Project Summary PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE October 29, 2014 Table of Contents PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE Site Diagrams Recreation Football Site Blocking Diagram...........................................................................1 Athletic Events Site Blocking Diagram..................................................................................2 Recreation Softball Site Blocking Diagram...........................................................................3 Project Summary........................................................................................................................4 Concept Site Plan........................................................................................................................7 Conceptual Interior View, Netting Down.......................................................................................8 Conceptual Interior View, General Use..........................................................................................9 Conceptual Interior View, Volleyball............................................................................................10 Conceptual Interior View, Track Meet.........................................................................................11 Conceptual Interior View, Soccer...............................................................................................12 Conceptual Interior View, Proposed Tennis Center......................................................................13 Recreation Court & Field Layouts...............................................................................................14 Architectural Program List & Cost Model...................................................................................15 2 3 4 5 Page 1 of 16 La Crosse Street REC FOOTBALL SOCCER, FLAG FOOTBALL, OPEN REC SEATING PRESS BOX REC FOOTBALL SEATING EXISTING CITY WELL REC FOOTBALL EXISTING CITY WELL FIELDHOUSE PARKING / DROP OFF EXISTING CITY WELL Pine Street PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE October 29, 2014 2 3 Recreation Football Site Blocking Diagram 4 5 2 3 4 5 Page 2 of 16 La Crosse Street DISCUS HAMMER COMPETITION SOCCER SEATING PRESS BOX SEATING EXISTING CITY WELL SHOT DISCUS HAMMER EXISTING CITY WELL FIELDHOUSE PARKING / DROP OFF EXISTING CITY WELL Pine Street PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE October 29, 2014 2 3 Athletic Events Site Blocking Diagram 4 5 2 3 4 5 Page 3 of 16 La Crosse Street REC SOFTBALL SEATING PRESS BOX SEATING EXISTING CITY WELL REC SOFTBALL EXISTING CITY WELL FIELDHOUSE PARKING / DROP OFF EXISTING CITY WELL Pine Street PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE October 29, 2014 2 3 Recreation Softball Site Blocking Diagram 4 5 Page 4 of 16 BACKGROUND 1) The University wishes to build a new Indoor 200 Meter Track & Field Venue along with four (4) Indoor Tennis courts and a new Competitive Soccer Pitch to well support a variety of the institution’s athletic, recreation, and academic needs. 2) The Indoor competition track must be capable of hosting NCAA-sanctioned Indoor Track & Field events, while the facility must also support a wide array of non-completion (practice and recreation) uses. The venue for tennis practice is a non-competition space without any designated spectator areas. The soccer pitch supports athletic and recreation use. 3) The entire facility must be multi-purpose capable, with suitable storage for “quick change” of the venue 4) Initial specifications to be achieved for the track, include . . . a) 200 M measured distance, non-banked track b) 8 Lanes, minimum 42” width c) Field Event Venues for Shot put / Discuss / Triple Jump / Long Jump / Pole Vault, Pentathlon, Heptathlon, and more d) 1,200 Spectator Seats (tilt ‘n roll), minimum e) Support Facilities, as necessary for NCAA sanctioned events and UWL Facility / Program needs 5) Tennis courts are NCAA sanctioned sizes with properly sized overrun and safe zones. 