CABELL County Technology Plan 2004-2007

advertisement
CABELL County Technology Plan
2004-2007
OPTIMAL
Online Planning - Technology Integration Measures for Achievement and Learning
Last revised on January 11, 2005
Page 1 of 35
County Technology Plan
West Virginia has placed an emphasis on equitably providing technology for schools in order to
enhance student learning, improve student achievement, and prepare students for post-secondary
education and the world of work. Many stakeholders are involved in this process including students,
teachers, administrators, parents, community members, legislators, board of education members and
others.
Collectively, the county technology planning team members have assisted in creating, refining,
implementing and utilizing educational technology to meet the current standards, develop local
programs, build partners and capacity, make data-driven decisions, and to evaluate the use of
technology for administrative and instructional tasks.
The county technology plan is a component of the UCIP and is based on the state OPTimal online
format (http://wv.ontargetus.com/). This plan will serve several functions. Not only does the plan
complement and support the county's instructional goals as delineated in the UCIP, it is also intended to
help meet the technology objectives/requirements of the school, county/state policies, state/federal
programs, and competitive grants. Examples of these include the following:
Policy 2320: A Process for Improving Education Performance Based Accreditation System
Policy 2450: Virtual Distance Learning
Policy 2460: Use of the Internet by Students and Educators
Policy 2470: Use of Technology by Students and Educators
Policy 2510: Assuring Quality of Education
Policy 2520: Content Standards and Objectives
Federal Communications Commission (FCC) in order to receive Universal Service Fund Program
E-rate Funds
The No Child Left Behind Act of 2001 which establishes the Enhancing Education Through
Technology (Ed Tech) Program
West Virginia House Bill 4319
Basic Skills/Computer Education (BS/CE)
WV SUCCESS
WVDE Reinventing Education
However, the most important function of the plan is to ensure that the effective use of educational
technology supports achievement and lifelong learning.
Page 2 of 35
Technology Team Contact Information
Name: Barbara Meek
Title: School Technology Coordinator
Email: bmeek@access.k12.wv.us
Phone: 304-528-6512
Name: Brian Cordle
Title: Network Engineer
Email: bcordle@access.k12.wv.us
Phone: 304-528-5092
Name: Dennis Adkins
Title: Technology Coordinator
Email: dadkins@access.k12.wv.us
Phone: 304-528-5087
Name: Rod Adkins
Title: Technology Specialist
Email: rdadkins@access.k12.wv.us
Phone: 304-528-5192
Name: Karen McClanahan
Title: Secretary
Email: kmcclana@access.k12.wv.us
Phone: 304-528-5011
Name: Pat McKee
Title: High School Teacher
Email: pmckee@access.k12.wv.us
Phone: 304-528-6400
Name: Jo Anne Potter
Title: School Technology Coordinator
Email: jpotter@access.12.wv.us
Phone: 304-743-7473
Name: Jara Curnutte
Title: Elementary teacher
Email: jcurnutte@access.k12.wv.us
Phone: 304-528-5231
Page 3 of 35
Name: Steve Beckelhimer
Title: High School Teacher
Email: sbeckelh@access.k12.wv.us
Phone: 304-743-7524
Name: William A. Smith
Title: Assistant Superintendent
Email: wsmith@access.k12.wv.us
Phone: 304-528-5203
Name: Elizabeth H. Green
Title: Elementary Teacher
Email: ehgreen@access.k12.wv.us
Phone: 304-733-3054
Name: Matthew Plante
Title: Elementary Teacher
Email: mplante@access.k12.wv.us
Phone: 304-528-5231
Name: Annette Lewis
Title: Business Partner
Email: alewis@clhnt.com
Phone: 304-529-6069 Ext: 2129
Page 4 of 35
County Mission and Vision Statements
County Vision:
The Cabell County Board of Education is responsible for preparing students to access, analyze, apply,
and communicate information effectively so that they will become successful, contributing members of a
changing, information-based global society. Accordingly, Cabell County envisions equitable access to
information technology for all Cabell County students.
County Mission:
Cabell County Schools recognize that in today’s society, all citizens must have the skills necessary to
access and communicate information. By including technology as an integral component of a
well-balanced K-12 program, our school system will provide students with the opportunity to develop
lifelong learning skills, through the use of technology. With technology as a tool, teachers,
administrators, and support staff will become more efficient and effective in facilitating and managing
the learning environment.
