BERKELEY County Technology Plan 2004-2007

advertisement
BERKELEY County Technology Plan
2004-2007
OPTIMAL
Online Planning - Technology Integration Measures for Achievement and Learning
Last revised on January 11, 2005
Page 1 of 45
County Technology Plan
West Virginia has placed an emphasis on equitably providing technology for schools in order to
enhance student learning, improve student achievement, and prepare students for post-secondary
education and the world of work. Many stakeholders are involved in this process including students,
teachers, administrators, parents, community members, legislators, board of education members and
others.
Collectively, the county technology planning team members have assisted in creating, refining,
implementing and utilizing educational technology to meet the current standards, develop local
programs, build partners and capacity, make data-driven decisions, and to evaluate the use of
technology for administrative and instructional tasks.
The county technology plan is a component of the UCIP and is based on the state OPTimal online
format (http://wv.ontargetus.com/). This plan will serve several functions. Not only does the plan
complement and support the county's instructional goals as delineated in the UCIP, it is also intended to
help meet the technology objectives/requirements of the school, county/state policies, state/federal
programs, and competitive grants. Examples of these include the following:
Policy 2320: A Process for Improving Education Performance Based Accreditation System
Policy 2450: Virtual Distance Learning
Policy 2460: Use of the Internet by Students and Educators
Policy 2470: Use of Technology by Students and Educators
Policy 2510: Assuring Quality of Education
Policy 2520: Content Standards and Objectives
Federal Communications Commission (FCC) in order to receive Universal Service Fund Program
E-rate Funds
The No Child Left Behind Act of 2001 which establishes the Enhancing Education Through
Technology (Ed Tech) Program
West Virginia House Bill 4319
Basic Skills/Computer Education (BS/CE)
WV SUCCESS
WVDE Reinventing Education
However, the most important function of the plan is to ensure that the effective use of educational
technology supports achievement and lifelong learning.
Page 2 of 45
Technology Team Contact Information
Name: David L. Kenney
Title: Director, Research and Technology, Berk. Co. Sch.
Email: dkenney@access.k12.wv.us
Phone: 204-267-3500 Ext: 3226
Name: Garry R. Kilmer
Title: Technology Specialist, Berkeley Co. Sch
Email: gkilmer@access.k12.wv.us
Phone: 304-267-3510 Ext: 3246
Name: Dennis S. Mongan
Title: Tech Specialist, Berkeley Co. Sch.
Email: dmongan@access.k12.wv.us
Phone: 304-267-3510 Ext: 3247
Name: Catherine J. Wood
Title: Computer Technician
Email: cjwood@access.k12.wv.us
Phone: 304-267-3500 Ext: 3510
Name: Dale L. Lewis
Title: Administrative Assistant
Email: dllewis@access.k12.wv.us
Phone: 304-267-3500 Ext: 3270
Name: Timothy Bruffey
Title: Parent - Community Representative
Email:
Phone: 304-229-3066
Name: Tammy Copenhaver
Title: Parent - Community Representative
Email:
Phone: 304-262-6575
Name: Karin Webb
Title: Parent - Community Representative
Email:
Phone: 304-263-7689
Page 3 of 45
Name: Beverly Hoffmaster
Title: Instructional Specialist, Berkeley Co. Schools
Email: bhoffmas@access.k12.wv.us
Phone: 304-267-3510 Ext: 3272
Name: William Agee
Title: General Community Representative
Email:
Phone: 304-267-7722
Name: Terry Forrest
Title: Asst. Dir. Transportation, Berkeley Co. Schools
Email: tlforres@access.k12.wv.us
Phone: 304-267-3575
Name: Tana Petrucci
Title: Principal, Inwood Primary School
Email: tpetrucc@access.k12.wv.us
Phone: 304-229-1990
Name: Margaret Kursey
Title: Principal, Eagle School Intermediate
Email: mkursey@access.k12.wv.us
Phone: 304-263-0422
Name: W. Lynn Aikens
Title: Principal, Musselman Middle School
Email: waikens@access.k12.wv.us
Phone: 304-229-1965
Name: Nancy Warrenfeltz
Title: Asst. Principal, Martinsburg High School
Email: nwarrenf@access.k12.wv.us
Phone: 304-267-3530
Name: Suzi Johnson
Title: Elementary School Teacher, Bunker Hill Elementary
Email: sujohnso@access.k12.wv.us
Phone: 304-229-1980
Name: Cindy Woods
Title: Library/Media Specialist, Potomack Intermediate
Email: cwoods@access.k12.wv.us
Phone: 304-274-6592
Page 4 of 45
Name: Regina Sherman
Title: Middle School Teacher, Musselman Middle School
Email: rlsherma@access.k12.wv.us
Phone: 304-229-1965
Name: Bob Fuegi
Title: High School Teacher, Hedgesville High School
Email: rfuegi@access.k12.wv.us
Phone: 304-754-3354
Name: Jack Price
Title: IT Community Representative
Email: priceje@state.gov
Phone: 304-263-5667
Page 5 of 45
County Mission and Vision Statements
County Vision:
It is the vision of Berkeley County Schools to move into the 21st Century with quality programs and
services that:
1) maximize the potential of each student
2) develop and support quality staff
3) meet the needs and expectations of a growing community
4) effectively manage financial and physical resources.
It is the mission of Berkeley County Schools:
1) to provide opportunities for our students to develop skills, attitudes, and knowledge for moving into
the next phase of their lives
2) to enhance professional growth opportunities for the purpose of recruiting and maintaining a quality
staff
3) to collaborate with parents, businesses, labor, and the community to meet their ever changing needs
and expectations
4) to continually access and utilize the available financial / physical resources for the development of
educational programs
County Mission:
The Mission of Berkeley County Schools is to “provide effective and affective education for the
community through developed proficiency in technological skills, thereby promoting employability,
elevating ethical responsibilities and enhancing the quality of life through life long learning.”
Page 6 of 45
Needs Assessment
Analysis of Assessment Data
STANDARDIZED ASSESSMENTS
A review of the 2003 – 2004 WESTEST results indicate that students skills in mathematics does not
meet county expectations. Although reading scores tend to be slightly higher than the state average,
some cell groups did not meet AYP standards.
