PROJECT GUIDE
|
Revisions & Updates
SFU Burnaby Project Guide is a living document and it is expected that as requirements
change over time, the Guide is periodically updated in the online document (www.sfu.ca/
fs). This list of Addendum items highlights substantive changes made to requirements and
their release dates. The most recent version of the Project Guide supersedes earlier versions.
The Consultant/ Contractor should request confirmation from the SFU Project Manager on
current version if in doubt.
Date
Description
06/30/2010
Final Draft released to Committee for final comments
08/09/2010
Project Guide v.1.0
09/01/2011
Project Guide v.2.0
Revision (Page and Section #)
0
Additions:
•
On Campus Making in America – link to online article
Page 8
•
Project Initiating Form
Appx.A-5
•
Burnaby Campus Construction Map
Appx.B-2
•
Storm Water Management Standards
Appx.B-3
•
EH&S Safety Procedures
Appx.B-4a,4b & 4c
•
Geographic and Climate Data
Part A- page 12, Appx.C-1
•
Door Numbering and Labeling Requirements
Appx.C-7
•
2011 Energy Efficiency Act
Appx.C-14
•
Green Standard – Common Area, Offices, Wet Labs
and Washrooms
Appx.C-8,9,10,11
•
Burnaby Recycling Bin Location Map
Updates:
09/01/2014
•
Burnaby Campus Map(2011)
•
SFU Legal Map (2011)
•
Departmental Renovations and Minor Project
Checklist
•
SFU Room ID Standards
•
Interior & Exterior Lighting Fixture Standard Products
•
Records Submittal Checklist
Appx.C-12
Appx.A-1
Appx.A-3
Appx.A-6
Appx.C-6
From Appx.C-5&6 to
Appx.C-17
Appx.D-3
Additions:
•
Determining ASHRAE 90.1-2010 Climate Zones
Appx.C-2B
•
Interior Signage Guidelines
Appx.C-18
Updates:
•
Burnaby Campus Map (2014)
Appx.A-1
•
Building List, Names, Official acronyms and Building
numbers
Appx.A-2
•
Climate Data & Geotechnical Site Information
-Revision to meet the current BC Building Code 2012
Part A-page 12
•
Reference Levels by Building Floors – Campus
reference Levels diagram were added
Appx.C-4
•
SFU Room ID Standards
•
Door Numbering and Labeling Requirements
Appx.C-6
•
SFU Mechanical & Electrical Equipment Identification
and Labeling System
•
Record Submittal Checklist – formatting changes
Appx.C-7
Appx.D-1
Appx.D-3
7
8
|
PROJECT GUIDE
01/09/2015
03/17/2015
04/13/2015
04/28/2016
Updates:
•
Building List, Names, Official acronyms and Building
numbers –Minor changes ( BLDG #10 & #31)
•
SFU Construction Map
Changes:
•
Unionized trades are required under $150,000
projects from $120,000.
Appx.A-2
Part B- Page 23
Part B- Page 23
Updates:
•
Burnaby Campus Map 2016
Appex.A-1
Additions:
•
Burnaby Campus Exterior Wayfinding Standards
Appx.C-19
Disclaimer
Simon Fraser University Facilities Services provides these standards and guidelines which
are to be applied as required in your project but in no way is intended to override or remove
responsibility of the Consultant or the Contractor to provide best practice and advise on the
proper system design or application for a specific project.
Notwithstanding the requirements of these Standards, the Contract and the specific
requirements of the contractual Agreement takes precedence over these standards.
Refer also to www.sfu.ca/fs for most up-to-date standards.