European Commission DG Justice, Freedom and Security Framework Contract Quality Assurance –JLS-B3-2007-05 Service Order: so 30- Entry-Exit Costing Study Final Report Cost Analysis of EntryExit & Registered Traveller Systems (CB-E-SO30-REP-003) Abstract This document is the Final Report of the cost analysis of the Entry-Exit and Registered Traveller Systems Document information AUTHOR OWNER ISSUE DATE VERSION APPROVAL STATUS Unisys European Commission DG JLS 19-04-2010 1.30 Submitted Document History VER DATE AUTHOR DESCRIPTION ACTION* PG 0.01 25/01/10 Huijgens Initial draft 0.02 11/02/10 Huijgens Tavano Updated based on feedback from COM. Identified scenarios and described the methodology I U All 0.03 16/02/10 Tavano Revised text, tables, pictures IR All 0.04 26/02/10 Tavano Updated based on feedback from COM. IR All 0.05 04/03/10 Huijgens Tavano Revised text, tables, pictures. Updated based on feedback from COM. IR All 0.06 23/03/10 Huijgens Revised text, tables, pictures IR All 0.07 24/03/10 Huijgens Revised text, tables, pictures IR All 1.00 24/03/10 Huijgens, Dalamanga, Wiersma Final version IR All 1.10 29/03/10 Huijgens, Dalamanga, Wiersma Final version addressing COM comments IR All L I M I T E D D I S T R I B U T I O N , Printed 4/25/2012, p. 1/137 Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems VER DATE AUTHOR DESCRIPTION ACTION* PG 1.20 31/03/10 Huijgens, Dalamanga, Wiersma Final version IR All 1.30 19/04/10 Huijgens Final version, removed disclaimer Changed ‘SemiAutomated’ to ‘Semi-Manual’ R 3 Action: I = Insert, R = Replace Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 2/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Contents 1 EXECUTIVE SUMMARY 7 2 INTRODUCTION 10 3 METHODOLOGY AND COST ANALYSIS STRUCTURE 11 3.1 IDENTIFYING THE COST ELEMENTS 11 3.2 TOOLS 12 3.2.1 The Cost Model 12 3.2.2 Function Point Analysis 13 3.2.3 CostXpert 14 3.2.4 Infrastructure Design and Sizing 14 3.2.5 Accuracy 14 4 USE CASES 15 4.1 THIRD COUNTRY NATIONAL BORDER CROSSING – ENTRY 15 4.2 THIRD COUNTRY NATIONAL BORDER CROSSING – EXIT 20 4.3 REGISTERED TRAVELLER BORDER CROSSING – ENTRY 23 4.4 REGISTERED TRAVELLER BORDER CROSSING – EXIT 27 4.5 REGISTERED TRAVELLER ENROLMENT 30 4.6 DATA DICTIONARY 33 4.7 TABLE OF INTERFACES 35 5 ASSUMPTIONS FOR SYSTEM AND COST MODELS 36 5.1 GENERAL ASSUMPTIONS 36 5.2 ANTICIPATED SYSTEM LOAD 37 5.3 SYSTEM MODEL PARAMETERS AND ASSUMPTIONS 38 6 SYSTEMS ARCHITECTURE 42 6.1 CENTRALISED SYSTEM ARCHITECTURE 42 6.1.1 Member State Technical Infrastructure 43 6.1.2 Central Technical Infrastructure 46 6.2 DISTRIBUTED SYSTEM ARCHITECTURE 49 6.2.1 Member State Distributed Technical Architecture 53 7 COST ANALYSIS 57 7.1 HOW TO USE THE EXCEL COST MODEL 57 7.1.1 Input 57 7.1.2 Presentation 57 7.1.3 Sizing 59 7.1.4 Estimating costs using the Model 59 7.2 COST ANALYSIS PRESENTATION 60 7.2.1 Cost elements 60 7.2.2 Costs 62 7.2.3 General Remarks 63 7.3 CENTRALISED SYSTEM ARCHITECTURE 64 7.4 A1C – CENTRALISED ENTRY-EXIT SYSTEM, NO BIOMETRICS 64 7.4.1 Scenario Parameters 64 7.4.2 Cost Summary Tables 66 7.5 A1D – DISTRIBUTED ENTRY-EXIT SYSTEM, NO BIOMETRICS 68 7.5.1 Scenario Parameters 68 7.5.2 Cost Summary Tables 69 Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 3/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.6 A2C – CENTRALISED ENTRY-EXIT SYSTEM, WITH BIOMETRICS 71 7.6.1 Scenario Parameters 71 7.6.2 Cost Summary Tables 72 7.7 A2D – DISTRIBUTED ENTRY-EXIT SYSTEM, WITH BIOMETRICS 74 7.7.1 Scenario Parameters 74 7.7.2 Cost Summary Tables 75 7.8 A3C – CENTRALISED ENTRY-EXIT SYSTEM, BIOMETRICS ADDED LATER 77 7.8.1 Scenario Parameters 77 7.8.2 Cost Summary Tables 78 7.9 A3D – DISTRIBUTED ENTRY-EXIT SYSTEM, BIOMETRICS ADDED LATER 80 7.9.1 Scenario Parameters 80 7.9.2 Cost Summary Tables 81 7.10 B0 – TOKEN-BASED RTS ONLY 83 7.10.1 Scenario Parameters 83 7.10.2 Cost Summary Tables 84 7.11 B1C – TOKEN-BASED RTS AND CENTRALISED ENTRY-EXIT SYSTEM WITHOUT BIOMETRICS 86 7.11.1 Scenario Parameters 86 7.11.2 Cost Summary Tables 87 7.12 B1D – TOKEN-BASED RTS AND DISTRIBUTED ENTRY-EXIT SYSTEM WITHOUT BIOMETRICS 89 7.12.1 Scenario Parameters 89 7.12.2 Cost Summary Tables 90 7.13 B2C – TOKEN-BASED RTS AND CENTRALISED ENTRY-EXIT SYSTEM WITH BIOMETRICS 92 7.13.1 Scenario Parameters 92 7.13.2 Cost Summary Tables 93 7.14 B2D – TOKEN-BASED RTS AND DISTRIBUTED ENTRY-EXIT SYSTEM WITH BIOMETRICS 95 7.14.1 Scenario Parameters 95 7.14.2 Cost Summary Tables 96 7.15 B3C – TOKEN-BASED RTS AND CENTRALISED ENTRY-EXIT SYSTEM WITH BIOMETRICS ADDED LATER 98 7.15.1 Scenario Parameters 98 7.15.2 Cost Summary Tables 99 7.16 B3D – TOKEN-BASED RTS AND DISTRIBUTED ENTRY-EXIT SYSTEM WITH BIOMETRICS ADDED LATER 101 7.16.1 Scenario Parameters 101 7.16.2 Cost Summary Tables 102 7.17 C0 – TOKEN-LESS RTS ONLY 104 7.17.1 Scenario Parameters 104 7.17.2 Cost Summary Tables 105 7.18 C1C – TOKEN-LESS RTS AND CENTRALISED ENTRY-EXIT SYSTEM WITHOUT BIOMETRICS 107 7.18.1 Scenario Parameters 107 7.18.2 Cost Summary Tables 108 7.19 C1D – TOKEN-LESS RTS AND DISTRIBUTED ENTRY-EXIT SYSTEM WITHOUT BIOMETRICS 110 7.19.1 Scenario Parameters 110 7.19.2 Cost Summary Tables 111 7.20 C2C – TOKEN-LESS RTS AND CENTRALISED ENTRY-EXIT SYSTEM WITH BIOMETRICS 113 7.20.1 Scenario Parameters 113 7.20.2 Cost Summary Tables 114 7.21 C2D – TOKEN-LESS RTS AND DISTRIBUTED ENTRY-EXIT SYSTEM WITH BIOMETRICS 116 Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 4/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.21.1 Scenario Parameters 116 7.21.2 Cost Summary Tables 117 7.22 C3C – TOKEN-LESS RTS AND CENTRALISED ENTRY-EXIT SYSTEM WITH BIOMETRICS ADDED LATER 119 7.22.1 Scenario Parameters 119 7.22.2 Cost Summary Tables 120 7.23 C3D – TOKEN-LESS RTS AND DISTRIBUTED ENTRY-EXIT SYSTEM WITH BIOMETRICS ADDED LATER 122 7.23.1 Scenario Parameters 122 7.23.2 Cost Summary Tables 123 8 SUMMARY TABLE 125 8.1 COMPARISON OF THE COSTS FOR VIS CO-LOCATION (NO VIS CONNECTION) 126 8.2 COMPARISON OF THE COSTS FOR VIS CONNECTION 127 9 REFERENCE AND APPLICABLE DOCUMENTS 128 9.1 APPLICABLE DOCUMENTS 128 9.2 REFERENCE DOCUMENTS 128 10 TERMINOLOGY AND ANNEXES 130 10.1 ACRONYMS & ABBREVIATIONS 130 11 ANNEX 1 – COST MODEL BUILDING BLOCKS 132 12 ANNEX 2 – COST XPERT INPUT REPORTS 137 Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 5/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Tables Table 1: Comparison of the costs - VIS co-location (no VIS connection) ............................................... 8 Table 2: Comparison of costs - VIS co-location................................................................................. 9 Table 3: Costing Scenarios ..........................................................................................................10 Table 4: Cost Items vs. Solution Scenarios .....................................................................................11 Table 5: EES Anticipated System load............................................................................................37 Table 6: RTS Anticipated System load............................................................................................38 Table 7: Business parameters ......................................................................................................38 Table 8: Cost Parameters ............................................................................................................39 Table 9: Member State Technical Architecture Building Blocks ...........................................................44 Table 10: Central Infrastructure Building Blocks ..............................................................................47 Table 11: Central System Building Blocks .......................................................................................51 Table 12: Distributed architecture building blocks ............................................................................54 Table 13: Cost elements..............................................................................................................61 Table 14: Cost parameters ..........................................................................................................61 Table 15: Example of MS Administrative Costs ................................................................................64 Table 15: Comparison of the costs - VIS co-location (no VIS connection)........................................... 126 Table 16: Comparison of costs – VIS connection............................................................................ 127 Table 17: Applicable Documents ................................................................................................ 128 Table 18: Reference Documents ................................................................................................. 129 Table 19: Acronyms & Abbreviations ........................................................................................... 131 Figures Figure 1: Spreadsheet Costing Workbook Structure .........................................................................13 Figure 2: TCN Border Crossing Systems Map – Entry .......................................................................16 Figure 3: TCN Border Crossing Systems Map – Exit ..........................................................................20 Figure 4: RT Border Crossing Systems Map – Entry..........................................................................23 Figure 5: RT Border Crossing Systems Map – Exit ............................................................................27 Figure 6: RT Enrolment ...............................................................................................................30 Figure 7: Centralised System Architecture ......................................................................................42 Figure 8: Member State Technical Architecture................................................................................44 Figure 9: Central Technical Architecture .........................................................................................47 Figure 10: Collaboration architecture .............................................................................................50 Figure 11: Base distributed system architecture ..............................................................................50 Figure 12: Central RTS system in distributed architecture .................................................................51 Figure 13: Member State distributed architecture ............................................................................54 Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 6/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems EXECUTIVE SUMMARY 1 The objective of this study was to carry out a thorough assessment of the costs connected to establishing an Entry/Exit System and a Registered Traveller System taking into account the various options and sub-options identified during the preparation of the legal proposals of the two systems. The study complements the Impact Assessments accompanying those proposals. The study was carried out based on the details in this document and, to a limited extent, on the EntryExit Feasibility Study Final report1. All cost estimates have been based on the documentary material provided by COM and the “SPECIFICATIONS FOR A COST ANALYSIS STUDY” as reported in the document “20091110_EES_RT_IA_Cost_ToR_lang”. To correctly estimate the costs, various techniques were used: - - - Sizing o Hardware sizing based on simplified process models from the Feasibility Study and forecasted numbers of Entries/Exits and RT travel events. o Software development sizing based on information in the Feasibility Study and completed with Function Point Analysis when necessary. o Network sizing based on predictions of the eventual expected system load Costing o Parametric cost analysis techniques were used to estimate development efforts and maintenance costs to support the introduction of a new software product. o Parametric cost estimation is based on the functional size of the solution, the level of re-usability of existing products and the proportion of COTS products that are used. Obvious parameters are the hourly rates and skill levels of the development team at specified reference rates. Less obvious parameters are associated with the development environment and project governance. The parameters that we propose to use for the estimations have been discussed and agreed with the COM. o Estimates of the costs of third party hardware, software and network products were based on list prices of popular and appropriate COTS products. o For estimating operational costs, we assumed a harmonised model, in which we adopted the rates given in the specifications as average rates to be used across Member States. We also assumed the same business hours throughout the Union, as well as the same number of holidays. Planning o The initial planning was produced by the parametric costing tool (CostXpert). This includes specification, design, realisation, testing and implementation and the first phase of deployment, where any defects have been detected. o The manual intervention and adjustments of the schedule is necessary, as CostXpert assumes unlimited resources to be available, which means that the planning needs to be adjusted to make it fit the actual situation. Two basic architectures have been considered: • Central architecture • Distributed (full-meshed) architecture. In addition to the above considerations, other features considered were the existence or not of a Registered Traveller System. Based on the analysis presented in the current study, the following tables present a summary of the costs for the different scenarios and for the two variables considered (co-location with VIS, VIS connection): 1 CA-B38-FR-004, 7.2.2008 Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 7/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Table 1: Comparison of the costs - VIS co-location (no VIS connection) € 21,028,017 € EU Total Yearly MS Total Yearly EU Total Yearly MS Total Yearly Incurring costs Incurring costs Incurring costs Incurring costs in 2014 in 2014 in 2020 in 2020 178,216,654 € 6,202,947 € 129,063,562 € 6,467,072 € 171,626,820 € 27,543,949 € 175,948,404 € (3,335,536) € 125,568,865 € 7,652,216 € 168,457,900 € 27,790,819 € 175,491,869 € (3,304,561) € 125,516,924 € 7,683,190 € 168,405,959 € 21,028,017 € 178,216,654 € 6,202,947 € 129,063,562 € 6,467,072 € 171,626,820 € 25,042,223 € 180,809,796 € 6,633,247 € 129,293,997 € 6,897,371 € 171,857,255 € 34,686,831 € 181,186,811 € (1,555,916) € 129,580,236 € 8,260,409 € 173,773,514 € 34,940,784 € 180,763,172 € (1,530,520) € 129,537,872 € 8,285,804 € 173,731,150 € 30,255,713 € 178,713,446 € (149,470) € 129,367,775 € 11,006,450 € 172,787,550 € 34,454,544 € 181,635,674 € (1,577,548) € 129,625,122 € 8,175,616 € 173,018,098 € 34,454,544 € 181,641,325 € (1,577,548) € 129,865,124 € 7,790,432 € 173,377,884 € 34,719,998 € 181,198,498 € (1,551,003) € 129,820,841 € 7,816,977 € 173,333,601 € 13,320,261 € 204,488,995 € 4,755,301 € 125,907,808 € 4,979,870 € 151,338,725 € 17,315,218 € 238,570,976 € 5,276,562 € 130,376,886 € 5,457,774 € 159,171,805 € 17,884,224 € 237,425,584 € 5,333,462 € 130,262,347 € 5,457,774 € 159,171,805 EU one-time costs Scenario, no VIS connection EU Cost Model: Proposal for the EES/RTS A1C - Central EES no biometrics, no RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A2C - Central EES with biometrics, no RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A3C - Central EES with biometrics added later, no RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B0 - Token-Based RTS, No EES, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B1C - Token-Based RTS, EES no biometrics, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B2C - Token-Based RTS, EES with biometrics, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B3C - Token-Based RTS, EES with biometrics added later, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C0 - Token-Less RTS, No EES, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C1C - Token-Less RTS, EES no biometrics, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C2C - Token-Less RTS, EES with biometrics, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C3C - Token-Less RTS, EES with biometrics added later, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A1D - Distributed EES no biometrics, no RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A2D - Distributed EES with biometrics, no RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A3D - Distributed EES with biometrics added later, no RTS, not connected to VIS, co-located with VIS, 5 year retention MS one-time Costs Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 8/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Table 2: Comparison of costs - VIS co-location € 15,708,069 € EU Total Yearly MS Total Yearly EU Total Yearly MS Total Yearly Incurring costs Incurring costs Incurring costs Incurring costs in 2014 in 2014 in 2020 in 2020 179,508,919 € 4,548,235 € 125,969,552 € 6,549,689 € 168,841,787 € 27,477,147 € 175,948,404 € (3,391,917) € 125,568,865 € 7,538,791 € 168,457,900 € 27,724,017 € 175,491,869 € (3,360,942) € 125,516,924 € 7,569,765 € 168,405,959 € 20,984,516 € 178,216,654 € 6,148,533 € 129,063,562 € 6,420,185 € 171,626,820 € 24,998,722 € 180,809,796 € 6,578,833 € 129,293,997 € 6,850,485 € 171,857,255 € 34,627,999 € 181,186,811 € (1,613,234) € 129,580,236 € 8,146,984 € 173,773,514 € 34,881,951 € 180,763,172 € (1,587,839) € 129,537,872 € 8,172,379 € 173,731,150 € 30,207,578 € 178,713,446 € (232,510) € 129,367,775 € 10,651,523 € 172,787,550 € 34,395,196 € 181,635,674 € (1,635,336) € 129,625,122 € 8,062,191 € 173,018,098 € 34,395,196 € 181,641,325 € (1,635,336) € 129,865,124 € 7,677,007 € 173,377,884 € 34,660,651 € 181,198,498 € (1,608,790) € 129,820,841 € 7,703,552 € 173,333,601 € 13,276,053 € 204,488,995 € 4,724,002 € 125,907,808 € 4,932,984 € 151,338,725 € 17,271,010 € 238,570,976 € 5,245,263 € 130,376,886 € 5,410,888 € 159,171,805 € 17,840,016 € 237,425,584 € 5,302,163 € 130,262,347 € 5,410,888 € 159,171,805 EU one-time costs Scenario, with VIS connection EU Cost Model: Proposal for the EES/RTS A1C - Central EES no biometrics, no RTS, connected to VIS, colocated with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A2C - Central EES with biometrics, no RTS, connected to VIS, colocated with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A3C - Central EES with biometrics added later, no RTS, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B0 - Token-Based RTS, No EES, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B1C - Token-Based RTS, EES no biometrics, connected to VIS, colocated with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B2C - Token-Based RTS, EES with biometrics, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B3C - Token-Based RTS, EES with biometrics added later, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C0 - Token-Less RTS, No EES, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C1C - Token-Less RTS, EES no biometrics, connected to VIS, colocated with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C2C - Token-Less RTS, EES with biometrics, connected to VIS, colocated with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C3C - Token-Less RTS, EES with biometrics added later, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A1D - Distributed EES no biometrics, no RTS, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A2D - Distributed EES with biometrics, no RTS, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A3D - Distributed EES with biometrics added later, no RTS, connected to VIS, co-located with VIS, 5 year retention MS one-time Costs Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 9/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems INTRODUCTION 2 Table 3 contains the identifications of all costing scenarios that are described in this document. For easy navigation, the references to the scenarios contain hyper links to the relevant sections. Table 3: Costing Scenarios No E-E E-E E-E E-E No/Biometrics w/Biometrics Later/Biometrics Central Distributed Central Distributed Central Distributed N/A A1C A1D A2C A2D A3C A3D RTS | Token Based B0 B1C B1D B2C B2D B3C B3D RTS | Tokenless2 C0 C1C C1D C2C C2D C3C C3D No RTS As described in the Terms of Reference [R1] document, the costs for the Entry-Exit System (EES) are estimated in two forms; as a centralised system with national interfaces and as a distributed system with a consultation mechanism active between Member States. These scenarios end up being remarkably different from a technical stand-point, making it appropriate to identify them as two separate alternatives, whereby 20 alternative scenarios are defined and analysed in total. 2 The token-less and token-based Registered Traveller systems refer to centralised systems that serve all the Member States. Only the EES can be either centralised or distributed architecture. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 10/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 3 METHODOLOGY AND COST ANALYSIS STRUCTURE 3.1 Identifying the Cost Elements For each applicable scenario, cost elements as mentioned in the Terms of Reference [R1] are calculated, based on the expected yearly volumes of third-country national (TCN) travellers. As several commonalities can be found among the various cost scenarios, it is therefore appropriate to introduce well-identified “cost building blocks” to be re-used in order to rationalise the cost model and reduce inherent complexity. Cost items pertain to the so called Central System (CS) scenario – which is to be run by under responsibility of the Management Authority – and to Member States’ distributed systems. For tangible cost elements – such as hardware, networking, software and facilities – costs have been estimated using a bottom-up approach, detailing the actual a Bill-of-Materials (BOM) of each individual system component. Furthermore, cost values are projected over time up to 2020, so that estimates for 2013, 2015 and 2020 can be extracted as requested by ToR [R1]. Table 2 below provides a complete overview of all cost categories and applicable options. Table 4: Cost Items vs. Solution Scenarios Cost Category Hardware Software Other Capital Expenditure Project Management Central System Distributed System Development Operations Development Operations 1 • • • • • • • • • • • • • • • • • • • • • • • • 9 9 9 9 Purchase Deploy Purchase Develop Deploy Purchase Deploy Provide Maintain Grow Maintain Grow • Maintain • Grow Purchase Deploy Purchase Develop Deploy Purchase Deploy Provide Maintain Grow Maintain Grow • Maintain • Grow Quality Assurance Administration Training Options • • • • • Procure Contract Control Plan Deliver Operating • • • • • • Control Procure Contract Plan Deliver Manage • • • • • Procure Contract Control Plan Deliver • • • • • • Control Procure Contract Plan Deliver Manage 2 3 4 5 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 Applicable options are: 1. Architecture a. E-E is a self-contained system, thoroughly independent from SIS/VIS b. E-E is interfaced with VIS, leverages BMS features, including database and biometric matcher 2. Retention Time a. 1 year b. 5 years c. 1 year for E-E details, 5 years for traveller details 3. RTS Enrolment site Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 11/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems a. Consular post b. At Schengen border control points (BCP) c. Both a) and b) above 4. Border Control mode for RTS users a. Fully-automated b. Semi-manual 5. Housing of EES / RTS 3.2 a. Co-location with SIS / VIS b. Location independent from SIS / VIS Tools Actual costs are calculated by identifying the elementary ‘cost units’ that are specific or typical of each cost category, such as: • Development / Management / Administration o • • • 3.2.1 Labour Facilities o Required space o Power o Bandwidth Operations o HW Maintenance o SW Maintenance / Licensing o Labour ... The Cost Model Microsoft Excel is the tool of choice for elaborating the cost structure that eventually allows calculating solutions cost for the various scenarios. This structure is designed top-down, starting from the ToR [R1] and the supporting documentation. Starting from the business requirements, that quantify system functionality and behaviour, the most-likely solution architectures have been determined – inclusive of technical and software elements – based on the findings of [R6] and also taking into account further developments since the publication of that report. The sizing of the system infrastructure is calculated from the expected system load. Sizing in this context comes down to actually determine which of building blocks are required for which scenarios, thus calculating the actual “horsepower” needed to meet the required performance. Business requirements per se are necessary but not sufficient in order to be able to properly size the solution. In fact, detailed technical assumptions are made to achieve this goal. The starting point is that most costs were as far as possible estimated irrelevant of any particular commercial product. However, infrastructure cost estimates were based on average ‘list prices’ for popular products, such that cost values are as realistic as possible and drawn from public sources. All relevant assumptions are duly documented in this report, the technical assumptions required for system sizing being implemented as variable parameters in the Excel structure so that they can be changed if and when necessary. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 12/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Actual costs are calculated bottom-up, aggregating all costs that are captured for each building block. Aggregation to conform to scenarios is then done via the option-based scenario specifications. Figure 1 shows the spreadsheet workbook structure. (ToR) Feasibility Study Legal Draft etc General parameters EES-RTS Sizing Building Block g icin Pr tails de Pric det ing ails EES-RTS Parameters Bu Bu ild S ildin Sc ingPa cen ena gP rio r inf Brl am ario in Balo fo acm o oc et k ete k er rs s Building Block Pr de icin ta g ils io ar rs en ete Sc am r Pa k loc gB ildin fo Bu in Building Block Te c De hnic sig al P n a ar ss am um et pti ers on s sizing Scenario parameters EES-RTS Scenario XnC/D Scenario Parameters Building Block info Scenario Costs BOM Specification Costs Unisys Team s ter me ra s Pa tion p ral ne sum Ge As Costing info Final Report Business Requirements Business requirements EES/RTS Costing Study Building Block ing Pric ils deta Public Domain Figure 1: Spreadsheet Costing Workbook Structure 3.2.2 Function Point Analysis Function-Point Analysis (FPA) was used to estimate the effort required to develop the custommade software components. FPA is a well-known and accepted technique that allows estimating the functional size of the system, describing it as a number of “Function Points”. In summary, the technique is based on analysing the data that is stored and managed by the system, its interactions with the users and other systems that store external data. The level of complexity of the data to be handled and the required operations on the data represent a reliable measure of the functional size of the system. As system sizing is fully based on system functionality as perceived from the user’s perspective, this technique is well suited for this cost analysis as only the functional behaviour of the EES and RTS systems are known at this time. The results from FPA do not represent cost, or project schedule. They are treated as input data into the CostXpert cost analysis tool (see below). For each required scenario, an FPA estimation was performed, which led to a single spreadsheet containing the results and documenting all parameters. