VRE’s Legislation Appreciation Reception 2 Performance 3 Reasons for Delays – Graph On Time Performance Ridership Update Monthly Citation Update On Time System Performance Chart On Time Performance by Line Chart Ridership Table Train Utilization Chart – Fredericksburg Train Utilization Chart – Manassas Parking Utilization Chart Financial Report Rail Operations 4 5 6 7 8 9 10 11 12 14 Safety General Information Legislative Update Capital Projects Alexandria Spotsylvania Franconia/Springfield Lorton Station Gainesville Long Bridge Update Railcar Acquisition and Production Capital Project Summary 1 16 17 18 19 As of the writing of o this report, VRE V is preparingg to host its thirrd Legislative AAppreciation Reception in Richm mond. The event gives us the chaance to bring a VRE train to Richmond R so that legislators, their t staff and others can see our equipmennt up close. Meembers of the Genneral Assembly then have a bettter idea of whaat they are invessting in and whaat VRE means too the Commonwealth of Virginiaa. Thiss year the VRE Operations Boaard will also reccognize two members of the General Assembly for their longg time support for VRE. State Sennator Charles Colgan and Deleggate Joseph May are the first recipients r of the VRE Appreciation and Leaderrship Award. At the reception eacch member will be presented with w a mounted model m VRE train set. We wish to thank Senator S Colgan and Delegate May, M as well as the many, many members of thhe General Asseembly who support and assist VREE in achieving thhe success that we have today. 2 Reasonss for Delays SSignal/Switch FFailure ‐ 12 O Other ‐ 10 A AMTRAK Interfference ‐ 9 V VRE Interference ‐ 8 SSlow Orders ‐ 7 7 FFreight Interferrence ‐ 3 M Mechanical Faiilure ‐ 3 P Passenger Handling ‐ 3 W Weather ‐ 2 LLate Turn ‐ 1 Onn Time Perforrmance Jannuary continuedd the trend of performance p abbove 96% with the overall monnthly performance now toppinng 95% or better for sixteen connsecutive monthhs. That is withoout question thee highest and moost consistent pperformance thhat VRE has prodduced in our 200 year history. As for individual linne performancee, the Fredericksburg line camee in at 96.4% annd the Manassaas line reported a final tally of 996.3% for the month of January. Loooking at the chaart above you’ll see that I havee reformatted thhe monthly delaay report to proovide a clearer picture of the causes of the delays that VRE enncountered durring the month of January. For the month of January, switcch/signal failurre were the leading cause of delays followed byy other (that is comprised this month of a bruush fire, and sccheduling/running time). What I need to emphhasize here is youu’ll see 58 delays during the month m but only a total of 23 laate trains in Jaanuary. The reaason for that iss that a train m may encounter sevveral delays durring its operation which may or o may not cauuse it to be latee. For instance, a train could bbe late leaving Union Station waiiting for anotheer train to depart the station. During the courrse of its run itt could also enccounter a signaal issue, yet stilll arrive at its finaal destination “on “ time”. Thatt train experiennced two delayys but was nott “LATE” (arrivving at its finall destination laater than five minnutes). 