2 ON TIME PERFORMANCE 3 RIDERSHIP UPDATE MONTHLY CITATIONS UPDATE 4 RIDERSHIP CHART 5 PERFORMANCE CHART 6 TRAIN UTILIZATION 7 PARKING UTILIZATION 8 GENERAL INFORMATION 9 HIGHWAY SIGN RENEWAL CAPITAL COMMITTE UPDATE NEW QUANTICO VENDOR AND EVENT BICYCLE COUNTS PER STATION PLANNING 10 TRANSPORTATION PRIORITIES PLAN TRANSPORTATION RESEARCH BOARD SYSTEM PLAN UPDATE RAIL OPERATIONS 11 SAFETY UPDATE CUSTOMER SURVEY FOLLOW-UP FINANCIAL REPORT 12 MONTHLY FINANCIAL REPORT INVESTMENT REPORT REVENUE EXPENSE REPORT 13 CAPITAL PROJECTS BROAD RUN PARKING EXPANSION L’ENFANT STORAGE TRACK SPOTSYLVANIA KING STREET PEDESTRIAN TUNNEL PROJECT LORTON PLATFORM EXTENSION 14 PROGRESS REPORT / PROJECTS UNDERWAY Reason for Delays While our On Time Performance (OTP) remained above 90% on both lines for the month of October, it did dip slightly in comparison with the two previous months. Most of the delays that occurred took place on three seperate days where incidents affected multiple trains throughout the day. One day’s delays were the result of signal issues, another day, delays were the result of a malfunctioning wheel chair lift to an early morning train which caused interference with each subsequent train, and one day’s delays were due to restricted speeds through the Burke area as local authorities investigated suspicious activity. Overall On Time Performance for October was 94%, with Fredericksburg trains operating at 93% and Manassas trains operating at 94%. Looking at this more closely, VRE operated 690 trains during October with 42 trains encountering a delay of five minutes or greater. Delays were split equally between the two lines with 21 delays a piece. Our goal for the upcoming months is to return our On Time Performance to the high 90th percentile. Signal/Switch Failure Late Turn Passenger Handling Train Interference Restricted Speed Schedule Other SYSTEM-WIDE Total delays Average delay (mins) Number over 30 min. Total heat restriction days On-Time Performance Mechanical AUG. SEP. OCT. 17 13 0 6/22 97% 21 42 14 2 2/20 97% 26 14 0/23 94% 21 10 0 99% 18 14 1 99% 27 6 93% 14 3 21 13 0 96% 17 1 96% 25 8 94% FREDERICKSBURG LINE Total delays Average delay (mins) Number over 30 min. On-Time Performance 3 MANASSAS LINE Total delays Average delay (mins) Number over 30 min. On-Time Performance 2 CEO REPORT/ NOVEMBER 2013 The story of ridership in October is the story of the government shutdown. Between the dates of October 1st and October 16th, ridership dropped 31%. The postive side of things was that as soon as the shutdown was over, ridership sprang back, with one day reaching 21,086, our fourth busiest day ever. Still that did not allow our monthly figures to equal the numbers from last year, with the shutdown resulting in a 16.7 % drop in ridership compared to October RIDERSHIP MONTH TO MONTH 2012. COMPARISON The shutdown had a slight affect on Amtrak trains with a drop in step-up usage from 11,104 in September to 10,575 step-up riders for the month of October. The average number of riders per day for the month of October was approximately 16,600. October 2013 368,153 October 2012 384,161 Service Days (Current/Prior) 23/20 Percentage Change We expect ridership numbers to return to normal at 19,000 plus in November. Keolis wrote 182 citations during the month of October, 29 less than September. -16.7% FARE EVASION COURT ACTIONS VRE waived 41 tickets after riders showed proof of purchase of a monthly ticket. Additionally, another 15 tickets were waived either for system errors, requests of the conductor or TVM issues. Of the remaining 126 citations that went to Court, 39 cases were found to be guilty, 25 were prepaid, 7 were continued on to a later date. 54 were dismissed and only 1 person was found not guilty. WAIVED CITATIONS VRE ACTIONS OCCURANCES Waived - Passenger had proof of monthly ticket 41 Waived - Per request of conductor 2 Waived - Special circumstances 13 TOTAL 56 Guilty Guilty in AbsenƟa Prepaid Prior to Court Date Cont. to Next Court Date Dismissed Not Guilty CEO REPORT/ NOVEMBER 2013 3 NOTE: Adjusted Averages and Totals include all VRE trips taken on Amtrak trains, but do not include “S” schedule days. * designates “S” schedule day ** Amtrak train numbers have been estimated (30% reduction from September 2013) 4 CEO REPORT/ NOVEMBER 2013 SYSTEM PERFORMANCE PERFORMANCE BY LINE CEO REPORT/ NOVEMBER 2013 5 FREDERICKSBURG LINE MANASSAS LINE 6 CEO REPORT/ NOVEMBER 2013 Parking Spaces FREDERICKSBURG LINE No. of spaces 800 No. in use 600 400 200 0 R DB LO W P RI N QA V BK R* LL G* FB MANASSAS LINE Parking Spaces 1400 1200 No. of spaces No. in use 1000 800 600 400 200 0 V BL V RR V BC PV M SS M U BR CEO REPORT/ NOVEMBER 2013 7 HIGHWAY SIGN RENEWAL In 1996, VRE worked with VDOT to install road signs for key stations on I-95 and I-495, and pathfinder signs for multiple secondary routes. In 2012, VRE revisited the road and pathfinder plan and determined it needed a better means to control the more than 102 signs. VRE addressed this concern by creating a Google Earth map for the 14 outer stations and the new Spotsylvania station to more accurately locate, renew and install any needed additional signs. Currently, VRE has two pathfinder signs and two Interstate road signs ready for renewal. VRE is also working with VDOT to install pathfinder and Interstate road signs in the near future for the Spotsylvania station. CAPITAL COMMITTEE UPDATE The Financial and Debt Management Principles, as recommended by the Capital Committee, were approved by the Operations Board in October and were presented to the Commissions for their review in November. In October, the Committee reviewed the recommendations for heavy maintenance and overhaul alternatives for VRE rolling stock; the funding for this program will be included in the FY 2015 to FY 2020 capital improvement program (CIP). In November, the Committee will be considering the funding sources and projects for the CIP, which will be presented to the Operations Board in December. NEW QUANTICO VENDOR AND EVENT VRE opened a new ticket vendor at our Quantico Station on Sept. 17th, 2013. The vendor, Ricks Roasters, offers coffee, both fresh brewed and take home beans, as well as snacks and other sundries. Since their opening, the vendor has done exemplary work in taking on ticket sales duties at this station. To celebrate the new vendor, and to introduce them to the VRE riders at Quantico, VRE will be holding a “Meet the Vendor” event at the station on Nov. 12th, 2013. Ricks Roasters will be providing coffee service for the event, and VRE staff will be there to speak with passengers, answer questions, and more. 8 CEO REPORT/ NOVEMBER 2013 BICYCLE COUNTS PER STATION - OCTOBER 2013 Backlick Road - 0 Broad Run - 1 Brooke - 0 Burke Centre - 5 Franconia/Springfield - 15* Fredericksburg -5 Leeland Road - 3 Lorton - 1 Manassas - 5 Manassas Park - 2 Quantico - 4 Rippon - 1 Rolling Road - 2 Woodbridge - 0 *(bike riders of VRE and Metro cannot be differentiated) PLANNING REGIONAL TRANSPORTATION PRIORITIES PLAN The Draft Regional Transportation Priorities Plan (RTPP) was discussed at the October 16 meeting of the National Capital Region Transportation Planning Board (TPB). The purpose of the RTPP is to identify those transportation strategies that best promote the TPB’s goals for economic opportunity, transportation choices, system safety and efficiency, quality of life, and environmental stewardship. The RTPP will identify strategies that the region agrees are the top priorities for addressing the most pressing challenges that the region faces in meeting our shared goals. A number of TPB members from Virginia as well as DC and Maryland expressed support at the meeting for expanding the plan’s emphasis on commuter rail as a strategy to address regional mobility, transportation choice, economic competitiveness and other TPB goals. It was indicated that subsequent versions of the RTPP will include a more detailed discussion of commuter rail. TRANSPORTATION RESEARCH BOARD The 12th Transportation Research Board (TRB) Rail Passenger Caucus will be held November 22-23, 2013 in Washington, DC and Baltimore, MD. Caucus attendees will travel from Fredericksburg to Washington, DC aboard VRE Train 310 on Friday morning. VRE staff will meet attendees at the Fredericksburg station prior to boarding to provide an overview of VRE station and train operations. Upon