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 13/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 3.2.3 CostXpert3 CostXpert is a parametric tool capable of estimating development costs and planning of a software development project. The tool relies on industry best practice data that are gathered by researchers in this area. “The Cost Xpert Tool Suite represents the latest standard of the Integrated Methodology driven Estimation (IME) and is an intuitive operated standard tool for the realistic estimation of effort, time, resources and cost to complete a project, as well as an estimate of potential risk, defects, and documentation page count for the entire IT application life cycle. Our solution is based on scientifically published methods and models, industry standards and best practice approaches. It is the most comprehensive approach, covering any project situation no matter if it is feasibility phase, development or maintenance. The intelligent consideration of all relevant elements including project types, process models, hard facts, soft facts, quality and risk factors and constraints ensures the accurate estimation. The intuitive workflow and precalibrations of our expert system, as well as a wizard guided assessment enables the effective use of methods even without the necessarily need to become a methodology expert first.”4 CostXpert supports a wide variety of estimation algorithms and methods. One all important input parameter is the actual size of the solution, but the tool also caters for such characteristic elements as the development environment, development methodology and maturity and quality of the development organisation. CostXpert also provides a high-level project plan, inclusive of a Work Breakdown Structure (WBS), estimating the project’s efficiency and throughput time. Based on proper hourly rates, it can thus provide a reliable estimate of development costs. Lastly, it is worth observing that the calculated values include costs associated with the early phase immediately following the system’s deployment, as the model also allows estimates of the number and nature of system infancy defects and incidents that need resolution. 3.2.4 Infrastructure Design and Sizing Designing the system infrastructure is mandatory, as it is needed to estimate infrastructure costs and also to understand the impact in terms of required storage space, network capacity and power. This design was done assuming an Enterprise Data Centre Architecture (EDCA) model, while using ‘Queuing Theory’ to estimate the ‘physical size’ of the infrastructure in combination with the expected system loads. Again, a spreadsheet was used to capture all this information. 3.2.5 Accuracy Given the many assumptions made – given the level of uncertainty on the final solution, and the many options proposed – the described approach led to estimates that we consider realistic, if not “real”, as we consider overall accuracy to fall in the surroundings of 20% to 30%. This is well in line with industry’s best practices and historical data. In fact, the relevant amount of options, alternative scenarios and undefined constraints make it impossible to provide estimates much closer to the final figures. Therefore, all cost values in the following of this report should be considered a median value, considering circa 25% as confidence range, plus or minus. 3 The Estimation Company. 4 http://www.costxpert.eu/en/expertise_product/cost_xpert_tool_suite Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 14/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems USE CASES 4 The Use Cases that are described in this section represent the basis for estimating the functional requirements of the solution system(s). These requirements serve then as an input to the FPA phase. These Use Cases are examples of the information that is presented in the Technical Feasibility Study [R6] and in the proposal for the foreseen implementation [R5], though the information from these sources is used to perform the analysis. The described processes are without prejudice to the final technical implementation at central or national level. 4.1 Third Country National Border Crossing – Entry5 CONTEXT BRIEF DESCRIPTION ACTORS STAKEHOLDERS & INTEREST PRECONDITIONS • TCN travellers crossing external EU borders to enter the Schengen area • This process is triggered when a TCN Traveller wishes to cross the border to enter the EU Schengen area • He/she must undergo a border check procedure. • Border Officer • National Border Check System (NBCS) • TCN Traveller • The stakeholders are the EES, VIS, SIS, other national systems/databases • The interest of these stakeholders is to support the border check procedure and, for EES, to record the entry record of TCN travellers • BCP is open and accepting travellers • Border Officer is available • TCN Traveller presents herself at a border check-booth 5 Note that this use case does not take into account RTS, which is described in section 4.3. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 15/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Figure 2: TCN Border Crossing Systems Map – Entry Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 16/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems A Border Officer gathers information from the TCN’s travel document and inserts it in the NBCS Source • Travel Credential Interface Input Data Process Output Data Interface Storage Hyperlinks • MRZ • Scan • MRZ_Validity_Status_OK • • • • • Travel Credential Reader • • MRZ • Read • • • • • • Pax_Details • Travel_Credential_Details • Write • Pax_Details • Travel_Credential_Details • Entry_Data_Record • I-NBCS • NBCS • B • • • • • SIS EES Other Syt’s Other Syt’s NBCS • • • • • C • • Traveller • NBCS • NBCS • Border Officer NBCS interrogates various databases (EES, SIS and national databases, possibly in parallel) to confirm document validity validate the travellers’ identity help assess her entry eligibility Specifically, EES confirms that TCN Traveller has not previously overstayed, returns the allowed number and sends the result to the NBCS NBCS returns any relevant information found I-SIS • Entry_Data_Record • Check Blacklist • SIS_Entry_Status • I-NBCS • I-EES • Entry_Data_Record • Check EE History • EE_Entry_Status • I-NBCS • I-Others • Entry_Data_Record • Check Blacklist • Other_Sys_Entry_Status • I-NBCS • I-Others • Entry_Data_Record • Check • Other_Sys_Entry_Status • I-NBCS • • *_Entry_Status • Assessment & Clearance • Entry_Status_OK • Display • Border Officer helps and supervises the traveller while capturing her fingerprints NBCS verifies the quality of the fingerprints and stores them temporarily for later processing Border Officer allows the TCN to enter the Schengen area and inserts his decision in the NBCS Fingerprint • Fingerprints • Scan • Fingerprint_Image • I-NBCS scanner • Fingerprint_Template • • Fingerprint_Image • Check Quality Level • Fingerprint_Quality_Status • • Fingerprint_Template • I-NBCS • Fingerprint_Quality_Status • Decision on Entry • Decision_on_Entry_OK • • *_Entry_Status • Interactive • Procedural_Q&A • Decision on Entry • Decision_on_Entry_OK • I-NBCS Dialogue of days for the present stay NBCS NBCS NBCS NBCS NBCS • • • • • • NBCS • • NBCS • • • • NBCS • Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 17/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems D NBCS creates an EES record, inclusive of biographic and biometric data gathered earlier in the process NBCS purges any temporary data stored Source Interface • NBCS • • NBCS • Input Data • • • • • • • Process Pax_Details Fingerprint_Image Fingerprint_Template Decision_on_Entry_OK Date&Time_Stamp BCP *_Temporary_Data Output Data Interface Storage Hyperlinks • Write • EE_Data_Record • I-EES • EES • • Delete • • • • If TCN holds a valid entry visa, the following event applies. E Source • TCN Visa • VIS Border Officer additionally gathers information from the visa sticker and inserts it in the NBCS NBCS additionally interrogates VIS to validate the traveller’s identity and visa to help assess eligibility to entry Interface • Visa Reader • I-VIS Input Data Process • Visa_Data • Visa_Data • Scan • Check Visa Validity Output Data • Visa_Data • Visa_Validity_OK Interface • I-NBCS • I-NBCS Storage • NBCS • NBCS Hyperlinks • • In case TCN needs to be re-directed to second-line checks, the following event applies. F Source • NBCS Border Officer cancels the procedure NBCS purges any unneeded information TCN is directed to second-line checks Interface Input Data • Interactive • *_Temporary_Data Process • Delete Output Data • Interface • Storage • Hyperlinks • In the case the TCN is not granted entry to the Schengen zone, the following event applies. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 18/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems G Border Officer enters recording of refusal of entry in the national system (This point is referred here for completeness, but is out of scope for the current cost study). Source • Interface • Input Data • Refuse_Entry Process • Write Output Data • Interface • Interactive Storage • NBCS Hyperlinks • Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 19/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 4.2 Third Country National Border Crossing – Exit CONTEXT BRIEF DESCRIPTION ACTORS STAKEHOLDERS & INTEREST • TCN travellers crossing external EU borders to exit the Schengen area • This process is triggered when a TCN Traveller wishes to cross the border to exit the EU Schengen area • He/she must undergo a border check procedure. • Border Officer • National Border Check System (NBCS) • Automated Exit Gate (e-Gate) • TCN Traveller • The stakeholders are the EES, VIS, SIS, other national systems/databases • The interest of these stakeholders is to support the border exit procedure and, for EES, to record the exit record of TCN travellers • BCP is open and accepting travellers • Border Officer is available, or PRECONDITIONS • • Automated Gate (e-Gate) is available under Border Officer supervision TCN Traveller presents herself at a border check-booth Figure 3: TCN Border Crossing Systems Map – Exit Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 20/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems A Automated Gate (e-Gate) or Border Officer provides instructions to the TCN Traveller to help her scan her travel document and to capture her fingerprints. E-Gate (Border Officer) processes and dispatches all data to NBCS Interface Input Data • E-Gate Source • Video screen • Display • • • • • Travel Credential • Scan • MRZ_Validity_Status_OK • • • • • Travel Credential Reader • • E_Gate_Instructions_to_Tra veller • MRZ • MRZ • Read • • • • • • Write • I-NBCS • NBCS • • Traveller • NBCS • • Check Quality Level • • NBCS • • NBCS • I-NBCS • Decision on Exit • Decision_on_Exit_OK • • • • Border Officer • Interactive Dialogue • • • • • • Fingerprint_Image • Fingerprint_Template • Fingerprint_Quality_Status • I-NBCS • NBCS • Fingerprint scanner • • Pax_Details • Travel_Credential_Details • Fingerprints • Pax_Details • Travel_Credential_Details • Exit_Data_Record • Decision on Exit • Decision_on_Exit_OK • I-NBCS • NBCS • B • • • • • SIS EES Other Syt’s Other Syt’s NBCS • • • • Process Fingerprint_Image Fingerprint_Template Fingerprint_Quality_Status *_Exit_Status Procedural_Q&A • Scan Output Data Interface NBCS interrogates various databases (EES, SIS and national databases, possibly in parallel) to confirm document validity validate the travellers’ identity help assess her entry eligibility Specifically, EES confirms that TCN Traveller has not previously overstayed, returns the allowed number sends the result to the NBCS NBCS returns any relevant information found I-SIS • Exit_Data_Record • Check Blacklist • SIS_Exit_Status • I-NBCS I-EES Exit_Data_Record Check EE History EE_Exit_Status I-NBCS I-Others • Exit_Data_Record • Check Blacklist • Other_Sys_Exit_Status • I-NBCS I-Others • Exit_Data_Record • Check • Other_Sys_Exit_Status • I-NBCS • *_Exit_Status • Assessment & Clearance • Exit_Status_OK • Display Storage Hyperlinks of days for the present stay and • • • • NBCS NBCS NBCS NBCS NBCS • • • • Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 21/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems C EES confirms that TCN is exiting within the allowed number of days (no overstaying) and sends the result back to NBCS NBCS creates an EES record, inclusive of biographic and biometric data gathered earlier in the process NBCS purges any temporary data stored Source Interface • NBCS • • NBCS • Input Data • • • • • • • Pax_Details Fingerprint_Image Fingerprint_Template Decision_on_Exit_OK Date&Time_Stamp BCP *_Temporary_Data Process Output Data Interface Storage Hyperlinks • Write • EE_Data_Record • I-EES • EES • • Delete • • • • When Exception handlings are required, such as: • Travel document cannot be read/scanned at e-Gate • Fingerprints do not meet required quality levels • EES or other critical system is unavailable • TCN Traveller is recognised as a threat to security and/or public health • TCN Traveller is flagged by EES as having overstayed her permit/visa TCN is to be re-directed to second-line checks, whereby the following event applies. D Source NBCS Border Officer takes control of the procedure NBCS purges any unneeded information Interface Interactive Input Data *_Temporary_Data Process Manual handling Output Data Interface Storage Hyperlinks Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 22/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 4.3 Registered Traveller Border Crossing – Entry CONTEXT BRIEF DESCRIPTION ACTORS STAKEHOLDERS & INTEREST PRECONDITIONS • Registered travellers crossing external EU borders to enter the Schengen area • This process is triggered when a Registered Traveller (RT) wishes to cross the border to enter the EU Schengen area • He/she must undergo a border check procedure. • Border Officer • National Border Check System (NBCS), Registered Traveller System (RTS) • Automated Gate (e-Gate) • Registered Traveller (RT) • The stakeholders are the EES, RTS, VIS, SIS, other national databases • The role of the RT system is to make sure verification occurs that the traveller was previously enrolled and therefore entitled to use the automated border crossing facility • The role of all systems is to support the border check procedure and, for EES, to record the entry record of Registered Travellers • BCP is open and accepting travellers • E-Gate is available6 • Border Officer is available for supervision and back-up • RT presents herself at a BCP e-Gate Figure 4: RT Border Crossing Systems Map – Entry 6 E-gate might not be available at all BCPs but in this case the RT holder could still benefit from a facilitated check. The same processes would take place, but without the e-gate. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 23/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems A e-Gate (Border Officer) provides instructions to the Traveller to help her scan her travel document and to capture her fingerprints E-Gate processes and dispatches all data to NBCS RTS final validation is required only after NBCS has verified effective rights of entry, also replacing mandatory Q&A interaction with the Border Officer Interface Input Data • E-Gate Source • Video screen • Display • • • • • Travel Credential • Scan • MRZ_Validity_Status_OK • • • • • Travel Credential Reader • • EGate_Instructions_to_Trav eller • MRZ • MRZ • Read • • • • • • Write • I-NBCS • NBCS • • Traveller • NBCS • • Check Quality Level • • NBCS • • NBCS • I-NBCS • • • • • Fingerprint_Image • Fingerprint_Template • Fingerprint_Quality_Status • I-NBCS • NBCS • Fingerprint scanner • • Pax_Details • Travel_Credential_Details • Fingerprints • Pax_Details • Travel_Credential_Details • Entry_Data_Record • I-RTS • RTS • • RTS • • • • • • I-NBCS • NBCS • B • • • • • SIS EES Other Syt’s Other Syt’s NBCS Process Fingerprint_Image Fingerprint_Template Fingerprint_Quality_Status *_Entry_Status • Travel_Credential_Details • Fingerprint_Image • Fingerprint_Template • Scan • Decision on Entry • Check RTS Output Data Decision_on_Entry_OK Fingerprint_Quality_Status *_Entry_Status Decision_on_Entry_OK Interface NBCS interrogates various databases (EES, SIS and national databases in parallel) to: o confirm document validity o validate the travellers’ identity o help assess her entry eligibility Specifically, EES confirms that RT has not previously overstayed, returns the allowed number the result to the NBCS NBCS returns any relevant information found • I-SIS • Entry_Data_Record • Check Blacklist • SIS_Entry_Status • • I-EES • Entry_Data_Record • Check EE History • EE_Entry_Status • • I-Others • Entry_Data_Record • Check Blacklist • Other_Sys_Entry_Status • • I-Others • Entry_Data_Record • Check • Other_Sys_Entry_Status • • • *_Entry_Status • Assessment & Clearance • Entry_Status_OK • Storage Hyperlinks of days for the present stay and sends I-NBCS I-NBCS I-NBCS I-NBCS Display • • • • • NBCS NBCS NBCS NBCS NBCS • • • • • Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 24/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems C NBCS creates an EES record, inclusive of biographic and biometric data gathered earlier in the process NBCS purges any temporary data stored Source Interface • NBCS • • NBCS • Input Data • • • • • • • Process Pax_Details Fingerprint_Image Fingerprint_Template Decision_on_Entry_OK Date&Time_Stamp BCP *_Temporary_Data Output Data Interface Storage Hyperlinks • Write • EE_Data_Record • I-EES • I-RTS • EES • RTS • • Delete • • • • If RT holds a valid entry visa, the following event applies. D NBCS additionally interrogates VIS to validate the traveller’s identity and visa to help assess eligibility to entry Source Interface • TCN Visa • Travel Credential Reader • I-VIS • VIS Input Data Process Output Data Interface Storage Hyperlinks • Visa_Data • Scan • Visa_Data • I-NBCS • NBCS • • Visa_Data • Check Visa Validity • Visa_Validity_OK • I-NBCS • NBCS • In case RT needs to be re-directed to second-line checks, the following event holds. E Source • NBCS Border Officer cancels the procedure NBCS purges all information no more needed RT is directed to second-line checks Interface Input Data • Interactive • *_Temporary_Data Process • Delete Output Data • Interface • Storage • Hyperlinks • In the case RT is not granted entry to the Schengen zone, the following event applies. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 25/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems F Border Officer enters recording of refusal of entry in the national system (This point is referred here for completeness, but is out of scope for the current cost study).). Source • • NBCS Interface • • Input Data • Refuse_Entry • Process • Write • Write Output Data • • Refuse_Entry Interface • Interactive • I-RTS Storage • NBCS • RTS Hyperlinks • • Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 26/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 4.4 Registered Traveller Border Crossing – Exit CONTEXT BRIEF DESCRIPTION ACTORS • Registered travellers crossing external EU borders to enter the Schengen area • This process is triggered when a Registered Traveller (RT) wishes to cross the border to exit the EU Schengen area • He/she must undergo a border check procedure. • Border Officer • National Border Check System (NBCS) • Registered Traveller System (RTS) • Automated Gate (e-Gate) • Registered Traveller (RT) • The stakeholders are the EES, RTS, VIS, SIS, other national databases • The role of the RT system is to make sure verification occurs that the traveller was previously enrolled and therefore entitled to use the automated border crossing facility, if available. A facilitated check could be carried out manually in case an automated border crossing system is not available. • The role of all systems is to support the border check procedure and, for EES, to record the exit record of Registered Travellers • BCP is open and accepting travellers • E-Gate is available • Border Officer is available for supervision and back-up • RT presents herself at a BCP e-Gate STAKEHOLDERS & INTEREST PRECONDITIONS Figure 5: RT Border Crossing Systems Map – Exit Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 27/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems A e-Gate (Border Officer) provides instructions to the Traveller to help her scan her travel document and to capture her fingerprints E-Gate processes and dispatches all data to NBCS RTS final validation is required only after NBCS has verified effective rights of exit, and replaces the mandatory Q&A interaction with the Border Officer Interface Input Data • E-Gate Source • Video screen • Display • • • • • Travel Credential • Scan • MRZ_Validity_Status_OK • • • • • Travel Credential Reader • • EGate_Instructions_to_Trav eller • MRZ • MRZ • Read • • • • • • Write • I-NBCS • NBCS • • Traveller • NBCS • • Check Quality Level • • NBCS • • NBCS • I-NBCS • • • • • Fingerprint_Image • Fingerprint_Template • Fingerprint_Quality_Status • I-NBCS • NBCS • Fingerprint scanner • • Pax_Details • Travel_Credential_Details • Fingerprints • Pax_Details • Travel_Credential_Details • Exit_Data_Record • I-RTS • RTS • • RTS • • • • • • I-NBCS • NBCS • B • • • • • SIS EES Other Syt’s Other Syt’s NBCS Process Fingerprint_Image Fingerprint_Template Fingerprint_Quality_Status *_Exit_Status • Travel_Credential_Details • Fingerprint_Image • Fingerprint_Template • Scan • Decision on Exit • Check RTS Output Data Decision_on_Exit_OK Fingerprint_Quality_Status *_Exit_Status Decision_on_Exit_OK Interface Storage Hyperlinks NBCS interrogates various databases (EES, SIS and national databases, possibly in parallel) to o confirm document validity o validate the travellers’ identity o help assess her exit eligibility Specifically, EES confirms that RT has not previously overstayed, returns the allowed number of days for the present stay and sends the result to NBCS NBCS returns any relevant information found • I-SIS • Exit_Data_Record • Check Blacklist • SIS_Exit_Status • I-NBCS • NBCS • • I-EES • Exit_Data_Record • Check EE History • EE_Exit_Status • I-NBCS • NBCS • • I-Others • Exit_Data_Record • Check Blacklist • Other_Sys_Exit_Status • I-NBCS • NBCS • • I-Others • Exit_Data_Record • Check • Other_Sys_Exit_Status • I-NBCS • NBCS • • • *_Exit_Status • Assessment & Clearance • Exit_Status_OK • Display • NBCS • Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 28/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems C NBCS creates an EES record, inclusive of biographic and biometric data gathered earlier in the process NBCS purges any temporary data stored Source Interface • NBCS • • NBCS • Input Data • • • • • • • Process Pax_Details Fingerprint_Image Fingerprint_Template Decision_on_Exit_OK Date&Time_Stamp BCP *_Temporary_Data Output Data Interface Storage Hyperlinks • Write • EE_Data_Record • I-EES • I-RTS • EES • RTS • • Delete • • • • When Exception handlings are required, such as: • Travel document cannot be read/scanned at e-Gate • Fingerprints do not meet required quality levels • EES or other critical system is unavailable • RT Traveller is recognised as a threat to security and/or public health • RT Traveller is flagged by EES as having overstayed her permit/visa RT is to be re-directed to second-line checks, whereby the following event applies. D Source • NBCS Border Officer takes control of the procedure NBCS purges all information no more needed Interface Input Data • Interactive • *_Temporary_Data Process • Manual handling Output Data • Interface • Storage • Hyperlinks • Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 29/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 4.5 Registered Traveller Enrolment • (TCN) Travellers seeking cleared status of Registered Traveller in order to benefit from fast processing at semi/automated facilities when crossing external EU borders upon entry to or exit from the Schengen area • This process is triggered when a traveller wishes to enrol as a Registered Traveller and gain Registered Traveller status • He/she must undergo a preliminary background check procedure and willingly provide her biometric details. • Border/Enrolment Officer • Registered Traveller System (RTS) • Traveller applying for RT status • The stakeholders are the EES, VIS, SIS, other national databases • The role of the RTS is to make sure verification occurs that the traveller is suitable for enrolment and therefore can be entitled to use semi-/automated border crossing facilities • The role of all systems is to support the enrolment procedure and, for EES, to return previous border crossing records, including a qualitative assessment of the traveller’s overstay history, if applicable • RTS is operational • Border/Enrolment Officer is available • Traveller presents herself at a Registered Traveller System Enrolment Facility (RTS-EF) CONTEXT BRIEF DESCRIPTION ACTORS STAKEHOLDERS & INTEREST PRECONDITIONS Figure 6: RT Enrolment Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 30/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems A Border/Enrolment Officer drives the process, providing instructions to the Traveller, helping her while scanning travel document and capturing fingerprints RTS processes and dispatches all data to NBCS7 NBCS polls all relevant back-office systems to carry out background checks and vet traveller’s application RTS final validation is required only after NBCS has verified effective rights of entry, and replaces the mandatory Q&A interaction with the Border Officer8 on arrival at BCP Source • Travel Credential Interface Input Data Process Output Data Interface Storage Hyperlinks • MRZ • Scan • MRZ_Validity_Status_OK • • • • • Travel Credential Reader • • MRZ • Read • • • • • • Write • I-RTS • RTS • • Traveller • RTS • • Scan • I-RTS • RTS • • RTS • • Check Quality Level • Fingerprint_Quality_Status • • RTS • • RTS • I-RTS • Decision on Application • RT_Status_OK • • • • RTS • I-RTS • • • • • • • • • Fingerprint_Image • Fingerprint_Template • Face_Image • I-RTS • Traveller • Fingerprint scanner • Camera • Pax_Details • Travel_Credential_Details • Fingerprints • Pax_Details • Travel_Credential_Details • Entry_Data_Record • Check NBCS • RT_Data_Record • I-NBCS • NBCS • B Face9 Fingerprint_Image Fingerprint_Template Fingerprint_Quality_Status *_RT_Status Travel_Credential_Details Fingerprint_Image Fingerprint_Template • Scan NBCS interrogates various databases (EES, SIS and national databases, possibly in parallel) to o confirm document validity o validate the travellers’ identity o help assess her entry eligibility Specifically, EES returns Traveller’s history of previous stays and dispatches the result to the NBCS NBCS returns any relevant information found to RTS 7 Please note that the enrolment would most likely take place using a direct interface to the RTS, though also this structure could/would be used in some MS depending on the national implementation. 8 The application processing procedure is described in the Draft proposal. 