Airfield Data Entry Form -- HEADER SHEET Unit: Airfield ID # : Airfield Name: Location: Airfield Type.: Size (GSF): Maintenance Level: Remoteness Factor: 1 Historic : Inspector Name: Inspection Date: Year Constructed: Year Surveyed: Benefitting Function: (Fill in: If Roaded Remote, 1.15; Wilderness/Primitive Remote, 1.5; Historic, 1.5; Roaded Remote & Historic, 1.65; Wilderness Remote & Historic, 2.00) (Fill in: E=eligible, I=ineligible, L=listed, U=undetermined) NFFA (Fill in: NFFA(facilities), QMQM(quarters), NFRM(recreation), NFFV(reforestation), NFRV(range), NFHR(heritage), etc.) NOTE: Information entered on this sheet is automatically transferred to the following spreadsheets. Data Entry Form -- ANNUAL MAINTENANCE Unit: Benefitting function: Maintenance Level: Remoteness Factor = 0 NFFA 0 1 Airfield Type: 0 Location: 0 Airfield ID #: Airfield Name: Size (GSF): Historic : 0 0 0 PRIORTITY for FUNDING: 1 High Safety Hazard 2 Safety Hazard 3 Structural Hazard 4 Not According to Code 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have CSI Division Measurements Description Quantity 101000 GENERAL AND SITE WORK Inspector Name: 0 Inspection Date: 01/00/00 Year Constructed: 0 Year Surveyed: 0 0 Units Cost/unit General and Site Work Totals: Annual Maint Cost H&S Res $0 $0 Priority for Funding Mis $0 Division 1 - General General Management Other Other Division 2 - Site Work Taxiways, Parking Sidewalks, Trails Signage, Exterior Site Drainage Landscaping Irrigation System Fences, Guard rails Utilities Sod Runway Other Misc. Annual Maintenance and Repair (Small Items, Break Downs) aviation - .0005 Costs is per s.f. of airfield area Direct costs only including specific proj prep, procurement, and, Contract Administration ( .0002 per s.f. of airfield area ) Seal Coat, Repaving, Restripping, Grading, Rock Replacement, etc ( .04 / s.f. of taxiway) PMR&R ( .18 / s.f. of walk or trail) PMR&R ( actual-site specific ) Culvert, Catch Basin, Ditch Clearing ( actual-site specific ) Tree Removal, Trimming, Plant Replacement ( actual-site specific ) (not lawn mowing or upkeep of grounds) PMR&R ( actual-site specific ) PMR&R ( actual-site specific ) PMR&R (Not utility bills) - included in water and wastewater Grading, etc. (.002/s.f.) 202000 ARCHITECTURAL WORK (Divisions 3 to 14) DO NOT INCLUDE BUILDINGS. EACH BUILDING WILL BE ENTERED SEPARATELY. Division 3 - Concrete Concrete Slabs Retaining Walls Precast, etc. Other Other Division 4 - Masonry Retaining Walls Veneer, panels, etc. Other Other Division 5 - Metals Structural, Ornamental (See Painting) Rails, Posts, etc. Other Other Division 6 - Wood Miscellaneous Other Division 7 - Thermal & Moisture Protection Not Applicable to Airfields Division 8 - Doors & Windows Not Applicable to Airfields Division 9 - Finishes Painting-Exterior Other 0 SF-Airfield Area $0.0005 $0 7 0 SF-Flr Area $0.0002 $0 $0 $0 $0 7 7 7 $0.04 $0.18 $0 $0 $0 $0 7 7 7 7 $0 $0 $0 $0 $0 $0 7 7 7 7 7 7 SF SF EA Site Site Site LF EA SF $0.002 Architectural Totals: PMR&R PMR&R ( actual-site specific ) PMR&R ( actual-site specific ) SF-Slab Area SF SF PMR&R (CMU - .03 s.f of wall area, BRICK - .20 s.f of wall area, STONE - .33 s.f. of wall area) Brick .27 and stone .50 per s.f. of wall area SF-Flr Area SF-Wall Area PMR&R ( actual-site specific ) PMR&R ( actual-site specific ) PMR&R ( actual-site specific ) Repaint every 5-10 years ( .10 s.f.) $0.02 $0 $0 $0 $0 $0 $0 $0 7 7 7 7 7 $0 $0 $0 7 7 7 EA EA $0 $0 $0 $0 7 7 7 7 EA $0 $0 7 7 $0 7 SF Page 2 $0 $0.10 $0 7 $0 $0 7 7 9/3/2004 Data Entry Form -- ANNUAL MAINTENANCE Unit: Benefitting function: Maintenance Level: Remoteness Factor = 0 NFFA 0 1 Airfield Type: 0 Location: 0 Airfield ID #: Airfield Name: Size (GSF): Historic : 0 0 0 2 Safety Hazard 3 Structural Hazard 4 Not According to Code PRIORTITY