arrival at Union Station, the meeting will move to the Amtrak Board Room where I will provide a short overview of VRE plans, programs and operations. Amtrak, WMATA, DDOT and WMAA presentations are also on the morning agenda. The afternoon includes tours of DDOT streetcar construction and WMATA operations before heading to Baltimore via MARC. The Caucus concludes on Saturday with presentations by MTA and MARC and a field review of MTA light rail operations. CEO REPORT/ NOVEMBER 2013 9 PLANNING TRANSPORTATION RESEARCH BOARD...conƟnued The TRB Rail Passenger Caucus is a joint business meeting of the passenger rail-oriented committees of the TRB Public Transport and Rail Groups. The TRB mission is to promote innovation and progress in transportation through research. It facilitates the sharing of information on transportation practice and policy by researchers and practitioners; stimulates research and offers research management services that promote technical excellence; provides expert advice on transportation policy and programs; and disseminates research results broadly and encouraged their implementation. SYSTEM PLAN UPDATE Work is underway to develop more detailed information about the preliminary VRE System Plan recommendations, presented to the VRE Operations Board at its October meeting. The analysis will include identifying the ridership market impact, capital and operating costs, benefits and implementation issues for the system investment and expansion projects that advance the plan’s three primary initiatives: • Maximize existing service • Expand service beyond existing capacity • Regional rail concepts Implementation of the program of investments associated with the first two initiatives supports potential VRE ridership growth of up to 50,000 daily passenger trips by 2040 and sets the stage for the establishment of a fullservice regional rail network serving the Washington, DC metropolitan area. SAFETY UPDATE Staff have been upgrading our contractor safety training program in order to reflect advances other railroads have recently made. TriVision studios cinematography of Chantilly has been retained to film a video on VRE property depicting general safety and security rules and standard procedures. The video will also cover some basic informational elements to help familiarize new contractors to the railroad environment. VRE’s goal is to present this video, coupled with an examination on its contents to all new contractors who will be performing work on VRE property prior to their arrival on VRE property. Passage of the examination will yield a VRE safety training credential valid for one year, similar to the annual training certification that VRE train crews receive. 10 CEO REPORT/ NOVEMBER 2013 CUSTOMER SURVEY FOLLOW-UP Last month we were happy to report steady improvements in virtually all categories of our annual customer service survey. OperaƟng RaƟo Budgeted Revenue YTD Actual Revenue YTD CumulaƟve Variance Percent Collected YTD 29,234,119 30,075,503 841,384 Budgeted Expenses YTD OperaƟng Expenses YTD CumulaƟve Variance Percent Expended YTD 28,254,477 26,295,692 1,958,785 55% 57% 35.72% 841,384 36.75% 34.52% 1,958,785 32.13% These figures are preliminary and unaudited. While happy with the results, we believe that there is always room for improvement. To help improve scores for next year, we will work to develop an action plan for any score below 80%. We plan to highlight several of these action plans in the next several CEO reports. A copy of the October 2013 Operating Budget Report is attached. Fare income for the month of October 2013 was $36,729 below the budget – an unfavorable variance of 1.14%. The cumulative variance for the year is 3.21% or $402,672 above the adopted budget. Revenue in FY 2014 is up 13.9% compared to FY 2013. The government shutdown in October did not have a material effect on fare revenue. A summary of the financial results (unaudited) as of October 2013 follows. Detail on the major revenue and expense categories is provided in the attached Operating Budget Report. Included is the investment report dated September 30, 2013 CEO REPORT/ NOVEMBER 2013 11 VRE Investment Portfolio As of