Page 5 of 35
Needs Assessment
Analysis of Assessment Data
Analysis of assessment data was summarized by the county testing coordinator and assistant
superintendent. That analysis can be found in the UCIP, which was used by the technology committee
in the development of the county technology plan.Data of greatest value was the Cluster Data and the
item weakness reports form SAT/9.Analysis of 2002-03 Cluster data for grades 1-11 indicates the
greatest needs are the following:ELEMENTARY Reading Comp. - TextualLanguage PunctuationContent and Organization Math - Estimation Problem Solving StrategiesRoundingSpelling HomophonesStructural PrinciplesScience - Earth and Space Soc.Science. - All Clusters (Civics &
Gov.,Culture, Economics, Geog., History)MIDDLE SCHOOLRead. Voc.- SynonymsRead.Comp. TextualLanguage - Sentence StructureUsageMath - Statistics Probability Geometry Measurement
Estimation Problem Solving Strategies Computation/Symbolic Notation. Rounding Computation in
Context Spelling - Phonetic Principles Science - Physical ScienceSoc.Sci. - All Clusters (Civics & Gov.,
Culture, Economics, Geog., History)HIGH SCHOOL Read. Voc.- Synonyms Math - Functions Statistics
Algebra Discrete Mathematics Geometry - Synthetic Geometry - Algebraic Trigonometry Calculus
Concepts Problem Solving Strategies Spelling - Homophones Science - All Clusters (Earth and Space,
Life Science, Physical Science)Soc. Sci. - All Clusters (Civics & Gov., Culture, Economics, Geog.,
History)
In addition to our last USIP update we used WESTEST data.
Sample WESTEST Results (all subgroups)
Mathematics:
Grade 3
Number and Operations - 37% below target
Algebra - 71% below target
Geometry - 30% below target
Measurement - 40% below target
Data analysis & Probability – 17% below target
Grade 4
Number and Operations - 40% below target
Algebra - 29% below target
Geometry - 30% below target
Measurement - 29% below target
Data analysis & Probability – 14% below target
Grade 5
Number and Operations - 33% below target
Algebra - 44% below target
Geometry - 67% below target
Measurement - 44% below target
Data analysis & Probability – 13% below target
Reading and Language Arts:
Page 6 of 35
Grade 3
Reading - 17% below target
Language Arts - 23% below target
Grade 4
Reading - 24% below target
Language Arts - 28% below target
Grade 5
Reading - 31% below target
Language Arts - 29% below target
Identified areas of concern in mathematics (Grade 3):
decimals-tenths, fractions, multiplication and division, story problems, geometric patterns, number
patterns, polygons, measurement conversions, clock to quarter hour, change to ten dollars, and
probability.
Identified Areas of Concern in reading and language arts (Grade 3):
content vocabulary, story elements, inference, main idea, literacy text, sentence order, written
composition, punctuation, and apostrophes.
Identified areas of concern in mathematics (Grade 4):
fractions, equivalent fractions, subtracting fractions, rounding decimals, division of 2/3 digit numbers,
identifying patterns, pattern rule, identifying angles, parts of a circle, measuring length, volume of a
rectangle, and tree diagrams.
Identified Areas of Concern in reading and language arts (Grade 4):
summarizing, story elements, personal response, drawing conclusions, topic sentence, research topics,
alphabetical order, capitalization, and verb tense.
Identified areas of concern in mathematics (Grade 5):
identifying fractions with models, converting fractions to percents, multiplication and division of
fractions, identifying patterns, input/output, equations with variables, 3-D figures, measuring angles,
symmetry, identifying rotation, area of triangles, area and perimeter, measurement conversions, scale
drawings, determining probability.
Identified Areas of Concern in reading and language arts (Grade 5):
Poetry, prefixes and suffixes, supporting details, drawing conclusions, summarizing, inference, compare
and contrast, pre-writing, relevant details, supporting sentences, paragraph organization, run-ons,
punctuation, and research strategies.
Analysis of UCIP
The county technology plan was developed using analysis of assessment data found in the UCIP, the
county strategic plan, school technology plans, surveys of teacher and principals, input from the
Professional Development Council, input from system operators, technical staff, and the county
technology team. The collective results of the analysis of this data identified the primary concerns that
we have addressed: The need for comprehensive basic skill software for grades K-2. This software
must integrate tightly with our prioritized curriculum for math and reading. The year's focus will be on
math (k-5) and Reading (3-5) Professional development programs for teachers and administrators that
Page 7 of 35
will help them integrate technology into an already crowded curriculum. A technology re-fresh cycle that
will assure adequate, dependable computer hardware in every classroom in every school. A technology
support staff with the appropriate skills to maintain the network infrastructure.
Technology Infrastructure
Infrastructure surveys indicate the following results:High schools exhibit the greatest infrastructure
needs. We are currently in the process of converting from Token-ring technology to Fast Ethernet
technology. The schools are large and we estimate that it will take two to three more years of upgrades
to complete the task with the funding that is annually available.
Middle schools are also in need of replacement Ethernet switching equipment, increasing the backbone
to gigabit speed. Elementary schools currently have the best infrastructures in the county and will
require only minor work in the next few years, other than the occasional replacement of failing
switches.All of our schools currently have T1 Frame Relay lines used to access WEVIS and the
Internet. Each high school has two T1 lines and an ATM line used for video conferencing.We realize
that infrastructure upgrades are required annually and that funding must be allocated annually.Our
current student to computer ratio is 4 to 1. We are currently on a five year replacement cycle and our
goal is to move to a four year cycle.
Page 8 of 35
Instructional Goal #1
100% of our students will demonstrate proficiency in problem solving, communication, and critical
thinking skills.
