WETZEL County Technology Plan 2004-2007

advertisement
WETZEL County Technology Plan
2004-2007
OPTIMAL
Online Planning - Technology Integration Measures for Achievement and Learning
Last revised on February 07, 2005
Page 1 of 51
County Technology Plan
West Virginia has placed an emphasis on equitably providing technology for schools in order to
enhance student learning, improve student achievement, and prepare students for post-secondary
education and the world of work. Many stakeholders are involved in this process including students,
teachers, administrators, parents, community members, legislators, board of education members and
others.
Collectively, the county technology planning team members have assisted in creating, refining,
implementing and utilizing educational technology to meet the current standards, develop local
programs, build partners and capacity, make data-driven decisions, and to evaluate the use of
technology for administrative and instructional tasks.
The county technology plan is a component of the UCIP and is based on the state OPTimal online
format (http://wv.ontargetus.com/). This plan will serve several functions. Not only does the plan
complement and support the county's instructional goals as delineated in the UCIP, it is also intended to
help meet the technology objectives/requirements of the school, county/state policies, state/federal
programs, and competitive grants. Examples of these include the following:
Policy 2320: A Process for Improving Education Performance Based Accreditation System
Policy 2450: Virtual Distance Learning
Policy 2460: Use of the Internet by Students and Educators
Policy 2470: Use of Technology by Students and Educators
Policy 2510: Assuring Quality of Education
Policy 2520: Content Standards and Objectives
Federal Communications Commission (FCC) in order to receive Universal Service Fund Program
E-rate Funds
The No Child Left Behind Act of 2001 which establishes the Enhancing Education Through
Technology (Ed Tech) Program
West Virginia House Bill 4319
Basic Skills/Computer Education (BS/CE)
WV SUCCESS
WVDE Reinventing Education
However, the most important function of the plan is to ensure that the effective use of educational
technology supports achievement and lifelong learning.
Page 2 of 51
Technology Team Contact Information
Name: Rick Bertozzi
Title: Paden City High School Technology Coordinator
Email: rbertozz@access.k12.wv.us
Phone: 304-337-2266 Ext: 15
Name: Jim Archer
Title: Short Line School Technology Coordinator
Email: jarcher@access.k12.wv.us
Phone: 304-386-4115
Name: John Ice,Jr .
Title: Paden City Elementary Technology Coordinator
Email: jice@access.k12.wv.us
Phone: 304-337-2221 Ext: 12
Name: Karen Longwell
Title: Long Drain School Technology Coordinator
Email: kalongwe@access.k12.wv.us
Phone: 304-775-4221
Name: Carolyn Zeppuhar
Title: New Martinsville School Technology Coordinator
Email: czeppuha@access.k12.wv.us
Phone: 304-455-2291 Ext: 211
Name: Mark Carl Fawcett
Title: Magnolia High School Technology Coordinator
Email: mfawcett@access.k12.wv.us
Phone: 304-455-1990 Ext: 17
Name: Robert W. Shaver
Title: Valley High School Technology Coordinator
Email: rshaver@access.k12.wv.us
Phone: 304-889-3151
Name: Pat Bland
Title: New Martinsville School Technology Coordinator
Email: pbland@access.k12.wv.us
Phone: 304-455-2291 Ext: 110
Page 3 of 51
Name: Bernard Shackleford
Title: Hundred High School Technology Coordinator
Email: bshackle@access.k12.wv.us
Phone: 304-775-5221
Name: Darrel A. Ballard
Title: County Technology Coordinator
Email: dballard@access.k12.wv.us
Phone: 304-455-2441 Ext: 32
Name: Dr. Paul E. Barcus
Title: Superintendent
Email: pebarcus@access.k12.wv.us
Phone: 304-455-2441 Ext: 20
Page 4 of 51
County Mission and Vision Statements
County Vision:
The Vision Statement for Wetzel County is: Educating Individuals for Success.
County Mission:
The mission statement for Wetzel County is: To provide opportunities for all individuals to acquire the
necessary skills to meet the challenges of the future.
Page 5 of 51
Needs Assessment
Analysis of Assessment Data
Wetzel County results on Westest for the previous year will be reviewed to determine areas of
highest priority for remediation. This can be addrssed through the use of Basic Skills and Skills Bank
software in the school's computer labs and classrooms.
Analysis of UCIP
The Wetzel County Unified County Improvement Plan for the current school year has been reviewed.
The UCIP specifically identified 5 goals for the county. The County Technology Plan will specificially
address goals 1,2,3,4,&5.
Technology Infrastructure
A review of the goals established by each school in their respective school unified improvement plans
indicated a commonality of the goals, which will be incorporated into the county unified plan.
School Satisfaction Survey
The only School Satisfaction Survey item identified county-wide was more community access to
computer lab in the schools. This can be addressed by using Technology funds to provide supervision
for use of computer labs after school hours.
OEPA Reports
Wetzel County reports no noncompliances through the OEPA Reports.
Facilities Assessment
All schools are currently in compliance with all OEPA, State Fire Marshall, Board of Risk, and Insurance
providers' regulations. No need assessment items were specificically related to Facilities and so there is
no need to address them in the Technology Plan.
School Technology Teams
Each school in Wetzel County has a local school Technology Committee and this committee determines
expenditure of local Technology funds according to the needs that they determine to be highest priority.
Page 6 of 51
Instructional Goal #1
To promote high expectations for students as evidenced by improved test scores on a variety of
assessment measures and to recognize student success/excellence so as to comply with requirements
of the "No Child Left Behind Act."
[UCIP GOAL #2]
Instructional Goal #1, Technology Improvement Objective #1
Students' communication and reading skills will improve across the curriculum by focusing instruction
on State Content Standards, designed methods of instruction, evaluation methods, and time scheduled
for reteaching.
