Chapter 11 Historic and Archaeological Resources

advertisement
Chapter 11
Historic and Archaeological
Resources
This chapter presents an overview of the identified historic and archaeological resources on
and in the vicinity of Boston College’s three campuses: Brighton, Chestnut Hill and Newton.
This chapter also includes a description of the impacts of the projects proposed by Boston
College over the next 10 years on these historic and archaeological resources.
The first section of this chapter outlines the methodology used to identify inventoried and
designated properties within one-quarter mile of the University’s three campuses. For each
campus, an overview is presented of the historic and archaeological resources that have been
officially designated, followed by a more specific description of the resources that are expected
to be affected by the proposed projects. Also included for each campus are a summary of the
proposed projects and an assessment of their expected impacts to affected inventoried and
designated resources. Boston College will comply with all applicable laws and regulations that
involve preservation agencies. These laws and regulations include consultation with the Boston
Landmarks Commission (BLC) on proposed demolitions through the submission of Article 85
demolition delay applications. If there is state involvement in a specific project, Boston College
will notify the Massachusetts Historical Commission (MHC) of the project and consult with
the agency concerning alternatives to adverse effects to historic properties per Massachusetts
General Laws Chapter 9, sections 26-27C (950 CMR71).
Methodology
Consultant Vanasse Hangen Brustlin, Inc., (VHB) conducted an archaeological and
architectural site files and records review to determine if any designated or inventoried historic
and archaeological resources are located on or adjacent to the three Boston College campuses.
Historic and Archaeological Resources
11-1
This research was carried out at the Massachusetts Historical Commission (MHC), which
holds all of the documentation on historic properties, including archaeological reports,
National Register nominations and inventory forms. Information about historic properties
was also obtained from the Boston Landmarks Commission (BLC) and the Newton Historical
Commission.
The literature review completed at the MHC identified properties listed in the Inventory of
Historic and Archaeological Assets of the Commonwealth (inventoried properties) and the
State Register of Historic Places (designated, or listed, properties). The site file search also
identified previous cultural resource investigations, especially the archaeological
investigations on both the Chestnut Hill and Newton campuses.
The Inventory of Historic and Archaeological Assets of the Commonwealth includes all
buildings, structures, sites and objects that have been recorded on inventory forms in the
Commonwealth, not all of which have received an official designation or have been officially
evaluated for their significance. The State Register of Historic Places was established in 1982
as a comprehensive listing of buildings, objects, structures and sites that have received local,
state or national designations based on their historical, architectural or archaeological
significance. All properties listed in the National Register of Historic Places are automatically
entered into the State Register of Historic Places.
Brighton Campus
The Boston College Brighton Campus contains and is adjacent to a number of previously
recorded historic districts, areas, and individual properties as shown in Figure 11-1 and listed
below:
Chancery-St. John’s Seminary Complex (BOS.JW) – As noted below in more detail, the
Seminary Complex was determined by the MHC (December 2003) to be eligible for
listing in the National Register of Historic Places as a “potential historic district” that
contains a number of contributing elements. The majority of the Brighton Campus
overlaps with the Chancery-St. John’s Seminary Complex.
Foster Street Streetscape (BOS.LA) – The Foster Street Area includes properties with the
addresses 1-289 and 2-284 Foster Street; there is some overlap in addresses with the
Upper Foster Area (see below). MHC did not render an opinion on the eligibility of this
streetscape north of the boundaries of the Upper Foster Area (north of 242 and
1
249 Foster Street).
Lake Street-Chandler Pond Area (BOS.JV) – The Lake Street-Chandler Pond Area was
determined by the MHC (March 1996) to be eligible for the National Register.
1
11-2
Brona Simon, Executive Director and State Historic Preservation Officer, Massachusetts Historical Commission, comment
letter to John Palmieri, Boston Redevelopment Authority, January 18, 2008. The comments were offered to assist in
compliance with Massachusetts General Law Chapter 9, sections 26-27C (950 CMR71) should any state agency funding,
licensing, or permit be required for these projects.