Instructional Goal #1, Technology Improvement Objective #1
Math and reading scores will increase by 2% anually and monitoring will show an increase in the
integration of basic skills technology in all classrooms. We will continue the integration of instructional
technology for the teaching and learning of mathematics in grades K-5, and prepare for the
implementation of BS/CE reading programs in grades K-5. This will be done to remediate specific
weaknesses determined by the WESTEST and for the enrichment of accellerated students.
Indicators of Achievement:
100% of teachers will show progress in the implementation of the new integrated math
software products that we moved to at the end of last school year. Integration of these
products will be measured by lesson plans and computer use logs, site visits by county
Year 1:
supervisory staff and vendor consultants, and integration surveys by county math
(2002-03) consultant.
Round one Ed Tech funding will provide an evaluation for this K-2 implementation of
Compass Math. Round two formula funds will continue the evaluation process into grades
3, 4, and 5.
All Cabell county elementary schools will be fully implemented and integrated with the new
math instructional technology. Monitoring will continue by using the processes outlined for
Year 2:
year one. The county testing coordinator will evaluate testing data in K-2 math and any
(2003-04) changes that may be attributed to the integration of technology.
We will continue training teachers in the BSCE programs for math in grades 3, 4, and 5
during this year. This will also include an evaluation provided through ED TECH funding
Testing data will show improved scores for K-5 math students. The software will be used by
Year 3:
every student every day. Full integration will be documented in lesson plans, by on- site
(2004-05)
observations, and by teacher surveys.
Year 4:
Math scores will show a two percent increase over the previous year. Monitoring will show
(2005-06) an increase in the daily use of BS/CE software in all classrooms.
Math scores will show a two percent increase over the previous year. Monitoring will show
Year 5:
an increase in the daily use of BS/CE software in all classrooms. Software management
(2006-07) reports and monitoring will be used to determine the progress of the reading software
implementation.
Technology Activity: #1, Instructional Goal #1, Technology Improvement Objective #1
Continue the integration of Compass Learning's management system and math software for grades K-5
in our 20 elementary schools by providing monitoring, and both advanced and remedial on-site training
Page 9 of 35
to teachers. We will also provide additional hardware and software to schools that have added
classrooms. We will replace or upgrade computers in grades 3,4, and 5. Elementary school computer
labs will also be upgraded at Altizer, Geneva Kent, Central City, Cox Landing, Salt Rock, Martha, Miller,
Davis Creek, and Hite-Saunders.
Persons Responsible
Dennis Adkins
Principals
Rod Adkins
Brian Cordle
Activity Type
Access
Professional Development
Content/Tech Integration
Admin/Support Procedures
No. Budget Item
Activity Type
1
Professional Development BS/CE
2
3
4
Professional Development
Hardware - Desktop
Software - Instructional
Monitoring and Evaluation
Access
Content/Tech Integration
Funding Source
63280.00
Step 7
4500.00
Total:
67780.00
BS/CE
34203.66
General Funds
637652.00
Total:
671855.66
Step 7
90000.00
Total:
90000.00
Admin/Support Procedures Ed Tech Formula - Round 2 6000.00
Total:
5
Est $
Technical Support - HW maintenance Admin/Support Procedures General Funds
Total:
6000.00
160000.00
160000.00
Technology Activity: #2, Instructional Goal #1, Technology Improvement Objective #1
Purchase and install Compass Learning's reading software for grades 4-6 in our 20 elementary schools
in the late spring of 2005. We will contuct training for 180 teachers in June of 2005. Integration of these
products with the county's prioritized curriculum will be our primary focus.
Persons Responsible
Dennis Adkins
County Reading Facilitators
Dr. Jeff Smith
Activity Type
Access
Professional Development
Page 10 of 35
Content/Tech Integration
Admin/Support Procedures
No. Budget Item
Activity Type
Funding Source
Est $
1
Content/Tech Integration
Step 7
30000.00
General Funds
20000.00
Total:
50000.00
2
Software - Instructional
Professional Development Professional Development Ed Tech Formula - Round 3 7000.00
Total:
3
Stipends
Professional Development Ed Tech Formula - Round 3 10800.00
Total:
4
5
7000.00
10800.00
Monitoring and Evaluation Admin/Support Procedures Ed Tech Formula - Round 3 7000.00
Computer furniture
Access
Total:
7000.00
General Funds
18000
Total:
18000.00
Page 11 of 35
Instructional Goal #1, Technology Improvement Objective #2
To provide a more stable and cost effective networks, we will continue the conversion of network
topology from Token-ring to Ethernet at both Huntington High School and Cabell Midland High School.
We will also begin the replacement of switches in elementary and middle schools.
Indicators of Achievement:
Year 1:
The addition of Ethernet cable drops, site maps of installations, and test results for each
(2002-03) drop.
Year 2:
The addition of Ethernet cable drops, site maps of installations, and test results for each
(2003-04) drop.