6) Soccer pitch will be 75Y x 115Y for competition and supported by spectator seating, toilets, concessions, press box, and storage. INFORMATION In this early planning for this Fieldhouse three primary questions must be answered. Will it fit? What’s included? How much will it cost? We have completed several site design blocking diagrams to 1) Craft a fieldhouse that will fit on the site, 2) Determine how to best leverage the site’s circulation and connections to the existing campus, and 3) Optimize the site while considering our impact to the existing site utilities. Will It Fit? 1) The project site, east of the existing stadium and outdoor track, and north of Pine Street, is tight. Very tight. It is bounded on the east by the University’s properly line (adjacent to Emerson Elementary School), and on all other sides by athletics and recreation spaces / venues. The south boundary of the site is Pine Street. 2) The biggest factor in determining fit for this facility is the track venue itself. As planned the single volume area for the 200 M track will require a minimum building measuring 195’ x 325’ out-to-out. For planning purposes this is 65,000 NSF. Support facilities can be appended to this volume in a variety of ways (one story or two). 3) The new facility will require the modification of the existing circulation and paved areas of the existing track and field site, and relocation of two large city-owned water mains. 4) The new facility also requires modification and / or relocation of the following existing outdoor athletic venues a) Shot Put area b) Javelin Throw area c) Hammer / Discuss Throw area d) Recreation Fields e) Soccer Support Facilities 5) The new venue will eliminate the following existing outdoor athletic venues a) Natural turf Football practice field. This is not being replaced. PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE October 29, 2014 Project Summary Page 5 of 16 The proposed location for this facility will maximize the building’s pedestrian access. In the future, the University plans to renovate Mitchell Hall for future athletic and recreational offerings and vacate Pine Street. The site currently presents a great opportunity to connect athletic events that are happening at the Veterans Memorial Field Complex and the recreational fields to the North allowing the building to serve as an “anchor” on the East Side of Campus. This location also greatly benefits and enhances the campus’ ability to host additional high school and collegiate events. We have reviewed the existing utilities found within the development area including site electrical (for the recreation field lighting), existing City of La Crosse water mains (currently located within the footprint of the proposed field house) and stormwater management for future improvements. All other utility considerations have been evaluated by Ring & DuChateau Consulting Engineers, including steam, chilled water, signal ductbanks, primary ductbanks, and other specific utilities. The field house planning project includes the costs for these utilities. The existing recreational field lighting will be relocated on site to provide lighting for the competitive soccer field, discus, shot and hammer events. In addition, the lighting will be used for recreational events (flag football, soccer, softball, etc). It is important to know we have not completed a foot-candle study to evaluate if the existing lighting meets current standards for athletic events. The University’s stormwater runoff is currently regulated through their MS4 permit, granted by the Wisconsin DNR. The site’s stormwater runoff from the building and parking lot will be managed on site through the use of green infrastructure, helping the university reduce sediment and phosphorous loading. Large storm events will be conveyed overland. Currently there are two primary water mains found on the site. One is 24” and the other 20” in diameter. These water mains are part of the main arteries for the City of La Crosse water distribution system. These water mains connect to three existing city wells, known as well 14, 20, and 21, all of which are located on the UWL sports complex. In addition