Historic and Archaeological Resources
Institutional Master Plan
Contributing buildings within the area are considered to be all buildings that are more
than 50 years old and retain integrity.
Pama Gardens (BOS.JZ) – This area consists of nine residential apartment buildings.
The MHC did not comment on the National Register eligibility of this area.
Upper Foster Street Area (BOS.JY) – The Upper Foster Street Area contains several
residential subdivisions that date between 1914 and 1940 as well as a small number of
19th century houses, mainly on Foster Street, that pre-date this period. The MHC has
made the opinion that this area meets the criteria for listing in the National Register of
2
Historic Places.
Upper Chestnut Hill-Evergreen Area (BOS.JX) – The Upper Chestnut Hill-Evergreen
Area was determined by the BLC (November 2006) to be eligible for listing in the
National Register. In addition, a portion of this area contains the Aberdeen Architectural
Conservation District.
Commonwealth Avenue – Brighton (BOS.YY) – The segment of Commonwealth Avenue rightof-way from Packard Corner to the Newton City line was documented in 2007 by the MHC.
The documented area does not include any flanking buildings, structures or other properties. It
is the opinion of the MHC that this segment of Commonwealth Avenue is eligible for the
National Register under Criteria A and C in the significance areas of community planning and
3
development, engineering, landscape, architecture and transportation.
There are several individually inventoried properties located within one-quarter mile of
the Brighton Campus.
Chancery – St. John’s Complex
Boston College has acquired approximately 65 acres of land from the Roman Catholic
Archdiocese of Boston (RCAB) that includes St. John’s Seminary, Chancery Offices and the
Cardinal’s Residence. The Chancery-St. John’s Seminary Complex was identified and
evaluated in 2004 in MHC’s Survey of Historic Properties of the Roman Catholic
Archdiocese in the City of Boston – Summary Report (Archdiocese Summary Report) and
was subsequently recorded on an Area Form in MHC’s Inventory as a “potential historic
district” (MHC #BOS.JW). The Chancery-St. John’s Seminary Complex consists of buildings
and structures that date from 1881-1967 with landscapes dating from various periods located
north of Commonwealth Avenue generally between Lake Street and Foster Street in
Brighton. Buildings and structures located within the Seminary Complex that are considered
by the MHC as contributing elements, despite the relatively recent age and non-existent
architectural merit of some of these buildings to the Seminary Complex, include:
Theology House, built 1881-1884 (MHC #BOS.8242)
St. John’s Seminary Chapel, built 1899-1901 (MHC #BOS.8243)
2
3
Brona Simon, Executive Director and State Historic Preservation Officer, Massachusetts Historical Commission, comment
letter to John Palmieri, Boston Redevelopment Authority, January 18, 2008.
Ibid.
Historic and Archaeological Resources
11-3
Peterson Hall, built 1957 (MHC #BOS.8529)
Kitchen and Refectory, built 1925 (MHC #BOS.15237)
St. William’s Hall, built 1888-1890, rebuilt 1936 (MHC #BOS.8530)
Keith Memorial Gymnasium, built 1937-1938 (MHC #BOS.8531)
Clergy Personnel Building (Tribunal Building), built 1928-1929 (MHC #BOS.8532)
Archbishop’s House (Cardinal’s Residence), built 1927 (MHC #BOS.8533)
St. Clement’s Hall, built 1939-1940, addition 1945-1946 (MHC #BOS.8534)
Main Entrance Gate, built mid-20th century (MHC #BOS. 9316)
Shrine of the Immaculate Conception, built 1928 (MHC #BOS.9317)
Service Building (Garage), built 1960s (MHC #BOS.15234)
Boston Roman Catholic Church Chancery (MHC #BOS.15235))
Creagh Research Library, built 1947 (MHC #BOS.15236)
Library (Seminary Library), built 1967 (MHC #BOS.15238)
The Seminary Complex history at the Brighton Campus began in 1881 with the construction of
the Theology House. Prior to the RCAB occupation, the site was occupied by a number of
farmsteads or country estates. Review of historic period maps (1875-1925) indicates that a number
of wood frame structures and outbuildings were located on what is now the Brighton Campus in
1875 along Lake Street, Foster Street and South Street (now Commonwealth Avenue).