The addition of Ethernet cable drops, site maps of installations, and test results for each
Year 3:
drop. This will include the addition of core switch expansions. New switching in some
(2004-05)
schools.
Year 4:
The addition of Ethernet cable drops, site maps of installations, and test results for each
(2005-06) drop. New switching in some schools
Year 5:
Completion of system conversion.
(2006-07) completion of switch replacement.
Technology Activity: #1, Instructional Goal #1, Technology Improvement Objective #2
Complete the rewireing of the main computer labs at Huntington High School and Section E and F at
Cabell Midland High School with Ethernet cabling and switching. Add expansion blades to the main
ethernet core switches at both high schools
Persons Responsible
Brian Cordle
Dennis Adkins
Activity Type
Access
No. Budget Item
Activity Type Funding Source Est $
1
Access
2
Network Infrastructure - Cabling
Network Infrastructure - Electronics Access
General Funds
20000.00
Total:
20000.00
Step 7
30000.00
Total:
30000.00
Technology Activity: #2, Instructional Goal #1, Technology Improvement Objective #2
Page 12 of 35
Begin replacement of older switches in both elementary and middle schools.
Persons Responsible
Brian Cordle
Dennis Adkins
Activity Type
Access
No. Budget Item
1
Activity Type Funding Source Est $
Network Infrastructure - Electronics Access
Step 7
15000
Total:
15000.00
Page 13 of 35
Instructional Goal #1, Technology Improvement Objective #3
We will improve student access to Compass Learning Software, the Internet, and productivity tools in
our efforts to address specific weaknesses identified on the WESTEST. We realize that our middle and
high school libraries and computer labs are increasingly in demand and that we must upgrade them to
support a variety of applications, including I-Know, Compass Learning, the on-line writing assessment,
and large group of on-line reaearch tools. We will also address any network deficiencies as we upgrade
computers in core curriculum areas.
Indicators of Achievement:
By installing 719 new computers in core curriculum areas, access to instructional software
Year 1:
will be improved and SAT-9 scores will show improvement in the identified weakness ares
(2002-03)
and in the cluster deficiencies.
By changing the network backbone to 1Gb, providing faster access time for applications
Year 2:
and the Internet, the quality of student computer usage will increase thus providing
(2003-04)
increases in achievement.
By changing the network backbone to 1Gb, providing faster access time for applications
and the Internet, the quality of student computer usage will increase thus providing
Year 3:
increases in achievement. We will also begin replacing computer labs and library
(2004-05)
computers. This year we see replacements at Cammack Middle, Barboursville, and Milton
Middle schools.
Year 4:
Continued maintenence and support.
(2005-06) Continued library and lab replacements.
Year 5:
Continued maintenence and support.
(2006-07) Continued library and lab replacements.
Technology Activity: #1, Instructional Goal #1, Technology Improvement Objective #3
We will purchase and install new compter lab and library equipment for Huntignton and Cabell Midland
high schools. We will also be making updates at Milton Middle, Cammack Middle, and Barboursville
Middle Schools.
Persons Responsible
Brian Cordle
Dennis Adkins
Activity Type
Access
Page 14 of 35
No. Budget Item
Activity Type Funding Source
Est $
1
Access
174758.00
Hardware - Desktop
SUCCESS
Telecommunications 212000.00
2
3
Software - Application Access
Computer fruniture
Access
Total:
386758.00
Step 7
5000.00
Total:
5000.00
General Funds
6000.00
Total:
6000.00
Technology Activity: #2, Instructional Goal #1, Technology Improvement Objective #3
We will add a new digital imaging and photoshop lab at Huntington. This lab will be used for both
student and adult training.
Persons Responsible
Brian Cordle
Dennis Adkins
Activity Type
Access
Professional Development
Content/Tech Integration
No. Budget Item
Activity Type
Funding Source Est $
1
Access
Step 7
18000.00
Total:
18000.00
Step 7
8000.00
Total:
8000.00
2
3
4
5
Hardware - Desktop
Hardware - Peripherals Access
Software - Instructional Content/Tech Integration General Funds
5000.00
Total:
5000.00
Software - Application Content/Tech Integration Step 7
2000.00
Total:
2000.00
General Funds
3000.00
Total:
3000.00
Computer fruniture
Access
Page 15 of 35
Instructional Goal #1, Technology Improvement Objective #4
Develop and deliver meaningful staff development opportunities in technology use and management,
helping teachers meet the proficiencies listed on the new state evaluation forms, and to better serve
technology savvy students.
Indicators of Achievement:
Year 1:
We will use teacher and administrator surveys, results from our professional evaluaton of
(2002-03) the Compass Math project, and Item deficiencies outlined on the WESTEST results.
Year 2:
We will use teacher and administrator surveys, results from our professional evaluaton of
(2003-04) the Compass Math project, and Item deficiencies outlined on the WESTEST results.
Year 3:
We will use teacher and administrator surveys, results from our professional evaluaton of
(2004-05) the Compass Math project, and Item deficiencies outlined on the WESTEST results.