the City has several other wells on campus that are demand driven. The two primary water lines (24” and 20”) cannot be combined and currently are under a 50’ wide “no build” easement. This easement prohibits constructing or placing structures within the easement, but does allow site improvements to be completed (turf, concrete, etc). They are buried approximately 4’ below the surface. The city will allow the relocation of the water mains on site. In addition, the mains can be located closer together which will help reduce the footprint of the easement. The field house planning project includes the costs to relocate these water lines. (continued) PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE October 29, 2014 Project Summary Page 6 of 16 What’s Included? • New 200 M Indoor Track & Field Venue • Elevated indoor Three-Lane Jogging Track • Four (4) new indoor Tennis Courts for practice • Support Spaces, as indicated in the Architectural Program • On-site parking for 18 automobiles, plus bicycles • New Soccer Pitch for competition, practice and recreation use • New Toilet Rooms near new Soccer Venue, for use by Intramurals, Recreation, Athletic Users, and patrons of soccer matches • The following activities are planned for and well supported in the new facility . . . UWL Sport / Activity NCAA Competition Baseball Athletics Practice Recreation X (In Tennis area) X Basketball No Accommodation X Cross Country X Football X Gymnastics X Jogging & Walking X Softball X (In Tennis area) X Swimming / Dive X Tennis Track & Field X (In Tennis area) X X X X Volleyball X Wrestling TBD Other Recreation Activities X What Will It Cost? The probable Total Project Cost, calculated at this time, is $33,000,000 • Includes inflation from Fall 2014 to Mid Point of Construction • Includes an across-the-board contingency factor (approximately 15%) • Anticipates Occupancy in Fall 2018 (continued) PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE October 29, 2014 Project Summary Page 7 of 16 TENNIS 200M FIELDHOUSE 1 or 2 STORY SUPPORT SPACES PARKING 200 0 NORTH 100 PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE October 29, 2014 1”=100’ Concept Site Plan Page 8 of 16 PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE October 29, 2014 Conceptual Interior View, Netting Down Page 9 of 16 PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE October 29, 2014 Conceptual Interior View, General Use Page 10 of 16 PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE October 29, 2014 Conceptual Interior View, Volleyball Page 11 of 16 PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE October 29, 2014 Conceptual Interior View, Track Meet Page 12 of 16 PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE October 29, 2014 Conceptual Interior View, Soccer Page 13 of 16 PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE Conceptual Interior View, Proposed Tennis Center October 29, 2014 Page 14 of 16 BAS K E TBA LL FL AG FOOTBA LL / RU G BY/ L ACRO SSE S OCCER VOLLE YBA LL NORTH 0 15 30 PROPOSED FIELDHOUSE, UNIVERSITY OF WISCONSIN - LA CROSSE October 29, 2014 Recreation Court & Field Layouts Page 15 of 16 Architectural Space Program & Probable Cost Summary Architectural Space Program Probable Cost Summary UW La&Crosse - Fieldhouse Planning UW La Crosse - Field House Planning Updated October 28, 2014 August 11, 2014 * Concept DRAFT * Concept DRAFT * Concept DRAFT * Concept DRAFT * Concpetual Design Area Space Space Description/ /Function Function Description AreaArea (NSF) (NSF) Cost // SF SF Cost Extension Extension Program / Calculations ProgramArea AreaSummary Summary / Calculations 11 FIELDHOUSE FIELDHOUSE 200 M200 Track Fieldand BldgField w/ Support M&Track Area & Bsmt Mech TennisTennis Courts Courts / Practice Area Area / Practice Spectator Space Space Spectator 22 LOCKER LOCKERROOMS ROOMS 21 X (8) lanes, 21MMradius, radius,42" 42"lanes lanes X (8) lanes, Tilt ea, outfield / infield) Tilt&&Roll Rollfor for1,500 1,500(750 (1,200 Min, 3,000 Max) 80 Grooming, Toilets 80Lockers, Lockers,Showers, Showers, Grooming, Toilets 80 Grooming, Toilets 