9 Optional feature Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 31/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems • • • • • • SIS EES Other Syt’s Other Syt’s NBCS NBCS C • • • • • • I-SIS I-EES I-Others I-Others • • • • • • • • • • • • • • RT_Data_Record RT_Data_Record RT_Data_Record RT_Data_Record *_Entry_Status RT_Data_Record *_RT_Status RT-Status_OK Check Blacklist Check EE History Check Blacklist Check Assessment & Clearance Write • • • • • • • SIS_RT_Status RT_Entry_Status RT_Entry_Status RT_Entry_Status RT_Status_OK NBCS_Assessment_Data *_RT_Status • • • • • • I-NBCS I-NBCS I-NBCS I-NBCS Display I-RTS • • • • • • NBCS NBCS NBCS NBCS NBCS RTS • • • • • • RTS creates a RT record, inclusive of biographic and biometric data gathered earlier in the process Source Interface • RTS • • NBCS • Input Data • • • • Process RT_Data_Record NBCS_Assessment_Data *_RT_Status *_Temporary_Data Output Data Interface Storage Hyperlinks • Write • RT_Data_Record • • RTS • • Delete • • • • If RT holds a valid entry visa, the following event applies. D Border/Enrolment Officer additionally gathers information from the visa sticker and inserts it in the RTS Border/Enrolment Officer additionally interrogates VIS to validate the traveller’s identity and visa to help assess eligibility to entry Source • TCN Visa • VIS Interface • Visa Reader • I-VIS Input Data • Visa_Data • Visa_Data Process • Scan • Check Visa Validity Output Data • Visa_Data • Visa_Validity_OK Interface • I-NBCS • I-NBCS Storage • NBCS • NBCS Hyperlinks • • In the case RT is not granted RT status, the following event applies. E Border/Enrolment Officer enters refusal of RT status in the RTS Source • Interface • Input Data • Refuse_Enrolment Process • Write Output Data • Interface • Interactive Storage • RTS Hyperlinks • Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 32/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 4.6 Data Dictionary Data Item Description Format *_Entry_Status All flags associated to an Entry event Array *_Exit_Status All flags associated to an Exit event Array *_RT_Status All flags associated to an RT event Array *_Temporary_Data All temporary data used by systems Data set BCP Border Crossing (Control) Point data record Data field Date&Time_Stamp Date and Time of event Date_Time field Decision_on_Entry_OK Flag Digit Decision_on_Exit_OK Flag Digit EE_Data_Record Data associated to EE event Data set EE_Entry_Status Flag Digit EE_Exit_Status Flag Digit EGate_Instructions_to_Traveller Operating instructions for traveller Multi-media content Entry_Data_Record Data associated to Entry event Data set Entry_Status_OK Flag Digit Exit_Data_Record Data associated to Exit event Data set Exit_Status_OK Flag Digit Face Data associated to biometric capture event Data set Face_Image Result of face capture JPEG Fingerprint_Image Result of fingerprint capture WSQ Fingerprint_Quality_Status Flag Digit Fingerprint_Template Result from fingerprint capture, elaborated Proprietary file Fingerprints Data associated to biometric capture event Data set MRZ Machine-readable zone of passport or ID Data set MRZ_Validity_Status_OK Flag Digit NBCS_Assessment_Data Flag Digit NBCS_Entry_Status Flag Digit NBCS_Exit_Status Flag Digit Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 33/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Data Item Description Format Other_Sys_Entry_Status Flag Digit Other_Sys_Exit_Status Flag Digit Pax_Details All biographical data describing traveller Data set Procedural_Q&A Questions to traveller, Answers given by traveller Data set Refuse_Enrolment Flag Data set Refuse_Entry Flag Data set RT_Data_Record Data associated the traveller when registered Data set RT_Entry_Status Flag Digit RT_Status_OK Flag Digit RT_Sys_Entry_Status Flag Digit RTS_Instructions_to_Traveller Operating instructions for traveller Multi-media content SIS_Entry_Status Flag Digit SIS_Exit_Status Flag Digit SIS_RT_Status Flag Digit Travel_Credential_Details Data associated to traveller’s credentials Data set Visa_Data Data associated to traveller’s visa Data set Visa_Validity_OK Flag Digit Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 34/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 4.7 Table of Interfaces Interface Connects ... With Camera Traveller RTS Fingerprint Scanner Traveller I-EES EES NBCS RTS NBCS I-NBCS NBCS I-NPS NPS I-RTS RTS I-SIS NBCS RTS SIS EES NPS VIS Other Systems Border Officer NBCS SIS II Traveller Border/Enrolment Officer NBCS NBCS I-VIS VIS NBCS Travel Credential Reader Travel Credential NBCS I-Others Other Systems NBCS Video Screen Traveller NBCS RTS Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 35/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 5 ASSUMPTIONS FOR SYSTEM AND COST MODELS 5.1 General Assumptions In order to be able to properly size the infrastructure components and to be able to estimate their cost, the following assumptions hold. ID Assumption Remark 1 Every border crossing is assumed to pertain to a new traveller, so that a complete EES record is captured and stored. This allows for scaling in the future. 2 To estimate the network and system load, we assume that there are 20 business hours per day, 365 days per year. This caters for extra capacity at peak time and for system maintenance. 3 The amount of data handled by the EES is calculated based on the draft legal proposal (art. 11, 12, 13 and 14) Based on [R14], which specifies the record contents. 4 The number of fingerprint searches (identification mode) on all biometric data requires definition. This parameter has a huge impact on the size of the AFIS and therefore on its costs, which are exponentially dependent on both the number of travellers and the data retention time. We have assumed this parameter to be 500.000 searches in year 1 up to 2.000.000 searches at the end of the period of time considered. This is a sensitive parameter in the cost estimation model. 5 The number of facial searches (identification mode) on all biometric data requires definition. We have assumed this parameter to be 500.000 searches in year 1 up to 2.000.000 searches at the end of the period of time considered. 6 This parameter has a huge impact on the size on the Facial Matching Engine (FME) and therefore on its costs, which are exponentially dependent on both the number of travellers and the data retention time. This is an optional system feature. This is a sensitive parameter in the cost estimation model. The response time for biometric (fingerprint and/or face) verification shall be less than 3 seconds (similar to VIS) This parameter is used to calculate the number of verification-matching CPUs as per Queuing Theory. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 36/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7 The response time for fingerprint searches (identification mode) shall be less than 15 minutes This parameter is used to calculate the number of identification-matching CPUs as per Queuing Theory. 8 The response time for facial searches (identification mode) shall be less than 15 minutes. This parameter is used to calculate the number of identification-matching CPUs as per Queuing Theory. This is an optional system feature. 5.2 Anticipated System Load Table 5 specifies the parameters for the system load and the data which is captured during the process. The anticipated Compound Annual Growth Rate (CAGR) is 10%. Actually, figures from the Commission highlight a value around 7%. In this case, we take a safe margin in assessing systems capacity and size. Table 5: EES Anticipated System load EES Parameter 2013 2014 2015 2016 2017 2018 2019 2020 Border Crossings TCNVH Crossings IN TCVNE Crossings IN Total Crossings IN (million) 67 74 81 89 98 108 119 131 (million) 100 110 121 133 146 161 177 195 (million) 167 184 202 222 245 269 296 325 TCVNH Crossings OUT TCVNE Crossings OUT Total Crossings OUT Total Crossings (million) 67 74 81 89 98 108 119 131 (million) 100 110 121 133 146 161 177 195 (million) 167 184 202 222 245 269 Percentage of Photos captured at BCP Percentage of new travellers 325 (million) 334 367 404 445 489 538 296 592 (%) 5% 10% 15% 20% 25% 30% 35% 40% (%) 100% 100% 100% 100% 100% 100% 100% 100% 651 Table 6 shows the parameters that drive the costs for the RTS, when applicable. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 37/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Table 6: RTS Anticipated System load RTS Parameter 2013 2014 2015 2016 2017 2018 2019 2020 Yearly Registrations (million) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 RT IN (million) 30 60 90 120 150 150 150 150 RT OUT (million) 30 60 90 120 150 150 150 150 Applications Consular Posts Applications at external BCP BCP Enrolments (million) 2.8 2.8 2.8 2.8 2.8 2.8 2.8 2.8 (%) 2.3 45% 2.3 45% 2.3 45% 2.3 45% 2.3 45% 2.3 45% 2.3 45% 2.3 45% (%) 5% 5% 5% 5% 5% 5% 5% 5% (n) 6 6 6 6 6 6 6 6 Percentage of revocations/extensions Average number or RT travels per yr (million) The actual distribution of RTS enrolments over the Border Control Points (BCP) and Consular Posts of the Member States is an option in the applicable scenarios. 5.3 System Model Parameters and Assumptions Table 7: Business parameters Business Parameter First year Value Unit Description 2013 EES Initial TCNVH IN 67 million The first year in the analysis. By changing this, the project can be moved in time by full years The number of TCNVH travellers as specified by COM EES Initial TCNVH OUT 67 million The number of TCNVH travellers as specified by COM EES Initial TCNVE IN 100 million The number of TCNVE travellers as specified by COM EES Initial TCNVE OUT 100 million The number of TCNVE travellers as specified by COM 5 million The initial number of RTS members in the first year as specified by COM The rate at which the number of enrolees of RTS grows CAGR Initial nr of RT registrations RT enrolment growth rate Yearly growth rate EES Passengers Percentage FP Searches 0% Initial annual FP Searches 0,50 million Initial annual Facial Searches 0,50 million Annual growth Fingerprint searches 10% Annual growth Facial searches Verification response time 10% 1,00 seconds The growth of the number of travellers that are handled by the EES per year The number of TCN per million travellers that are biometrically (fingerprint) searched against the database The number of TCN per million travellers that are biometrically (face) searched against the database The fixed number of TCN that are biometrically (fingerprint) searched against the database in the first year The fixed number of TCN that are biometrically (face) searched against the database in the first year The annual growth of the fixed number of fingerprint searches (only applicable in case of fixed number based calculation) The annual growth of the fixed number of facial searches (only applicable in case of fixed number based calculation) Biometric verification response time, specified by COM Biometric search response time Exact text search response time 2,00 hours Biometric search response time, specified by COM 3,00 seconds Exact text search response time, specified by COM Percentage Facial Searches 10% 0 1/million 0 1/million Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 38/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Business Parameter Value Number of overstayers 3,5 Overstayers annual growth 5% Investigated overstayers Business days per year Unit Description million Expected number of overstayers that may need investigations by means of biometric searches. Provided by COM Expected annual growth of the expected number of overstayers. Provided by COM Percentage of overstayers that are actually biometrically searched in the database 100% 365 days Business hours per day 20 hours Facial Matching Yes Fingerprint matching Yes TESTA 100 Mbps connections preferred TESTA 1 Gbps connections preferred Yes VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No 4 Logical, when Yes, facial matching capabilities are included Logical, when Yes, fingerprint matching capabilities are included When Yes, 100Mbps TESTA connections are preferred way to interface with TESTA When Yes, 1Gbps TESTA connections are preferred way to interface with TESTA, depends on the availability of 1Gbps lines When Yes, 100Mbps VIS/BMS connections are preferred way to interface with VIS/BMS. Only applicable in case of independent housing When Yes, 1Gbps VIS/BMS connections are preferred way to interface with VIS/BMS. Only applicable in case of independent housing The rate at which RTS members whose membership has expired, will re-enrol after the expiry date (not implemented yet) The lifetime of the RT membership, after which the membership data is removed (not implemented yet) The number of fingerprint images captured for EES. These are flat prints. The number of fingerprint images captured for RTS. These are flat prints. The average size of fingerprint images compressed using WSQ with a ratio of 1:15. Actual size varies (12-20k) The size of a fingerprint template. This may differ from vendor to vendor, this size is sufficient for the major algorithms The average size of fingerprint images compressed using JPEG or JPEG-2000 The peak factor to determine the peak load 300 The number of incidents per month that require helpdesk 50% min The speed at which the number of incidents decreases per month The time required for the helpdesk to find a work-around for the incident per year Unit Description year Is included in the calculation of the costs associated to hardware Intended to automatically calculate hardware replacements. This is not used yet To calculate energy costs No RT Renewal rate 50% RT Validity time 5 Number of Fingerprints for EES Number of Fingerprints for RTS Average Fingerprint image size (WSQ) Average Fingerprint template size 4 Average photo image size Peak Load factor Initial number of incidents per month Incident decrease percentage per year Average helpdesk repair time Project Meeting Frequency years 10 15.360 bytes 2.048 bytes 15.360 bytes 60 4 Table 8: Cost Parameters Cost Parameter Name Average installation cost rate Technical Lifecycle Power costs per kwh Net-Gross HW space factor Office space per workstation Value 10% 10 € 0,06 6 10 m2 To calculate the required datacentre floor space based on calculated equipment space to calculate the required amount of office space for staff Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 39/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Cost Parameter Name Value Number of servers per FTE 100 Max. nr of technical support staff Number of databases per DBA Cost per year per m2 (datacentre), co-located Cost per year per m2 (datacentre), independently located One-of costs per m2 for colocation 25 3 € 500 € 600 € 300 Unit Description The span of control for system engineers The span of control for DBA's Estimation of the cost per sqr metre for datacentre space, when co-located with VIS Estimation of the cost per sqr metre for datacentre space, when located independently from VIS € 74 Estimation of costs required to acquire the required datacentre space when co-located with VIS (establishing the room, airco, power, network etc) Estimation of costs required to acquire the required datacentre space when independently located from VIS (establishing the room, airco, power, network etc) Estimation of the cost per sqr metre for office space at the Management Authority Estimation of the one-off cost per sqr metre to setup the office space at the Management Authority The industry average standard for Hardware maintenance fees (replacement, repair) The industry average standard for Software maintenance fees (replacement, repair) Provided by COM € 26 Provided by COM 7,5 Provided by COM 20 Provided by COM Working days per year 220 Provided by COM Working hours per year 1650 One-of costs per m2 for independent-location € 700 Cost per year per m2 (office), MA One-off cost per year per m2 (office), MA Hardware Yearly maintenance costs Software Yearly Maintenance costs Hourly rate for Management Authority staff Average hourly rate for EU27 and Schengen associated country staff Working hours per day € 500 Working days per month Span of control Team/leader € 900 8% 20% 5 Admin support 20% Contractor Average rate € 85 Yearly development effort 10% Training percentage 10% Price per Gbyte TESTA Communication costs per month MS average technical space costs MS average one-off space costs Average costs per Monthly progress meeting Average costs per Quarterly meeting €€ 2.100 € 350 € 500 Calculated from the above Determines the number of team Leaders The percentage of admin support FTE related to the operational staff The industry average standard for developer fees (average hourly rate) Effort to continue developments on the custom software (pro-active maintenance, new/changing functionality, etc) The amount of training effort to be invested, related to the maintenance Estimate of the data transmission costs over TESTA. To be provided by COM As per quote Orange via COM The average price per square meter per year in the Member States for technical space to accommodate data centres, border control gates and enrolment systems Estimation of costs required to acquire the required space for the Member States (establishing the room, airco, power, network etc). This includes space for data centres, border control gates and enrolment systems € 30.000 € 50.000 Operational Cost parameters Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 40/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Cost Parameter Name Value 24*7 Helpdesk support factor 4 MA Development effort 11% MS Development effort 12% Automated Border Control officers per gate Semi Automated BC officers 2,73 Manual BC officers per million travellers per gate BC Officer control automated BC Officer control - semiautomated BC Officer control - Manual 7,68 5 10 Unit Description The factor used to calculate the required FTE for the helpdesk relative to the size of the helpdesk FTEs for office hours The percentage f the time spent by the MA, relative to the contractor effort The percentage f the time spent by the MA, relative to the contractor effort officers per million travellers per year records (from feasibility study) Between manual and automated from feasibility study, pg 208 BC Officer span of control for automated gates 3 BC Officer span of control for semi-automated gates 1 BC Officer span of control for manual gates Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 41/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems SYSTEMS ARCHITECTURE 6 Two main architectural alternatives are considered in the following – namely, a centralised systems design where all peripheral connections rely on a common hub and a de-centralised system where a network of national sub-systems is built to co-operate in a peer-to-peer, manyto-many mode. Each solution may present advantages and shortcomings, depending upon the technical, cost and political (e.g., ownership) choices. In this chapter we present these alternatives from a technical viewpoint only, while the following chapter will provide insight on the various cost scenarios associated to these architectures. 6.1 Centralised System Architecture The high-level system architecture for the Centralised solution is presented in Figure 7. This shows all components of the solution, regardless of the various scenarios. The goal of the picture is to define and identify all sub-systems that take part in the solution. This picture is fully based on [R6] (CA-B38-FR-004) and [R1] (20091110_EES_RT_IA_Cost_ToR_lang.doc). Figure 7: Centralised System Architecture Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 42/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Only the parts marked in red on the figure below fall within the scope of this cost analysis; namely: • Entry-Exit System Central Unit (EES-CU) • Registered Traveller System Central Unit (RTS-CU) • BMS Central Unit Expansion • Entry-Exit System Backup Central Unit (EES-BCU) • Registered Traveller System Backup Central Unit (RTS-BCU) • BMS Backup Central Unit Expansion • RTS Enrolment System @ Consular Post • RTS Enrolment System @ Border Control Point (BCP) • Manual/Assisted Border Control System • (semi-)Automated Border Control System The blue parts highlight relevant existing central systems that need to be integrated with the EES and RTS, depending on the option. These are: • Visa Information System Central Unit (VIS-CU) • Biometric Matching System Central Unit (BMS-CU) • Visa Information System Backup Central Unit (VIS-BCU) • Biometric Matching System Backup Central Unit (BMS-BCU) The grey components represent national (Member State) components that must be integrated with the EES and RTS in order to deploy the functionality. For most Member States, these are: • National Border Control System (NBCS) • National Information Systems (NIS) • National Visa Information System (N-VIS) Albeit complete, this view is not sufficient to provide an estimate of infrastructure costs. For this reason a high-level technical design was developed, enabling the identification of all required infrastructure components and their sizing, thus allowing an estimate of the associated costs. The technical architecture of the Centralised system covers also national components that are to be implemented in the Member States, besides the strictly central system. These are described in sections 6.1.1 and 6.1.2 respectively. 6.1.1 Member State Technical Infrastructure Figure 8 shows the Member State technical architecture for the Centralised solution, identifying by means of circular marks N1 the elements whose costs need being estimated. The national technical architecture will need to be implemented in all Member States, the major differences among Member States – from the perspective of this study – being represented by • the size of the country as relates to number of end users and connections required • the number of border crossing points • The number of travellers. Infrastructure costs per Member State are assumed to be proportional to the actual number of Border Crossing Points (BCP) and Consular Posts (CP). For labour-related cost estimates, average hourly rates were used, as provided by COM. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 43/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Systems that fall within the scope of this study show a tag associated with them, while their base colour is red (or dark grey when printed in black/white). The tagged systems represent the building blocks used to estimate system costs, and are briefly described in Table 9 below. Figure 8: Member State Technical Architecture Table 9: Member State Technical Architecture Building Blocks10 ID Building Block name Description Remarks N1 National RTS The local system for managing the RTS applications and tokens at national level. Basically contains a copy of the lists of existing enrolees to avoid duplicate tokens being issued N2 National EES The local system that manages entry/exit records for the Member State. N3 Consular Post RTS Enrolment System The enrolment system to capture RT applicant details at one Member State’s consular posts N4 NI.RTS The National Interface to It should be possible to re-use enrolment equipment already in use for Visa and e-Passports 10 All possible elements are included in the picture, irrelevant of applicable options. An actual implementation scenario might not include some components, e.g., printers for token production. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 44/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems the Central RTS. N5 NI.EES The National Interface to the Central EES. N6 BCP RTS Enrolment system The enrolment system for registration of RTS member at the Border Control Points N7 Automated Border Control System Automated Border Control system that supports RTS tokens and e-Passports. The process is automated and assumes supervision of the Border Control Authorities, who can intervene when deemed necessary. It should be possible to reuse enrolment equipment already in use for Visa and the same enrolment system as in N3. EES records are automatically generated. N8 Semi-manual Border Control System Semi-manual Border Control system that supports RTS tokens and e-Passports, where the ID verification based on RTS tokens and e-Passports is automated and the Border Control Authority manually controls the process. EES records are automatically generated. N9 Manual/Assisted Manual Border Control system that supports RTS tokens and e-Passports, where the ID verification based on RTS tokens and e-Passports is performed manually and the Border Control Authority manually controls the process. - EES records are manually entered into the system N10 National EES-RTS Database Server National Database Server that manages a copy of the relevant data of the central EES and RTS systems - N11 National Storage The actual storage device that physically stores the data. - Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 45/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 6.1.2 Central Technical Infrastructure Figure 9 depicts the technical architecture for the Central Unit (CU) of the EES and RTS systems for the Centralised solution, identifying by means of circular designators C1 the elements for which costs need to be estimated. The architecture assumes the existence of a Central National Interface (CNI) and a Central System (CS). A layered network architecture is considered in order to provide the required levels of security, commanding the deployment of firewalls. The CU has a backup facility (Backup Central Unit, BCU) that makes the overall system redundant for disaster recovery purposes. This BCU is essentially a copy of the CU, and it is therefore not explicitly shown. Note that CU-BCU interconnect is necessary to allow for data replication between the CU and BCU and to enable the switch-over from CU to BCU and switch-back from BCU to CU when needed. The systems that are in the scope of this study have a tag associated with them. They are grouped together in architectural entities indicated by the yellow boxes: • Central National Interface (CNI) • Central System (CS) • Biometric Matcher • RTS Token Management System. When possible, components are put together to form a composite building block featuring more than one function. These composite building blocks are marked by means of a grey rectangle. Systems thus tagged constitute the building blocks used for cost estimate purposes and briefly described in Table 4 below. Please note that not all elements are necessarily applied, as their use depends on the choices made at configuration level. They are reported here for the sake of completeness. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 46/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Figure 9: Central Technical Architecture Table 10: Central Infrastructure Building Blocks ID Building Block Description C1 TESTA Interface This is the physical interface to the TESTA network, consisting of firewall and WAN access routers. C2 Web Server These web servers convey EES and RTS services to the Member States. C3 RTS Token Directory This is the server that provides token revocation lists to Member States. The RTS Token Directory is provisioned by the RTS Token Management System. C4 CU/BCU Cluster The high-speed connection Remarks It is assumed that this directory is copied daily by Member States so that they can perform revocation checks independently from the Central RTS system. Fail-over and fail-back Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 47/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Interconnect C5 Supporting Servers between the CU and BCU that is sized to support replication of the EES and RTS databases and provides the cluster interconnect. must be fast. These are the supporting servers required to run the CU/BCU and being able to maintain them. They consist of Message-, DNS-, DHCP-, Management-, Backup-, and directory servers. C6 Database Server This database server will run the RDBMS that will support the databases for the EES, RTS and biometric systems, if applicable. Sizing depends on data size and retention time Data is physically stored in the appropriate SAN components. C7 Logging Server The logging server takes care of logging all transactions for system auditing. C8 RTS Application Server This is the server that runs the RTS Central Application. C9 EES Application Server This is the server that runs the EES Central Application. C10 Biometric Storage This is the SAN server that stores all biometric data for EES and RTS if applicable. This storage is kept separate from the other data to optimise protection of personal data. C11 RTS Storage This is the SAN server that physically stores the RTS database. C12 EES Storage This is the SAN server that physically stores the EES database. C13 Backup & Archive This Backup & Archive is the facility that takes care of backing up and archiving the EES and RTS data according to the policies. Independent from the Database Server to limit the impact on the EES and RTS performance. Options: - EES only - EES / RTS - EES only, TCNVH in VIS - EES / RTS, TCNVH in VIS - Retention time (1 yr, 5 yr, variable) ‘Member’ information Options: - Token-based - Token-less - Retention time (1 yr, 5 yr, variable) Backup facility Variants: - EES only - EES/RTS, with Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 48/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems biometrics C14 FP Matcher The fingerprint matcher facility that can do 1:n fingerprint identifications searches and 1:1 verification comparisons to support EES and RTS functionality. This building block can be regarded as either a standalone system, or as an expansion of the BMS. C15 Facial Matcher The facial matcher facility that can do facial 1:n identification searches and 1:1 verification comparisons to support EES and RTS functionality. EES/RTS, no biometrics Includes 1:1 and 1:n matching. Options: - EES FP Matcher - BMS FP Matcher Expansion - RTS FP Matcher - Based on templates only - Based on images (optional) Optional, includes both - 1:1 matching - 1:n matching This building block can be regarded as either a standalone system, or as an expansion to the BMS. C16 C17 6.2 RTS Token Management System The RTS token management system manages the lifecycle of RTS tokens or virtual tokens. VIS/BMS Interconnect The VIS/BMS interconnect provides the network connection over the internal LAN to the VIS and BMS systems. Variants: - Token based - Token-less Distributed System Architecture Essentially the distributed architecture means that when a Member State looks for information, they would have to send a request to all other Member States. Consequently, Member States also receive requests every time a MS searches information on a TCN crossing external borders. This is why it can also be referred to as collaboration architecture, represented graphically Figure 10 below. For the Data Storage, it is assumed that no tape backup devices will be used, but instead modern archiving technology. The latter is based on high available disk arrays, where data will be archived to cheaper, lower speed disks, and it then becomes near-line storage. The advantage is that the data will be always on-line, no hassle with tapes. The storage systems will need to be configured properly to assure that the data is secure. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 49/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Figure 10: Collaboration architecture The high-level system architecture for the Centralised solution is presented in Figure 11. Internal LAN Internal LAN This shows all components of the solution, regardless of the various scenarios. Figure 11: Base distributed system architecture Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 50/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Figure 12: Central RTS system in distributed architecture presents the central part in the EES-RTS distributed architecture: Figure 12: Central RTS system in distributed architecture The architecture for the central system in the distributed architecture is basically the same as for the central architecture, the difference is that is does not provide EES systems and storage. This means that the size is smaller and the costs will be lower. Table 11: Central System Building Blocks ID Building Block Description C1 TESTA Interface This is the physical interface to the TESTA network, consisting of firewall and WAN access routers. C2 Web Server These web servers convey RTS services to the Member States. Remarks Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 51/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems C3 RTS Token Directory This is the server that provides token revocation lists to Member States. The RTS Token Directory is provisioned by the RTS Token Management System. C4 CU/BCU Cluster Interconnect The high-speed connection between the CU and BCU that is sized to support replication of the RTS databases and provides the cluster interconnect. C5 Supporting Servers These are the supporting servers required to run the CU/BCU and being able to maintain them. It is assumed that this directory is copied daily by Member States so that they can perform revocation checks independently from the Central RTS system. Fail-over and fail-back must be fast. They consist of Message-, DNS-, DHCP-, Management-, Backup-, and directory servers. C6 Database Server This database server will run the RDBMS that will support the databases for the RTS and biometric systems, if applicable. Sizing depends on data size and retention time Data is physically stored in the appropriate SAN components. C7 Logging Server The logging server takes care of logging all transactions for system auditing. C8 RTS Application Server This is the server that runs the RTS Central Application. C10 Biometric Storage This is the SAN server that stores all biometric data for RTS if applicable. This storage is kept separate from the other data to optimise protection of personal data. C11 C13 RTS Storage Backup & Archive This is the SAN server that physically stores the RTS database. This Backup & Archive is the facility that takes care of backing up and archiving the RTS data according to the policies. Independent from the Database Server to limit the impact on the RTS performance. Options: - RTS - Retention time (1 yr, 5 yr, variable) ‘Member’ information Options: - Token-based - Token-less - Retention time (1 yr, 5 yr, variable) Backup facility Variants: - Token-less RTS - Token-based RTS Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 52/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems C14 FP Matcher The fingerprint matcher facility that can do 1:n fingerprint identifications searches and 1:1 verification comparisons to support RTS functionality. This building block can be regarded as either a standalone system, or as an expansion of the BMS. C15 Facial Matcher The facial matcher facility that can do facial 1:n identification searches and 1:1 verification comparisons to support RTS functionality. Includes 1:1 and 1:n matching. Options: - BMS FP Matcher Expansion - RTS FP Matcher - Based on templates only Optional, includes both - 1:1 matching - 1:n matching This building block can be regarded as either a standalone system, or as an expansion to the BMS. C16 C17 6.2.1 RTS Token Management System The RTS token management system manages the lifecycle of RTS tokens or virtual tokens. VIS/BMS Interconnect The VIS/BMS interconnect provides the network connection over the internal LAN to the VIS and BMS systems. Variants: - Token based - Token-less Member State Distributed Technical Architecture The figure below presents the Member State distributed architecture for the distributed architecture solution. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 53/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Figure 13: Member State distributed architecture Distributed architecture building blocks are listed in the table below: Table 12: Distributed architecture building blocks ID Building Block Description Remarks N1 National RTS The local system for managing the RTS applications and tokens at national level Basically contains a copy of the lists of existing enrolees to avoid duplicate tokens being issued N2 National EES The local system that manages entry/exit records for the Member State. It provides the same functionality as the Central EES, but is smaller in size, while it is more complex on the other side, as it interfaces with all other MS’ National EESs N3 Consular post RTS – Enrolment system The enrolment system to capture RT applicant details at one Member State’s consular posts It should be possible to re-use enrolment equipment already in use for Visa and e-Passports N4 NI.RTS The National Interface to the Central RTS. N5 NI.EES The National Interface to the EES systems of other Member States, This forms the secure collaboration and communication infrastructure. N6 BCP RTS Enrolment system The enrolment system for registration of RTS member at the Border Control Points This interface relies on the capacity and security of the (TESTA) network. It should be possible to re-use enrolment equipment already in use for Visa Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 54/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems N7 Automated Border Control system Automated Border Control system that supports RTS tokens and e-Passports. The process is automated and assumes supervision of the Border Control Authorities, who can intervene when deemed necessary. EES records are automatically generated. N8 Semi-manual Border Control system Semi-manual Border Control system that supports RTS tokens and e-Passports, where the ID verification based on RTS tokens and e-Passports is automated and the Border Control Authority manually controls the process. EES records are automatically generated. N9 Manual/ Assisted Border control system Manual Border Control system that supports RTS tokens and e-Passports, where the ID verification based on RTS tokens and e-Passports is performed manually and the Border Control Authority manually controls the process. EES records are manually entered into the system N10 Database server This database server will run the RDBMS that will support the databases for the EES, RTS and biometric systems, if applicable. - Sizing depends on the number of TCN travellers that travel via a specific country, the data size and the retention time - This storage includes Backup and Archiving functionality. Data is physically stored in the appropriate SAN components. N11 EES/RTS Storage The physical data storage, which holds all data. N12 Testa interface This is the physical interface to the TESTA network, consisting of firewall and WAN access routers. N13 National EES/RTS (Face matcher) The facial matcher facility that can do facial 1:n identification searches and 1:1 verification comparisons to support EES and RTS functionality. Optional, includes both - 1:1 matching - 1:n matching Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 55/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems N14 National EES/RTS AFIS The fingerprint matcher facility that can do 1:n fingerprint identifications searches and 1:1 verification comparisons to support EES and RTS functionality. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 56/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems COST ANALYSIS 7 This section provides the cost estimates for the different options that are looked at in the current study (Table 3). Due to the fact that the variables for each scenario are numerous (retention time, use of biometrics, architecture, etc), after agreement with the Commission, this section only presents the cost estimates for the following possible options: o Separate architecture co-located with VIS, but not connected to VIS o Architecture connected to VIS. Note that the above cost estimations are presented for the option of 5 year retention time. Using the model that has been developed in the framework of the current study it is possible to estimate the costs of the scenarios for all other different parameters that are possible. The following sections therefore include the 21 different costing scenarios (see Table 3). Each section is structured in the same way in order to enable easier comparison between the costs of the different scenarios and parameters. The structure used is the following: • Listing of scenario parameters • Cost estimates for: 7.1 o Independent from VIS o With connection to VIS How to use the Excel cost model The tables in the report are generated using a cost calculation model based on Excel (2003). 7.1.1 Input The model takes the input parameters from the file ‘Parameters.xls’ and configures the Building Blocks that are required to implement the required functionality. This configuration is done in two different Excel workbooks: ‘Scenario - EES Distributed Architecure.xls’ for the solution based on the distributed architecture and ‘Scenario - EES Central Architecure.xls’. These workbooks create the actual Bill Of Material (BOM) for the scenario in the sheets ‘BOM 1yr’, BOM 5yr’ and ‘BOM var’, which are specific for the different retention times. In these sheets, the costs are assigned three attributes: Phase, Cost Category and Allocation. The values of these attributes are described in section 7.1. 7.1.2 Presentation These attributes are used to present the costs in the ‘EU Cost model’, which was specified by COM. If required, the detailed cost items in the BOM sheets are accessible and can be studied in detail, the BOM provides the lowest level of cost items calculated by the cost model. It is possible to create pivot tables using this information to create the required view. As the model calculates the costs per calendar year, it is possible to retrieve information which is not shown on the ‘EU Cost Model’. The exhaustive list of the building blocks / cost line items used in the BOM is provided in Annex I – Cost Model Building Blocks. In those cases that the BOM does not provide sufficient information, this can be found in the underlying worksheets. Costs associated with hardware, software and infrastructure can be found in: Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 57/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems • Hardware Costs 1yr11 – specifies the hardware and network components • Hardware Costs 5yr12 • Hardware Costs var13 • Servers 1yr11 – specifies the number of servers, used to calculate license, such as OS, DB, AFIS etc • Servers 5yr12 • Servers var13 • Power 1yr11 – specifies the power consumption per year • Power 5yr12 • Power 5yr13 • Space 1yr11 – specifies the net space required in the data centre • Space 5yr12 • Space var13 • Software Costs 1yr11 – specifies the software costs (COTS) per year • Software Costs 5yr12 • Software Costs variable13 These sheets contain the detailed information per building block and also aggregations for the Management Authority and the Member States. Details about development costs and associated man-time can be found in the sheet: • Development Costs – specifies the development effort for realising the solution; Contractor development for MA, Management Authority development, Contractor development, for MS Member State development, This includes training, testing and project management. In the Development Cost sheet all estimated administrative efforts are specified per year and it will show the amount of time and the associated costs. These costs of these detailed line items are visible in the BOM. The man-time input is provided by CostXpert. In these estimates, project management meetings for the development of the solution are included. However, the quarterly meetings and monthly meetings with the Member States and the Management Authority are added separately under the Administrative costs The costs of all development costs items are visible in the BOM. Details about the Administrative Costs are to be found in the sheet: o Admin Costs – specifies the admin man-time effort, required office space (m2), meetings, infra costs, power, COTS HW/SW maintenance, Border Control Staffing, communication costs In this sheet all estimated administrative efforts are specified per year and it will show the amount of time and the associated costs. These costs of these detailed line items are visible in the BOM. 11 Denotes 1 year data retention time 12 Denotes 5 year data retention time 13 Denotes variable data retention time (5 year for personal data, 1 year for entry-exit data) Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 58/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.1.3 Sizing The actual required sizing of the solution is calculated by the sizing workbooks ‘Scenario – Distributed Sizing.xlsm’ and ‘Scenario – Sizing.xlsm’ for the Distributed and Centralised architecture respectively. These files take as input the configuration specific data provided by the Scenario worksheets, and calculate the required capacity of the various building blocks. This is based on the Queuing Theory, which allows us to estimate the number of servers and CPUs. Next to that the specification of the data and the system load is used, not only for the CPU sizing, but also for the network bandwidth. 7.1.4 Estimating costs using the Model The Building Block files that specify the functionality, capacity, costs, power consumption, necessary space and man-power are common for both the Distributed and Central architectures and are located in a subdirectory of the Central Architecture. The calculation of manpower effort is kept with the scenario worksheets, as explained above, since it contains the result of a calculation done using CostXpert. The output is a file with the name ‘CX Labor xxx.xls’, where xxx denotes the scenario name. This sheet provides both the required development effort for the scenario and the estimated project schedule in months. The CostXpert input file contains all the parameters used to create the project estimation, and it also contains the project schedule and the estimated effort, specified per project role. The costs in CostXpert are based on US$, and that can not be changed, the tool only supports US$. However, the pricing information is not used in the Cost Model, only the man-time – effort is used and the rates as provided by COM are applied. The labour Costs in CostXpert are irrelevant. The Cost model implements an estimation of the number of incidents after delivery of the solution, similar to CostXpert. Based on this input, it is possible to estimate the 1st and 2nd line support. The directory also contains a file provided by COM, which specifies the number of entries and exits of travellers for the various countries in the EU. This information is used to calculate the participation of the individual Member States, and is important for the sizing of the national systems in both the Centralised and Distributed architectures. To estimate the costs for a certain scenario, it is required to create a subdirectory within the structure and to copy the above-mentioned files to a subdirectory within the structure (or use an existing one) to open all the files simultaneously. The following actions should then be performed: 1) The proper parameters should be entered in the ‘Parameters.xls’ workbook, including the name of the scenario (sheets ‘Business Parameters’ and ‘Cost Parameters’); 2) The worksheet ‘Scenario – (Distributed) Sizing.xls’ should be used to calculate the biometric sizing by clicking the ‘Calculate!’ button at the top of the sheet ‘EES AFIS Sizing’ or ‘EES Face Match Sizing’; 3) Then, the configurator file ‘Scenario - EES Distributed/Central Architecure.xls’ should be used in order to check that the output in the EU Cost Model represents the input. Especially the title should be the same as the title in the Paramaters.xls file. Open this file and calculate the contents of the ‘EU Cost Model’ by clicking the ‘Calculate’ button at the top of the sheet ‘EU Cost Model’; 4) Finally, the output generator sheet, called ‘XXX Document Output.xls’ needs to be updated. These files are actually used to provide the information that is used in this document. 5) It is recommended simultaneously to open the following files for each scenario (subdirectory), make the changes as described above and save and close all files when done; ‘Parameters.xls’, ‘Scenario – (Distributed) Sizing.xls’, ‘Scenario - EES Distributed/Central Architecure.xls’ and ‘XXX Document Output.xls’. The other available files (‘CX Labor.xls’ and ‘sammanstallning lander 091008.xls’) can also be opened, but these typically do not change and thus this will have no effect. Note that it is not possible to open files from different directories, as this will create incorrect links between the various workbooks and the result will not be correct. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 59/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.2 Cost analysis presentation It is important at this point to briefly describe the way the cost estimates are presented in the following sections. The costs are displayed in the form of tables displayed as shown in the table below: EU Cost Model: Proposal for the EES/RTS Scenario Code VIS co-location / connection 5 year retention Tariff Time Price Price Freq (€ per hour) (hour) in 2014 in 2020 (per year) Nbr of Entities Total Yearly Total Yearly Incurring Total Number Incurring costs costs in 2020 of actions in 2014 Type of Description Obligatio of required Target Groups action n No 7.2.1 Total one time costs EU MS Cost elements The cost elements estimated and displayed on the cost tables are listed below: • The number (No) is a unique identifier for the element / required action whose cost is being estimated. This is the same across all scenarios. • Description of the Type of Obligation and its cost impact. More specifically, this describes what obligations are mentioned in a legal proposal and their costs, such as administration costs and operating the system, as well as monitoring. • The description of the required action includes the list of elements for which costs are being estimated in the tables. It concerns costs for the Management Authority, costs for the Member States and costs for the Border Check Points, as shown the table below. • Finally, target groups are other stakeholders for which the costs and required actions are relevant, such as for example banks. However, other target groups are not involved at this stage of the costing exercise. Border Control Costs In addition, to the above, the Cost table contains the costs for the various border check point (BCP) systems; automated, semi-manual and manual. Only that cost of the variant that is actually selected is shown. These costs contain the hardware/software required to implement physical BCP systems in all Member States. The quantity is based on the number of passengers and the number of BCP in the various countries. The number is calculated based on Queuing Theory. The costs for the Border Control Staff is also estimated, based on the number of passengers crossing the border, applying the parameters provided by COM. In the background, the costs for all types of BCP systems and associated staff is calculated based on the same information and parameters,, in order to assess the impact of implementing one or the other, comparing it with manual BCP systems. These costs are not shown, as they are no part of the estimate. However, the details can be found in the underlying sheets. The above listed cost elements are shown in detail in the table below: Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 60/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Table 13: Cost elements No 1 2 3 4 5 6 7 8 9 Type of Description of required action Target Groups Obligation Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA 10 11 12 13 14 15 16 17 18 19 20 21 21 22 23 23 24 22 Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Automated Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Automated Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points The cost elements listed in the above table are calculated in an Excel sheet. The following attributes have been used in order to group the cost elements and present the data consistently: • Project phase to which the cost parameters are relevant (e.g. DEV, OPE etc) • Operational phase identifier (e.g. hardware, software etc) • Allocation for Management Authority or Member States. Table 14: Cost parameters Cost Parameter Name Value Unit Description Development Cost Identifier DEV Operation Cost Identifier OPE Admin Cost Identifier ADM Value used to identify costs during development phase Value used to identify Operational costs during operational phase Value used to identify Administrative costs Hardware Cost HW Value used to identify Hardware costs Software Cost SW Value used to identify Software costs Infra Cost Identifier INF Value used to identify Infrastructure costs Contractor Cost Identifier CONTR Office Cost Identifier OFFICE Value used to identify Contractor costs (if applicable) Value used to reserved to identify Office Space costs Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 61/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Cost Parameter Name Value Border Check Systems identifier Border Check Systems identifier Border Check Systems identifier Border Check Systems identifier Border Officers Identifier A-BORDER B-OFFICER-A Border Officers Identifier B-OFFICER-S Value used to identify Semi - Manual Border Control costs (if applicable) Border Officers Identifier OTH Border Officers Identifier B-OFFICERM Value used to identify Semi - Manual Border Control costs (if applicable) Value used to identify Semi - Manual Border Control costs (if applicable) Management Authority MA Value used to identify the Management Authority Member States MS Value used to identify Member States 7.2.2 Unit S-BORDER M-BORDER ENROL Description Value used to reserved to identify Automated Border Control costs Value used to identify Semi - Automated Border Control costs (if applicable) Value used to identify Semi - Manual Border Control costs (if applicable) Value used to identify Semi - Manual Border Control costs (if applicable) Value used to identify Semi - Manual Border Control costs (if applicable) Costs The following figure presents the different costs / other values that are being estimated for each of the elements described above. Tariff Time (€ per hour) (hour) Price Price Freq (per action or equip) in 2014 (per action or equip) in 2020 Nbr of Entities (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 Total one time costs • Tariff (€ per hour) and time per hour are used in order to calculate manpower costs. For example, the costs of trainings and meetings in Member States and Management Authority, tariff (€ per hour) and time per hour are calculated. • Price per action or equipment in 2014 estimates the annual cost of all cost elements in 2014. • Similarly, the price per action or equipment in 2020 provides the estimated annual cost for 2020. The cost estimates for the two years enables the reader to understand how the cost develops within the period between 2014 and 2020. • The following 3 values are multipliers taken into account for the estimation of the total incurring costs. o Frequency per year presents the value of how the costs develop. o Number of entities is relevant for infrastructure, hardware and software costs. For example, the number of entities for the development costs is 2 due to the fact that there is a development for CU and BCU. Note that Member States are considered as a whole. This is why the number of entities is 1 and not 27. o • Total number of actions is always 1 as the Cost Model assumes that the costs instance occur only once during the project. Total incurring costs in 2014 presents the calculated price based on: Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 62/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems o • the number of entities, the total number of actions and The frequency per year. Total incurring costs in 2020 presents the calculated price based on o • the price per action or equipment by 2014 multiplied by: the price per action or equipment by 2020 multiplied by: the number of entities, the total number of actions and The frequency per year. Total one time costs presents the costs for the Management Structure, one time costs for hardware and other costs. In addition to the costs presented above, the tables also include some additional information specific to the scenario, the cost of which is displayed. More specifically, the business parameters that define the scenario are presented, i.e.: Scenario • RTS • EES • EES/RTS built together Scenario options • Architecture vs. VIS • RTS Enrolment • RTS Border Check Mode • Housing • Bio-searches based on Finally, a number of assumptions that are relevant for the specific scenario investigated are also displayed in the costs tables, such as the impact of deploying (semi-)automated border check systems. 