Adopted software that are available in all schools can address reading and math skills. The beauty of
computerized programming is its ability to individualize automatically and/or by teacher input. By using
the “I Know” web site, the Content Standards on CD and internet, and the TestMate Clarity CD that can
disaggregate assessment results, teachers can refine instruction to focus on the specific needs of
individual students.
In addition, PLATO software is being used to remediate students who have skill deficiencies in the
middle and high schools. It is anticipated that this computer courseware will improve the academic
performance of identified students.
PARTICIPATION RATE
The schools utilized WVEIS information to track participation in the WESTEST and other assessments.
Only one cell group at one school did not meet AYP in this category. Tracking students attendance via
WVEIS throughout the year and working closely with students who were targeted with high absentee
records contributed to the schools’ successes in this area.
WRITING ASSESSMENT
Every school met the criterion for Writing Assessment. Both the legacy IBM and the current Compass
Learning software have writing components which can be used in grades K – 5. Microsoft Office
Professional Suite offers Word as a resource for grades 6 – 12. Word can be an effective tool for
teachers to incorporate in their lessons by requiring writing assignments in their subjects and requiring
students to use Word as their medium.
Additionally, students in seventh and tenth grades will take the writing assessment on line this spring.
Many students participated in a pilot assessment for this program. Additionally, in preparation for the
online Writing Assessment some schools are examining the possibility of using online assessment
programs that will allow students to practice writing that will be scored on line.
PHYSICAL FITNESS
Every school met this requirement. The internet, however, can be used as a source to find lessons or
activities to incorporate in the physical fitness programs. Additionally, the teachers can use a
spreadsheet (available in either Lotus or Microsoft applications suite) to track each student’s progress
as he/she learns and practices the skills that are tested.
Analysis of UCIP
Assessment - See previous narrative
Attendance Rate - All schools with grades K-8 met this requirement.
Graduation Rate - None of the three high schools met this requirement. Dropout prevention measures
Page 7 of 45
have been implemented. Among these is using WVEIS attendance records to identify students who are
persistently absent, whose academic performance is poor, and who have exhibited poor behavior.
These at-risk students can be directed into the Plato program, which can be individualized to meet their
academic needs. A dropout prevention task force has been created and is mandated to study the
dropout problem in the high schools and suggest stragegies to lower this rate.
Special Education.
Two areas that have been included in the Office of Special Education's Continuous Improvement
Monitoring Plan are: to provide work-based learning experiences in grades 9-12 and to improve
performance on the state standardized assessment. Students with disabilities is a subgroup that did not
meet AYP.
The Office of Special Education is providing more computers for special education classrooms and
assistive technology for those who need such devices. Thereby, students and teachers have improved
access to appropriate courseware and teachers have access to IEP writing software that is compatible
with the State's Content Standards and test options.
Vocational Education.
A review of vocational programs indicated that equipment had become outdated. New equipment is
being provided so that students can develop their work skills on technology they can expect to use
when they enter the work force.
Adult and Community Education
Computer courses have been a part of the Adult and Community Education program for a long time.
However, their relevance was a function of the hardware and software available in the schools.
Upgrading equipment has been and continues to be a primary concern. With newer hardware and
software, the Adult and Community Education program can offer more current topics on more
contemporary equipment, thereby improving its efforts to meet the technological needs of the
community and to increase technological literacy for all ages.
Technology Infrastructure
After reviewing the status of each site according to State standards, the county’s technology findings
are:
1. WVEIS and Internet access speed is the same for all schools and all non-instructional sites. All sites
are now equipped with T1 lines.
2. Most schools still have Cat5 cabling, rather than fiber optic cabling, for their backbone. Three high
schools, three middle schools, four intermediate schools, seven elementary schools, Pikeside, the
Central Office, Ramer Center and Ramer Annex have fiber optic backbones.
3. New classrooms added to existing schools need three computers and one printer in each. New
portables need to be cabled.
4. The newest school, Spring Mills, has been cabled, WVEIS/Internet access installed, and hardware
and software installed to the state standard.
5. Twelve (12) elementary schools and one middle school do not have Layer II switches and do not
therefore meet state standard. Three high schools meet this state standard, as do Hedgesville Middle,
North Middle. Berkeley Heights, Eagle School, Mill Creek, Opequon, Orchard View, Potomack,
Hedgesville Elementary, Back Creek, and Valley View also meet OTIS (Layer II master switches with
10/100 Layer I to all desktops).
6. Sixteen (16) of 19 elementary schools still have the (original) Basic Skills Legacy software and
hardware! Donated hardware is assisting with replacing IBM Model 25s, 35s, and 45s with donated
Model 300s or more recent hardware.
7. Fourteen (14) elementary schools have the Basic Skills Legacy hardware and software in their
classrooms but have the current Basic Skills hardware and software (Compass Learning) in their labs.
However, the new software cannot be used in classrooms because the Legacy hardware in the
classrooms does not support the current Basic Skills software.
Page 8 of 45
8. One of 19 elementary schools still has an Apple IIGS computer lab from the Potomac Edison
grant (circa early 1990s). Inwood Primary School does not have a lab due to space limitations.
9. Remodeling and expansion at four schools (Tomahawk, South Middle, Hedgesville High, Martinsburg
High) will require re-cabling, during which fiber optic backbone and Layer II electronics will be installed.
10. All secondary schools have a limited number of computer labs. No school has one lab for each
grade or for each discipline. Computer lab usage must be shared and well scheduled.
11. Most schools have only a limited number of computers with Windows 9X/2000/XP operating
systems for administrative purposes.
12. All schools do not have computers in classrooms specifically for teachers. Some older models are
installed in faculty rooms, mainly for access to WVEIS.
13. The new intermediate school in the southern part of the county must be cabled, WVEIS/Internet
access installed, and hardware and software installed to meet the state standards.
OEPA Reports
NEEDS REVISION
Facilities Assessment
See response to Technology Infrastructure
Page 9 of 45
Instructional Goal #1
All school facilities will provide a safe, disciplined environment to meet the educational needs of all
students.
Instructional Goal #1, Technology Improvement Objective #1
Ensure adequate network connectivity and communications at all county and school sites.
