also includes technical requirements and functional requirements for specific facility types, both published as UFC documents and Facility Criteria (FC) documents. DGs are living documents and will be periodically reviewed, updated, and made available to users as part of the Services’ responsibility for providing guidance for military construction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Command (NAVFAC), and the Air Force Civil Engineer Center (AFCEC) are responsible for administration of the UFC system. Defense agencies should contact the preparing service for document interpretation and improvements. Technical content is the responsibility of the cognizant DoD discipline working group. For Air Force DG documents, recommended changes with supporting rationale should be sent to the following email address: afcec.cft.workflow@us.af.mil. DG is effective upon issuance and is distributed only in electronic media from the following source: • Whole Building Design Guide web site http://www.wbdg.org/. i DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 AIR FORCE DESIGN GUIDE (DG) NEW SUMMARY SHEET Document: FIGHTER HANGAR/AMU FACILITY DG Superseding: None Description: This DG provides guidance for evaluating, planning, programming, and designing Fighter Hangar/AMU (Aircraft Maintenance Unit) Facilities. The information in this DG applies to the design of all new construction projects, to include additions, alterations, and renovation projects in the continental United States (CONUS) and outside the continental United States (OCONUS). It also applies to the procurement of design/build services for the above-noted projects. Alteration and renovation projects should update existing facilities to meet the guidance within budgetary constraints. Reasons for Document: This DG is the initial release to provide guidance for the Fighter Hangar/AMU Facility. It defines the guidance for determining appropriately sized, flexible, cost-optimized, durable, quality-designed facilities on a lifecycle basis to support the mission. These are concepts only and are primarily intended to communicate functional user guides. A thorough compliance check of all other applicable criteria is required. Impact: This DG will facilitate and standardize the design of Fighter Hangar/AMU Facilities throughout the Air Force. • It will provide more complete and consistent project guidance and will expedite the programming and design of facilities and reduce initial design cost. • The improved performance-based guide will reduce design-build proposals. Unification Issues: None ii DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 CONTENTS CHAPTER 1 INTRODUCTION ....................................................................................... 1 1-1 GENERAL INFORMATION .................................................................................. 1 1-2 GENERAL BUILDING REQUIREMENTS ............................................................ 1 1-3 REFERENCES ..................................................................................................... 2 1-4 INSTRUCTIONS................................................................................................... 2 1-4.1 Standard Facility Prototype Tools.................................................................. 2 1-4.2 Supplemental Facilities Guidance & Criteria ................................................. 2 1-4.2.1 Notional Site Plan ..................................................................................... 2 1-4.2.2 Composite Facility Adjacency Diagram(s)/Composite Floor Plan(s) ......... 2 1-4.2.3 Modules .................................................................................................... 3 1-4.2.4 Module Flexibility/Adjustments .................................................................. 3 1-4.2.5 Room Data Sheets .................................................................................... 4 1-4.3 Programming Sheet(s) .................................................................................. 4 1-4.4 Design Drawings – BIM ................................................................................. 4 1-4.5 Additions and Alterations ............................................................................... 4 1-4.6 Sustainability ................................................................................................. 4 CHAPTER 2 SITE AND OVERALL ADJACENCY ......................................................... 5 2-1 GENERAL FACILITY OVERVIEW....................................................................... 5 2-2 NOTIONAL SITE PLAN ....................................................................................... 5 2-2.1 Site Location and Orientation ........................................................................ 5 2-2.2 Vehicular and Pedestrian Circulation ............................................................ 6 2-3 COMPOSITE FACILITY ADJACENCY DIAGRAMS ........................................... 8 CHAPTER 3 FACILITY REQUIREMENTS AND GUIDES.............................................. 9 3-1 MODULE A – HANGAR BAY MODULE .............................................................. 9 3-1.1 Function and Adjacency ................................................................................ 9 3-1.2 Hangar Bay ................................................................................................. 11 3-1.3 Data Sheets................................................................................................. 12 3-2 MODULE B – HANGAR BAY SUPPORT MODULE ......................................... 13 3-2.1 Function and Adjacency .............................................................................. 13 3-2.2 Hangar Bay Support .................................................................................... 14 3-2.3 Data Sheets................................................................................................. 15 3-3 MODULE C – AMU ADMINISTRATION MODULE ............................................ 19 3-3.1 Function and Adjacency .............................................................................. 19 3-3.2 AMU Administration ..................................................................................... 20 3-3.3 Data Sheets................................................................................................. 21 iii DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-4 MODULE D – READY ROOM MODULE ........................................................... 26 3-4.1 Function and Adjacency .............................................................................. 26 3-4.2 Ready Room ............................................................................................... 27 3-4.3 Data Sheets................................................................................................. 28 3-5 MODULE E – FLIGHT LINE MANAGEMENT MODULE ................................... 36 3-5.1 Function and Adjacency .............................................................................. 36 3-5.2 Flight Line Management .............................................................................. 37 3-5.3 Data Sheets................................................................................................. 38 3-6 MODULE F – ENGINE SHOP MODULE ........................................................... 42 3-6.1 Function and Adjacency .............................................................................. 42 3-6.2 Engine Shop ................................................................................................ 43 3-6.3 Data Sheets................................................................................................. 44 3-7 MODULE G – TOOL AND PARTS SUPPORT MODULE .................................. 48 3-7.1 Function and Adjacency .............................................................................. 48 3-7.2 Tool and Parts Support ............................................................................... 49 3-7.3 Data Sheets................................................................................................. 50 3-8 MODULE H – BATTERY SHOP MODULE ........................................................ 57 3-8.1 Function and Adjacency .............................................................................. 57 3-8.2 Battery Shop................................................................................................ 58 3-8.3 Data Sheets................................................................................................. 59 3-9 MODULE I – WHEEL AND TIRE SHOP MODULE ............................................ 62 3-9.1 Function and Adjacency .............................................................................. 62 3-9.2 Wheel and Tire Shop ................................................................................... 63 3-9.3 Data Sheets................................................................................................. 64 3-10 MODULE J – EGRESS SHOP MODULE .......................................................... 66 3-10.1 Function and Adjacency .............................................................................. 66 3-10.2 Egress Shop ................................................................................................ 67 3-10.3 Data Sheets................................................................................................. 68 3-11 MODULE K – BUILDING SUPPORT MODULE ................................................ 73 3-11.1 Function and Adjacency .............................................................................. 73 3-11.2 Building Support .......................................................................................... 74 3-11.3 Data Sheets................................................................................................. 75 3-12 MODULE L – CIRCULATION ROOM MODULE................................................ 79 CHAPTER 4 ENGINEERING/TECHNICAL CRITERIA ................................................ 80 4-1 NOT USED. ........................................................................................................ 80 APPENDIX A REFERENCES ....................................................................................... 82 APPENDIX B PROGRAMMING SHEET LINK ............................................................. 88 iv DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 APPENDIX C GLOSSARY ........................................................................................... 97 v DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 FIGURES Figure 2-1 Notional Site Diagram................................................................................. 7 Figure 2-2 Functional Adjacency Diagram ................................................................... 8 Figure 3-1 Module A Adjacency Diagram .................................................................. 10 Figure 3-2 Module A Floor Plan and Axonometric ..................................................... 