EAST 1ST STREET -80 I TO PEDESTRIAN BRIDGE OVER LIGHTSTREET ROAD COUN Construction - June 2016 - November 2016 NORTHUMBERLAND RESIDENCE HALL - PAINT EXISTING DOORS AND FRAMES LIGHTSTREET ROAD (RT. 487) Upgrade existing fire alarm panels and devices in building. MA SU IN BS TA TIO N X X EN NT'S CE ) #1 9W e st OSUN A D RIV E HAAS SH BU EL S TE R Re BUS R TE SHEL ter McCORMICK BAKELESS Lo NO PARKING Pa rki ng NAVY HALL NO PARKING LES t WALLER NO PARKING POLICE PARKING GATE POLICE PARKING POLICE PARKING KEHR UNION STOP ENTER ONLY UP DN #5 Chestnut Street Parking BUS SHELTER CHUCK DALY WAY GREENHOUSE A D M I S S I O N S BUS LANE CHEMICAL STORAGE BUILDINGS EXIT ONLY NEW RESIDENCE HALL AND BOOKSTORE Construction - April 2016 - August 2017 NO PARKING EAST PINE AVENUE (alley) KEHR UNION - SOUND SYSTEM - BALLROOM RENOVATION Construction - May 2016 to September 2016. Install a new sound and lighting system in the multi-space ballroom. Ceiling and floor finishes will be replaced, as well as re-painting of the space. Construction of a new 162,000 square foot; 7 story building. Ground floor will house University Bookstore, food service area and district cooling plant. First floor will include campus mail services and integrative learning area. First thru sixth floors will include suite style student residences. New pedestrian and vehicular traffic routes in effect during project construction are posted at http://www.bloomu.edu/planning-construction-plans. This information will be updated as necessary. LOCUST STREET ELWELL HALL ELM ALLEY PARKING SPRUCE STREET SCRANTON COMMONS - STEAK-N-SHAKE TILE FLOOR GARAGE EAST SECOND STREET Site fence CHESTNUT STREET CENTENNIAL HALL BUS SHELTER Site fence HARTLINE E GATE SUTLIFF HALL LAUBACH DRIVE DRIV LYCOMING Site fence N NG TIO I D IL UC U B TR TE NS SI O C BEN FRANKLIN YLER DN SCHU Site fence Site fence EAST SECOND STREET Installation of new tile flooring at Steak-N-Shake. STOP fla gp ole SWISHER CIRCLE fence fence GATE ENTER ONLY EXIT ONLY Construction - May 9, 2016 to July 15, 2016 ce UNIVERSITY POLICE BUS LANE HALL ST O POLICE PARKING Site fence COMMONS POLICE PARKING BOOK DEPOSIT BOX LUZERNE HALL SCRANTON fen A IAL POLICE PARKING P STOP OS UN ME 1919 MO R SCHUYLKILL HALL Life cycle replacement of mechanical and plumbing equipment in the mechanical room for more efficient operation of the building heating and plumbing systems. PL DAY AY CA GR RE OU ND CARVER HALL Construction - May 2016 to August 2016. PENN STREET SCHUYLKILL HALL - MECHANICAL EQUIPMENT RENOVATION WARREN STUDENT SERVICES CENTER P DR POLICE PARKING ANDRUSS LIBRARY ST O #12 Penn Street Parking Lot RESTUD C E CEREATNT NT ION ER NORTHUMBERLAND HALL NO PARKING MONTOUR HALL IVE BU CK A P (P LA LE RE RE SI CE W SID DE ROAD BUS LANE RCYC #13 Heating Plant Parking Lot OLD SCIENCE TREET OSUNA DRIVE CARPENTER SHOP MOTO DO HEATING PLANT TO S c. Ce n BL LE ce OO WN TO WN YC fen G UR B MS NO PARKING SIMON OSUNA DRIVE RC GE X M PA EMO VIL RI IO AL N S TO RA X LIGHTS TR HT MO GA E DRIV A OSUN LIG X ) 87 .4 EE TR Construction - May 2016 to August 2016. Upgrade existing fire alarm panels and devices in building. COLUMBIA HALL D OA fence X X T (R McCORMICK - UPGRADE FIRE ALARM PANELS AND DEVICES X PE BR DES IDG TR E IAN SWISHER CIRCLE Construction - May 2016 to August 2016. MI T HOCHE US LL E STOP CENTENNIAL HALL VICINITY- REPLACE STEAM AND CONDENSATE LINES Construction - May 2016 to September 2016 New steam lines will be installed around the south and east sides of Centennial Hall. In addition, all walks around these sides will be replaced, as well as additions and upgrades of exterior pole lights to meet campus standards and provide energy saving fixtures. Pedestrian traffic will not be available along these routes during project. WILSON HOUSE New pedestrian and vehicular traffic routes in effect during project construction will be posted at http://www.bloomu.edu/planning-construction-plans. This information will be updated as necessary. The University bus stops will not be useable during this time frame. The new bus stops and bus routing will be posted at http://www.bloomu.edu/planning-construction-plans. EE RIVE I EL D E NS T HIPP OLD SCIENCE HALL - UPGRADE FIRE ALARM PANELS AND DEVICES LIG D Paint all existing interior doors and frames. B HE MA UC IN KIN ED ALT T G H (H UCA & P CENENA HAM PE TIO HY TE NC ) N B SIC R E MA UIL AL IN DI NG CE TEN AN NTE ANC NE R E X TR S HT B ROA Construction - May 9, 2016 to June 10, 2016 D OA R T LU TRY C Construction of a pedestrian overpass across Lightstreet Road, connecting the student housing complexes on Honeysuckle Lane with the lower campus at the rear of Haas Center. Included are an elevator tower and stairs, sidewalk approaches from both sides, as well as state of the art lighting and security cameras. DE VE L CE OPM NT EN ER T FE AL NST UM EM NI AK HO ER US E