Building 100 Remodel - Feasibility Chabot College 11.12.2009 AGENDA • Background • Assumptions • Scope and Cost • Layouts • Pros and Cons • Next Steps BACKGROUND User Group Involvement • June - September 2009 • Dean Corcoran, Dean Vo-Kumamoto, Cindy Hicks, Jim Matthews Previous Library/Learning Connection FPP in 2007 • Extensive Remodel of All Floors • New Entry/Lobby/Stairs/Elevator • Series of Large User Group Meetings, Interviews and Tours • Previous Budget: $16M - $20M Feasibility Study • No Demolition, Minimal Renovation, Moderate Remodel • Current Budget: $3.1M Construction Budget, $4M Total Project Budget ASSUMPTIONS COST ASSUMPTIONS ALL 3 OPTIONS: • Construction Timeline: April – October 2010 • Per DSA 8/24/09: No Sprinkler, No Seismic, No Elevator Upgrade • Not included: Soft Cost, Fees, Sitework • Areas to Remain: TV, Radio, Telecon, Media, Health, Restrooms • All 3 Options include: • Library Circulation Desk, A/V Changes and Wall Removal • New Carpet/Paint, New FF&E Budget • Security Adjustments, Select CCTV, Elevator Controls • Associated Hazmat • Connection Loop to C.U.P. SCOPE AND COST SCOPE AND COST NO DEMOLITION • • • • • • ~12,800 asf, ~18,300 gsf All walls stay as is New carpet & paint Min M/E adjustments No new lighting Study Rooms on perimeter Estimate = $1.79M, ~$98/sf MINIMAL RENOVATION • • • • • • • • ~13,500 asf, ~18,300 gsf Perimeter offices stay as is New carpet & paint Some M/E adjustments 2/3 new lighting Some walls with glazing Existing offices on perimeter Study Rooms on perimeter Estimate = $3.13M, ~$171/sf MODERATE REMODEL • • • • • • • • • ~14,300 asf, ~18,300 gsf All walls new configuration New carpet & paint More M/E/P adjustments All new lighting More walls with glazing New offices on perimeter Study Rooms in center More open areas Estimate = $4.42M, ~$241/sf LAYOUTS NO DEMOLITION – Space Layout NO DEMOLITION – Furniture Layout MINIMAL – Space Layout MINIMAL – Furniture Layout MODERATE – Space Layout MODERATE – Furniture Layout LIBRARY – Space Layout LIBRARY – Furniture Layout MEZZANINE – Space Layout PROS AND CONS PROS AND CONS NO DEMO PRO CON VISIONARY Centralizes Learning Support Services Provides ‘inviting’ and ‘welcoming’ space Provides spaces that stimulate social interaction l l FUNCTIONAL MODERATE PRO CON l l l l l O l O O l l O l l l O O l l l Offers convenient Study Rooms l l l l l Safe and supervisable areas l l l Enhances Library & Learning Connection relationship PRAGMATIC MINIMAL PRO CON Supports collaboration and integration of Programs Collects groups into ‘open areas’ Multi-functional dynamic spaces adaptable to pedagogy Creates intuitive wayfinding Relative Construction Timeline Construction Cost Total Units (Student Seats) 3m 1.7M 219 4m 3.1M 258 6m 4.4M 324 NEXT STEPS • Recommended Feasibility • Begin Detailed Design Phase