V/S SIC Programme of work 2012 - 2015 V/S SIC PROGRAMME OF WORK Issue number: July 2014 Calendar Year 2013 Q1 Q2 High level objectives [and how they relate to the long term outputs in CP5 ] Supporting workstreams 1. INFRASTRUCTURE GAUGING Support & inform the development, management, maintenance and publication of infrastructure gauging information, associated vehicle characteristics and the requirements for ensuring compatibility. Supports: availability, capacity, cost efficiency. 1.1 Platform stepping distances 1.2 Developing electronic means RIS published of holding vehicle gauging data Q3 Q4 Calendar Year 2014 Q1 Q2 T1037 Report T1037 Q3 Q4 Calendar Year 2015 Q1 Q2 Q3 Q4 Initial outputs of Input to PTI T1037 Strategy Group (Nov) Consider R2 development. Input to developments of requirements for gauging 12 month location, rules database. review and organisation to hold VGD Update to changes in NGD 1.3 National gauging database 1.4 National rules for gauging for placing into service 2. FUTURE GAUGING Develop a vision for of a credible and sustainable future gauge capability across the national rail network which optimises the needs of customers and funders. Supports: capacity, cost efficiency. 2.1 Provide input to Route Utilisation Strategies and other gauging/load capability documents. Discussion with stakeholder group Evaluate feedback from TSLG C:\Users\twalters\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\LB1YQ8PU\VS SIC Programme_v1 0 Input into Interoperability RUS Publish revised LSG, LSVG and LSIG in GM/RT2173 and GI/RT7074 Page 1 V/S SIC Programme of work 2012 - 2015 Calendar Year 2013 Q1 Q2 High level objectives [and how they relate to the long term outputs in CP5 ] Q3 Q4 Calendar Year 2014 Q1 Q2 Q3 Q4 Calendar Year 2015 Q1 Q2 Q3 Q4 Supporting workstreams Developed 1. GAUGING INFRASTRUCTURE GAUGING 1.1 Platformcomplete stepping distances 3. CLASSIFICATION 3.1 develop lowergauge & inform theclassification sector gauge for vehicles and Support and develop development, management, methods that simplify access to infrastructure maintenance andnetwork. publication of the national rail infrastructure gauging Supports: capacity, cost efficiency. information, associated vehicle characteristics and the requirements for ensuring compatibility. Supports: availability, capacity, cost efficiency. 3.2 Development and publishing of 'Suburban' gauge a) 20 m ------------------------------------b) 23 m Discussions with T1037 Network Rail and ORR Publish report Develop RGS on suburban text for GE/RT gauge. Consider 8073 options to take this forward. Expert review of PG1 (20 m) GE/RT8073 text ------------------23 m gauge variation scope agreed Project on hold 3.3 Develop a new locomotive gauge SC visits for gauging documents -----------------23 m development work Consultation Publish revised LSG, LSVG and LSIG in GM/RT2173 and GI/RT7073 Consultation on RGS --------------23 m gauge finalise. Submit request to include in GE/RT8073 consultation Publish Project startup? 3.4 Development and publishing of 'Intercity' gauge 3.5 Consideration of further gauges and removal of obsolete gauges Consideration of obsolete gauges Consultation on RGS 3.6 Support GB input in development of EN15273 and European Gauging Standards EN15273 revision published. UK input C:\Users\twalters\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\LB1YQ8PU\VS SIC Programme_v1 0 Publish Drafting complete Page 2 V/S SIC Programme of work 2012 - 2015 Calendar Year 2013 Q1 Q2 High level objectives [and how they relate to the long term outputs in CP5 ] Q4 Calendar Year 2014 Q1 Q2 Q3 Q4 Calendar Year 2015 Q1 Q2 Q3 Q4 Supporting workstreams T1037 1. GAUGING INFRASTRUCTURE GAUGING 1.1 Support Platformwork stepping distances 4. INTERFACE 4.1 on defining & & inform theappropriate validating statistical Support and develop development, techniques formanagement, optimising the methodologies for clearances maintenance and publication vehicle / structure interface. of infrastructure gauging Supports: capacity, cost efficiency, information, associated vehicle safety. characteristics and the requirements for ensuring compatibility. Supports: 5. GAUGINGcapacity, & THE cost availability, ENVIRONMENT efficiency. Providing guidance to non-rail agencies / bodies about the impact of rail on the environment 6. INFRASTRUCTURE LOADING Support and inform the development, management, maintenance and publication of infrastructure loading capability information, associated vehicle characteristics and the requirements for ensuring compatibility. Supports: availability, capacity, cost efficiency, safety. Q3 6.1 The effect of railway traffic on embankment stability (T679) [safety] Project resumed Project concluded T1066 start 6.2 National rules for infrastructure loading 7. ROLE OF THE SIC 7.1 Publish V/S SIC bulletins Establish the SIC as an optimising industry stakeholder / client group for the review and development of vehicle to structure interaction strategies, statutory requirements, and 8. ROLE OF THEstandards SIC 8.1 Provide input to work of TSLG Support and inform the industry's Rail Technical Strategy including consideration of long term vehicle/structures interface strategies Review model feedback from NR Gauging bulletin V/S SIC seminar Engaging with EIT initiative Support EIT innovation call V/S SIC bulletin Seminar? Annual report to TSLG C:\Users\twalters\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\LB1YQ8PU\VS SIC Programme_v1 0 Seminar? Support NR as champion for the Infrastructure RTS Chapter Page 3