Student Name: ___________________________ CHABOT COLLEGE CISCO NETWORKING ACADEMY I 8B - Network Diagrams Preparations Read this document carefully. Answer all questions in italic. Each student will work individually at the curriculum workstation. Your instructor will set up yellow cables on the racks for this activity. Before you launch Visio, examine the yellow connections on the racks and compare them to the model diagram. Objective 1 - Prepare a physical diagram of a network Steps Launch the Visio program, which you will find in Start | Programs | Visio. Choose New | Network Diagram | Visio Network Equipment Sampler Immediately go to File | Page Setup and select the Print Setup tab. Select Paper Orientation: Landscape Select the Page Size tab. Make sure Same as Printer Paper Size is selected. Create a physical network diagram that shows the cabling connections among the hubs and patch panels on all 5 racks and the South Building IDF on the plywood backboard. Be sure to include your name on the diagram. Try to make your diagram similar to the model shown below. Use these Stencils and shapes: Stencil Item Part Number Lucent Patch Panels 1100 Cat5-24 Lucent Patch Panels 1100 Cat5-48 Allied Telesyn Hubs AT-3012SL Rack A Rack B Rack C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Rack E 12 UTP SD 1100CAT5 MODULAR JACK PANEL Lucent Rack D 24 EIA - T568 B WIRING 12 UTP SD 1100CAT5 MODULAR JACK PANEL Lucent 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 EIA - T568 B WIRING SD 1100CAT5 MODULAR JACK PANEL Lucent 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 SD 12 UTP 1100CAT5 MODULAR JACK PANEL Lucent 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 EIA - T568 B WIRING SD 1100CAT5 MODULAR JACK PANEL Lucent 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 EIA - T568 B WIRING 10BASE-T PORT ACTIVITY 10BASE-T 12-PORT HUB 1 2 3 4 5 6 7 8 9 10 11 12 NETWORK UTILIZATION (%) 1 3 5 7 9 11 13 15 SD CentreCOMä 3012SL BNC PORT OK AUI PORT OK RECEIVING RECEIVING 10BASE-T PORT ACTIVITY 10BASE-T 12-PORT HUB STATUS 1 POWER ACTIVITY DIAL MON 1 2 3 4 5 6 7 8 9 10 11 12 POWER 2 3 4 5 6 7 8 9 10 11 12 NETWORK UTILIZATION (%) 1 3 5 7 9 11 13 15 SD CentreCOMä 3012SL BNC PORT OK AUI PORT OK 10BASE-T PORT ACTIVITY 10BASE-T 12-PORT HUB STATUS 1 2 3 4 5 6 7 8 9 10 11 POWER ACTIVITY DIAL MON 1 2 3 4 5 6 7 8 9 10 11 12 RECEIVING RECEIVING 12 NETWORK UTILIZATION (%) 1 3 5 7 9 11 13 15 SD CentreCOMä 3012SL BNC PORT OK AUI PORT OK RECEIVING RECEIVING 10BASE-T PORT ACTIVITY 10BASE-T 12-PORT HUB STATUS 1 POWER ACTIVITY DIAL MON 1 2 3 4 5 6 7 8 9 10 11 12 POWER POWER 2 3 4 5 6 7 8 9 10 11 12 NETWORK UTILIZATION (%) 1 3 5 7 9 11 13 15 SD CentreCOMä 3012SL BNC PORT OK AUI PORT OK 10BASE-T PORT ACTIVITY 10BASE-T 12-PORT HUB STATUS 1 2 3 4 5 6 7 8 9 10 11 NETWORK UTILIZATION (%) 1 3 5 7 9 11 13 15 12 POWER ACTIVITY DIAL MON 1 2 3 4 5 6 7 8 9 10 11 12 RECEIVING RECEIVING SD CentreCOMä 3012SL BNC AUI PORT OK STATUS PORT OK POWER ACTIVITY DIAL MON 1 2 3 4 5 6 7 8 9 10 11 12 POWER POWER RECEIVING RECEIVING 62.5/125 Fiber South Building IDF 10BASE-T PORT ACTIVITY 10BASE-T 12-PORT HUB 1 2 3 4 5 6 7 8 9 10 11 12 NETWORK UTILIZATION (%) 1 3 5 7 9 11 13 15 BNC PORT OK AUI PORT OK Print your finished diagram: 1 STATUS POWER ACTIVITY DIAL MON RECEIVING RECEIVING SD CentreCOMä 3012SL 1 2 3 4 5 6 7 8 9 10 11 12 POWER Student Name: ___________________________ Get your page from the printer, and attach it to this worksheet. Objective 2 - Prepare a logical diagram of the same network Steps Now start a new logical network diagram: File | New | Network Diagram | Logical Network Diagram. Create a logical network diagram that shows the hubs and PCs that you just diagramed physically. Be sure to include your name on the diagram. No model is provided; you should plan your diagram independently. Use the Logical Symbols stencil, which loads automatically for a new logical network diagram. Omit the physical elements such as patch panels. Just show the hubs and PCs and use lines for the logical connections. When done, print your finished diagram. Get your page from the printer, and attach it to this worksheet. Save your two diagrams to Network Neighborhood\Users\yourname\1files (or whatever you called your personal file directory) Reflection: Answer these questions thoughtfully. 1. Your instructor will have connected the hubs as shown in the diagram on the previous page. Go to the hubs and examine them to determine if there is a good Layer 1 physical connection. What is the quickest and best evidence you should check? _____________________________________ 2. How many collision domains does this network segment have? ___________ 3. How many broadcast domains does this network segment have? __________ 4. What is the name for the physical topology of this network? _________________ 5. What is the name for the logical topology of this network? _________________ 6. Suppose we wanted to segment this network into several collision domains by replacing a single piece of equipment. Which piece of equipment would we replace? Remove the: ______________(equipment type) from the ____________________(rack name) Replace it with a(n) ______________ END | THREE-HOLE PUNCH | ATTACH DIAGRAMS | SUBMIT 2