Building Data Entry Form -- HEADER SHEET Unit: Bldg ID # : Bldg Name: Location: Bldg. Category/Subcategory: Size (GSF): Maintenance Level: Remoteness Factor: 1.15 Historic Status: Inspector Name: Inspection Date: Year Constructed: Year Surveyed: Benefitting Function: (Fill in: If Roaded Remote, 1.15; Wilderness/Primitive Remote, 1.5; 1.5; Roaded Remote & Historic, 1.65; Wilderness Remote & Historic (Fill in: E=eligible, I=ineligible, L=listed, U=undetermined) NFFA (Fill in: NFFA(facilities), QMQM(quarters), NFRM(recreation), NFFV(reforestation), NFRV(range), NFHR(heritage), etc.) NOTE: Information entered on this sheet is automatically transferred to the following spreadsheets. Historic, c, 2.00) Building Data Entry Form -- ANNUAL MAINTENANCE Unit: Benefitting function: Maintenance Level: Remoteness Factor = 0 NFFA 0 1.15 Bldg Cat.: 0 Location: 0 PRIORTITY for FUNDING: CSI Division Bldg ID #: Bldg Name: Size (GSF): Historic : 0 0 0 0 Inspector Name: Inspection Date: Year Constructed: Year Surveyed: 1 High Safety Hazard 2 Safety Hazard 3 Structural Hazard 4 Not According to Code 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have Measurements Quantity Units Description 101000 GENERAL AND SITE WORK Cost/unit General and Site Work Totals: Annual Maint Cost H&S Res $0 0 01/00/00 0 0 Funding Priority Mis $0 $0 Division 1 - General General Management Misc. Annual Maintenance and Repair (Small Items, Break Downs) aviation - .50, crew - .36, office - .50, residence - .30, school - .75, service - 1.50, storage .23, watchtower 6.12. All costs are per s.f. of floor area Direct costs only including specific proj prep, procurement, and, Contract Administration ( .50 s.f. of floor area ) 0 SF-Flr Area $0.30 7 0 SF-Flr Area $0.50 7 7 7 SF SF SF LS $0.04 $0.18 $1.00 $10.00 7 7 7 7 SF LF LF SF $0.02 $0.11 $0.32 $0.18 7 7 7 7 7 7 Other Other Division 2 - Site Work Driveways, Parking Sidewalks, Trails Signage, Exterior Site Drainage Landscaping Irrigation System Fences, Guard rails Wood Decks, Wood Exterior Stairs Other Other Seal Coat, Repaving, Restripping, Grading, Rock Replacement, etc ( .04 / s.f. of driveway) PMR&R ( .18 / s.f. of walk or trail) PMR&R ( actual-site specific ) Culvert, Catch Basin, Ditch Clearing ( actual-site specific ) Tree Removal, Trimming, Plant Replacement ( city-type sites only ) (not lawn mowing or upkeep of grounds) PMR&R ( $.11/LF if separate system from domestic water ) PMR&R (Cedar: .32/lf, Wire or Chain Link: .29/lf) PMR&R (treated: .07/sf, untreated: .18/sf) 202000 ARCHITECTURAL WORK (Divisions 3 to 14) Division 3 - Concrete Foundations, Slabs Retaining Walls Precast, etc. Other Other Division 4 - Masonry Foundation Walls Retaining Walls Chimneys Masonry Fireplace Veneer, panels, etc. Wall Construction Other Division 5 - Metals Structural, Ornamental (See Painting) Rails, Posts, etc. Pipe Rail Lookout Guy Cables and Anchors Other Division 6 - Wood Roof Framing Architectural Totals: PMR&R ( Crawl Space/Slab/Pier: .03 s.f, basement: .08/SF floor area ) PMR&R ( actual-site specific ) PMR&R ( actual-site specific ) 0 SF-Flr Area SF SF PMR&R (CMU - .03 s.f of floor area if crawl space - .08 s.f if basement), (BRICK - .20 s.f of floor area if crawl space - .53 s.f. if basement), (STONE - .33 