Schedule of Proposed Action (SOPA) 01/01/2016 to 03/31/2016 Carson National Forest

advertisement
Schedule of Proposed Action (SOPA)
01/01/2016 to 03/31/2016
Carson National Forest
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.
Project Name
Project Purpose
Planning Status
Decision
Expected
Implementation
Project Contact
R3 - Southwestern Region, Occurring in more than one Forest (excluding Regionwide)
Supplement to the Final EIS for
Invasive Plant Control Project
EIS
- Vegetation management
(other than forest products)
- Watershed management
In Progress:
DEIS NOA in Federal Register
03/21/2014
Est. FEIS NOA in Federal
Register 06/2015
Expected:09/2015
09/2015
Julie Bain
505-438-5443
commentssouthwesternsantafe@fs.fed.us
Description: A supplement to the Final EIS for Invasive Plant Control Project on the Carson and Santa Fe National Forests to
disclose, review, and assess additional information.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=27249
Location:
UNIT - Carson National Forest All Units, Santa Fe National Forest All Units. STATE - New Mexico. COUNTY Colfax, Los Alamos, Mora, Rio Arriba, Sandoval, San Miguel, Santa Fe, Taos. LEGAL - Not Applicable. Carson
and Santa Fe National Forests in New Mexico.
R3 - Southwestern Region
Carson National Forest, Forestwide (excluding Projects occurring in more than one Forest)
Carson National Forest
Revision of Land and Resource
Management Plan
- Land management planning
EIS
*NEW LISTING*
In Progress:
NOI in Federal Register
10/07/2015
Est. DEIS NOA in Federal
Register 11/2016
Expected:03/2018
04/2018
Kevin Naranjo
575-758-6221
carsonplan@fs.fed.us
Description: Revision of the 1986 Carson National Forest Land and Resource Management Plan to update plan direction
Web Link: http://www.fs.usda.gov/goto/carsonforestplan
Location:
01/01/2016 05:43 am MT
UNIT - Carson National Forest All Units. STATE - New Mexico. COUNTY - Colfax, Mora, Rio Arriba, Taos.
LEGAL - Not Applicable. Carson National Forest.
Page
1 of 13
Carson National Forest
Project Name
Project Purpose
Planning Status
Decision
Expected
Implementation
R3 - Southwestern Region
Carson National Forest, Forestwide (excluding Projects occurring in more than one Forest)
Forest-wide Outfitter-Guide
Permit Issuance
- Special use management
EA
*UPDATED*
In Progress:
Scoping Start 04/14/2014
Est. Comment Period Public
Notice 03/2016
Project Contact
Expected:07/2016
07/2016
Amy Simms
575-758-6200
commentssouthwesterncarson@fs.fed.us
Description: Issue new and reissue expiring 10-year permits for outfitter-guide services on the Carson National Forest. Permits
would be issued based on the need and capacity within individual geographic areas.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=43472
Location:
Forest-wide Reissuance of
Expired Lands Special Use
Permits
UNIT - Carson National Forest All Units. STATE - New Mexico. COUNTY - Colfax, Mora, Rio Arriba, Taos.
LEGAL - Not Applicable. Carson National Forest.
- Special use management
Developing Proposal
Est. Scoping Start 01/2016
Expected:03/2016
CE
*UPDATED*
03/2016
Marcia Rose-Ritchie
503-307-5401
commentssouthwesterncarson@fs.fed.us
Description: Reissue approximately 35 expired or expiring long-term permits for land uses on the Carson National Forest.
There will be no change to the facilities or activities authorized in the permits.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46809
Location:
Carson National Forest
01/01/2016 05:43 am MT
UNIT - Carson National Forest All Units. STATE - New Mexico. COUNTY - Colfax, Mora, Rio Arriba, Taos.
LEGAL - Not Applicable. Carson National Forest.
