ENGINEERING TECHNICAL NOTES TECHNICAL REPORTS DATA RETRIEVAL MANAGEMENT FIELD INFORMATION SYSTEM PROFESSIONAL DEVELOPMENT I Notes Field Constructing Post Tensioned Prestressed Concrete Bridges Environmental Solar Effects Off-Road Vehicles Energy and Greenhouses Polvester Resin Anchorage System Prairie Portage L of Dam Washington Office News FOREST SERVICE JUNE 1976 FpPE5T 5qCCý UýRJ U.S. DEPARTMENT OF AGRICULTURE EST 5EM.. UýS FIELD NOTES ENGINEERING Volume 8 Number 6 June 1976 This monthly newsletter U.S. Department of Agriculture-Forest Service and Department of Agriculture or use of this information The use of trade convenience of conclusion product The text in the author assumes no to Such exclusion publication its own names use recommendation the distribution to.employees does is not as for not intended technicians exclusively U.S. should for read each the information or approval personal The opinions by FOREST SERVICE DEPARTMENT OF AGRICULTURE 20250 of the reference. engineers this engineers. of any or approved FSM all and official suitable. recommended issue however Washington D.C. an constitute procedures mandatory instructions or policy except Because of the type of material in the publication engineering only. the interpretation which may be the represents and must not be construed of the employees. endorsement of others retirees its for responsibility by other than reader. service respective for firm or corporation the evaluation or published is and publication is 4 x y 77 gam 4f_ I Y iiF Last Chance place in Creek Bridge deck. Rigid metal a duct in Note parabolic shape of ducts. 1v r Ewa. y A Y. ten-don mad Last Chance Creek Bridge elongation after Inspector measuring tendon has been stressed. CONSTRUCTING POST TENSIONED PRESTRESSED CONCRETE BRIDGES John W. Civil Bell Engineer Region In 1975 Region and Creek Creek Creeks Chance a 92 ft. Structures Section in was Prestressed amount on the cost The method of remote On three projects specified using this special Two 3. of these Poplar Creek bridge was a 55 All three bridges Creek Ramshorn third bridge two span haunched ft. ft. single span slab and Ramshorn were designed more by the Regional of reduce and exhibits durable substantially the total the project cost. by the bids received far less tendency cracking the in of using and the bridges lieu 0.6 of Forest diameter in highway Transportation and then post tensioning was selected the concrete resulting of hauling difficulty for post tensioning project specification was used all would reduce long the sites. project specification of it to have been substantiated appears is since which should required Service Standard strand in rigid to the State of similar 601 A. The Specification metal ducts. The advantages of R-5 were bridges CALTRANS now are under being The specification calls by construction built for packaging the strand does The specification contractors understressing in to this the California specification jack can during damage allows the to engineer tensioning. a prestressed Jacking structure. 1 use force for rejection rust is an independent is container a shipping The development of visible rust is grounds not have to make a value judgment of how much inhibitor added. engineer The and prestressing firms are familiar with most of the requirements. potential 2. of Two bridges. Forest. structures. a special was that thirds Department concrete location Californias specification 1. steel concrete members of prestressed process 126 girder. prestressing by first placing precast the a for these bridges specified reinforced of the because was and reinforcing Prestressed conventional National Forest. Poplar was span box single of prestressed projects. National Creek bridge concrete Plumas on the San Francisco. concrete of concrete The lower than 3 post-tensioned were was on the Shasta-Trinity slab Last flat constructed 5 Chance Last 5 critical as too much load both with a rust of the strand the rust. cell to check the overstressing and The 4. specification water-to-cement very is of grout pumping ratio the area of grout inspection. in specific through .0 a maximum for a It calls screen and use of a grout flow inch cone to measure consistency. the Although Standard Specifications Service would have been averted post tensioning corporation and process did the on some still construction control The specifications. tensioning post subcontractor same The unfamiliar relatively with post contractors with the familiar international large he learned he specifications until were small businessmen who the resulting suffered in tensioning Forest did not adequately subcontractor whom of all a the in These problems problems. been more personnel three jobs. all The prime had done something wrong. were there were had the construction to that compared projects and did not carefully read the contract for the plan used had a number of advantages specification Some delays. specific problems were The 1. The post State Forest Service project was tensioning Two cell by CALTRANS was a 3. Prestressed for most also for the Creek and the requires all suppliers on the prime contractor from the local at meeting amount both in delays of concrete specifications on the Ramshorn has For been tensioned. directly cast-in-place stressed. specifications and post tensioned Consequently Stressing however the the by the for the The testing inspector the furnished years of experience His experience as a proved invaluable in air 4000 of strength specifications required Creek were they forced prime contractors at 28 days strength and specifications proved to be content to had based psi this Both the prime contractor use bids. on the Last at methods their There were no projects. the projects. project the call with an independent laboratory all He had many compressive on which cost furnished projects. Plumas. Poplar ones the 4. concrete highway minimum tested the specs They were resolved through a to accomplish. post tensioning operation. three bridges post some was placed with strand although use and anchorages were beyond of strand hand on our in to All three jobs rejected. monitoring the jacking for of information. interstate before just wanted The jobs. advance of anticipated use. in Meeting both the strength and air. concrete different sources on For applications. 