3 Onn Time Perforrmance (Conntinued) SYSTE EM-WIDE Total delaays Average length of delay (mins.) ( o 30 minutess Number over Days withh heat restrictioons/Total days On-Time Performance P FREDER RICKSBURG LINE Total delaays Average length of delay (mins.) ( o 30 minutess Number over On-Time Performance P MANAS SSAS LINE Total delaays Average length of delay (mins.) ( o 30 minutess Number over On-Time Performance P NOV VEMBER 28 31 4 0/20 95% DECEMBER 14 37 6 0/19 98% JJANUARY 23 34 8 0/21 96% 13 41 3 95% 8 43 3 97% 11 52 6 96% 15 20 1 95% 6 28 3 98% 12 18 2 96% Riddership Updaate Aveerage daily ridership for Januaary 2013 was higher than Januuary 2012. That is a very positive sign. The tabble below showss that we did neaarly 400,000 paassenger trips in January, a number n that we have not achieeved prior to thhis month. Equaally impressive was that we reccorded our secoond highest rideership day everr on January 299th (21,285) and that we postedd nine days over 20,000 during the month. Thaat means that 43% 4 of our operational days we w posted riderrship above 20,000. Beyond thhose statistics, January 2013 wwas also the seccond highest farre revenue month in the historyy of VRE, anotheer very positive indicator of our service. RIDERSH HIP MONTH TO MON NTH COMP PARISON DESCR RIPTION MO ONTHLY RIDE ERSHIP January J 2013 397.936* January J 2012 391.184 SERVICE S DAYS (CURRENT/PRIOR) (20/21) PERCENT CHANGE -4% % Normalizzed *Am mtrak Cross Honnor numbers arre estimations 4 Moonthly Citatioons Update VR RE ACTION NS Waived- Passenger showed proof of a monthly ticcket Waived- Per the reequest of the isssuing conductorr Waived- Due to deffective tickets or o TVM TO OTAL OC CCURANCE ES 21 1 0 22 For the month of Januaary, VRE issued a total of 103 citationns. That is about 10% more than January 2012. Off those 103 citaations issued, VVRE waived 22 of them m for our riderss. That means tthat 21% of all citationns issued duringg the month weere waived by VRE. Of tthe remaining 81 8 citations, 8 were w found not guilty, 9 were dismissed and 9 were continuued. This means that 68% of people issued citaations were found guilty of violaating VRE’s faree evasion policy. I thhink it is important for VRE to remain vigilant in its ticket enfforcement. We have successfuully prosecuted a fraudulent ticket case and noww we have another one on the docket for Apriil. Only through persistent tickket checks will wwe be able to fiind those individduals who are atteempting to ride VRE with counterfeit or frauduulent tickets. Fare e Evasion Court Actionss Guuilty in Absentia ‐ 26 Preepaid Prior to Court ‐ 24 Dissmissed ‐ 9 Coontinued to Neext Court Date ‐ 9 Noot Guilty ‐ 8 Guuilty ‐ 5 5 O On-Tiime Perforrman nce System Perfor P rmancee Januuary 2010 – January 20013 10 00.00% 9 95.00% 9 90.00% 8 85.00% 8 80.00% 7 75.00% 7 70.00% 6 65.00% 6 60.00% 5 55.00% 5 50.00% 4 45.00% System m Trendline 6 O On-Tiime Perfor P rman nce Peerform mance bby Linee January 20100 – Jannuary 22013 10 00.0% 9 95.0% 9 90.0% 8 85.0% 8 80.0% 7 75.0% 7 70.0% 6 65.0% 6 60.0% 5 55.0% 5 50.0% 4 45.0% Frederricksburg Manasssas Line Frederricksburg Trendline Manasssas Trend dline 7 R Rideersh hip Januaary Da ate Manassas AM M Manassas PM Total T Manassas Acttual OTP TD Fred d'burg AM Fred d'burg PM Fred'b burg Total Actual OTP O TD Total Trips Actual OTP TD 1 2 7 4,417 4,200 8,617 100% 4,722 4,586 9,308 100% 5 17,925 100% 3 4,630 0 4,511 9,141 88% 5,173 5,150 10 0,322 100% 19,464 4 93% 4 4,380 0 3,614 7,994 94% 4,285 4,363 8,649 100% 16,643 3 97% 7 4 4,714 4,339 9,053 100% 5,149 5,033 10 0,181 100% 19,234 4 100% 8 4,794 4 4,784 9,578 100% 5,392 5,486 10 0,878 100% 20,455 5 100% 9 4,873 3 4,711 9,584 100% 5,350 5,486 10 0,835 100% 20,420 0 100% 10 4,761 1 4,909 9,670 100% 5,167 5,226 10 0,393 100% 20,064 4 100% 11 4,056 6 3,742 7,799 100% 4,015 4,047 8,063 100% 15,861 100% 14 0 4,930 4,629 9,559 100% 5,128 4,819 9,948 100% 19,506 6 100% 15 5,046 6 4,930 9,976 100% 5,173 5,401 0,574 10 100% 20,550 0 100% 16 4,905 5 4,879 9,784 88% 5,326 5,343 10 0,669 