Indicators of Achievement:
- At least 50 percent of county and school sites will have T1 access.
Year 1:
- Number of county and schools sites that have certified networks will increase by ten
(2002-03) percent.
- Number of county and schools sites with Layer II switches will increase by ten percent.
- 100 percent of county and schools sites will have T1 access.
Year 2:
- Number of county and schools sites that have certified networks will increase by ten
(2003-04) percent.
- Number of county and schools sites with Layer II switches will increase by ten percent.
- 100 percent of county and schools sites will have T1 access.
Year 3:
- Number of county and schools sites that have certified networks will increase by ten
(2004-05) percent.
- Number of county and schools sites with Layer II switches will increase by ten percent.
- 100 percent of county and schools sites will have T1 access.
Year 4:
- Number of county and schools sites that have certified networks will increase by ten
(2005-06) percent.
- Number of county and schools sites with Layer II switches will increase by ten percent.
- 100 percent of county and schools sites will have T1 access.
Year 5:
- Number of county and schools sites that have certified networks will increase by ten
(2006-07) percent.
- Number of county and schools sites with Layer II switches will increase by ten percent.
Technology Activity: #1, Instructional Goal #1, Technology Improvement Objective #1
Install cabling and network electronics at new school (Gerrardstown/Back Creek Valley, temporary
name) to provide access to server-based and online instructional resources and to provide means to
communicate with the community and beyond.
Persons Responsible
County Technology Specialists
Activity Type
Access
Page 10 of 45
No. Budget Item
Activity Type Funding Source Est $
1
Access
2
Network Infrastructure - Cabling
Network Infrastructure - Electronics Access
General Funds
3000
E-Rate Year 8
4500
Total:
7500.00
General Funds
8000
E-Rate Year 8
12000
Total:
20000.00
Technology Activity: #2, Instructional Goal #1, Technology Improvement Objective #1
Upgrade cabling and network electronics at Ramer Center, Ramer Annex, Inwood Primary School,
Bunker Hill Elementary School, Martinsburg South Middle School, and Musselman Middle Schools to
improve access thereby enabling teachers to more effectively use technology resources in their
instruction and staff to more efficiently complete their job responsibilities. (FY06)
Persons Responsible
County Technology Specialists
Activity Type
Content/Tech Integration
No. Budget Item
1
2
3
Activity Type
Funding Source Est $
E-rate - SUCCESS E-rate App. Content/Tech Integration E-Rate Year 6
6023.00
SUCCESS
6023.00
Total:
12046.00
E-rate - SUCCESS E-rate App. Content/Tech Integration E-Rate Year 6
19944.00
SUCCESS
13296.00
Total:
33240.00
E-rate - SUCCESS E-rate App. Content/Tech Integration E-Rate Year 6
42760.80
SUCCESS
28507.20
Total:
71268.00
Technology Activity: #3, Instructional Goal #1, Technology Improvement Objective #1
Upgrade cabling and network electronics at Back Creek Elementary School, Hedgesville Elementary
School, Marlowe Elementary School, Tomahawk Elementary School, and Musselman Middle Schools to
improve access thereby enabling teachers to more effectively use technology resources in their
instruction and staff to more efficiently complete their job responsibilities. (FY05)
Page 11 of 45
Persons Responsible
County Technology Specialists
Activity Type
Access
No. Budget Item
1
2
3
Activity Type
Funding Source Est $
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 7
11643.24
BS/CE
7762.16
Total:
19405.40
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 7
29988.50
BS/CE
29988.50
Total:
59977.00
E-rate - BSCE E-rate App. Content/Tech Integration E-Rate Year 7
11643.24
BS/CE
7762.16
Total:
19405.40
Technology Activity: #4, Instructional Goal #1, Technology Improvement Objective #1
Install cabling and network electronics at new middle school (Spring Mills Middle, Martinsburg HS,
Martinsburg South MS and Musselman MS) to provide access to server-based and online instructional
resources and to provide means to communicate with the community and beyond.
Persons Responsible
County Technology Specialist
Activity Type
Access
No. Budget Item
1
Activity Type
Funding Source Est $
E-rate - SUCCESS E-rate App. Content/Tech Integration E-Rate Year 7
148729.57
SUCCESS
103692.88
Total:
252422.45
Technology Activity: #5, Instructional Goal #1, Technology Improvement Objective #1
Install T1 in new middle school (Springs Mills Middle) to provide access to onlne instructional and
administrative resources and to provide means to communicate with the community and beyond.
Persons Responsible
County Technology Specialists
Page 12 of 45
Activity Type
Access
No. Budget Item
Activity Type Funding Source Est $
1
Access
2
E-rate - Data Lines
Technical Support - Installation Access
Step 7
2000
E-Rate Year 7
3000
Total:
5000.00
Step 7
1200
Total:
1200.00
Technology Activity: #6, Instructional Goal #1, Technology Improvement Objective #1
Install cabling and network electronics in new additions at Hedgesville High School, Martinsburg High
School, and Musselman High Schools to provide access to server-based and online instructional
resources and to provide means to communicate with the community and beyond.
Persons Responsible
County Technology Specialists
Activity Type
Access
No. Budget Item
1
2
Activity Type
Funding Source Est $
E-rate - SUCCESS E-rate App. Content/Tech Integration E-Rate Year 7
E-rate - SUCCESS E-rate App.
17533.00
SUCCESS
17533.00
Total:
35066.00
E-Rate Year 8
33000
Total:
33000.00
Technology Activity: #7, Instructional Goal #1, Technology Improvement Objective #1
Install network infrastructure to new portable classrooms to provide access for students and teachers to
state-adopted, grade-appropriate software and Internet resources.
Persons Responsible
County Technology Specialists
Activity Type
Access
Page 13 of 45
No. Budget Item
1
Activity Type Funding Source Est $
Network Infrastructure - Electronics Access
E-Rate Year 7
1500
General Funds
14000
Total:
15500.00
Technology Activity: #8, Instructional Goal #1, Technology Improvement Objective #1
Provide access to WVEIS and Internet service to all sites enabling teachers and students to access
online instructional resources and staff to use online administrative resources and services.