Year 4:
We will use teacher and administrator surveys, results from our professional evaluaton of
(2005-06) the Compass Math project, and Item deficiencies outlined on the WESTEST results.
Year 5:
We will use teacher and administrator surveys, results from our professional evaluaton of
(2006-07) the Compass Math project, and Item deficiencies outlined on the WESTEST results.
Technology Activity: #1, Instructional Goal #1, Technology Improvement Objective #4
Continuation of Technology Standards for Teachers and Intel Teach to the Future courses once
sponsored by The EdVenture Group. These courses develop computer skills and technology
integration.
Persons Responsible
Dennis Adkins
Steve Beckelhimer
Rod Adkins
Brian Cordle
Activity Type
Access
Professional Development
Content/Tech Integration
Stakeholder Involvement
Page 16 of 35
No. Budget Item
Activity Type
Funding Source Est $
1
Access
Step 7
55000.00
Total:
55000.00
2
3
4
Hardware - Notebook
Software - Application
Content/Tech Integration Step 7
4000.00
Total:
4000.00
Professional Development Professional Development Step 7
4000.00
Total:
4000.00
Step 7
2400.00
Total:
2400.00
Hardware - Printer
Access
Technology Activity: #2, Instructional Goal #1, Technology Improvement Objective #4
Skill building classes to encourage the use and integration of technology into all grade levels and
subjects. This will include training on a variety of software packages and hardware peripherals including
digital cameras, scanners, palm devices, printers, microscopes, science data collection devices, and
others. We will also provide classes in the appropriate way to use the Internet with students at a variety
of levels.
Persons Responsible
Dennis Adkins
Steve Beckelhimer
Rod Adkins
Pat McKee
Activity Type
Professional Development
Content/Tech Integration
Innovative Strategies
No. Budget Item
Activity Type
Funding Source Est $
1
Access
Step 7
50000.00
Total:
50000.00
Step 7
18000.00
Total:
18000.00
2
3
Hardware - Peripherals
Software - Application
Software - Instructional
Innovative Strategies
Content/Tech Integration General Funds
Total:
4
Professional Development Professional Development General Funds
Total:
18000.00
18000.00
9000.00
9000.00
Technology Activity: #3, Instructional Goal #1, Technology Improvement Objective #4
Page 17 of 35
Continue general technology training sessions for teachers and parents (topics include: Internet, E-mail,
Windows XP, Computer Maintenence).
Persons Responsible
Denns Adkins
Rod Adkins
Activity Type
Access
Professional Development
Stakeholder Involvement
No. Budget Item Activity Type
1
Supplies
Funding Source Est $
Stakeholder Involvement General Funds
Total:
2500.00
2500.00
Page 18 of 35
Instructional Goal #1, Technology Improvement Objective #5
Expand the use of our distance learning/video conferencing facilities at Huntington High School and
Cabell Midland High School, offering greater access to remote sources of information and training by
working with Marshall University.
Indicators of Achievement:
Log the number and type of distance learning and video conferencing activities. We will do
Year 1:
an analysis of student progress by compairing test results of distance learning courses to
(2002-03)
courses delivered conventionally.
Year 2:
Log the number and type of distance learning and video conferencing activities.
(2003-04) Professional development sessions logged.
Year 3:
Log the number and type of distance learning and video conferencing activities.
(2004-05) Professional development sessions logged.
Year 4:
Log the number and type of distance learning and video conferencing activities.
(2005-06) Professional development sessions logged.
Year 5:
Log the number and type of distance learning and video conferencing activities.
(2006-07) Professional development sessions logged.
Technology Activity: #1, Instructional Goal #1, Technology Improvement Objective #5
Work with Marshall University School Of Medicine to provide tele-mental medicine and psychological
service to our high schools and remote sites. This is in addition to our regularly scheduled interactive
video classes.
Persons Responsible
Dennis Adkins
Larry Oyster
Brian Cordle
Activity Type
Access
Content/Tech Integration
Stakeholder Involvement
Innovative Strategies
Page 19 of 35
No. Budget Item
Activity Type Funding Source Est $
1
Access
2
3
E-rate - Data Lines
Hardware - Notebook Access
Software - Application Access
E-Rate Year 7
7920.00
General Funds
7920.00
Total:
15840.00
Step 7
7000.00
Total:
7000.00
Step 7
600.00
Total:
600.00
Page 20 of 35
Instructional Goal #2
100% of our students will demonstrate proficiency in problem solving, communication, and critical
thinking skills.
Instructional Goal #2, Technology Improvement Objective #1
Continue to develop and encourage the use of all forms of electronic communications to enhance
learning and teaching for students and staff in all Cabell County Schools. This is to include: Interactive
Video, Internet, WEVIS, Voice, and emerging technologies.
Indicators of Achievement:
Year 1:
Conduct an annual survey of our communications infructure to insure capacity for our
(2002-03) growing telecommunications needs.
Year 2:
Conduct an annual survey of our communications infructure to insure capacity for our
(2003-04) growing telecommunications needs.