s.f. of floor area if crawl space - .88 s.f. if basement) Tuck Pointing, Silicone Sealer, Expansion Joint Caulking ( actual-site specific ) $100 per year, per flue $100 per year, per fireplace Brick .27 and stone .50 per s.f. of wall area PMR&R (.06/sf floor area) SF-Flr Area SF EA EA SF-Wall Area SF-Floor Area PMR&R PMR&R PMR&R PMR&R EA EA LF LS ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) PMR&R Truss/Joist/Purlin (.02/sf top floor area) SF Page 3 $0.03 $0.18 $100.00 $100.00 $0.06 $0 $0 $0 7 7 7 7 7 7 7 7 7 7 7 7 $0.50 7 7 7 7 7 $0.02 7 9/3/2004 Building Data Entry Form -- ANNUAL MAINTENANCE Unit: Benefitting function: Maintenance Level: Remoteness Factor = 0 NFFA 0 1.15 Bldg Cat.: 0 Location: 0 Bldg ID #: Bldg Name: Size (GSF): Historic : 0 0 0 0 0 01/00/00 0 0 PRIORTITY for FUNDING: CSI Division Wall Framing Floor Framing Roof Sheating Wall Sheathing Exterior Siding and Trim (See Painting) Interior Trim (See Painting) Interior Stairs Structural Glulams/Heavy Timbers (See Painting) Timber LO Tower Structure Other Division 7 - Thermal & Moisture Protection Insulation, Vapor Barriers Fire Stopping Roofing, incl. Flashings Gutters & Downspouts Skylights, Hatches Grilles, Louvers Metal/Vinyl Siding Caulking Other Other Division 8 - Doors & Windows Doors & Frames - Exterior Doors & Frames - Interior Windows & Frames Hardware-Locks, Keys, Closers - Ext Hardware-Locks, Keys, Closers - Int. Weatherstripping Screen Doors & Frames Other Division 9 - Finishes Sheetrock, Plaster Acoustical Ceiling Hard Floors--Wood, Vinyl, Tile, Stair Treads Carpeted Floors--incl. Stair Treads Hard Wall Surfaces Wall Coverings ( vinyl ) Painting-Exterior Painting-Interior Other Other Division 10 - Specialties Toilet/Shower Partitions Flag Pole Fire Extinguishers Bulletin Boards 1 High Safety Hazard 2 Safety Hazard 3 Structural Hazard 4 Not According to Code 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have Measurements Description Quantity Units 0 SF PMR&R (Stud:.023/sf floor area, log:.05/sf floor area, pole:.05/sf floor area) PMR&R (sf floor area) SF PMR&R (sf top floor area) SF PMR&R (sf floor area) SF PMR&R, Rot/Mildew Control ( .10 s.f. of wall area ) SF 0 SF-Flr Area PMR&R ( .05 s.f. of floor area ) PMR&R (Per Flight) Flight PMR&R (.02s.f. of floor area) SF-Flr Area PMR&R ($8.10/per Tier/year) Tier Inspector Name: Inspection Date: Year Constructed: Year Surveyed: Cost/unit $0.023 $0.029 $0.012 $0.012 $0.10 $0.05 $27.75 $0.02 $8.10 Annual Maint Cost H&S Res Mis Funding Priority 7 7 7 7 7 7 7 7 7 7 PMR&R (.02 cents per s.f. of floor area) Inspection-Patching ( actual-site specific ) PMR&R ( wood shingle and shake - .23, standard metal - .10, standing seam metal .20, composition shingles - .10, single ply membrane - .15, built-up - .10, all costs per s.f. of roof area ) PMR&R (.43 cents per linear foot of gutter and spouts) PMR&R ( actual-site specific ) PMR&R ($1/sf of grill or Louver) PMR&R ( metal - .16 s.f, vinyl - .18 s.f. of siding ) PMR&R ( .02 cents per floor area) 0 SF-Flr Area $0.02 7 7 SF-Roof Area LF SF SF SF 0 SF-Flr Area $0.10 $0.43 $3.00 $1.00 7 7 7 7 7 7 7 7 PMR&R ( $40.00 per year per door ) PMR&R ( $20.00 per year per door ) Glazing, Glass Replacement, Entire Unit Replacement ( $30.00 per window) PMR&R (exterior doors - $50.00 per year per door ) PMR&R ( interior doors - $20.00 per year per door ) PMR&R ( $5.00 per opening, exterior doors and windows) PMR&R ($11/yr) EA EA EA 0 EA 0 EA 0 EA EA PMR&R (Sheetrock: .04, Plaster: .10, fiberboard: .02 per s.f. of floor area) PMR&R ( .10 per s.f. of actual area) PMR&R (wood - .34, vinyl - .35, ceramic tile -. 