Persons Responsible
County Technology Specialists
Activity Type
Access
No. Budget Item
1
2
3
Activity Type
Funding Source Est $
E-rate - Data Lines Content/Tech Integration E-Rate Year 6
118810.20
General Funds
68899.80
Total:
187710.00
E-rate - Data Lines Content/Tech Integration E-Rate Year 7
103520.05
General Funds
66184.95
Total:
169705.00
E-rate - Data Lines Content/Tech Integration E-Rate Year 8
70000
General Funds
180000
Total:
250000.00
Technology Activity: #9, Instructional Goal #1, Technology Improvement Objective #1
Repair, replace, and upgrade existing newtork infrastructure, as needed, to provide access to
server-based and online instructional resources and to provide means to communicate with the
community and beyond.
Internal Connections requests
Persons Responsible
County Technology Specialists
Activity Type
Access
Page 14 of 45
No. Budget Item
1
2
3
Activity Type Funding Source Est $
E-rate - Internal Connections Access
E-rate - Internal Connections Access
E-rate - Internal Connections Access
E-Rate Year 6
241842.52
General Funds
131655.72
Total:
373498.24
E-Rate Year 7
63055.50
General Funds
40314.17
Total:
103369.67
E-Rate Year 8
100000
General Funds
60000
Total:
160000.00
Technology Activity: #10, Instructional Goal #1, Technology Improvement Objective #1
To provide local voice service for Berkeley County schools for a safer school environment and improved
communication between schools, homes and communities.
Persons Responsible
Business Manager
Long Distance Provider
Activity Type
Access
No. Budget Item Activity Type
1
2
3
Funding Source Est $
E-rate - Voice Stakeholder Involvement E-Rate Year 6
87296.05
General Funds
53504.03
Total:
140800.08
E-rate - Voice Stakeholder Involvement E-Rate Year 7
43787.75
General Funds
27995.45
Total:
71783.20
E-rate - Voice Stakeholder Involvement E-Rate Year 8
50000
General Funds
30000
Total:
80000.00
Page 15 of 45
Instructional Goal #1, Technology Improvement Objective #2
To provide adequate communication between schools, communities and homes and Berkeley County
Indicators of Achievement:
Year 1:
2002-3: 372 phones in Berkeley County schools
(2002-03) Digital Divide Survey
Year 2:
2003-4: 392 phones in Berkeley County Schools
(2003-04) Digital Divide Survey
Year 3:
Increase by 5% for improved communication and safer school environment
(2004-05)
Year 4:
Increase by 5% for improved communication and safer school environment
(2005-06)
Year 5:
Increase by 5% for improved communication and safer school environment
(2006-07)
Technology Activity: #1, Instructional Goal #1, Technology Improvement Objective #2
To provide cellular service for Berkeley County schools for a safer school environment and improved
communication between schools, homes and communities
Persons Responsible
County e-rate coordinator
Activity Type
Stakeholder Involvement
No. Budget Item
1
2
3
Activity Type
Funding Source Est $
E-rate - Cellular Stakeholder Involvement E-Rate Year 6
31002.48
General Funds
19001.52
Total:
50004.00
E-rate - Cellular Stakeholder Involvement E-Rate Year 7
24156.00
General Funds
15444.00
Total:
39600.00
E-rate - Cellular Stakeholder Involvement E-Rate Year 8
30000
General Funds
20000
Total:
50000.00
Page 16 of 45
Technology Activity: #2, Instructional Goal #1, Technology Improvement Objective #2
To provide long distance service for Berkeley County schools for a safer school environment and
improved communication between schools, homes and communities
Persons Responsible
county e-rate coordinator
Activity Type
Stakeholder Involvement
No. Budget Item
1
2
3
Activity Type
Funding Source Est $
E-rate - Long Distance Stakeholder Involvement E-Rate Year 6
22345.44
General Funds
13695.60
Total:
36041.04
E-rate - Long Distance Stakeholder Involvement E-Rate Year 7
16982.40
General Funds
10857.60
Total:
27840.00
E-rate - Long Distance Stakeholder Involvement E-Rate Year 8
20000
General Funds
32000
Total:
52000.00
Page 17 of 45
Instructional Goal #2
All school facilities will provide a safe, disciplined environment to meet the educational needs of all
students.
Instructional Goal #2, Technology Improvement Objective #1
Provide technology hardware and services to support instruction and administration.
Indicators of Achievement:
Collect baseline data on number of computers with various operating systems.
Year 1:
Remove old Apple labs from three elementary schools and install Compass Learning in
(2002-03)
same three schools.
Replace 25 percent of computers with Windows 3.1 operating system at elementary
schools with newer models.
Year 2:
Remove old Apple labs from three more elementary schools and install Compass Learning
(2003-04) in same three schools.
Replace 25 percent of computers with Windows 95 operating system with newer models in
secondary schools.
Replace 10 percent of computers with Windows 3.1 and Windows 95 operating system at
elementary schools with newer models.
Year 3:
Remove old Apple labs from three more elementary schools and install Compass Learning
(2004-05) in same three schools.
Replace 10 percent of computers with Windows 95 operating system with newer models in
secondary schools and admionistrative areas.
Replace 10 percent of computers with Windows 3.1 and Windows 95 operating system at
elementary schools with newer models.
Year 4:
Remove old Apple labs from three more elementary schools and install Compass Learning
(2005-06) in same three schools.
Replace 10 percent of computers with Windows 95 operating system with newer models in
secondary schools and admionistrative areas.
Replace 10 percent of computers with Windows 3.1 and Windows 95 operating system at
elementary schools with newer models.
Year 5:
Remove old Apple labs from two more elementary schools and install Compass Learning in
(2006-07) same two schools.
Replace 10 percent of computers with Windows 95 operating system with newer models in
secondary schools and admionistrative areas.
Technology Activity: #1, Instructional Goal #2, Technology Improvement Objective #1
Add computers to Title I classrooms with which students can learn and practice reading and math skills.