7.2.3 General Remarks In the various cost sheets, the following should be noted: 1. Meeting Costs: As part of the Management Authority Admin costs, it is assumed that there are monthly progress meetings, to update everybody involved. The costs for these meetings are assumed to be €30,000. These meetings occur 10 times per annum (not during holiday and Christmas season). The costs for the Quarterly Meetings with the Member States are assumed to be € 50,000. These Quarterly meetings occur 4 times per annum. These costs include rental of space and travel for the Management Authority, it is assumed that the Member State Delegates cover their own costs. 2. In most scenarios, there is quite a large sum for Administrative Costs for the Member States. These costs are high, as they are the sum of the Admin Costs for all Member States. The admin costs comprise the following items, as presented in the following example: Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 63/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Table 15: Example of MS Administrative Costs Description MS Power Costs per year MS Technical system managers MS DBA MS Admin support MS Team leader/planner MS helpdesk & Incident Management MS Helpdesk MS Technical support MS Hardware Maintenance, 1yr retention MS COTS Software Maintenance, 1yr retention MS EES Development MS EES Development MS RTS Development MS RTS Development MS EES/RTS Development MS EES/RTS Development MS Testing MS Testing Phase OPE OPE OPE OPE OPE OPE OPE OPE OPE OPE DEV OPE DEV OPE DEV OPE DEV OPE Category ADM ADM ADM ADM ADM ADM ADM ADM ADM ADM ADM ADM ADM ADM ADM ADM ADM ADM Allocated MS MS MS MS MS MS MS MS MS MS MS MS MS MS MS MS MS MS € € € € € € € € € € € € € € € € € € 2013 1,632,138 20,571,408 3,174,600 4,749,690 5,699,140 6,349,200 260,000 33,606,720 3,432,363 7,694,661 - € € € € € € € € € € € € € € € € € € 2014 1,787,193 20,571,408 3,174,600 4,749,690 5,699,140 3,174,600 130,000 14,002,800 61,977,936 8,750,460 343,236 769,466 € € € € € € € € € € € € € € € € € € 2015 1,969,282 20,571,408 3,174,600 4,749,690 5,699,140 1,587,300 65,000 14,002,800 68,080,592 9,033,700 343,236 769,466 € € € € € € € € € € € € € € € € € € 2016 2,145,452 20,571,408 3,174,600 4,749,690 5,699,140 793,650 35,000 14,002,800 73,963,584 9,288,900 343,236 769,466 € € € € € € € € € € € € € € € € € € 2017 2,145,452 20,888,868 3,174,600 4,810,740 5,774,842 396,825 20,000 14,188,800 81,954,240 9,393,380 343,236 769,466 € € € € € € € € € € € € € € € € € € 2018 2,612,664 20,888,868 3,174,600 4,810,740 5,774,842 198,413 10,000 14,188,800 89,711,328 9,593,580 343,236 769,466 € € € € € € € € € € € € € € € € € € 2019 2,851,993 20,888,868 3,174,600 4,810,740 5,774,842 99,206 5,000 14,188,800 97,519,024 9,672,180 343,236 769,466 € € € € € € € € € € 2020 3,155,732 20,888,868 3,174,600 4,810,740 5,774,842 99,206 5,000 14,188,800 97,519,024 9,672,180 This example is extracted from the worksheet ‘BOM 1yr’ in the workbook ‘Scenario - EES Central Architecture.xls’, where only the Administrative costs for the Member States are selected. As shown, many cost types are included, and these costs are calculated per calendar year. In this way, it is possible to view the details associated for each cost type. The large number of Member States causes these costs to be so high. It must be noted though, that the Member State costs are calculated for the individual Member States when possible based on the relative portion of passengers being managed by those states. After that, the costs are aggregated. However, this mechanism does not allow to accurately assign the costs per individual Member State. This mechanism only makes sure that the figures are realistic for the total number of travellers. 7.3 Centralised System Architecture 7.4 A1C – Centralised Entry-Exit System, no biometrics 7.4.1 Scenario Parameters The following parameters and values apply. Scenario A1C RTS No EES Yes Fingerprint images in EES No Fingerprint templates in EES No Fingerprint images in RTS No Fingerprint templates in RTS No Facial Matching No Fingerprint matching No TESTA 100 Mbps connections preferred No TESTA 1 Gbps connections preferred No Biometric Data specification Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 64/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems VIS/BMS 100 Mbps Interconnect No VIS/BMS 1Gbps Interconnect Yes Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 65/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.4.2 Cost Summary Tables 7.4.2.1 VIS co-location (no VIS connection) EU Cost Model: Proposal for the EES/RTS A1C - Central EES no biometrics, no RTS, not connected to VIS, colocated with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Tariff Time Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 13,954 € 74 14,146 € 85 27,852 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 501,628 1,335,600 825,000 632,746 9,000 236,744 3,540,719 24,000 173,948 1,878,200 112,469,134 14,002,800 515,479 129,063,562 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 501,628 1,335,600 935,000 657,871 236,744 3,680,843 36,000 173,948 705,900 156,006,693 14,188,800 515,479 171,626,820 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 1,003,256 2,671,200 1,650,000 632,746 9,000 236,744 6,202,947 € € € € € € € € € 28,000 1,003,256 2,671,200 1,870,000 657,871 236,744 6,467,072 - € € € € € € € € € 24,000 173,948 1,878,200 112,469,134 14,002,800 515,479 129,063,562 - € € € € € € € € € 36,000 173,948 705,900 156,006,693 14,188,800 515,479 171,626,820 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price Token- EES Based RTS Enrolment Self Contained None EES/RTS built together at both RTS Border Check mode No € € € € € € € € 3,322,000 1,032,565 2,773,200 10,450,000 1,046,811 36,000 2,367,441 21,028,017 € € € MS € - - € € € € € € € € 23,094,000 1,739,483 41,874,100 72,279,559 34,074,720 5,154,792 178,216,654 - € € € € € € € 137,316,800 266,772 137,583,572 € 315,800,226 21,028,017 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 66/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.4.2.2 VIS connection Tariff Time EU Cost Model: Proposal for the EES/RTS A1C - Central EES no biometrics, no RTS, connected to VIS, co-located with VIS, 5 year retention (€ per hour) (hour) No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Price Freq Nbr of Entities in 2014 in 2020 (per year) Total Yearly Total Number of Incurring costs in 2014 actions Total Yearly Incurring costs in 2020 € 74 14,115 € 74 36,414 € 85 38,079 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 502,226 1,335,600 557,914 (9,000) 323,669 2,710,409 24,000 157,075 715,000 110,289,916 14,002,800 780,762 125,969,552 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 502,226 1,360,800 935,000 601,968 323,669 3,737,663 12,000 157,075 836,000 152,867,150 14,188,800 780,762 168,841,787 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 1,004,452 2,671,200 557,914 (9,000) 323,669 4,548,235 € € € € € € € € € 28,000 1,004,452 2,721,600 1,870,000 601,968 323,669 6,549,689 - € € € € € € € € € 24,000 157,075 715,000 110,289,916 14,002,800 780,762 125,969,552 - € € € € € € € € € 12,000 157,075 836,000 152,867,150 14,188,800 780,762 168,841,787 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs RTS Scenario Scenario Options Architecture vs VIS None Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price EES RTS Enrolment No Biometrics at both EES/RTS built together RTS Border Check mode Interfaced with VIS Yes Yes Manual Housing € € € € € € € € Co-located with VIS 2,764,000 1,044,522 2,773,200 3,168,000 2,694,657 27,000 3,236,690 15,708,069 € € € MS - - € € € € € € € € 23,070,000 1,570,747 41,159,100 71,826,738 34,074,720 7,807,615 179,508,919 - € € € € € € € 137,316,800 266,772 137,583,572 € 317,092,492 15,708,069 Bio-searches based on € Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 67/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.5 A1D – Distributed Entry-Exit System, no biometrics 7.5.1 Scenario Parameters The following parameters and values apply. Scenario A1D RTS No EES Yes (no biometrics) Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES No Fingerprint images in RTS No Fingerprint templates in RTS No Facial Matching No Fingerprint matching No TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 68/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.5.2 Cost Summary Tables 7.5.2.1 VIS-co-location (no VIS connection) Tariff Time EU Cost Model: Proposal for the EES/RTS A1D - Distributed EES no biometrics, no RTS, not connected to VIS, colocated with VIS, 5 year retention (€ per hour) (hour) No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price Price Freq Nbr of Entities in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 EU € 74 € 74 € 85 € 26 € 26 € 85 26 € 26 € € 14,700 € € € 16,475 € € 75,118 € € € € € 595,590 € € € 2,741,111 € € 163,118 € € € € € € 5281415.385 € € € 555,049 € € 23,800 504,391 1,310,400 439,612 638,506 2,916,709 1,548,535 108,969,969 14,002,800 1,386,504 125,907,808 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 42,400 500,000 1,310,400 440,000 394,270 2,687,070 81,000 137,254,925 14,002,800 151,338,725 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 47,600 1,008,783 2,620,800 439,612 638,506 4,755,301 € € € € € € € € € 84,800 1,000,000 2,620,800 880,000 394,270 4,979,870 - € € € € € € € € € 1,548,535 108,969,969 14,002,800 1,386,504 125,907,808 - € € € € € € € € € 81,000 137,254,925 14,002,800 151,338,725 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs RTS Scenario Scenario Options Architecture vs VIS Total one time costs None EES Self RTS Enrolment Contained No Biometrics at both EES/RTS built together RTS Border Check mode Yes Yes Manual Housing € € € € € € € € Co-located with VIS 816,400 1,087,828 2,620,800 1,164,000 1,219,174 27,000 6,385,058 13,320,261 € € € MS - - € € € € € € € € 30,213,000 15,485,352 1,782,000 37,800,000 71,268,887 34,074,720 13,865,036 204,488,995 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 356,237,068 13,320,261 Bio-searches based on € Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 69/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.5.2.2 VIS connection EU Cost Model: Proposal for the EES/RTS A1D - Distributed EES no biometrics, no RTS, connected to VIS, colocated with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Tariff Price Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 € 74 € 85 26 € 26 € 85 26 € 26 € € 14,700 € € € 15,878 € € 75,118 € € € € € 595,590 € € € 2,741,111 € € 163,118 € € € € € € 5281415.385 € € € 555,049 € € 23,800 504,391 1,310,400 399,313 9,000 638,506 2,885,410 1,548,535 108,969,969 14,002,800 1,386,504 125,907,808 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 42,400 500,000 1,310,400 440,000 347,384 2,640,184 81,000 137,254,925 14,002,800 151,338,725 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 47,600 1,008,783 2,620,800 399,313 9,000 638,506 4,724,002 € € € € € € € € € 84,800 1,000,000 2,620,800 880,000 347,384 4,932,984 - € € € € € € € € € 1,548,535 108,969,969 14,002,800 1,386,504 125,907,808 - € € € € € € € € € 81,000 137,254,925 14,002,800 151,338,725 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs RTS Scenario Scenario Options Architecture vs VIS None Total one time costs EU € Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Time EES RTS Enrolment No Biometrics at both EES/RTS built together RTS Border Check mode Interfaced with VIS Yes Yes Manual Housing € € € € € € € € Co-located with VIS 816,400 1,087,828 2,620,800 1,164,000 1,174,966 27,000 6,385,058 13,276,053 € € € MS - - € € € € € € € € 30,213,000 15,485,352 1,782,000 37,800,000 71,268,887 34,074,720 13,865,036 204,488,995 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 356,237,068 13,276,053 Bio-searches based on € Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 70/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems A2C – Centralised Entry-Exit System, with biometrics 7.6 This section includes the cost estimations for the option whereby there is a centralised Entry-Exit system and database with biometrics for verification of TCN crossing the EU borders. In this scenario, the Registered Traveller System is not taken into account. 7.6.1 Scenario Parameters The following parameters and values apply. Scenario A2C RTS No EES With biometrics Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES Yes Fingerprint images in RTS No Fingerprint templates in RTS No Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 71/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.6.2 Cost Summary Tables 7.6.2.1 VIS co-location (no VIS connection) EU Cost Model: Proposal for the EES/RTS A2C - Central EES with biometrics, no RTS, not connected to VIS, colocated with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Tariff Time Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 14,510 € 74 34,632 € 85 63,062 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 215,000 503,687 1,335,600 (4,400,000) 810,864 9,000 536,027 (989,822) 24,000 115,852 715,000 110,135,354 14,002,800 575,859 125,568,865 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 503,687 1,360,800 935,000 1,489,215 536,027 4,838,729 12,000 115,852 836,000 152,729,389 14,188,800 575,859 168,457,900 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 430,000 1,007,373 2,671,200 (8,800,000) 810,864 9,000 536,027 (3,335,536) € € € € € € € € € 28,000 1,007,373 2,721,600 1,870,000 1,489,215 536,027 7,652,216 - € € € € € € € € € 24,000 115,852 715,000 110,135,354 14,002,800 575,859 125,568,865 - € € € € € € € € € 12,000 115,852 836,000 152,729,389 14,188,800 575,859 168,457,900 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs RTS Scenario Scenario Options Architecture vs VIS Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price None EES Self RTS Enrolment Contained With Biometrics EES/RTS built together at both RTS Border Check mode No No Manual Housing € € € € € € € € Co-located with VIS 3,748,000 1,073,732 2,773,200 11,990,000 2,562,743 36,000 5,360,274 27,543,949 € € € MS - - € € € € € € € € 23,070,000 1,158,521 41,159,100 70,727,471 34,074,720 5,758,592 175,948,404 - € € € € € € € 137,316,800 266,772 137,583,572 € 313,531,977 27,543,949 Bio-searches based on € Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 72/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.6.2.2 VIS connection EU Cost Model: Proposal for the EES/RTS A2C - Central EES with biometrics, no RTS, connected to VIS, colocated with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Tariff Time Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 14,510 € 74 33,851 € 85 63,062 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 215,000 503,687 1,335,600 (4,400,000) 754,483 9,000 536,027 (1,046,203) 24,000 115,852 715,000 110,135,354 14,002,800 575,859 125,568,865 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 503,687 1,360,800 935,000 1,375,790 536,027 4,725,304 12,000 115,852 836,000 152,729,389 14,188,800 575,859 168,457,900 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 430,000 1,007,373 2,671,200 (8,800,000) 754,483 9,000 536,027 (3,391,917) € € € € € € € € € 28,000 1,007,373 2,721,600 1,870,000 1,375,790 536,027 7,538,791 - € € € € € € € € € 24,000 115,852 715,000 110,135,354 14,002,800 575,859 125,568,865 - € € € € € € € € € 12,000 115,852 836,000 152,729,389 14,188,800 575,859 168,457,900 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs RTS Scenario Scenario Options Architecture vs VIS None Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price EES RTS Enrolment With Biometrics EES/RTS built together at both RTS Border Check mode Interfaced with VIS No No Manual Housing € € € € € € € € Co-located with VIS 3,748,000 1,073,732 2,773,200 11,990,000 2,504,941 27,000 5,360,274 27,477,147 € € € MS - - € € € € € € € € 23,070,000 1,158,521 41,159,100 70,727,471 34,074,720 5,758,592 175,948,404 - € € € € € € € 137,316,800 266,772 137,583,572 € 313,531,977 27,477,147 Bio-searches based on € Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 73/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.7 A2D – Distributed Entry-Exit System, with biometrics 7.7.1 Scenario Parameters The following parameters and values apply. Scenario A2D RTS No EES Yes, with biometrics Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES Yes Fingerprint images in RTS No Fingerprint templates in RTS No Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 74/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.7.2 Cost Summary Tables 7.7.2.1 VIS co-location (no connection to VIS) EU Cost Model: Proposal for the EES/RTS A2D - Distributed EES with biometrics, no RTS, not connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Tariff Time Price Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 EU € 74 € 74 € 85 € 26 € 26 € 85 26 € 26 € € 15,344 € € € 22,268 € € 115,846 € € € € € 452,658 € € € 2,872,827 € € 124,455 € € € € € € 5281415.385 € € € 555,049 € € 80,600 506,772 1,310,400 496,322 984,695 3,378,789 54,000 1,176,912 880,000 113,205,308 14,002,800 1,057,867 130,376,886 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 250,000 500,000 1,310,400 440,000 456,974 2,957,374 54,000 145,115,005 14,002,800 159,171,805 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 161,200 1,013,545 2,620,800 496,322 984,695 5,276,562 € € € € € € € € € 500,000 1,000,000 2,620,800 880,000 456,974 5,457,774 - € € € € € € € € € 54,000 1,176,912 880,000 113,205,308 14,002,800 1,057,867 130,376,886 - € € € € € € € € € 54,000 145,115,005 14,002,800 159,171,805 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs RTS Scenario Scenario Options Architecture vs VIS Total one time costs None EES Self RTS Enrolment Contained With Biometrics EES/RTS built together at both RTS Border Check mode Yes Yes Manual Housing € € € € € € € € Co-located with VIS 873,200 1,135,448 2,620,800 1,164,000 1,647,822 27,000 9,846,948 17,315,218 € € € MS - - € € € € € € € € 35,748,000 11,769,115 1,782,000 67,500,000 74,693,512 36,499,680 10,578,668 238,570,976 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 390,319,049 17,315,218 Bio-searches based on € Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 75/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.7.2.2 VIS connection EU Cost Model: Proposal for the EES/RTS A2D - Distributed EES with biometrics, no RTS, connected to VIS, colocated with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Tariff Price Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 € 74 € 85 26 € 26 € 85 26 € 26 € € 15,344 € € € 21,670 € € 115,846 € € € € € 452,658 € € € 2,872,827 € € 124,455 € € € € € € 5281415.385 € € € 555,049 € € 80,600 506,772 1,310,400 456,023 9,000 984,695 3,347,490 54,000 1,176,912 880,000 113,205,308 14,002,800 1,057,867 130,376,886 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 250,000 500,000 1,310,400 440,000 410,088 2,910,488 54,000 145,115,005 14,002,800 159,171,805 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 161,200 1,013,545 2,620,800 456,023 9,000 984,695 5,245,263 € € € € € € € € € 500,000 1,000,000 2,620,800 880,000 410,088 5,410,888 - € € € € € € € € € 54,000 1,176,912 880,000 113,205,308 14,002,800 1,057,867 130,376,886 - € € € € € € € € € 54,000 145,115,005 14,002,800 159,171,805 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs RTS Scenario Scenario Options Architecture vs VIS None Total one time costs EU € Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Time EES RTS Enrolment With Biometrics EES/RTS built together at both RTS Border Check mode Interfaced with VIS Yes Yes Manual Housing € € € € € € € € Co-located with VIS 873,200 1,135,448 2,620,800 1,164,000 1,603,614 27,000 9,846,948 17,271,010 € € € MS - - € € € € € € € € 35,748,000 11,769,115 1,782,000 67,500,000 74,693,512 36,499,680 10,578,668 238,570,976 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 390,319,049 17,271,010 Bio-searches based on € Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 76/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.8 A3C – Centralised Entry-Exit System, biometrics added later 7.8.1 Scenario Parameters The following parameters and values apply. Scenario A3C RTS No EES Biometrics added later Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES Yes Fingerprint images in RTS No Fingerprint templates in RTS No Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 77/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.8.2 Cost Summary Tables 7.8.2.1 VIS co-location (no VIS connection) EU Cost Model: Proposal for the EES/RTS A3C - Central EES with biometrics added later, no RTS, not connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Tariff Time Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Yearly Total Number of Incurring costs in 2014 actions Total Yearly Incurring costs in 2020 € 74 14,561 € 74 34,238 € 85 66,265 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 215,000 503,874 1,335,600 (4,400,000) 814,234 9,000 563,256 (959,035) 24,000 110,567 715,000 110,114,971 14,002,800 549,586 125,516,924 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 503,874 1,360,800 935,000 1,492,586 563,256 4,869,516 12,000 110,567 836,000 152,709,006 14,188,800 549,586 168,405,959 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 430,000 1,007,748 2,671,200 (8,800,000) 814,234 9,000 563,256 (3,304,561) € € € € € € € € € 28,000 1,007,748 2,721,600 1,870,000 1,492,586 563,256 7,683,190 - € € € € € € € € € 24,000 110,567 715,000 110,114,971 14,002,800 549,586 125,516,924 - € € € € € € € € € 12,000 110,567 836,000 152,709,006 14,188,800 549,586 168,405,959 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS None Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price EES Self RTS Enrolment Contained Biometrics added EES/RTS built together later at both RTS Border Check mode No € € € € € € € € 3,748,000 1,077,478 2,773,200 11,990,000 2,533,578 36,000 5,632,564 27,790,819 € € € MS € - - € € € € € € € € 23,070,000 1,105,665 41,159,100 70,586,521 34,074,720 5,495,863 175,491,869 - € € € € € € € 137,316,800 266,772 137,583,572 € 313,075,442 27,790,819 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 78/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.8.2.2 VIS connection EU Cost Model: Proposal for the EES/RTS A3C - Central EES with biometrics added later, no RTS, connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Tariff Time Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Yearly Total Number of Incurring costs in 2014 actions Total Yearly Incurring costs in 2020 € 74 14,561 € 74 33,456 € 85 66,265 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 215,000 503,874 1,335,600 (4,400,000) 757,854 9,000 563,256 (1,015,416) 24,000 110,567 715,000 110,114,971 14,002,800 549,586 125,516,924 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 503,874 1,360,800 935,000 1,379,161 563,256 4,756,092 12,000 110,567 836,000 152,709,006 14,188,800 549,586 168,405,959 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 430,000 1,007,748 2,671,200 (8,800,000) 757,854 9,000 563,256 (3,360,942) € € € € € € € € € 28,000 1,007,748 2,721,600 1,870,000 1,379,161 563,256 7,569,765 - € € € € € € € € € 24,000 110,567 715,000 110,114,971 14,002,800 549,586 125,516,924 - € € € € € € € € € 12,000 110,567 836,000 152,709,006 14,188,800 549,586 168,405,959 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS None Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price EES RTS Enrolment Biometrics added EES/RTS built together later at both RTS Border Check mode Interfaced with VIS No € € € € € € € € 3,748,000 1,077,478 2,773,200 11,990,000 2,475,776 27,000 5,632,564 27,724,017 € € € MS € - - € € € € € € € € 23,070,000 1,105,665 41,159,100 70,586,521 34,074,720 5,495,863 175,491,869 - € € € € € € € 137,316,800 266,772 137,583,572 € 313,075,442 27,724,017 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 79/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.9 A3D – Distributed Entry-Exit System, biometrics added later 7.9.1 Scenario Parameters The following parameters and values apply. Scenario A3D RTS No EES Biometrics added later Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES Yes Fingerprint images in RTS No Fingerprint templates in RTS No Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 80/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.9.2 Cost Summary Tables 7.9.2.1 VIS co-location (no VIS connection) Tariff EU Cost Model: Proposal for the EES/RTS A3D - Distributed EES with biometrics added later, no RTS, not connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Time Price Price Freq Nbr of Entities (€ per hour) (hour) Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS in 2020 (per year) Total Yearly Incurring costs in 2020 € 74 € 74 € 85 26 € 26 € 85 26 € 26 € € 15,437 € € € 23,105 € € 121,731 € € € € € 432,006 € € € 2,867,989 € € 118,777 € € € € € € 5281415.385 € € € 555,049 € € 80,600 507,116 1,310,400 502,514 1,034,715 3,435,346 54,000 1,123,216 880,000 113,192,728 14,002,800 1,009,603 130,262,347 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 250,000 500,000 1,310,400 440,000 456,974 2,957,374 54,000 145,115,005 14,002,800 159,171,805 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 161,200 1,014,233 2,620,800 502,514 1,034,715 5,333,462 € € € € € € € € € 500,000 1,000,000 2,620,800 880,000 456,974 5,457,774 - € € € € € € € € € 54,000 1,123,216 880,000 113,192,728 14,002,800 1,009,603 130,262,347 - € € € € € € € € € 54,000 145,115,005 14,002,800 159,171,805 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS None Total one time costs EU € Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points in 2014 Total Total Yearly Number of Incurring costs actions in 2014 EES Self RTS Enrolment Contained Biometrics added EES/RTS built