5V2% entrained difficult wealth veritable concrete also for state until then strand. construction to be laboratory two days CALTRANS the actual had still in testing CALTRANS. and inspection control testing well specification during resident structures engineer steel was It inventory. Service project engineers cell and an inspector keeping the agreement with cooperative load stressing Japanese subcontractor of strand and for laboratory of the Forest capability his was done testing for testing in requirements during from order rush The delivery. to submit samples contractor 2. upon Service The rejected. tensioning their strand while a rush order for properly-packaged The a domestic manufacturer. Forest was It two weeks delayed of packaged did not learn about the engineers post Act requirement in inventory a large domestic strand improperly-packaged were then had commence. to on using Japanese planned not have a Buy-American and the subcontractor contract load subcontractor tensioning of California does and materials The Plumas difficulties Chance difficulty in a substantial meeting these project. the bridges bridge deck false-work must be left in cannot take place 2 until the 4000 will not support place psi until concrete the itself until it deck has been strength has been On reached. only the Last designed projects following with post tensioning Post tensioned anchorages are economic 2. 3. the If However Forest project do not have certain 4. for phases The Field page anyone Manual 5. Forests to installed construction get post tensioning the post tensioning operated cost. unless post the some structures and may warrant of a The sites. steel and duct metal using only it in laboratory testing of going to contract. it experience in of concrete rigid services personnel tensioning 1975 experience remote at which advantages control Prior field source. strand and/or can be arranged in advance in the volume control not be used construction from R-5s system for use in equipment has package prior experience in is assigned post to post a to obtain desirable tensioning is tensioning construction during essential of inspection. of Inspection includes and grouting. that be drawn State of California has an excellent publication publication a four Service tensioning should it cell from an outside assistance post California specification situations. an independent load with The can reductions substantial additional is On both was that the result bridges. They then wanted to number of problems for both a were systems rising waters. The October. early to be an economical appears transported easily disadvantage The certain concrete sites. falsework Service. Forests. It achieves remote at in contractors their caused and recommendations conclusions the National needed to be done tensioning possible which as The 1. post and the Forest subcontractor in be washed out by flows and could stream began to worry about losing rapidly as the summer caused delays contractors done Chance and Ramshorn bridges for low It information shows how inspection to on shop drawings make inspecting construction rigid duct calculations for elongation for use checklist entitled during of a post a post tensioned February A Guide 1975. This strand wedges jacks stressing and anchor tensioning bridge Manual Prestress Structures Post-Tensioned Cast-in-Place. project. obtain set. It also It a copy is includes recommended of the Prestress for reference. CALTRANS in cooperation other with was very Regions their helpful should respective to R-5 consider State on our post whether Highway construction. 3 tensioning opportunities projects exist Departments as a tool it for bridge during them 1975. to use and highway ENVIRONMENTAL EFFECTS OF OFF-ROAD VEHICLES Rob Harrison Mechanical Engineer San Dimas Equipment Note This a condensed is sponsored-by gived of Land Management and held Bureau the of a presentation version Center Developrrent the at Surface Anchorage in Seminar Protection Alaska January 19-23 1976. Off-road recreational of objective research This and four the the generally rather most three it of off-road and vehicles -policy is a dearth motorcycles noise pollution of aspects of these three classes effects areas of environmental recognized there effects. Sociological on the concentrates without preconceived but unfortunately classes popular ATVs. vehicles all-terrain avoided are seldom approached subject a and strong detractors regard to their environmental with discuss will paper snowmobiles vehicles ORVs are vehicles have strong supporters They biases. off-road water pollution air on of vehicles and ground disturbance. pollution Noise No research to any exists at which much enough it is louder The does than not acclimate lands. damage by all is harmful annoyance work by three classes the ORVs of to the operator but that at distances the sound by spectators classes considerable Rather extensive that the