Boston College acquired 43 acres (of the total 65 acres) of the Seminary Complex in 2004
and filed an amendment to the previous Boston College IMP with the Boston Redevelopment
Authority (BRA) in July 2006. The amendment included Boston College’s plans for
St. William’s Hall, the Cardinal’s Residence, the Tribunal Building and the Gymnasium,
including planned renovations to each building except the Gymnasium. The MHC
commented on the proposed amendment on August 4, 2006 indicating that the three
buildings proposed for renovation (St. William’s Hall, the Cardinal’s Residence and the
Tribunal Building) are historically and architecturally significant and appear to meet the
Criteria of Eligibility (36 CFR Part 60) for listing in the National Register of Historic Places.
Boston College subsequently submitted an additional IMPNF for an amendment to its
previous IMP in October 2007, outlining proposed improvements to the STM Library.
The Brighton Campus has not been subject to any archaeological investigations. Additionally,
the Brighton Campus does not contain any previously recorded archaeological sites.
IMP Projects
This section describes the proposed projects on the Brighton Campus and their potential
effect on the identified inventoried and designated resources on or near the campus. Only the
potential impacts to inventoried and designated resources are described in this discussion.
The section is divided into new construction projects, renovations and demolitions.
11-4
Historic and Archaeological Resources
Institutional Master Plan
New Construction
Planned construction on the Brighton Campus includes the following (see Chapter 5,
Proposed Institutional Projects):
The Brighton Athletics Center, which includes intercollegiate baseball and softball fields,
one intramural playing field and support facilities. The existing site consists of playing
fields and no structures will be impacted by the development of the complex.
A new 500-space parking garage on a currently undeveloped site just south of
Brighton Athletics Center project.
A 14,000 sf Library Storage building just north of the existing Seminary Library.
Construction of Library Storage building may have a visual impact on the Seminary
Library.
A Fine Arts District, consisting of an approximately 55,000 sf Fine Arts/Museum
complex of linked buildings of four to five stories and a height of 60 feet, and an
approximately 30,000 sf auditorium with 1,200 seats, primarily for University use. This
district will be located on Commonwealth Avenue between the former Cardinal’s
Residence and the former Creagh Library. These new buildings may have a visual impact
on the former Cardinal’s Residence and the former Creagh Library.
No archaeological investigations have been conducted on the Brighton Campus. To date no
archaeological resources have been identified that would be impacted by the proposed
institutional projects. Boston College will conduct an intensive (locational) archaeological
survey of the campus after consulting with MHC on the appropriate methodology, should
any of the projects require state involvement.
Renovation of Existing Buildings
Boston College plans to renovate five buildings on the Brighton Campus. One of those buildings is
St. William’s Hall, which was added to the existing Boston College IMP in an IMP Amendment
approved in 2006. Renovations are also planned for the STM Library (former Seminary Library),
Bishop Peterson Hall, the Chancery and the Creagh Library. The proposed renovation of the STM
Library is addressed in an IMPNF for an IMP Amendment and a PNF submitted by Boston College
to the BRA on October 12, 2007. The renovation of Bishop Peterson Hall, the Chancery and the
Creagh Library are addressed in this IMPNF in Chapter 5, Proposed Future Projects.