Camino Real Ranger District (excluding Projects occurring in more than one District)
Page
2 of 13
R3 - Southwestern Region
Carson National Forest
Project Name
Carson National Forest
Project Purpose
Planning Status
Decision
Expected
Implementation
R3 - Southwestern Region
Camino Real Ranger District (excluding Projects occurring in more than one District)
Martinez Acequia Secondary
Inlet Structure
- Special use management
In Progress:
Scoping Start 12/09/2015
Expected:04/2016
Project Contact
04/2016
CE
*UPDATED*
Paul Schilke
575-587-2255
commentssouthwestern-carsoncaminoreal@fs.fed.us
Description: Proposed installation of a water control structure (headgate) to control erosion, divert water into the Martinez
acequia, and return excess water to its historic channel. Installation includes steel wingwalls and weir, gabion
baskets, and rip-rap.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47764
Location:
Rio Trampas
EA
Gabriel Romero
08/2016
- Forest products
In Progress:
Expected:07/2016
575-587-2255
- Vegetation management
Scoping Start 10/10/2014
comments(other than forest products)
Est. Comment Period Public
southwestern-carson- Fuels management
Notice 03/2016
caminoreal@fs.fed.us
- Watershed management
Description: A collaborative project to improve forest and watershed health on lands managed by the Camino Real RD, Carson
NF; BLM, Taos Field Office; and Picuris Pueblo within the Rio Trampas watershed. Provide fuelwood and forest
products to local communities.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45663
Location:
Tri-State Taos to Black Lake
Transmission Line Access
UNIT - Camino Real Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - Township 22 North,
Range 14 East, Section 30, New Mexico Principal Meridian. Project area is on the south side of NM Highway 518,
west of Forest Road 89.
UNIT - Camino Real Ranger District. STATE - New Mexico. COUNTY - Rio Arriba, Taos. LEGAL - Not
Applicable. 15 miles south of Taos, New Mexico.
- Special use management
EA
*UPDATED*
In Progress:
Scoping Start 09/29/2011
Est. Comment Period Public
Notice 01/2016
Expected:05/2016
05/2016
Kathryn Furr
575-758-6200
commentssouthwesterncarson@fs.fed.us
Description: Approval of 2010 proposed plan, including access across NFS lands. *This project was previously named "Tri
State Transmission Line Vegetation Management Plan". Vegetation management within the transmission line
right-of-way has been dropped.*
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=31668
Location:
01/01/2016 05:43 am MT
UNIT - Camino Real Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - sections in T 25N R
13E thru T25N R 15E. North of US 64, in Taos Canyon.
Page
3 of 13
Carson National Forest
Project Name
Carson National Forest
Project Purpose
Planning Status
Decision
Expected
Implementation
R3 - Southwestern Region
Canjilon Ranger District (excluding Projects occurring in more than one District)
Canjilon Lakes Forest Health
and Sanitation Project
CE
- Recreation management
- Vegetation management
(other than forest products)
Completed
Actual: 10/15/2015
Project Contact
11/2015
*UPDATED*
Sandra Imler-Jacquez
575-581-4554
commentssouthwestern-carsoncanjilon@fs.fed.us
Description: The purpose of this project is to reduce the risk to human life and safety in the Canjilon Lakes recreation area.
There is a need to reduce the risk of hazard trees from falling on recreationists and structures throughout the
campgrounds.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45511
Location:
Continental Divide National
Scenic Trail-Martinez Canyon
and Mesa de Las Viejas
UNIT - Canjilon Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Section: 20, T27 N.,
R6 E.; Rio Arriba County, New Mexico. This project is located within the Canjilon Lakes Campground on the
Canjilon Ranger District of the Carson National Forest.
- Recreation management
In Progress:
Scoping Start 06/07/2011
Expected:03/2016
06/2016
CE
Sandra Imler-Jacquez
575-581-4554
commentssouthwestern-carsoncanjilon@fs.fed.us
Description: Complete the re-route analysis for the last two segments of the CDT on the Canjilon Ranger District.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=42794
Location:
Fred Pearson Private Road
Access SUPs
UNIT - Canjilon Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Not Applicable.
Canjilon Ranger District.
- Special use management
In Progress:
Scoping Start 07/13/2015
CE
Expected:10/2015
10/2015
Ray Martinez
575-684-2489
commentssouthwestern-carsoncanjilon@fs.fed.us
Description: This project would authorize access to two separate parcels of private land located within 1/4 mile of each other.
This would authorize two special use permits, one for each parcel.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47874
Location:
01/01/2016 05:43 am MT
UNIT - Canjilon Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Not Applicable.
T.27N., R.5E., Section 31 off of Forest Road 124.
Page
4 of 13
Carson National Forest
Project Name
Carson National Forest
Project Purpose
Planning Status
Decision
Expected
Implementation
R3 - Southwestern Region
Canjilon Ranger District (excluding Projects occurring in more than one District)
Pedro and Lorraine Trujillo
Expired SUP
- Special use management
In Progress:
Scoping Start 03/31/2015
Expected:03/2016
Project Contact
04/2016
CE
*NEW LISTING*
Ray Martinez
575-684-2489
commentssouthwestern-carsoncanjilon@fs.fed.us
Description: Re-issue an expired special use permit for an acequia.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48022
Location:
Carson National Forest
UNIT - Canjilon Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Not Applicable. 1 mile
northeast of Canjilon, NM. South of Forest Road 559.