noise created noise has been extensively investigated. disturb the It as is not intended there is two When of the snowmobile however however Forest cause has dropped to a level not level normal conversation. rapidly to the noise. disturbance. humans does permanent hearing to cause significantly physical presence this from any of the three vehicle noise shown Center has most normally perceived Only snowmobile noise environment. Development be loud The non-motorized users of National to Equipment can of the aspect particularly which shows that the noise species of they and are ample evidence that snowmobile disturbed by snowmobiles that the ORV noise and investigated-deer operator rather than its minimize the to Research concludes wildlife is probably the the noise itself noise from it problem ORVs can rabbits. with that causes regard and does to cause severe annoyance. Air Pollution The general sources air pollution man-made and picture natural is very ORVs little are affected miniscule 4 by ORV exhaust. contributors. No Compared evidence to other exists that ORV exhaust any contains of phase the concentrations toxic-in poisons A biosphere. minute the concentrations brief mathematical ORV use shown has investigation due to the most intensive of air pollutants they are found-to that are that local negligible. Water Pollution Water is pollution areas would seem still has reached of biodegradable use waters. to accelerated This erosion such Of oils. ATV of aspect severe adverse disturbance. In conducted on to types Energy inputs is community arrangement of into as defined compression as even soil on Water pollution due small. phenomenon possibility this by the use of research little has is is best that of ground to research been actually been generated has a brief review ORVs we must look intelligently on done with regard to automobiles and In order trucks. of some basic ground disturbance the soil fluffy the it is is slippage of fragility not snow. pH average Its structure composition strata of the see The surface. normal to the many to and input into the soil. shear. soil a structure-oriented is important to the plants and animals soil as between difficult soil as is to energy proportional is of the chemical as being the direction Considering in damage varieties compactio particles though the on the other hand surface. soil two main of the soil as a layer of soft a snowball Shear a military vehicles however such gross descriptors of the are generally considered living vehicles that is to the soil are of Compaction Think they here water pollution are used extensively necessary. is The fundamental assumption there only probably deal of excellent literature ORVs to Very vehicles. of industrial data this extrapolate of if In are considering Disturbance ground disturbance discuss but a good mechanics terrain theory other ORVs recreational the to is also is impact caused environmental order effluent oil impact. Surface The most then water pollution disturbance managers under discussion the vehicles ATVsand land that proportions by off-road vehicles caused part of surface as most of the because significant stratum the surface of the lake upon which boats are operated. finite to be the problem only with inland considered by boats can be caused as problem this the requiring least on a very deposited some at how nominal is pH is soil surface in structures excessive live analysis. irreparably altered by making et or particles root that class and seive shear unaltered. Compaction it is plane. planes the to the parallel micro-flora and to inputs the soil soil fauna do can irreparable damage. A second Without basic this coefficient velocity consideration slip of friction between zero if differential If we compare the blacktop or the between curve is the tire a tire rolls over no force would and the ground surface gravel aggregate as there a surface be generated. is some slip. 1 shows the Figure a function of the and sand. The coefficient differential of friction as steeply as is zero thus no force can be generated. three curves until whenever velocity two for blacktop velocity these that is differential higher we see that the sand shear stresses loosen 5 curve rises initially the sand and induce almost the characteristically . Oe . SAND m . . 0 . 0 . . SLIP Figure higher throughout slip with any your tires spinning. And increased shear. VELOCITY remainder of the sand the ORV soft in sandy soils surface obviously 1.0 1.2 1.4 1.6 fps of friction tire and ground surface. Coefficient 1. . disturbance as is Snowmobile shows the This curve. forward are not increased velocities greatly of spinning futility because increased of the by such greatly Damage by snowmobiles when traversing snow-covered terrain is negligible. Compaction of the snow itself however can be a problem as can the compaction of the soil beneath it. The insulating properties of snow and vegetative debris produce sub-surface soil Shear damage temperatures temperatures observations caused which under are conflicting that this Snowmobiles compared snow may be are colder permanently does exert a ground pressure of only about 1/2-psi present a considerably extremely aggressive and damage caused fluctuate change retards to even foot travel which applies about 2-3/4 Motorcycles soil and less more with not conclusively plant Soil depth. quickly. Although indicate growth but there that is an so. Motorcycle Thus which research carefully-controlled snow compaction snowmobile-caused indication compacted and warmer progressively are it is by difficult different to avoid motorcycles 6 is relatively minor