7310.42_exhibit _01 Page 1 of 3 FOREST SERVICE MANUAL SOUTHWESTER REGION (REGION 3) ALBUQUERQUE, NEW MEXICO FSM 7300 – BUILDINGS AND OTHER STRUCTURES CHAPTER 7300 – ZERO CODE Supplement No.: 7300-2001-1 Effective Date: October 3, 2001 Duration: Effective until superseded or removed Approved: James T. Gladen Deputy Regional Forester, Respources Date Approved: September 19, 2001 Posting Instructions: Supplements are numbered consecutively by Title and calendar year. Post by document name. Remove entire document and replace with this supplement. Retain this transmittal as the first page of this document. The last supplement to this title was 7300-96-1 to FSM 7310. 7310.42 Exhibit 01 New Document(s): 3 Pages Superseded Document(s): Digest: 7310.42 Exhibit 01 Delegation of authority summary exhibit. This supplement is a reissuance of expired Interim Directive R3 7300-981 to Zero Code. R3 SUPPLEMENT 7300-2001-1 EFFECTIVE DATE: 10/03/2001 DURATION: Effective until superseded or removed 7310.42_exhibit _01 Page 2 of 3 FSM 7300 – BUILDINGS AND OTHER STRUCTURES CHAPTER – ZERO CODE 7310.42 - Exhibit 01 Delegations of Buildings and Other Structures Authorities Delegable (Del) = The authority is delegated and may be redelegated to next lower organizational level. Yes = The authority is delegated to the organizational level. Yes ( ) = The authority is delegated to the position identified in parenthesis. No = The authority is not delegated and may not be exercised. RF = Regional Forester; DRF = Deputy Regional Forester; SD = Staff Director; FS = Forest Supervisor. Delegated Authority - Activity FSM/FSH Reference Authority delegated to RF DRF SD FS 1. Approve facility master plans. FSM 7310.42 Yes No No No 2. Approve ownership and use of fuel dispensing facilities per Dept. of Agriculture Property Management Regulation 104-38.5300-2 (FSH 6409.31, subchapter G). FSM 7310.42 Yes Yes Yes ENG No 3. Approve method of facility FSM 7310.42 acquisition (lease, purchase, and 7313.04 construction, exchange) as documented in the Preliminary Project Analysis. Yes Yes No No 4. Submit acquisition proposals for quarters that are outside OMB or Congressional limitations. FSM 7310.42 Yes Yes No No 5. Approve construction proposals (w/ FSM 7310.42 Design Narrative Engineering Report and Site Development Plan) for: a. Projects less than $250,000. Del Yes Yes Yes Del Del Yes ENG or REC No b. Projects more than $250,000. R3 SUPPLEMENT 7300-2001-1 EFFECTIVE DATE: 10/03/2001 DURATION: Effective until superseded or removed 7310.42_exhibit _01 Page 3 of 3 FSM 7300 – BUILDINGS AND OTHER STRUCTURES CHAPTER – ZERO CODE 7310.42 - Exhibit 01--Continued Delegations of Buildings and Other Structures Authorities Delegable (Del) = The authority is delegated and may be redelegated to next lower organizational level. Yes = The authority is delegated to the organizational level. Yes ( ) = The authority is delegated to the position identified in parenthesis. No = The authority is not delegated and may not be exercised. RF = Regional Forester; DRF = Deputy Regional Forester; SD = Staff Director; FS = Forest Supervisor. Delegated Authority - Activity FSM/FSH Reference 6. Approve construction drawings and specifications for: buildings and related facilities if: a. Projects less than $250,000. FSM 7310.42 Authority delegated to RF DRF SD FS Del Del Del Yes b. Drawings and specifications stamped or certified by registered professionals regardless of project cost. Del Del Del Yes c. Project cost is more than $250,000 and drawings and specifications are not stamped or certified as above. (see FSM 7100 for case by case criteria to redelegate) Del Del Yes Yes ENG (Case by Case) 7. Determine frequency and intensity of health and safety inspections for facilities. FSH 7309.11, Sect 44.2 Del Del Yes ENG & S&H Mgr. Yes 8. Select safety and health inspectors for facilities. FSH 7309.11, Sect 44.2 Del Del Yes ENG Yes