Indicators of Achievement:
Year 1:
County-wide test scores will show improvement on priority areas of basic skills.
(2002-03)
Year 2:
County-wide test scores will shows improvement on priority areas of basic skills.
(2003-04)
Year 3:
County-wide test scores will continue to meet the state prescribed standards for
(2004-05) improvement.
Year 4:
County-wide test scores will continue to meet the state prescribed standards for
(2005-06) improvement.
Year 5:
County-wide test scores will continue to meet the state prescribed standards for
(2006-07) improvement.
Technology Activity: #1, Instructional Goal #1, Technology Improvement Objective #1
Students scoring below the 50th percentile on Math, Reading, or Language on the Westest will be
scheduled for remediation using the Basic Skills computers or SUCCESS computers utilizing programs
such as SkillsBank to remediate weaknesses.
Persons Responsible
Principals
Teachers
Activity Type
Content/Tech Integration
Page 7 of 51
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Instructional Content/Tech Integration BS/CE
3300
General Funds
2000
Total:
5300.00
Page 8 of 51
Instructional Goal #1, Technology Improvement Objective #2
High expectations for all students will be evidenced by increased student performance on a variety of
assessment measures.
Indicators of Achievement:
Year 1:
Improvement in ACT and SAT test scores for specific students based on their previous
(2002-03) scores from PLAN and PSAT.
Year 2:
Improvement in ACT and SAT test scores for specific students based on their previous
(2003-04) scores from PLAN and PSAT.
Year 3:
Improvement in ACT and SAT test scores for specific students based on their previous
(2004-05) scores from PLAN and PSAT.
Year 4:
Improvement in ACT and SAT test scores for specific students based on their previous
(2005-06) scores from PLAN and PSAT.
Year 5:
Improvement in ACT and SAT test scores for specific students based on their previous
(2006-07) scores from PLAN and PSAT.
Technology Activity: #1, Instructional Goal #1, Technology Improvement Objective #2
Students will utilize on-line resources such as College View or ACT Discover to prepare for taking ACT
or SAT exams, such as those provided on ACT, SAT, WV Mentor web sites.
Persons Responsible
Guidance Counselors
Principals
Teachers
Activity Type
Access
Content/Tech Integration
Innovative Strategies
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
College View and ACT Discover software Content/Tech Integration General Funds
Total:
6000
6000.00
Technology Activity: #2, Instructional Goal #1, Technology Improvement Objective #2
Page 9 of 51
Students will access free test preparation materials for ACT and/or SAT on the Internet using school
and/or home computers to address weakness indicated by test results from PLAN and/or PSAT.
Persons Responsible
Principals
Teachers
Guidance Counselors
Activity Type
Access
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 10 of 51
Instructional Goal #1, Technology Improvement Objective #3
Students will graduate with skills commensurate with their future career and educational goals as
evidenced by their certificate of proficiency and transcript of grades.
Indicators of Achievement:
Students will be surveyed prior to graduation to establish their final plans for employment
Year 1:
and/or further education. Certificates of Proficiency and transcripts will be reviewed to
(2002-03) determine adequate preparation of the student for their stated goal. Sixty percent adequate
preparation will be the goal for year 1.
Students will be surveyed prior to graduation to establish their final plans for employment
Year 2:
and/or further education. Certificates of Proficiency and transcripts will be reviewed to
(2003-04) determine adequate preparation of the student for their stated goal. Sixty-five percent
adequate preparation will be the goal for year 2.
Students will be surveyed prior to graduation to establish their final plans for employment
Year 3:
and/or further education. Certificates of Proficiency and transcripts will be reviewed to
(2004-05) determine adequate preparation of the student for their stated goal. Seventy percent
adequate preparation will be the goal for year 3.
Students will be surveyed prior to graduation to establish their final plans for employment
Year 4:
and/or further education. Certificates of Proficiency and transcripts will be reviewed to
(2005-06) determine adequate preparation of the student for their stated goal. Seventy-five percent
adequate preparation will be the goal for year 4.
Students will be surveyed prior to graduation to establish their final plans for employment
Year 5:
and/or further education. Certificates of Proficiency and transcripts will be reviewed to
(2006-07) determine adequate preparation of the student for their stated goal. Seventy-seven percent
adequate preparation will be the goal for year 5.
Technology Activity: #1, Instructional Goal #1, Technology Improvement Objective #3
Teachers in all content areas will utilize computers in classrooms or labs to have students do reading,
writing, and math related basic skill activities relevant to their subject area.
Persons Responsible
Teachers
Principals
Technology Coordinators
Activity Type
Access
Content/Tech Integration
Admin/Support Procedures
Page 11 of 51
No. Budget Item
Activity Type
1
Content/Tech Integration SUCCESS
2
3
4
Hardware - Desktop
Hardware - Server
Hardware - Other
Funding Source Est $
29200
BS/CE
28500
General Funds
51000
Total:
108700.00
Content/Tech Integration SUCCESS
11300
BS/CE
1800
General Funds
3700
Total:
16800.00
Content/Tech Integration BS/CE
960
SUCCESS
1400
General Funds
3800
Total:
6160.00
Software - Application Content/Tech Integration SUCCESS
2900
BS/CE
2000
General Funds
2800
Total:
7700.00
Technology Activity: #2, Instructional Goal #1, Technology Improvement Objective #3
A Guidance Counselor at each school will spend one day reviewing the senior exit surveys and
comparing them with Certificates of Proficiency and Transcripts to determine adequacy of preparation.
