DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 Environmental Quality PB-28 Summary; Total Program, all Appns 1. Recurring Costs - Class 0 a. Manpower b. Education and Training 113,966 102,062 11,904 121,249 109,876 11,373 118,634 108,103 10,531 7,283 7,814 -531 -2,615 -1,773 -842 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 121,219 6,436 25,078 24,349 65,356 108,415 5,923 22,655 22,517 57,320 101,958 5,763 17,478 21,522 57,195 -12,804 -513 -2,423 -1,832 -8,036 -6,457 -160 -5,177 -995 -125 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 38,408 38,827 43,226 419 4,399 4. Environmental Conservation - Recurring Costs (Class 0) 19,456 18,187 17,565 -1,269 -622 293,049 286,678 281,383 -6,371 -5,295 20,895 3,880 5,653 16,936 63,744 17,771 47,811 176,690 5,924 8,204 11,569 34,563 50,918 10,655 45,625 167,458 10,327 5,451 6,162 29,382 53,383 10,930 40,495 156,130 -14,971 4,324 5,916 17,627 -12,826 -7,116 -2,186 -9,232 4,403 -2,753 -5,407 -5,181 2,465 275 -5,130 -11,328 Total Recurring Costs 5. Environmental Compliance - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. RCRA Subtitle I - Underground Storage Tanks d. Clean Air Act e. Clean Water Act f. Planning g. Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 57 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 8,469 698 18,628 14,587 3,096 13,621 59,099 8,501 2,016 15,681 14,564 2,546 12,239 55,547 5,767 808 15,872 13,390 2,936 15,483 54,256 32 1,318 -2,947 -23 -550 -1,382 -3,552 -2,734 -1,208 191 -1,174 390 3,244 -1,291 7. Environmental Conservation - Non Recurring Costs (Class I/II) a. T&E Species b. Wetlands c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) 9,187 2,569 1,635 8,146 21,537 5,135 2,174 1,539 5,921 14,769 6,587 1,859 1,125 7,021 16,592 -4,052 -395 -96 -2,225 -6,768 1,452 -315 -414 1,100 1,823 550,375 524,452 508,361 -25,923 -16,091 8,335 15,924 9,555 7,589 -6,369 GRAND TOTAL ENVIRONMENTAL QUALITY Environmental Quality Program Outside the United States (memo entry for amounts included above) Exhibit PB-28 Funds Budgeted for Environmental Quality 58 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 Appropriation: 3010 - Aircraft Procurement Inside the United States and Territories 1. Recurring Costs - Class 0 a. Manpower b. Education and Training 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 0 0 0 0 0 4. Environmental Conservation - Recurring Costs (Class 0) 0 0 0 0 0 0 0 0 0 0 2,574 0 0 574 6,593 0 2,312 12,053 100 0 0 4,900 6,285 0 1,774 13,059 94 0 0 4,612 5,915 0 1,670 12,291 -2,474 0 0 4,326 -308 0 -538 1,006 -6 0 0 -288 -370 0 -104 -768 Total Recurring Costs 5. Environmental Compliance - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. RCRA Subtitle I - Underground Storage Tanks d. Clean Air Act e. Clean Water Act f. Planning g. Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 59 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 7. Environmental Conservation - Non Recurring Costs (Class I/II) a. T&E Species b. Wetlands c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) GRAND TOTAL ENVIRONMENTAL QUALITY FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 1,185 250 1,150 0 0 449 3,034 809 0 973 1,037 0 100 2,919 822 0 987 1,052 0 122 2,983 -376 -250 -177 1,037 0 -349 -115 13 0 14 15 0 22 64 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 15,087 15,978 15,274 891 -704 Exhibit PB-28 Funds Budgeted for Environmental Quality 60 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 Environmental Quality Appropriation: 3020 - Missile Procurement Inside the United States and Territories 1. Recurring Costs - Class 0 a. Manpower b. Education and Training 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 0 0 0 0 0 4. Environmental Conservation - Recurring Costs (Class 0) 0 0 0 0 0 0 0 0 0 0 353 0 0 0 193 450 357 1,353 1,179 0 0 0 61 0 121 1,361 1,163 0 0 0 62 0 123 1,348 826 0 0 0 -132 -450 -236 8 -16 0 0 0 1 0 2 -13 Total Recurring Costs 5. Environmental Compliance - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. RCRA Subtitle I - Underground Storage Tanks d. Clean Air Act e. Clean Water Act f. Planning g. Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 61 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 7. Environmental Conservation - Non Recurring Costs (Class I/II) a. T&E Species b. Wetlands c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) GRAND TOTAL ENVIRONMENTAL QUALITY FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 762 64 240 0 0 0 1,066 716 0 0 316 0 0 1,032 727 0 0 323 0 0 1,050 -46 -64 -240 316 0 0 -34 11 0 0 7 0 0 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,419 2,393 2,398 -26 5 Exhibit PB-28 Funds Budgeted for Environmental Quality 62 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 Environmental Quality Appropriation: 3080 - Other Procurement Inside the United States and Territories 1. Recurring Costs - Class 0 a. Manpower b. Education and Training 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 0 0 0 0 0 4. Environmental Conservation - Recurring Costs (Class 0) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Recurring Costs 5. Environmental Compliance - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. RCRA Subtitle I - Underground Storage Tanks d. Clean Air Act e. Clean Water Act f. Planning g. Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 63 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 7. Environmental Conservation - Non Recurring Costs (Class I/II) a. T&E Species b. Wetlands c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) GRAND TOTAL ENVIRONMENTAL QUALITY FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 447 0 300 200 0 0 947 662 0 0 270 0 0 932 668 0 0 270 0 0 938 215 0 -300 70 0 0 -15 6 0 0 0 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 947 932 938 -15 6 Exhibit PB-28 Funds Budgeted for Environmental Quality 64 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 Environmental Quality Appropriation: 3300 - Military Construction - AF Inside the United States and Territories 1. Recurring Costs - Class 0 a. Manpower b. Education and Training 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 0 0 0 0 0 4. Environmental Conservation - Recurring Costs (Class 0) 0 0 0 0 0 0 0 0 0 0 8,900 0 0 0 8,800 0 0 17,700 0 0 0 0 10,950 0 5,350 16,300 0 0 0 0 10,150 0 0 10,150 -8,900 0 0 0 2,150 0 5,350 -1,400 0 0 0 0 -800 0 -5,350 -6,150 Total Recurring Costs 5. Environmental Compliance - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. RCRA Subtitle I - Underground Storage Tanks d. Clean Air Act e. Clean Water Act f. Planning g. Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 65 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7. Environmental Conservation - Non Recurring Costs (Class I/II) a. T&E Species b. Wetlands c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 17,700 16,300 10,150 -1,400 -6,150 GRAND TOTAL ENVIRONMENTAL QUALITY Change 01/02 Exhibit PB-28 Funds Budgeted for Environmental Quality 66 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 Environmental Quality Appropriation: 3300 - Military Construction - AF Outside the United States and Territories 1. Recurring Costs - Class 0 a. Manpower b. Education and Training 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 0 0 0 0 0 4. Environmental Conservation - Recurring Costs (Class 0) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5,700 0 0 5,700 0 0 0 0 1,000 0 0 1,000 0 0 0 0 0 0 0 0 0 0 0 0 -4,700 0 0 -4,700 0 0 0 0 -1,000 0 0 -1,000 Total Recurring Costs 5. Environmental Compliance - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. RCRA Subtitle I - Underground Storage Tanks d. Clean Air Act e. Clean Water Act f. Planning g. Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 67 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7. Environmental Conservation - Non Recurring Costs (Class I/II) a. T&E Species b. Wetlands c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5,700 1,000 0 -4,700 -1,000 GRAND TOTAL ENVIRONMENTAL QUALITY Change 01/02 Exhibit PB-28 Funds Budgeted for Environmental Quality 68 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 76,721 67,478 9,243 87,266 78,869 8,397 83,858 76,306 7,552 10,545 11,391 -846 -3,408 -2,563 -845 104,434 6,043 21,691 18,520 58,180 91,292 5,460 19,009 16,406 50,417 81,628 5,236 13,433 15,371 47,588 -13,142 -583 -2,682 -2,114 -7,763 -9,664 -224 -5,576 -1,035 -2,829 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 33,305 32,602 37,570 -703 4,968 4. Environmental Conservation - Recurring Costs (Class 0) 16,098 14,991 14,306 -1,107 -685 230,558 226,151 217,362 -4,407 -8,789 5,493 2,682 66 9,977 24,435 13,787 19,816 76,256 337 7,149 1,381 23,357 13,907 9,163 12,588 67,882 3,674 4,843 2,139 16,989 20,035 9,215 24,093 80,988 -5,156 4,467 1,315 13,380 -10,528 -4,624 -7,228 -8,374 3,337 -2,306 758 -6,368 6,128 52 11,505 13,106 Environmental Quality Appropriation: 3400 - Operation and Maintenance Inside the United States and Territories 1. Recurring Costs - Class 0 a. Manpower b. Education and Training 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs Total Recurring Costs 5. Environmental Compliance - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. RCRA Subtitle I - Underground Storage Tanks d. Clean Air Act e. Clean Water Act f. Planning g. Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 69 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 3,476 272 15,279 13,262 403 9,451 42,143 4,574 924 13,743 10,152 207 5,349 34,949 1,642 456 13,837 10,786 830 10,318 37,869 1,098 652 -1,536 -3,110 -196 -4,102 -7,194 -2,932 -468 94 634 623 4,969 2,920 b. Wetlands c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) 2,431 774 7,004 10,209 2,174 700 5,558 8,432 1,754 715 6,844 9,313 -257 -74 -1,446 -1,777 -420 15 1,286 881 359,166 337,414 345,532 -21,752 8,118 GRAND TOTAL ENVIRONMENTAL QUALITY FY02 Estimate Change 00/01 Change 01/02 Exhibit PB-28 Funds Budgeted for Environmental Quality 70 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 Environmental Quality Appropriation: 3400 - Operation and Maintenance Outside the United States and Territories 1. Recurring Costs - Class 0 a. Manpower b. Education and Training 4,842 3,502 1,340 5,170 3,795 1,375 5,324 3,961 1,363 328 293 35 154 166 -12 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 7,298 122 1,111 3,079 2,986 8,408 129 1,548 3,500 3,231 10,774 140 1,811 3,531 5,292 1,110 7 437 421 245 2,366 11 263 31 2,061 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 2,651 3,894 3,224 1,243 -670 4. Environmental Conservation - Recurring Costs (Class 0) 1,266 1,339 1,357 73 18 16,057 18,811 20,679 2,754 1,868 1,365 471 4,555 188 6,812 94 23,810 37,295 2,536 447 9,000 1,083 8,598 89 24,974 46,727 3,430 0 3,408 2,236 11,379 75 13,079 33,607 1,171 -24 4,445 895 1,786 -5 1,164 9,432 894 -447 -5,592 1,153 2,781 -14 -11,895 -13,120 Total Recurring Costs 5. Environmental Compliance - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. RCRA Subtitle I - Underground Storage Tanks d. Clean Air Act e. Clean Water Act f. Planning g. Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 71 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 1,365 0 94 489 193 2,571 4,712 649 743 55 2,055 204 5,780 9,486 107 12 0 468 106 3,943 4,636 -716 743 -39 1,566 11 3,209 4,774 -542 -731 -55 -1,587 -98 -1,837 -4,850 b. Wetlands c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) 0 290 132 422 0 339 303 642 0 281 0 281 0 49 171 220 0 -58 -303 -361 58,486 75,666 59,203 17,180 -16,463 EnvironmentalCleanup Program Outside the United States 8,335 15,924 (Memo entry foroverseas cleanupamounts included above) (The amounts entered in this item shall not include any