11 Figure 3-3 A1 Hangar Bay Room Data Sheet ............................................................ 12 Figure 3-4 Module B Adjacency Diagram .................................................................. 13 Figure 3-5 Module B Floor Plan and Axonometric ..................................................... 14 Figure 3-6 B1 IPA/HAZ Room Data Sheet................................................................. 15 Figure 3-7 B2 Laundry Room Data Sheet.................................................................. 16 Figure 3-8 B3 Zamboni Room Data Sheet................................................................. 17 Figure 3-9 B4 Aircraft Data Input Room Data Sheet .................................................. 18 Figure 3-10 Module C Adjacency Diagram ................................................................ 19 Figure 3-11 Module C Floor Plan and Axonometric ................................................... 20 Figure 3-12 C1 Assistant OIC/Chief/Super Room Data Sheet................................... 21 Figure 3-13 C2 AMU Administration Office Room Data Sheet .................................. 22 Figure 3-14 C3 Mechanical/Electrical Room Data Sheet ........................................... 23 Figure 3-15 C4 Toilet Room Data Sheet.................................................................... 24 Figure 3-16 C5 Entry Corridor Room Data Sheet ...................................................... 25 Figure 3-17 Module D Adjacency Diagram ................................................................ 26 Figure 3-18 Module D Floor Plan and Axonometric ................................................... 27 Figure 3-19 D1 Ready Room Data Sheet .................................................................. 28 Figure 3-20 D2 MIS Unclassified Room Data Sheet .................................................. 29 Figure 3-21 D3 Break/Galley Room Data Sheet ........................................................ 30 Figure 3-22 D4 Storage Room Data Sheet ................................................................ 31 Figure 3-23 D5 ALIS Classified Room Data Sheet .................................................... 32 Figure 3-24 D6 Toilet/Locker/Shower Room Data Sheet ........................................... 33 Figure 3-25 D7 Janitor Room Data Sheet.................................................................. 34 Figure 3-26 D8 Corridor Room Data Sheet ............................................................... 35 Figure 3-27 Module E Adjacency Diagram ................................................................ 36 Figure 3-28 Module E Floor Plan and Axonometric ................................................... 37 Figure 3-29 E1 Flight Line Management Room Data Sheet ...................................... 38 Figure 3-30 E2 Classified Maintenance Debrief Room Data Sheet ........................... 39 Figure 3-31 E3 Maintenance Debrief Room Data Sheet............................................ 40 Figure 3-32 E4 Conference Room Data Sheet .......................................................... 41 Figure 3-33 Module F Adjacency Diagram ................................................................ 42 Figure 3-34 Module F Floor Plan and Axonometric ................................................... 43 Figure 3-35 F1 Engine Shop Room Data Sheet ........................................................ 44 Figure 3-36 F2 Engine Shop Office Room Data Sheet .............................................. 45 Figure 3-37 F3 Tool Crib Room Data Sheet .............................................................. 46 Figure 3-38 F4 Engine Shop Storage Room Data Sheet ........................................... 47 Figure 3-39 Module G Adjacency Diagram ................................................................ 48 Figure 3-40 Module G Floor Plan and Axonometric ................................................... 49 Figure 3-41 G1 HAZMAT Room Data Sheet ............................................................. 50 Figure 3-42 G2 Shop Office Room Data Sheet ......................................................... 51 Figure 3-43 G3 Tool/Parts Storage Room Data Sheet .............................................. 52 Figure 3-44 G4 Assembly Room Data Sheet............................................................. 53 Figure 3-45 G5 Tool Issue Room Data Sheet............................................................ 54 vi DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-46 G6 Secure Vault Room Data Sheet ........................................................ 55 Figure 3-47 G7 TNB/FOM Room Data Sheet ............................................................ 56 Figure 3-48 Module H Adjacency Diagram ................................................................ 57 Figure 3-49 Module H Floor Plan and Axonometric ................................................... 58 Figure 3-50 H1 Battery Shop Room Data Sheet ........................................................ 59 Figure 3-51 H2 Shop Office Room Data Sheet .......................................................... 60 Figure 3-52 H3 Charging Room Data Sheet .............................................................. 61 Figure 3-53 Module I Adjacency Diagram.................................................................. 62 Figure 3-54 Module I Floor Plan and Axonometric .................................................... 63 Figure 3-55 I1 Wheel and Tire Shop Room Data Sheet ............................................ 64 Figure 3-56 I2 Office Room Data Sheet..................................................................... 65 Figure 3-57 Module J Adjacency Diagram ................................................................. 66 Figure 3-58 Module J Floor Plan and Axonometric .................................................... 67 Figure 3-59 J1 Egress Maintenance Room Data Sheet............................................. 68 Figure 3-60 J2 Administration/Ready Room Data Sheet ........................................... 69 Figure 3-61 J3 Egress Support CTK Room Data Sheet ............................................ 70 Figure 3-62 J4 Egress Storage Room Data Sheet .................................................... 71 Figure 3-63 J5 CAD/PAD Room Data Sheet ............................................................. 72 Figure 3-64 Module K Adjacency Diagram ................................................................ 73 Figure 3-65 Module K Floor Plan and Axonometric ................................................... 74 Figure 3-66 K1 Communications Room Data Sheet .................................................. 75 Figure 3-67 K2 Electrical Room Data Sheet .............................................................. 76 Figure 3-68 K3 Fire Pump Room Data Sheet ............................................................ 77 Figure 3-69 K4 Mechanical Room Data Sheet .......................................................... 78 Figure 3-70 Circulation Room Data Sheet ................................................................. 79 vii DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 CHAPTER 1 INTRODUCTION 1-1 GENERAL INFORMATION This standard facility prototype design guidance was developed to assist Air Force planners in preparing and validating DD Form 1391 requirements and to assist architect-engineer (A-E) design professionals with the approved project-specific design requirements. It is a source of basic programming and functional information for the fighter hangar/AMU facility. This standard is consistent with Air Force Corporate Facility Standards (AFCFS) and Unified Facilities Criteria (UFC). This standard, in conjunction with the AFCFS, is intended to define Air Force expectations for project programming and A-E design decisions. The standard facility prototype design program defines consistent facility requirements across the Air Force enterprise to expedite delivery of a facility. This standard was designed in compliance with AFMAN 32-1084. The objective is to deliver appropriately sized, flexible, cost-optimized, durable, quality-designed facilities on a lifecycle basis to support the Air Force mission. This standard facility prototype represents a shift in Air Force facility design philosophy toward maximizing the use of open office space and systems furniture. This design approach allows maximum flexibility to reconfigure the building space as mission needs change. Where offices require sound attenuation and physical or visual separation, evaluate the use of systems furniture or demountable partition walls in lieu of full-height hard wall construction. Maximizing open office space may require more systems furniture and funding must be listed on the DD Form 1391 as a furniture, fixtures, and equipment (FF&E) cost. Comply with the latest Air Force policy on centralized procurement of systems and other furniture. 1-2 GENERAL BUILDING REQUIREMENTS Comply with UFC 1-200-01. UFC 1-200-01 provides applicability of model building codes and government-unique criteria for typical design disciplines and building systems, as well as for accessibility, antiterrorism, security, high-performance and sustainability requirements, and safety. Use this DG in addition to UFC 1-200-01 and the UFCs and government criteria referenced therein. Lighting systems must meet ASHRAE 90.1; refer to UFC 1-200-02 for the ASHRAE publication year. Note that the requirements included in this DG refer to ASHRAE 90.12010. When UFC 1-200-02 adopts a newer publication year of ASHRAE 90.1 it will have precedence over these DG requirements. Note: Often, the hangar bay portion of these facilities is designated as a low-occupancy portion of the hangar. By structurally isolating the administrative or higher occupancy area of the hangar from the low-occupancy hangar bay, the design is able to exempt the hangar bay portion from the requirements of UFC 4-010-01. 1 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 1-3 REFERENCES Appendix A contains a list of related documents and references to use in conjunction with this DG. The publication date of the code or standard is not included. In general, use the latest available issuance of the reference. 1-4 INSTRUCTIONS The standard facility prototype was developed by determining personnel counts, allowable/authorized space/room sizes, adjacency diagrams between the functional spaces and the overall facility space requirements. It establishes Air Force guidance for the facility type. Use these guides in conjunction with other Air Force policy and regulations such as Air Force departmental publications, and UFCs when programming and designing this facility type. Supplement this DG with a thorough review by individual program managers and operations staff. 