Page 18 of 45
Persons Responsible
Title I Director
School Title I Teachers
County Technology Specialists
Activity Type
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source Est $
Hardware - Desktop Content/Tech Integration Title I
12000
Total:
12000.00
Technology Activity: #2, Instructional Goal #2, Technology Improvement Objective #1
Replace Apple labs with Compass Learning labs at Back Creek Valley, Hedgeaville Elementary, and
Marlowe Elementary Schools to provide more current software on which students can learn and praxtice
reading, language, math, and writing skills. (FY05)
Persons Responsible
County Technology Specialists
IBM Personnel
Compass Learning Personnel
Activity Type
Content/Tech Integration
No. Budget Item
Activity Type
1
Content/Tech Integration BS/CE
Hardware - Desktop
Funding Source Est $
Total:
2
Hardware - Server
Content/Tech Integration BS/CE
Total:
3
Hardware - Printer
Content/Tech Integration BS/CE
Total:
4
5
Hardware - Peripherals
Technical Support - Installation
Content/Tech Integration BS/CE
86000
86000.00
9000
9000.00
4000
4000.00
1300
Total:
1300.00
BS/CE
1900
Total:
1900.00
Technology Activity: #3, Instructional Goal #2, Technology Improvement Objective #1
Install electronic receive-site classrooms at Musselman High School and Hedgesville High School to
Page 19 of 45
enable these schools to receive broadcasts from Martinsburg High School's electronic classroom and
thereby access to courses not available at these high schools. (FY05)
Persons Responsible
Director of Research & Technology
WVU Technology Personnel
County Technology Specialists
Seneca Communications Personnel
Activity Type
Content/Tech Integration
Innovative Strategies
No. Budget Item
1
2
Activity Type
Funding Source Est $
Hardware - Other Innovative Strategies Grants
E-rate - Data Lines Access
59000
Total:
59000.00
E-Rate Year 7
1200
General Funds
1200
Total:
2400.00
Technology Activity: #4, Instructional Goal #2, Technology Improvement Objective #1
Repair, upgrade, replace existing administrative and instructional hardware to ensure that teachers,
students, administrators, and staff have the hardware they need to teach, learn, lead, and meet their job
responsibilities.
Persons Responsible
County Technology Specialists
Pomeroy Repair Personnel
RESA VIII Repair Personnel
IBM Repair Personnel
Activity Type
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
Technical Support - HW maintenance Admin/Support Procedures Step 7
30000
E-Rate Year 6
30000
Total:
60000.00
Technology Activity: #5, Instructional Goal #2, Technology Improvement Objective #1
Install additional hardware as needed in new classrooms, including portables, to ensure that teachers
Page 20 of 45
and students have the hardware they need to teach and learn.
Persons Responsible
County Technology Specialists
Compass Learning Personnel
IBM & Pomeroy Installers
Activity Type
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source Est $
Hardware - Desktop Content/Tech Integration SUCCESS
Total:
2
Hardware - Printer
Content/Tech Integration SUCCESS
Total:
10000
10000.00
1500
1500.00
Technology Activity: #6, Instructional Goal #2, Technology Improvement Objective #1
Repair A-V equipment to ensure that teachers and students have the tools necessary to teach and
learn.
Persons Responsible
County Technology Specialists
RESA VIII Repair Personnel
Activity Type
Content/Tech Integration
No. Budget Item
1
Activity Type Funding Source Est $
Hardware - Other
Step 7
2500
Total:
2500.00
Technology Activity: #7, Instructional Goal #2, Technology Improvement Objective #1
Replace and increase number of calculators used for mat instruction and for standardized math testing.
Persons Responsible
Director, Curriculum and Instruction
Activity Type
Content/Tech Integration
Page 21 of 45
No. Budget Item
1
Activity Type
Funding Source Est $
Hardware - Other Content/Tech Integration Step 7
Total:
2000
2000.00
Technology Activity: #8, Instructional Goal #2, Technology Improvement Objective #1
Provide computers and assistive technology to Special Education classrooms for students to work on
skills at their own level, at their own speed, and with assistance based on their own disability and for
teachers to more effectively plan appropriate instructional programs consistent with current state
Content Standards.
Persons Responsible
Director; Special Education
Activity Type
Content/Tech Integration
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
Hardware - Desktop Content/Tech Integration General Funds
Total:
60000
60000.00
Technology Activity: #9, Instructional Goal #2, Technology Improvement Objective #1
Contract with experts/consultants to address technical problems that cannot be resolved by available
personnel.
Persons Responsible
County Technology Specialists
Activity Type
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
Technical Support - HW maintenance Admin/Support Procedures General Funds
Total:
30000
30000.00
Technology Activity: #10, Instructional Goal #2, Technology Improvement Objective #1
Provide servers, computers, and printers to students and teachers at Spring Mills Middle School,
Gerrardstown/Back Creek Valley Intermediate School (temporary name), and all three high schools to
Page 22 of 45
integrate computers and internet resources in core subjects and develop and enhance their technology
literacy.
Persons Responsible
County Technology Specialists
Pomeroy Personnel
IBM Personnel
Activity Type
Content/Tech Integration
No. Budget Item
Activity Type
1
Content/Tech Integration SUCCESS
Hardware - Server
Funding Source
Total:
2
Hardware - Desktop Content/Tech Integration SUCCESS
Total:
3
4
Hardware - Desktop
Hardware - Printer
Est $
33000
33000.00
60000
60000.00
Ed Tech Formula - Round 2 125000
Total:
125000.00
SUCCESS
12000
Total:
12000.00
Page 23 of 45
Instructional Goal #2, Technology Improvement Objective #2
Provide opportunities for county and school admninistrators to become more technologically literate and
improve knowledge of software adopted for use for their grade orientation.
Indicators of Achievement:
Year 1:
This objective was not included in Year 1.
(2002-03)
Collect baseline data regarding perceived capability and training of adminsitrators.
Year 2:
90 percent of county and school administrators will attend literacy training on specific
(2003-04)
technology (PDAs).
Year 3:
90 percent of county and school administrators will attend literacy training on specific
(2004-05) technology.
Year 4:
90 percent of county and school administrators will attend literacy training on specific
(2005-06) technology.
Year 5:
90 percent of county and school administrators will attend literacy training on specific
(2006-07) technology.
Technology Activity: #1, Instructional Goal #2, Technology Improvement Objective #2
Train county and school administrators on the use of PDAs to improve their technology skills, their
productivity, and their effectiveness as role models for their staff, faculty, and students.