32, plywood - .04; all per s.f. of actual floor area) PMR&R (carpet - .28 per s.f. of actual floor area) PMR&R ( Tile: .32, Fiberglass: .18, Plastic: .17, Laminated Hardboard: .26, Wood Paneling: .07, Plywood: .04 of actual wall area) PMR&R ( .15 of actual wall area) Repaint every 5-10 years ( .10 s.f. of floor area ) Repaint every 5-10 years ( .15 s.f. of floor area ) PMR&R ($50.00 per year per stall) PMR&R ( $100.00 per year) One year & Five year inspections/tests ($15.00 per extinguisher) PMR&R ($30.00 per year) $40.00 $20.00 $30.00 $50.00 $20.00 $5.00 $11.00 7 7 7 7 7 7 7 7 0 SF-Flr Area SF $0.04 $0.10 7 7 SF-Flr Area SF-Flr Area $0.35 $0.28 7 7 SF-Wall Area SF-Wall Area 0 SF-Flr Area 0 SF-Flr Area $0.07 $0.15 $0.10 $0.15 7 7 7 7 7 7 $50.00 $100.00 $15.00 $30.00 7 7 7 7 Stall Ea Ea Ea Page 4 $0.02 9/3/2004 Building Data Entry Form -- ANNUAL MAINTENANCE Unit: Benefitting function: Maintenance Level: Remoteness Factor = 0 NFFA 0 1.15 Bldg Cat.: 0 Location: 0 Bldg ID #: Bldg Name: Size (GSF): Historic : 0 0 0 0 Inspector Name: Inspection Date: Year Constructed: Year Surveyed: PRIORTITY for FUNDING: CSI Division Signage-Interior Toilet & Bath Accessories Folding Partitions Tub/Shower Doors Other Division 11 - Equipment Gov't Supplied Kitchen Appliances Gov't Supplied Laundry Appliances Audio, Visual Equipment Food Service Equipment Waste Compactors Fume Hoods Specialty Equipment Tree Cooler Mech. Air Compressors Other Division 12 - Furnishings Lab Casework Systems Furniture Window Coverings Furniture & Seating Steel Cabinetry (per LF Top or Bottom) Wood Cabinetry (per LF Top or Bottom) Countertops Open Wood Shelving, 6' high Other Division 13 - Special Construction Prefabricated Structures Greenhouses Other Other Division 14 - Conveying Systems Elevators Wheelchair Lifts Hoists, Cranes Automobile Hoists Other Other PMR&R PMR&R PMR&R PMR&R 1 High Safety Hazard 2 Safety Hazard 3 Structural Hazard 4 Not According to Code 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have Measurements Description Quantity Units - included in genral ($25.00 per year per bathroom) Bathroom ( actual-site specific ) ($20/yr/ea) EA PMR&R PMR&R PMR&R PMR&R PMR&R PMR&R PMR&R PMR&R PMR&R ( actual-site specific ) ( Residence - $150.00 per year, Crew and others $300.00) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) ( $2000.00 per year ) ($200/hp/yr) 0 01/00/00 0 0 EA EA PMR&R ( actual-site specific ) PMR&R ( actual-site specific ) PMR&R ($20.00 per window) PMR&R ( actual-site specific ) PMR&R ($8/LF cabinet) PMR&R ($13.00 per LF of cabinet, incl.bath, kitch, recept.counters, etc.) PMR&R ($0.83/LF) PMR&R Annual Maint Cost H&S Res Funding Priority Mis 7 7 7 7 7 $25.00 $20.00 $20.00 $15.00 7 7 7 7 7 7 7 7 7 7 Kitchen Tree Cooler hp 0 Window LF LF LF LF $2,000.00 $200.00 7 7 7 7 7 7 7 7 7 $20.00 $8.00 $13.00 $0.83 $5.00 PMR&R ( actual-site specific ) PMR&R, Glazing, Vents/Louvers, Controls, Curtains, Benches, Irrigation System, Kool Cell Pads, etc. (Actual Site - Specific) 7 PMR&R, Service Contract, Annual & 5 year Inspections ( actual-site specific ) PMR&R, Inspections ( actual-site specific ) PMR&R, Inspections ( actual-site specific ) PMR&R, Inspections ( actual-site specific ) 7 7 7 7 7 7 7 7 7 315000 MECHANICAL WORK Division 15 - Mechanical Fire Sprinklers Plumbing Seasonal Start Up & Shut Down Fixtures-Toilets, Lavs, Showers, Hose Bibs, Fountains Backflow Preventer Water Softner, Filter, Deionizer Hot Water Heater Cost/unit Mechanical Totals: PMR&R, Inspections, Tests, Flushing ( .09 s.f. of floor area ) Below includes all supply/waste/vent piping PMR&R ( $600.00 per year ) PMR&R ( $30.00 per fixture ) PMR&R ( $10.00 per year) PMR&R, Inspections, Tests ( included in water systems) PMR&R ( $100.00 per year) PMR&R, Flush, Test Press Relief ( $50.00 per year) SF-Flr Area Page 5 $0.09 Ea EA Ea $600.00 $30.00 $10.00 Ea Ea $100.00 $50.00 $0 $0 $0 7 7 7 7 7 7 7 7 9/3/2004 Building Data Entry Form -- ANNUAL MAINTENANCE Unit: Benefitting function: Maintenance Level: Remoteness Factor = 0 NFFA 0 1.15 Bldg Cat.: 0 Location: 0 Bldg ID #: Bldg Name: Size (GSF): Historic : 0 0 0 0 Inspector Name: Inspection Date: Year Constructed: Year Surveyed: 1 High Safety Hazard 2 Safety Hazard 3 Structural Hazard 4 Not According to Code 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have Measurements Description Quantity Units PMR&R, Fill with Water ( $5.00 ) Ea PMR&R ( $40.00 ) Ea PMR&R ( $20.00 ) Ea PMR&R ( $20.00 ) Ea PMR&R ( $20.00 ) LS PMR&R Ea 0 01/00/00 0 0 PRIORTITY for FUNDING: CSI Division Floor Drains Sump Pumps Radon Vent System Sewage Ejector Gas Piping Water Meters Heating, Ventilation Furnace, Boiler Electric Baseboard/Wall Heaters Air Handler, Louvers, Grilles, Dampers, Radiators, etc. (add to Boiler) Wood Heat Stove Air Ducts, Diffusers, Registers Exhaust Fans PreFab Chimney Humidification System Air Conditioners, Chillers (incl. Pumps, Valves, Coils) Temperature Controls Piping & Duct Insulation Walk-In Coolers, Freezers Air Compressors Other Other PMR&R, Service Contract, Inspections, Tests, Cleaning ( $.22 per year per SF Floor Area ) PMR&R ($.09/yr/SF Floor Area) PMR&R, Service Contract, Inspections, Belts, Filters PMR&R PMR&R (Plate Steel: $100/yr, Cast Iron: $120/yr) PMR&R, Inspections, Rebalancing, Cleaning PMR&R $100 per year, per chimney PMR&R PMR&R, Start Up, Shut Down, Inspections, Balancing, Tests, Service Contract ( .08 per s.f. of floor area) PMR&R, Service Contract, Calibrate, Training PMR&R PMR&R PMR&R (per Horsepower) SF-Flr Area SF-Flr Area Ea SF-Floor Area EA SF-Floor Area EA EA $0.13 $100.00 $0.01 $6.67 $100.00 SF-Flr Area EA SF-Flr Area SF-Flr Area HP $0.11 $3.00 $0.01 $1.13 $200.00 416000 ELECTRICAL WORK PMR&R ( Distribution Syst., if Gov't-Owned, per LF ) PMR&R (Per SF Floor Area) PMR&R, Bulbs, Ballasts, Cleaning ( .13 per s.f. of floor area ) PMR&R, Service Contract, Testing (Office, Multi-unit: .06 s.f. of floor area, SingleFamily: .03 SF Floor Area ) PMR&R PMR&R ( $10/Bldg ) PMR&R, Testing ( $10.50/kw ) PMR&R ( actual-site specific ) PMR&R ( Offices: .25, Residences: .13, Other: .05 s.f of floor area ) PMR&R (per Panel) Fire & Smoke Detection