1-4.1 Standard Facility Prototype Tools This standard facility prototype consists of four parts to be used by programmers and designers: • • • 1-4.2 DG for standard prototype (this DG document) Interactive programming sheet Facility Building Information Modeling (BIM) drawings Supplemental Facilities Guidance & Criteria The design guidance & criteria consist of three primary components: • • • 1-4.2.1 Notional site plan Composite facility adjacency diagram(s)/composite floor plan(s) Modules with associated room data sheets Notional Site Plan The notional site plan diagram demonstrates key site development criteria. It is not a site-specific solution. The information represents the land requirements to construct this facility and includes associated antiterrorism/force protection (AT/FP) standoff and parking. Utilization of existing or shared parking is allowable and may reduce the total acreage required for the facility. Adapt the requirements to the specific site and location and comply with the applicable Installation Development Plan (IDP) and Area Development Plan (ADP) for facility siting. 1-4.2.2 Composite Facility Adjacency Diagram(s)/Composite Floor Plan(s) The composite facility adjacency diagram(s) represent ways to conceptually assemble the functional areas (modules) into a cohesive whole. They demonstrate how the various functional components of the facility type can be successfully placed together into layout diagrams. Individual modules are represented by different colors. Composite 2 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 diagrams demonstrate acceptable ways the fixed modules can be placed together into conceptual building plans. They are not intended to be definitive building designs. Composite floor plans indicate definitive floor plans and represent the approved plan solutions that fully satisfy all functional requirements. Effectively, the plan becomes a “super module,” demonstrates a standard/approved building floor plan, and must be used in total. Plan variation other than rotating, flipping, or reversing to fit the actual site must be coordinated with and approved by AFCEC. 1-4.2.3 Modules Spaces and rooms that are integrally related with a specific functional connection or operational flow are grouped into a module. Modules and the associated room data sheets identify specific criteria and additional details for each functional area of the facility as outlined in the space programming sheets in Appendix B. Information is provided in a standard presentation and data sheet format. The required space adjacencies and modules are illustrated in figures. The modules are a grouping of functional spaces and represent “Lego blocks” to be used in a “kit-of-parts” design approach. Use the fixed modules as pre-assembled pieces of the facility “puzzle.” Assemble them to comply with the required adjacencies indicated in the diagrams and module plans. Arrange modules and create a configuration/composite building layout/plan responding to the constraints and opportunities of the specific site. The resulting shape of the facility assembled from the standard facility prototype modules must provide construction efficiencies obtained from building proportions and overall configuration. The building footprint shall be organized and well composed. The building design must comply with the Installation Facility Standards (Architectural Compatibility Plan) and the AFCFS. 1-4.2.4 Module Flexibility/Adjustments Modules must be used as designed to the greatest extent possible and shall not be deconstructed or altered except as indicated herein. The intent of the standard facility prototype criteria is to avoid manipulation of the composition, functional relationships, adjacencies, and module sizes. Modules contain fixed attributes and must not be arbitrarily changed. However, modules may be rotated, flipped, and reversed to accommodate an overall composition or site issue. When the fixed modules cannot be arranged to produce a constructible floor plan due to site constraints, it is permissible to slightly adjust a module proportion to create a constructible plan. Manipulating the module shape must not result in an overall increase in square feet or reduce the functionality of any module or the composite plan. Some modules are linked to space requirements that increase or decrease in size based on the personnel count and equipment for a particular mission. In these cases, increase or decrease the size of the module to match the revised scope calculation. This may sometimes require minor adjustments in other adjacent modules so that they properly fit together to create a constructible facility floor plan. Spaces must comply with any critical dimensions indicated on the module plans. Manipulate as few modules as 3 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 possible to create a constructible facility. The resulting composite plan must respect the established module adjacencies and must not exceed the authorized project scope. 1-4.2.5 Room Data Sheets Specific requirements for each room, space, or area are provided on room data sheets that are located following their respective module. Information contained on the data sheets defines the functional and physical requirements for each of the spaces within the facility type. 1-4.3 Programming Sheet(s) This tool is provided in two formats. A programming sheet is provided in Appendix B as a reference and reflects the baseline standard facility program. The additional interactive programming sheet provides a tool for planners and programmers. It allows the input of authorized personnel positions and special purpose spaces. Updated inputs are automatically calculated and provide new required square footage for each space and the estimated overall facility size. A link is provided in Appendix B for access to the interactive tool. 1-4.4 Design Drawings – BIM This component of the standard facility prototype tool includes both a Portable Document Format (PDF) version and Revit version of the modules and rooms. The spaces, rooms and modules shown reflect the programming sheet linked in Appendix B. The drawings in this DG are exact copies of the larger BIM drawings and comply with the program scope. The BIM drawings provide a starting point for the digitization of building data and a starting point in the design/construction of a facility. BIM and PDF documents are found at the link provided in Appendix B. 1-4.5 Additions and Alterations For additions and alterations to existing facilities, use the adjacencies, sizing/scope, and detailed requirements contained in the site diagrams, module drawings, and room data sheets to the maximum extent possible. The functionality and adjacency of the modules are still valid but may require some manipulation to fit into existing spaces. This standard may be slightly modified to accommodate the existing structure. However, proposed adjustments to the standard must be submitted to AFCEC for functional issues and deviations from the core requirements. Move non-structural walls to the greatest extent possible to open up space in the existing facilities to make them more receptive to the placement of the modules. The planner and designer shall determine the most efficient means to balance the placement of modules within existing spaces or as a facility addition. 1-4.6 Sustainability Meet the requirements of UFC 1-200-02, High Performance and Sustainable Building Requirements, and achieve green building certification in accordance with the current AF Sustainable Design and Development memo. See Appendix B for interactive Sustainability Requirements Scoresheet. 4 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 CHAPTER 2 SITE AND OVERALL ADJACENCY 2-1 GENERAL FACILITY OVERVIEW The Fighter Hangar/AMU Facility is typically a one-story structure but a two-story scenario is envisioned if there are site constraints as well as a linear hangar scenario in lieu of the tail-to-tail hangar scenario. The fighter hangar/AMU facility will serve as a standalone facility on the flight line. This hangar houses increments of two fighter aircraft in a tail-to-tail or wing-to-wing linear configuration. (The linear hangar scenario is not the most desirable due to the additional area required for engine repair/replacement and the additional travel distance to the AMU portion of the facility.) The F-22 footprint was used as the basis of design but all fourth- and fifth-generation fighters, including the F-15, F-16, and F-35, are being considered as possible candidates to receive this facility type. The fighter hangar/AMU facility will consist of, but not be limited to, the following modules: Hangar Bay Module (housing increments of two airframes; typically six aircraft for a squadron), Hangar Bay Support Module, AMU Administration Module, Ready Room Module, Flight Line Management Module, Engine Shop Module, Tools and Parts Support Module, Battery Shop Module, Wheel and Tire Shop Module, Egress Shop Module, and Building Support Module. The Battery Shop Module, Wheel and Tire Shop Module, and Egress Shop Module will be added if there is more than one squadron and/or if there is no separate building for these modules. There may be a scenario where there is a standalone AMU facility without the fighter hangar component and would consist of a Tools and Parts Support Module, AMU Administration Module, Ready Room Module, Flight Line Management Module, and Building Support Module. A standalone fighter hangar without an AMU component will have the same requirements as a fighter hangar/AMU facility without the AMU-related modules. AFCFS: Consult the AFCFS website at: http://afcfs.wbdg.org to determine the facility requirements and quality standards for this facility group. This standard facility prototype is in the Group 3 hierarchy. Facility Users/Occupants: This facility is operated by Active Duty, National Guard, and Reserve military personnel as well as contractor representatives from the aircraft types. Operational Aspects: Hours of operation for this facility type are user driven and vary up to two shifts, with approximately 30 personnel per shift. 2-2 NOTIONAL SITE PLAN The site diagram represents a notional layout to reflect site development requirements/criteria only. It is not an actual site design. Siting must comply with the IDP and ADP. 2-2.1 Site Location and Orientation Emphasis shall be placed on operation, function, and safety when siting the facility. The preferred location for this facility is immediately adjacent to the flight line or in close proximity. Other facility functions placed in close proximity may include engine maintenance shops, squadron operations, and aircraft sunshades. Analyze and comply 5 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 with airfield clearances, building setback restrictions, and line-of-sight restrictions from the adjacent flight line. The preferred orientation for this facility is such that the aircraft maintenance bays and associated hangar access aprons are provided direct access to the flight line operations area for ease of access to the facility for aircraft, flight line vehicles, and equipment. The approximate project area required for the fighter hangar/AMU facility is 5.0 acres, which includes AT/FP standoff and parking. 