for FUNDING: 1 High Safety Hazard 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have CSI Division Measurements Description Quantity Other Division 10 - Specialties Flag Pole Wind Sock & Pole Fire Extinguishers Bulletin Boards Other Other Division 11 - Equipment Specialty Equipment Other Other Division 12 - Furnishings Not Applicable to Airfields Division 13 - Special Construction Lookout Towers Other Other Division 14 - Conveying Systems Hoists, Cranes Other Other PMR&R ( $100.00 per year) PMR&R ( $100.00 per year) One year & Five year inspections/tests ($15.00 per extinguisher) PMR&R ($30.00 per year) Units Cost/unit Ea Ea Ea Ea Annual Maint Cost H&S Res $100.00 $100.00 $15.00 $30.00 PMR&R ( actual-site specific ) PMR&R, Rails, Guys, Anchors, etc. ( $3000.00 L.S. per lookout) Lookout $3,000.00 PMR&R, Inspections ( actual-site specific ) 315000 MECHANICAL WORK Mechanical Totals: Division 15 - Mechanical Plumbing Seasonal Start Up & Shut Down Hose Bibs, Fountains Backflow Preventer Gas Piping Water Meters Air Compressors Other Other PMR&R PMR&R ( $600.00 per year ) PMR&R ( $10.00 per year) PMR&R, Inspections, Tests ( included in water systems) PMR&R ( $20.00 ) PMR&R PMR&R 416000 ELECTRICAL WORK $0 Ea Ea $600.00 $10.00 LS Ea $20.00 Electrical Totals: Division 16 - Electrical Power Distribution, Cables, Transformers Meters, Switchgear, Breakers, Fuses $0 PMR&R, Bulbs, Ballasts, Cleaning ( .13 per s.f. of floor area, includes next two items ) PMR&R ( actual-site specific ) PMR&R, Testing ( actual-site specific ) SF-Flr Area Priority for Funding Mis $0 7 $0 $0 $0 $0 $0 $0 7 7 7 7 7 7 $0 $0 $0 7 7 7 $0 7 $0 $0 $0 $0 $0 $0 $0 7 7 7 $0 $0 $0.13 7 7 7 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 PMR&R ( actual-site specific ) Lighting-Exterior Lightening Rod Protection System Stand By Generator Other Other Location Factor or Multiplier = Inspector Name: 0 Inspection Date: 01/00/00 Year Constructed: 0 Year Surveyed: 0 0 7 7 7 7 7 7 7 7 7 $0 $0 $0 7 7 $0 $0 $0 $0 $0 7 7 7 7 7 1 TOTAL Page 3 $0 $0 $0 9/3/2004 Data Entry Form -- DEFERRED MAINTENANCE Unit: Remoteness Factor = Benefitting Function: NFFA 0 Airfield Type: Location: Maintenance Level: 0 1 0 Airf'ld ID #: 0 0 Bldg Name: Size (GSF): 0 Historic : Inspector Name: 0 Inspection Date: 1/0/1900 0 Year Constructed: 0 Year Surveyed: 0 0 2 Safety Hazard 3 Structural Hazard 4 Not According to Code PRIORTITY for FUNDING: 1 High Safety Hazard 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have Measurements CSI Division Description Deficiencies Quantity Units Cost/unit 101000 GENERAL AND SITE WORK General and Site Work Totals: Deferred Maint Cost H&S Res Mis $0 $0 Priority for Funding $0 Division 1 - General Other Other Division 2 - Site Work Taxiways, Parking Sidewalks, Trails Signage, Exterior Site Drainage Landscaping Irrigation System Fences, Guard rails Utilities 0 0 Seal Coat, Repaving, Restripping, Grading, Rock Replacement, etc (.89 s.f. of taxiway) ( 4.38 / s.f. of walk or trail) ( actual-site specific ) Culvert, Catch Basin, Ditch Clearing (actualsite specific ) Tree Removal, Trimming, Plant Replacement ( actualsite specific ) (not lawn mowing or upkeep of grounds) ( actual-site specific ) ( actual-site specific ) (Not utility bills) included in water and wastewater SF $0.89 0 SF EA $4.38 0 0 Site 0 Site Site LF 0 0 0 EA 0 0 0 Other Other 202000 ARCHITECTURAL WORK (Divisions 3 to 14) Architectural Totals: DO NOT INCLUDE BUILDINGS . EACH BUILDING WILL BE ENTERED SEPARATELY. Division 3 - Concrete Concrete Slabs ( 2.00 s.f ) ( actual-site specific ) Retaining Walls ( actual-site specific ) Precast, etc. Other Other 0 SF SF SF Page 4 $0 $2.00 $0 $0 0 0 0 0 0 9/3/2004 Data Entry Form -- DEFERRED MAINTENANCE Unit: Remoteness Factor = Benefitting Function: NFFA 0 Airfield Type: Location: Maintenance Level: 0 1 0 Airf'ld ID #: 0 0 Bldg Name: Size (GSF): 0 Historic : Inspector Name: 0 Inspection Date: 1/0/1900 Year Constructed: 0 Year Surveyed: 0 0 0 PRIORTITY for FUNDING: 1 High Safety Hazard 2 Safety Hazard 3 Structural Hazard 4 Not According to Code 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have Measurements CSI Division Description Deficiencies Quantity Units Cost/unit Deferred Maint Cost H&S Res Mis Priority for Funding Division 4 - Masonry Retaining Walls (CMU - 3.00 s.f of wall area, STONE - 11.06 s.f. of wall area, BRICK 6.75 s.f. of wall area) Veneer, panels, etc. 25.00 per s.f. of wall area SF-Wall Area ( actual-site specific ) ( actual-site specific ) EA EA Other Other Division 5 - Metals Structural, Ornamental (See Painting) Rails, Posts, etc. Other Other Division 6 - Wood Miscellaneous Other Other Division 7 - Thermal & Moisture Protection Not Applicable to Airfields Division 8 - Doors & Windows Not Applicable to Airfields Division 9 - Finishes Painting-Exterior Other Other Division 10 - Specialties Flag Pole Wind Sock & Pole Bulletin Boards Other Other Division 11 - Equipment Specialty Equipment Other Other Division 12 - Furnishings Not Applicable to Airfields Division 13 - Special Construction 0 SF 0 0 0 0 0 (actual-site specific) $0.00 0 0 0 0 0 0 .77 per s.f of wall area SF-Wall Area $1500.00 per pole $1500.00 per pole ( actual-site specific ) Ea Ea Ea ( actual-site specific ) $0.77 0 0 0 $1,500.00 $1,500.00 0 0 0 0 0 0 0 0 0 Page 5 9/3/2004 Data Entry Form -- DEFERRED MAINTENANCE Unit: Remoteness Factor = Benefitting Function: NFFA 0 Airfield Type: Location: Maintenance Level: 0 1 0 Airf'ld ID #: 0 0 Bldg Name: Size (GSF): 0 Historic : Inspector Name: 0 Inspection Date: 1/0/1900 Year Constructed: 0 Year Surveyed: 0 0 0 PRIORTITY for FUNDING: 1 High Safety Hazard 2 Safety Hazard 3 Structural Hazard 4 Not According to Code 5 Critical Maintenance 6 Energy Conservation 7 Routine Maintenance 8 Outdated/Nice to Have Measurements CSI Division Description Deficiencies Quantity Units Cost/unit Deferred Maint Cost H&S Res Mis Priority for Funding Rails, Guys, Anchors, etc. ( actual-site specific) Lookout Towers 0 0 0 Other Other Division 14 - Conveying Systems Inspections ( actualsite specific ) Hoists, Cranes 0 0 0 Other Other 315000 MECHANICAL WORK Mechanical Totals: Division 15 - Mechanical Plumbing Hose Bibs, Fountains Backflow Preventer Water Meters Air Compressors Other Other ($100.00) ($755.00) ( actual-site specific ) ( actual-site specific ) Ea Ea Ea 416000 ELECTRICAL WORK $0 $0 0 0 0 0 0 0 0 $100.00 $755.00 Electrical Totals: Division 16 - Electrical Power Distribution, Cables, Transformers Meters, Switchgear, Breakers, Fuses Lighting-Exterior Lightening Rod Protection System Stand By Generator Other Other Location Factor or Multiplier = $0 $0 $0 $0 ( actual-site specific ) ($150.00 ea.) ( actual-site specific ) ( actual-site specific ) EA 0 0 0 0 0 0 0 $150.00 1 TOTAL Page 6 $0 $0 $0 9/3/2004 Data Entry Form -- W.O. Summary ID #: Name: Type: Benef.Funct.: Item Size (GSF): Inspection Date: Inspector Name: 0 0 0 NFFA Description Quantity Unit Cost 0 1/0/1900 0 0 0 Maintenance Level: Year Surveyed: Cost Data: Means Annual Maint. Cost Total H&S Res. Mis. Total Year constructed: 0 Historical: 0 Age (years): 0 H&S 9/3/2004 Critical Deferred Maint. Cost Res. Mis. Project Number 101000 SITE WORK $0 $0 $0 $0 $0 $0 $0 $0 $0 202000 ARCHITECTURAL WORK (Divisons 3 to 14) $0 $0 $0 $0 $0 $0 $0 $0 $0 315000 MECHANICAL WORK $0 $0 $0 $0 $0 $0 $0 $0 $0 416000 ELECTRICAL WORK $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Annual Maintenance Grand Total: $0 $0 = Deferred Maintenance Grand Total Form adapted from Means Facilities Maintenance Standards, 1988 edition by R.S. Means Company, Inc. Page 7 9/3/2004