Budgeting for Evolutionary Acquisition and Spiral Development Presented By Tim Spaulding Lean Aerospace Initiative / MIT March 26, 2003 An LAI Plenary Conference Problem Statement • Can evolutionary acquisition (and specifically spiral development) be performed without changing the way funds are allocated? • Summary: • • • • • Historical examples say no Must distinguish between incremental and spiral Concrete example shows difficultly Several options for action SPADE web.mit.edu/lean ©Massachusetts Institute of Technology Tim Spaulding- 032603 2 ACTDs (Advanced Concept Technology Demonstrations) • • • • • Program started in 1994 to mitigate the cycle time problem 2 to 4 year effort to build a prototype Congress approves money before specific projects are selected (~ $1b per year) If successful, projects enter the normal acquisition process Global Hawk (and others) slowed down in transition Transitions represent a “use and learn” cycle, and have proven difficult to fund web.mit.edu/lean ©Massachusetts Institute of Technology Tim Spaulding- 032603 3 • Concrete Example: Space Based Radar 1) Digital Terrain and Elevation Data (DTED) • 8 satellites • Small apertures 2) Imaging (SAR) and limited ground movement target indication (GMTI) • 16 satellites • Larger apetures 3) Better SAR and full tracking capabilities • 22 satellites web.mit.edu/lean ©Massachusetts Institute of Technology Tim Spaulding- 032603 4 Funding, $B Iteration 1 Iteration 2 Use and Learn FY 03 FY 04 FY 05 FY 06 Iteration 1 FY 03 User Utility Iteration 3 FY 04 Use and Learn FY 07 FY 08 FY 09 Iteration 2 FY 05 FY 06 FY 07 FY 10 FY 11 FY 12 FY 13 FY 14 Iteration 3 FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 FY 12 FY 13 FY 14 Incremental Use and Learn Spiral Use and Learn FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 FY 10 FY 11 Funding, $B Spiral Iteration 2 Iteration 1 Iteration 3 Use and Learn Use and Learn FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 X FY 10 FY 11 FY 12 FY 13 FY 14 X Plan Program Plan Program “Use and learn” not incorporated Funding, $B Incremental Iteration 1 FY 03 FY 04 Iteration 2 FY 05 FY 06 X Plan FY 07 Iteration 3 FY 08 FY 09 X Program Plan Program FY 10 FY 11 FY 12 FY 13 FY 14 Funding, $B Spiral Iteration 1 Iteration 2 Iteration 3 Use and Learn FY 03 FY 04 FY 05 FY 06 Use and Learn FY 07 FY 08 FY 09 FY 10 FY 11 X FY 12 FY 13 FY 14 X Plan Program Plan Program “Use and learn” incorporated, but timeliness reduced Funding, $B Incremental Iteration 1 FY 03 FY 04 Iteration 2 FY 05 FY 06 X Plan FY 07 Iteration 3 FY 08 FY 09 X Program Plan Program FY 10 FY 11 FY 12 FY 13 FY 14 • Conclusion: One of three things will happen 1) Use and learn will be ignored, funds will be programmed early. REAL SPIRAL DEVELOPMENT NEVER MATERIALIZES 2) Timing will be delayed. SPIRAL DEVELOPMENT WILL OCCUR BUT TOO SLOWLY 3) FUNDING STRUCTURE WILL CHANGE web.mit.edu/lean ©Massachusetts Institute of Technology Tim Spaulding- 032603 8 • Changing the Funding Structure: • Program in anticipation of success • Undefended money is problematic • Services hesitant to set aside money • Circumvent the PPBS process • Undermines the strategic planning purpose of PPBS • Who makes decrementing decisions? • Create separate budget category like ACTDs • Congress loses control, must be small programs • Loss of contractor control? web.mit.edu/lean ©Massachusetts Institute of Technology Tim Spaulding- 032603 9 • Recommendation: Something like WRAP • Warfighter Rapid Acquisition Program • Came out of CORONA, borrowed from Army • On the order of $20 M/yr (6 Projects in FY01) • Too small for spiral development on large scale • Need something bigger…. web.mit.edu/lean ©Massachusetts Institute of Technology Tim Spaulding- 032603 10 SPADE (Spiral Program Acquisition and Development Enabler) • Money used for second and third iterations of projects designated as “spiral” • Money contained in its own POM. Programs receiving SPADE funds chosen by Air Force leadership • Only previously funded programs (programs with their own POM) are eligible for funding. • Anything funded with SPADE is immediately placed in the POM for further funding. (Transition funding is only available to those programs that will be continuing on to a second iteration) • Total size is comparable to ACTD pool (approx $1B) (represents 1/20 of AF procurement budget) web.mit.edu/lean ©Massachusetts Institute of Technology Tim Spaulding- 032603 11 Without a way to reduce the two-year cycle, “use and learn” spiral development cannot be realized web.mit.edu/lean ©Massachusetts Institute of Technology Tim Spaulding- 032603 12 • BACKUP SLIDES web.mit.edu/lean ©Massachusetts Institute of Technology Tim Spaulding- 032603 13 Funding, $B SPADE SPADE Iteration 2 Iteration 1 Iteration 3 Use and Learn Use and Learn FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 FY 10 X Funding, $B Program Iteration 1 Plan FY 13 FY 05 FY 06 FY 14 Program Iteration 2 Use and Learn FY 04 FY 12 X Plan FY 03 FY 11 Use and Learn FY 07 FY 08 X Plan Iteration 3 FY 09 FY 10 FY 11 FY 12 FY 13 X Program Plan Program FY 14