2-2.2 Vehicular and Pedestrian Circulation Convenient and safe vehicular access and circulation shall be provided for personal vehicles and essential services, including operations, maintenance, deliveries, trash and garbage collection, and emergency services. Parking shall be provided to accommodate the largest shift size, plus an additional 40 percent for shift overlap. Separate the service drives to the facility from the parking circulation areas. Locate sidewalk networks to provide convenient and safe pedestrian circulation from existing circulation elements of the project site to the new parking areas and doors of the facility. 6 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 2-1 Notional Site Diagram 7 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 2-3 COMPOSITE FACILITY ADJACENCY DIAGRAMS The functional adjacency diagram (Figure 2-2) is of a prototypical fighter hangar/AMU facility for six fighter aircraft. The Hangar Bay Module, Hangar Bay Support Module, Support Module, Engine Shop Module, Ready Room Module, and Flight Line Management Module are required to have access to the flight line, with the Ready Room Module and the Flight Line Management Module to have direct access (and visual access) to the flight line. The AMU Administration Module is to be located on the land side of the facility, with direct access from the POV and visitor parking lot. There are multiple points of entry to the facility from the flight line to accommodate the missions of the modules and a single point of entry to the AMU Administration Module on the land side. Figure 2-2 Functional Adjacency Diagram 8 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 CHAPTER 3 FACILITY REQUIREMENTS AND CRITERIA 3-1 MODULE A – HANGAR BAY MODULE 3-1.1 Function and Adjacency The Hangar Bay Module consists of a high bay space to accommodate increments of two aircraft, with enough clearance between wingtips and tails to accommodate storage requirements as identified by fighter maintenance crews. The bay is designed to fit the fighter aircraft tail-to-tail, with the nose of the aircraft facing the hangar doors. Steel sliding hangar doors and vertical lift fabric doors are the two acceptable hangar door options. An alternate hangar bay configuration would be a linear concept where aircraft fit into the hangar wing-to-wing with enough space as required at the aircraft tail for engine removal/replacement. This alternate configuration would fit a scenario where there is limited site area for a tail-to-tail configuration. The linear configuration is not the most desirable due to an increased hangar bay size to accommodate engine removal/replacement; in a tail-to-tail configuration this engine removal/replacement area is shared. 9 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-1 Module A Adjacency Diagram 10 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-1.2 Hangar Bay Figure 3-2 Module A Floor Plan and Axonometric 11 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-1.3 Data Sheets Figure 3-3 A1 Hangar Bay Room Data Sheet Maintenance hangar bay for fighter aircraft for aircraft inspections, tests, repairs, training, etc. Minimum 27’-0” unobstructed clearances and as required to meet UFC 3-260-01 clearances Translucent wall panels for daylighting Description/Usage Ceiling Height Windows Type Doors Security/ Hardware View Panels/ Kick Plates Walls Finishes Floor Base Ceiling Plumbing Keyed lock set View panels, 5” x 20” at all exterior doors Kick plates on both sides of doors CMU – painted wainscot 8’ above floor, pre-finished metal wall or liner panels above to roof deck Epoxy-non-slip (fuel resistant) or dry shake hardener No base Exposed structure –painted No floor drains. Wall mounted hose stations and hose reels for cold water. Compressed air drops with hose reels - coordinate with user on quantity and location. Emergency shower and eyewash per UFC 3-42001. Heating and ventilation. Exhaust directly outdoors. May require overhead radiant heating. May require snow-melting system at hangar door tracks in colder climates. Aircraft may require preconditioned air. HVAC Fire Protection / Life Safety Power Lighting Communication Horizontal sliding hangar doors or vertical lift fabric doors Hollow metal personnel doors - 3'x7' Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework Special Requirements Provide draft curtains. Low-level high-expansion foam system. Fire separation between office and shop areas. Wet pipe or dry pipe sprinkler system as required by UFC 3-600-01. 3-phase 480V 200A outlets in addition to UFC 3-520-01 required devices Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 Per program security requirements N/A Per program security requirements Per UFC 3-450-01 for noise control Two 10-ton bridge cranes spanning to support 3 aircraft each (in 6-plane scenario); overhead fall protection railing is required over fuselage and wings. Bird intrusion system at hangar bay trusses, e.g., bird netting, sonic devices, anti-roosting spikes, etc. For F-35, need 32’ tail-to-tail clearance for engine removal/replacement. 12 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-2 MODULE B – HANGAR BAY SUPPORT MODULE 3-2.1 Function and Adjacency The Hangar Bay Support Module consists of an aircraft data input room with seven workstations; Zamboni room for hangar bay floor cleaning; a laundry room; and a IPA/HAZ room for collecting hazardous materials. Each room serves the hangar bay or the aircraft inside the hangar bay. Figure 3-4 Module B Adjacency Diagram 13 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-2.2 Hangar Bay Support Figure 3-5 Module B Floor Plan and Axonometric 14 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-2.3 Data Sheets Figure 3-6 B1 IPA/HAZ Room Data Sheet Description/Usage Initial point of accumulation of hazardous materials. Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' Keyed lock set No view panels Kick plates both sides of door CMU or gypsum board - painted Sealer hardener Resilient Gypsum board – painted, or exposed structure - painted Plumbing Emergency shower and eyewash stations per UFC 3-420-01. HVAC Heating and ventilation. Exhaust directly outdoors through roof. Fire Protection / Life Safety Wet pipe sprinkler Power Lighting Per UFC 3-520-01 and NFPA 70 NEC for hazardous locations Per UFC 3-530-01 and NFPA 70 NEC for hazardous locations N/A N/A N/A N/A N/A N/A Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements Recessed floor for chemical spill containment. Requires space for seven 55-gallon barrels and space for one 25-gallon barrel. 15 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-7 B2 Laundry Room Data Sheet Description/Usage Laundry room adjacent to hangar bay Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, pair 3'-7' Keyed lock set No view panels Kick plates on both sides of doors CMU or gypsum board - painted Sealer hardener Resilient Gypsum board –painted, exposed structure - painted Plumbing Hot and cold water to washer, floor drain HVAC Air conditioned, ventilation, heating; dryer vent to exterior Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 in addition to power for washers and dryers Per UFC 3-530-01 N/A N/A N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework Washer and dryer Special Requirements N/A 16 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-8 B3 Zamboni Room Data Sheet Description/Usage Room for hangar floor cleaning machines (two minimum) Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Overhead coiling door, 8' x 8' power-operated Keyed lock set N/A CMU - painted Sealer hardener No base Gypsum board – painted, exposed structure - painted Plumbing Hot and cold water, small janitor sink, floor drain HVAC Air conditioned, ventilation, heating Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 in addition to charger unit power for floor cleaner Per UFC-3-530-01 N/A N/A N/A N/A N/A N/A Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements Need space for three 55 gallon barrels. 17 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-9 B4 Aircraft Data Input Room Data Sheet Description/Usage Room for aircraft maintenance crew to log in aircraft maintenance data Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' Keyed lock set View panels, 5” x 20” Kick plates on both sides of door CMU or gypsum board - painted Sealer hardener Resilient Acoustical ceiling tile Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework Seven (7) workstations Special Requirements N/A 18 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-3 MODULE C – AMU ADMINISTRATION MODULE 3-3.1 Function and Adjacency The AMU Administration Module will be located on the land side of the facility. The module consists of (OIC)/Chiefs Office (open office for four); an AMU Administrative Office; Corridors; Men’s and Women’s Toilets; and Mechanical/Electrical room. This module serves the administrative needs of the AMU. Figure 3-10 Module C Adjacency Diagram [ 19 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-3.2 AMU Administration Figure 3-11 Module C Floor Plan and Axonometric 20 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-3.3 Data Sheets Figure 3-12 C1 Assistant OIC/Chief/Super Room Data Sheet Description/Usage Open office with 4 workstations Ceiling Height Windows 9'-0" minimum Exterior insulated AT/FP Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7’ Keyed lock set View panels, 5” x 20” Kick plates on both sides of door Systems furniture, demountable partitions or gypsum board - painted Carpet tile Resilient Acoustical ceiling tile or exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework Four (4) workstations Special Requirements N/A 21 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-13 C2 AMU Administration Office Room Data Sheet Description/Usage Office with one workstation Ceiling Height Windows 9'-0" minimum Exterior insulated AT/FP Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' Keyed lock set View panels, 5” x 20” Kick plates on both sides of door Systems furniture, demountable partitions or gypsum board - painted Carpet tile Resilient Acoustical ceiling tile or exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework One (1) workstation Special Requirements N/A 22 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-14 C3 Mechanical/Electrical Room Data Sheet Description/Usage Mechanical/Electrical equipment Ceiling Height Windows No ceiling, 9'-0 minimum clearance N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, single 3' x 7' Keyed lock set No view panels Kick plates on both sides of doors CMU - painted Sealed concrete No base Exposed structure - painted Plumbing N/A HVAC Heating and ventilation Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A Per UFC 3-580-01 N/A N/A N/A N/A Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 23 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-15 C4 Toilet Room Data Sheet Description/Usage Men's and Women's toilet Ceiling Height Windows 8'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3'x7' Privacy lock set No view panels Kick plates on both sides of door Gypsum board - painted Porcelain tile or quartz epoxy Porcelain tile or quartz epoxy Gypsum board - painted Plumbing Water closets, urinals (Men's), lavatories. Floor drain in restroom area. HVAC Heating, ventilation, air conditioning. Exhaust directly outdoors. Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A N/A N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements Water-resistant gypsum board throughout 24 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-16 C5 Entry Corridor Room Data Sheet Description/Usage Building entrance from land side and general circulation within module Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Aluminum entrance door with glass or hollow metal with full glass, 3'x7' Keyed lock set Side light, 12” wide Kick plates both sides of door Gypsum board – painted Sealed concrete, stained concrete or tile Resilient or tile Acoustical ceiling tile or exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A N/A N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 25 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-4 MODULE D – READY ROOM MODULE 3-4.1 Function and Adjacency The Ready Room Module includes a ready room with 21 four-person tables and wall space for a computer counter with 12 computer docks; Maintenance Information System (MIS) unclassified room with 21 workstations and wall space for copiers, printers, storage cabinets, etc.; Autonomic Logistics Information System (ALIS) classified room; storage room with a roll-up counter shutter to the ready room; a break/galley corridor with a counter, microwaves, refrigerators, etc.; and a men’s and women’s toilet/locker/shower area. This module must have direct access to the flight line. Figure 3-17 Module D Adjacency Diagram 26 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-4.2 Ready Room Figure 3-18 Module D Floor Plan and Axonometric 27 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-4.3 Data Sheets Figure 3-19 D1 Ready Room Data Sheet Description/Usage Ready room for flight maintenance, with 21 four-person tables and a data input counter with 12 workstations and chairs Ceiling Height Windows 9'-0" minimum Exterior insulated AT/FP Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, full glass, 3'-7' (single and pair) Keyed lock sets View panels, 5” x 20” Kick plates on both sides of doors Gypsum board - painted Sealed concrete, Stained concrete, Tile, Terrazzo or Quartz Epoxy Resilient, tile, terrazzo or quartz epoxy Acoustical ceiling tile or exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A Per user requirement N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework Tables, chairs, computer workstations Special Requirements N/A 28 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-20 D2 MIS Unclassified Room Data Sheet Description/Usage Room for 21 workstations, printers and file storage Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' Keyed lock set View panels, 5” x 20” Kick plates on both sides of door Gypsum board - painted Sealed concrete, Stained concrete, tile, terrazzo or quartz epoxy Resilient, tile, terrazzo or quartz epoxy Acoustical ceiling tile or exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A Per user requirement N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 29 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-21 D3 Break/Galley Room Data Sheet Description/Usage Small area in corridor with a counter, cabinets, sink, microwaves, refrigerators, ice maker, and electric water cooler for maintenance staff Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling N/A N/A N/A Gypsum board - painted Sealed concrete, stained concrete, tile, terrazzo or quartz epoxy Resilient, tile, terrazzo or quartz epoxy Acoustical ceiling tile Plumbing Sink with disposal, electric water cooler. Water for ice machine. HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A N/A N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework Counter, cabinets Special Requirements N/A 30 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-22 D4 Storage Room Data Sheet Description/Usage Storage room adjacent to ready room with distribution counter with counter shutter and counter with cabinets (8’ in length) and sink Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' - 7' Counter shutter – 6’ x 4’, manually operated Keyed lock set View panels, 5” x 20” Kick plates on both sides of door Gypsum board - painted Sealed concrete, Stained concrete, tile, terrazzo or quartz epoxy Resilient, tile, terrazzo or quartz epoxy Gypsum board – painted or exposed structure - painted Plumbing Sink HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A N/A N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 31 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-23 D5 ALIS Classified Room Data Sheet Description/Usage Classified room with two workstations Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' Electronic strike, card reader, X-09 lock No view panels Kick plates on both sides of door Gypsum board - painted Sealed concrete, stained concrete, tile, terrazzo or quartz epoxy Resilient, tile, terrazzo or quartz epoxy Gypsum board - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 Per program security requirements N/A Per program security requirements Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 32 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-24 D6 Toilet/Locker/Shower Room Data Sheet Description/Usage Men's/women's toilet, locker, showers serve all personnel in the facility; on flight line side of facility Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Hollow metal, 3' x 7' Push-pull No view panels Kick plates on both sides of doors Walls Ceramic tile or quartz epoxy full height at wet walls, showers, gypsum board - painted Floor Base Ceiling Porcelain tile or quartz epoxy Porcelain tile or quartz epoxy Gypsum board - painted Plumbing Water closets, urinals (men's), lavatories, showers. Hot and cold water for fixtures. Floor drains in restroom and locker areas. HVAC Heating, ventilation, air conditioning. Exhaust directly outdoors. Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A N/A N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements Water resistant gypsum board throughout. See RFP for accessories requirements. 33 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-25 D7 Janitor Room Data Sheet Description/Usage Custodial room for general maintenance for flight line side of facility Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3'x7' Keyed lock set No view panels Kick Plates both sides of door Gypsum board - painted, ceramic tile at mop sink Porcelain tile or quartz epoxy Porcelain tile or quartz epoxy Gypsum board - painted Plumbing Mop sink, floor drain HVAC Heating, ventilation, air conditioning. Exhaust directly outdoors. Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A N/A N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements Water resistant gypsum board throughout. 34 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-26 D8 Corridor Room Data Sheet Description/Usage General circulation within the module Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' Keyed lock set View panels, 5” x 20” Kick plates both sides of door Gypsum board – painted Sealed concrete, stained concrete or tile Resilient or tile Acoustical ceiling tile or exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A N/A N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 35 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-5 MODULE E – FLIGHT LINE MANAGEMENT MODULE 3-5.1 Function and Adjacency The Flight Line Module includes a flight line management room, a maintenance debrief room with six desks, a classified maintenance debrief room with six desks, and a conference room. The open office has areas for specialist (six desks), weapons (four desks), production (four desks), Air Force Engineering and Technical Services (AFETS) (four desks), and crew chiefs (four desks) as well as space for storage cabinets and an area for a small conference table (seats six). This module must have direct access to the flight line. Figure 3-27 Module E Adjacency Diagram 36 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-5.2 Flight Line Management Figure 3-28 Module E Floor Plan and Axonometric 37 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-5.3 Data Sheets Figure 3-29 E1 Flight Line Management Room Data Sheet Description/Usage Open office divided into 5 sections: AFETS (4 workstations); crew chiefs (4 workstations); production pro-super/expeditors (4 workstations); weapons (4 workstations); specialists (6 workstations, small conference table) Ceiling Height Windows 9'-0" minimum Exterior insulated AT/FP Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' Keyed lock set View panels, 5” x 20” Kick plates on both sides of doors Gypsum board - painted Sealed concrete, stained concrete, tile or carpet tile Resilient or tile Acoustical ceiling tile or exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A Per user requirement N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 38 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-30 E2 Classified Maintenance Debrief Room Data Sheet Description/Usage Classified open office with 6 workstations Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' Electronic strike, card reader, X-09 lock No view panels Kick plates both sides of door Gypsum board - painted Sealed concrete, stained concrete, tile or carpet tile Resilient or tile Gypsum board - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A Per program security requirements Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 39 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-31 E3 Maintenance Debrief Room Data Sheet Description/Usage Open office with 6 workstations Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' Keyed lock set View panels, 5” x 20” Kick plates on both sides of door Gypsum Board - Painted Sealed concrete, stained concrete, tile or carpet tile Resilient or tile Acoustical ceiling tile or exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 40 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-31 E4 Conference Room Data Sheet Description/Usage Conference room for module Ceiling Height Windows 9'-0" minimum Exterior insulated AT/FP Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' Keyed lock set View panels, 5” x 20” and side lite, 12” wide Kick plates on both sides of door Systems furniture, demountable partitions or gypsum board - painted Carpet tile Resilient Acoustical ceiling tile or exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework Conference table for 12; 10 extra chairs at wall Special Requirements N/A 41 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-6 MODULE F – ENGINE SHOP MODULE 3-6.1 Function and Adjacency The Engine Shop Module (intended for F-35 aircraft engines only) includes a large, open workspace for two aircraft engines and two spare engines (broken into modules), tool cribs with wire mesh partitions, a storage room with a Stanley stacking system, and an engine shop office. Figure 