Year 3:
Conduct an annual survey of our communications infructure to insure capacity for our
(2004-05) growing telecommunications needs. We will also porvide monitoring and evaluation.
Year 4:
Conduct an annual survey of our communications infructure to insure capacity for our
(2005-06) growing telecommunications needs. We will also porvide monitoring and evaluation.
Year 5:
Conduct an annual survey of our communications infructure to insure capacity for our
(2006-07) growing telecommunications needs. We will also porvide monitoring and evaluation.
Technology Activity: #1, Instructional Goal #2, Technology Improvement Objective #1
To provide access to WVEIS and the Internet in order to enhance learning and improve student
achievement in all Cabell County Schools.
Persons Responsible
Dennis Adkins
Brian Cordle
Rod Adlkins
Richard Pullin
Activity Type
Access
Content/Tech Integration
Admin/Support Procedures
Page 21 of 35
No. Budget Item
1
2
3
Activity Type Funding Source Est $
E-rate - Data Lines Access
E-rate - Data Lines Access
E-rate - Data Lines Access
E-Rate Year 6
112159.95
General Funds
38323.00
Total:
150482.95
E-Rate Year 7
128293.02
General Funds
49975.00
Total:
178268.02
E-Rate Year 8
128293.02
General Funds
49975.98
Total:
178269.00
Technology Activity: #2, Instructional Goal #2, Technology Improvement Objective #1
To provide voice and long distance communication services to the staff and students of all Cabell
County Schools. This service not only provides routine communication for the operation of our school
but it provides an extra degree of security for emergency situations.
Persons Responsible
Phyllis Argabrite
Brian Cordle
Dennis Adkins
Activity Type
Access
Admin/Support Procedures
No. Budget Item Activity Type Funding Source Est $
1
2
3
E-rate - Voice Access
E-rate - Voice Access
E-rate - Voice Access
E-Rate Year 6
138985.37
General Funds
59216.95
Total:
198202.32
E-Rate Year 7
178033.00
General Funds
84347.01
Total:
262380.01
E-Rate Year 8
178033.00
General Funds
84347.01
Total:
262380.01
Technology Activity: #3, Instructional Goal #2, Technology Improvement Objective #1
To provide voice and long distance communication services to the staff and students of all Cabell
Page 22 of 35
County Schools. This service not only provides routine communication for the operation of our school
but it provides an extra degree of security for emergency situations.
continued
Persons Responsible
Phyllis Argabrite
Dennis Adkins
Brian Cordle
Activity Type
Access
Admin/Support Procedures
No. Budget Item
1
2
3
Activity Type Funding Source Est $
E-rate - Long Distance Access
E-rate - Long Distance Access
E-rate - Long Distance
E-Rate Year 6
3254.32
General Funds
1298.24
Total:
4552.56
E-Rate Year 7
3896.64
General Funds
1556.28
Total:
5452.92
E-Rate Year 8
3896.64
General Funds
1556.28
Total:
5452.92
Page 23 of 35
Instructional Goal #2, Technology Improvement Objective #2
Continue our annual upgrade of computer hardware in all of our schools. Our goal is a technology
refresh cycle of no more than five years and to provide timely maintenance and service support for all of
the technology in our system.
Indicators of Achievement:
Year 1:
Replace one fifth of our instructional computing hardware and provide maintenance for all
(2002-03) of the technology in our system.
Year 2:
Replace one fifth of our instructional computing hardware and provide maintenance for all
(2003-04) of the technology in our system.
Year 3:
Replace one fifth of our computing hardware and provide maintenance for all of the
(2004-05) technology in our system.
Year 4:
Replace one fifth of our computing hardware and provide maintenance for all of the
(2005-06) technology in our system.
Year 5:
Replace one fifth of our computing hardware and provide maintenance for all of the
(2006-07) technology in our system.
Technology Activity: #1, Instructional Goal #2, Technology Improvement Objective #2
Provide new computers for middle school secretaries and assistant principals to facilitate their access to
student records.
Persons Responsible
Dennis Adkins
Brian Cordle
Activity Type
Access
Professional Development
Stakeholder Involvement
Admin/Support Procedures
No. Budget Item
Activity Type Funding Source Est $
1
Access
2
Hardware - Desktop
Software - Application Access
General Funds
15000.00
Total:
15000.00
General Funds
1800.00
Total:
1800.00
Page 24 of 35
Technology Activity: #2, Instructional Goal #2, Technology Improvement Objective #2
Provide new computers for our eight school nurses in order to increase their ability to communicate with
staff, parents, and the central office.
Persons Responsible
Brian Cordle
Todd Alexandr
Dennis Adkins
Rod Adkins
Activity Type
Professional Development
Content/Tech Integration
Stakeholder Involvement
Admin/Support Procedures
No. Budget Item
Activity Type
Funding Source Est $
1
Access
General Funds
12800.00
Total:
12800.00
2
3
Hardware - Notebook
Professional Development Professional Development General Funds
Software - Application
Access
500.00
Total:
500.00
General Funds
1000.00
Total:
1000.00
Page 25 of 35
Instructional Goal #2, Technology Improvement Objective #3
We will encourage parental and community involvement by offering a variety of workshops that
showcase the technology currently available in our schools. (Internet, E-Mail, Productivity Tools, and an
array of curriculum products.