psi. Damage picture. Motorcycle spinning the of is so compaction both tires used off-road wheel under adverse compaction and shear are conditions. varieties. The footprint walking man through his damage that probably on the order of 6 psi or roughly is running damage soil energy easily is a good feet that bike trail but whereas a strong not suggested premise of a pressure is design ranging and 1 other 1l Since vehicle damage terrain shows up surface. as deforms shows up for great soil So-called winter when cc. or twin single exerts a ground pressure of to as ATV contact ATV tire winter is of type to steering as tire As the shear. this energy ground to the input is do this must it Thus energy is often ignored increased move relative wasted is the is as tire well as other in both to each and surface as laterally fact pressure the earths tire greets of the tread must move surface. on asphalt shear energy waste this energy soil. must look Center like a thought. past unstable rough riding is tires equally are this of tires of Henry Hodges applicable that for tires. to be more appear any mode of the ATV to emphasis on aggression produced and unsuitable more probably one engendered The comment nomenclature recent In the slippery. tool trenching winter regarding a relatively are relative wheel skids over the terrain a the than compaction To by sound engineering Test tires wheels. This faster but what statement shape. the speeded up is say that the low pressure minimizes ground tire of squirm elements side a rubber shows up it more damaging to the than noisy input energy balloon one any other steering method. situations toroidal its they as that an uniquely is Canada and the United in ATV The from the away almost mechanism of the and the various by advertising copy Nevada Automotive were the large as shear damage concept aggressive than In off-road from of these directions The a direction in which may be much longitudinally It the basic accept the potential engines of 2-stroke This means that which is of course an accurate decreased because tire produced being by snowmobile wasted. In a highway situation with of Protagonists that shear the ATVs design. proportional is is wear. tire compaction we ground figure. Damage from 290 to 440 size of skid-steer are to turn the great deal of energy is in more ground disturbance causes damage if this psi. ATVs All six-wheel the three recreational only All three are six-wheel types powered between but that of a hp to the /4 100 times as available to soil 1 seen. There are currently cylinder much as to power proportional ATV States. generate will proportional to the soil input bike trail is might be able to exert about hiker twice tires of motion that except excavation. The ATV siping. Sipes small which can occur hydroplaning can The for tire except longitudinal at its very low speeds occur even stability heavy lugs to contact area Longer more slender vehicles the with such will length waste is escape with the vehicle of the six-wheel ground given sparse to allow water slots smooth without any are quite necessary to prevent a fat lightly-loaded carcass as stationary ATV of the less completely is very the tire is ATV tires. is especially of Indeed spinning. poor. For any off-highway footprint energy 7 if trace hydroplaning more important in soft terrain. than This vehicle the of a width. means more of the engines horsepower goes damage. ATVs narrow as system during terrain as work to wasted from a Therefore and the forward and vehicle standpoint a skid-steer vehicle is be more would-seem turning to effort is for efficient against mitigate soil make skid-steer of its tractive These two conflicting basic needs-narrowness for efficient as to desirable stubby for the fairly the shows up less would it must be vehicle skid-steer narrower width driving disturbance But a maneuvers. turning ability surface possible. and the into skid-steer ATVs. Minimization of Surface Disturbance With on snow cover operated dont snowmobiles current vehicles soils. ATVs to an interesting challenge present payloads potential though and considerable Nonetheless vehicles. and forth in the same maintained fragile at over tracks be avoided. thereby than tight can damage of figures soil of damage drive instruction and be instructed not to run back be encouraged. the Motorcycles 4-wheel through operator should if are damage. significant is they as are capable conventional radius turns which compaction damage. Large turns should soils. ATVs The soil. that cause Operators avoiding recommended manufacturers soft than less one way to avoid vehicles wheel skid less great deal long as frozen over manager. These vehicles land maneuverability a is Wheel spin should always training. the certain soils these vehicles in For current generation involve excellent disturbance are operated they if shouldprobably be limited to non-fragile excellent much ground cause and particularly Tire vehicles to are be should pressures on dry be used should be increased somewhat. soil the pressure Future Designs The limitation of the that maybe achieved on some of the larger decrease damage soil Beyond a this Looking over in beyond inflatable water Renton including fragile sensor velocity differential six-wheel vehicles one should vehicle powered well as not-too-rough terrain. Washington and it environments inexpensive efficient into production quite has been Canadian noise. Considerable surface both system which on the ground damage effect surface-effect as would vehicles industrial the limit improve and maneuverability potential. certainly have a salutory an amount of reduction in