September 30, 2013 Investment Type Institution Amount Description Rate Checking Account LGIP (Local Government Investment Pool) SunTrust LGIP 7,072,389 23,855,178 Checking account Operating and reserve funds 0% 0.110% Project Funds LGIP (Local Government Investment Pool) LGIP (Local Government Investment Pool) Money market fund Insurance trust fund LGIP LGIP U.S. Bank DRM 140,308 52,937 1,726,833 10,416,572 Proceeds from sale of rolling stock Revolving account for small liability claims Funds held by bond trustee until next payment date Amount as of 9/30/2013 0.110% 0.110% 0.00% N/A Total portfolio 43,264,217 Percentage of portfolio: Checking-SunTrust LGIP Money market fund-US Bank Insurance trust fund 16% 56% 4% 24% Total Percentage of Portfolio: 100% Earnings Credit - Checking Account Current year earnings credit amount Average monthly balance Earnings credit rate Current Month 669.36 5,617,926.82 0.20% Year to Date 2,299.52 6,465,169.28 0.20% (1) Contract allows for earnings credit of .20% on average monthly balance as an offset to banking services costs. (2) Earnings calculated based on monthly average. VIRGINIA RAILWAY EXPRESS FY 2014 Operating Budget Report October 31, 2013 CURR. MO. ACTUAL CURR. MO. BUDGET YTD ACTUAL YTD BUDGET YTD VARIANCE $ % OPERATING REVENUE Passenger Ticket Revenue Other Operating Revenue Subtotal Operating Revenue 3,171,239 1,900 3,173,139 3,207,968 14,550 3,222,518 12,942,911 50,740 12,993,651 12,540,239 56,876 12,597,116 402,672 (6,136) 396,535 3.2% -10.8% 3.1% Jurisdictional Subsidy (1) Federal/State/Other Jurisdictional Subsidy Appropriation from Reserve Interest Income Total Operating Revenue 2,849,829 2,394 6,025,362 2,705,079 1,341 5,928,938 8,360,923 8,712,355 8,574 30,075,503 8,360,923 8,270,838 5,242 29,234,119 441,516 3,332 841,384 0.0% 5.3% 0.0% 63.6% 2.9% 4,953,102 575,611 5,528,713 5,264,657 575,611 5,840,268 22,797,370 3,498,322 26,295,692 24,756,155 3,498,322 28,254,477 1,958,785 1,958,785 7.9% 0.0% 496,649 88,669 3,779,811 979,642 2,800,169 OPERATING EXPENSES Departmental Operating Expenses Debt Service Other Non-Departmental Expenses Total Operating Expenses NET INCOME (LOSS) FROM OPERATIONS CALCULATED OPERATING RATIO (1) Total jurisdictional subsidy is $16,428,800. Portion shown is attributed to Operating Fund only. 12 CEO REPORT/ NOVEMBER 2013 57% 6.9% BROAD RUN PARKING EXPANSION The design and engineering firm Dewberry has completed the 30% design of the Broad Run parking facility and prepared the environmental CE (Categorgical Exclusion) application. VRE has forwarded the CE application to FTA for review and approval. To date no response has been received from FTA. Upon approval of the CE application, VRE will ask Dewberry to proceed to the 60% design level. L’ENFANT STORAGE TRACK CSX anticipates completing the L’Enfant Storage Track design and construction cost estimate in approximately one month. The design includes the addition of two power switches, signalization, and a tail track for emergency temporary storage of several VRE railcars and/or locomotives. The track portion of the design is complete and has been approved by VRE. CSX is currently making final revisions to the signal portion of the design. PEPCO has confirmed that an electric service can be installed close to the site, which will supply power to VRE’s wayside power equipment and CSX switch heaters. CSX has approved VRE’s request to attach electrical conduits to the stone bridge abutment at 6th Street, allowing VRE to issue PEPCO a Notice-to-Proceed for the design and construction process. SPOTSYLVANIA Construction contracts for the new station and the Hamilton to Crossroads third track project were awarded early this past summer. Once the land purchase is completed by Spotsylvania County, VRE can issue the notice to proceed and construction can begin. In the meantime, utility relocation and finalizing signal design work continues. ALEXANDRIA KING STREET PEDESTRIAN TUNNEL PROJECT VDOT has completed their pre-award audit evaluations, therefore, we will be moving forward with selecting the firm to conduct the design work. The project team is moving forward to accomplish following milestones: • NEPA Documentation – Complete December 2012 - Complete • Public Information Meeting – Spring 2013 • Design – Complete March 2014 • Construction Advertisement – June 2014 • Construction – Complete 2015 LORTON PLATFORM EXTENSION VRE is prepared to issue an IFB in January 2014, with construction expecting to commence during the spring of 2014. This project will extend the existing platform at the VRE Lorton Station by approximately 256 feet to accommodate longer VRE trains. CEO REPORT/ NOVEMBER 2013 13 COMMUT Project&Code Description Task TaskDescription Project Manager BoardItem Number WashingtonUnion JointstudywithAmtrakandMARCre: TerminalRail Christine meetingcurrentandforecastedgrowthfor Hoeffner Service targetyears2017and2030. ImprovementPlan AmtrakJoint Recapitalization Project LortonStation Expansion 100% Completed CoachYardWayside stationforVREstoragetracksattheCoach RichDalton PowerUpgrade yard 100% Completed WUTCanopyRoof RepairsofcanopyroofatWUTlowerlevel RichDalton platforms Repairs 60% 4thQuarter 2013 AlexandriaͲKingSt StationPlatform Elevation 0% 3rdQuarter 2014 100% Completed 4thQuarter 2012 Upgradeandreplacewaysidepower AmtrakandVREjoint benefitrecapitalization projects PEand Expansionofstationby Environmental extendingeasternplatform andaddingasecond StationExpansion platform Design FeasibilityStudy AlexandriaͲKing StPedestrian Tunnel BroadRun StationParking Expansion FranconiaͲ Springfield Station Rehabilitation Security Cameras %ofTotal Task Task Completion Completion Date(Est.) Designandinstallationofa newpedestriantunnel betweentheVRE/Amtrak andMETROstationsand SiteInvestigation modificationstoeastern platformtoallowservice Design& fromTrack#1. Construction (Future) EnvironmentalAnalysisand Engineeringtoexpand parkingby700spaces Tomakerepairs& improvementstothe FranconiaSpringfield StationEasternPlatform& PassengerWalkway EA&PE Raisewestplatformelevation EAandPEtoextendtheexitingplatform EricJohnson andconstructasecondplatform. Prepareconstructiondocumentsfor250' platformexpansionwithupgradedLED EricJohnson lighting 8B–05Ͳ2012 100% 2ndQuarter 2013 Prepareafeasibilitystudywithlimitedsurveyto investigatechallengesassociatedwithdesigning, RichDalton permittingandconstructingatunnelunderalive CSXtrack. 8CͲ05Ͳ2012 95% 2ndQuarter 2013 10% 3rdQuarter 2013 0% 4thQuarter 2014 30% 1stQuarter 2014 CompilesoilsdataandperforminͲsitutestingto prepareforfinaldesignphaseandprovideVDOT RichDalton withenvironmentalinformation. FutureDesign&Construction n/a TDB EnvironmentalAnalysisandEngineeringto EricJohnson 11DͲ04Ͳ2011 expandparkingby700spaces Repairs& Improvements Infrastructurerepairsandimprovements toeasternplatformandpassenger walkwayatVREFranconiaͲSpringfield Station. KipFoster 9FͲ06Ͳ2011 100% Completed FlaggingServices& Protection Provideflaggingservicesduringplatform levelrepairsandoverheadpedestrian bridgework. KipFoster 9GͲ06Ͳ2011 Complete Completed JohnDuque 8AͲ05Ͳ2012 Completed 4thQuarter 2012 Installationofsecuritycamerasonstationplatformsandrehab.ofcommunication cabinettosupportadditionaldevicesforthecameras.Fredericksburg,Woodbridge, Quantico,andBurkeCenter 14 CEO REPORT/ NOVEMBER 2013 RichDalton TERSTATIONS TE Status ChangeOrder,Budget&ScheduleChange Notes&Updates Vendor TotalAdopted TotalBoard Contractual Total CIPBudget Approved Commitments Expenditures ThruFY14($) Funds($) ToͲDate($) ToͲDate($) Finalplancomplete. Lastinvoicereceived10/31/12;awaitingfinal invoice. Amtrak $1,000,000 $1,000,000 $1,000,000 $985,995 Projectcompletedandisinuse. Lastinvoicereceived4/12/2013 Amtrak $750,000 $750,000 $750,000 $515,968 Amtrakhasspentallallocatedbudget,butperformedonly60%ofthework. Amtrakrequestingadditional$300ktocompletetheproject. Amtrak $600,000 $600,000 $600,000 $403,617 Projectscopingunderway.Amtrakisintheprocessofwritinganagreementtobe submittedtoVREforreview. Amtrak $278,867 $278,867 $Ͳ $Ͳ TOTALS $2,628,867 $2,628,867 $2,350,000 $1,905,580 Completed $306,350 $278,500 $271,476 HDR $2,820,000 Buildingplansandsiteplanapproved.IFBforconstructionispreparedforissuance B inDecember.CoordinatingwithCSXregardingforceaccountagreementfor flaggingservices. $103,400 $94,000 $78,801 HDR FeasibilitystudywasdistributedtostakeholdersJan2013.Commentsreceived