Indicators of Achievement:
Year 1:
Attendance logs from workshops.
(2002-03)
Year 2:
Attendance logs from workshops.
(2003-04)
Year 3:
Attendance logs from workshops.
(2004-05)
Year 4:
Attendance logs from workshops.
(2005-06)
Year 5:
Attendance logs from workshops.
(2006-07)
Technology Activity: #1, Instructional Goal #2, Technology Improvement Objective #3
Provide Internet and E-Mail awareness classes to the general public.
Persons Responsible
Rod Adkins
Dennis Adkins
Activity Type
Content/Tech Integration
Stakeholder Involvement
No. Budget Item
1
Activity Type
Funding Source Est $
Internet Classes for Parents Stakeholder Involvement Business Partners 2500.00
Total:
Page 26 of 35
2500.00
Instructional Goal #2, Technology Improvement Objective #4
We will work with the Adult Literacy program offered by the Cabell County Career Technology Center
(CCCTC) to identify technology needs in this area, and assist in the acquisition of appropriate hardware
and software.
Indicators of Achievement:
The CCCTC will monitor the use of technology in the adult literacy program and report each
Year 1:
year to the Technology Department. Reports will include baseline data, improvement data,
(2002-03)
and usage.
The CCCTC will monitor the use of technology in the adult literacy program and report each
Year 2:
year to the Technology Department. Reports will include baseline data, improvement data,
(2003-04)
and usage.
The CCCTC will monitor the use of technology in the adult literacy program and report each
Year 3:
year to the Technology Department. Reports will include baseline data, improvement data,
(2004-05)
and usage.
The CCCTC will monitor the use of technology in the adult literacy program and report each
Year 4:
year to the Technology Department. Reports will include baseline data, improvement data,
(2005-06)
and usage.
The CCCTC will monitor the use of technology in the adult literacy program and report each
Year 5:
year to the Technology Department. Reports will include baseline data, improvement data,
(2006-07)
and usage.
Technology Activity: #1, Instructional Goal #2, Technology Improvement Objective #4
Assist the CCCTC in the acquisition of computer hardware and software for their adult literacy program
and make buildings avilable for these programs.
Persons Responsible
Dennis Adkins
Brian Cordle
Rod Adkins
Activity Type
Access
Content/Tech Integration
Stakeholder Involvement
Page 27 of 35
No. Budget Item
Activity Type
Funding Source Est $
1
Access
General Funds
3000.00
Total:
3000.00
2
Hardware - Desktop
Software - Instructional Stakeholder Involvement General Funds
Total:
Page 28 of 35
2500.00
2500.00
Instructional Goal #2, Technology Improvement Objective #5
Continue to provide opportunities for our school network system operators, support staff, and
technicians to upgrade their skills in network management, trouble-shooting, and technology
integration.
Indicators of Achievement:
Usage logs and surveys will be used to measure the stability of our networks and the level
Year 1:
of technology integration. The number of maintenence work orders will also be used to
(2002-03)
judge the over all health of our technology.
Usage logs and surveys will be used to measure the stability of our networks and the level
Year 2:
of technology integration. The number of maintenence work orders will also be used to
(2003-04)
judge the over all health of our technology.
Usage logs and surveys will be used to measure the stability of our networks and the level
Year 3:
of technology integration. The number of maintenence work orders will also be used to
(2004-05)
judge the over all health of our technology.
Usage logs and surveys will be used to measure the stability of our networks and the level
Year 4:
of technology integration. The number of maintenence work orders will also be used to
(2005-06)
judge the over all health of our technology.
Usage logs and surveys will be used to measure the stability of our networks and the level
Year 5:
of technology integration. The number of maintenence work orders will also be used to
(2006-07)
judge the over all health of our technology.
Technology Activity: #1, Instructional Goal #2, Technology Improvement Objective #5
Provide a two day summer workshop for school system operators on system maintenence and
operations.
Persons Responsible
Brian Cordle
Dennis Adkins
Rod Adkins
Activity Type
Professional Development
Content/Tech Integration
Admin/Support Procedures
Page 29 of 35
No. Budget Item Activity Type
1
2
Stipends
Supplies
Funding Source Est $
Professional Development Step 7
18000.00
Total:
18000.00
Professional Development General Funds
Total:
3000.00
3000.00
Technology Activity: #2, Instructional Goal #2, Technology Improvement Objective #5
Provide travel and registration expenses to the National Educational Computer Conference in
Philadelphia, June, 2004. Fifty-five system operators and trainers will attend NECC sessions that focus
on technology integration.
This is a five day outing.
