Contractor Integral Work under General Requirements These items are included as part of the General Contractor’s work unless specifically noted in the Contract, the costs and charges for all items and matters within these descriptions are deemed to be covered in a Contractor’s quotation for the entire duration of the Project until Project Completion. GENERAL CONDITIONS Mobilization/Demobilization Survey and Layout Staff related expenses, Temporary buildings, Sanitary facilities, Office Supplies and equipment, Site Office furnishings, Computers, radios, telephones and cell phones, Software and licenses, Copier, fax, and scanner, First Aid supplies and equipment, Couriers and mail, Cartage, delivery, and demurrage Progress photographs (incl. description and cataloguing), Plans and printing, Electronic document posting Security and fire protection Inspections and testing On-going cleanup and finish protection, Waste disposal containers/recycling, Snow removal Small Tools and consumables, Warning/safety signs/site safety plans, Project and site signs Temporary fencing, hoarding and protection Ladders, barricades, and fall protection Temporary access Environmental Care -oil spillage, wash down, etc., Final cleanup Legal and professional services, Misc. fees, permits and licenses LEED allowance Close-out, manuals, as-built, Warranty and deficiency repairs TEMPORARY SERVICES Temp. Telephone and internet/email, Temp. Fax , Temp. Computer install and maintenance, Temp. Power for offices 12-Dec-11 usage inc. hook-up Temp. Power for site usage inc. hook-up Temp. Water Temp. Heating Temp. Lighting Temp. Weather protection Temp. Roads EQUIPMENT Hoists, cranes, and forklifts, Temporary elevator Vehicles, Equipment rental LABOUR General labour Hoist operators Snow removal, sanding and salting Traffic control and flagging BONDS Performance, Labour and Materials Payment Sub-Trades INSURANCE Commercial General Liability Automobile Wrap-up All Risks Professional Liability Sub-Guard While not all items listed are applicable to every project, this list is a standard expectation for SFU major projects and can serve as a guide for other projects. 12-Dec-11