System Lightning Rod Protection System Carbon Monoxide Detection System Stand By Generator Security Systems Data, Telephone, Sound, Cable TV, Solar Array & Wiring Other Other Annual Maint Cost H&S Res Funding Priority Mis 7 7 7 7 7 7 7 $0.22 $0.09 Electrical Totals: Division 16 - Electrical Power Distribution, Cables, Transformers Meters, Panels, Breakers, Fuses Lighting-Exterior/Interior/Emergency/Exit Location Factor or Multiplier = Cost/unit $5.00 $40.00 $20.00 $20.00 $20.00 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 $0 $0 $0 LF 0 SF-Flr Area 0 SF-Flr Area $1.25 $0.03 $0.13 7 7 7 SF-Flr Area EA EA kw $0.03 $12.50 $10.00 $10.50 SF-Flr Area EA $0.13 $50.00 7 7 7 7 7 7 7 7 7 1.15 TOTAL Page 6 $0 $0 $0 9/3/2004 Building Data Entry Form -- DEFERRED MAINTENANCE Unit: Remoteness Factor = 0 Benefitting Function: NFFA Bldg Cat.: 0 Location: 0 Maintenance Level: 0 Bldg ID #: Bldg Name: Size (GSF): Historic : 1.15 PRIORTITY for FUNDING: CSI Division Description 0 0 0 0 Inspector Name: Inspection Date: Year Constructed: Year Surveyed: 0 1/0/1900 0 0 1 High Safety Hazard 2 Safety Hazard 3 Structural Hazard 4 Not According to Code 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have Measurements Deferred Maint Cost Deficiencies Quantity Units Cost/unit H&S Res Mis 101000 GENERAL AND SITE WORK General and Site Work Totals: $0 $0 Funding Priority $0 Division 1 - General Other Other Division 2 - Site Work Driveways, Parking Sidewalks, Trails Signage, Exterior Site Drainage Landscaping Irrigation System Fences, Guard rails Utilities 0 0 Seal Coat, Repaving, Restripping, Grading, Rock Replacement, etc (.89 s.f. of driveway) ( 4.38 / s.f. of walk or trail) ( actual-site specific ) Culvert, Catch Basin, Ditch Clearing (actual-site specific ) Tree Removal, Trimming, Plant Replacement ( actualsite specific ) (not lawn mowing or upkeep of grounds) ( actual-site specific ) ( actual-site specific ) (Not utility bills) - included in water and wastewater SF SF EA $0.89 $4.38 0 0 0 Site 0 Site Site LF 0 0 0 EA 0 0 0 Other Other 202000 ARCHITECTURAL WORK (Divisions 3 to 14) Architectural Totals: $0 $0 $0 Division 3 - Concrete Foundations, Slabs Retaining Walls Precast, etc. Other Other Division 4 - Masonry ( 3.00 s.f of floor area if crawl space - 8.00 s.f if basement) ( actual-site specific ) ( actual-site specific ) 0 SF-Flr Area SF SF Page 7 0 0 0 0 0 9/3/2004 Building Data Entry Form -- DEFERRED MAINTENANCE Unit: Remoteness Factor = 0 Benefitting Function: NFFA Bldg Cat.: 0 Location: 0 Maintenance Level: 0 1.15 PRIORTITY for FUNDING: CSI Division Foundation Walls Retaining Walls Chimneys Veneer, panels, etc. Other Other Division 5 - Metals Structural, Ornamental (See Painting) Rails, Posts, etc. Lookout Guy Cables & Anchors Other Other Division 6 - Wood Exterior Siding and Trim Interior Trim Structural Glulams/Heavy Timbers Timber Lookout Tower Structure Other Other Division 7 - Thermal & Moisture Protection Insulation, Vapor Barriers Fire Stopping Bldg ID #: Bldg Name: Size (GSF): Historic : Description 0 0 0 0 Inspector Name: Inspection Date: Year Constructed: Year Surveyed: 0 1/0/1900 0 0 1 High Safety Hazard 2 Safety Hazard 3 Structural Hazard 4 Not According to Code 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have