80Lockers, Lockers,Showers, Showers, Grooming, Toilets Team Locker Room No. 1 No. 1 Team Locker Room Team Locker Room No. 2 No. 2 Team Locker Room Officia's Locker / Shower (Male) Official locker / shower (Male) Official's Locker / Shower (Female) Official locker / shower (Female) UWL Team Meeting Room UWL Team Meeting Room Multi-purpose Room 1 Multi-purpose Room 1 Multi-purpose Room 2 Multi-purpose Athletic Training RoomRoom 2 Room TimingAthletic Mgmt / Training Control Center / Control Center JoggingTiming Track,Management Elevated 10 Persons 10 Persons OFFICEAREA AREA 33 OFFICE Operations Operations Office Office 94,030 93,800 65,630 63,000 NSF NSF 26,000 26,000 NSF NSF 2,400 4,800 NSF NSF 155 155 140 140 170 170 10,172,650 9,765,000 3,640,000 3,640,000 408,000 816,000 15,500 5,900 1,000 1,000 1,000 1,000 250 250 250 250 800 800 900 900 900 900 500 500 300 300 9,600 NSF NSF NSF NSF NSF NSF NSF NSF NSF NSF NSF NSF NSF NSF NSF NSF NSF NSF NSF 225 225 225 225 225 225 225 225 190 190 190 190 200 200 200 200 180 180 120 225,000 225,000 225,000 225,000 56,250 56,250 56,250 56,250 152,000 152,000 171,000 171,000 180,000 180,000 100,000 100,000 54,000 54,000 1,152,000 500 500 500 NSF NSF 500 200 200 100,000 100,000 NSF NSF NSF NSF NSF NSF NSF NSF 125 125 125 125 125 125 125 125 125,000 125,000 125,000 125,000 62,500 62,500 62,500 62,500 1,000 1,000 1,000 1,000 NSF NSF 175 175 175,000 175,000 120SF, SF,1 1@@140 140SFSF 33@@120 STORAGE 44 STORAGE 3,000 3,000 1,000 1,000 1,000 1,000 500 500 500 500 & Athletic Rec. &Rec. Athletic StorageStorage Track Field Storage Track & Field&Storage Equipment Other Other Equipment StorageStorage Maintenance / Operations StorageStorage Maintenance / Operations 44 ENTRY ENTRY/ /LOBBY LOBBY Lobby Lobby Plug qty. Can be smaller, TBD Plugarea number. Canpossibly be smaller SUB Program Area at Fieldhouse SUBTOTAL TOTAL- Assignable - Assignable Program Area 114,030 104,200 Net NettotoGross GrossFactor Factor 9,970 5,500 1,500 109,700 320 400 780 92% Basement MEP, Walls, & Circ @ Fieldhouse 95% Toilets, Incl. Public Toilets, MEP, Walls, & Circ 5 Soccer Support Buildings TOTALField - Gross Building Area / Cost Mens & Women's Toliet Rooms for 500 Spectators Two-Story Press Box, Storage, Concessions (sim to Existing) Storage First Aid Pine Streetand Modifications Excluded. Curb Cuts, only Site Development Costs Land Acquisition Costs Excluded. Excluded Excluded Deep -Foundations TOTAL Gross Building Area / Cost Geothermal Wells Costs Site Development Site Utility Costs Site Demolition Domestic Water / Sewer Power (Campus) RelocatedElectric Field Event Venues Fiber Optic (Campus) On-Site Parking Spaces (Campus) Paving & Steam Sidewalks Natural Gas Landscaping, Overall Chilled Water (Campus) Other Development Costs Outdoor Event ChillerPlaza Space / Amenities Storm Site Water Project Specific Utility Costs Sanitary Domestic Water / Sewer Relocation ElectricWater Power, Primary Ductbank Water Service Electrical Cabling, Transform, Switch On-Site Parking Spaces Fiber Optic / Signal (Campus) Paving Sidewalks Steam&(Campus) Site Demolition Chilled Water (Campus) Relocate Chiller / Adjust Existing Soccer Field Relocated Field Event Venues Natural Gas Storm Water Relocate Existing Field Lighting Sanitary Landscaping, Overall Water Main Relocations Other Development Costs 20" MJ CI Pipe Outdoor Event Plaza Space / Amenities A/E Professional Services Fees Total Project Cost A/E Reimbursable Expenses Guesstimate Guesstimate 11 201 1 11 1 4,8001 Guesstimate Excluded. Guesstimate Plug Number Excluded. / Guesstimate Contingency Repair disturbed areas, only Guesstimate Guesstimate 20 -&24" PVC Ring DuChateau Report Ring & DuChateau Report (50% Bldg, 50% Site) Ring & DuChateau Report Guesstimate Ring & DuChateau Report Guesstimate Ring & DuChateau Report (10/24/2014) Excluded. Excluded. Work of another project / budget Pads, Cages, Turf, Sidewalks Excluded. Excluded Plug Number Contingency / Guesstimate Repair disturbed areas, only LSEA EA SP LS LSEA LS SF EA 100 60 1 1,200 100 30 1 15 100 1001 1001 LF EA LFLF LSLF LFSP LFLS LFLS LF 1 LS 100 LF 601 LFLS 1 LS 450 