MHC commented on the renovation of St. William’s Hall and requested the opportunity to
review the proposed renovation plans in order to identify architecturally significant interior
features that should be preserved prior to the implementation of the proposed renovation
projects. Boston College will file all required Project Notification Forms to MHC on the
proposed renovation of the STM Library, Bishop Peterson Hall, the Chancery, the Creagh
Library and St. William’s Hall, if there is state involvement with these projects.
Historic and Archaeological Resources
11-5
Demolition
The only demolition on the Brighton Campus currently anticipated in the next 10 years is the
St. John's Seminary Service Building (MHC #BOS.15234), which is a contributing element of
the Chancery-St. John's Seminary Complex. Boston College plans to demolish the service
building and create landscaped open space to replace open areas lost to new construction and
to create a buffer between the planned garage and adjacent residential properties. The service
building was constructed in the 1960s and serves as a garage and maintenance building. It was
identified as a contributing element of the Chancery-St. John’s Seminary Complex in the 20032004 survey. While the area form lists the service building as a contributing element, it does so
simply because the building is noted to have a “low profile” that “does not detract from the
4
prominence of the other buildings on the campus.” Demolition of the service building may be
subject to the Boston Landmarks Commission (BLC) demolition delay ordinance (Article 85). If
there is state involvement in the project, Boston College will consult with the MHC.
Chestnut Hill Campus
Cultural Resources
Similar to the Brighton Campus, the Chestnut Hill Campus contains individual properties as
shown on Figure 11-1 and is adjacent to a number of previously recorded historic districts and
areas. The Chestnut Hill Campus is recorded on an Area Form (MHC #NWT.DI) and
contains five inventoried structures on the Middle Campus:
Gasson Hall (NWT.5397)
St. Mary’s Hall (NWT.5398)
Bapst/Burns Library (NWT.5399)
Devlin Hall (NWT.5400)
Fulton Hall (NWT.5401)
Review of MHC’s inventory indicates that the following inventoried areas and historic
districts are located immediately adjacent to the Chestnut Hill Campus:
Chestnut Hill Reservoir and Pumping Stations Complex (BOS.LX), which also includes
the Cochituate and Sudbury Aqueduct Linear Districts (BOS.LY and BOS.SK). Both the
Chestnut Hill Reservoir and the Pumping Stations (BOS.LW) are listed in the National
Register of Historic Places as contributing elements to the Chestnut Hill Reservoir
Historic District (CHRHD) (BOS.LX). The CHRHD is a Local Historic District
(September 26, 1989), a National Register District (January 18, 1990), and is also
included in the National Register Thematic Resource Area of the Metropolitan District
Water Commission (September 18, 1990) (BOS.LV).
4
11-6
Broomer, Kathleen Kelly, Form A Area, Chancery – St. John’s Seminary Complex, 2003.
Historic and Archaeological Resources
Institutional Master Plan
Chestnut Hill Historic District (NWT.O, NWT.AJ, and NWT.EG) is listed in the National
Register of Historic Places (September 4, 1986 and February 16, 1990) and is a local
historic district regulated by the Chestnut Hill Historic District Commission. The
Chestnut Hill Historic District contains approximately 168 properties and is located
immediately south of the Boston College Chestnut Hill Campus. The Chestnut Hill
Historic District also contains a number of buildings that are currently owned by the
University, including the entire Hammond Triangle area.
Upper Chestnut Hill – Evergreen Area (BOS.JX) consists of a number of residential
structures and the Evergreen Cemetery. The Upper Chestnut Hill - Evergreen Area is
contiguous to the northeastern portion of the Boston College Chestnut Hill campus as
well as the southern portion of the Boston College Brighton Campus. The area has been
recommended eligible for listing in the National Register of Historic Places as an historic
district and the Cemetery was also recommended as individually eligible.5
Commonwealth Avenue Historic District (NWT.AB) is listed in the National Register of
Historic Places as an historic district (February 16, 1990) and is included in the
Newton NR MRA – 1908-1940 (February 16, 1990). The Commonwealth Avenue Historic
District contains 321 properties and is located immediately north and west of the Boston
College Chestnut Hill Campus and does not include any resources associated with the
MBTA system. MHC noted that they additionally consider that the eastern boundary of
the district (which currently terminates at Mt. Alvernia and near Algonquin Road in
Newton) should actually extend to the Boston-Newton city line in order to include the
entirety of the Commonwealth Avenue historic Carriageway.6
Monadnock Road Historic District (NWT.AE) is listed in the National Register of Historic
Places as an historic district (February 16, 1990) and is included in the Newton NR MRA
– 1908-1940 (February 16, 1990). It contains 89 properties and is located immediately
west of the Boston College Chestnut Hill Campus.
