V/T SIC Vehicle/Track System Interface Committee Vehicle/Track SIC Remit Issue (02) 01 June 2011 1 Introduction 1.1 System Interface Committees shall be comprised of Members, who shall consist of representatives of the Industry Categories, a Chair, Participants and Observers 1.2 The Vehicle/Track SIC (V/T SIC) was established to provide the focus for the interface between the vehicle wheel and the rail and between the vehicle and track interaction. 1.3 This document outlines the remit for V/T SIC to undertake its business, including its Purpose, Objectives, Scope, Specific Actions and Structure. 2 Purpose of the SIC 2.1 The purpose of the Vehicle/Track System Interface Committee shall be to assist the Railway Industry to manage all aspects of the vehicle / track system interfaces in a safe, cost effective and efficient way 2.2 The scope of the V/T SIC includes relevant aspects of human factors, managerial, and process issues as well as technical engineering matters. 3 Objectives of SIC V/T SIC will aim to: Define the geometry condition of the wheel/rail interface. Set out permitted track geometry ie. Curve radius, installed cant, vertical curvature etc. Define the permitted track conditions for the type of track eg. Mainline. Identify the allowable wheelset parameters, ie. gauge, conicity, profile, axle load for the trains that operate on the network. Maintain the wheel/rail interface within the prescribed limits and ensure safety of the railway. Implement processes to ensure sustainability of the railway. Ensure systems exist for seasonal maintenance activities and revised to account for seasonal variation Utilise systems to monitor the condition at the wheel/rail interface. Data collected by these systems is to be analysed and distributed to the appropriate party for the monitoring of performance and programme rectification activities. 3.1 V/T SIC will sponsor Research & Development projects relevant to its scope, through acting as client for projects managed within the RSSB R&D programme. The aim of this research is to provide the knowledge and information necessary to support key decisions made by the SIC and advice given by it to the industry. 3.2 The Committee will review relevant research and work undertaken by other groups (outside its Working Groups) and decide if it should promote that work within the industry. Page 1 of 3 V/T SIC Vehicle/Track System Interface Committee 4 Membership of SIC 4.1 The current membership of the committee will comprise of representation from: Passenger train operators ROSCOs Non-passenger operators Infrastructure managers Infrastructure contractors ORR DfT Suppliers RSSB 4.2 Supporting technical and operational expertise will be invited as and when required. 5 Disclosure of Interests 5.1 Disclosure of Interest applies to both SIC and Sub Groups alike and Issue 4 of the SIC Protocol, section 6.4 states: 5.2 If a member, or a person for whom that member works, has a direct or indirect personal interest in a matter to be discussed by the committee, as distinct from a common interest of the industry category as a whole, the member shall declare that interest to the Chairman of the committee of which they are a member at the earliest opportunity: 6 a) On the first occasion at which the matter is discussed, or b) If a member is not aware of an interest at that time, at the next committee meeting after which they become aware of that interest, regardless of whether the matter is being discussed at that meeting. Specialist Skills and Knowledge 6.1 The SIC will review members' skills and experience to ensure the SIC scope of work and objectives are suitably achieved. 7 SIC Funding and Budget Management 7.1 Representation by the stakeholders on the V/T SIC shall be in kind. 7.2 Funding for specific packages of research and development will be made available from RSSB subject to support from the System Interface Committee and authorisation by RSSB 8 Process to elect and appoint new members / chairpersons 8.1 The V/T SIC shall follow the election process for new members or a new chairperson as set out in SIC Protocol Issue 4. 9 Organisation / Operation of Meetings 9.1 The V/T SIC may regulate its proceedings as it sees fit providing they meet the objectives of this remit. Page 2 of 3 V/T SIC Vehicle/Track System Interface Committee 9.2 Unless otherwise decided by the V/T SIC, it shall meet at least once every four to six weeks. 9.3 Where applicable, the V/T SIC shall form a separate sub group to review and report on specific issues. The Sub Group will be the forum for the discussion and identification of issues and system enhancements relevant to the remit of the group and the subsequent development of work streams to identify appropriate solutions suitable that can be recommended to the V/T SIC. 9.4 The meeting frequency will be decided at the discretion of the sub-group chairman and the requirements of the SIC. 9.5 The meeting will operate to a pre-agreed agenda. 9.6 If there are insufficient agenda items to be discussed at any single meeting the Chairman will, with consultation, cancel the meeting with a minimum of five working day’s notice. 10 Meeting Quorum 10.1 A meeting quorum comprises 5 members (in accordance with Section 4.1) or their nominated alternates. If a meeting is not quorate, decisions will be taken in agreement with Section 11.1.1 of this remit. 11 Delegation of Authority 11.1 Decision Making 11.1.1 If the meeting is not quorate absent members will have two weeks after the meeting to make an objection to any decision taken in the meeting. If no objections are made the decision will stand. 11.2 Reporting 11.2.1 12 The V/T SIC will submit an annual report to TSLG. Administration 12.1 Minutes 12.1.1 Draft minutes will be reviewed by the RSSB Technical Expert, RSSB Research and Development Member and then by the Chair before distribution to the group. 12.1.2 The draft minutes will be distributed to the group via group email. 12.1.3 The draft minutes of each meeting will be approved at the following meeting. 12.1.4 The final approved minutes of each meeting will be distributed to the group via group email. 12.2 Meeting Documentation 12.2.1 The meeting documentation will be provided to the group no later than five working days prior to the meeting. 12.2.2 The meeting documentation will be distributed to the group via group email. 12.3 Remit Review 12.3.1 This remit shall be reviewed by the V/T SIC every two years. 12.3.2 Any amendments shall be endorsed by the V/T SIC. Page 3 of 3