R3 - Southwestern Region
El Rito Ranger District (excluding Projects occurring in more than one District)
Ancones Mutual Domestic
Water and Waste Water
Consumers Association Tank
- Special use management
Completed
Actual: 10/16/2015
10/2015
CE
*UPDATED*
Marshall Alford
575-581-4554
commentssouthwestern-carsonelrito@fs.fed.us
Description: Installation and use of one 40,000 gal (18 ft dia, 20 ft tall) welded steel storage tank, including 490 ft of 3 inch inlet
and 6 inch outlet underground piping, re-enforced concrete foundation, and 15 ft access on either side of water
line trench.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=44734
Location:
UNIT - El Rito Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - T.25N,R.8E, Section 2.
State Highway 111, just north of the community of Ancones, NM.
CC Culver Private Road Special - Special use management
Use Permit
Completed
CE
*UPDATED*
Actual: 10/16/2015
10/2015
Ray Martinez
575-684-2489
commentssouthwestern-carsonelrito@fs.fed.us
Description: This project is a roadway ingress/egress to a private inholding. The access is approximately .21 miles on National
Forest Lands. The project is located near La Madera, NM.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47189
Location:
01/01/2016 05:43 am MT
UNIT - El Rito Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Not Applicable. T. 25
N., R. 8E, Section 24.
Page
5 of 13
Carson National Forest
Project Name
Carson National Forest
Project Purpose
Planning Status
Decision
Expected
Implementation
R3 - Southwestern Region
El Rito Ranger District (excluding Projects occurring in more than one District)
Sagebrush Habitat
Improvement Project
- Wildlife, Fish, Rare plants
- Vegetation management
(other than forest products)
- Watershed management
EA
On Hold
N/A
Project Contact
N/A
Sandra Imler-Jacquez
575-581-4554
commentssouthwestern-carsonelrito@fs.fed.us
Description: The El Rito Ranger District is proposing to treat approximately 13,000 acres of sagebrush via mechanical methods
and Tebuthiuron, reseed sagebrush treated areas where needed with grasses and forbs, and broadcast burn
sagebrush treated areas.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38104
Location:
Carson National Forest
UNIT - El Rito Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Not Applicable. Multiple
Allotments on the El Rito Ranger District.
R3 - Southwestern Region
Jicarilla Ranger District (excluding Projects occurring in more than one District)
2016 New Mexico Department
of Game and Fish Habitat
Stamp Program Projects
- Wildlife, Fish, Rare plants
- Watershed management
In Progress:
Scoping Start 07/01/2015
CE
*UPDATED*
Expected:01/2016
02/2016
Patrick Yamnik
505-632-2956
commentssouthwestern-carsonjicarilla@fs.fed.us
Description: The Forest Service proposes to construct 4 new, relocate 1, decommission 2, and maintain and implement
improvements to 23 existing wildlife water developments. Install stream barbs and riparian enclosures within
Carrizo/Compañero Canyon.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47011
Location:
01/01/2016 05:43 am MT
UNIT - Jicarilla Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Township (T) 27N,
Range (R) 4W; T28N, R4W; T29N, R4W; T30N, R4W; T30N, R5W; T31N, R4W; T31N, R5W; T32N, R4W; T32N,
R5W. Various locations across Jicarilla Ranger District.
Page
6 of 13
Carson National Forest
Project Name
Carson National Forest
Project Purpose
Planning Status
Decision
Expected
Implementation
R3 - Southwestern Region
Jicarilla Ranger District (excluding Projects occurring in more than one District)
El Paso CGP Company, LLC
Special Use Authorization
- Minerals and Geology
- Special use management
In Progress:
Scoping Start 10/22/2015
Expected:01/2016
Project Contact
04/2016
CE
*UPDATED*
Patrick Yamnik
505-632-2956
commentssouthwestern-carsonjicarilla@fs.fed.us
Description: Issuance of a Special Use Permit for an existing groundwater monitoring well and drilling four new monitoring wells
to monitor a historic pipeline line drip; would also allow for additional future monitoring wells and site remediation if
needed.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47726
Location:
Williams Four Corners, LLC
(WFC) Special Use
Authorization, Oil and Gas
Pipeline
CE
*UPDATED*
- Special use management
01/01/2016 05:43 am MT
In Progress:
Scoping Start 04/08/2013
Expected:01/2016
01/2016
Jon Miller
505-632-2956x77240
jjmiller@fs.fed.us
Description: The Forest Service is proposing to approve an application for a special use authorization, submitted by WFC. The
special use authorization would allow WFC to operate and maintain an existing natural gas pipeline and associated
infrastructure system.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=41925
Location:
Carson National Forest
UNIT - Jicarilla Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Southeast 1/4 of
Section 13, Township 28 North, Range 4 West, New Mexico Principal Meridian. The action would be limited to a
total area of approximately 4.3 acres on the eastern boundary of the Jicarilla Ranger District approximately 1 mile
south of Forest System Road 357.