soil damage steer system such as concept ATVs. An articulated will by current potential used system skid-steer less carries consider vehicle than any has flat areas 8 wheel spin would it minimize such that all air ground-borne should as approach. tractor engine. was developed shown other a good payload particularly in relatively to engineered research limit the air cushion by an 8 hp garden This would picture. have Fan-tastic It will by Palmer Aerosystems environmental cushion vehicle. vehicles impacts damage Fan-tastic a wide application the Arctic. is maneuver is once put SOLAR ENERGY AND GREENHOUSES Hyde Jerry M. Structures Engineer Washington Solar Energy Greenhouses tomatoes uses is now Large-scale One tube special roses. strictly transplanting. Container compared seedling using to controlled Millions of seedlings used are to grow plants produces mushrooms for forest seedlings tree in planting on public activities like its seedlings tree and Japan greenhouses a is lands the recent relatively Service must Forest environmental each has seedling evolved recently bare-root seedling a complete nursery survival The encased in its own healthy undisturbed root rate. and sophisticated to rather precise production. is roots and minimize shock in the growth of feeder seedlings have a very good has Each conditions. of about 6 for short periods grown seedlings tree to encourage designed conventional throughout expanding needs of containerized production practiced that Zealand reforestation when planted Thus of and melons. These containerized structure. greenhouse by the nature collector. facilities. is especially New A greenhouses. solar structures accelerate option under for heating a gigantic growing greenhouse available months and production its as for growing fruits development. To expand acts important are carnations them used being and function structure Office technology is levels and available is the Nation. needed are for forest annually products while during the next decade perpetuating the meet to resource forest as the Nations a permanent heritage. To gain opposed the to advantages the required to heat Most greenhouses natural gas. inherent traditional forest in tree nursery the greenhouse to maintain in Natural the gas United has States become rearing of tree greenhouse are operation optimum growing currently increasingly natural gas have been assigned lower priority is than 9 heated expensive seedlings intensive. Most the operation of this energy as is temperatures. with and domestic heat fossil scarce. uses. fuels-in most cases Agricultural uses of Clearly alternative most in U.S. sources energy are gas and needed because fuel oil are of the uncertain prohibitively expensive under study Solar energy by the U.S. Forest has a high potential an agency of Service for greenhouse heating major reasons 1. Solar energy 2. Designs A technology is and equipment solar source energy Solar energy employed widely is off-the-shelf components are generally considered manufactured. be stored can now. available now with greenhouses compatible 4. gas. are currently of Agriculture. Department for several 3. heating Propane cases. Alternative the for greenhouse sources energy and increasing cost of natural supply in the United distributed over form of heat the States. a storage in medium rock bed or i.e. tank. water PROJECT DEVELOPMENT A study feasibility The year study United square a The of 3418. consecutive some The that the is between of 512 days of cloudy a large Forest of 3 Service conifer seedlings Southwestern Region Btu per year in per of the and 5000 of solar greenhouse feet square billion the United in langleys and of clear a fossil fuels would be heating solar number of total and cold days The States for solar heating. mean nights and the weather minimize thermal low-temperature and greenhouses storage and site has hours of annual low probability of overall solar heating of the greenhouse was considered as Fiberglass does glass transmittance vandalism. was were used covering. Light for all polyethylene and low heat film. radiation its is structure Glass simplicity solar on and its the high and and solar system compatibility with Fiberglass has the is other less heat relative susceptible hand has and must be tempered to avoid This requirement implies a high initial cost and a heavy support 10 was decided it design. solar-heating calculations. transmittance not require a heavy support and and the to be a natural further analysis design. of because equipment After there appears storage system and the air-type the preliminary selected material-handling a systems. solar air-type in Thus air collector. of rock beds for the thermal floor plan containers properties regular savings Because of these factors Fiberglass glazing U-factors best the in one of the best is The combination combination rectangular seedling to produce 3 million containerized located annual would be selected for further study The design for basis detail. greenhouse affinity a providing energy. climate system requirements. in An daily solar radiation sunshine engineers would consist of 40000 facility solar Albuquerque several New Mexico of headhouse. by using mean competent has been completed. for a greenhouse facility States. feet realized The is Albuquerque in by prepared and operation construction a losses are low. to damage than very light high weather damage structure. and To evaluate the construction Heat considered. materials were losses objectively by looking calculated total the at economics life-cycle of replacing cost must heat lost be using natural gas. A glazed single have $4523 a structure annual a double-glazed A bill. $3014 a structure will The assumed $259. only fuel gas would have natural 4552500 requiring cubic structure double-glazed annual only fuel bill. With an 246000 require of natural escalation rate gas would of natural feet 2932300 requiring 14 percent A per year. to of feet however of gas and the annual feet gas was cubic solar-heating system active cubic be expected bill is standard compound amount factors for 15% per year gives factors of 6.7 20.3 47.6 and 102.4 10 15 and 20 years respectively. This compounding effect results in more and more table of 5 for savings each system capital This year. value of saved fuel used is to the determine payback for the solar investment. SUMMARY my In opinion solar-heated and is The next step in implementation be awarded am site for producing in fiscal confident with this project will opportunities for opportunity The to establish number a a developing concept design is innovative of dispersed smaller States and private industry. of construction for construction year 1977 October best seedlings. the preparation is package ready that new have engineers the presents container an opportunity units in cooperation to a complete leading I Albuquerque modularized which provides greenhouse solar the greenhouse 1 30 1976 to September stimulate for planning further of use and specifications drawings Construction bids. could then 1977. solar something new contracts and Architects energy. under the sun-solar-heated greenhouses. Reading Further Resource Publications Development Equipment Seedling Center EDT Missoula 2340 Greenhouse solar IBG energy controls P.O. 3 Mont.-1 and Costs a Greenhouse 2 notebook benches Design Ill. Portfolio in Costs of Jan. Tree for Study. 1976 newspaper glazing and 2A Computer Program Instrumentation parts and Design Environment A Cope Equipment Service survey on structures handling RF400 A a Controlled 60090-1 catalog materials Forest Agriculture Greenhouses 3 Comparing 4 Greenhouse Box 100 Wheeling greenhouses equipment humidification in of Growing Seedlings Design Growing Tree Seedlings Roper Corp. Department U.S. cooling heating watering supplies on and with drawings. Hand-book National Greenhouse Greenhouses Lord Parts Burnham Co. P.O. Supplies Division for Greenhouses Box 100 Pana and Accessories 62557-1 2 hobby Ill. Catalog greenhouse flyers Burnham Corp. Irvinton-on-Hudson N.Y. Parts and Supplies. 11 No. 121-1976 and price 10533-l list. POLYESTER RESIN ANCHORAGE SYSTEM PORTAGE DAM PRAIRIE Gary Zone Schulze B. Materials Engineer National Superior Prairie anchored The an arched is a ledge rock in to the ledge with rock ledge affected The Dam Portage constructed by rock The rock anchorage system by the hole are governed between the sufficient minute bars were Grade 60 a 1-3/8 in to situation in this jacking bridge pullout test bearing this bar and rested set-up at size The governed is diameter reinforcing the considering a point four test feet the there size The viscosity space must be viscosity and requiring one was used. The cartridges was questionable rock amount on each anchor as sufficient to of fracturing test in a jack the pullout the ledge. well as the A correct size and number of the holes chuck cylinder jack tests resting after on the of resistance Consequently of the bar was specified side bridge. homemade and pullout on the bar with Jacking would not be the the annular fill bar and cartridges bars. fractured bar long is pieces. of catalyst cartridges of the resin. 10 is dam jointed sheared and and number of The medium with the of slabby or platey the It spillway. deep feet and overturning. cross size by components hole assure anchorage. would on the jacking highly consists bars. by the application. into this highly required to sliding preproportioned reinforcing hole governed immediately surrounding anchor The bar. 7 deformed anchorage placement were the is time grout setting Adequate prepackaged type wide and 12 medium-grained granite utilizes an ogee with resistance to assure proper mixing of the two space feet and bar size there must be enough grout to size the dam gravity about 170 to provide and deformed time of the grout setting rock and hole is the foundation area typically in hardener polyester resin that anchors metamorphosed is frost. specific concrete channel Forest 9 Region that fitted arrangement mated a for use in the the jack over the with the bar After drilling the were inserted broke the cartridges bars holes the and rotated into using and mixed the components for a few minutes to allow the of 18000 pounds. resin 12 were placed grout. they The bars were were tested for a them. The rotating bars in The regular jackhammer. a of the to harden before cartridges left undisturbed pullout resistance Legend a-Chuck c-Jacking Bridge b-Cylinder Jack d-ridge Bearing 13 e- Bar Bars set the in minutes holes water-filled pullout test because the same use and have grout bar passed ambient temperatures Polyester resins performed the of 70F. many The applications work. overhead and by inexperienced setting grout setting Inc. Box 33024 The use would eliminated Co. Point bolting Both the and setting Place hardened has $1.00/cartridge to grout more fast tension the bar at to position-even times allow combinations setting grout for and structural any in is are easy they mounting be used time setting to be the bottom and hold polyester resin used for this job was manufactured contractor bar threaded easier placement need for a homemade Blvd. resin bottom The strength Division 1560 North Maryland applications and Forest anchorage in and of the deformed bars used on removal apparatus. 