together later at both RTS Border Check mode Yes € € € € € € € € 873,200 1,142,328 2,620,800 1,164,000 1,709,746 27,000 10,347,150 17,884,224 € € € MS € - - € € € € € € € € 35,748,000 11,232,163 1,782,000 67,500,000 74,567,712 36,499,680 10,096,028 237,425,584 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 389,173,657 17,884,224 Yes Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 81/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.9.2.2 VIS connection EU Cost Model: Proposal for the EES/RTS A3D - Distributed EES with biometrics added later, no RTS, connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Tariff Price Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 € 74 € 85 26 € 26 € 85 26 € 26 € € 15,437 € € € 22,507 € € 121,731 € € € € € 432,006 € € € 2,867,989 € € 118,777 € € € € € € 5281415.385 € € € 555,049 € € 80,600 507,116 1,310,400 462,216 9,000 1,034,715 3,404,047 54,000 1,123,216 880,000 113,192,728 14,002,800 1,009,603 130,262,347 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 250,000 500,000 1,310,400 440,000 410,088 2,910,488 54,000 145,115,005 14,002,800 159,171,805 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 161,200 1,014,233 2,620,800 462,216 9,000 1,034,715 5,302,163 € € € € € € € € € 500,000 1,000,000 2,620,800 880,000 410,088 5,410,888 - € € € € € € € € € 54,000 1,123,216 880,000 113,192,728 14,002,800 1,009,603 130,262,347 - € € € € € € € € € 54,000 145,115,005 14,002,800 159,171,805 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS None Total one time costs EU € Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Time EES RTS Enrolment Biometrics added EES/RTS built together later at both RTS Border Check mode Interfaced with VIS Yes € € € € € € € € 873,200 1,142,328 2,620,800 1,164,000 1,665,538 27,000 10,347,150 17,840,016 € € € MS € - - € € € € € € € € 35,748,000 11,232,163 1,782,000 67,500,000 74,567,712 36,499,680 10,096,028 237,425,584 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 389,173,657 17,840,016 Yes Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 82/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.10 B0 – Token-Based RTS only 7.10.1 Scenario Parameters The following parameters and values apply. Scenario B0 RTS Yes token-based EES No Fingerprint images in EES No Fingerprint templates in EES No Fingerprint images in RTS No Fingerprint templates in RTS Yes Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect No VIS/BMS 1Gbps Interconnect No Biometric Data specification Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 83/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.10.2 Cost Summary Tables 7.10.2.1 VIS co-location (no VIS connection) Tariff Time EU Cost Model: Proposal for the EES/RTS B0 - Token-Based RTS, No EES, not connected to VIS, co-located with VIS, 5 year retention (€ per hour) (hour) No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Price Freq Nbr of Entities in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 13,954 € 74 14,146 € 85 27,852 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 501,628 1,335,600 825,000 632,746 9,000 236,744 3,540,719 24,000 173,948 1,878,200 112,469,134 14,002,800 515,479 129,063,562 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 501,628 1,335,600 935,000 657,871 236,744 3,680,843 36,000 173,948 705,900 156,006,693 14,188,800 515,479 171,626,820 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 1,003,256 2,671,200 1,650,000 632,746 9,000 236,744 6,202,947 € € € € € € € € € 28,000 1,003,256 2,671,200 1,870,000 657,871 236,744 6,467,072 - € € € € € € € € € 24,000 173,948 1,878,200 112,469,134 14,002,800 515,479 129,063,562 - € € € € € € € € € 36,000 173,948 705,900 156,006,693 14,188,800 515,479 171,626,820 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price Token- EES Based Self RTS Enrolment Contained None EES/RTS built together at both RTS Border Check mode No € € € € € € € € 3,322,000 1,032,565 2,773,200 10,450,000 1,046,811 36,000 2,367,441 21,028,017 € € € MS € - - € € € € € € € € 23,094,000 1,739,483 41,874,100 72,279,559 34,074,720 5,154,792 178,216,654 - € € € € € € € 137,316,800 266,772 137,583,572 € 315,800,226 21,028,017 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 84/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.10.2.2 VIS connection Tariff Time EU Cost Model: Proposal for the EES/RTS B0 - Token-Based RTS, No EES, connected to VIS, co-located with VIS, 5 year retention (€ per hour) (hour) No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Price Freq Nbr of Entities in 2014 in 2020 (per year) Total Yearly Total Number of Incurring costs in 2014 actions Total Yearly Incurring costs in 2020 € 74 13,954 € 74 13,680 € 85 27,852 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 501,628 1,335,600 825,000 596,332 (9,000) 236,744 3,486,305 24,000 173,948 1,878,200 112,469,134 14,002,800 515,479 129,063,562 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 501,628 1,335,600 935,000 610,985 236,744 3,633,957 36,000 173,948 705,900 156,006,693 14,188,800 515,479 171,626,820 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 1,003,256 2,671,200 1,650,000 596,332 (9,000) 236,744 6,148,533 € € € € € € € € € 28,000 1,003,256 2,671,200 1,870,000 610,985 236,744 6,420,185 - € € € € € € € € € 24,000 173,948 1,878,200 112,469,134 14,002,800 515,479 129,063,562 - € € € € € € € € € 36,000 173,948 705,900 156,006,693 14,188,800 515,479 171,626,820 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS TokenBased Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price EES RTS Enrolment None EES/RTS built together at both RTS Border Check mode Interfaced with VIS No € € € € € € € € 3,322,000 1,032,565 2,773,200 10,450,000 1,012,310 27,000 2,367,441 20,984,516 € € € MS € - - € € € € € € € € 23,094,000 1,739,483 41,874,100 72,279,559 34,074,720 5,154,792 178,216,654 - € € € € € € € 137,316,800 266,772 137,583,572 € 315,800,226 20,984,516 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 85/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.11 7.11.1 B1C – Token-Based RTS and Centralised Entry-Exit System without biometrics Scenario Parameters The following parameters and values apply. Scenario B1C RTS Yes token-based EES Yes (no biometrics) Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES No Fingerprint images in RTS No Fingerprint templates in RTS Yes Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect No VIS/BMS 1Gbps Interconnect Yes Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 86/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.11.2 Cost Summary Tables 7.11.2.1 VIS co-location (no VIS connection) Tariff Time EU Cost Model: Proposal for the EES/RTS B1C - Token-Based RTS, EES no biometrics, not connected to VIS, colocated with VIS, 5 year retention (€ per hour) (hour) No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Price Freq Nbr of Entities in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 14,657 € 74 16,572 € 85 72,354 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 504,230 1,335,600 825,000 679,575 9,000 615,012 3,968,417 24,000 144,501 1,878,200 112,500,098 14,002,800 744,398 129,293,997 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 504,230 1,335,600 935,000 704,700 615,012 4,108,542 36,000 144,501 705,900 156,037,657 14,188,800 744,398 171,857,255 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 1,008,460 2,671,200 1,650,000 679,575 9,000 615,012 6,633,247 € € € € € € € € € 28,000 1,008,460 2,671,200 1,870,000 704,700 615,012 6,897,371 - € € € € € € € € € 24,000 144,501 1,878,200 112,500,098 14,002,800 744,398 129,293,997 - € € € € € € € € € 36,000 144,501 705,900 156,037,657 14,188,800 744,398 171,857,255 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price Token- EES Based Self RTS Enrolment Contained With Biometrics EES/RTS built together at both RTS Border Check mode No € € € € € € € € 3,322,000 1,084,597 2,773,200 10,450,000 1,226,305 36,000 6,150,121 25,042,223 € € € MS € - - € € € € € € € € 23,094,000 1,445,007 41,874,100 72,877,994 34,074,720 7,443,976 180,809,796 - € € € € € € € 137,316,800 266,772 137,583,572 € 318,393,369 25,042,223 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 87/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.11.2.2 VIS connection EU Cost Model: Proposal for the EES/RTS B1C - Token-Based RTS, EES no biometrics, connected to VIS, colocated with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Tariff Time Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 14,657 € 74 16,105 € 85 72,354 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 504,230 1,335,600 825,000 643,161 (9,000) 615,012 3,914,003 24,000 144,501 1,878,200 112,500,098 14,002,800 744,398 129,293,997 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 504,230 1,335,600 935,000 657,813 615,012 4,061,655 36,000 144,501 705,900 156,037,657 14,188,800 744,398 171,857,255 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 1,008,460 2,671,200 1,650,000 643,161 (9,000) 615,012 6,578,833 € € € € € € € € € 28,000 1,008,460 2,671,200 1,870,000 657,813 615,012 6,850,485 - € € € € € € € € € 24,000 144,501 1,878,200 112,500,098 14,002,800 744,398 129,293,997 - € € € € € € € € € 36,000 144,501 705,900 156,037,657 14,188,800 744,398 171,857,255 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS TokenBased Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price EES RTS Enrolment With Biometrics EES/RTS built together at both RTS Border Check mode Interfaced with VIS No € € € € € € € € 3,322,000 1,084,597 2,773,200 10,450,000 1,191,804 27,000 6,150,121 24,998,722 € € € MS € - - € € € € € € € € 23,094,000 1,445,007 41,874,100 72,877,994 34,074,720 7,443,976 180,809,796 - € € € € € € € 137,316,800 266,772 137,583,572 € 318,393,369 24,998,722 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 88/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.12 7.12.1 B1D – Token-Based RTS and Distributed Entry-Exit System without biometrics Scenario Parameters The following parameters and values apply. Scenario B1D RTS Yes token-based EES Yes (no biometrics) Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES No Fingerprint images in RTS No Fingerprint templates in RTS Yes Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 89/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.12.2 Cost Summary Tables 7.12.2.1 VIS co-location (no VIS connection) Tariff EU Cost Model: Proposal for the EES/RTS B1D - Distributed EES no biometrics, Token-Based RTS, not connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price Price Freq Nbr of Entities (€ per hour) (hour) Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Time in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 EU € 74 € 74 € 85 € 26 € 26 € 85 26 € 26 € € 15,327 € € € 22,517 € € 114,806 € € € € € 456,308 € € € 2,914,601 € € 130,024 € € € € € € 5281415.385 € € € 555,049 € € 23,800 506,712 1,335,600 1,210,000 612,673 975,855 4,664,640 3,645,000 1,186,401 54,660,400 260,611,790 19,767,600 1,105,201 340,976,391 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 70,800 500,000 1,335,600 440,000 617,124 2,963,524 54,000 176,363,477 20,926,800 197,344,277 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 47,600 1,013,423 2,671,200 2,420,000 612,673 975,855 7,740,751 € € € € € € € € € 141,600 1,000,000 2,671,200 880,000 617,124 5,309,924 - € € € € € € € € € 3,645,000 1,186,401 54,660,400 260,611,790 19,767,600 1,105,201 340,976,391 - € € € € € € € € € 54,000 176,363,477 20,926,800 197,344,277 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS Total one time costs Token- EES Based Self RTS Enrolment Contained Biometrics added EES/RTS built together later at both RTS Border Check mode Yes € € € € € € € € 2,017,000 1,134,232 2,773,200 12,772,000 1,666,268 27,000 9,758,552 30,148,252 € € € MS € - - € € € € € € € € 30,213,000 11,864,006 1,782,000 37,800,000 75,779,629 34,074,720 11,052,008 202,565,363 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 354,313,436 30,148,252 Yes Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 90/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.12.2.2 VIS connection Tariff Time EU Cost Model: Proposal for the EES/RTS B1D - Distributed EES no biometrics, Token-Based RTS, connected to VIS, co-located with VIS, 5 year retention (€ per hour) (hour) No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Price Freq Nbr of Entities in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 € 74 € 85 26 € 26 € 85 26 € 26 € € 15,327 € € € 22,066 € € 114,806 € € € € € 456,308 € € € 2,914,601 € € 130,024 € € € € € € 5281415.385 € € € 555,049 € € 23,800 506,712 1,335,600 1,210,000 582,197 975,855 4,634,163 3,645,000 1,186,401 54,660,400 260,611,790 19,767,600 1,105,201 340,976,391 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 70,800 500,000 1,335,600 440,000 570,238 2,916,638 54,000 176,363,477 20,926,800 197,344,277 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 47,600 1,013,423 2,671,200 2,420,000 582,197 975,855 7,710,275 € € € € € € € € € 141,600 1,000,000 2,671,200 880,000 570,238 5,263,038 - € € € € € € € € € 3,645,000 1,186,401 54,660,400 260,611,790 19,767,600 1,105,201 340,976,391 - € € € € € € € € € 54,000 176,363,477 20,926,800 197,344,277 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS TokenBased Total one time costs EU € Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price EES RTS Enrolment Biometrics added EES/RTS built together later at both RTS Border Check mode Interfaced with VIS Yes € € € € € € € € 2,017,000 1,134,232 2,773,200 12,772,000 1,632,848 27,000 9,758,552 30,114,832 € € € MS € - - € € € € € € € € 30,213,000 11,864,006 1,782,000 37,800,000 75,779,629 34,074,720 11,052,008 202,565,363 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 354,313,436 30,114,832 Yes Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 91/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.13 7.13.1 B2C – Token-Based RTS and Centralised Entry-Exit System with biometrics Scenario Parameters The following parameters and values apply. Scenario B2C RTS Yes token-based EES With biometrics Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES Yes Fingerprint images in RTS No Fingerprint templates in RTS Yes Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 92/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.13.2 Cost Summary Tables 7.13.2.1 VIS co-location (no VIS connection) EU Cost Model: Proposal for the EES/RTS B2C - Token-Based RTS, EES with biometrics, not connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Tariff Time Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 14,620 € 74 17,082 € 85 70,043 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 215,000 504,095 1,335,600 (3,569,000) 868,327 9,000 595,368 (41,610) 24,000 148,314 1,878,200 112,762,880 14,002,800 764,042 129,580,236 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 237,000 504,095 1,360,800 935,000 1,591,251 595,368 5,223,514 36,000 148,314 705,900 157,930,458 14,188,800 764,042 173,773,514 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 430,000 1,008,189 2,671,200 (7,138,000) 868,327 9,000 595,368 (1,555,916) € € € € € € € € € 474,000 1,008,189 2,721,600 1,870,000 1,591,251 595,368 8,260,409 - € € € € € € € € € 24,000 148,314 1,878,200 112,762,880 14,002,800 764,042 129,580,236 - € € € € € € € € € 36,000 148,314 705,900 157,930,458 14,188,800 764,042 173,773,514 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price Token- EES Based Self RTS Enrolment Contained With Biometrics EES/RTS built together at both RTS Border Check mode No € € € € € € € € 4,306,000 1,081,895 2,773,200 19,272,000 1,264,057 36,000 5,953,680 34,686,831 € € € MS € - - € € € € € € € € 23,094,000 1,483,140 41,874,100 73,020,434 34,074,720 7,640,417 181,186,811 - € € € € € € € 137,316,800 266,772 137,583,572 € 318,770,383 34,686,831 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 93/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.13.2.2 VIS connection EU Cost Model: Proposal for the EES/RTS B2C - Token-Based RTS, EES with biometrics, connected to VIS, colocated with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Tariff Time Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Yearly Total Number of Incurring costs in 2014 actions Total Yearly Incurring costs in 2020 € 74 14,620 € 74 16,287 € 85 70,043 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 215,000 504,095 1,335,600 (3,569,000) 811,008 9,000 595,368 (98,929) 24,000 148,314 1,878,200 112,762,880 14,002,800 764,042 129,580,236 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 237,000 504,095 1,360,800 935,000 1,477,826 595,368 5,110,089 36,000 148,314 705,900 157,930,458 14,188,800 764,042 173,773,514 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 430,000 1,008,189 2,671,200 (7,138,000) 811,008 9,000 595,368 (1,613,234) € € € € € € € € € 474,000 1,008,189 2,721,600 1,870,000 1,477,826 595,368 8,146,984 - € € € € € € € € € 24,000 148,314 1,878,200 112,762,880 14,002,800 764,042 129,580,236 - € € € € € € € € € 36,000 148,314 705,900 157,930,458 14,188,800 764,042 173,773,514 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS TokenBased Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price EES RTS Enrolment With Biometrics EES/RTS built together at both RTS Border Check mode Interfaced with VIS No € € € € € € € € 4,306,000 1,081,895 2,773,200 19,272,000 1,205,224 36,000 5,953,680 34,627,999 € € € MS € - - € € € € € € € € 23,094,000 1,483,140 41,874,100 73,020,434 34,074,720 7,640,417 181,186,811 - € € € € € € € 137,316,800 266,772 137,583,572 € 318,770,383 34,627,999 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 94/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.14 7.14.1 B2D – Token-Based RTS and Distributed Entry-Exit System with biometrics Scenario Parameters The following parameters and values apply. Scenario B2D RTS Yes token-based EES Yes with biometrics Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES Yes Fingerprint images in RTS No Fingerprint templates in RTS Yes Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 95/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.14.2 Cost Summary Tables 7.14.2.1 VIS co-location (no VIS connection) Tariff EU Cost Model: Proposal for the EES/RTS B2D - Distributed EES with biometrics, Token-Based RTS, not connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price Price Freq Nbr of Entities (€ per hour) (hour) Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Time in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 EU € 74 € 74 € 85 € 26 € 26 € 85 26 € 26 € € 15,271 € € € 22,349 € € 111,247 € € € € € 468,801 € € € 3,088,375 € € 133,584 € € € € € € 5281415.385 € € € 555,049 € € 100,600 506,503 1,335,600 1,210,000 754,154 9,000 945,596 4,861,453 3,753,000 1,218,883 55,540,400 272,002,550 19,767,600 1,135,460 353,417,893 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 500,000 1,335,600 440,000 965,980 3,255,580 54,000 191,015,221 20,926,800 211,996,021 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 201,200 1,013,007 2,671,200 2,420,000 754,154 9,000 945,596 8,014,157 € € € € € € € € € 28,000 1,000,000 2,671,200 880,000 965,980 5,545,180 - € € € € € € € € € 3,753,000 1,218,883 55,540,400 272,002,550 19,767,600 1,135,460 353,417,893 - € € € € € € € € € 54,000 191,015,221 20,926,800 211,996,021 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS Total one time costs Token- EES Based Self RTS Enrolment Contained Biometrics added EES/RTS built together later at both RTS Border Check mode Yes € € € € € € € € 3,295,800 1,130,070 2,773,200 28,612,000 1,653,815 36,000 9,455,961 46,956,846 € € € MS € - - € € € € € € € € 35,748,000 12,188,828 1,782,000 67,500,000 80,297,743 36,499,680 11,354,599 245,370,851 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 397,118,924 46,956,846 Yes Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 96/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.14.2.2 VIS connection EU Cost Model: Proposal for the EES/RTS B2D - Distributed EES with biometrics, Token-Based RTS, connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Tariff Price Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 € 74 € 85 26 € 26 € 85 26 € 26 € € 15,271 € € € 21,835 € € 111,247 € € € € € 468,801 € € € 3,088,375 € € 133,584 € € € € € € 5281415.385 € € € 555,049 € € 100,600 506,503 1,335,600 1,210,000 713,989 945,596 4,812,289 3,753,000 1,218,883 55,540,400 272,002,550 19,767,600 1,135,460 353,417,893 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 500,000 1,335,600 440,000 880,999 3,170,599 54,000 191,015,221 20,926,800 211,996,021 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 201,200 1,013,007 2,671,200 2,420,000 713,989 945,596 7,964,992 € € € € € € € € € 28,000 1,000,000 2,671,200 880,000 880,999 5,460,199 - € € € € € € € € € 3,753,000 1,218,883 55,540,400 272,002,550 19,767,600 1,135,460 353,417,893 - € € € € € € € € € 54,000 191,015,221 20,926,800 211,996,021 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS TokenBased Total one time costs EU € Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Time EES RTS Enrolment Biometrics added EES/RTS built together later at both RTS Border Check mode Interfaced with VIS Yes € € € € € € € € 3,295,800 1,130,070 2,773,200 28,612,000 1,615,760 27,000 9,455,961 46,909,791 € € € MS € - - € € € € € € € € 35,748,000 12,188,828 1,782,000 67,500,000 80,297,743 36,499,680 11,354,599 245,370,851 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 397,118,924 46,909,791 Yes Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 97/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.15 7.15.1 B3C – Token-Based RTS and Centralised Entry-Exit System with biometrics added later Scenario Parameters The following parameters and values apply. Scenario B3C RTS Yes token-based EES With biometrics added later Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES Yes Fingerprint images in RTS No Fingerprint templates in RTS Yes Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 98/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.15.2 Cost Summary Tables 7.15.2.1 VIS co-location (no VIS connection) EU Cost Model: Proposal for the EES/RTS B3C - Token-Based RTS, EES with biometrics added later, not connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Tariff Time Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 14,662 € 74 17,455 € 85 72,670 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 215,000 504,248 1,335,600 (3,569,000) 871,091 9,000 617,692 (16,369) 24,000 143,980 1,878,200 112,747,175 14,002,800 741,717 129,537,872 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 237,000 504,248 1,360,800 935,000 1,594,015 617,692 5,248,756 36,000 143,980 705,900 157,914,753 14,188,800 741,717 173,731,150 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 430,000 1,008,497 2,671,200 (7,138,000) 871,091 9,000 617,692 (1,530,520) € € € € € € € € € 474,000 1,008,497 2,721,600 1,870,000 1,594,015 617,692 8,285,804 - € € € € € € € € € 24,000 143,980 1,878,200 112,747,175 14,002,800 741,717 129,537,872 - € € € € € € € € € 36,000 143,980 705,900 157,914,753 14,188,800 741,717 173,731,150 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price Token- EES Based Self RTS Enrolment Contained Biometrics added EES/RTS built together later at both RTS Border Check mode No € € € € € € € € 4,306,000 1,084,965 2,773,200 19,272,000 1,291,694 36,000 6,176,924 34,940,784 € € € MS € - - € € € € € € € € 23,094,000 1,439,804 41,874,100 72,863,375 34,074,720 7,417,173 180,763,172 - € € € € € € € 137,316,800 266,772 137,583,572 € 318,346,745 34,940,784 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 99/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.15.2.2 VIS connection EU Cost Model: Proposal for the EES/RTS B3C - Token-Based RTS, EES with biometrics added later, connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Tariff Time Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 14,662 € 74 16,660 € 85 72,670 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 215,000 504,248 1,335,600 (3,569,000) 813,772 9,000 617,692 (73,687) 24,000 143,980 1,878,200 112,747,175 14,002,800 741,717 129,537,872 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 237,000 504,248 1,360,800 935,000 1,480,590 617,692 5,135,331 36,000 143,980 705,900 157,914,753 14,188,800 741,717 173,731,150 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 430,000 1,008,497 2,671,200 (7,138,000) 813,772 9,000 617,692 (1,587,839) € € € € € € € € € 474,000 1,008,497 2,721,600 1,870,000 1,480,590 617,692 8,172,379 - € € € € € € € € € 24,000 143,980 1,878,200 112,747,175 14,002,800 741,717 129,537,872 - € € € € € € € € € 36,000 143,980 705,900 157,914,753 14,188,800 741,717 173,731,150 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS TokenBased Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price EES RTS Enrolment Biometrics added EES/RTS built together later at both RTS Border Check mode Interfaced with VIS No € € € € € € € € 4,306,000 1,084,965 2,773,200 19,272,000 1,232,861 36,000 6,176,924 34,881,951 € € € MS € - - € € € € € € € € 23,094,000 1,439,804 41,874,100 72,863,375 34,074,720 7,417,173 180,763,172 - € € € € € € € 137,316,800 266,772 137,583,572 € 318,346,745 34,881,951 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 100/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.16 7.16.1 B3D – Token-Based RTS and Distributed Entry-Exit System with biometrics added later Scenario Parameters The following parameters and values apply. Scenario B3D RTS Yes token-based EES With biometrics added later Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES Yes Fingerprint images in RTS No Fingerprint templates in RTS Yes Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 101/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.16.2 Cost Summary Tables 7.16.2.1 VIS co-location (no VIS connection) EU Cost Model: Proposal for the EES/RTS B3D - Distributed EES with biometrics added later, Token-Based RTS, not connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Tariff Time Price Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 EU € 74 € 74 € 85 € 26 € 26 € 85 26 € 26 € € 15,271 € € € 22,349 € € 111,247 € € € € € 468,801 € € € 3,088,375 € € 133,584 € € € € € € 5281415.385 € € € 555,049 € € 100,600 506,503 1,335,600 1,210,000 754,154 9,000 945,596 4,861,453 3,753,000 1,218,883 55,540,400 272,002,550 19,767,600 1,135,460 353,417,893 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 500,000 1,335,600 440,000 965,980 3,255,580 54,000 191,015,221 20,926,800 211,996,021 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 201,200 1,013,007 2,671,200 2,420,000 754,154 9,000 945,596 8,014,157 € € € € € € € € € 28,000 1,000,000 2,671,200 880,000 965,980 5,545,180 - € € € € € € € € € 3,753,000 1,218,883 55,540,400 272,002,550 19,767,600 1,135,460 353,417,893 - € € € € € € € € € 54,000 191,015,221 20,926,800 211,996,021 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS Total one time costs Token- EES Based Self RTS Enrolment Contained Biometrics added EES/RTS built together later at both RTS Border Check mode Yes € € € € € € € € 3,295,800 1,130,070 2,773,200 28,612,000 1,653,815 36,000 9,455,961 46,956,846 € € € MS € - - € € € € € € € € 35,748,000 12,188,828 1,782,000 67,500,000 80,297,743 36,499,680 11,354,599 245,370,851 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 397,118,924 46,956,846 Yes Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 102/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.16.2.2 VIS connection EU Cost Model: Proposal for the EES/RTS B3D - Distributed EES with biometrics added later, Token-Based