93% 20,452 2 90% 17 4,689 9 4,106 8,796 100% 4,790 5,163 9,954 100% 18,750 0 100% 18 3,716 6 3,785 7,501 100% 4,027 4,334 8,361 100% 15,862 2 100% 22 3 4,633 5,016 9,649 100% 5,155 4,909 0,064 10 93% 19,714 4 97% 23 4,764 4 4,912 9,676 100% 5,492 5,200 10 0,692 100% 20,368 8 100% 24 4,315 5 4,248 8,564 75% 3,723 3,895 7,618 57% 16,182 2 67% 25 3,751 1 3,781 7,532 88% 4,260 4,231 8,491 100% 16,022 2 93% 28 2,677 7 3,202 5,879 100% 3,437 3,842 7,279 100% 13,158 8 100% 29 5,005 5 5,181 10,186 100% 5,721 5,377 11 1,099 93% 21,285 5 97% 30 4,865 5 4,840 9,705 100% 5,368 5,114 10 0,483 100% 20,188 8 100% 4,716 6 5,050 9,765 94% 5,264 5,405 10 0,669 86% 20,434 4 90% 94,638 8 93,369 188,008 96% 102,117 102,411 96% 392,536 6 96% Amtrak Trains: 400 209,528 Adjusted d Total: 397,936 6 5 6 12 13 19 20 21 26 27 31 Adjusted total: # of Service Days: Manassas s Daily Avg. Trips: Am mtrak Trains: 188,408 Adjjusted Total: 21 Total Trips This T Month: 204,528 5,000 ** 397,936 usted Avg.: 8,953 Adju 8972 Prior To otal FY-2013: Fred'burg g Daily Avg. Trips: 9,739 Adju usted Avg.: 9978 Total Trips FY-2013: 2 2,658,344 Tota al Avg. Daily Trips: 18,692 Adju usted Avg.: Total Prior P Years: 5 57,778,565 18,949 9 G Grand Total: Adjusted d Total: 2,260,408 60 0,436,908 Note: Adjusted Ave erages & Totals in nclude all VRE triips taken on Amttrak trains, but do o not include "S" schedule days. * designates "S" scchedule day ** Amtrak A Cross Ho onor Numbers are e estimates 8 397,936 6 T Train Utilizzation n Freddericcksbuurg Line Januuary 20013 160% % 140% % Capacity 120% % 10% % 100% % 80% % 5% 7% 4% 7 4% 60% % 77% 70% 6 77% 68% 3% 99% 92% % 83% 1% 107% 101% 4% % % 69% 62% 40% % 5% 43% 20% % 5% % % 5% 54% 29% 0% % 300 302 304 306 3 308 310 312 301 3033 305 307 7 309 311 313 Average Ridersship 9 Midweekk Peak T Train Utilizzation n Manas M ssas Line Januuary 20013 140% % 120% % 221% C it Capacity 100% % % 17% 1 15% 15% 15% 80% % 60% % 40% % 11% 12% 11% 83% % 70% 74% 76% 74% 70% 7 17% 18% 889% 76% 52% 68% % 14% % 5% 46% 20% % 155% 0% % 19% 322 324 3 326 328 330 0 332 3225 327 3329 331 333 335 5 337 Average Ridersship 10 Midweekk Peak P Parkin ng Utiilizatiion Janua J ary 22013 54% % 1600 Parking Spaces g p 1400 1200 1000 800 99% 80% % 81% 66% 65% 68% % 67% 600 400 82% % 91% 96% 66% 81% % 200 0 V BL V RR V BC PV M SS M U BR R DB LO W P RI N QA V BK R* LL G* FB No. of s paces No. in use * Denotes stations w with overflow parking availablee that is no ow being d in final co ounts. included 11 F Finan nciall Rep portt Januuary 20013 A copy of the January 2013 Operaating Budget Repport is attachedd. Farre income for thhe month of January 2013 was $97,579 above the budget – a ffavorable variance of 3.40%. TThe cumulative vvariance for the year is -0.30% % or $60,087 beelow the adopted budget. Revennue in the first sseven months oof FY 2013 is dowwn 6.7% compared to FY 2012. Revenue will be monitored closely c over the next several months to see if tthe reinstatemeent of the higher federal transiit subsidy in Jannuary 2013 will reverse r the trend toward lower average revennue per trip expperienced in thee early part of the fiscal year. A summary of the financial results (unaudited) ass of January 20013 follows. Detaail on the major revenue and exxpense categories is proovided in the attached Operating Budget Reporrt. Amounts shown reflect the aamended FY13 bbudget. MEASUURES DOLLARRS GOAL Opperating Ratio Budgeted Revennue Buudgeted Revenue YTD Acctual Revenue YTD Cuumulative Variannce Peercent Collectedd YTD 799,814,561 53,814,700 53,845,916 31,216 Budgeted Expennses Buudgeted Expensees YTD Opperating Expenses YTD Cuumulative Variannce Peercent Expendedd YTD 799,814,561 46,821,850 44,,019,588 2,802,262 ACTTUAL 5 5% 55% 67.42% 31,216 67.46% 58.66% 2,802,262 55.15% 2,833,478 Neet Income (Losss) from Operaations Theese figures are preliminary andd unaudited. 