Persons Responsible
Director; Research and Technology
EdVenture Trainers
County Technology Specialists
Dept. of Curriculum and Instruction
Activity Type
Professional Development
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Technology Activity: #2, Instructional Goal #2, Technology Improvement Objective #2
Page 24 of 45
Offer series of workshops for school and county administrators on instructional software and Internet
resources to be used in their job assignments to improve their ability to provide assistance and evaluate
assigned personnel's integration and use of technology.
Persons Responsible
County Technology Specialists
Pomeroy Trainers
Compass Learning Trainers
Other Contracted Trainers
Activity Type
Professional Development
Content/Tech Integration
Admin/Support Procedures
No. Budget Item
Activity Type
1
Content/Tech Integration Step 7
Substitutes
Funding Source
Total:
2
Est $
4500
4500.00
Professional Development Professional Development Ed Tech Formula - Round 2 40000
Total:
Page 25 of 45
40000.00
Instructional Goal #2, Technology Improvement Objective #3
Access transportation files by school and county personnel for busing information and routing and
boundary optimization.
Indicators of Achievement:
Year 1:
100 percent of county will receive 911 addresses.
(2002-03) 95 percent of student WVEIS records will have 911 addresses.
100 percent of relevant county personnel will be trained on using EDULOG NT version.
Year 2:
At least one secretary in each school will be trained to obtain busing information via remote
(2003-04) access.
97 percent of student WVEIS records will have 911 addresses.
Year 3:
97 percent of student WVEIS records will have 911 addresses.
(2004-05)
Year 4:
97 percent of student WVEIS records will have 911 addresses.
(2005-06)
Year 5:
97 percent of student WVEIS records will have 911 addresses.
(2006-07)
Technology Activity: #1, Instructional Goal #2, Technology Improvement Objective #3
Train county personnel to use EDULOG NT for routing optimization and boundary planning.
Persons Responsible
Assistant Director; Transportation
University of North Carolina Personnel
Activity Type
Professional Development
Admin/Support Procedures
No. Budget Item Activity Type
1
Travel
Funding Source Est $
Professional Development General Funds
Total:
2000
2000.00
Technology Activity: #2, Instructional Goal #2, Technology Improvement Objective #3
Train school and county personnel to remotely acces transportation files to obtain bus information for
Page 26 of 45
new enrollees.
Persons Responsible
Assistant Director; Transportation
County Technology Specialists
Activity Type
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 27 of 45
Instructional Goal #3
1. Berkeley County students will be proficient in reading to be able to compete and succeed in a global
environment.
2. Berkeley County students will be proficient in math to be able to compete and succeed in a global
environment.
3. All school facilities will provide a safe, disciplined environment to meet the educational needs of all
students.
Instructional Goal #3, Technology Improvement Objective #1
Provide software and online resources to support instruction and administration.
Indicators of Achievement:
Compass Learning labs will be installed in three elementary schools.
Year 1:
100 percent of grades 7-12 core classrooms will have access to SUCCESS resources.
(2002-03)
75 percent of schools will have library software.
Compass Learning labs will be installed in three elementary schools.
Year 2:
100 percent of grades 7-12 core classrooms will have access to SUCCESS resources.
(2003-04) 100 percent of sixth grade core subject classrooms will be converted to SUCCESS project.
100 percent of schools will have library software.
Compass Learning labs will be installed in three elementary schools.
Year 3:
100 percent of grades 6-12 core classrooms will have access to SUCCESS resources.
(2004-05) 100 percent of sixth grade core subject classrooms will be converted to SUCCESS project.
100 percent of schools will have library software.
Compass Learning labs will be installed in three elementary schools.
Year 4:
100 percent of grades 6-12 core classrooms will have access to SUCCESS resources.
(2005-06) 100 percent of sixth grade core subject classrooms will be converted to SUCCESS project.
100 percent of schools will have library software.
100 percent of all elementary schools will have Compass Learning labs.
Year 5:
100 percent of grades 6-12 core classrooms will have access to SUCCESS resources.
(2006-07) 100 percent of sixth grade core subject classrooms will be converted to SUCCESS project.
100 percent of schools will have library software.
Technology Activity: #1, Instructional Goal #3, Technology Improvement Objective #1
Install Compass Learning software in labs at Back Creek Valley, Marlowe, and Hedgesville Elementary
Schools to provide more current software on which students can learn and practice their reading, math,
language, and writing skills.
Page 28 of 45
Persons Responsible
County Technology Specialists
Compass Learning Personnel
Activity Type
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Instructional Content/Tech Integration BS/CE
Total:
2
Software - Application Content/Tech Integration BS/CE
Total:
3500
3500.00
400
400.00
Technology Activity: #2, Instructional Goal #3, Technology Improvement Objective #1
Install Compass Learning labs at Bunker Hill Elementary, Inwood Primary, and Gerrardstown / Back
Creek Valley Internediate (temporary name) Schools to provide more current software on which
students can learn and practice their reading, math, language, and writing skills.
Persons Responsible
County Technology Specialists
Compass Learning Personnel
Activity Type
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Instructional Content/Tech Integration BS/CE
Total:
2
Software - Application Content/Tech Integration BS/CE
Total:
60000
60000.00
1800
1800.00
Technology Activity: #3, Instructional Goal #3, Technology Improvement Objective #1
Renew licenses for eChoices in the high school to enable students to simultaneously access this career
information and decision-making online resource.
Persons Responsible
County Technology Specialists
Activity Type
Content/Tech Integration
Page 29 of 45
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Instructional Content/Tech Integration SUCCESS
Total:
5000
5000.00
Technology Activity: #4, Instructional Goal #3, Technology Improvement Objective #1
Renew licenses for Bridges online CX for middle schools to enable students to access simultaneously
this career information and exploration online resource.
Persons Responsible
County Technology Specialists
Activity Type
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Instructional Content/Tech Integration SUCCESS
Total:
4000
4000.00
Technology Activity: #5, Instructional Goal #3, Technology Improvement Objective #1
Add licenses and support for Plato courseware and provide computers for remediation in the middle
schools.