25th Avenue 21219 of a jacking Melrose markets construction system described it has effective. 14 plate until and slow by Celtite Park Dywidag engineers proven to be on this the Construction Inland-Ryerson has hollow cylinder jacks also Service lieu and chuck Baltimore and anchorage polyester purposes. The one minute machine anchors The various personnel. After test. less than the failed Cleveland Ohio 44133. Post Tensioning North allow Only one anchor the time of the test. After a few at pullout cable as for pretensioning above. provided the such viscosities hardened. of a high have various hole grout has 18000 pound the concrete slow well as bars set in dry holes. cartridge form are not expensive in used in the same as had not hardened Illinois threaded available were very relatively project bar and Products 60161 bars or 4601 for rock for rent. pleased with the inexpensive simple WASHINGTON OFFICE NEWS STANDARDS CONSULTATION C. R. Weller Assistant Director PRESS-LAM BRIDGE PROJECT The Forest Service Forest Products Laboratory makes to less than 1 from days down veneer lathe with the State of Virginia to design construct and cooperating is manufactured by a new method timber bridge to cut wood the hour. more efficient The secrete of of use this logs and reduces fabrication rapid high-yield system a hot press to dry it and glue and another is the time the use press to put a test The process developed by Press-Lam. called it of a back together. Sections is of green clipped The veneer the desired heated logs to ease cutting and placed into sheets sheets-still hot-are coated thickness reached. The is with sheets glue and cut to are up peeled into veneer are in a hot press where heat to 1/2-inch and pressure quickly thick. dry the assembled one on top of the other accommodate the depth of the This wood. until member to be fabricated. For the purpose of veneer will Coastal Douglas project this be clipped it the Lab has peeled 4-foot from the Mt. Hood NF curbs and britlie railing will be fabricated The Press-Lam NF Washington 18 feet long completed The will field Federal Highway Reports will will be constructed be designed or during be used for the deck panels and on the Virginia State Highway HS 20 loading. fabrication Installation and laboratory by the Virginia Highway The and The stringers. The NF. 610 structure initial field in 26 the feet tests George wide by should be testing FPL installation by the either a movie or slide tape on the project. by the Laboratory and the Council. 15 by Research Council. The Office of Development Administration plans to prepare be prepared Virginia. veneer. depth requirements. the spring of 1977. involves effort testing for into.42-inch stringer of oak from the George Washington about 25 miles north of Harrisonburg this fall cooperative State and bridge will log sections widths to meet into approximately 21-inch GUIDELINES FOR DETERMINING Warren D. of Guidelines publication of culmination Bulletin The Director Fairchild Number several of the U.S. Water of work by the Council announced has Flow Frequency. The new for Determining Flood years Resources Councils Hydrology report Committee and the is the this is 17 issued by the Committee. Guidelines exceedance FLOOD FLOW FREQUENCY contains probabilities available. Utilization represent a of by procedures forward flood defining where for watersheds the step significant for procedures - defining upon studies of Peak records and interpreting flood and discharge flood Councils member agencies the in -eak potentials systematic flows and States hazards in are will the flood in Water plain areas of the Nation. Procedures selected were Resources of the Hydrology Committee. The WO University Watershed Determining Flood copies may based at Austin Management Staff Flow Frequency to be obtained Office Washington of Texas DC from the has done at the Center for Research and on studies by the members of the Councils obtained to distribute 16 is copies National of Documents Superintendent 20402. The stock number sufficient the Forest U.S. 052-045-00031-2. of Guidelines level. Government The price is for Additional Printing $3.90. TECHNOLOGICAL IMPROVEMENTS Heyward Taylor T. Assistant Director ASTM ELECTS PELZNER Adrian Pelzner Chief Chairman of the ASTM. ASTM a is standards Materials Middle to for specifications methods test formed for Office was the systems services consensus and classifications promotion the elected and Materials of voluntary practices and recently for Testing development recommended definitions products materials Washington the in of the American Society District corporation nonprofit relating Engineer Atlantic of related knowledge. The Middle Atlantic Virginia advance We the are pleased its publications and job of managing procedure is In addition technical the level-in local Forest particular Service engineer at the are organized promotion to of the to an important post in a outside Center the receive system report of the with those that will are adopted revised procedures part of a continuing concise clear effort to insure reports to assist them in Forests. are in the field not properly to get useful each and two All to Field is that The recentlyadopted reviewed comments are Units. or executives of the use of language explained. manuscript users. 