Quincy Road – Mayflower Road – Priscilla Road – Old Colony Road Area (NWT.BA) is an
inventoried area immediately west of the Boston College Chestnut Hill Campus and
includes a number of properties that are currently owned by the University. The Area
Form does not indicate how many properties are included in the Area.
There are also a number of individually inventoried properties (not located in areas or
historic districts) that are located immediately north and west of the Chestnut Hill Campus.
Unlike the Brighton Campus, the Chestnut Hill Campus was subject to a reconnaissance
archaeological and architectural survey in 1994 in conjunction with the previous Boston
College IMP. The survey identified areas that were considered to be archaeologically sensitive
and, as a result, the MHC requested that they be subject to additional archaeological survey.
5
6
Roysin Bennett Younkin, Boston Landmarks Commission, Certified Local Government Opinion: Eligibility for National
Register: Evergreen Cemetery, 11/06.
Brona Simon, Executive Director and State Historic Preservation Officer, Massachusetts Historical Commission, comment
letter to John Palmieri, Boston Redevelopment Authority, January 18, 2008.
Historic and Archaeological Resources
11-7
The western portion of the Middle Campus and the southern portion of the Upper Campus
were determined to be moderately sensitive to contain archaeological resources, while the
Hammond Triangle section of the Chestnut Hill Campus was determined to be highly
sensitive to contain archaeological resources. Subsequent archaeological investigations
identified archaeological sites in those locations, but none of the sites were determined
eligible for listing in the National Register.
New Construction
Boston Portion of the Chestnut Hill Campus
Planned construction on the Boston portion of the Chestnut Hill Campus includes the
following:
An undergraduate residence hall, first floor retail and underground parking (up to
100 spaces) on the existing site of More Hall, adjacent to the Evergreen Cemetery. The
existing More Hall will be demolished. Boston College will comply with Article 85 and
submit a demolition delay application to the BLC for More Hall, which was built in 1955.
It is anticipated that the building will not be found to meet any of the significance
criteria. As part of the redevelopment of this site, a new roadway will be built along the
east side of the property between Commonwealth Avenue and St. Thomas More Road at
the south end of the property. The roadway will be set back from the Evergreen
Cemetery. Currently, there is a surface parking lot immediately adjacent to the Cemetery.
A Recreation Center on the current site of Edmonds Hall, which was built in 1975, and
which will be demolished. The construction of this project is not expected to have any
impact on significant cultural resources.
Undergraduate residence halls on part of Shea Field. The construction of this series of
buildings involves the elimination of the existing baseball and softball fields which will be
relocated to the Brighton Campus. The site is adjacent to the Chestnut Hill Reservoir,
which is listed in the National Register of Historic Places and is a local Boston Landmark.
Although this project will be located adjacent to the Chestnut Hill Reservoir and
Pumping Station Complex, the construction of this project is not expected to have any
impact on significant cultural resources.
A 350-space addition to the Beacon Street Garage. The construction of this project is not
expected to have any impact on significant cultural resources.
Undergraduate residence halls with student life or academic uses on part of the site of
the current Modular Apartments. The construction of this series of buildings will involve
the demolition of a number of Modular Apartments. The construction of this project is
not expected to have any impact on significant cultural resources.