Measurements Deferred Maint Cost Deficiencies Quantity Units Cost/unit H&S Res Mis (CMU - 3.00 s.f of floor area if crawl space - 8.00 s.f if basement), (STONE - 11.06 s.f. of floor area if crawl space - 29.52 s.f. if basement), (BRICK - 6.75 s.f. of floor area if crawl space 18.02 if basement) Tuck Pointing, Silicone Sealer, Expansion Joint Caulking (actual-site specific) 76.00 per vertical linear foot of chimney Brick 13.50 and stone 25.00 per s.f. of wall area Funding Priority 0 SF-Flr Area SF VLF 0 $76.00 SF-Wall Area ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) EA LS LS Cedar siding (3.50 s.f. of wall area) ( actual-site specific ) ( actual-site specific ) (actual-site specific) SF-Wall Area SF-Flr Area SF-Flr Area LS Blown in Attic Insulation (.62 for 6 in., 1.04 for 12" per s.f.), Batt for attic (.53 for 6in., 1.05 for 12"), 6" batt for walls = .60, 3-1/2" batt for walls = .49 Inspection-Patching ( actualsite specific ) SF 0 0 0 0 0 0 0 $3.50 0 0 0 0 0 0 0 0 0 Page 8 9/3/2004 Building Data Entry Form -- DEFERRED MAINTENANCE Unit: Remoteness Factor = 0 Benefitting Function: NFFA Bldg Cat.: 0 Location: 0 Maintenance Level: 0 1.15 PRIORTITY for FUNDING: CSI Division Roofing Gutters & Downspouts Skylights, Hatches Flashings, Grilles, Louvers Metal/Vinyl Siding Caulking Other Other Division 8 - Doors & Windows Doors & Frames - Exterior Doors & Frames - Interior Windows & Frames Hardware-Locks, Keys, Closers - Ext Hardware-Locks, Keys, Closers - Int. Weatherstripping Bldg ID #: Bldg Name: Size (GSF): Historic : Description 0 0 0 0 Inspector Name: Inspection Date: Year Constructed: Year Surveyed: 1 High Safety Hazard 2 Safety Hazard 3 Structural Hazard 4 Not According to Code 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have Measurements Deferred Maint Cost Deficiencies Quantity Units Cost/unit H&S Res Mis Paneling Ceramic Tile Acoustical Ceiling Funding Priority ( wood shingle and shake 4.50, standard metal - 2.00, standing seam metal -4.00, composition shingles -1.50, single ply membrane -3.00, built-up -2.00, all costs per s.f. of roof area) ($4.31 per linear foot of gutter and spouts) ( actual-site specific ) (Included in roof costs) ( metal - 4.00 s.f, vinyl - 3.50 s.f. of siding ) ( $1.47 per linear foot) LF $4.31 SF LF $1.47 $750.00 per Door $500.00 per Door EA EA $750.00 $500.00 0 0 EA $500.00 0 SF-Roof Area 0 0 0 0 0 0 0 0 Glazing, Glass Replacement, Entire Unit Replacement ( $500.00 average) (exterior doors - $150.00 per door ) ( interior doors - $115.00 per door ) EA $150.00 0 EA $115.00 0 ( $100.00 per opening, exterior doors and windows) EA $100.00 0 0 0 Other Other Division 9 - Finishes Sheetrock 0 1/0/1900 0 0 ($1.02 per s.f. of wall area for walls, $1.19 per s.f. of ceiling for ceilings) (wood - 2.72, fiberglass 1,97, laminated hardboard 1.02, plywood - .89 all per s.f. of wall area) SF 0 SF-Wall Area $2.72 0 ( $6.00 of actual wall area) SF-Wall Area $6.00 0 ($1.99 per s.f. of actual area) SF $1.99 0 Page 9 9/3/2004 Building Data Entry Form -- DEFERRED MAINTENANCE Unit: Remoteness Factor = 0 Benefitting Function: NFFA Bldg Cat.: 0 Location: 0 Maintenance Level: 0 1.15 PRIORTITY for FUNDING: CSI Division Floors--Wood, Vinyl Tile, Stair Treads Carpet, Wall Base