Persons Responsible
County Technology Specialists
Middle School Principals
Deputy Superintendent
Dept. Curriculum and Instruction
Activity Type
Content/Tech Integration
No. Budget Item
Activity Type
1
Content/Tech Integration Grants
Hardware - Desktop
Funding Source Est $
Total:
2
Software - Instructional
Content/Tech Integration Grants
Total:
3
Technical Support - SW maintenance Content/Tech Integration Grants
Total:
Page 30 of 45
20000
20000.00
5000
5000.00
4000
4000.00
Technology Activity: #6, Instructional Goal #3, Technology Improvement Objective #1
Provide virtual courses for secondary students for soursework that is not available locally.
Persons Responsible
Director; Curriculum and Instruction
Activity Type
Content/Tech Integration
No. Budget Item Activity Type
1
Salary
Funding Source
Innovative Strategies Step 7
Total:
2
Tuition
Est $
1000
1000.00
Innovative Strategies WV Virtual School 5000
Total:
5000.00
Technology Activity: #7, Instructional Goal #3, Technology Improvement Objective #1
Provide licenses for county-adopted administrative software to Spring Mills Middle School and
Gerrardstown / Back Creek Valley Intermediate School (temporary name) to enable school
administrative personnel to meet their job responsibilities.
Persons Responsible
County Technology Specialists
Activity Type
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Application Admin/Support Procedures Step 7
Total:
250
250.00
Technology Activity: #8, Instructional Goal #3, Technology Improvement Objective #1
Provide MS Office Professional licenses to Spring Mills Middle School and Internet resources for
students and teachers to develop skills in use of technology and in the core subjects.
Persons Responsible
County Technology Specialists
Pomeroy Personnel
Page 31 of 45
Activity Type
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Instructional Content/Tech Integration SUCCESS
Total:
14000
14000.00
Technology Activity: #9, Instructional Goal #3, Technology Improvement Objective #1
Maintain existing Follett Library software licenses to enable students to search holdings for resources
and library/media specialists to keep records on their catalog and circulation.
Persons Responsible
County Technology Specialists
Activity Type
Content/Tech Integration
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Application Content/Tech Integration Step 7
Total:
Page 32 of 45
14000
14000.00
Instructional Goal #3, Technology Improvement Objective #2
Provide software and online resources to support instruction and administration at all school and county
locations.
Indicators of Achievement:
Deep Freeze will be installed on all secondary computers which are compatible with Deep
Freeze.
Year 1:
Norton AntiVirus will be installed on all servers.
(2002-03)
Technology staff will respond to, investigate, and report on each reported incident of
unacceptable use.
All SUCCESS labs will have monitoring software installed.
Deep Freeze will be installed on 100 percent of instructional computers which are
compatible with Deep Freeze.
Year 2:
Norton AntiVirus will be installed on all servers.
(2003-04) 100 percent of school and county personnel will have access to current versions of
software applicable to their job assignment.
Technology staff will respond to, investigate, and report on each reported incident of
unacceptable use.
All SUCCESS labs will have monitoring software installed.
Deep Freeze will be installed on 100 percent of instructional computers which are
compatible with Deep Freeze.
Year 3:
Norton AntiVirus will be installed on all servers.
(2004-05) 100 percent of school and county personnel will have access to current versions of
software applicable to their job assignment.
Technology staff will respond to, investigate, and report on each reported incident of
unacceptable use.
Deep Freeze will be installed on 100 percent of instructional computers which are
compatible with Deep Freeze.
Norton AntiVirus will be installed on all servers.
Year 4:
100 percent of school and county personnel will have access to current versions of
(2005-06)
software applicable to their job assignment.
Technology staff will respond to, investigate, and report on each reported incident of
unacceptable use.
Deep Freeze will be installed on 100 percent of instructional computers which are
compatible with Deep Freeze.
Norton AntiVirus will be installed on all servers.
Year 5:
100 percent of school and county personnel will have access to current versions of
(2006-07)
software applicable to their job assignment.
Technology staff will respond to, investigate, and report on each reported incident of
unacceptable use.
Technology Activity: #1, Instructional Goal #3, Technology Improvement Objective #2
Page 33 of 45
Renew county license for Deep Freeze and insure that Deep Freeze is installed on every computer on
which it can be installed to protect the integrity of the hardware and networks.
Persons Responsible
County Technology Specialists
Activity Type
Admin/Support Procedures
No. Budget Item
1
Activity Type
Funding Source Est $
Software - Application Admin/Support Procedures Step 7
Total:
1200
1200.00
Technology Activity: #2, Instructional Goal #3, Technology Improvement Objective #2
Install Windows version of POS software in all schools to provide school personnel with current version
of software to keep records on meals served and payments made.
Persons Responsible
County Technology Specialists
Assistant Director; Food Service
Director; Food Service
Activity Type
Admin/Support Procedures
THERE IS NO BUDGET ITEM
No. Budget Item
Activity Type Funding Source Est $
No Budget Items
Page 34 of 45
Instructional Goal #3, Technology Improvement Objective #3
Provide technology-related furniture, supplies, and accessories to support instruction and
administration.
Indicators of Achievement:
Year 1:
100 percent of requests met.
(2002-03)
Year 2:
100 percent of requests met.
(2003-04)
Year 3:
100 percent of requests met.
(2004-05)
Year 4:
100 percent of requests met.
(2005-06)
Year 5:
100 percent of requests met.
(2006-07)
Technology Activity: #1, Instructional Goal #3, Technology Improvement Objective #3
Install computer tables in new labs and in new classrooms and portables.
Persons Responsible
Maintenance Department
Activity Type
Content/Tech Integration
Admin/Support Procedures
No. Budget Item Activity Type
1
Supplies
Funding Source Est $
Content/Tech Integration General Funds
Total:
8000
8000.00
Technology Activity: #2, Instructional Goal #3, Technology Improvement Objective #3
Disburse as needed computer supplies: cartridges, toner, paper, pre-printed paper, disks, computer
cleaning supplies, power cords, mice, keyboards, etc.
Persons Responsible
Page 35 of 45
Technology Staff
Activity Type
Content/Tech Integration
Admin/Support Procedures
No. Budget Item Activity Type
1
Supplies
Funding Source Est $
Content/Tech Integration Step 7
Total:
50000
50000.00
Page 36 of 45
Instructional Goal #4
All school facilities will provide a safe, disciplined environment to meet the educational needs of all
students.