Persons Responsible
Guidance Counselors
Principals
Activity Type
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 12 of 51
Instructional Goal #2
To continue the integration of the use of technology throughout the various teaching and learning
activities within the school system by both students and staff members. [UCIP GOAL #1]
Instructional Goal #2, Technology Improvement Objective #1
Students will utilize technology as integrated into all aspects of the educational process and
instructional programs to the extent the students' skills relevent to the use of technology improve
throughout the learning continuum.
Indicators of Achievement:
Year 1:
County-wide test scores will show improvement on priority areas of basic skills.
(2002-03)
Year 2:
County-wide test scores will show improvement on priority areas of basic skills.
(2003-04)
Year 3:
County-wide test scores will meet the state prescribed standards for priority areas of basic
(2004-05) skills.
Year 4:
County-wide test scores will meet the state prescribed standards for priority areas of basic
(2005-06) skills.
Year 5:
County-wide test scores will meet the state prescribed standards for priority areas of basic
(2006-07) skills
Technology Activity: #1, Instructional Goal #2, Technology Improvement Objective #1
Computers will be used in every classroom for both management and instructional purposes.
Persons Responsible
Principals
Teachers
Technology Coordinators
Activity Type
Access
Professional Development
Content/Tech Integration
Admin/Support Procedures
Page 13 of 51
No. Budget Item
1
Activity Type
Funding Source Est $
RESA Maintenance Admin/Support Procedures General Funds
Total:
27000
27000.00
Technology Activity: #2, Instructional Goal #2, Technology Improvement Objective #1
Most research projects will utilize electronic data retrieval and word processing.
Persons Responsible
Principal
Teacher
County Technology Coordinator
Activity Type
Access
Content/Tech Integration
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #3, Instructional Goal #2, Technology Improvement Objective #1
Existing infrastructure will be maintained and new network componets will be installed as needed.
Persons Responsible
Technology Coodinator
Principals
County Technology Coordinator
Activity Type
Access
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
Technical Support - HW maintenance Admin/Support Procedures General Funds
Total:
6000
6000.00
Technology Activity: #4, Instructional Goal #2, Technology Improvement Objective #1
Maintenance of existing computers will be provided by school Technology Coordinators. Outside
Page 14 of 51
maintenance has already been addressed.
Persons Responsible
Technology Coordinators
Activity Type
Admin/Support Procedures
No. Budget Item Activity Type Funding Source Est $
1
Salary
General Funds
40000
Total:
40000.00
Technology Activity: #5, Instructional Goal #2, Technology Improvement Objective #1
To provide access to the Internet and WVEIS in order to enhance learning and improve student
achievement in all Wetzel County Schools.
Persons Responsible
E-rate coordinator
Principals
Teachers
Activity Type
Access
Content/Tech Integration
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #6, Instructional Goal #2, Technology Improvement Objective #1
Wetzel County Schools will make available Virtual School and distance learning activities to all
students. Funding formerly 100% by state-may change to partial county funding.
Persons Responsible
Teachers
Principals
Technology Coordinators
Activity Type
Access
Content/Tech Integration
THERE IS NO BUDGET ITEM
Page 15 of 51
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 16 of 51
Instructional Goal #2, Technology Improvement Objective #2
All staff members will improve their skills relevent to integrating technology through staff development
activities and classroom practices.
Indicators of Achievement:
Year 1:
Staff members will increase their technology skills.
(2002-03)
Year 2:
Staff members will increase their technology skills over the previous year.
(2003-04)
Year 3:
Staff members will increase their technology skills over the previous year.
(2004-05)
Year 4:
Staff members will increase their technology skills over the previous year.
(2005-06)
Year 5:
Staff members will increase their technology skills over the previous year.
(2006-07)
Technology Activity: #1, Instructional Goal #2, Technology Improvement Objective #2
Continuing education opportunities will be provided to staff to enhance their use of technology in
maintaining and managing data.
Persons Responsible
Principals
Superintendent
County Coordinator
Activity Type
Professional Development
Content/Tech Integration
Admin/Support Procedures
No. Budget Item
Activity Type
1
Professional Development General Funds
Stipends
Funding Source Est $
Total:
2
Professional Development Professional Development SUCCESS
Total:
20000
20000.00
1700
1700.00
Technology Activity: #2, Instructional Goal #2, Technology Improvement Objective #2
Page 17 of 51
All instructional staff will document that they meet the technology goals in content standards.
Persons Responsible
Teachers
Principals
Activity Type
Professional Development
Content/Tech Integration
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #3, Instructional Goal #2, Technology Improvement Objective #2
Continuing Education for staff regarding integration of technology into curriculum will be provided.
Persons Responsible
School Tech Coordinator
Principal
School Tech Team
Activity Type
Professional Development
Admin/Support Procedures
No. Budget Item
1
Professional Development
Activity Type Funding Source Est $
BS/CE
589
Total:
589.00
Page 18 of 51
Instructional Goal #2, Technology Improvement Objective #3
Ed Tech Formula funds will be used by Magnolia High School to upgrade the School Technology
Program in order to improve community involvement with the school.
Indicators of Achievement:
Year 1:
This objective was not included in the 2002-03 plan.
(2002-03)
Year 2:
A formula grant application is completed and submitted for Ed Tech Funding. Items will be
(2003-04) purchased and installed.
Year 3:
Grant evaluation procedures will be used to determine improved school and community
(2004-05) involvement.
Year 4:
Grant evaluation procedures will be used to determine improved school and community
(2005-06) involvement.
Year 5:
Grant evaluation procedures will be used to determine improved school and community
(2006-07) involvement.
Technology Activity: #1, Instructional Goal #2, Technology Improvement Objective #3
Professional development will be given to Magnolia staff to improve integration of Technology into the
school curriculum.