3-33 Module F Adjacency Diagram 42 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-6.2 Engine Shop Figure 3-34 Module F Floor Plan and Axonometric 43 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-6.3 Data Sheets Figure 3-35 F1 Engine Shop Room Data Sheet Description/Usage Engine repair, maintenance and storage; maintenance for engine support equipment, including engine stands and trailers Ceiling Height No ceiling, 18'-0" minimum clearance or as required for 15'-0" hook height for monorail crane Windows Translucent wall panels for daylighting Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, pair 3' x 7' to exterior, single 3’ x 7’ to corridor; overhead insulated coiling door, 12' x 12' to exterior Keyed lock set View panels, 5” x 20” Kick plates on both sides of doors CMU - painted Epoxy - non-slip or sealed concrete No base Exposed structure - painted Plumbing No floor drains. Compressed air drops with hose reels - coordinate with users on number of drops and locations. Emergency shower/eyewash station per UFC 3-420-01. HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A Per program security requirements Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements Overhead monorail crane – 4000-pound capacity, 15' minimum hook height 44 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-36 F2 Engine Shop Office Room Data Sheet Description/Usage Engine shop office with two workstations Ceiling Height Windows 9'-0" minimum Exterior insulated AT/FP if on exterior wall Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' Keyed lock set View panels, 5” x 20” Kick plates on both sides of door Gypsum board - painted Sealed concrete, stained concrete or tile Resilient or tile Acoustical ceiling tile or exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 45 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-37 F3 Tool Crib Room Data Sheet Description/Usage Tool storage for engine maintenance Ceiling Height Windows No ceiling, 12' minimum clearance for tool storage N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Wire mesh fence 10’ height with gate, 8' x 8’ bi-parting Gate locks N/A CMU - painted, wire mesh partitions Epoxy - non-slip or sealed concrete No base Exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A Per program security requirements N/A Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 46 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-38 F4 Engine Shop Storage Room Data Sheet Description/Usage Storage area for Stanley stacker system Ceiling Height Windows No ceiling, minimum 12' clearance for stacker system N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Wire mesh fence 10’ height with gate, 8' x 8’ bi-parting Gate locks N/A CMU - painted, wire mesh partitions Epoxy - non-slip or sealed concrete No base Exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A N/A N/A N/A Per program security requirements N/A Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 47 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-7 MODULE G – TOOL AND PARTS SUPPORT MODULE 3-7.1 Function and Adjacency The Tools and Parts Support Module includes a supply shop with a designated tool transaction space, a supply TNB/FOM room, a HAZMAT storage space, and a supply shop office supporting three to four personnel. The main function of this module is to store aircraft parts and tools for distribution to the maintenance crews. TNB/FOM will contain sensitive aircraft parts. The HAZMAT area is positioned so chemicals can exit the bay and not re-enter. [top-right G5 in fig 3-38 is G7 in fig 3-39. G3 missing exit in 3-38] Figure 3-39 Module G Adjacency Diagram 48 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-7.2 Tool and Parts Support Figure 3-40 Module G Floor Plan and Axonometric 49 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-7.3 Data Sheets Figure 3-41 G1 HAZMAT Room Data Sheet Description/Usage Hazardous material storage with exterior access for small amounts of aircraft paint, sanding equipment, supplies, etc. Ceiling Height Windows No ceiling, 9'-0" minimum clearance N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, pair 3' x 7' to exterior, single 3’ x 7’ to assembly area Keyed lock set No view panels Kick plates both sides of doors CMU - painted Sealed concrete No base Exposed structure - painted Plumbing Emergency shower/eyewash station per UFC 3-420-01 HVAC Heated and ventilated. Exhaust directly outdoors. Fire Protection / Life Safety Wet pipe sprinkler system. Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A N/A N/A N/A N/A N/A Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 50 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-42 G2 Shop Office Room Data Sheet Description/Usage Open office with three workstations Ceiling Height Windows 9'-0" minimum Exterior insulated AT/FP if room located on exterior wall Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' Keyed lock set View panels, 5” x 20” Kick plates on both sides of door Gypsum board - painted Sealed concrete, stained concrete or tile Resilient or tile Acoustical ceiling tile or exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 51 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-43 G3 Tool/Parts Storage Room Data Sheet Description/Usage Tools/parts storage with mezzanine Ceiling Height Windows No ceiling, 18'-0" minimum clearance or as required for mezzanine N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling N/A N/A N/A N/A CMU - painted Sealed concrete No base Exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A Per program security requirements Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements Full coverage mezzanine 10’-0” height with stairs and 2000-poundcapacity caged lift. 52 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-44 G4 Assembly Room Data Sheet Tools/parts assembly area with exterior access and access to tool issue with counter and counter shutter Description/Usage Ceiling Height Windows Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling No ceiling, 12’ minimum clearance N/A Hollow metal, 3'-7' to exterior; overhead insulated coiling door, 8' x 12' to exterior, 8’ x 4’ counter shutter, power operated Keyed lock set View panels, 5” x 20” Kick plates on both sides of doors CMU - painted Sealed concrete No base Exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 53 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-45 G5 Tool Issue Room Data Sheet Description/Usage Tool/parts issuing area with access to hangar bay and flight line Ceiling Height Windows No ceiling, 12’ minimum clearance N/A Hollow metal, pair 3' x 7' to exterior and to hangar bay, single 3’ x 7’ to assembly area, overhead coiling, 8’ x 8’ to hangar and assembly area, power operated Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Keyed lock sets View panels, 5” x 20” Kick plates on both sides of doors CMU - painted Sealed concrete No base Exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A Per program security requirements N/A Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 54 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-46 G6 Secure Vault Room Data Sheet Description/Usage Classified storage Ceiling Height Windows 9'-0" minimum to underside of vault cap N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling 39" x 78" minimum Class V vault door Per UFC 4-215-01 N/A N/A CMU - painted Sealed concrete No base Gypsum board - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 Per program security requirements N/A Per program security requirements Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 55 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-47 G7 TNB/FOM Room Data Sheet Description/Usage TNB/FOM storage Ceiling Height Windows No ceiling, 9'-0" minimum clearance N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3'x7' Keyed lock set No view panels Kick plates on both sides of door CMU - painted Sealed concrete No base Exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 56 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-8 MODULE H – BATTERY SHOP MODULE 3-8.1 Function and Adjacency The Battery Shop Module includes a battery shop, a charging room and a shop office. A series of battery shelves, work benches, and charging stations are utilized in this area. Figure 3-48 Module H Adjacency Diagram 57 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-8.2 Battery Shop Figure 3-49 Module H Floor Plan and Axonometric 58 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-8.3 Data Sheets Figure 3-50 H1 Battery Shop Room Data Sheet Description/Usage Battery storage/crating Ceiling Height Windows No ceiling, 9'-0" minimum clearance N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, pair 3' x 7' to exterior Keyed lock set View panels, 5” x 20” Kick plates on both sides of doors CMU - painted Sealed concrete No base Exposed structure - painted Plumbing N/A HVAC Heating, ventilation. Exhaust directly outdoors through side-wall. Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A N/A N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework Battery storage racks Special Requirements N/A 59 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-51 H2 Shop Office Room Data Sheet Description/Usage Battery Shop Office with one workstation Ceiling Height Windows 9'-0" minimum Exterior insulated AT/FP Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' Keyed lock set View panels, 5” x 20” Kick plates on both sides of doors CMU or gypsum board - painted Sealed concrete, stained concrete or tile Resilient or tile Acoustical ceiling tile or exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkling system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 60 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-52 H3 Charging Room Data Sheet Description/Usage Battery charging room Ceiling Height Windows No ceiling, 9'-0" minimum clearance N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling No door, cased opening, 4'x7' N/A N/A N/A CMU - painted Sealed concrete No base Exposed structure - painted Plumbing Emergency shower/eyewash station per UFC 3-420-01. Sink with drain to neutralization tank. HVAC Heating, ventilation, air conditioning. Exhaust from over charging stations to outdoors through roof. Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A N/A N/A N/A N/A N/A Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements Charging stations to be low counter type, 30" height max. 61 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-9 MODULE I – WHEEL AND TIRE SHOP MODULE The Wheel and Tire Shop Module consists of the wheel and tire shop with an open layout and an office supporting three to four personnel. Space accommodations include areas for bead breaking, parts cleaning, bearing, and inflation. This module needs access to the exterior (preferably the flight line). 