Facilities Master Planning Chabot College Chabot-Las Positas Community College District •

advertisement
Chabot College
Chabot-Las Positas Community College District
Facilities Master Planning
AGENDA – 3-10-05
•
Review Project Status
•
Review Landscape Option
•
Solution Development
•
Discuss Next Steps
Project Status
E d uc a tio na l a nd Fa c ilitie s Ma s te r P la n 2004
AUGUST
P ro p o s e d S c he d ule
2
S T R AT E GIC R E VIE W
Meet to review project scope
TOUR & INTRODUCTIONS
- Tour Stanford CFI
- Introduce Team, Present Qualifications
Collect and review information
COMMITTEE MEETING (Augus t 26)
- Review Process and Schedule
- Define Project Goals
AN ALYS IS OF E XIS T IN G CON D IT ION S
Meet with key facility personnel
Analyze existing campus
COMMITTEE MEETING (S e pt. 23)
- Review and Validate Physical Analysis
- Define Key Planning Issues
- Review Landscape Analysis
E D U CAT ION AL P LAN N IN G
Space Inventory Assessment
Forecast Data Collection
Forecast Capacity/ WSCH/ ASF
Stakeholder Meetings(Nov. 9,10 &23)
Translate ASF to Divisions
COMMITTEE MEETING (Oc t. 26)
- Review Space Program for Master Plan
OP T ION D E VE LOP ME N T
Develop Planning Options
Develop Evaluation Criteria
COMMITTEE MEETING (De c . 9)
- Review and Evaluate Options
Revise Options
COMMITTEE MEETING
Select Preferred Option
S OLU T ION D E VE LOP ME N T
Develop Master Plan Recommendations
Identify Primary and Secondary Effects
Develop Design Guidelines
COMMITTEE MEETING (Fle xDay)
- Review Recommendations
- Discuss Project Linkages &Priorities
- Review Design Guidelines
Review and Validate Project Budgets
Develop Phasing and Implementation Plans
COMMITTEE MEETING
- Review Plans and Guidelines
Prepare Draft Report
College Review of Draft Report
Prepare Final Report
9
2005
SEPTEMBER
16
23
30
6
13
20
OCTOBER
27
4
11
NOVEMBER
18
25
1
8
15
DECEMBER
22
29
6
13
20
JANUARY
27
3
10
FEBRUARY
17
24
31
7
14
21
MARCH
28
7
14
APRIL
21
28
4
14
18
25
Chabot College
Chabot-Las Positas Community College District
Facilities Master Planning
Solution Development
EXISTING
75% Impervious
surface existing
EXISTING UTILITIES – STORM DRAIN
Brittle pipes
EXISTING UTILITIES – NATURAL GAS
EXISTING UTILITIES – DOMESTIC WATER
EXISTING UTILITIES – FIRE WATER
EXISTING UTILITIES – POWER
EXISTING UTILITIES – PHONE
well
EXISTING UTILITIES – IRRIGATION
EXISTING
Chabot College
Chabot-Las Positas Community College District
Facilities Master Planning
SEQUENCING
EXISTING CAMPUS
FIRST FLOOR- MOVES
SECOND FLOOR - MOVES
Chabot College
Chabot-Las Positas Community College District
Facilities Master Planning
ZONING OPTIONS
EXISTING ZONING - USES
ZONING – USE OPTION
ZONING – USE OPTION CLUSTERING
Chabot College
Chabot-Las Positas Community College District
Facilities Master Planning
Next Step:
Solution Development
Design Guidelines
Phasing and Implementation