Discussion Topics
A condition or place of great
disorder or confusion
%'&)(+*-, .0/2143 5+6 (+**-, 50/8709 *
%':);<&=143 58>?(+@A0B70/87+.+(03 *
%2C4@-, (0/8AD, 6D, @E:)(+*(+703 @-F8(03 *
%'GH&)IKJ4709 , L+7+AD, 50/MC<N8(+@-, 709 , *A *
%2OP50/8AD3 7+@A 503 *Q+C<R+S8@50/8AD3 7+@A 503 *
%'TVU0R+, N+W(0/8A+;XB70, /8A (0/870/8@(
T4/8.0, /8(+(03 *
%'143 5+L0R8@AD, 50/2B70/87+.+(03 *
%2I4@ADR8709Y)*(03 *
• What can or did go wrong?
• Look @ actual or hypothetical events.
(Names can be changed to protect the
innocent)
• What were the ramifications?
• Unforeseen circumstances?
• What can people do to prevent a similar
situation?
• Feel free to share experiences!
City Officials, Codes &
Compliances
• Jurisdiction will not allow or approve the use of
a facility as your team would like to design and
use it due to HAZ MAT and/or EIR concerns.
• What can be done to mitigate with the city?
Security
The city has allowed
you to build a
viviarium within your
complex, however
the area is known
for political activist
activity. What can
your team do to
address security
concerns?
Equipment
• Equipment Failures?
• Mechanical Difficulties?
• Process Piping not connected
correctly?
• Controls not being monitored
correctly?
• Delivery of the system?
Research & Development
You are ½ way through construction.
The product development group informs
you that the product was developed,
and process stability was established
at a 6 degree lower temperature than
your original room design temperature.
All HVAC equipment is purchased.
What do you do?
Shop Drawings
Your fermentation facility has purchased
European equipment. All connections
are in place per the shop drawings.
When the unit arrives, there is no
resemblance between the “certified”
drawings used and what arrived at site.
The primary nozzle is not in the correct
locations.
Maintenance Nightmares
Mechanical space is located over
operating area. Facility was designed
w/o the input of the maintenance
department. The Heat Exchanger was
installed 4’ from a building column. The
tube bundle is 8’ long. Several tubes
are leaking and the tube bundle needs
to be pulled & repaired. OOOOOps.
Z 50R+3[@50W\N870/8]EF87+*EN+R+3 @-F87+*(+L27'N+9 70/8A
5+^(03 *(+7+*-_
Z 50RM*(0/8L272A (+70W`A 5\7+@@-9 , W7VA (2ADF8(26 503 (0, .0/
S+3 70/8@-F2, /8A 52]50R+3HN+3 5+L0R8@AD, 50/2/8(+(+L+*a50/M70/
b I<W(03c, @70/8dH*@-F8(+L0R+9 (0_
Bad Publicity
• The company you are working for is
a start up biotech company just
about to release an IPO and
finishing up your first signature
building off of a major thoroughfare
in the Bay Area. One of your
vendors is non-union. The morning
of the IPO release, you find a giant
rat balloon flying above your new
building and picketers are striking
outside of the premises.