Persons Responsible
Dennis Adkins
Brian Cordle
Rod Adkins
Karen McClanahan
Activity Type
Professional Development
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source
NECC 2005 registration Professional Development Ed Tech Formula - Round 3 11000.00
Total:
2
Est $
Travel
11000.00
Professional Development Ed Tech Formula - Round 3 50000
Total:
50000.00
Technology Activity: #3, Instructional Goal #2, Technology Improvement Objective #5
We will continue to provide technical training to our three computer technicians and system engineer.
This will include Novel training, Internet serurity, Linux and other sessions.
Persons Responsible
Brian Cordle
Dennis Adkins
Activity Type
Professional Development
Page 30 of 35
No. Budget Item
1
Activity Type
Funding Source Est $
Professional Development Professional Development General Funds
Total:
10000.00
10000.00
Technology Activity: #4, Instructional Goal #2, Technology Improvement Objective #5
We will submit an application for Ed Tech round 3 Competitive funding. We will formulat a plan for
technology integration specialists to serve Central City Elementary, West Middle, Highlawn,
Guyandotte, and Enslow Middle schools.
Persons Responsible
Dennis Adkins
Vickie Adkins
Dr. Jeff Smith
School principals
Activity Type
Professional Development
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source
Est $
Professional Development Professional Development Ed Tech Competitive - Round 3 150000.00
Total:
Page 31 of 35
150000.00
Compliance Checklist
Ed Tech Compliance Checklist
1. Does the county plan include the county's specific goals for using advanced technology to improve
student achievement?
yes
This is addressed under Goal 1 Objective 1 and Activity 1
2. Does the plan include strategies that address how Ed Tech Funds will improve academic
achievement of all students in all schools in the county? (Emphasis should be given to high-need and
high-poverty schools)
yes
This is addressed under Goal 1 Objective 1 and Activity 2
3. Does the county plan include strategies that address how to ensure that all students and teachers will
have increased access to technology?
yes
This is addressed under Goal 1 Objective 3 and Activity 1
4. Does the county plan include plans to provide ongoing professional development for teachers,
principals and administrators to further the effective use of technology?
yes
This is addressed under Goal 1 Objective 1 and Activity 1
5. Does the county plan include a budget (description of type and costs of technology to be acquired
with Ed Tech formula and /or competitive funds)?
yes
This is addressed under Goal 2 Objective 5 and Activity 2
6. Does the county plan include strategies that address how to encourage the development and use of
innovative strategies for the delivery of specialized or rigorous courses (e.g., distance learning)?
yes
This is addressed under Goal 1 Objective 5 and Activity 1
7. Does the county plan include strategies that address how to use technology to promote parental
involvement to increase communication with parents?
yes
This is addressed under Goal 2 Objective 3 and Activity 1
Page 32 of 35
8. Does the county plan include strategies that address how the technology programs will be developed
in collaboration with adult literacy providers?
yes
This is addressed under Goal 2 Objective 4 and Activity 1
9. Does the county plan include strategies that address how the county will evaluate the extent to which
activities funded in formula and competitive funds are effective in integrating technology?
yes
This is addressed under Goal 1 Objective 1 and Activity 2
E-rate Compliance Checklist
1. Does the county plan include the E-rate requirements for clear goals and a realistic strategy for using
telecommunications?
yes
This is addressed under Goal 2 Objective 1 and Activity 1
2. Does the county plan include strategies that address the computer equipment currently available or
budgeted for purchase?
yes
This is addressed under Goal 1 Objective 1 and Activity 1
3. Does the county plan include strategies that address the internal connections that the county has in
place or budgeted to install in the current, next or future academic years?
yes
This is addressed under Goal 1 Objective 2 and Activity 1
4. Does the county plan include strategies that address the computer software necessary to
communicate with other computers over an internal network?
yes
This is addressed under Goal 1 Objective 4 and Activity 2
5. Does the county plan include the professional development plan for professionals using the
equipment connected to the telecommunications network?
yes
This is addressed under Goal 1 Objective 4 and Activity 2
6. Does the county plan include the existing or budgeted maintenance contracts to maintain computers?
yes
This is addressed under Goal 1 Objective 1 and Activity 1
7. Does the county plan include specific plans for using telecommunications technologies and how they
Page 33 of 35
integrate the use of these technologies into the curriculum?
yes
This is addressed under Goal 1 Objective 4 and Activity 1
8. Does someone else other than your county personnel submit your local E-rate application?
no
9. E-rate requires that we report the number of schools in each county that have the following Internet
Connections:
Number of schools in the county with Dial up modem connections to the Internet?
0
Number of schools in the county with 56 K frame relay connection to the Internet?
0
Number of schools in the county that have T-1 frame relay connections to the Internet? 30
Number of schools in the county that have ATM T-1 Internet connections?
2
Number of schools in the county that have cable modem connections to the Internet? 0
Page 34 of 35
Policies and Procedures
Do you have an Acceptable Use Policy?
yes
If yes, what is the last date of adoption/revision?
11/06/2001
When was the public meeting held for CIPA Compliance?
09/25/2001
Provide the URL to your acceptable use policy.
boe.cabe.k12.wv.us/Policy%20Manual/I%20poli
Page 35 of 35