University Center on an existing parking area and a portion of the Flynn Recreation
Complex site. The construction of the University Center will involve the demolition of the
Flynn Recreation Complex which will be replaced by a new Recreation Center on the site
11-8
Historic and Archaeological Resources
Institutional Master Plan
of Edmonds Hall. The construction of this project is not expected to have any impact on
significant cultural resources.
Newton Portion of the Chestnut Hill Campus
Planned construction on the Newton portion of the Chestnut Hill Campus includes the
following projects. If there is state involvement in any of these projects, Boston College will
notify the MHC of the project and consult with the agency if adverse effects are identified to
historic properties. The City of Newton’s Demolition Delay Ordinance requires that any
building 50 or more years old must be reviewed by the Newton Historical Commission for
either “total demolition” or “partial demolition” of an historically significant building or
structure. Boston College will comply with this ordinance if any of the buildings proposed for
demolition are more than 50 years old. Currently none of the buildings proposed for
demolition meet this age requirement.
The Science Center on the site of Cushing Hall and a portion of a service building.
The proposed Science Center is located immediately southeast of Fulton Hall, which
was determined to be eligible for listing in the National Register by the MHC. The
new Science Center could have a visual
impact on Fulton Hall.
The construction of the 125,000 sf Stokes
Commons, which involves the alteration
of and addition to Lyons Hall. This area is
in a portion of the Chestnut Hill Campus
that was indicated as archaeologically
sensitive. Portions of this area were tested
during a subsequent intensive survey and
no archaeological sites were identified
that were eligible for the National
Register.
Construction of an Academic Building for Nursing and Social Work (75,000 sf), which
involves the demolition of the McElroy Switch House. It does not appear that the
construction of this project will have any impact on significant cultural resources. This area is
in a portion of the Chestnut Hill Campus that was indicated as archaeologically sensitive.
Portions of this area were tested during a subsequent intensive survey and no archaeological
sites were identified that were eligible for the National Register.
Construction of an Academic Building for Humanities with possible underground
parking for up to 90 spaces (125,000 sf) involves the demolition of McElroy Commons. It
does not appear that the construction of this IMP project will have any impact on
significant cultural resources.
Historic and Archaeological Resources
11-9
Renovation of Existing Buildings
The Boston College IMP proposes renovation of one building (Carney Hall, built in 1962) on
the Chestnut Hill Campus. The building is located on the Middle Campus in the vicinity of a
number of significant existing architectural resources. According to the 1994 report
submitted by Timelines, Inc., a number of buildings on the Boston College Middle Campus
meet the Criteria of Eligibility (36 CFR Part 60) for listing in the National Register. If there is
state involvement in any of these projects, Boston College will notify the MHC of the project
and consult with the agency if adverse effects are identified to historic properties.
Demolition
Several buildings on the Chestnut Hill Campus will be demolished to make room for the
projects proposed in the IMP. The following sections describe those buildings and the likely
impact of their demolition on cultural resources.
More Hall
More Hall is situated at the northeast corner of the Boston College Chestnut Hill Campus,
contiguous to the Evergreen Cemetery and the Upper Chestnut Hill-Evergreen area. Both the
Evergreen Cemetery and the Upper Chestnut Hill-Evergreen area meet the Criteria of
Eligibility (36 CFR Part 60) (opinions by BLC and MHC) for listing in the National Register
of Historic Places (Evergreen Cemetery individually and Upper Chestnut Hill-Evergreen Area
as a district). The Evergreen Cemetery was established in 1848 and appears to have been used
continuously through the present day. The demolition of More Hall and the construction of a
new building and a roadway through the site is unlikely to have a negative visual impact on
the Cemetery. As described above, the roadway will be set back from the east edge of the
property in contrast to the existing parking area which is immediately adjacent to the
Cemetery.
