PROJECT GUIDE | Revisions & Updates SFU Burnaby Project Guide is a living document and it is expected that as requirements change over time, the Guide is periodically updated in the online document (www.sfu.ca/ fs). This list of Addendum items highlights substantive changes made to requirements and their release dates. The most recent version of the Project Guide supersedes earlier versions. The Consultant/ Contractor should request confirmation from the SFU Project Manager on current version if in doubt. Date Description 06/30/2010 Final Draft released to Committee for final comments 08/09/2010 Project Guide v.1.0 09/01/2011 Project Guide v.2.0 Revision (Page and Section #) 0 Additions: • On Campus Making in America – link to online article Page 8 • Project Initiating Form Appx.A-5 • Burnaby Campus Construction Map Appx.B-2 • Storm Water Management Standards Appx.B-3 • EH&S Safety Procedures Appx.B-4a,4b & 4c • Geographic and Climate Data Part A- page 12, Appx.C-1 • Door Numbering and Labeling Requirements Appx.C-7 • 2011 Energy Efficiency Act Appx.C-14 • Green Standard – Common Area, Offices, Wet Labs and Washrooms Appx.C-8,9,10,11 • Burnaby Recycling Bin Location Map Updates: 09/01/2014 • Burnaby Campus Map(2011) • SFU Legal Map (2011) • Departmental Renovations and Minor Project Checklist • SFU Room ID Standards • Interior & Exterior Lighting Fixture Standard Products • Records Submittal Checklist Appx.C-12 Appx.A-1 Appx.A-3 Appx.A-6 Appx.C-6 From Appx.C-5&6 to Appx.C-17 Appx.D-3 Additions: • Determining ASHRAE 90.1-2010 Climate Zones Appx.C-2B • Interior Signage Guidelines Appx.C-18 Updates: • Burnaby Campus Map (2014) Appx.A-1 • Building List, Names, Official acronyms and Building numbers Appx.A-2 • Climate Data & Geotechnical Site Information -Revision to meet the current BC Building Code 2012 Part A-page 12 • Reference Levels by Building Floors – Campus reference Levels diagram were added Appx.C-4 • SFU Room ID Standards • Door Numbering and Labeling Requirements Appx.C-6 • SFU Mechanical & Electrical Equipment Identification and Labeling System • Record Submittal Checklist – formatting changes Appx.C-7 Appx.D-1 Appx.D-3 7 8 | PROJECT GUIDE 01/09/2015 03/17/2015 04/13/2015 04/28/2016 Updates: • Building List, Names, Official acronyms and Building numbers –Minor changes ( BLDG #10 & #31) • SFU Construction Map Changes: • Unionized trades are required under $150,000 projects from $120,000. Appx.A-2 Part B- Page 23 Part B- Page 23 Updates: • Burnaby Campus Map 2016 Appex.A-1 Additions: • Burnaby Campus Exterior Wayfinding Standards Appx.C-19 Disclaimer Simon Fraser University Facilities Services provides these standards and guidelines which are to be applied as required in your project but in no way is intended to override or remove responsibility of the Consultant or the Contractor to provide best practice and advise on the proper system design or application for a specific project. Notwithstanding the requirements of these Standards, the Contract and the specific requirements of the contractual Agreement takes precedence over these standards. Refer also to www.sfu.ca/fs for most up-to-date standards.