17 because information researchers and completeness accuracy reviewers Center is development engineers to assure technical to the normal MEDC recently Missoula These new procedures needs ordata designed experts of this information MEDCs of the communicate technicaljargon Center the Nations objective reports satisfy fail to. election reports. who most need their may a of Maryland States districts standards. Development those Often on society ASTM REPORTS PROCEDURES that The primary of Columbia. District society. PUBLICATIONS The Equipment the the 1800 members and encompasses the over and the consensus to report major professional for of objectives of voluntary concept has District part of West Virginia is- but 400 review and user understanding. by a minimum analyzed of two by the author and if review appropriate the manuscript. for review has been gratifying and most in figure 1 depicts the procedure. Responses to taking The diagram into are incorporated their MEDCs requests job seriously and are making a commendable effort helpful. Reviewers are to keep the review procedure on schedule. AUTHOR EDITOR CONTROL PLANNER USER TYPE F I OTHER FOR COMMENT REVIEWERS AUTHOR REWRITE I EDITOR EDITING MANAGEMENT REVIEW PRODUCTION Figure 1. MEDC Review 18 Procedure. TECHNICAL OPERATIONS Harold Strickland L. Assistant Director WASHINGTON OFFICE TOUR OF DUTY the During all Tour Regions on March policy The to Regional policy is A 2. When you determination A factor be will for the position 3. a to be into the will it made Legislative b. Time on a need for transmitting a by the final Staff. under 6133.51d and should be for a procedure for returning to the field people limit. enhances performance significantly the determining WO was which was reviewed memorandum and the provides and there policy best qualified case-by-case basis when candidates for that the evaluation in a position position. criteria is it This developed filled. provide a. 5-year Office experience in that suggested Service Manual Forest read this. Basically development required minimum it was it This resulted in a draft Chief issued a 6130 the the suggested Washington as meeting Policy. tour of from 2 to 5 years suggested be used 23 1976 being incorporated prior to their reaching will of Duty Foresters Station and Area Directors released by the time 1. RFD 1975 January Office Washington plan GS-13 for each for the following types or above coming into the WO. As a of experience training. for observing Congressional Committee preferably activities related to Forest Service matters. c. d. Time f. g. observing Executive interactions e. for Short process with Forest work House and Senate exposure with emphasis on USDA and OMB relationships to and Service programs. assignment Opportunity to meet in the individuals top-level Exposure to other agencies the employees activities. current and/or Forest area of special Service managers. and organizations future interest. assignment. 19 in the areas which have an impact upon Opportunity h. assistance to visits to to travel Regions the on field and program reviews activity and Areas Stations which the employee and technical might not be familiar with. i. Opportunity to participate which are The Chiefs memorandum This covers policy from dialogue all an extremely of levels of a Washington employees especially to difficult continued without effectiveness of possible are knowledgeable Engineering supports issue of and our organization. assignment to aspire in the Forest how the above policy and is are the the include that as 20 statement of a great deal of over-emphasize positions. The opportunities many accomplished especially those development full assignment. presently working implementation. result cannot I Office Service things is to courses area. the following leadership policy a Washington the contains policy Office covered training D.C. metropolitan critical who those experiences obtain this transmitting importance developmental advanced management in only in the Washington available It is list which vital to of our employees at the National with Personnel the of our of are the as level. Management on TO READERS OF INVITATION FIELD NOTES Every reader short a potential is you would article FIELD NOTES author of an like with FIELD NOTES. Service Washington Office you have a news item or you to submit invite should for publication Regional Office to see that respective we engineers If it to for publication. submitted to the Material share to for article be reviewed by the the information is current timely technically accurate informative and of interest to engineers Service-wide 7113. The length of material submitted may vary from several short sentences to several typewritten pages however short articles news or should be typed are preferred. and double-spaced black and white photos. Each Region questions items FSM has an Information The McCabe submitted to the material Coordinator to and material for publication. whom field Ted Wood R-5 Jim Strohschein R-6 Kjell Bakke R-8 Ernest Quinn Allen R-3 Bill should direct questions USDA Forest Engineering Attn 12th glossy submit both R-9 Norbert Smith R-10 Frank Muchmore WO Al Colley editing publishing dates and other Service Staff Gordon L. Room 1108 RP-E Rome or Rita E. Wright Independence D.C. Washington McCoy concerning format problems to should or are Coordinators R-4 Bill R-2 personnel Office Washington should be original drawings Groven R-1 Coordinators All all illustrations Ave. S.W. 20250 Telephone Area Code 703-235-8198 This publication is distributed from the and Area Headquarters. Office sent to Manager your or the office. If you are Regional Copies of not Washington now Information back issues Office directly to all Regional receiving a copy Coordinator are and would to increase also available like the from the one number Washington Station ask your of copies Office.