Persons Responsible
Principal
Tech Coordinator
Superintendent
Activity Type
Professional Development
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source
Est $
Professional Development Professional Development Ed Tech Formula - Round 3 6000
Total:
6000.00
Technology Activity: #2, Instructional Goal #2, Technology Improvement Objective #3
Fourteen computers will be purchased to upgrade an existing computer lab.
Page 19 of 51
Persons Responsible
Principal
School Technology Coordinator
Activity Type
Access
Content/Tech Integration
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source
Est $
Hardware - Desktop Admin/Support Procedures Ed Tech Formula - Round 3 17848
Total:
Page 20 of 51
17848.00
Instructional Goal #3
To increase family and community involvement and communications to better support the learning
activities engaged by students. Such an increase will be noted through the following activities:
parent/teacher organizations, parent/teacher conferences, parent training opportunities, and volunteer
behavior, and (c) attendance on the part of students so that parents are aware of their child's progress
and also so that there is a joint effort by parents and staff members in working together to better assure
each student's success [UCIP GOAL #4]
Instructional Goal #3, Technology Improvement Objective #1
Schools will be utilized as community learning and activity centers beyond the school day for such
purposes as after school tutoring and summer enrichment programs.
Indicators of Achievement:
Year 1:
The number of participants and activities after school will increase.
(2002-03)
Year 2:
The number of participants and activities after school will increase over the previous year.
(2003-04)
Year 3:
The number of participants and activities after school will increase over the previous year.
(2004-05)
Year 4:
Professional development will be given to Magnolia staff to improve integration of
(2005-06) Technology into the school curriculum.
Year 5:
Professional development will be given to Magnolia staff to improve integration of
(2006-07) Technology into the school curriculum.
Technology Activity: #1, Instructional Goal #3, Technology Improvement Objective #1
Education programs for parents and other adults will be offered, including Adult Basic Education.
Persons Responsible
Principal
Site Coordinator
Teacher/Instructor
Activity Type
Access
Page 21 of 51
No. Budget Item Activity Type Funding Source Est $
1
Salary
Access
General Funds
9000
Total:
9000.00
Technology Activity: #2, Instructional Goal #3, Technology Improvement Objective #1
School facilities will be utilized for after- school activities for students.
Persons Responsible
Principal
Teacher/Instructor
Activity Type
Access
Content/Tech Integration
Innovative Strategies
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #3, Instructional Goal #3, Technology Improvement Objective #1
A Technology Opportunity Center will be established at Long Drain School to offer technology training in
order to increase computer literacy skills in Wetzel County and surrounding communities.
Persons Responsible
School Technology Coordinator
Principal
EdVenture Group
Activity Type
Access
Stakeholder Involvement
Admin/Support Procedures
No. Budget Item
1
Activity Type Funding Source Est $
TOC Grant (EdVenture) Access
Grants
13750
Total:
13750.00
Page 22 of 51
Instructional Goal #3, Technology Improvement Objective #2
Schools will take the initiative to provide opportunities for parents, guardians, and care givers to become
involved in the educational process, PreK-Adult in such areas as planning for student learning,
reviewing student progress, and improving test results.
Indicators of Achievement:
Year 1:
Attendance records will indicate participation.
(2002-03)
Year 2:
Attendance records will indicate increase in participation over previous year.
(2003-04)
Year 3:
Attendance records will indicate increase in participation over previous year.
(2004-05)
Year 4:
Attendance records will indicate increase in participation over previous year.
(2005-06)
Year 5:
Attendance records will indicate increase in participation over previous year.
(2006-07)
Technology Activity: #1, Instructional Goal #3, Technology Improvement Objective #2
Fall and/or Spring Open House sessions and/or Parent conferences will be scheduled.
Persons Responsible
Principal
Teacher
Activity Type
Access
Content/Tech Integration
Innovative Strategies
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 23 of 51
Instructional Goal #3, Technology Improvement Objective #3
Schools will use multiple communication channels to connect with parents, Internet resources and
reporting agencies.
Indicators of Achievement:
Year 1:
This objective was not included in the previous year.
(2002-03)
Year 2:
All schools will have T-1 equivalent Internet access, adequate voice phone service, and
(2003-04) sufficient WVEIS connections.
Year 3:
All schools will have T-1 equivalent Internet access, adequate voice phone service, and
(2004-05) sufficient WVEIS connections.
Year 4:
All schools will have T-1 equivalent Internet access, adequate voice phone service, and
(2005-06) sufficient WVEIS connections.
Year 5:
All schools will have T-1 equivalent Internet access, adequate voice phone service, and
(2006-07) sufficient WVEIS connections.
Technology Activity: #1, Instructional Goal #3, Technology Improvement Objective #3
To provide access to the Internet, WVEIS, to provide a safe school environment, to maintain a stable
network, and to provide for improved communication between school, home and community.
Persons Responsible
Superintendent
Principals
Technology Coordinators
Activity Type
Access
Admin/Support Procedures
No. Budget Item
Activity Type Funding Source Est $
1
Access
2
3
E-rate - Voice
E-rate - Long Distance Access
E-rate - Data Lines
Access
E-Rate Year 6
44870.40
General Funds
14169.60
Total:
59040.00
E-Rate Year 6
9120
General Funds
2880
Total:
12000.00
E-Rate Year 6
41999.88
Page 24 of 51
4
5
E-rate - Cellular
E-rate - Paging
Access
Access
General Funds
13263.12
Total:
55263.00
E-Rate Year 6
2462.40
General Funds
777.60
Total:
3240.00
E-Rate Year 6
2579.59
General Funds
814.61
Total:
3394.20
Technology Activity: #2, Instructional Goal #3, Technology Improvement Objective #3
To provide access to the Internet, WVEIS, to provide a safe school environment, to maintain a stable
network, and to provide for improved communication between school, home and community.
