Strategic Community Partnership Plan April 22, 2016

advertisement
Strategic Community
Partnership Plan
setting priorities for potential enhancement sites
April 22, 2016
355
square mile
service area
Combined Sewer Area
ASLA 2015 Annual Meeting and EXPO
126 CSO Locations
Combined
Sewer Area
Throughout
Combined Sewer
Area
ASLA 2015 Annual Meeting and EXPO
Historical CSO & Consent Decree
Requirement
9
9
Typical Year
CSO Volume Remaining
(BG)
8
7
4.5
6
5
4
3
0.494
2
1
0
Baseline (1970s)
Current (2015)
Target (2036)
Project Clean Lake: THE GRAY
25 years of tunnel construction
7 tunnel systems
– 21 miles
– 17’ to 24’ diameter
– 100’ to 200’ deep
– Three deep tunnel
pump stations
– Drop structures
– Near-surface sewers ,
structures
Looking across combined sewer area for
opportunities to manage stormwater
before it enters combined system
ASLA 2015 Annual Meeting and EXPO
Buckeye /
Woodland Hills
Neighborhood
The Sewer District: COMBINED SEWER OVERFLOW CONTROL
Project Clean Lake
Community Enhancements
NEORSD Stated Goals for Project Clean Lake
Community Enhancements:
• Meet requirements of EPA Consent Decree
• Leave behind investment following construction / disruption
• Develop a coordinated, system-wide approach
• Tell the story of NEORSD investment / impact
• Explore potential to integrate public art and public space
enhancements with construction projects
• Create a Project Clean Lake identity
• Environmental education beyond a project’s construction
Phase I:
Developing an
Investment Framework
Project Clean Lake:
• Green Infrastructure
Basin Sites
• Gray Infrastructure
Tunnel Routes
• Pump Stations
• Miscellaneous
Structures
• Neighborhood-Based
Initiatives
Project Clean Lake – Analysis of Initiatives
Planning Horizon: Pre-2026 Projects:
• Buckeye Road GI Basins
• Center Street Storage Tank
• Columbus Road Storage Tank
• CSO-045 Storage Tank
• CSO-063 Relief Consolidation
Sewer
• Doan Valley Regulators / Relief
• Doan Valley Relief and
Consolidation Sewer
Relief Sewer & GI Basins
• East 37th Street Pump Station
Pipes
• Shoreline Storage Tunnel
• East 37th Street Pump Station
Upgrade
• Slavic Village Demonstration GI
Basins
• Lakeshore Boulevard Relief
Sewer
• Southerly Pump Station
• Fairhill GI Basin
• Fleet Avenue GI Basin
• Doan Valley Storage Tunnel
• Kingsbury Blvd Relief Sewer
• Dugway Regulators / Relief
Sewer
• London Road Relief Sewer
• Dugway South Relief and
Consolidation Sewer
• Regulator S-8 Upgrade
• Low Level Interceptor Relief
System
• Shoreline Consolidation
• Superior Avenue Pump Station
• UAIZ GI Basins
• Union Avenue GI Basin
• Wade Avenue Connector
• Westerly Main CSO Storage
Tunnel
• Mary Street Pump Station
• Westerly Tunnel Dewatering
Pump Station
• Dugway West Interceptor Relief
• Morgana Run & Burke Brook
Rehabilitation
• Woodland Central East / West
GI Basins
• East 140th Consolidation and
• Morgana Run Relief Sewer
• Dugway Storage Tunnel
Establishing a Community Investment Timeline
Planning Horizon: Pre-2026 Projects:
• Buckeye Road GI Basins
• Center Street Storage Tank
• Columbus Road Storage Tank
• CSO-045 Storage Tank
• CSO-063 Relief Consolidation
Sewer
• Doan Valley Regulators / Relief
• Doan Valley Relief and
Consolidation Sewer
Relief Sewer & GI Basins
• East 37th Street Pump Station
Pipes
• Shoreline Storage Tunnel
• East 37th Street Pump Station
Upgrade
• Slavic Village Demonstration GI
Basins
• Lakeshore Boulevard Relief
Sewer
• Southerly Pump Station
• Fairhill GI Basin
• Fleet Avenue GI Basin
• Doan Valley Storage Tunnel
• Kingsbury Blvd Relief Sewer
• Dugway Regulators / Relief
Sewer
• London Road Relief Sewer
• Dugway South Relief and
Consolidation Sewer
• Regulator S-8 Upgrade
• Low Level Interceptor Relief
System
• Shoreline Consolidation
• Superior Avenue Pump Station
• UAIZ GI Basins
• Union Avenue GI Basin
• Wade Avenue Connector
• Westerly Main CSO Storage
Tunnel
• Mary Street Pump Station
• Westerly Tunnel Dewatering
Pump Station
• Dugway West Interceptor Relief
• Morgana Run & Burke Brook
Rehabilitation
• Woodland Central East / West
GI Basins
• East 140th Consolidation and
• Morgana Run Relief Sewer
• Dugway Storage Tunnel
Establishing a Community Investment Timeline
Partner Outreach:
•
•
•
•
•
•
•
•
•
•
•
•
•
Cleveland City Planning Commission
Northeast Shores
Cuyahoga Soil and Water
Famicos Foundation
NOAH: East Cleveland
University Circle Inc.