of the 50 states, District of Columbia, Guam, Puerto Rico, or other territories and possessions of the U.S.) 9,555 7,589 -6,369 GRAND TOTAL ENVIRONMENTAL QUALITY Narrative: The AF funded an additional $152M in Y99-03 for buyout of non-recurring environmental requirements at overseas installations (PACAF, USAFE) to comply with host nation Final Governing Standards. That funding increase peaks in FY01. In addition, the AF funded an additional $13M for Level 1 requirements for USAFE and AFSPC (Thule) in FY01 during the FY01-05 APOM. Exhibit PB-28 Funds Budgeted for Environmental Quality 72 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 16,203 16,203 0 13,049 13,049 0 12,364 12,364 0 -3,154 -3,154 0 -685 -685 0 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 0 0 0 0 0 4. Environmental Conservation - Recurring Costs (Class 0) 0 0 0 0 0 16,203 13,049 12,364 -3,154 -685 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Environmental Quality Appropriation: 3500 - Military Personnel - AF Inside the United States and Territories 1. Recurring Costs - Class 0 a. Manpower b. Education and Training Total Recurring Costs 5. Environmental Compliance - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. RCRA Subtitle I - Underground Storage Tanks d. Clean Air Act e. Clean Water Act f. Planning g. Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 73 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16,203 13,049 12,364 -3,154 -685 GRAND TOTAL ENVIRONMENTAL QUALITY Narrative: Decreases beyond FY01 are primarily due to reductions in MILPERS at AFMC; result of A-76 actions and re-engineering efforts. Exhibit PB-28 Funds Budgeted for Environmental Quality 74 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 2,044 2,044 0 1,750 1,750 0 1,905 1,905 0 -294 -294 0 155 155 0 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 0 0 0 0 0 4. Environmental Conservation - Recurring Costs (Class 0) 0 0 0 0 0 2,044 1,750 1,905 -294 155 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Environmental Quality Appropriation: 3500 - Military Personnel - AF Outside the United States and Territories 1. Recurring Costs - Class 0 a. Manpower b. Education and Training Total Recurring Costs 5. Environmental Compliance - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. RCRA Subtitle I - Underground Storage Tanks d. Clean Air Act e. Clean Water Act f. Planning g. Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 75 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 b. Wetlands c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,044 1,750 1,905 -294 155 GRAND TOTAL ENVIRONMENTAL QUALITY Exhibit PB-28 Funds Budgeted for Environmental Quality 76 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 1. Recurring Costs - Class 0 a. Manpower b. Education and Training 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 0 0 0 0 0 4. Environmental Conservation - Recurring Costs (Class 0) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Appropriation: 3600 - RDT&E Inside the United States and Territories Total Recurring Costs a. b. c. d. e. f. g. RCRA Subtitle C - Hazardous Waste RCRA Subtitle D - Solid Waste RCRA Subtitle I - Underground Storage Tanks Clean Air Act Clean Water Act Planning Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 77 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 493 98 877 229 535 205 2,437 499 99 898 234 548 241 2,519 1,088 0 842 216 296 246 2,688 6 1 21 5 13 36 82 589 -99 -56 -18 -252 5 169 c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,437 2,519 2,688 82 169 GRAND TOTAL ENVIRONMENTAL QUALITY Exhibit PB-28 Funds Budgeted for Environmental Quality 78 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 Environmental Quality Appropriation: 3730 - Military Construction - AFR Inside the United States and Territories 1. Recurring Costs - Class 0 a. Manpower b. Education and Training 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 0 0 0 0 0 4. Environmental Conservation - Recurring Costs (Class 0) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,000 0 0 2,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -2,000 0 0 -2,000 0 0 0 0 0 0 0 0 Total Recurring Costs 5. Environmental Compliance - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. RCRA Subtitle I - Underground Storage Tanks d. Clean Air Act e. Clean Water Act f. Planning g. Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 79 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 b. Wetlands c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,000 0 0 -2,000 0 GRAND TOTAL ENVIRONMENTAL QUALITY Exhibit PB-28 Funds Budgeted for Environmental Quality 80 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 Environmental Quality Appropriation: 3740 - Operation and Maintenance - AFR Inside the United States and Territories 1. Recurring Costs - Class 0 a. Manpower b. Education and Training 5,481 4,987 494 5,118 4,660 458 4,915 4,501 414 -363 -327 -36 -203 -159 -44 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 3,772 158 733 606 2,275 3,625 157 687 546 2,235 4,250 209 661 572 2,808 -147 -1 -46 -60 -40 625 52 -26 26 573 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 2,060 1,921 2,060 -139 139 4. Environmental Conservation - Recurring Costs (Class 0) 1,682 1,557 1,719 -125 162 12,995 12,221 12,944 -774 723 0 0 244 254 1,498 0 26 2,022 75 0 430 100 1,411 0 0 2,016 309 0 0 351 827 103 802 2,392 75 0 186 -154 -87 0 -26 -6 234 0 -430 251 -584 103 802 376 Total Recurring Costs 5. Environmental Compliance - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. RCRA Subtitle I - Underground Storage Tanks d. Clean Air Act e. Clean Water Act f. Planning g. Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 81 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 150 14 688 407 133 0 1,392 40 250 12 367 439 119 1,227 0 340 206 0 285 206 1,037 -110 236 -676 -40 306 119 -165 -40 90 194 -367 -154 87 -190 b. Wetlands c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) 66 410 0 476 0 500 0 500 0 0 0 0 -66 90 0 24 0 -500 0 -500 16,885 15,964 16,373 -921 409 GRAND TOTAL ENVIRONMENTAL QUALITY FY02 Estimate Change 00/01 Change 01/02 Exhibit PB-28 Funds Budgeted for Environmental Quality 82 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 1. Recurring Costs - Class 0 a. Manpower b. Education and Training 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 0 0 0 0 0 4. Environmental Conservation - Recurring Costs (Class 0) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,700 0 0 1,700 0 0 0 0 3,760 0 0 3,760 0 0 0 0 0 0 0 0 0 0 0 0 2,060 0 0 2,060 0 0 0 0 -3,760 0 0 -3,760 Environmental Quality Appropriation: 3830 - Military Construction - ANG Inside the United States and Territories Total Recurring Costs 5. Environmental Compliance - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. RCRA Subtitle I - Underground Storage Tanks d. Clean Air Act e. Clean Water Act f. Planning g. Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 83 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 b. Wetlands c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,700 3,760 0 2,060 -3,760 0 0 0 0 0 GRAND TOTAL ENVIRONMENTAL QUALITY Environmental Quality Program Outside the United States (memo entry for amounts included above) Exhibit PB-28 Funds Budgeted for Environmental Quality 84 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 Environmental Quality Appropriation: 3840 - Operation and Maintenance - ANG Inside the United States and Territories 1. Recurring Costs - Class 0 a. Manpower b. Education and Training 3,103 2,790 313 4,008 3,294 714 4,215 3,442 773 905 504 401 207 148 59 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 5,715 113 1,543 2,144 1,915 5,090 177 1,411 2,065 1,437 5,306 178 1,573 2,048 1,507 -625 64 -132 -79 -478 216 1 162 -17 70 