3-9.1 Function and Adjacency Figure 3-53 Module I Adjacency Diagram 62 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-9.2 Wheel and Tire Shop Figure 3-54 Module I Floor Plan and Axonometric 63 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-9.3 Data Sheets Figure 3-55 I1 Wheel and Tire Shop Room Data Sheet Description/Usage Maintains and stores aircraft wheel and tire components; builds-up, repairs, tests, stores, strips and degreases wheel and tire components and disassembles for nondestructive inspection (NDI) Ceiling Height Windows No ceiling, 12'-0" minimum clearance N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, pair 3' x 7' to exterior and single 3’ x 7’ to corridor; overhead insulated coiling door, 10' x 10' to exterior Keyed lock set View panels, 5” x 20” Kick plates on both sides of doors CMU - painted Epoxy - non-slip or sealed concrete No base Exposed structure - painted Plumbing Compressed air drops - coordinate with user on quantity and location. Possibly nitrogen for filling tires. HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 in addition to tire-changing equipment power Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 64 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-56 I2 Office Room Data Sheet Description/Usage Wheel and tire office with four workstations Ceiling Height Windows 9'-0" minimum Exterior insulated AT/FP Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' keyed lock set View panels, 5” x 20” Kick plates on both sides of doors Gypsum board - painted Sealed concrete, stained concrete, tile Resilient or tile Acoustical ceiling tile or exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 65 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-10 MODULE J – EGRESS SHOP MODULE 3-10.1 Function and Adjacency The Egress Shop Module consists of an administration/ready room supporting three to four personnel, an egress support Consolidated Tool Kit (CTK) (tool distribution), an egress maintenance room, an egress storage room, and a bomb/CAD/PAD room. All cockpit egress maintenance will take place in this module before the assembled product is taken to the bay. Figure 3-57 Module J Adjacency Diagram 66 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-10.2 Egress Shop Figure 3-58 Module J Floor Plan and Axonometric 67 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-10.3 Data Sheets Figure 3-59 J1 Egress Maintenance Room Data Sheet Description/Usage Space and utilities for tools, equipment and personnel for maintenance of egress systems; work areas for repair, replacement, and inspection of ejection seats and canopy Ceiling Height Windows No ceiling, 10'-0" minimum clearance N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, pair 3' x 7' and single 3’ x 7’ Keyed lock set View panels, 5” x 20” Kick plates on both sides of doors CMU - painted Sealed concrete No base Exposed structure - painted Plumbing Compressed air drops - coordinate with users on number and location of drops HVAC Heating, ventilation and air conditioning. Specialized exhaust systems may be required. Exhaust directly outdoors. Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework Work benches with devices on each end to work on ejection seats. Special Requirements Grounding bus bars located around workspace where transparencies and seats are being maintained. 68 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-60 J2 Administration/Ready Room Data Sheet Description/Usage Ready room with four work stations, tables/chairs, counter, sink, cabinets, microwave, refrigerator Ceiling Height Windows 9'-0" minimum Exterior insulated AT/FP Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, 3' x 7' Keyed lock set View panels, 5” x 20” Kick plates on both sides of doors Gypsum board - painted Sealed concrete, stained concrete, tile Resilient or tile Acoustical ceiling tile or exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A Per user requirement N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 69 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-61 J3 Egress Support CTK Room Data Sheet Description/Usage Tool storage and issue area Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, pair 3' x 7' Keyed lock set View panels, 5” x 20” Kick plates on both sides of doors Gypsum board - painted Sealed concrete Resilient Acoustical ceiling tile or exposed structure - painted Plumbing Hot and cold water for sink HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 70 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-62 J4 Egress Storage Room Data Sheet Description/Usage Egress storage of built-up seats Ceiling Height Windows No ceiling, 10'-0" minimum clearance N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, pair 3' x 7'; overhead insulated coiling door, 8' x 8' to exterior, overhead coiling door, 8’ x 8’ to egress maintenance Keyed lock set View panels, 5” x 20” Kick plates on both sides of doors CMU - Painted Sealed concrete No base Exposed structure - painted Plumbing N/A HVAC Heating, ventilation, air conditioning Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A N/A N/A N/A N/A Per UFC 3-450-01 for noise control Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 71 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-63 J5 CAD/PAD Room Data Sheet Description/Usage Secure storage room for canopy explosive charges and ejection seat rocket motors Ceiling Height Windows 9'-0" minimum to underside of concrete cap N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling 39" x 78" min. Class V vault door, secure Per UFC 4-215-01 N/A CMU - painted Sealed concrete no base Concrete - painted Plumbing Compressed air drops - coordinate with users on number of drops and location. HVAC Heating, ventilation, and air conditioning. Specialized exhaust systems may be required. Exhaust directly outdoors. Humidifier/dehumidifier may be required due to the presence of ordnance. Explosion-proof fan motors may be required. Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A N/A N/A N/A Per program security requirements N/A Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework Explosive vaults for temporary of ejection seat and canopy explosives. Special Requirements N/A 72 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-11 MODULE K – BUILDING SUPPORT MODULE The Building Support Module consists of a mechanical room, fire pump room (if required), electrical room, and communications room. All rooms will have exterior access (with the exception of the communications room, which may have interior access). These modules will be located on the exterior wall adjacent to the utility courtyard and accessible for maintenance. 3-11.1 Function and Adjacency Figure 3-64 Module K Adjacency Diagram 73 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-11.2 Building Support Figure 3-65 Module K Floor Plan and Axonometric 74 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-11.3 Data Sheets Figure 3-66 K1 Communications Room Data Sheet Description/Usage Communications equipment Ceiling Height Windows No ceiling, 9'-0 minimum clearance N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, single 3' x 7' Keyed lock set No view panels Kick plates on both sides of door CMU - painted Sealed concrete No base Exposed structure - painted Plumbing N/A HVAC Heating, ventilation and air conditioning. Dedicated unit required. Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 Per UFC 3-580-01 Per UFC 3-580-01 N/A N/A Per BCE requirements N/A Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 75 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-67 K2 Electrical Room Data Sheet Description/Usage Electrical equipment Ceiling Height Windows No ceiling, 9'-0 minimum clearance N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, single or pair 3' x 7' to exterior Keyed lock set No view panels Kick plates on both sides of doors CMU - painted Sealed concrete No base Exposed structure - painted Plumbing N/A HVAC Heating and ventilation Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A Per UFC 3-580-01 N/A N/A N/A N/A Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 76 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-68 K3 Fire Pump Room Data Sheet Description/Usage Fire pump equipment Ceiling Height Windows No ceiling, 9'-0" minimum clearance N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, pair 3' x 7' to exterior Keyed lock set No view panels Kick plates on both sides of doors CMU - painted Sealed concrete No base Exposed structure - painted Plumbing Floor drains as required HVAC Heating and ventilation. Air conditioning required in foam equipment room with releasing panel per UFC 3-600-01. Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A Per UFC 3-580-01 N/A N/A N/A N/A Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 77 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 Figure 3-69 K4 Mechanical Room Data Sheet Description/Usage Mechanical equipment Ceiling Height Windows No ceiling, 9'-0" minimum clearance N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Hollow metal, pair 3' x 7' to exterior Keyed lock set No view panels Kick plates on both sides of doors CMU - painted Sealed concrete No base Exposed structure - painted Plumbing Floor drains as required HVAC Heating and ventilation Fire Protection / Life Safety Wet pipe sprinkler system Power Lighting Per UFC 3-520-01 Per UFC 3-530-01 N/A Per UFC 3-580-01 N/A N/A N/A STC 45 assembly minimum between adjacent spaces Communication Tele. Data CCTV CATV Security Acoustical Furnishings / Equipment / Casework N/A Special Requirements N/A 78 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 3-12 MODULE L – CIRCULATION ROOM MODULE The Circulation Room Module consists of general circulation or corridor space not associated with individual modules. This space provides circulation among modules as well as means of egress. Figure 3-70 Circulation Room Data Sheet Description/Usage This data sheet is for general circulation or corridor spaces not associated with individual modules. Ceiling Height Windows 9'-0" minimum N/A Type Doors Finishes Security/ Hardware View Panels/ Kick Plates Walls Floor Base Ceiling Plumbing HVAC Fire Protection Power Lighting Tele. Data Communication CCTV CATV Security Acoustical Requirements Hollow metal, 3’x7’ (egress) Keyed lock set N/A Kick plates both sides of door CMU – painted or gypsum board - painted Sealed concrete, stained concrete or tile Resilient or tile Acoustical ceiling tile or exposed structure - painted N/A Heated and air conditioned Wet pipe sprinkler system Per UFC 3-520-01 Per UFC 3-530-01 N/A N/A N/A N/A N/A N/A Furnishings, Equipment and Casework N/A Special Requirements N/A 79 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 CHAPTER 4 ENGINEERING/TECHNICAL CRITERIA 4-1 NOT USED. 80 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 This Page Intentionally Left Blank 81 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 APPENDIX A REFERENCES Use the latest available issuance of the reference. AIR FORCE AFI 31-101, Integrated Defense, http://www.e-publishing.af.mil/ AFI 32-1054, Corrosion Control, http://www.e-publishing.af.mil/ AFI 32-1062, Electrical Systems, Power Plants and Generators, http://www.epublishing.af.mil/ AFI 32-1065, Grounding