fromallstakeholders.Preparingfinaldraftaddressingcomments.Preparingfor finaldesignonceVDOTprovidesapprovalofuseofGECcontract. TOTALS $2,820,000 $409,750 $372,500 $350,277 AECOM $162,711 $147,919 $140,487 $7,470,000 RightofentrypermitsweresubmittedinApriltoCSX&WMATA.Waiting approvals. AECOM IntheprocessofselectingoneoftheGECVItocompletethedesign. n/a $Ͳ $Ͳ $Ͳ $Ͳ TOTALS $7,470,000 $162,711 $197,860 $140,487 Dewberry $3,420,000 $2,031,263 $1,846,603 $368,994 TOTALS $3,420,000 $2,031,263 $1,846,603 $368,994 AwaitingFTAapprovalofCEapplicationsubmittedinAugust.30%designunder VREreview.60%designeffortwillbeginafterCEapprovalisobtained. ChangeOrder#1,Canopy Roof/Gutters/Downspouts,$39,230ͲͲͲ SubstantialCompletionandowneroccupancyinJune.Punchlistcomplete.Fairfax ChangeOrder#2,Stringer S CountyPermitclosedout.Contractcloseoutunderway. Repair/Replacement,$47,440ͲͲͲChange Order#3,StructuralSteelRepairs/Rehab, $45,682 $Ͳ $49,941 $Ͳ Vista Contracting, Inc. $455,950 $443,852 $437,637 $522,000 Noadditionalflaggingexpected. Completed Forceaccountestimateforflagginginthe amountof$124,765. Thechangeorderforadditionalconduitshad beenprocessedandcompletedsuccessfully. Thetotalamountofthechangeorderis $17,745.00 CSXTrans. $132,000 $124,765 $27,842 TOTALS $522,000 $587,950 $568,617 $465,479 X7 $320,000 $320,000 $306,539 $306,539 TOTALS $320,000 $320,000 $306,539 $306,539 CEO REPORT/ NOVEMBER 2013 15 TRACK&INFRAST Project&Code Gainesville Haymarket Expansion Description TaskDescription Project Manager G/HExpanion Analysis (Feasabillity) DevelopexpansionalternativesforVREServiceto G/H Christine Hoeffner Complete Complete Performmodeling,environmentalanalysisare preliminaryengineering Christine Hoeffner 0% 2ndQuarter 2016 Construction (Future) FutureTrackConstruction TBD 0% TBD StorageTrack Construction Construct~1,400oftracknorthofL'Enfant Station EricJohnson 100% Complete WaysidePower Design Designwaysidepowerforstoredtrainsets EricJohnson 90% 4thQuarter 2013 WaysidePower Construction Constructionofwaysidepowerforstoredtrain EricJohnson sets 30% 1stQuarter 2014 AirCompressor Procurement Installationofaircompressorequipmentfornew EricJohnson storagetrackairsystem(eVA). 90% 2ndQuarter 2013 CabSignalInstal. fromCPROtoCP VirginiaAve. InstallationofcabsignalsfromMPCFP110.1to EricJohnson MPCFP112.2. 100% Complete ExpansionofVREServiceto G/HExpansionPE Gainesville&Haymarket, andEA VA Construct~1,400feetof L'EnfantStorage StorageTrackNorthofthe L'EnfantStationPlatform, includingWaysidePower Track (Capacityof2Trainsets) Switch& SignalizationDesign Spotsylvania Station Crossroadsto HamiltonThird Track Designofstoragetrackswitchesandsignals EricJohnson 9BͲ06Ͳ2011 90% 4thQuarter 2013 Designofthenewplatformandhead house. KipFoster 9FͲ06Ͳ2012& 9GͲ06Ͳ2012 100% Complete Constructionofthenewplatformand headhouse. KipFoster 9FͲ05Ͳ2013 0% 2ndQuarter 2014 ThirdTrackCivil Design EnvironmentalAnalysisandFinalDesign KipFoster 100% 2ndQuarter 2013 ThirdTrackSignal Design Signaldesignandengineeringsupport KipFoster 9EͲ06Ͳ2012 75% 4thQuarter 2013 Track&Signal Construction ConstuctionofSignals KipFoster 9HͲ09Ͳ2013 0% n/a TrackWork& Structures ConstructionofTrack&Structures KipFoster 9CͲ06Ͳ2013 0% 2ndQuarter 2014 DevelopmentofanewVRE StationDesign stationinSpotsylvania County(StationOnly,NO Parking)nearthe StationConstruction CrossroadsYard Constructapproximately 2.5milesofthirdtrack leadingtothenew SpotsylvaniaStation BoardItem Number %ofTotal Task Task Completion Completion Date(Est.) Task PLANNING&COMM Project&Code Description Task TaskDescription CommunicationcabinetsatVREstationstobeequippedwithanairconditioning(AC) Comm.Cabinets unitandanuninterruptiblepowersupply(UPS)unitfortemperaturecontrolandpower redundancyandsurgefaultprotection. Upgrade SystemPlanning 16 CEO REPORT/ NOVEMBER 2013 Preparesystemplantocover20+yearplanninghorizon Project Manager BoardItem Number %ofTotal Task Completion Task Completion Date(Est.) JohnDuque 9BͲ01Ͳ2013 90% 4thQuarter 2013 63% 4thQuarter 2013 Christine Hoeffner TTRUCTUREPROJECTS Status ChangeOrder,Budget&ScheduleChange Notes&Updates Vendor FeasabillityStudyCompletedon9/28/2009 AerialSurveyDeferredtoNEPA/PE.Revised