Other Buildings on the Chestnut Hill Campus
The demolition of the following structures does not appear to have any impacts on significant
cultural resources:
Edmonds Hall
The Modular Apartments
Flynn Recreation Complex
Cushing Hall
Service Building
McElroy Commons. This area is in a portion of the Chestnut Hill Campus that was
indicated in 1994 as archaeologically sensitive. Portions of this area were tested during a
11-10
Historic and Archaeological Resources
Institutional Master Plan
subsequent intensive survey and no archaeological sites were identified that were eligible
for the National Register.
McElroy Switch House. This area is in a portion of the Chestnut Hill campus that was
indicated in 1994 as archaeologically sensitive. Portions of this area were tested during a
subsequent intensive survey and no archaeological sites were identified that were eligible
for the National Register.
Newton Campus
Cultural Resources
Similar to the Chestnut Hill and Brighton campuses, the Newton Campus contains, and is
adjacent to, a number of previously recorded historic districts, areas and individual properties
(Figure 11-2). The Newton Campus is recorded on an Area Form (NWT.DL) and includes
three inventoried structures:
Harriman, Henry I. House (Alumni House) (NWT.5610)
Schraft, George F. House (Barat House) (NWT.5396)
Stuart, Janet Erskine House (NWT.5256)
A fourth inventoried structure is also located on the Newton campus, but was not included
on the Newton Campus Area Form:
Mill Street Cottage, 29 Mill Street (NWT.3148)
Review of MHC’s inventory indicates that the following inventoried areas and historic
districts are located immediately adjacent to the Newton Campus:
Towle, Loren Estate – Newton Country Day School (NWT.5611)
Towle Estate Area (NWT.BK)
East Parish Burying Ground (NWT.801)
Edmunds – Madden Estate (NWT.2826)
In addition there are several individually inventoried properties that are located within onequarter mile of the Newton Campus.
Demolition
Two structures are proposed for demolition on the Newton Campus: the Quonset hut which
is in the northwestern portion of the campus and the Smith Wing of Stuart Hall. The
Quonset hut is proposed to be replaced by a new Recreation/Athletics Building. The Smith
Wing of Stuart Hall will be replaced with a new wing that will be constructed on the opposite
side of Stuart Hall. This will open the existing quadrangle on the south side and enclose it on
Historic and Archaeological Resources
11-11
the north. Both structures date from 1974 and, thus, are not subject to the City of Newton’s
demolition delay ordinance which applies to buildings 50 years of age and older.
New Construction
There are three new construction projects on the Newton Campus:
The proposed 150-space surface parking lot, which is located in the vicinity of a previously
recorded archaeological site that was identified during an intensive archaeological survey
of the campus and reported in a 1995 archaeological report. The new construction may
have an effect on previously recorded archaeological sites.
The construction of an 8,500 sf recreation/athletics building, which involves the
demolition of the Quonset hut as described above. The proposed building is also in the
vicinity of several recorded archaeological sites that were identified during an intensive
archaeological survey of the campus. The new construction may have an effect on
previously recorded archaeological sites.
The construction of the 42,000 sf Smith Wing replacement and renovations to both
Stuart House and Kenny-Cottle Library. This construction has the potential to impact
Stuart House. Also, this project is located immediately south of Barat House, which was
determined eligible for listing in the National Register by the MHC.
If there is state involvement in any of these projects, Boston College will notify the MHC of
the project and consult with the agency if adverse effects are identified to historic properties.
The Newton Campus was subject to a reconnaissance archaeological and architectural survey
in 1994 in conjunction with the previous Boston College IMP. The survey identified areas
that were considered to be archaeologically sensitive, and were therefore requested by the
MHC to be subject to additional archaeological survey. Subsequent archaeological
investigations identified archaeological sites on the campus; some of the sites were
determined not to be eligible for listing in the National Register while three others have not
yet been evaluated to determine if they are eligible for the National Register.
11-12
Historic and Archaeological Resources
Download