Persons Responsible
Technology Coordinators
Principals
Superintendent
Activity Type
Access
Admin/Support Procedures
No. Budget Item
1
Activity Type Funding Source Est $
E-rate - Internal Connections Access
E-Rate Year 6
29400
General Funds
6600
Total:
36000.00
Technology Activity: #4, Instructional Goal #3, Technology Improvement Objective #3
To provide access to the Internet, WVEIS, to provide a safe school environment, to maintain a stable
network, and to provide for improved communication between school, home and community. (YEAR 7
E-RATE STARTS HERE.)
Persons Responsible
Superintendent
County E-rate coordinator
Activity Type
Access
Admin/Support Procedures
Page 25 of 51
No. Budget Item
Activity Type Funding Source Est $
1
Access
2
3
4
5
E-rate - Voice
E-rate - Long Distance Access
E-rate - Data Lines
E-rate - Cellular
E-rate - Paging
Access
Access
Access
E-Rate Year 7
50104
General Funds
14896
Total:
65000.00
E-Rate Year 7
7104
General Funds
2496
Total:
9600.00
E-Rate Year 7
42995.82
General Funds
13467.18
Total:
56463.00
E-Rate Year 7
3552.
General Funds
1248.
Total:
4800.00
E-Rate Year 7
2530.80
General Funds
889.20
Total:
3420.00
Technology Activity: #5, Instructional Goal #3, Technology Improvement Objective #3
To provide access to the Internet, WVEIS, to provide a safe school environment, to maintain a stable
network, and to provide for improved communication between school, home and
community.(Continuation of Activity 4 for E-Rate Year 7 due to lack of space in previous Activity.)
Persons Responsible
Supertindent
County E-rate Coordinator
Activity Type
Access
Admin/Support Procedures
No. Budget Item
1
3
Activity Type
E-rate - Internal Connections Access
E-rate - Web Hosting
Funding Source Est $
E-Rate Year 7
19200.
General Funds
4800.
Total:
24000.00
Content/Tech Integration E-Rate Year 7
5157
General Funds
1811
Total:
6968.00
Technology Activity: #6, Instructional Goal #3, Technology Improvement Objective #3
Page 26 of 51
To provide access to the Internet, WVEIS, to provide a safe school environment, to maintain a stable
network, and to provide for improved communication between school, home and community. (YEAR 8
PROJECTIONS PENDING APPROVAL: START HERE.)
Persons Responsible
Superintendent
Principals
Technology Coordinators
Activity Type
Access
Admin/Support Procedures
No. Budget Item
Activity Type Funding Source Est $
1
Access
2
3
4
5
E-rate - Voice
E-rate - Long Distance Access
E-rate - Data Lines
E-rate - Cellular
E-rate - Paging
Access
Access
Access
E-Rate Year 8
55114.40
General Funds
16385.60
Total:
71500.00
E-Rate Year 8
7814.40
General Funds
2745.60
Total:
10560.00
E-Rate Year 8
47295.40
General Funds
14813.60
Total:
62109.00
E-Rate Year 8
3907.20
General Funds
1372.80
Total:
5280.00
E-Rate Year 8
2783.88
Total:
3762.00
Technology Activity: #7, Instructional Goal #3, Technology Improvement Objective #3
To provide access to the Internet, WVEIS, to provide a safe school environment, to maintain a stable
network, and to provide for improved communication between school, home and community. (YEAR 8
PROJECTIONS PENDING APPROVAL: START HERE.) THIS IS A CONTINUATION OF ACTIVITY 5
DUE TO LACK OF SPACE.
Persons Responsible
County Technology Coordinator
RESA
Principals
Activity Type
Page 27 of 51
Access
Admin/Support Procedures
No. Budget Item
1
2
Activity Type
E-rate - Internal Connections Access
E-rate - Web Hosting
Funding Source Est $
E-Rate Year 8
21120.
General Funds
5280.
Total:
26400.00
Content/Tech Integration E-Rate Year 8
5157.06
General Funds
1811.94
Total:
6969.00
Page 28 of 51
Instructional Goal #4
To promote the importance, long-term value, and necessity of all students graduating from high school
by implementing various programs and activities designed for dropout prevention. Realizing the
importance of addressing this issue at a young age, such programs and activities will be introduced in
elementary schools. [UCIP GOAL #5]
Instructional Goal #4, Technology Improvement Objective #1
County attendance director, school principals and guidance counselors will use WVEIS to track
attendance, discipline, achievement records and academic performance of students to determine their
risk of dropping out of school.
Indicators of Achievement:
Year 1:
Lower discipline referrals, raise attendance, and decrease the drop out rate by 1%.
(2002-03)
Year 2:
Lower discipline referrals, raise attendance, and decrease the drop out rate by 1%.
(2003-04)
Year 3:
Lower discipline referrals, raise attendance, and decrease the drop out rate by 1%.
(2004-05)
Year 4:
Lower discipline referrals, raise attendance, and decrease the drop out rate by 1%.
(2005-06)
Year 5:
Lower discipline referrals, raise attendance, and decrease the drop out rate by 1%.
(2006-07)
Technology Activity: #1, Instructional Goal #4, Technology Improvement Objective #1
Attendance will be entered into WVEIS on a daily basis.
Persons Responsible
School Secretary
School Principal
School Guidance Counselor
Activity Type
Admin/Support Procedures
THERE IS NO BUDGET ITEM
Page 29 of 51
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #2, Instructional Goal #4, Technology Improvement Objective #1
Discipline records will be entered and monitored on a weekly basis.
Persons Responsible
School Principals
WVEIS County Contact
School Guidance Counselors
Activity Type
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #3, Instructional Goal #4, Technology Improvement Objective #1
Achievement records will be accessed and monitored on an "as need basis."