12 Safety In Januaary, Greg Deibller was promotted from Passeenger Operatioons Specialist tto VRE’s Manager of System Safety and a Security following the depparture of Sharrmila Samarasiinghe. Greg joinned VRE in 20008 to oversee evening service operations and work with w our host rrailroads to enssure service dissruptions were managed and properlyy communicatedd. In addition to being involveed in VRE’s traiin operations, GGreg has been involved with other VRRE activities succh as coordinatiing the fall 20122 Disaster Prepaaredness Drill. He recently graaduated with a master’ss degree in trannsportation policy and operatioons from Georgee Mason Universsity. Greeg began his railroad career building railroadd track panels while w learning thhe basics of on the job safety.. Prior to joiningg VRE, he was employed with Norrfolk Southern (NS) as a freightt conductor, eveentually earningg 1,500 miles off route and term minal operating qualifications. He advanced his commitment too rail safety thrrough participaation in variouss NS safety com mmittees and wwith Operation Lifesaver, an orgganization dedicated to eliminatting trespasser and grade crosssing fatalities. Greeg’s goal in his new role as Maanager of System Safety and Security is to coontinuously lookk for any opporttunity to both eemphasize and culttivate a culture of safety amonngst VRE’s passsengers, staff annd contractors – thus further improving what has already m matured into a greeat commuter raail system. Leggislative Upddate Currrently, the 2013 legislative session has reachhed the proverbbial half way pooint known as “Crossover”. The following is aan overview of legislative items thhat are directly related to VRE: Sennate Bill 1210, introduced by Senator Richard Stuart, S would haave given the Chhairman of the Commonwealthh Transportationn Board or his dessignee voting weight on the Virrginia Railway Express E oversigght board equall to the highestt jurisdiction. Thhe bill also provvides that the Chaairman of the Commonwealth Transportation T Board B or his deesignee shall be included for puurposes of consstituting a quorum on certain transportation com mmissions and shall have votinng rights equal to the appointeees of componeent governments. The measuree successfully wass reported out of o the Senate Trransportation Committee; howeever, the bill waas defeated in thhe Senate. 14 Leggislative Upddate (Continuued) House H Bill 229 7, introduced bby Delegate Eilleen Filler-Cornn, would have allocated a funds for railroad access fees. The llegislation provides funds for contract c fees ppaid by the Virrginia Railway Express for acccess to CSX Transportation, T Norfolk Southern Corporation, and the National Railroad Passenger P Corpporation are to be allocated from the public transportation portion p of federral Surface Traansportation Program funds. This legislation would w finally ccodify what haas been past practice of tthe past five Governors G andd General Asssembly to include these funds in their respective r buudgets. The bbill passed tthe House TTransportation Subcommittee S wwhere it was reeported to the full committee. BBefore the full House H Transpoortation Commiittee Delegate Filler-Corn maade a strong presentation p fo r passage of thhe legislation, but the measuree failed 11 to 10 wheen a Northern Virginia V legislatoor changed his vote against thee bill at the lastt second. We truuly appreciate tthe efforts of Delegate