RTS, connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Tariff Price Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 € 74 € 85 26 € 26 € 85 26 € 26 € € 15,271 € € € 21,835 € € 111,247 € € € € € 468,801 € € € 3,088,375 € € 133,584 € € € € € € 5281415.385 € € € 555,049 € € 100,600 506,503 1,335,600 1,210,000 713,989 945,596 4,812,289 3,753,000 1,218,883 55,540,400 272,002,550 19,767,600 1,135,460 353,417,893 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 500,000 1,335,600 440,000 880,999 3,170,599 54,000 191,015,221 20,926,800 211,996,021 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 201,200 1,013,007 2,671,200 2,420,000 713,989 945,596 7,964,992 € € € € € € € € € 28,000 1,000,000 2,671,200 880,000 880,999 5,460,199 - € € € € € € € € € 3,753,000 1,218,883 55,540,400 272,002,550 19,767,600 1,135,460 353,417,893 - € € € € € € € € € 54,000 191,015,221 20,926,800 211,996,021 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS TokenBased Total one time costs EU € Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Time EES RTS Enrolment Biometrics added EES/RTS built together later at both RTS Border Check mode Interfaced with VIS Yes € € € € € € € € 3,295,800 1,130,070 2,773,200 28,612,000 1,615,760 27,000 9,455,961 46,909,791 € € € MS € - - € € € € € € € € 35,748,000 12,188,828 1,782,000 67,500,000 80,297,743 36,499,680 11,354,599 245,370,851 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 397,118,924 46,909,791 Yes Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 103/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.17 7.17.1 C0 – Token-less RTS only Scenario Parameters The following parameters and values apply. Scenario C0 RTS Yes token-less EES No Fingerprint images in EES No Fingerprint templates in EES No Fingerprint images in RTS No Fingerprint templates in RTS Yes Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect No VIS/BMS 1Gbps Interconnect No Biometric Data specification Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 104/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.17.2 Cost Summary Tables 7.17.2.1 VIS co-location (no VIS connection) EU Cost Model: Proposal for the EES/RTS C0 - Token-Less RTS, No EES, not connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Tariff Time Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 13,882 € 74 14,016 € 85 23,296 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 1,016,000 501,362 1,335,600 (3,546,000) 1,020,594 18,000 198,013 543,568 24,000 181,467 1,878,200 112,744,141 14,002,800 537,167 129,367,775 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 250,000 501,362 1,335,600 935,000 4,764,513 198,013 7,984,488 36,000 181,467 705,900 157,138,217 14,188,800 537,167 172,787,550 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 2,032,000 1,002,724 2,671,200 (7,092,000) 1,020,594 18,000 198,013 (149,470) € € € € € € € € € 500,000 1,002,724 2,671,200 1,870,000 4,764,513 198,013 11,006,450 - € € € € € € € € € 24,000 181,467 1,878,200 112,744,141 14,002,800 537,167 129,367,775 - € € € € € € € € € 36,000 181,467 705,900 157,138,217 14,188,800 537,167 172,787,550 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price Token- EES Less Self RTS Enrolment Contained None EES/RTS built together at both RTS Border Check mode No € € € € € € € € 4,152,000 1,027,237 2,773,200 19,250,000 1,037,148 36,000 1,980,128 30,255,713 € € € MS € - - € € € € € € € € 23,094,000 1,814,667 41,874,100 72,484,289 34,074,720 5,371,669 178,713,446 - € € € € € € € 137,316,800 266,772 137,583,572 € 316,297,018 30,255,713 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 105/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.17.2.2 VIS connection Tariff Time EU Cost Model: Proposal for the EES/RTS C0 - Token-Less RTS, No EES, connected to VIS, co-located with VIS, 5 year retention (€ per hour) (hour) No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Price Freq Nbr of Entities in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 13,882 € 74 13,487 € 85 23,296 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 1,016,000 501,362 1,335,600 (3,546,000) 946,553 9,000 198,013 460,528 24,000 181,467 1,878,200 112,744,141 14,002,800 537,167 129,367,775 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 250,000 501,362 1,335,600 935,000 4,409,587 198,013 7,629,562 36,000 181,467 705,900 157,138,217 14,188,800 537,167 172,787,550 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 2,032,000 1,002,724 2,671,200 (7,092,000) 946,553 9,000 198,013 (232,510) € € € € € € € € € 500,000 1,002,724 2,671,200 1,870,000 4,409,587 198,013 10,651,523 - € € € € € € € € € 24,000 181,467 1,878,200 112,744,141 14,002,800 537,167 129,367,775 - € € € € € € € € € 36,000 181,467 705,900 157,138,217 14,188,800 537,167 172,787,550 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS TokenLess Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price EES RTS Enrolment None EES/RTS built together at both RTS Border Check mode Interfaced with VIS No € € € € € € € € 4,152,000 1,027,237 2,773,200 19,250,000 998,013 27,000 1,980,128 30,207,578 € € € MS € - - € € € € € € € € 23,094,000 1,814,667 41,874,100 72,484,289 34,074,720 5,371,669 178,713,446 - € € € € € € € 137,316,800 266,772 137,583,572 € 316,297,018 30,207,578 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 106/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.18 7.18.1 C1C – Token-less RTS and Centralised Entry-Exit System without biometrics Scenario Parameters The following parameters and values apply. Scenario C1C RTS Yes token-less EES No biometrics Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES No Fingerprint images in RTS No Fingerprint templates in RTS Yes Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect No VIS/BMS 1Gbps Interconnect Yes Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 107/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.18.2 Cost Summary Tables 7.18.2.1 VIS co-location (no VIS connection) EU Cost Model: Proposal for the EES/RTS C1C - Token-Less RTS, EES no biometrics, not connected to VIS, colocated with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Tariff Time Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 14,576 € 74 16,724 € 85 67,261 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 215,000 503,932 1,335,600 (3,569,000) 870,673 9,000 571,714 (63,080) 24,000 152,906 1,878,200 112,779,521 14,002,800 787,695 129,625,122 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 250,000 503,932 1,335,600 935,000 1,554,837 571,714 5,151,084 36,000 152,906 705,900 157,146,797 14,188,800 787,695 173,018,098 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 430,000 1,007,864 2,671,200 (7,138,000) 870,673 9,000 571,714 (1,577,548) € € € € € € € € € 500,000 1,007,864 2,671,200 1,870,000 1,554,837 571,714 8,175,616 - € € € € € € € € € 24,000 152,906 1,878,200 112,779,521 14,002,800 787,695 129,625,122 - € € € € € € € € € 36,000 152,906 705,900 157,146,797 14,188,800 787,695 173,018,098 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price Token- EES Less Self RTS Enrolment Contained With Biometrics EES/RTS built together at both RTS Border Check mode No € € € € € € € € 4,340,000 1,078,641 2,773,200 19,272,000 1,237,559 36,000 5,717,144 34,454,544 € € € MS € - - € € € € € € € € 23,094,000 1,529,056 41,874,100 73,186,844 34,074,720 7,876,954 181,635,674 - € € € € € € € 137,316,800 266,772 137,583,572 € 319,219,246 34,454,544 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 108/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.18.2.2 VIS connection EU Cost Model: Proposal for the EES/RTS C1C - Token-Less RTS, EES no biometrics, connected to VIS, colocated with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Tariff Time Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 14,576 € 74 15,922 € 85 67,261 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 215,000 503,932 1,335,600 (3,569,000) 812,886 9,000 571,714 (120,868) 24,000 152,906 1,878,200 112,779,521 14,002,800 787,695 129,625,122 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 250,000 503,932 1,335,600 935,000 1,441,413 571,714 5,037,659 36,000 152,906 705,900 157,146,797 14,188,800 787,695 173,018,098 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 430,000 1,007,864 2,671,200 (7,138,000) 812,886 9,000 571,714 (1,635,336) € € € € € € € € € 500,000 1,007,864 2,671,200 1,870,000 1,441,413 571,714 8,062,191 - € € € € € € € € € 24,000 152,906 1,878,200 112,779,521 14,002,800 787,695 129,625,122 - € € € € € € € € € 36,000 152,906 705,900 157,146,797 14,188,800 787,695 173,018,098 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS TokenLess Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price EES RTS Enrolment With Biometrics EES/RTS built together at both RTS Border Check mode Interfaced with VIS No € € € € € € € € 4,340,000 1,078,641 2,773,200 19,272,000 1,178,212 36,000 5,717,144 34,395,196 € € € MS € - - € € € € € € € € 23,094,000 1,529,056 41,874,100 73,186,844 34,074,720 7,876,954 181,635,674 - € € € € € € € 137,316,800 266,772 137,583,572 € 319,219,246 34,395,196 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 109/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.19 7.19.1 C1D – Token-less RTS and Distributed Entry-Exit System without biometrics Scenario Parameters The following parameters and values apply. Scenario C1D RTS Yes token-less EES Yes, no biometrics Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES No Fingerprint images in RTS No Fingerprint templates in RTS Yes Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect No VIS/BMS 1Gbps Interconnect Yes Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 110/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.19.2 Cost Summary Tables 7.19.2.1 VIS co-location (no VIS connection) EU Cost Model: Proposal for the EES/RTS C1D - Distributed EES no biometrics, Token-Less RTS, not connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Tariff Time Price Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 EU € 74 € 74 € 85 € 26 € 26 € 85 26 € 26 € € 14,689 € € € 25,638 € € 74,402 € € € € € 598,104 € € € 3,177,077 € € 170,428 € € € € € € 5281415.385 € € € 555,049 € € 6,238,600 504,350 1,335,600 1,237,000 3,835,766 45,000 632,417 13,828,732 3,699,000 1,555,072 55,540,400 304,211,477 19,767,600 1,448,639 386,222,188 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 500,000 1,335,600 440,000 8,849,002 11,138,602 189,418,949 20,926,800 210,345,749 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 12,477,200 1,008,699 2,671,200 2,474,000 3,835,766 45,000 632,417 23,144,282 € € € € € € € € € 28,000 1,000,000 2,671,200 880,000 8,849,002 13,428,202 - € € € € € € € € € 3,699,000 1,555,072 55,540,400 304,211,477 19,767,600 1,448,639 386,222,188 - € € € € € € € € € 189,418,949 20,926,800 210,345,749 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS Total one time costs Token- EES Less Self RTS Enrolment Contained No Biometrics EES/RTS built together at both RTS Border Check mode Yes € € € € € € € € 14,809,800 1,086,991 2,773,200 29,086,000 1,897,244 72,000 6,324,167 56,049,402 € € € MS € - - € € € € € € € € 35,748,000 15,550,717 1,782,000 67,500,000 82,603,999 36,499,680 14,486,393 254,170,789 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 405,918,862 56,049,402 Yes Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 111/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.19.2.2 VIS connection EU Cost Model: Proposal for the EES/RTS C1D - Distributed EES no biometrics, Token-Less RTS, connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Tariff Price Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 € 74 € 85 26 € 26 € 85 26 € 26 € € 14,689 € € € 23,619 € € 74,402 € € € € € 598,104 € € € 3,177,077 € € 170,428 € € € € € € 5281415.385 € € € 555,049 € € 6,238,600 504,350 1,335,600 1,237,000 3,584,535 36,000 632,417 13,568,502 3,699,000 1,555,072 55,540,400 304,211,477 19,767,600 1,448,639 386,222,188 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 500,000 1,335,600 440,000 8,205,688 10,495,288 189,418,949 20,926,800 210,345,749 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 12,477,200 1,008,699 2,671,200 2,474,000 3,584,535 36,000 632,417 22,884,051 € € € € € € € € € 28,000 1,000,000 2,671,200 880,000 8,205,688 12,784,888 - € € € € € € € € € 3,699,000 1,555,072 55,540,400 304,211,477 19,767,600 1,448,639 386,222,188 - € € € € € € € € € 189,418,949 20,926,800 210,345,749 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS TokenLess Total one time costs EU € Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Time EES RTS Enrolment No Biometrics EES/RTS built together at both RTS Border Check mode Interfaced with VIS Yes € € € € € € € € 14,809,800 1,086,991 2,773,200 29,086,000 1,747,833 63,000 6,324,167 55,890,991 € € € MS € - - € € € € € € € € 35,748,000 15,550,717 1,782,000 67,500,000 82,603,999 36,499,680 14,486,393 254,170,789 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 405,918,862 55,890,991 Yes Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 112/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.20 7.20.1 C2C – Token-less RTS and Centralised Entry-Exit System with biometrics Scenario Parameters The following parameters and values apply. Scenario C2C RTS Yes token-less EES With biometrics Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES Yes Fingerprint images in RTS No Fingerprint templates in RTS Yes Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 113/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.20.2 Cost Summary Tables 7.20.2.1 VIS co-location (no VIS connection) Tariff Time EU Cost Model: Proposal for the EES/RTS C2C - Token-Less RTS, EES with biometrics, not connected to VIS, colocated with VIS, 5 year retention (€ per hour) (hour) No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Price Freq Nbr of Entities in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 14,576 € 74 16,724 € 85 67,261 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 215,000 503,932 1,335,600 (3,569,000) 870,673 9,000 571,714 (63,080) 24,000 152,906 1,878,200 113,019,523 14,002,800 787,695 129,865,124 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 503,932 1,360,800 935,000 1,591,253 571,714 4,976,700 36,000 152,906 705,900 157,506,583 14,188,800 787,695 173,377,884 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 430,000 1,007,864 2,671,200 (7,138,000) 870,673 9,000 571,714 (1,577,548) € € € € € € € € € 28,000 1,007,864 2,721,600 1,870,000 1,591,253 571,714 7,790,432 - € € € € € € € € € 24,000 152,906 1,878,200 113,019,523 14,002,800 787,695 129,865,124 - € € € € € € € € € 36,000 152,906 705,900 157,506,583 14,188,800 787,695 173,377,884 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price Token- EES Less Self RTS Enrolment Contained With Biometrics EES/RTS built together at both RTS Border Check mode No € € € € € € € € 4,340,000 1,078,641 2,773,200 19,272,000 1,237,559 36,000 5,717,144 34,454,544 € € € MS € - - € € € € € € € € 23,094,000 1,529,056 41,874,100 73,192,496 34,074,720 7,876,954 181,641,325 - € € € € € € € 137,316,800 266,772 137,583,572 € 319,224,897 34,454,544 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 114/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.20.2.2 VIS connection EU Cost Model: Proposal for the EES/RTS C2C - Token-Less RTS, EES with biometrics, connected to VIS, colocated with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Tariff Time Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 14,576 € 74 15,922 € 85 67,261 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 215,000 503,932 1,335,600 (3,569,000) 812,886 9,000 571,714 (120,868) 24,000 152,906 1,878,200 113,019,523 14,002,800 787,695 129,865,124 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 503,932 1,360,800 935,000 1,477,828 571,714 4,863,275 36,000 152,906 705,900 157,506,583 14,188,800 787,695 173,377,884 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 430,000 1,007,864 2,671,200 (7,138,000) 812,886 9,000 571,714 (1,635,336) € € € € € € € € € 28,000 1,007,864 2,721,600 1,870,000 1,477,828 571,714 7,677,007 - € € € € € € € € € 24,000 152,906 1,878,200 113,019,523 14,002,800 787,695 129,865,124 - € € € € € € € € € 36,000 152,906 705,900 157,506,583 14,188,800 787,695 173,377,884 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS TokenLess Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price EES RTS Enrolment With Biometrics EES/RTS built together at both RTS Border Check mode Interfaced with VIS No € € € € € € € € 4,340,000 1,078,641 2,773,200 19,272,000 1,178,212 36,000 5,717,144 34,395,196 € € € MS € - - € € € € € € € € 23,094,000 1,529,056 41,874,100 73,192,496 34,074,720 7,876,954 181,641,325 - € € € € € € € 137,316,800 266,772 137,583,572 € 319,224,897 34,395,196 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 115/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.21 7.21.1 C2D – Token-less RTS and Distributed Entry-Exit System with biometrics Scenario Parameters The following parameters and values apply. Scenario C2D RTS Yes token-less EES Yes, with biometrics Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES Yes Fingerprint images in RTS No Fingerprint templates in RTS Yes Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 116/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.21.2 Cost Summary Tables 7.21.2.1 VIS co-location (no VIS connection) Tariff EU Cost Model: Proposal for the EES/RTS C2D - Distributed EES with biometrics, Token-Less RTS, not connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price Price Freq Nbr of Entities (€ per hour) (hour) Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Time in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 EU € 74 € 74 € 85 € 26 € 26 € 85 26 € 26 € € 15,140 € € € 34,093 € € 102,966 € € € € € 497,861 € € € 3,108,310 € € 141,864 € € € € € € 5281415.385 € € € 555,049 € € 6,238,600 506,019 1,335,600 1,210,000 4,685,170 45,000 875,210 14,895,600 3,699,000 1,294,440 55,540,400 279,319,878 19,767,600 1,205,846 360,827,163 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 500,000 1,335,600 440,000 10,335,278 12,624,878 189,418,949 20,926,800 210,345,749 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 12,477,200 1,012,039 2,671,200 2,420,000 4,685,170 45,000 875,210 24,185,819 € € € € € € € € € 28,000 1,000,000 2,671,200 880,000 10,335,278 14,914,478 - € € € € € € € € € 3,699,000 1,294,440 55,540,400 279,319,878 19,767,600 1,205,846 360,827,163 - € € € € € € € € € 189,418,949 20,926,800 210,345,749 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS Total one time costs Token- EES Less Self RTS Enrolment Contained With Biometrics EES/RTS built together at both RTS Border Check mode Yes € € € € € € € € 20,947,800 1,120,388 2,773,200 29,140,000 2,522,910 90,000 8,752,105 65,346,403 € € € MS € - - € € € € € € € € 35,748,000 12,944,397 1,782,000 67,500,000 80,816,064 36,499,680 12,058,456 247,348,597 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 399,096,670 65,346,403 Yes Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 117/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.21.2.2 VIS connection Tariff Time EU Cost Model: Proposal for the EES/RTS C2D - Distributed EES with biometrics, Token-Less RTS, connected to VIS, co-located with VIS, 5 year retention (€ per hour) (hour) No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Price Freq Nbr of Entities in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 € 74 € 85 26 € 26 € 85 26 € 26 € € 15,140 € € € 34,093 € € 102,966 € € € € € 497,861 € € € 3,108,310 € € 141,864 € € € € € € 5281415.385 € € € 555,049 € € 6,238,600 506,019 1,335,600 1,210,000 4,685,170 45,000 875,210 14,895,600 3,699,000 1,294,440 55,540,400 279,319,878 19,767,600 1,205,846 360,827,163 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 500,000 1,335,600 440,000 10,335,278 12,624,878 189,418,949 20,926,800 210,345,749 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 12,477,200 1,012,039 2,671,200 2,420,000 4,685,170 45,000 875,210 24,185,819 € € € € € € € € € 28,000 1,000,000 2,671,200 880,000 10,335,278 14,914,478 - € € € € € € € € € 3,699,000 1,294,440 55,540,400 279,319,878 19,767,600 1,205,846 360,827,163 - € € € € € € € € € 189,418,949 20,926,800 210,345,749 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS TokenLess Total one time costs EU € Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price EES RTS Enrolment With Biometrics EES/RTS built together at both RTS Border Check mode Interfaced with VIS Yes € € € € € € € € 20,947,800 1,120,388 2,773,200 29,140,000 2,522,910 90,000 8,752,105 65,346,403 € € € MS € - - € € € € € € € € 35,748,000 12,944,397 1,782,000 67,500,000 80,816,064 36,499,680 12,058,456 247,348,597 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 399,096,670 65,346,403 Yes Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 118/137 LIMITED DISTRIBUTION Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.22 7.22.1 C3C – Token-less RTS and Centralised Entry-Exit System with biometrics added later Scenario Parameters The following parameters and values apply. Scenario C3C RTS Yes token-less EES With biometrics added later Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES Yes Fingerprint images in RTS No Fingerprint templates in RTS Yes Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 119/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.22.2 Cost Summary Tables 7.22.2.1 VIS co-location (no VIS connection) Tariff EU Cost Model: Proposal for the EES/RTS C3C - Token-Less RTS, EES with biometrics added later, not connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Time Price Freq Nbr of Entities (€ per hour) (hour) Type of Target Description of required action Obligation Groups Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 14,620 € 74 17,114 € 85 70,006 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 215,000 504,093 1,335,600 (3,569,000) 873,562 9,000 595,050 (36,695) 24,000 148,376 1,878,200 113,003,106 14,002,800 764,360 129,820,841 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 504,093 1,360,800 935,000 1,594,142 595,050 5,003,085 36,000 148,376 705,900 157,490,166 14,188,800 764,360 173,333,601 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 430,000 1,008,185 2,671,200 (7,138,000) 873,562 9,000 595,050 (1,551,003) € € € € € € € € € 28,000 1,008,185 2,721,600 1,870,000 1,594,142 595,050 7,816,977 - € € € € € € € € € 24,000 148,376 1,878,200 113,003,106 14,002,800 764,360 129,820,841 - € € € € € € € € € 36,000 148,376 705,900 157,490,166 14,188,800 764,360 173,333,601 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs RTS Scenario Specification Scenario Options Architecture vs VIS Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price Token- EES Less Self RTS Enrolment Contained Biometrics added EES/RTS built together later at both RTS Border Check mode No € € € € € € € € 4,340,000 1,081,851 2,773,200 19,272,000 1,266,448 36,000 5,950,500 34,719,998 € € € MS € - - € € € € € € € € 23,094,000 1,483,757 41,874,100 73,028,323 34,074,720 7,643,598 181,198,498 - € € € € € € € 137,316,800 266,772 137,583,572 € 318,782,070 34,719,998 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 120/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.22.2.2 VIS connection Tariff Time EU Cost Model: Proposal for the EES/RTS C3C - Token-Less RTS, EES with biometrics added later, connected to VIS, co-located with VIS, 5 year retention (€ per hour) (hour) No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Target Type of Description of required action Groups Obligation Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Price Freq Nbr of Entities in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 € 74 14,620 € 74 16,312 € 85 70,006 € 26 10,260 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 215,000 504,093 1,335,600 (3,569,000) 815,775 9,000 595,050 (94,483) 24,000 148,376 1,878,200 113,003,106 14,002,800 764,360 129,820,841 11,673,600 293,450 11,967,050 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 504,093 1,360,800 935,000 1,480,717 595,050 4,889,660 36,000 148,376 705,900 157,490,166 14,188,800 764,360 173,333,601 24,464,400 519,864 24,984,264 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 430,000 1,008,185 2,671,200 (7,138,000) 815,775 9,000 595,050 (1,608,790) € € € € € € € € € 28,000 1,008,185 2,721,600 1,870,000 1,480,717 595,050 7,703,552 - € € € € € € € € € 24,000 148,376 1,878,200 113,003,106 14,002,800 764,360 129,820,841 - € € € € € € € € € 36,000 148,376 705,900 157,490,166 14,188,800 764,360 173,333,601 - € € € € € € € 11,673,600 293,450 11,967,050 € € € € € € € 24,464,400 519,864 24,984,264 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS TokenLess Total one time costs EU Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Price EES RTS Enrolment Biometrics added EES/RTS built together later RTS Border Check mode at both Interfaced with VIS No € € € € € € € € 4,340,000 1,081,851 2,773,200 19,272,000 1,207,101 36,000 5,950,500 34,660,651 € € € MS € - - € € € € € € € € 23,094,000 1,483,757 41,874,100 73,028,323 34,074,720 7,643,598 181,198,498 - € € € € € € € 137,316,800 266,772 137,583,572 € 318,782,070 34,660,651 No Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 64% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 64% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the yearly operational costs by 35% compared to Manual Border Check Systems Deploying Semi-Automated Border Check Systems decreases the total costs by 35% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 25.9 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 121/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.23 7.23.1 C3D – Token-less RTS and Distributed Entry-Exit System with biometrics added later Scenario Parameters The following parameters and values apply. Scenario C3D RTS Yes token-less EES Yes, with biometrics added later Biometric Data specification Fingerprint images in EES No Fingerprint templates in EES Yes Fingerprint images in RTS No Fingerprint templates in RTS Yes Facial Matching No Fingerprint matching Yes TESTA 100 Mbps connections preferred Yes TESTA 1 Gbps connections preferred No VIS/BMS 100 Mbps Interconnect Yes VIS/BMS 1Gbps Interconnect No Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 122/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.23.2 Cost Summary Tables 7.23.2.1 VIS co-location (no VIS connection) EU Cost Model: Proposal for the EES/RTS C3D - Distributed EES with biometrics added later, Token-Less RTS, not connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Target Type of Description of required action Groups Obligation Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Tariff Time Price Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 Total one time costs EU € 74 € 74 € 85 € 26 € 26 € 85 26 € 26 € € 15,207 € € € 34,691 € € 107,169 € € € € € 483,112 € € € 3,098,192 € € 137,661 € € € € € € 5281415.385 € € € 555,049 € € 6,238,600 506,265 1,335,600 1,210,000 4,689,592 45,000 910,934 14,935,991 3,699,000 1,256,092 55,540,400 275,657,463 19,767,600 1,170,122 357,090,677 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 500,000 1,335,600 440,000 10,335,278 12,624,878 189,418,949 20,926,800 210,345,749 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 12,477,200 1,012,530 2,671,200 2,420,000 4,689,592 45,000 910,934 24,226,456 € € € € € € € € € 28,000 1,000,000 2,671,200 880,000 10,335,278 14,914,478 - € € € € € € € € € 3,699,000 1,256,092 55,540,400 275,657,463 19,767,600 1,170,122 357,090,677 - € € € € € € € € € 189,418,949 20,926,800 210,345,749 