CAMPUS PLANNING & DEVELOPMENT Simon Fraser University Date: Sep 26, 2005 Major Capital Project Checklist Project Name: XXXXXX Schedule DEFINITION / FEASIBILITY Variable • Develop Description Users Space Allocation • Initiate Preliminary Planning Location Schedule Central Systems (OTS,FM, Sec, AV,Reg,SS,FS, Disabled) Cost - Unit Rate or Other Initiate Standard Project Reports CONSULTANT SELECTION • • • • • • • Initiated Complete 1 Month Recommend Committee Membership Recommend Short List Set Up Interviews Recommend Award to VP Finance and Administration Negotiate Initial Contract Recommend Signing of Contract Copy to File Proceed with Programming / Schematics FACILITY PROGRAMMING • • • • • • • • • • • • Notes: Initiated Complete 4 Months Set up Building User Committee Check Campus Masterplan for requirements Check OTS for Data/Tel requirements Check FM Operations and Maintenance Check Traffic and Security Check Audio-Visual Check Registrars (Where applicable) Check Student Services Check Food Services Check Disabled Requirements Interview Users Review with Building Committee Publish Functional Program Document SCHEMATIC DESIGN Initiated Complete 2 Months • Initiate Geotechnical study • Initiate Topographic survey Review site with Construction Inspector/Campus Planner • Select / Engage Cost Consultant • Initiate Preliminary Planning • FM Operations and Maintenance review • Central Systems Review (OTS,FM, Sec, AV,Reg,SS,FS, Disabled) Hold Public Information Session • Verify Cost Estimate • Review with Building Committee • Submit to Ministry if Required Publish Schematic Design Document Major_ Project_Checklist.Sep05 Initiated Complete Page 1 BUSINESS PLAN 1 Month • Engage Consultants if Required Define Users Define Space Allocation Define Location Define Schedule Define Cost Estimate Develop Revenues Develop Operating Costs • Determine Contracting Strategy • Review with Building Committee Initiated Complete Submit for Approval CONFIRM ARCHITECT COMMISSION (Where applicable) • Review performance • Negotiate fee for services • Recommend Award to VP Finance and Administration Apply to Board of Gov. for Award of Contract • Send Letter of Intent with appropriate signature • Receive contracts Review for Compliance Signatures by appropriate party • Copy to File Proceed with Design Development CONSTRUCTION MANAGER SELECTION (Where applicable) • • • • • Prequalify Candidates Tender Fee for Pre-construction Services Recommend Award to VP Finance and Administration Send Letter of Intent with appropriate signature Receive contracts Review for Compliance Signatures by appropriate party • Copy to File Proceed with Design Development DESIGN DEVELOPMENT • • • • • Initiated Complete 1 Month Initiated Complete 3 Months Perform Value Analysis and / or Constructibility Review Central Systems Review (OTS,FM, Sec, AV,Reg,SS,FS, Disabled) Verify Cost Estimate Review with Building Committee Submit to Ministry if Required Submit PPA Application to Burnaby CONSTRUCTION DOCUMENTATION - BUILDING SHELL • • • • • • • • 1 Month Perform Value Analysis and / or Constructibility Review Provide SFU Tender Documentation Risk Manager Review Operations and Maintenance Review Central Systems Review (OTS,FM, Sec, AV,Reg,SS,FS, Disabled) Verify Cost Estimate Review with Building Committee Submit to Ministry if Required Apply for Building Permit Major_ Project_Checklist.Sep05 Complete 6 Months Initiated Complete Page 2 GO TO TENDER - BUILDING SHELL 2 Months • Apply to AVED for permission to go to Tender (Where applicable) Program, cost estimate, schedule • Set Tender date Advertisements • Site Tour • Tender • Recommend Award of Tender Letter of recommendation from Architect Letter of review from Risk Manger Letter of review from Lawyer • Memo to Director Apply to Board of Gov. for Award of Contract Apply to Minstry for Capital Approval Certificate • Send Letter of Intent with appropriate signature • Receive contracts Review for Compliance Signatures by appropriate party Copies to Contractor / File CONSTRUCTION - BUILDING SHELL • • • • Initiated Complete 12-20 months Start up site meeting Progress claims Change Orders Substantial Completions Initiated Complete Apply for Occupancy Permit CONSTRUCTION DOCUMENTATION - FITOUT • • • • • • • Perform Value Analysis and / or Constructibility Review Provide SFU Tender Documentation Risk Manager Review Central Systems Review (OTS,FM, Sec, AV,Reg,SS,FS, Disabled) Verify Cost Estimate Review with Building Committee Submit to Ministry if Required Apply for Building Permit GO TO TENDER - FITOUT 6 Months Initiated Complete 2 Months • Apply to AVED for permission to go to Tender (Where applicable) Program, cost estimate, schedule • Set Tender date Advertisements • Site Tour • Tender • Recommend Award of Tender Letter of recommendation from Architect Letter of review from Risk Manger Letter of review from Lawyer • Memo to Director Apply to Board of Gov. for Award of Contract Apply to Minstry for Capital Approval Certificate • Send Letter of Intent with appropriate signature • Receive contracts Review for Compliance Signatures by appropriate party Copies to Contractor / File Major_ Project_Checklist.Sep05 Initiated Complete Page 3 CONSTRUCTION - FITOUT • • • • 12-20 months Start up site meeting Progress claims Change Orders Substantial Completions Initiated Complete Apply for Occupancy Permit FURNITURE 12 months • Select Furniture Consultant Provide SFU brief including standards and contract procedures • Identify requirements with users • Tender Letter of recommendation from Consultant Letter of review from Lawyer if required • Send Letter of Intent with appropriate signature • Receive contracts Review for Compliance Signatures by appropriate party Monitor Delivery and Installation SIGNAGE Complete 6 months • Select Signage Consultant Provide SFU brief including standards and contract procedures • Identify requirements with users • Tender Letter of recommendation from Consultant Letter of review from Lawyer if required • Send Letter of Intent with appropriate signature • Receive contracts Review for Compliance Signatures by appropriate party Monitor Delivery and Installation OCCUPANCY • • • • • • • Initiated Initiated Complete 4 months Develop schedule Tender moving contractor Confirm data / tel hookup arrangements Confirm keying / security arrangements Monitor comissioning Implement deficiency completion Implement handover process to Users - FM etc Initiated Complete Coordinate Move-in CLOSE OUT • • • • • • • n/a Closure Letter to Ministry (Where applicable) CAD Files to CPD Space, FM Records, OTS Records Warranty's to FM Maintenance and As Builts to Records Financial Reconciliation Post Occupancy Review Project summary information to Director Review files and send to Archives Major_ Project_Checklist.Sep05 Initiated Complete Page 4