UNIT - Jicarilla Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Township (T) 27 N,
Range (R) 4 W; T28N, R4W; T29N, R4W; T29N, R5W; T30N, R4W; T30N, R5W; T31N, R4W; T31N, R5W; and
T32N, R5W. Jicarilla Ranger District.
Questa Ranger District (excluding Projects occurring in more than one District)
Page
7 of 13
R3 - Southwestern Region
Carson National Forest
Project Name
Carson National Forest
Project Purpose
Planning Status
Decision
Expected
Implementation
R3 - Southwestern Region
Questa Ranger District (excluding Projects occurring in more than one District)
14D Mountain Bike Trail
- Special use management
CE
Developing Proposal
Est. Scoping Start 04/2016
Expected:07/2016
Project Contact
08/2016
Eric Garner
575-586-0520
commentssouthwestern-carsonquesta@fs.fed.us
Description: Construction of 3.2 miles of flow track mountain bike trail within the special use permit boundary of Taos Ski Valley
(TSV).
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45908
Location:
Bitter Creek Recreation
Residence Lot 24 Improvement
Project
UNIT - Questa Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - NMPM T27N R14E Section
9. The 14D Mountain Bike Trail would be located within the Taos Ski Valley special use permit area. It would begin
at the drop-off of Lift 1 (Al's Run) and continue to northeast of the village core.
- Special use management
In Progress:
Scoping Start 10/06/2015
Expected:10/2015
10/2015
CE
*UPDATED*
Kevin Lehto
575-586-0520
commentssouthwestern-carsonquesta@fs.fed.us
Description: Roof replacement, attached shed removal, and construction of an addition in the same style as the existing
structure is proposed to the recreation residence at 24 Bitter Creek Rd. in Red River, NM.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47685
Location:
Bull-of-the-Woods Connector
Trail
UNIT - Questa Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - T 29N, R 14E, Section 25,
NMPM. 24 Bitter Creek Rd., Red River, NM.
- Recreation management
Completed
CE
*UPDATED*
Actual: 10/26/2015
05/2016
Eric Garner
575-586-0520
commentssouthwestern-carsonquesta@fs.fed.us
Description: A 435' pedestrian trail is proposed to connect the eastern parking area of Taos Ski Valley with the Bull-of-theWoods trailhead.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46561
Location:
01/01/2016 05:43 am MT
UNIT - Questa Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - NMPM T27N R14E SE 1/4
of Section 4. The Bull-of-the-Woods Connector Trail will be located north of Twining Road near its intersection
with Thunderbird Road at the east end of the Taos Ski Valley parking area.
Page
8 of 13
Carson National Forest
Project Name
Carson National Forest
Project Purpose
Planning Status
Decision
Expected
Implementation
R3 - Southwestern Region
Questa Ranger District (excluding Projects occurring in more than one District)
Citizens Ditch Diversion
- Special use management
CE
In Progress:
Scoping Start 02/26/2015
Expected:04/2016
Project Contact
07/2016
Eric Garner
575-586-0520
commentssouthwestern-carsonquesta@fs.fed.us
Description: A water control structure (headgate) is proposed to be installed across the Red River at the Questa Citizens Ditch
Association's point of diversion.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45905
Location:
Kiowa-San Cristobal Wildland
Urban Interface
EA
UNIT - Questa Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - NMPM, T29N, R13E,
Section 33, SW 1/4. Located on the Red River, south of State Highway 38 and east of the Questa Ranger Station.