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS Token- EES Less RTS Enrolment Self Contained Biometrics added EES/RTS built together later RTS Border Check mode at both Yes € € € € € € € € 20,947,800 1,125,302 2,773,200 29,140,000 2,567,135 90,000 9,109,338 65,752,775 € € € MS € - - € € € € € € € € 35,748,000 12,560,918 1,782,000 67,500,000 80,552,997 36,499,680 11,701,222 246,344,816 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 398,092,889 65,752,775 Yes Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 123/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 7.23.2.2 VIS connection EU Cost Model: Proposal for the EES/RTS C3D - Distributed EES with biometrics added later, Token-Less RTS, connected to VIS, co-located with VIS, 5 year retention No 1 2 3 4 5 6 7 8 12 13 14 15 16 17 18 19 20 21 25 26 27 28 29 30 31 32 33 37 Target Type of Description of required action Groups Obligation Management Authority Management Authority Hardware Management Authority Other (training, meetings) Management Authority Infrastructure Management Authority software Management Authority Admin Management Authority Office Space Management Authority Contractor Development Subtotal MA Member States Member States Hardware Member States Other (training, meetings) Member States Infrastructure Member States software Member States Admin Member States Office Space Member States Contractor Development Subtotal MS Tariff Price Price Freq Nbr of Entities (€ per hour) (hour) in 2014 in 2020 (per year) Total Total Yearly Number of Incurring costs actions in 2014 Total Yearly Incurring costs in 2020 Total one time costs EU € 74 € 74 € 85 € Member States Border Check Points Automated Border Check Points Semi-Manual Border Check Points Manual Border Check Points Border Control Staff - Automated Check Points Border Control Staff - Semi-Manual Check Points Border Control Staff - Manual Check Points Subtotal Border Check Points Time 26 € 26 € 85 26 € 26 € € 15,207 € € € 34,691 € € 107,169 € € € € € 483,112 € € € 3,098,192 € € 137,661 € € € € € € 5281415.385 € € € 555,049 € € 6,238,600 506,265 1,335,600 1,210,000 4,689,592 45,000 910,934 14,935,991 3,699,000 1,256,092 55,540,400 275,657,463 19,767,600 1,170,122 357,090,677 11,673,600 15,658,107 27,331,707 € € € € € € € € € € € € € € € € € € € € € € € € € € € € 14,000 500,000 1,335,600 440,000 10,335,278 12,624,878 189,418,949 20,926,800 210,345,749 24,464,400 24,764,314 49,228,714 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 € € € € € € € € 12,477,200 1,012,530 2,671,200 2,420,000 4,689,592 45,000 910,934 24,226,456 € € € € € € € € € 28,000 1,000,000 2,671,200 880,000 10,335,278 14,914,478 - € € € € € € € € € 3,699,000 1,256,092 55,540,400 275,657,463 19,767,600 1,170,122 357,090,677 - € € € € € € € € € 189,418,949 20,926,800 210,345,749 - € € € € € € € 11,673,600 15,658,107 27,331,707 € € € € € € € 24,464,400 24,764,314 49,228,714 Total of administrati ve costs Scenario RTS Specification Scenario Options Architecture vs VIS Token- EES Less RTS Enrolment Self Contained Biometrics added EES/RTS built together later RTS Border Check mode at both Yes € € € € € € € € 20,947,800 1,125,302 2,773,200 29,140,000 2,567,135 90,000 9,109,338 65,752,775 € € € MS € - - € € € € € € € € 35,748,000 12,560,918 1,782,000 67,500,000 80,552,997 36,499,680 11,701,222 246,344,816 - € € € € € € € 137,316,800 14,431,273 151,748,073 € 398,092,889 65,752,775 Yes Manual Housing Co-located with VIS Bio-searches based on Co-located with VIS Deploying Automated Border Check Systems increases the one time costs by 35% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the yearly operational costs by 85% compared to Manual Border Check Systems Deploying Automated Border Check Systems decreases the total costs by 85% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems increases the one time costs by 157% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the yearly operational costs by 87% compared to Manual Border Check Systems Deploying semi-manual Border Check Systems decreases the total costs by 87% compared to Manual Border Check Systems Other Costs in clude training and attending meetings Project Schedule is 29.8 months Back to Introduction, Table 3: Costing Scenarios Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 124/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 8 SUMMARY TABLE The tables below summarises the cost estimates for all the different scenarios that were presented in section 7 of this report. For the easier comparison, there are three tables in this section: 1. Comparison of the costs for VIS co-location (no VIS connection) 2. Comparison of the costs for VIS connection. Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 125/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 8.1 Comparison of the costs for VIS co-location (no VIS connection) Table 16: Comparison of the costs - VIS co-location (no VIS connection) € 22,741,703 € EU Total Yearly MS Total Yearly EU Total Yearly MS Total Yearly Incurring costs Incurring costs Incurring costs Incurring costs in 2020 in 2020 in 2014 in 2014 184,844,599 € 6,220,758 € 128,532,953 € 6,035,990 € 158,939,594 € 31,840,217 € 181,699,133 € (3,156,308) € 125,904,137 € 6,644,764 € 157,052,092 € 32,228,963 € 180,980,228 € (3,107,532) € 125,822,345 € 6,644,764 € 157,052,092 € 22,741,703 € 184,844,599 € 6,220,758 € 128,532,953 € 6,035,990 € 158,939,594 € 29,062,869 € 188,928,019 € 6,898,351 € 128,895,819 € 6,035,990 € 158,939,594 € 38,579,054 € 189,519,267 € (1,360,213) € 129,200,082 € 7,121,294 € 160,605,800 € 38,978,952 € 188,852,164 € (1,320,224) € 129,133,371 € 7,121,294 € 160,605,800 € 31,723,065 € 185,624,462 € (271,459) € 128,860,361 € 9,370,708 € 159,625,889 € 38,192,130 € 190,226,091 € (1,398,670) € 129,270,764 € 7,078,848 € 159,610,089 € 38,192,130 € 190,231,742 € (1,398,670) € 129,510,766 € 6,694,704 € 161,228,147 € 38,610,142 € 189,534,423 € (1,356,869) € 129,441,034 € 6,694,704 € 161,228,147 € 13,703,708 € 204,105,549 € 4,759,085 € 125,753,063 € 4,932,782 € 151,145,325 € 17,606,643 € 238,279,550 € 5,264,328 € 130,231,344 € 5,380,254 € 158,978,405 € 18,162,354 € 237,147,454 € 5,319,899 € 130,118,134 € 5,380,254 € 158,978,405 € 30,148,252 € 202,565,363 € 7,654,087 € 339,457,191 € 5,156,828 € 195,722,677 € 46,139,013 € 245,370,851 € 7,818,367 € 350,314,693 € 5,110,721 € 208,785,621 € 46,139,013 € 245,370,851 € 7,818,367 € 350,314,693 € 5,110,721 € 208,785,621 EU Cost Model: € Proposal for the EES/RTS C1D - Distributed EES no biometrics, Token-Less RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: € Proposal for the EES/RTS C2D - Distributed EES with biometrics, Token-Less RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: € Proposal for the EES/RTS C3D - Distributed EES with biometrics added later, Token-Less RTS, not connected to VIS, co-located with VIS, 5 year retention 42,877,216 € 212,306,433 € 7,466,024 € 377,861,788 € 5,092,676 € 199,235,749 45,639,124 € 247,348,597 € 7,742,214 € 357,644,763 € 5,092,676 € 207,067,749 46,045,496 € 246,344,816 € 7,782,851 € 353,908,277 € 5,092,676 € 207,067,749 EU one-time costs Scenario, no VIS connection EU Cost Model: Proposal for the EES/RTS A1C - Central EES no biometrics, no RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A2C - Central EES with biometrics, no RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A3C - Central EES with biometrics added later, no RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B0 - Token-Based RTS, No EES, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B1C - Token-Based RTS, EES no biometrics, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B2C - Token-Based RTS, EES with biometrics, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B3C - Token-Based RTS, EES with biometrics added later, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C0 - Token-Less RTS, No EES, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C1C - Token-Less RTS, EES no biometrics, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C2C - Token-Less RTS, EES with biometrics, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C3C - Token-Less RTS, EES with biometrics added later, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A1D - Distributed EES no biometrics, no RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A2D - Distributed EES with biometrics, no RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A3D - Distributed EES with biometrics added later, no RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B1D - Distributed EES no biometrics, Token-Based RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B2D - Distributed EES with biometrics, Token-Based RTS, not connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B3D - Distributed EES with biometrics added later, Token-Based RTS, not connected to VIS, co-located with VIS, 5 year retention MS one-time Costs Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 126/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 8.2 Comparison of the costs for VIS connection Table 17: Comparison of costs – VIS connection € 18,897,846 € EU Total Yearly MS Total Yearly EU Total Yearly MS Total Yearly Incurring costs Incurring costs Incurring costs Incurring costs in 2014 in 2014 in 2020 in 2020 187,305,874 € 4,645,194 € 126,539,826 € 6,029,326 € 157,041,492 € 31,773,415 € 181,699,133 € (3,212,688) € 125,904,137 € 6,531,339 € 157,052,092 € 32,162,161 € 180,980,228 € (3,163,913) € 125,822,345 € 6,531,339 € 157,052,092 € 22,698,202 € 184,844,599 € 6,166,345 € 128,532,953 € 5,989,104 € 158,939,594 € 29,019,368 € 188,928,019 € 6,843,937 € 128,895,819 € 5,989,104 € 158,939,594 € 38,520,222 € 189,519,267 € (1,417,532) € 129,200,082 € 7,007,869 € 160,605,800 € 38,920,120 € 188,852,164 € (1,377,542) € 129,133,371 € 7,007,869 € 160,605,800 € 31,674,930 € 185,624,462 € (354,499) € 128,860,361 € 9,015,781 € 159,625,889 € 38,132,783 € 190,226,091 € (1,456,457) € 129,270,764 € 6,965,424 € 159,610,089 € 38,132,783 € 190,231,742 € (1,456,457) € 129,510,766 € 6,581,279 € 161,228,147 € 38,550,794 € 189,534,423 € (1,414,656) € 129,441,034 € 6,581,279 € 161,228,147 € 13,659,500 € 204,105,549 € 4,727,786 € 125,753,063 € 4,885,896 € 151,145,325 € 17,562,435 € 238,279,550 € 5,233,029 € 130,231,344 € 5,333,368 € 158,978,405 € 18,118,146 € 237,147,454 € 5,288,600 € 130,118,134 € 5,333,368 € 158,978,405 € 30,114,832 € 202,565,363 € 7,623,611 € 339,457,191 € 5,109,942 € 195,722,677 € 46,096,078 € 245,370,851 € 7,772,953 € 350,314,693 € 5,063,835 € 208,785,621 € 46,096,078 € 245,370,851 € 7,772,953 € 350,314,693 € 5,063,835 € 208,785,621 EU Cost Model: € Proposal for the EES/RTS C1D - Distributed EES no biometrics, Token-Less RTS, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: € Proposal for the EES/RTS C2D - Distributed EES with biometrics, Token-Less RTS, connected to VIS, co-located with VIS, 5 year retention € EU Cost Model: Proposal for the EES/RTS C3D - Distributed EES with biometrics added later, Token-Less RTS, connected to VIS, co-located with VIS, 5 year retention 42,833,766 € 212,306,433 € 7,420,141 € 377,861,788 € 5,045,789 € 199,235,749 45,595,674 € 247,348,597 € 7,696,332 € 357,644,763 € 5,045,789 € 207,067,749 46,045,496 € 246,344,816 € 7,782,851 € 353,908,277 € 5,092,676 € 207,067,749 EU one-time costs Scenario, with VIS connection EU Cost Model: Proposal for the EES/RTS A1C - Central EES no biometrics, no RTS, connected to VIS, colocated with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A2C - Central EES with biometrics, no RTS, connected to VIS, colocated with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A3C - Central EES with biometrics added later, no RTS, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B0 - Token-Based RTS, No EES, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B1C - Token-Based RTS, EES no biometrics, connected to VIS, colocated with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B2C - Token-Based RTS, EES with biometrics, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B3C - Token-Based RTS, EES with biometrics added later, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C0 - Token-Less RTS, No EES, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C1C - Token-Less RTS, EES no biometrics, connected to VIS, colocated with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C2C - Token-Less RTS, EES with biometrics, connected to VIS, colocated with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS C3C - Token-Less RTS, EES with biometrics added later, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A1D - Distributed EES no biometrics, no RTS, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A2D - Distributed EES with biometrics, no RTS, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS A3D - Distributed EES with biometrics added later, no RTS, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B1D - Distributed EES no biometrics, Token-Based RTS, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B2D - Distributed EES with biometrics, Token-Based RTS, connected to VIS, co-located with VIS, 5 year retention EU Cost Model: Proposal for the EES/RTS B3D - Distributed EES with biometrics added later, Token-Based RTS, connected to VIS, co-located with VIS, 5 year retention MS one-time Costs Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 127/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 9 REFERENCE AND APPLICABLE DOCUMENTS 9.1 Applicable documents ID Reference Title Version A1 CB-C-PQP-001 Project Quality Plan 1.10 A2 Call for Tender JLS-B3-2007-05 N/A A3 Framework Contract JLS-B3-2007-05 N/A Table 18: Applicable Documents 9.2 Reference documents ID Reference Title R1 20091110_EES _RT_IA_Cost_T oR_lang.doc Specifications For A Cost Analysis Study, EU Commission, 10 November 2009 R2 20091110_EES _RT_IA_Cost_R oadmap.doc Cost Analysis Study/Roadmap 10.11.2009, P. Nokelainen et all, 10 November 2009 R3 Impact Assessment Guidelines SEC (2009) 92 R4 Draft proposal for a Regulation establishing a Registered Traveller Programme R5 Draft proposal for a Regulation establishing the Entry/Exit System (EES) to register entry and exit data of third country nationals crossing the external borders of the Member States of the European Union R6 CA-B38-FR-004 Entry-Exit Feasibility Study, Final report CA-B38-FR-004, 7.2.2008, in particular Chapters 7 and 8 as well as the data tables R7 Migrapol 222, 14.10.2008; R8 Migrapol 234, 2.3.2009 R9 SEC(2009) 837 Version Commission staff working document accompanying the Proposal for a Regulation of the EP and the Council establishing an Agency for the operational management of large-scale IT systems in the area of freedom, security and justice and the Proposal for a Council decision conferring upon the Agency established by Regulation XX tasks Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 128/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems ID Reference Title Version regarding the operational management of SIS II and VIS in application of Title VI of the EU Treaty, R10 COM(2009) 292 final Communication from the Commission on a legislative package establishing an Agency for the operational management of large-scale IT systems in the area of freedom, security and justice N/A R11 COM(2009) 293 final Proposal for a Regulation of the EP and the Council establishing an Agency for the operational management of large-scale IT systems in the area of freedom, security and justice N/A Proposal for a Council decision conferring upon the Agency established by Regulation XX tasks regarding the operational management of SIS II and VIS in application of Title VI of the EU Treaty N/A Inception Report on Cost Study on Entry-Exit System and Registered Traveller System 1.00 Proposal for a “REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL” As provided by COM R12 R13 R14 CB-E-SO30REP-003 Table 19: Reference Documents Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 129/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 10 TERMINOLOGY AND ANNEXES 10.1 Acronyms & Abbreviations Acronym or Abbreviation Meaning AFIS Automated Fingerprint Information System BMS Biometric Matching System BCP Border Control Point BCU Backup Central Unit BOM Bill-of-Materials CAGR Compound Annual Growth Rate CMS Card Management System CNI Central National Interface COM The European Commission (DG JLS) COTS Custom Of The Shelf CP Consular Post CPUs Central Processing Unit CS Central System CU Central Unit DHCP Dynamic Host Configuration Protocol DNS Domain Name Service EDCA Enterprise Data Centre Architecture E-E Entry-Exit EES Entry-Exit System e-Gate Automated Gate FPA Function-Point Analysis FP-Matcher Fingerprints matcher HW Hardware KMS Key Management System LAN Local Area Network MS Member State(s) MRZ Machine Readable Zone NBCS National Border Control System NI.RTS National Interface to the Central RTS. NI.EES National Interface to the Central EES NIS National Information Systems NPS National Police System N-VIS National Visa Information System Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 130/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems Q&A Questions and Answers RDBMS Relational database Management System RT Registered Traveller RTS Registered Traveller System SAN Storage Area Network SIS Schengen Information System SW Software TCN Third-Country National TCVNE Third-Country National Visa Exempt TCVNH Third Country National Visa Holder Testa Trans European Services for Telematics between Administrations ToR Terms of Reference UIS Unisys VIS Visa Information System WAN Wide Area Network WBS Work Break Down Structure Table 20: Acronyms & Abbreviations Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 131/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 11 ANNEX 1 – COST MODEL BUILDING BLOCKS ID Building Block Description Phase Category Allocated C1 TESTA interface (100 Mbps links), yearly investments DEV INF MA C1 TESTA interface (100 Mbps links), yearly investments OPE INF MA C1 TESTA interface (1 Gbps links), yearly investments DEV INF MA C1 TESTA interface (1 Gbps links), yearly investments OPE INF MA C2 WEBSERVER, yearly investments DEV HW MA C2 WEBSERVER, yearly investments OPE HW MA C3 RTS Directory Server, yearly investments DEV HW MA C3 RTS Directory Server, yearly investments OPE HW MA C4 CU-BCU Interconnect, yearly investments DEV HW MA C4 CU-BCU Interconnect, yearly investments OPE HW MA C5 Supporting Servers, yearly investments DEV HW MA C5 Supporting Servers, yearly investments OPE HW MA C6 Database Server, 1 yr retention, yearly investments DEV HW MA C6 Database Server, 1 yr retention, yearly investments OPE HW MA C7 Logging Server, 1 yr retention, yearly investments DEV HW MA C7 Logging Server, 1 yr retention, yearly investments OPE HW MA C8 EES Application Server, yearly investments DEV HW MA C8 EES Application Server, yearly investments OPE HW MA C9 RTS Application Server, yearly investments DEV HW MA C9 RTS Application Server, yearly investments OPE HW MA C10-13 EES RTS Data Storage, 1 yr retention, yearly investments DEV HW MA C10-13 EES RTS Data Storage, 1 yr retention, yearly investments OPE HW MA C14 HARDWARE for Facial Matching 1 year retention of biometric data, yearly investments DEV HW MA C14 HARDWARE for Facial Matching 1 year retention of biometric data, yearly investments OPE HW MA C15 HARDWARE for Fingerprint matching 1 year retention of biometric data, yearly investments DEV HW MA C15 HARDWARE for Fingerprint matching 1 year retention of biometric data, yearly investments OPE HW MA C16 CMS & KMS HARDWARE , yearly investments DEV HW MA C16 CMS & KMS HARDWARE , yearly investments OPE HW MA C17 VIS/BMS Interconnect, co-located, yearly investments DEV HW MA C17 VIS/BMS Interconnect, co-located, yearly investments OPE HW MA C17 VIS/BMS Interconnect, independently located, STM-1, yearly investments DEV HW MA C17 VIS/BMS Interconnect, independently located, STM-1, yearly investments OPE HW MA Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 132/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems ID Building Block Description Phase Category Allocated C17 VIS/BMS Interconnect, independently located, STM-4, yearly investments DEV HW MA C17 VIS/BMS Interconnect, independently located, STM-4, yearly investments OPE HW MA N1 MS RTS Application Server, yearly investments DEV HW MS N1 MS RTS Application Server, yearly investments OPE HW MS N2 MS EES Application Server, yearly investments DEV HW MS N2 MS EES Application Server, yearly investments OPE HW MS N3 Consular Post RTS enrolment, yearly investments DEV ENROL MS N3 Consular Post RTS enrolment, yearly investments OPE ENROL MS N4 NI.RTS Server, yearly investments DEV HW MS N4 NI.RTS Server, yearly investments OPE HW MS N5 NI.EES Server, yearly investments DEV HW MS N5 NI.EES Server, yearly investments OPE HW MS N6 Border Control Point RTS enrolment, yearly investments DEV ENROL MS N6 Border Control Point RTS enrolment, yearly investments OPE ENROL MS N7 Automated RTS Border Control Point, yearly investments DEV A-BORDER MS N7 Automated RTS Border Control Point, yearly investments OPE A-BORDER MS N8 Semi-manual RTS Border Control Point, yearly investments DEV S-BORDER MS N8 Semi-manual RTS Border Control Point, yearly investments OPE S-BORDER MS N9 Manual Border Control Point, yearly investments DEV M-BORDER MS N9 Manual Border Control Point, yearly investments OPE M-BORDER MS N10 MS EES -RTS Database Server, yearly investments DEV HW MS N10 MS EES -RTS Database Server, yearly investments OPE HW MS N11 MS National Storage, 1 yr retention, yearly investments DEV HW MS N11 MS National Storage, 1 yr retention, yearly investments OPE HW MS N12 MS TESTA Interface, yearly investments DEV INF MS N12 MS TESTA Interface, yearly investments OPE INF MS N13 MS HARDWARE for Facial Matching 1 year retention of biometric data, yearly investments DEV HW MS N13 MS HARDWARE for Facial Matching 1 year retention of biometric data, yearly investments OPE HW MS N14 MS HARDWARE for Fingerprint matching 1 year retention of biometric data, yearly investments DEV HW MS N14 MS HARDWARE for Fingerprint matching 1 year retention of biometric data, yearly investments OPE HW MS OS Operating System licenses, yearly investments DEV SW MA Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 133/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems ID Building Block Description Phase Category Allocated OS Operating System licenses, yearly investments OPE SW MA MSG Messaging Software licensing, yearly investments DEV SW MA MSG Messaging Software licensing, yearly investments OPE SW MA DB Database Software licenses, yearly investments DEV SW MA DB Database Software licenses, yearly investments OPE SW MA DIRECTORY Directory Server software licenses, yearly investments DEV SW MA DIRECTORY Directory Server software licenses, yearly investments OPE SW MA CMS & KMS Token Management and Key Management Software, yearly investments DEV SW MA CMS & KMS Token Management and Key Management Software, yearly investments OPE SW MA OTHER SOFTWAR E Supporting Server Software, yearly investments DEV SW MA OTHER SOFTWAR E Supporting Server Software, yearly investments OPE SW MA AFIS AFIS SOFTWARE, yearly investments DEV SW MA AFIS AFIS SOFTWARE, yearly investments OPE SW MA FACE MATCH Face Matching Software, yearly investments DEV SW MA FACE MATCH Face Matching Software, yearly investments OPE SW MA MS-OS MS Operating System licenses, yearly investments DEV SW MS MS-OS MS Operating System licenses, yearly investments OPE SW MS MS-MSG MS Messaging Software (application servers), yearly investments DEV SW MS MS-MSG MS Messaging Software (application servers), yearly investments OPE SW MS MS-DB MS Database Software, yearly investments DEV SW MS MS-DB MS Database Software, yearly investments OPE SW MS AFIS MS AFIS Software 1yr, yearly investments DEV SW MS AFIS MS AFIS Software 1yr, yearly investments OPE SW MS FACE MATCH MS Face Match Software 1yr, yearly investments DEV SW MS FACE MATCH MS Face Match Software 1yr, yearly investments OPE SW MS Management Authority Power costs per year OPE ADM MA MS Power Costs per year OPE ADM MS MA Technical system managers OPE ADM MA MA DBA OPE ADM MA MA Admin support OPE ADM MA Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 134/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems ID Building Block Description Phase Category Allocated MA Team leader/planner OPE ADM MA MA Central site helpdesk & Incident Management OPE ADM MA MA Helpdesk OPE ADM MA MA Technical support OPE ADM MA MA Helpdesk one-off Office Space OPE OFFICE MA MA Technical office space OPE OFFICE MA MA EES Communication Costs OPE INF MA MA RTS Communication Costs OPE INF MA MS Technical system managers OPE ADM MS MS DBA OPE ADM MS MS Admin support OPE ADM MS MS Team leader/planner OPE ADM MS MS helpdesk & Incident Management OPE ADM MS MS Helpdesk OPE ADM MS MS Technical support OPE ADM MS MS Helpdesk one-off Office Space OPE OFFICE MS MS Technical office space OPE OFFICE MS MA Hardware Maintenance, 1yr retention OPE ADM MA MA COTS Software Maintenance, 1yr retention OPE ADM MA MS Hardware Maintenance, 1yr retention OPE ADM MS MS COTS Software Maintenance, 1yr retention OPE ADM MS Automated Border Control Staff OPE B-OFFICER-A MS Semi-manual Border Control Staff OPE B-OFFICER-S MS Manual Border Control Staff OPE B-OFFICER-M MS TESTA 600Mbps monthly costs (MA) (1yr) OPE INF MA TESTA 600Mbps monthly costs (MS)(1yr) OPE INF MA Contractor EES Development DEV CONTR MA Contractor EES Development OPE CONTR MA Contractor RTS Development DEV CONTR MA Contractor RTS Development OPE CONTR MA Contractor EES/RTS Development DEV CONTR MA Contractor EES/RTS Development OPE CONTR MA Contractor Testing DEV CONTR MA Contractor Testing OPE CONTR MA Contractor Training development DEV CONTR MA Contractor Training development OPE CONTR MA Contractor EES Development DEV CONTR MS Contractor EES Development OPE CONTR MS Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 135/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems ID Building Block Description Phase Category Allocated Contractor RTS Development DEV CONTR MS Contractor RTS Development OPE CONTR MS Contractor EES/RTS Development DEV CONTR MS Contractor EES/RTS Development OPE CONTR MS Contractor Testing DEV CONTR MS Contractor Testing OPE CONTR MS Contractor Training development DEV CONTR MS Contractor Training development OPE CONTR MS MA EES Project Management & QA DEV ADM MA MA EES Project Management & QA OPE ADM MA MA RTS Project Management & QA DEV ADM MA MA RTS Project Management & QA OPE ADM MA MA EES/RTS Project management & QA DEV ADM MA MA EES/RTS Project management & QA OPE ADM MA MA Testing DEV ADM MA MA Testing OPE ADM MA MA Training DEV OTH MA MA Training OPE OTH MA MS EES Project Management DEV ADM MA MS EES Project Management OPE ADM MA MS RTS Project Management DEV ADM MA MS RTS Project Management OPE ADM MA MS EES/RTS Project Management DEV ADM MS MS EES/RTS Project Management OPE ADM MS MS Testing DEV ADM MS MS Testing OPE ADM MS MS Training DEV OTH MS MS Training OPE OTH MS MA Monthly Progress meetings OPE OTH MA MA Quarterly Meetings OPE OTH MA Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 136/137 LIMITED DISTRIBUTION Final Report Cost Analysis of Entry-Exit & Registered Traveller Systems 12 ANNEX 2 – COST XPERT INPUT REPORTS For the Annexes see separate zip file delivered with the report (Entry-Exit&Registered-TravellerAnnex-2.v.1.10). *** End of CB-E-30-REP-003 *** Quality Assurance, JLS-B3-2007-05, CB-E-so30-REP-003_1 30_Entry Exit Cost Study_Final Report.doc, p. 137/137 LIMITED DISTRIBUTION