FillerCorrn for spear heaading this initiattive on behalf off VRE and the reegion. Houuse Bill 2152, inttroduced by Delegate Richard Anderson, is the same as Senaate Bill 1210 in tthat it would have given the Chhairman of the Com mmonwealth Transportation Booard or his dessignee equal votting weight on tthe Virginia Railway Express ooversight boardd. The bill also proovides that the Chairman of thee Commonwealtth Transportation Board or hiss designee shalll be included foor purposes of constituting a quoorum on certain transportatioon commissionss and shall have voting rights equal to the aappointees of ccomponent goveernments. The measure has recceived serious debate and coonsideration in the House. Thhe bill was firrst reported too the House TTransportation mon ground to Subbcommittee, whhere Chairman Cosgrove askedd VDRPT and VRRE to try and wwork with Deleggate Anderson to find a comm move forward. The parties did meet m but the biill came back before b the Trannsportation Subbcommittee beffore an agreem ment could be reaached. The Subccommittee voted 2 to 2 on the bill, which usually results in a bill not movinng forward; howwever, at the pleasure of the Subbcommittee Chaair the bill wass sent ahead too the full Housee Transportation Committee. TThe House Trannsportation Com mmittee voted straight party line 14 to 7 to movee the bill, and on February 5th the t House votedd to pass the m measure 66 to 333. The bill will bbe sent to the Sennate and we aree awaiting its asssignment to com mmittee. On the budget fronnt, VRE remainss in the Secretaary’s budget forr funding for traack access; howwever, Senator Colgan’s budgeet amendment s from thee final Senate Finance Commiittee report. We again thank for $7 million for core capacity improvements was recently struck Sennator Colgan forr his tireless effforts to advance VRE’s needs before b the Gene ral Assembly. 15 Aleexandria TUNNNEL UPDATE: Thhe Alexandria tuunnel project will connect the King K St - Old Towwn Metrorail staation to the VREE Alexandria Staation via a new peddestrian tunnel which will allow w all three traccks to be accessible to both VVRE and Amtraak passenger trrains. A feasibility study was initiated to determ mine a preliminary cost estimaate for construuction of an AD A accessible tuunnel, and the m modification of the east side plattform (so that train service can utilize bothh sides of the platform). The feasibility studdy draft was completed and distributed to stakeholders in Jaanuary, 2013. A meeting is schheduled in February with VDOTT and the City oof Alexandria too discuss the findings of the study, environmenntal documents, project funding and other steeps necessary tto proceed. Dessign is anticipated to start in summer 2013 andd be completed a year later, in summer 2014. Construction C coould then begin aas early as fall 2014. Spotsylvania Thirrd Track and Station: Both the t track andd station projeccts are slated foor design com mpletion by thee end of Februaary. Prefinaal plans have been compleeted and circculated to CSX,, DRPT and Spootsylvania Couunty for final comment. Once O all com mments are received r and CSX has perrformed preliminary signal deesign, the plans can be com mpleted and thee project cann be put out to bid for construction. We expeect that invitations for bid forr both projects will be issued by March, withh construction begginning in springg 2013. 