LFSF 4,800 450 LF 30 LF 1 8% 3% 4% 1 1 11 1 1 1 4 LS LS LS LSLS LS LS LS EA 152 19,116,405 20,000 30,000 40,000 60,000 30,000 3,500 45,000 15,000 100,000 25,000 25 100,000 60 150 30,000 180 300 60 110,000 3,500 300 15,000 1,000 20,000 450 20,000 30,000 40,000 60,000 30,000 70,000 45,000 15,000 100,000 25,000 120,000 100,000 6,000 9,000 30,000 216,000 30,000 1,800 110,000 52,500 30,000 15,000 100,000 20,000 45,000 60,000 60 150 100,000 25,000 230 25 280 60 60,000 6,000 9,000 100,000 25,000 103,500 120,000 126,000 840,300 1,800 1,979,000 1,979,000 1,422,409 42,672 711,204 10,000 25,000 155,000 50,000 100,000 3,165,300 75,000 22,281,705 100,000 2,228,171 80,000 24,509,876 of Const of Fee of Const 10,000 25,000 155,000 50,000 100,000 75,000 100,000 20,000 1,960,790 26,470,666 2,616,285 20,396,392 15% Design & Constructuion, Complete, at Concpetual Design TotalCertification Escalated Project Cost, Complete (Rounded) October 29, 2014LEED Enhanced Commissioning EIS/EIA Consultant DFD Project Management 154 16,939,807 395 126,400 320 128,000 144 112,320 11 LSEA Guesstimate Pads, Cages, Turf, Sidewalks PROPOSED FIELDHOUSE, UNIVERSITY OF10% WISCONSIN - LA CROSSE Escalation to Mid Point of Const Occupy in Fall 2018 A/E Predesing Services Project Contingency SF SF SF 125,500 24" MJ CI Pipe Total Site Development Cost Potable Water Service Other Project / Soft Cost Condensate Pumps, Meters, etc. (Included in Bldg Cost above) Heat Exchanger, PRV Station, Campus Site Utility Extensions Ring & DuChateau Report A/E Professional Services Fees Pine Modifications Excluded. Curb Cuts, only A/EStreet Reimbursable Expenses Land Costs Excluded. DFDAcquisition Professional Services Fees Deep Foundations Excluded. Site Survey & Documentation Geothermal Wells Excluded. Geotechnical Site Analysis Guesstimate A./V, Equipment & Technologies Construction Site Testing Guesstimate Enhanced Commissioning Total Site Development Cost Fixtures, Furnishings, & Equipment (FF&E) Guesstimate Sub Total Construction Cost USGBC LEED Silver Certification Design Contingency 10% Conceptual Design Rooms A/V Technology Items High Technology Regulatory PermittingCost Included in Building Costs, above Sub Total Construction Construction Management Fees Included in Building Costs, above Escalation Factor 8% Occupanacy in Fall 2018 Builders Risk Insurance Included in Building Costs, above TOTAL CONSTRUCTION COST Total Site Development Cost Sub Total Project Cost Other Project / Soft Cost Overall Project Contingency SF SF 17,242,150 16,090,500 151 1,507,535 154 849,307 151 154 7% 4% 3,059,459 1,852,947 23,455,850 74,118 2,345,585 of TCC 132,353 30,000 25,800,000 30,000 of TCC 264,707 46,000 46,000 of Const of Fee Architectural Program List & Cost Model 0.5% 1 LS 1.0% 1 LS 10% Contingency 4.0% of TCC 2,647,067 of TCC + Cont 1,164,709 Campus Site Utility Extensions Ring & DuChateau Report Pine Street Modifications Land Acquisition Costs Deep Foundations Geothermal Wells Excluded. Curb Cuts, only Excluded. Excluded. Excluded. A./V, Equipment & Technologies 1 LS 1,979,000 1 LS 155,000 Total Site Development Cost Page 16 of 16 22,281,705 Architectural Space Program & Probable Cost Summary UW La Crosse - Field House Planning 2,228,171 10% Conceptual Design Sub Total Construction Cost Escalation Factor 155,000 3,165,300 Sub Total Construction Cost Design Contingency 1,979,000 August 11, 2014 24,509,876 * Concept DRAFT * Concept DRAFT * Concept DRAFT * Concept DRAFT * 8% Occupanacy in Fall 2018 Area CONSTRUCTION Space TOTAL COST Description / Function Area (NSF) Cost / SF 1,960,790 Extension 26,470,666 Program Area Summary / Calculations Other Project / Soft Cost 1 FIELDHOUSE A/E Professional Services Fees 200 M Track and Field Area A/E Reimbursable Expenses Tennis Courts / Practice Area A/E Predesing Services Spectator Space LEED Certification 2 Enhanced LOCKER ROOMS Commissioning Team Locker Room No. 1 EIS/EIA Consultant Team Locker Room No. 2 Project Contingency Official locker / shower (Male) DFD Project Management Official locker / shower (Female) MoveableUWL Equipment Allowance Team Meeting Room Multi-purpose