Persons Responsible
County Test Coordinator
School Principal
School Guidance Counselors
Activity Type
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #4, Instructional Goal #4, Technology Improvement Objective #1
Academic performance for student grades 5-12 will be maintained and monitored on a six-week basis.
Persons Responsible
Classroom Teachers
School Principals
Page 30 of 51
School Guidance Counselors
Activity Type
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 31 of 51
Instructional Goal #4, Technology Improvement Objective #2
Integrate various technology related academic and instructional programs with the school curriculum
that are designed for drop out prevention.
Indicators of Achievement:
Year 1:
1. Evaluate student progress reports from network software programs for at risk students.
(2002-03) 2. Monitor at risk students' scores on achievement testing.
Year 2:
1. Evaluate student progress reports from network software programs for at risk students.
(2003-04) 2. Monitor at risk students' scores on achievement testing.
Year 3:
1. Evaluate student progress reports from network software programs for at risk students.
(2004-05) 2. Monitor at risk students' scores on achievement testing.
Year 4:
1. Evaluate student progress reports from network software programs for at risk students.
(2005-06) 2. Monitor at risk students' scores on schievement testing.
Year 5:
1. Evaluate student progress reports from network software programs for at risk students.
(2006-07) 2. Monitor at risk students' scores on schievement testing.
Technology Activity: #1, Instructional Goal #4, Technology Improvement Objective #2
Students will use Accelerated Reader and Math programs to improve reading and math skills.
Persons Responsible
Classroom Teachers
Technology Coordinators
Activity Type
Access
Content/Tech Integration
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Instructional Content/Tech Integration General Funds
Total:
10000
10000.00
Technology Activity: #2, Instructional Goal #4, Technology Improvement Objective #2
Students will use Compass software (K-6) to remediate and maintain language arts and math skills.
Funding has already been addressed in this plan.
Page 32 of 51
Persons Responsible
Classroom teachers
Technology Coordinators
Activity Type
Content/Tech Integration
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 33 of 51
Instructional Goal #4, Technology Improvement Objective #3
Students will use Technology to complete career explorations from Internet resources and networked
computer programs.
Indicators of Achievement:
Year 1:
1. Students will complete a 5-year plan prior to grade 9 and indicate a Career Cluster.
(2002-03)
Year 2:
1. Students will complete a 5-year plan prior to grade 9 and indicate a Career Cluster.
(2003-04)
Year 3:
1. Students will complete a 5-year plan prior to grade 9 and indicate a Career Cluster.
(2004-05)
Year 4:
1. Students will complete a 5-year plan prior to grade 9 and indicate a Career Cluster.
(2005-06)
Year 5:
1. Students will complete a 5-year plan prior to grade 9 and indicate a Career Cluster.
(2006-07)
Technology Activity: #1, Instructional Goal #4, Technology Improvement Objective #3
Students will have access to career information resources through Chronological Career Library, ACT
eDiscover, Internet resources, or Classroom, Inc.
Persons Responsible
Classroom Teachers
School Technology Coordinators
County Technology Coordinator
Activity Type
Access
Content/Tech Integration
Stakeholder Involvement
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Instructional Content/Tech Integration General Funds
Total:
4200.
4200.00
Technology Activity: #2, Instructional Goal #4, Technology Improvement Objective #3
Page 34 of 51
Electronic presentations of career explorations to Local School Improvement Council (LSIC) and faculty
advisors.
Persons Responsible
LSIC Team Members
School Faculty
School Guidance Counselors
Activity Type
Content/Tech Integration
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 35 of 51
Instructional Goal #5
To create and maintain a safe school environment which is conducive to learning and that meets the
needs of all diverse learners.[UCIP GOAL #3]
Instructional Goal #5, Technology Improvement Objective #1
All students will use the Internet in a safe, secure manner as prescribed by the county and school
Acceptable Use Policies.
Indicators of Achievement:
Year 1:
All students will have a signed Acceptable Use Policy on file in their school.
(2002-03)
Year 2:
All students will have a signed Acceptable Use Policy on file in their school.
(2003-04)
Year 3:
All students will have a signed Acceptable Use Policy on file in their school.
(2004-05)
Year 4:
All students will have a signed Acceptable Use Policy on file in their school.
(2005-06)
Year 5:
All students will have a signed Acceptable Use Policy on file in their school.
(2006-07)
Technology Activity: #1, Instructional Goal #5, Technology Improvement Objective #1
Students will receive training on the safe use of the Internet and e-mail.
Persons Responsible
Classroom Teachers
Principal
School Technology Coordinators
Activity Type
Access
Stakeholder Involvement
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 36 of 51
Technology Activity: #2, Instructional Goal #5, Technology Improvement Objective #1
Students and parents will sign the school Acceptable Use Policy.
Persons Responsible
Principal
Homeroom Teacher
Teacher
Technology Coordinator
Activity Type
Access
Content/Tech Integration
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 37 of 51
Instructional Goal #5, Technology Improvement Objective #2
Provide a secure computer network environment to ensure the safety and integrity of student personal
information.
Indicators of Achievement:
Year 1:
Up to date Anti-Virus software, firewall protection, and security procedures will be in place
(2002-03) to provide a safe and secure school network environment and access to WVEIS.
Year 2:
Up to date Anti-Virus software, firewall protection, and security procedures will be in place
(2003-04) to provide a safe and secure school network environment and access to WVEIS.
Year 3:
Up to date Anti-Virus software, firewall protection, and security procedures will be in place
(2004-05) to provide a safe and secure school network environment and access to WVEIS.
Year 4:
Up to date Anti-Virus software, firewall protection, and security procedures will be in place
(2005-06) to provide a safe and secure school network environment and access to WVEIS.