Painting-Exterior Painting-Interior Wall Coverings ( vinyl ) Other Other Division 10 - Specialties Toilet/Shower Partitions Flag Pole Fire Extinguishers Fireplaces, Wood Stoves Bulletin Boards Signage-Interior Toilet & Bath Accessories Folding Partitions Other Other Division 11 - Equipment Audio, Visual Equipment Food Service Equipment Waste Compactors Fume Hoods Laundries Specialty Equipment Other Other Division 12 - Furnishings Lab Casework Residential/Office Cabinetry Systems Furniture Window Coverings Furniture & Seating Other Other Division 13 - Special Construction Prefabricated Structures Bldg ID #: Bldg Name: Size (GSF): Historic : Description 0 0 0 0 Inspector Name: Inspection Date: Year Constructed: Year Surveyed: 0 1/0/1900 0 0 1 High Safety Hazard 2 Safety Hazard 3 Structural Hazard 4 Not According to Code 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have Measurements Deferred Maint Cost Deficiencies Quantity Units Cost/unit H&S Res Mis (wood - 6.00, vinyl - 3.53, carpet - 3.00, ceramic tile -. 8.00, all per s.f. of actual floor area) SF-Flr Area Wall Base - $ 2.13 per l.f. .77 per s.f of wall area .45 per s.f of wall area 1.32 of wall area LF SF-Wall Area SF-Wall Area SF-Wall Area ($720.00 per stall) $1500.00 per pole $93.50 per extinguisher ($1500.00 per stove) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) Stall Ea Ea Ea Ea Ea Ea Ea ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) Ea Ea Ea Ea ( actual-site specific ) ( Wood - $200, Metal - $150, both per linear foot of cabinet, including bathroom, kitchen, reception counters, etc. ) ( actual-site specific ) ($5.00 per s.f.) ( actual-site specific ) Funding Priority 0 $2.13 $0.77 $0.45 $1.32 0 0 0 0 0 0 $720.00 $1,500.00 $93.50 $1,500.00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ( actual-site specific ) LF $200.00 SF $5.00 0 0 0 0 0 0 0 Page 10 9/3/2004 Building Data Entry Form -- DEFERRED MAINTENANCE Unit: Remoteness Factor = 0 Benefitting Function: NFFA Bldg Cat.: 0 Location: 0 Maintenance Level: 0 Bldg ID #: Bldg Name: Size (GSF): Historic : 1.15 PRIORTITY for FUNDING: CSI Division Greenhouses Other Other Division 14 - Conveying Systems Elevators Wheelchair Lifts Hoists, Cranes Automobile Hoists Other Other Description Inspector Name: Inspection Date: Year Constructed: Year Surveyed: 0 1/0/1900 0 0 1 High Safety Hazard 2 Safety Hazard 3 Structural Hazard 4 Not According to Code 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have Measurements Deferred Maint Cost Deficiencies Quantity Units Cost/unit H&S Res Mis Funding Priority Glazing, Vents/Louvers, Controls, Curtains, Benches, Irrigation System, Kool Cell Pads, etc. (Actual Site Specific) 0 0 0 $50,000 per elevator $10,000 per lift Inspections ( actual-site specific ) ( actual-site specific ) Ea Ea $50,000.00 $10,000.00 0 0 0 0 0 0 315000 MECHANICAL WORK Division 15 - Mechanical Fire Sprinklers Plumbing Fixtures-Toilets, Lavs, Showers, Hose Bibs, Fountains Backflow Preventer Water Softner, Filter, Deionizer Hot Water Heater Floor Drains Sump Pumps Radon Vent System Sewage Ejector Gas Piping Water Meters Plumbing Vents Heating, Ventilation, Air Conditioning Furnace, Boiler Terminal Units (VAVs, etc.) Air Handler, Louvers, Grilles, Dampers Coils, Circulating