ConsultantResponsabillityforCostEstimatingfrom BelstartoVHB/DMJM VHB ContractawardawaitingexecutionofmatchAddendumbetweenVREandNSandgrantNTP. VREsentagreementtoNSforsignatureon1/08/13.VRErequestedgrantextensionfromDRPT 2/7/13.VREalsopursuingadditionalfundingfromvariousavailablesources. VRErequestedgrantextensionfromDRPT2/7/13. NVTAapproved$1.5MinFY14fundsforproject. STV/RWA FutureConstructionRelatedtoExpansion FundingSourcesTBD TBD TOTALS TotalAdopted TotalBoard Contractual Total CIPBudget Approved Commitments Expenditures ThruFY14($) Funds($) ToͲDate($) ToͲDate($) $1,537,338 $1,397,338 $1,042,749 $4,286,414 $2,749,076 $2,499,160 $Ͳ $Ͳ $Ͳ $Ͳ $4,286,414 $4,286,414 $3,896,498 $1,042,749 CSXTrans. $830,000 $706,000 $442,794 HDR $Ͳ $50,925 $40,110 WaysidepowerconstructiontofollowPEPCO'sdesignandconstructionofelectricservice, contingentonCSXapprovaldescribedabove. NVE $Ͳ $688,480 $208,390 Procurementprocesshasbeencompleted.Aircompressorsystemhasbeendeliveredandis beingstoredatCrossroadsYard.VRE/NVEcoordinatingwithKaeserregardingconstruction details.Kaeserinstalledphasemonitorsoncompressors. Kaeser Compressors, Inc. $Ͳ $37,531 $37,531 CSXTrans. $1,260,000 $1,260,000 $497,744 CSXTrans. $250,000 $225,000 $125,792 TrackComplete n/a PEPCOconfirmedthatservicecanbeprovidedfromVirginiaAvenue.Conduitsmustbe attachedtoviaductwallandbridgeabutmentinordertoroutepowerfromservicetowayside SupplementtoGECVTaskOrder7intheamountof $8,600executedinlateDecember2012. powerequipment.WaysidePowerdesigntobecompletedafterCSXhasapprovedattaching conduitstobridgeabutment. $3,219,000 SignalcutovercompletedweekendofOctober24,2009.AttendedsitevisitwithDRPTandCSX inmidJanuaryrequiredforgrantreimbursement. Totalprojectbudget$1,260,000.VREshare $882,000(70%). CSXpreviouslyanticipatedcompletionoftrackandsignalmodificationdesigninMay2013. DesignworkcontinuesasofearlyOctober.CSXhasnotprovidedestimatedcompletiondate despiteVRE'srepeatedinquiries. TOTALS PermittingalmostcompletewithSpotsylvaniaCounty. STV ContractexecutedandCEissuedbyFHWA.NTPtobeissuedonceConstruction AgreementinplacewithCSXandCountyacquiresland. Hammerhead Construction $3,219,000 $2,340,000 $2,967,936 $1,352,361 $405,912 $369,011 $205,332 $3,422,500 TOTALS $2,583,900 $Ͳ $Ͳ $3,422,500 $2,989,812 $369,011 $205,332 Permittingcomplete,waitingforNTPinordertoinitiateagencyconstructionnotifications. Designplanscirculatedforsignature.FinalRevisioncompleted.ConstructionPlansbeing circulatedtocontractorsandotherstakeholders. STV $817,703 $743,366 $396,034 CSXFAcostestimatefinalizedlastmonth.Coordinationwithutilitiesandrelocationefforts underway.WaitingforCSXConstructionAgreementexecution.SignalDesignforPhase1 complete.SignalDesignforPhase2estimatedtobecompletewithinthemonth. CSXTrans. $1,009,800 $917,400 $Ͳ $32,500,000 BoardApprovedinSeptmeber2013 CSXTrans. $20,522,611 $Ͳ $Ͳ ContractexecutedandCEissuedbyFTA.NTPtobeissuedonceCSXConstructionAgreement ExecutedandCountyacquiresland. Abernathy Construction Corp $8,880,073 $8,072,794 $Ͳ TOTALS $32,500,000 $31,230,187 $9,733,560 $396,034 M MUNICATIONSPROJECTS Status ChangeOrder,Budget&ScheduleChange Notes&Updates Vendor Total Contractual TotalAdopted TotalBoard Approved Commitments Expenditures CIPBudget ToͲDate($) ToͲDate($) Funds($) ThruFY14($) AmtrakiswaitingforRioPrimetosubmitinsurancedocumentsbefore noticetoproceedcanbeprocessed.RioPrimeispreparingthefinal documentsforsubmission.Lastupdate10/1/2013 Changeorder01Ͳ$4,112 RioPrime $138,150 $138,150 $142,307 $117,111 TOTALS $138,150 $138,150 $142,307 $117,111 P.B. $150,000 $150,000 $150,000 $34,470 TOTALS $150,000 $150,000 $150,000 $34,470 Workisprogressingonschedule.NextmilestoneisOctober2013VREOps Boardpresentationofdraftplanrecommendations. CEO REPORT/ NOVEMBER 2013 17 YARD Project&Code Description BroadRunYard Designandconstructionof TrainWashand BroadRunYardtrainwash CrossroadsYard andCrossroadsYard warehouse. Warehouse Project Manager BoardItem Number %ofTotal Task Task Completion Completion Date(Est.) Task TaskDescription Crossroads WarehouseDesign Conceptualandfinaldesignofnew Crossroadswarehouse. EricJohnson 10DͲ04Ͳ2012 100% Completed 4thQuarter 2012 Crossroads Warehouse Construction ConstructionofnewCrossroads warehouse. EricJohnson 