Year 5:
Up to date Anti-Virus software, firewall protection, and security procedures will be in place
(2006-07) to provide a safe and secure school network environment and access to WVEIS.
Technology Activity: #1, Instructional Goal #5, Technology Improvement Objective #2
Provide data security training for technology site coordinators, guidance counselors, and principals.
Persons Responsible
County Tech Coordinator
School Tech Coordinator
Principal
Activity Type
Professional Development
Admin/Support Procedures
No. Budget Item Activity Type
1
Stipends
Funding Source Est $
Professional Development General Funds
Total:
600
600.00
Technology Activity: #2, Instructional Goal #5, Technology Improvement Objective #2
Provide adequate hardware and software upgrades to maintain the integrity of the school network.
Page 38 of 51
Persons Responsible
School Tech Coordinator
Principal
County Tech Coordinator
Activity Type
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #3, Instructional Goal #5, Technology Improvement Objective #2
Upgrade and maintain critical software such as network and client operating systems.
Persons Responsible
School Tech Coordinator
Principal
Principal
Activity Type
Access
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Application Admin/Support Procedures General Funds
Total:
Page 39 of 51
1100.
1100.00
Instructional Goal #5, Technology Improvement Objective #3
All Wetzel County Teachers will utilize the Project
RIDE software to plan remediation for At-Risk Students.
Indicators of Achievement:
Year 1:
This Objective was not included in the plan last year.
(2002-03)
Year 2:
Project RIDE software will be purchased and installed at each school. Teachers will be
(2003-04) trained in using the software.
Year 3:
70% of Teachers will utilize the Project Ride software the first year.
(2004-05)
Year 4:
80% of Teachers will utilize the Project Ride software the next year.
(2005-06)
Year 5:
85% of Teachers will utilize the Project Ride software the next year.
(2006-07)
Technology Activity: #1, Instructional Goal #5, Technology Improvement Objective #3
Project RIDE software will be utilized by each school in Wetzel County.
Persons Responsible
Director of Special Education
Student Assistance Team Coordinator
Activity Type
Content/Tech Integration
Innovative Strategies
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #2, Instructional Goal #5, Technology Improvement Objective #3
Install Project RIDE software on any new/remaining teacher computers/servers at each school.
Persons Responsible
Page 40 of 51
County Tech Coordinator
School Tech Coordinator
Activity Type
Innovative Strategies
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #3, Instructional Goal #5, Technology Improvement Objective #3
Teachers will utilize the Project RIDE software to plan remediation for At-Risk students.
Persons Responsible
Teachers
Principals
SAT Coordinators
Activity Type
Innovative Strategies
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 41 of 51
Instructional Goal #6
To help students develop technology skills that support lifelong learning.
Instructional Goal #6, Technology Improvement Objective #1
Students will demonstrate a sound understanding and proficiency in the use of technology.
Indicators of Achievement:
Year 1:
Students will increase understanding of technology.
(2002-03)
Year 2:
Students will increase understanding of technology from the previous year.
(2003-04)
Year 3:
Students will increase understanding of technology from the previous year.
(2004-05)
Year 4:
Students will increase understanding of technology from the previous year.
(2005-06)
Year 5:
Students will increase understanding of technology from the previous year.
(2006-07)
Technology Activity: #1, Instructional Goal #6, Technology Improvement Objective #1
Students will use technology equipment as a tool in the instructional process.
Persons Responsible
Teachers
Technology Coordinators
Activity Type
Access
Content/Tech Integration
Innovative Strategies
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 42 of 51
Instructional Goal #6, Technology Improvement Objective #2
Students will demonstrate responsible use of technology systems, information, and software and will
develop positive attitudes toward lifelong learning.
Indicators of Achievement:
Year 1:
Students will increase their understanding of technology systems.
(2002-03)
Year 2:
Students will increase their understanding of technology sytems from the previous year.
(2003-04)
Year 3:
Students will increase their understanding of technology systems from the previous year.
(2004-05)
Year 4:
Students will increase their understanding of technology systems from the previous year.
(2005-06)
Year 5:
Students will increase their understanding of technology systems from the previous year
(2006-07)
Technology Activity: #1, Instructional Goal #6, Technology Improvement Objective #2
Students will use grade-level-appropriate software.
Persons Responsible
Teacher
School Technology Coordinator
Activity Type
Access
Content/Tech Integration
Innovative Strategies
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 43 of 51
Instructional Goal #6, Technology Improvement Objective #3
Students will use technology tools to increase productivity and promote creativity in order to construct
technology enhanced works.
Indicators of Achievement:
Year 1:
Students will increase their understanding of using technology tools.
(2002-03)
Year 2:
Students will increase their understanding of using technology tools from the previous year.
(2003-04)
Year 3:
Students will increase their understanding of using technology tools from the previous year.
(2004-05)
Year 4:
Students will increase their understanding of using technology tools from the previous year.
(2005-06)
Year 5:
Students will increase their understanding of using technology tools from the previous year.
(2006-07)
Technology Activity: #1, Instructional Goal #6, Technology Improvement Objective #3
Students will use productivity software.
Persons Responsible
Teachers
Principals
Technology Coordinators
Activity Type
Access
Content/Tech Integration
Innovative Strategies
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 44 of 51
Instructional Goal #6, Technology Improvement Objective #4
Students will use technology to collect, publish, and interact with others using a variety of media and
formats.
Indicators of Achievement:
Year 1:
Students will increase their understanding of the use of technology skills.
(2002-03)
Year 2:
Students will increase their understanding of the use of technology skills from the previous
(2003-04) year.
Year 3:
Students will increase their understanding of the use of technology skills from the previous
(2004-05) year.