Systems, http://www.e-publishing.af.mil/ AFMAN 32-1084, Facility Requirements, http://www.e-publishing.af.mil/ Air Force Corporate Facility Standards (AFCFS), http://afcfs.wbdg.org/index.html ETL 02-15, Fire Protection Engineering Criteria – New Aircraft Facilities, http://www.wbdg.org/ccb/browse_cat.php?o=33&c=125 ETL 04-3, Design Criteria for Prevention of Mold in Air Force Facilities, http://www.wbdg.org/ccb/browse_cat.php?o=33&c=125 ETL 07-4, Air Force Carpet Standard, http://www.wbdg.org/ccb/browse_cat.php?o=33&c=125 ETL 13-4, Standby Generator Design, Maintenance, and Testing Criteria, http://www.wbdg.org/ccb/browse_cat.php?o=33&c=125 AMERICAN CONCRETE INSTITUTE ACI 301-10, Specifications for Structural Concrete, http://www.concrete.org/store/productdetail.aspx?ItemID=30110 ACI 318-14, Building Code Requirements for Reinforced Concrete and Commentary, http://www.concrete.org/store/productdetail.aspx?itemid=31814 ACI 530.1-13, Specifications for Masonry Structures, http://www.concrete.org/store/productdetail.aspx?ItemID=53013 ARCHITECTURAL BARRIERS ACT ABA Accessibility Standard for Department of Defense Facilities, http://www.accessboard.gov/guidelines-and-standards/buildings-and-sites/about-the-abastandards/aba-standards 82 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 ARMY EM 200-1-3, Requirements for the Preparation of Sampling and Analysis Plans, http://oai.dtic.mil/oai/oai?verb=getRecord&metadataPrefix=html&identifier=ADA4022 24 ER 1110-1-263, Chemical Data Quality Management for Hazardous, Toxic, Radioactive Waste Remedial Activities, http://oai.dtic.mil/oai/oai?verb=getRecord&metadataPrefix=html&identifier=ADA4043 61 TI 800-01, Design Criteria, http://www.wbdg.org/ccb/browse_doc.php?d=3043 AMERICAN INSTITUTE OF STEEL CONSTRUCTION ANSI/AISC-360-10, Specification for Structural Steel Buildings, https://www.aisc.org/WorkArea/showcontent.aspx?id=39246 AMERICAN IRON AND STEEL INSTITUTE AISI S100-12, North American Specification for the Design of Cold-Formed Steel Structural Members, https://shop.steel.org/p/299/aisi-s100-12-north-americanspecification-for-the-design-of-cold-formed-steel-structural-members-and-aisi-s10012-c-commentary-on-the-specification-2012-edition AMERICAN SOCIETY OF CIVIL ENGINEERS ASCE/SEI 7-10, Minimum Design Loads for Buildings and Other Structures, http://www.asce.org/templates/publications-book-detail.aspx?id=6725 AMERICAN SOCIETY OF HEATING, REFRIGERATING, AND AIR-CONDITIONING ENGINEERS ANSI/ASHRAE Standard 15-2013, Safety Standard for Refrigeration Systems, https://www.ashrae.org/resources--publications/bookstore/standards-15--34 ANSI/ASHRAE Standard 62.1-2013, Ventilation for Acceptable Indoor Air Quality, https://www.ashrae.org/resources--publications/bookstore/standards-62-1--62-2 ANSI/ASHRAE Standard 90.1, Energy Standard for Buildings Except Low-Rise Residential Buildings, https://www.ashrae.org/resources-publications/bookstore/standard-90-1 ANSI/ASHRAE/USGBC Standard 189.1, Standard for the Design of High-Performance Green Buildings, https://www.ashrae.org/resources-publications/bookstore/standard-189-1 83 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 AMERICAN WELDING SOCIETY AWS D1.1/D1.1M-2010, Structural Welding Code –Steel, DEPARTMENT OF DEFENSE MIL-HDBK 1013/1A, Design Guidelines for Physical Security of Facilities, http://www.wbdg.org/ccb/browse_doc.php?d=2813 UFC 1-200-01, General Building Requirements, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 1-200-02, High Performance and Sustainability Building Requirements, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 1-300-07A, Design Build Technical Requirements, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-120-01, Design: Sign Standards, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-190-06, Protective Coatings and Paints, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-220-04FA, Backfill for Subsurface Structures, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-220-08FA, Engineering Use of Geotextiles, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-250-01FA, Pavement Design for Roads, Streets, Walks and Open Storage Areas, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-250-04, Standard Practice for Concrete Pavements, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-250-08FA, Standard Practice for Sealing Joints and Cracks in Rigid and Flexible Pavements, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-250-11, Soil Stabilization for Pavements, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-260-01, Airfield and Heliport Planning and Design, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-260-17, Dust Control for Roads, Airfields, and Adjacent Areas, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-301-01, Design: Structural Engineering, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 84 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 UFC 3-400-02, Design: Engineering Weather Data, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-410-04N, Industrial Ventilation, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 4-211-01, Maintenance Hangar, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-450-01, Noise and Vibration Control, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-520-01, Interior Electrical Systems, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-520-05, Stationary Battery Areas, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-570-02A, Cathodic Protection, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-575-01, Lightning and Static Electricity Protection Systems, http://www.wbdg.org/ccb/DOD/UFC/ufc_3_575_01.pdf UFC 3-580-01, Telecommunications Building Cabling Systems Planning and Design, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 3-600-01, Fire Protection Engineering for Facilities, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 4-022-01, Security Engineering: Entry Control Facilities / Access Control Points, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 4-022-02, Selection and Application of Vehicle Barriers, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 4-022-03, Security Fences and Gates, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 4-023-03, Design of Buildings to Resist Progressive Collapse, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 UFC 4-215-01, Armories and Arms Rooms, http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 85 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 ENERGY INDEPENDENCE AND SECURITY ACT EISA Section 438, Stormwater Management for Federal Facilities under Section 438 of the Energy Independence and Security Act, http://water.epa.gov/polwaste/nps/section438.cfm ENERGY POLICY ACT EPACT, http://energy.gov/sites/prod/files/2013/10/f3/epact_2005.pdf ENVIRONMENTAL PROTECTION AGENCY National Pollutant Discharge Elimination System (NPDES) for Construction Activities (varies by state), http://water.epa.gov/polwaste/npdes/ FEDERAL AVIATION ADMINISTRATION FAA AC 70/7460-1K, Obstruction Marking and Lighting, http://www.faa.gov/documentLibrary/media/Advisory_Circular/AC%2070%2074601K.pdf FAA AC 150/5320-5D, Airport Drainage Design, http://www.faa.gov/documentLibrary/media/Advisory_Circular/150_5320_5d.pdf FAA AC 150/5345-43G, Specification for Obstruction Lighting Equipment, http://www.faa.gov/documentLibrary/media/Advisory_Circular/150_5345_43g.pdf FAA AC 150/5370-2F, Operational Safety on Airports During Construction, http://www.faa.gov/documentLibrary/media/Advisory_Circular/150_5370_2f.pdf FEDERAL HIGHWAY ADMINISTRATION Manual on Uniform Traffic Control Devices (MUTCD), http://mutcd.fhwa.dot.gov/ ILLUMINATING ENGINEERING SOCIETY OF NORTH AMERICA IESNA, The Lighting Handbook, http://www.ies.org/handbook/ INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS IEEE C2, National Electrical Safety Code, http://standards.ieee.org/findstds/standard/C2-2012.html INTERNATIONAL CODE COUNCIL International Fuel Gas Code (IFC), http://publicecodes.cyberregs.com/icod/ifgc/index.htm International Mechanical Code (IMC), http://publicecodes.cyberregs.com/icod/imc/index.htm 86 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 International Plumbing Code (IPC), http://publicecodes.cyberregs.com/icod/ipc/index.htm NATIONAL FIRE PROTECTION ASSOCIATION NFPA 70, National Electrical Code (NEC), http://www.nfpa.org/codes-andstandards/document-information-pages?mode=code&code=70 NFPA 780, Standard for the Installation of Lightning Protection Systems, http://www.nfpa.org/codes-and-standards/document-informationpages?mode=code&code=780 OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION OSHA regulations, https://www.osha.gov/law-regs.html US GREEN BUILDING COUNCIL USGBC LEED-NC, LEED 2009 for New Construction and Major Renovations Rating System (U.S. Green Building Council), http://www.usgbc.org/Docs/Archive/General/Docs5546.pdf 87 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 APPENDIX B PROGRAMMING SHEET LINK See the link below for access to the interactive programming sheet: http://www.wbdg.org/references/afbim_tools.php This Page Intentionally Left Blank 88 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 B-1 PROGRAMMING SHEET 89 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 This Page Intentionally Left Blank 90 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 B-2 PDF FLOOR PLANS AND BIM DRAWINGS LINK The PDF floor plans and BIM drawings can be found on the Whole Building Design Guide at http://www.wbdg.org/references/afbim_tools.php 91 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 This Page Intentionally Left Blank 92 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 B-3 AIR FORCE MILCON SUSTAINABILITY REQUIREMENTS SCORESHEET The interactive score sheet can be found on the Whole Building Design Guide at: http://www.wbdg.org/ccb/browse_cat.php?c=265. 93 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 94 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 95 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 96 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 APPENDIX C GLOSSARY ADP Area Development Plan A-E architect-engineer AFCEC Air Force Civil Engineering Center AFCFS Air Force Corporate Facility Standards AFETS Air Force Engineering and Technical Services AFMAN Air Force Manual ALIS Autonomic Logistics Information System AMU aircraft maintenance unit ASHRAE American Society of Heating, Refrigerating, and Air-Conditioning Engineers AT/FP antiterrorism/force protection BIM Building Information Modeling CAD/PAD Cartridge Actuated Device / Propellant Actuated Device CATV cable television CCTV closed-circuit television CMU concrete masonry unit CTK Consolidated Tool Kit DG Design Guide DOD Department of Defense ETL Engineering Technical Letter HVAC heating, ventilating, air conditioning IDP Installation Development Plan MIS Maintenance Information System PDF Portable Document Format RFP request for proposal 97 DG - AIR FORCE FIGHTER HANGAR/AMU FACILITY 1 AUG 2015 SF square feet STC Sound Transmission Class TNB/FOM Tail Number Bin/Facilitate Other Maintenance UFC Unified Facilities Criteria 98