Room 1 (FF&E) Fixtures, Furnishings, & Equipment Multi-purpose Room 2 Geotechnical Site Analysis Athletic Training Room Construction Site Testing Timing Management / Control Center Regulatory Permitting 3 Construction OFFICE AREA Management Fees Operations Office Builders Risk Insurance 21 M radius, 42" lanes X (8) lanes, Tilt & Roll for 1,500 (1,200 Min, 3,000 Max) 80 Lockers, Showers, Grooming, Toilets 80 Lockers, Showers, Grooming, Toilets 10% Contingency Guesstimate Guesstimate Guesstimate 10 Persons Included in Building Costs, above Included in Building Costs, above 3 @ 120inSF, 1 @ 140 SF above Included Building Costs, 93,800 7% 63,000 4% 26,000 0.5% 4,800 1 5,900 1.0% 1,000 1 1,000 250 4.0% 250 800 0% 900 1 900 1 500 1 300 TOTAL PROJECT COSTS (Rounded) Rec. & Athletic Storage Track & Field Storage Other Equipment Storage Maintenance / Operations Storage Plug number. Can be smaller Page 1 of 1 SUB TOTAL - Assignable Program Area Net to Gross Factor 100,000 NSF NSF NSF NSF 125 125 125 125 33,000,000 125,000 1,000 1,000 NSF 175 175,000 154 16,090,500 6,486,900 104,200 95% Incl. Public Toilets, MEP, Walls, & Circ TOTAL - Gross Building Area / Cost 30,000 of TCC NSF 225 LS 46,000 NSF 225 of TCC NSF 225 NSF of TCC + Cont 225 NSF of TCC 190 NSF 190 LS 200,000 NSF 200 LS 25,000 NSF 200 LS 50,000 NSF 180 1,852,947 9,765,000 74,118 3,640,000 132,353 816,000 30,000 264,707 225,000 46,000 225,000 2,647,067 56,250 1,164,709 56,250 152,000171,000 200,000 180,000 25,000 100,000 50,000 54,000 200 3,000 1,000 1,000 500 500 Lobby LS 500 500 NSF Other Project / Soft Cost 4 Total STORAGE 4 ENTRY / LOBBY of Const NSF of Fee 155 NSF 140 of TCC NSF 170 5,500 SF 109,700 125,000 62,500 62,500 154 849,307 154 16,939,807 Site Development Costs Pine Street Modifications Land Acquisition Costs Deep Foundations Geothermal Wells Site Utility Costs Domestic Water / Sewer Electric Power (Campus) Fiber Optic (Campus) Steam (Campus) Natural Gas Chilled Water (Campus) Chiller Storm Water Sanitary Water Relocation Water Service On-Site Parking Spaces Paving & Sidewalks Site Demolition Relocate / Adjust Existing Soccer Field Relocated Field Event Venues Relocate Existing Field Lighting Landscaping, Overall Other Development Costs Outdoor Event Plaza Space / Amenities Excluded. Curb Cuts, only Excluded. Excluded Excluded Guesstimate Guesstimate Guesstimate Excluded. Guesstimate Excluded. Guesstimate 20 - 24" PVC Guesstimate Guesstimate Excluded. Work of another project / budget Pads, Cages, Turf, Sidewalks Excluded Plug Number Contingency / Guesstimate Repair disturbed areas, only 1 1 1 EA EA EA 30,000 40,000 30,000 30,000 40,000 30,000 1 EA 15,000 15,000 1 100 60 1,200 30 15 1 1 EA LF LF LF LF SP LS LS 100,000 60 150 180 60 3,500 15,000 20,000 100,000 6,000 9,000 216,000 1,800 52,500 15,000 20,000 1 LS 60,000 60,000 1 1 4,800 LS LS SF 100,000 25,000 25 100,000 25,000 120,000 Total Site Development Cost 840,300 Other Project / Soft Cost A/E Professional Services Fees A/E Reimbursable Expenses DFD Professional Services Fees Site Survey & Documentation Geotechnical Site Analysis Construction Site Testing Enhanced Commissioning Fixtures, Furnishings, & Equipment (FF&E) USGBC LEED Silver Certification A/V Technology Items Regulatory Permitting Construction Management Fees Builders Risk Insurance 8% 3% 4% 1 1 1 1 1 1 4 Guesstimate Guesstimate Guesstimate High Technology Rooms Included in Building Costs, above Included in Building Costs, above Included in Building Costs, above Total Site Development Cost 20,396,392 15% Design & Constructuion, Complete, at Concpetual Design Total Project Cost PROPOSED FIELDHOUSE, UNIVERSITY OF10% WISCONSIN - LA CROSSE Escalation to Mid Point of Const Occupy in Fall 2018 Total Escalated Project Cost, Complete (Rounded) October 29, 2014 10,000 25,000 50,000 100,000 75,000 100,000 20,000 1,422,409 42,672 711,204 10,000 25,000 50,000 100,000 75,000 100,000 80,000 2,616,285 Sub Total Project Cost Overall Project Contingency LS LS LS LS LS LS EA of Const of Fee of Const 3,059,459 23,455,850 (continued) Architectural Program 2,345,585List & Cost Model 25,800,000