- Vegetation management
(other than forest products)
- Fuels management
*UPDATED*
In Progress:
Scoping Start 10/27/2015
Est. Comment Period Public
Notice 08/2016
Expected:12/2016
05/2017
Raymundo Corral
575-587-2255
commentssouthwestern-carsonquesta@fs.fed.us
Description: A wildland urban interface project that will reduce existing hazardous fuel conditions and improve habitat, range,
and resource conditions over approximately 9,000 acres.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45682
Location:
New Mexico Gas Company
Authorization
UNIT - Questa Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - Secs. 1-4, 9-16, 22, & 23
T27N R12E NMPM; Secs. 6-9 & 16-18 T27N R13E NMPM; Secs. 24-27 & 33-36 T28N R12E NMPM; Secs. 30
& 31 T28N R13E NMPM. National Forest System lands adjacent to San Cristobal and Kiowa Village. Project area
is bounded to the west by Hwy. 522, to the north by Lama, and to the south by the Arroyo Hondo Land Grant.
- Special use management
On Hold
CE
N/A
N/A
Kevin Lehto
575-586-0520
commentssouthwestern-carsonquesta@fs.fed.us
Description: Issue to a new owner a special use authorization for existing gas distribution improvements, and analyze the
installation of additional pipeline through the National Forest in the Red River area and minor improvements to
existing infrastructure.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40354
Location:
01/01/2016 05:43 am MT
UNIT - Questa Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - Not Applicable. Multiple
locations across the Questa Ranger District.
Page
9 of 13
Carson National Forest
Project Name
Carson National Forest
Project Purpose
Planning Status
Decision
Expected
Implementation
R3 - Southwestern Region
Questa Ranger District (excluding Projects occurring in more than one District)
Red River Ski Area Green
Chairlift Replacement and Fuel
Storage Project
- Special use management
In Progress:
Scoping Start 08/26/2015
Expected:12/2015
Actual: 12/03/2015
Project Contact
05/2016
CE
*UPDATED*
Kevin Lehto
575-586-0520
commentssouthwestern-carsonquesta@fs.fed.us
Description: Decision has approved replacement of Red River Ski Area's existing 37-year-old Green Chairlift with a new
chairlift in a more efficient alignment. Decision on installation of a 4,000-gallon fuel tank in the RRSA's
maintenance yard is forthcoming.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47626
Location:
Red River Town Park
Restoration
UNIT - Questa Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - Sections 1 & 2, T 28N, R
14E, NMPM; Section 35, T 29N, R 14E, NMPM. Project activities will take place in the vicinity of Red River Ski
Area's Green Chairlift and maintenance yard. Existing roads will be utilized for access.
- Wildlife, Fish, Rare plants
- Special use management
In Progress:
Scoping Start 06/26/2015
CE
Expected:12/2015
09/2016
Michael Gatlin
575-758-6200
commentssouthwesterncarson@fs.fed.us
Description: Installation of in-stream structures and other measures to improve fish habitat in a 0.5-mile section of the Red
River. A special use permit is also proposed to expand the paved trail of Red River Town Park and to install ADAcompliant fishing piers.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=45987
Location:
01/01/2016 05:43 am MT
UNIT - Questa Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - NMPM T29N R14E Section
36 southern half. Restoration of the Red River will occur just upstream from its confluence with Bitter Creek west
to the bridge at Pioneer Rd. Expansion of the paved trail will occur behind the Conference Center.
Page
10 of 13
Carson National Forest
Project Name
Carson National Forest
Rio Costilla Terminal Fish
Barrier
Project Purpose
Planning Status
Decision
Expected
Implementation
R3 - Southwestern Region
Questa Ranger District (excluding Projects occurring in more than one District)
- Wildlife, Fish, Rare plants
EA
In Progress:
Comment Period Public Notice
12/10/2015
Expected:04/2016
*UPDATED*
Project Contact
09/2016
Michael Gatlin
575-758-6200
commentssouthwesterncarson@fs.fed.us
Description: A 98.4-foot-wide permanent fish passage barrier is proposed along Rio Costilla. Connected actions include the
realignment of approximately 850 feet of Forest Road 1950, and the installation of riprap to control erosion.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=46396
Location:
Upper Bitter Creek Project
EA
Timothy Fruits
- Wildlife, Fish, Rare plants
On Hold
N/A
N/A
575-758-6312
- Forest products
tfruits@fs.fed.us
- Vegetation management
(other than forest products)
- Fuels management
- Watershed management
Description: Project will address forest and watershed health issues, improvements to wildlife habitat, provide traditional use
forest products, maintain heathy vegetation characteristics that allow resistance to wildfire, insect and disease
outbreaks.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=33860
Location:
Carson National Forest
01/01/2016 05:43 am MT
UNIT - Questa Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - SE 1/4 sec. 16, T. 30 N, R.