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 392 410 372 18 -38 4. Environmental Conservation - Recurring Costs (Class 0) 410 300 183 -110 -117 9,620 9,808 10,076 188 268 1,098 0 788 808 1,205 3,439 848 8,186 734 0 758 772 1,009 1,402 717 5,392 694 0 615 842 1,081 1,537 626 5,395 -364 0 -30 -36 -196 -2,037 -131 -2,794 -40 0 -143 70 72 135 -91 3 Total Recurring Costs a. b. c. d. e. f. g. RCRA Subtitle C - Hazardous Waste RCRA Subtitle D - Solid Waste RCRA Subtitle I - Underground Storage Tanks Clean Air Act Clean Water Act Planning Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 85 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 591 0 0 0 1,832 945 3,368 552 0 0 133 1,148 650 2,483 713 0 0 275 1,419 648 3,055 -39 0 0 133 -684 -295 -885 161 0 0 142 271 -2 572 c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) 161 1,010 1,171 0 60 60 129 177 306 -161 -950 -1,111 129 117 246 22,345 17,743 18,832 -4,602 1,089 GRAND TOTAL ENVIRONMENTAL QUALITY Exhibit PB-28 Funds Budgeted for Environmental Quality 86 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 1,076 1,076 0 1,131 1,131 0 2,297 2,297 0 55 55 0 1,166 1,166 0 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 0 0 0 0 0 4. Environmental Conservation - Recurring Costs (Class 0) 0 0 0 0 0 1,076 1,131 2,297 55 1,166 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Environmental Quality Appropriation: 3850 - Military Personnel - ANG Inside the United States and Territories 1. Recurring Costs - Class 0 a. Manpower b. Education and Training Total Recurring Costs 5. Environmental Compliance - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. RCRA Subtitle I - Underground Storage Tanks d. Clean Air Act e. Clean Water Act f. Planning g. Other Total - Non Recurring Costs (Class I/II) Exhibit PB-28 Funds Budgeted for Environmental Quality 87 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 b. Wetlands c. Other Natural Resources d. Historical & Cultural Resources Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,076 1,131 2,297 55 1,166 GRAND TOTAL ENVIRONMENTAL QUALITY Narrative: Beginning in FY04, ANG was successful in programming one environmental manager per base. According to ANG rules, these additional 104 "technician" status positions require a weekend wartime position. The weekend wartime positions, programmed separately, were available beginning in FY02. Hence, MILPERS funding requirement increases significantly after FY01. Exhibit PB-28 Funds Budgeted for Environmental Quality 88 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual FY01 Estimate FY02 Estimate Change 00/01 Change 01/02 4,496 3,982 514 3,757 3,328 429 3,756 3,327 429 -739 -654 -85 -1 -1 0 2. Environmental Compliance - Recurring Costs (Class 0) a. Permits & Fees b. Sampling, Analysis, Monitoring c. Waste Disposal d. Other Recurring Costs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3. Environmental Pollution Prevention - Recurring Costs (Class 0) 0 0 0 0 0 4. Environmental Conservation - Recurring Costs (Class 0) 0 0 0 0 0 4,496 3,757 3,756 -739 -1 Environmental Quality Appropriation: DWCF Reimbursement Inside the United States and Territories 1. Recurring Costs - Class 0 a. Manpower b. Education and Training Total Recurring Costs Exhibit PB-28 Funds Budgeted for Environmental Quality 89 DEPARTMENT OF THE AIR FORCE SUMMARY OF FUNDS BUDGETED FOR ENVIRONMENTAL PROJECTS FY 2002 PRESIDENT’S BUDGET ($ in Thousands) FY 00 Actual 6. Pollution Prevention - Non Recurring Costs (Class I/II) a. RCRA Subtitle C - Hazardous Waste b. RCRA Subtitle D - Solid Waste c. Clean Air Act d. Clean Water Act e. Hazardous Material Reduction f. Other Total - Non Recurring Costs (Class I/II) 0 0 0 0 0 0 0 FY01 Estimate 0 0 0 0 0 0 0 FY02 Estimate 0 0 0 0 0 0 0 Change 00/01 Change 01/02 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Exhibit PB-28 Funds Budgeted for Environmental Quality 90