11EͲ04Ͳ2011 100% Completed 2ndQuarter 2013 60% 4thQuarter 2013 BroadRunTrain WashDesign BroadRunTrain WashConstruction ConceptualandfinaldesignofnewBroad EricJohnson 9DͲ06Ͳ2012(?) Runtrainwash. FutureConstruction/InstallationWork relatedtoBroadRunTrainwash TBD TBD n/a n/a YardFall Protection InstallationoffallprotectionsystemsatBroadRunandCrossroadsyards KipFoster 9CͲ01Ͳ2013 100% 3rdQuarter 2013 TieReplacement atYards Tiereplacementatbothyards. KipFoster 9EͲ05Ͳ2013 100% 3rdQuarter 2013 ROLLINGST T Project&Code PositiveTrain Control(PTC) Description Toinsallandimplement PositiveTrainControl(PTC) forallVRELocomotives NewPassenger ToAquireEight(8)New Railcars RailcarsfromSumitomoto Procurement addtotheexistingVRE PassengerCarFleet No.90Ͳ66Ͳ16060 18 CEO REPORT/ NOVEMBER 2013 Task TaskDescription Project Manager PositiveTrain PositiveTrainControlforalllocomotives, asmandatedbytheRailSafety RichDalton ControlInstallation ImprovementActof2008. andInfrastructure BoardItem Number Task %ofTotal Completion n Task Completion Date(Est.) 9EͲ09Ͳ2013 0% 4thQuarter r 2014 Oversight OversightͲPositiveTrainControlforall locomotives,asmandatedbytheRail SafetyImprovementActof2008. RichDalton 9AͲ03Ͳ2013 0% 4thQuarter r 2014 NewRailcar Manufacture(8 cars) BaseOrderof8NewPassengerrailcars RichDalton 10CͲ01Ͳ2012 15% 4thQuarter r 2013 NewRailcars Engineering Oversight Onsiteengineeringthroughwarranty administrationunderMECVtaskorder STVͲ0017underMECV RichDalton 9EͲ02Ͳ2012 20% 4thQuarter r 2013 PPROJECTS Status FinalpaymentissuedinearlyApril. ChangeOrder,Budget&ScheduleChange Notes&Updates Vendor STVTaskOrder#3Supplement#1for $146,414foradditionalCrossroads warehouseengineeringservices STV/RWA ContractAmendmentNo.1ͲMultiplechangeorders increasingContractamountby$124,409andContracttime byninedays.ContractAmendmentNo.2ͲMultiplechange ordersincreasingContractamountby$87,774andContract timeby173days. 60%reviewcommentsprovided.90%designeffortunderway. $629,248 $619,334 $619,311 Trinity Construction $2,600,000 $2,092,364 $2,125,632 Group,Inc. $5,723,959 STV/RWA $325,513 $283,421 $97,523 TBD $Ͳ $Ͳ $Ͳ TOTALS $5,723,959 $3,554,761 $2,995,119 $2,842,466 IndustrialTurn Around $230,000 $169,482 $154,074 $22,337 Corporation (ITAC) WaitingforexecutionofProjectCloseoutFinalContractAmendment.Contract Closeoutunderway. TOTALS ProjectComplete.WaitingforexecutionofProjectCloseoutFinalContract Amendment.ContractCloseoutunderway. TotalAdopted TotalBoard Contractual Total CIPBudget Approved Commitments Expenditures ThruFY14($) Funds($) ToͲDate($) ToͲDate($) BoardItem8FͲ10Ͳ2013increasedBoardapproved Fundingfrom$434,533to$449,646 $230,000 $169,482 $154,074 $22,337 GWPeoples $530,000 $449,646 $395,048 $Ͳ TOTALS $530,000 $449,646 $395,048 $Ͳ Total TotalAdopted TotalBoard Contractual Approved Commitments Expenditures CIPBudget ToͲDate($) ToͲDate($) Funds($) ThruFY14($) TOCKPROJECTS T Status ChangeOrder,Budget&ScheduleChange Notes&Updates Vendor PreparingcontractdocumentsforWRE Authorizationtoawardasolesourcecontractto WabtecwasapprovedbybothCommissionson10Ͳ3Ͳ 13,preparingsolesourcedocumentation WRE $8,821,989 $7,980,877 $550,645 $30,242 PTCImplementationoversightͲDefinitionPhaseͲ MatrixoftaskswasreviewedandapprovedbyVRE TaskorderissueonMarch13,2013toSTVforengineeringandoversightworkfor forplandevelopmentandpreparationunderwayfor implementation.MECIVTaskOrder0026 scopeofworkincludinghardwarepricingand STV quotes,STVisalsodevelopingbackofficeoperation TOTALS $8,821,989 $7,980,877 $550,645 $30,242 Manufacturingof8baseorderpassengerrailcarsplanningformanufacturingand ThecarnumbersaredesignatedasV820ͲV827;the SumitomoͲ carsareinfinalassembly. schedulingisunderwayͲcarbodyshellinroutetoAuroraIL NipponSharyo Continuingtoprovidemanufacturingandengineeringoversight STVcontinuestoprovideoversightofthecar constructioninIL.STVCompletedFAIforDoor AssembliesatNaritaManufacturing,Wheelchairlift atRicon,andHVACunitsatTransitair...Resident inspectoractiveatRochelleoperation... completedLeanTestingonGalleryIVcarsand continuedrawingreviews.... $23,140,000 $21,240,000 $Ͳ $24,614,000 STV TOTALS $1,474,000 $1,250,000 $610,150 $24,614,000 $24,614,000 $22,490,000 $610,150 CEO REPORT/ NOVEMBER 2013 19