15 E NMPM. Project located approximately 0.6 miles east of the Forest Service Boundary along Forest Road 1950
on the west end of the Valle Vidal Unit.
UNIT - Questa Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - R.15E./T.30N. Sec.31,32,33 and R.15E./T.29N.- Sec.3,4,5,6,7,8,9,10,15,16,17,18,20. Headwaters of 3 watersheds, all tributaries
of the Red River WS, including Bitter Creek, Cabresto Creek, Mallette Creek, has some common boundary with
VV Unit and RCLA.
Tres Piedras Ranger District (excluding Projects occurring in more than one District)
Page
11 of 13
R3 - Southwestern Region
Carson National Forest
Project Name
Carson National Forest
Project Purpose
Planning Status
Decision
Expected
Implementation
R3 - Southwestern Region
Tres Piedras Ranger District (excluding Projects occurring in more than one District)
Rio Tusas-Lower San Antonio
Landscape Restoration Project
- Vegetation management
(other than forest products)
EA
*UPDATED*
In Progress:
Scoping Start 10/22/2015
Est. Comment Period Public
Notice 06/2016
Expected:04/2017
Project Contact
05/2017
Alicia Gallegos
575-758-8678
commentssouthwestern-carsontres-piedras@fs.fed.us
Description: The objective is to conserve and restore the Rio Tusas-Lower San Antonio landscape in order to increase forest
ecosystem sustainability and resiliency to natural disturbances such as drought and climatic variability, insects,
disease, fire and wind
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=47861
Location:
San Antonio Mountain
Communication Site Lease
Taos County
UNIT - Tres Piedras Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Not Applicable.
The project is located on the Tres Piedras Ranger District of the Carson National Forest (CNF) and surrounds the
community of Tres Piedras in northern New Mexico.
- Special use management
Developing Proposal
Est. Scoping Start 01/2016
Expected:01/2016
01/2016
CE
*NEW LISTING*
Marshall Alford
575-581-4554
commentssouthwestern-carsontres-piedras@fs.fed.us
Description: Transfer communication site lease for existing facilities from the current lease holder, Kit Carson Electric
Cooperative, to the government of Taos County.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=48123
Location:
Santos Grazing Allotment
UNIT - Tres Piedras Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - T. 30 N, R. 9 E,
section 5. Existing communication site at the top of San Antonio Mountain, located approximately 15 miles north of
Tres Piedras, NM.
- Grazing management
On Hold
EA
N/A
N/A
Wayne Yonemoto
575-758-8678
commentssouthwestern-carsontres-piedras@fs.fed.us
Description: Permit adjustment of season of use. *Project placed on hold due to comments received during comment period.*
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=40136
Location:
01/01/2016 05:43 am MT
UNIT - Tres Piedras Ranger District. STATE - New Mexico. COUNTY - Taos. LEGAL - T. 25N, R. 10 E.,
Sections 2, 3, 4, 9, 10; T. 26N, R 10 E, Sections 19, 20, 26, 27, 29-31, 33-35. Tres Piedras Ranger District,
Carson National Forest.
Page
12 of 13
Carson National Forest
Project Name
Carson National Forest
Project Purpose
*UPDATED*
Decision
Tres Piedras Ranger District (excluding Projects occurring in more than one District)
Tio Gordito Restoration Project
EA
Planning Status
Expected
Implementation
Project Contact
R3 - Southwestern Region
Sandra Imler-Jacquez
- Wildlife, Fish, Rare plants
Completed
Actual: 11/18/2015
11/2015
575-581-4554
- Forest products
comments- Vegetation management
southwestern-carson(other than forest products)
tres-piedras@fs.fed.us
- Fuels management
Description: Improve resiliancy and restore desired conditions in ponderosa pine forests using mechanical treatments and
prescribed burning.
Web Link: http://www.fs.fed.us/nepa/nepa_project_exp.php?project=38406
Location:
UNIT - Tres Piedras Ranger District. STATE - New Mexico. COUNTY - Rio Arriba. LEGAL - Not Applicable.
Red Mesa, Dry Lakes, and Tres Piedras areas.
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial
status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited
bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at
(202) 720-2600 (voice and TDD).
To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA
is an equal opportunity provider and employer.
This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.
01/01/2016 05:43 am MT
Page
13 of 13
Carson National Forest
Download