Pumps, Valves Radiators, etc. Air Ducts Exhaust Fans PreFab Chimney Humidification System 0 0 0 0 Mechanical Totals: $0 $3.20 s.f of floor area SF-Flr Area ( $750.00 per fixture) ($100.00) ($755.00) ($650.00) ($540.00) ($100.00) ($500.00) ($2,000.00) ($825.00) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) Ea Ea Ea Ea Ea Ea Ea Ea Ea LS Ea LS $750.00 $100.00 $755.00 $650.00 $540.00 $100.00 $500.00 $2,000.00 $825.00 ($2,000.00) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) ($150.00) $50.00 per vertical linear foot ( actual-site specific ) Ea Ea Ea Ea $2,000.00 EA VLF Page 11 $3.20 $150.00 $50.00 $0 $0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9/3/2004 Building Data Entry Form -- DEFERRED MAINTENANCE Unit: Remoteness Factor = 0 Benefitting Function: NFFA Bldg Cat.: 0 Location: 0 Maintenance Level: 0 Bldg ID #: Bldg Name: Size (GSF): Historic : 1.15 PRIORTITY for FUNDING: CSI Division Air Conditioners, Chillers Circulating Pumps, Valves, Coils, etc. Temperature Controls, pneumatic Piping & Duct Insulation Mechanical Identification-Tags, Pipe Labels, Color Codes Walk-In Coolers, Freezers Air Compressors Other Other Description ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) Inspector Name: Inspection Date: Year Constructed: Year Surveyed: Electric Heat Equipment Carbon Monoxide Detection System Stand By Generator Security Systems Data, Telephone, Sound, Cable TV, Cable Systems Other Other Funding Priority 0 0 0 0 0 0 0 0 0 0 LF Ea Electrical Totals: Division 16 - Electrical Power Distribution, Cables, Transformers Meters, Switchgear, Breakers, Fuses Lighting-Exterior Lighting-Interior Exit & Emergency Lights Fire & Smoke Detection System Lightening Rod Protection System 0 1/0/1900 0 0 1 High Safety Hazard 2 Safety Hazard 3 Structural Hazard 4 Not According to Code 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have Measurements Deferred Maint Cost Deficiencies Quantity Units Cost/unit H&S Res Mis 416000 ELECTRICAL WORK Location Factor or Multiplier = 0 0 0 0 $0 $0 $0 ( actual-site specific ) ($150.00 ea.) ($150.00 ea.) ($100.00 ea.) ( actual-site specific ) ( actual-site specific ) ( $25 l.f. - baseboards, $350 fan forced wall units ) ( included in general ) ( actual-site specific ) ( actual-site specific ) ( actual-site specific ) EA EA EA 0 0 0 0 0 0 0 $150.00 $150.00 $100.00 0 0 0 0 0 0 0 0 1.15 TOTAL Page 12 $0 $0 $0 9/3/2004 Building Data Entry Form -- W.O. Summary Bldg ID #: Bldg Name: Bldg Cat.: Benef.Funct.: Item Size (GSF): Inspection Date: Inspector Name: 0 0 0 NFFA Description Quantity Unit Cost Maintenance Level: Year Surveyed: Cost Data Source: 0 1/0/1900 0 Annual Maint. Cost Total H&S Res. Mis. Year constructed: 0 Historical: 0 Age (years): 0 0 0 Means Deferred Maint. Cost H&S Res. Total 9/3/2004 Critical Mis. Project Number 101000 SITE WORK $0 $0 $0 $0 $0 $0 $0 $0 $0 202000 ARCHITECTURAL WORK (Divisons 3 to 14) $0 $0 $0 $0 $0 $0 $0 $0 $0 315000 MECHANICAL WORK $0 $0 $0 $0 $0 $0 $0 $0 $0 416000 ELECTRICAL WORK $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Totals: Annual Maintenance Grand Total = $0 $0 = Deferred Maintenance Grand Total Form adapted from Means Facilities Maintenance Standards, 1988 edition by R.S. Means Company, Inc. Page 13 9/3/2004