Buckeye Shaker Square
Campus District
St Clair Superior
Flats Forward
Detroit Shoreway
Ohio City Inc.
Tremont West
Neighborhood Outreach
Opportunity Areas:
- Target redevelopment
areas within
neighborhoods with
uniquely identifiable
characteristics, changes in
land-use patterns, strongly
defined physical edges, or
topographic boundaries.
Opportunity Areas - Community Reinvestment Zones
Opportunity Areas – Criteria for Assessing Impact
Opportunity Areas are evaluated on a scale of 1-5 for each of the
following criteria to assess it’s viability for NEORSD sponsored
public space enhancements:
• Current Visibility: Automobile
• Current Visibility & Accessibility:
Pedestrian / Bicycle / RTA station
• Increased Ped/Bike Visibility:
Greenspace & Trails Initiative
• Development Potential
• Population Growth
• Partnership / Funding Opportunities
• Equity / Environmental Justice
• Proximity to Schools
M
Opportunity Area
Impact Ranking:
L
- High Impact
- Medium Impact
- Low Impact
M
L
H
L
M
H
Opportunity Areas – Criteria for Assessing NEORSD Impact
Catalytic Neighborhood Investment Opportunities
Enhancement Sites:
A
- Potential locations at which
Project Clean Lake community
investments can be integrated
within neighborhoods have been
identified. Investment
opportunities build from planned /
ongoing redevelopments, offer
NEORSD education prospects,
and occupy high-visibility
locations throughout the City.
A
A
B
C
A
B
A
C
Catalytic Neighborhood Investment Opportunities
Green Infrastructure
Fleet Avenue Streetscape Infiltration Basin
Green Ambassador Project
H
Fairhill / Ambler Park Basin
Green Ambassador Project
H
UAIZ Basin Outdoor Classroom
Green Ambassador Project
H
Gray Infrastructure
Dugway / Doan
Initiatives
M
Opportunity Areas:
L
H
Forest Hills
Glenville Neighborhood
Glenville/
Famicos
Foundation
East
Cleveland
M
East Cleveland
M
Garrett Square
University
Circle
Heritage Lane
Little Italy / Red Line Route
H
H
Stokes / Ambler Park
Woodhill Road
L
Buckeye
Glenville:
Forest Hills Park
M
East 110th Street
Forest
Hills
Park
Glenville Town
Center / East
Side Market
Shaft Site / Easement Locations
Glenville:
Garrett Square
M
Garrett Square
Redevelopment
Superior Avenue
Planned Development Initiatives
East Cleveland:
Pattison Park
Forest Hills
Park /
Cleveland
2nd Ave GI
Basin
Programming partnerships
& community engagement
H
Pattison Park
Phillips Avenue
Active / Engaged Communities
University Circle:
Ambler Park
Cleveland
Museum
of Art
H
UC 3
UC 3
UCI
Gateway
Case Western
Reserve Master
Plan / Stearns
Road Proposal
0
CMSD John Hay /
School of the Arts
Complex
Carnegie Avenue
High Visibility Civic Destinations
Ambler
Park
Below Grade - infrastructure
DVT
ISOMETRIC VIEW
MLKCT
Doan Brook
Culvert
SHAFT
DVT-2
CSO-073
WCT
Giddings
Brook
Culvert
Ground Surface
Reference Line
SHAFT
Ventilation
Vault
Gate Control
Vault
WCT
Giddings
Brook
Culvert
SHAFT
DVT-2
CSO-073
MLKCT
Overflow
Structure
Flow
Control/Gate
Structure
Diversion
Structure
DVT
ISOMETRIC VIEW
Doan Brook
Culvert
Project Clean Lake Identity