16 Fraanconia/Sprringfield Thee repair and reeplacement of major m structuraal components of the existing steel stair towwer that connnects the VRE platform to the Metrorail staation is nearing completion. Cooncrete placem ment and painting are schedduled to be com mpleted by the end of Februarry, weather perrmitting. This coincides with plans to placee the existing stair tower back in service by March, 2013. The project is scheeduled to be complete in Aprril of this year. Lorrton Station Thee Lorton Stationn consists of a 400-ft platform m with a 65-ft steel cannopy that can accommodate a a five car train set. The exiisting plattform will be exxtended an additional 250-ft northward, n as shown in tthe photo, plus the addition of o a 100-ft steeel canopy. Thiss will extend the total platform length to approximatelyy 650-ft, allowinng an Platform m e and safely. eight car train sett to service the station more efficiently Extension It wwill also providee 165-ft of totaal overhead cannopy, fitted withh LED lighhting, to shelter passengers from f the elements. The plattform extension will be 16-ft wide witth handrails along the back edge. c will be Addditionally, the existing platform handrail connections reppaired and the existing canoppy provided witth LED lighting, roof deccking and gutterr pan. The existting at-grade trrack crossing will w be rem moved and placeed at the end off the extended platform. p A concrete sideewalk will be added to connecct the northernn end of the exiisting parrking lot to thee extended platform. The platform design iss substantially complete and has been subm mitted to Fairfaax County for perrmitting. Construction is expectted to begin in summer s 2013 annd be complete in fall 2013. Staatus Gainesvville VREE is awaiting Norfolk Southern signature on the match agreem ment for the prooject. Once signned by both partties, the agreem ment solidifies Norrfolk Southern’ss local match coontribution to thhe project and will w allow VRE to proceed with the planning andd environmentall work. 17 Lonng Bridge Uppdate I atttended a Bridgge Workshop on January 24, 2013 along witth Christine Hooeffner, VRE Plaanning Managerr, sponsored by the District Deppartment of Transportation (DDDOT). DDOT receeived an Americcan Recovery annd Reinvestment Act (ARRA) grant to study thee bridge. s include: Objectives of the study Analyze the t structural inntegrity and identify short-term m structural rem mediation requiirements m connnectivity and opperational improvements Analyze multi-modal l multi-modal capacitty improvementts, including futture operating requirements for high-speed and intercity Analyze long-term passengeer rail, commuter rail, transit, bike and pedesttrian, and freighht services overr the Potomac RRiver Thee workshop included an overvieew of the existing structure, discussion of brridge design connsiderations (e..g., bridge architecture, span lengths, height limitations), and bridge alignmentt considerationss (e.g., adjacentt land uses affe cting alignmentt, relationship too VRE stations at eeach end of thee bridge, need to t maintain exissting bridge opeerations during construction). Two small grouup discussions were held for parrticipants to provide their ideaas and input onn bridge architeecture and aestthetics and on alignment alterrnatives at eithher end of the briddge. Rail Car Acquissition and Prroduction Prooduction at Nipppon-Sharyo’s Tooyokawa, Japan manufacturingg facility of 8 neew rail cars continues. Piece pparts and assem mblies for the carr shells will be completed c by suummer. The carr shells will thenn be shipped too Nippon Sharyoo’s new manufaccturing facility in Rochelle, IL for final assemblyy. With the openning of this new w facility, all fuuture VRE car oorders with Sumitomo Corporration/Nippon SSharyo will be asssembled entirelyy in the U.S. 18 Capita al Project Sum mmaryy Jaanuaary 220133 Seee atttachm mentss 19