Year 4:
Students will increase their understanding of the use of technology skills from the previous
(2005-06) year.
Year 5:
Students will increase their understanding of the use of technology skills from the previous
(2006-07) year.
Technology Activity: #1, Instructional Goal #6, Technology Improvement Objective #4
Students will do research using various Internet resources.
Persons Responsible
Teachers
Technology Coordinators
Activity Type
Access
Content/Tech Integration
Innovative Strategies
Admin/Support Procedures
No. Budget Item
1
Activity Type Funding Source Est $
Software - Application Access
General Funds
2400
Total:
2400.00
Technology Activity: #2, Instructional Goal #6, Technology Improvement Objective #4
Students will use technology to access courses from WV Virtual School and other online resources.
Page 45 of 51
Persons Responsible
Teacher
Online Faciliator
Technology Coordinator
Activity Type
Access
Content/Tech Integration
Innovative Strategies
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 46 of 51
Instructional Goal #6, Technology Improvement Objective #5
Students will use technology to locate, collect and evaluate information from multiple sources, and use
technology to assist with decision-making.
Indicators of Achievement:
Year 1:
Students will increase their understanding of technology.
(2002-03)
Year 2:
Students will increase their understanding of technology from the previous year.
(2003-04)
Year 3:
Students will increase their understanding of technology from the previous year.
(2004-05)
Year 4:
Students will increase their understanding of technology from the previous year.
(2005-06)
Year 5:
Students will increase their understanding of technology from the previous year.
(2006-07)
Technology Activity: #1, Instructional Goal #6, Technology Improvement Objective #5
Students will use eLibrary to gather information from multiple sources.
Persons Responsible
Teacher
Technology Coordinator
Librarian
Activity Type
Access
Content/Tech Integration
Innovative Strategies
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Instructional Content/Tech Integration General Funds
Total:
Page 47 of 51
5000.
5000.00
Compliance Checklist
Ed Tech Compliance Checklist
1. Does the county plan include the county's specific goals for using advanced technology to improve
student achievement?
yes
This is addressed under Goal 2 Objective 2 and Activity 1
2. Does the plan include strategies that address how Ed Tech Funds will improve academic
achievement of all students in all schools in the county? (Emphasis should be given to high-need and
high-poverty schools)
yes
This is addressed under Goal 2 Objective 3 and Activity 1
3. Does the county plan include strategies that address how to ensure that all students and teachers will
have increased access to technology?
yes
This is addressed under Goal 3 Objective 3 and Activity 1
4. Does the county plan include plans to provide ongoing professional development for teachers,
principals and administrators to further the effective use of technology?
yes
This is addressed under Goal 5 Objective 2 and Activity 1
5. Does the county plan include a budget (description of type and costs of technology to be acquired
with Ed Tech formula and /or competitive funds)?
yes
This is addressed under Goal 2 Objective 3 and Activity 3
6. Does the county plan include strategies that address how to encourage the development and use of
innovative strategies for the delivery of specialized or rigorous courses (e.g., distance learning)?
yes
This is addressed under Goal 2 Objective 1 and Activity 6
7. Does the county plan include strategies that address how to use technology to promote parental
involvement to increase communication with parents?
yes
This is addressed under Goal 3 Objective 3 and Activity 1
Page 48 of 51
8. Does the county plan include strategies that address how the technology programs will be developed
in collaboration with adult literacy providers?
yes
This is addressed under Goal 3 Objective 1 and Activity 1
9. Does the county plan include strategies that address how the county will evaluate the extent to which
activities funded in formula and competitive funds are effective in integrating technology?
yes
This is addressed under Goal 2 Objective 4 and Activity 4
E-rate Compliance Checklist
1. Does the county plan include the E-rate requirements for clear goals and a realistic strategy for using
telecommunications?
yes
This is addressed under Goal 3 Objective 3 and Activity 1
2. Does the county plan include strategies that address the computer equipment currently available or
budgeted for purchase?
yes
This is addressed under Goal 1 Objective 3 and Activity 1
3. Does the county plan include strategies that address the internal connections that the county has in
place or budgeted to install in the current, next or future academic years?
yes
This is addressed under Goal 1 Objective 3 and Activity 1
4. Does the county plan include strategies that address the computer software necessary to
communicate with other computers over an internal network?
yes
This is addressed under Goal 1 Objective 3 and Activity 1
5. Does the county plan include the professional development plan for professionals using the
equipment connected to the telecommunications network?
yes
This is addressed under Goal 2 Objective 2 and Activity 1
6. Does the county plan include the existing or budgeted maintenance contracts to maintain computers?
yes
This is addressed under Goal 2 Objective 1 and Activity 4
7. Does the county plan include specific plans for using telecommunications technologies and how they
Page 49 of 51
integrate the use of these technologies into the curriculum?
yes
This is addressed under Goal 4 Objective 3 and Activity 1
8. Does someone else other than your county personnel submit your local E-rate application?
yes
This is addressed under Goal Objective and Activity
9. E-rate requires that we report the number of schools in each county that have the following Internet
Connections:
Number of schools in the county with Dial up modem connections to the Internet?
0
Number of schools in the county with 56 K frame relay connection to the Internet?
0
Number of schools in the county that have T-1 frame relay connections to the Internet? 8
Number of schools in the county that have ATM T-1 Internet connections?
1
Number of schools in the county that have cable modem connections to the Internet? 0
Page 50 of 51
Policies and Procedures
Do you have an Acceptable Use Policy?
yes
If yes, what is the last date of adoption/revision?
10/09/2001
When was the public meeting held for CIPA Compliance?
09/06/2001
Provide the URL to your acceptable use policy.
www.wetzelcountyschools.com
Page 51 of 51