Instructional Goal #4, Technology Improvement Objective #1
Enhance community's envolvement and technology-literacy through access and expanded use of
technology.
Indicators of Achievement:
Year 1:
-Collect baseline data on number of technology-related offerings and number of
(2002-03) participants.
Year 2:
-Number of technology-related offerings will increase by five percent.
(2003-04) -Number of participants in technology-related offerings will increase by five percent.
Year 3:
-Number of technology-related offerings will increase by five percent.
(2004-05) -Number of participants in technology-related offerings will increase by five percent.
Year 4:
-Number of technology-related offerings will increase by five percent.
(2005-06) -Number of participants in technology-related offerings will increase by five percent.
Year 5:
-Number of technology-related offerings will increase by five percent.
(2006-07) -Number of participants in technology-related offerings will increase by five percent.
Technology Activity: #1, Instructional Goal #4, Technology Improvement Objective #1
Offer computer and technology courses thought Adult and Community Education.
Persons Responsible
Director, Adult & Community Education
Activity Type
Stakeholder Involvement
THERE IS NO BUDGET ITEM
No. Budget Item Activity Type
1
Salary
Funding Source Est $
Stakeholder Involvement General Funds
Total:
15000
15000.00
Page 37 of 45
Technology Activity: #2, Instructional Goal #4, Technology Improvement Objective #1
Provide opportunities for parents to see and experience software and Internet resources used by their
children during Instructional Support Days.
Persons Responsible
School Administrators
Activity Type
Stakeholder Involvement
THERE IS NO BUDGET ITEM
No. Budget Item
1
Activity Type
Funding Source Est $
Professional Development Stakeholder Involvement No Funds
Total:
0.00
Technology Activity: #3, Instructional Goal #4, Technology Improvement Objective #1
Collaborate with adult literacy providers in the community to provide school computer labs and
classrooms to enhance adult literacy, upon request.
Persons Responsible
Director, Adult & Commnuity Education
County Technology Specialists
School Administrators
Activity Type
Stakeholder Involvement
THERE IS NO BUDGET ITEM
No. Budget Item Activity Type
1
N/A
Funding Source Est $
Content/Tech Integration Business Partners 0.00
No Funds
Total:
0.00
Page 38 of 45
Instructional Goal #5
All school facilities will provide a safe, disciplined environment to meet the educational needs of all
students.
Instructional Goal #5, Technology Improvement Objective #1
Ensure that county and school personnel (educators, administrators, and support staff) receive
adequate training on county-adopted technology appropriate to their job assignments.
Indicators of Achievement:
Year 1:
- 98 percent of new staff will be trained on the appropriate technology for their job
(2002-03) description.
Year 2:
- 98 percent of new staff will be trained on the appropriate technology for their job
(2003-04) description.
Year 3:
- 98 percent of new staff will be trained on the appropriate technology for their job
(2004-05) description.
Year 4:
- 98 percent of new staff will be trained on the appropriate technology for their job
(2005-06) description.
Year 5:
- 98 percent of new staff will be trained on the appropriate technology for their job
(2006-07) description.
Technology Activity: #1, Instructional Goal #5, Technology Improvement Objective #1
Provide initial three-day training to new teachers and administrators in schools that received Compass
Learning Labs in previous years and in schools that will receive new labs in the current year.
Persons Responsible
Compass Learning Trainers
School Principals
County Technology Specialists
Activity Type
Professional Development
Content/Tech Integration
Admin/Support Procedures
Page 39 of 45
No. Budget Item
Activity Type
1
Professional Development Step 7
Substitutes
Funding Source Est $
Total:
2
Professional Development Professional Development BS/CE
Total:
25000
25000.00
6000
6000.00
Technology Activity: #2, Instructional Goal #5, Technology Improvement Objective #1
Provide follow-up training to teachers who were trained on Compass Learning software in previous
years.
Persons Responsible
Compass Learning Trainers
Principals
County Technology Specialists
Activity Type
Professional Development
Content/Tech Integration
Admin/Support Procedures
No. Budget Item
Activity Type
1
Professional Development Step 7
Substitutes
Funding Source Est $
Total:
2
Professional Development Professional Development BS/CE
Total:
2000
2000.00
3000
3000.00
Technology Activity: #3, Instructional Goal #5, Technology Improvement Objective #1
Provide training to teachers of reading, language arts, math, science, and social studies in grades 6-12
on MS Office applications, curriculum integration, and Internet integration
Persons Responsible
SUCCESS Trainers
County Technology Specialists
Activity Type
Professional Development
Content/Tech Integration
Page 40 of 45
No. Budget Item
1
Activity Type
Funding Source
Professional Development Professional Development Ed Tech Formula - Round 2 40000
Total:
2
Est $
40000.00
Professional Development Professional Development Ed Tech Formula - Round 3 40000
Total:
40000.00
Technology Activity: #4, Instructional Goal #5, Technology Improvement Objective #1
Provide new county and school staff with technology-related training appropriate to their job
assignments: WVEIS, POS, MS Office, Edulog, Internet, Email, Web design, etc.
Persons Responsible
County Technology Specialists
Activity Type
Professional Development
Admin/Support Procedures
No. Budget Item Activity Type Funding Source Est $
1
Substitutes
Step 7
10000
Total:
10000.00
Page 41 of 45
Compliance Checklist
Ed Tech Compliance Checklist
1. Does the county plan include the county's specific goals for using advanced technology to improve
student achievement?
yes
This is addressed under Goal 3 Objective 1 and Activity 5
2. Does the plan include strategies that address how Ed Tech Funds will improve academic
achievement of all students in all schools in the county? (Emphasis should be given to high-need and
high-poverty schools)
yes
This is addressed under Goal 2 Objective 1 and Activity 10
3. Does the county plan include strategies that address how to ensure that all students and teachers will
have increased access to technology?
yes
This is addressed under Goal 2 Objective 1 and Activity 5
4. Does the county plan include plans to provide ongoing professional development for teachers,
principals and administrators to further the effective use of technology?
yes
This is addressed under Goal 5 Objective 1 and Activity 1
5. Does the county plan include a budget (description of type and costs of technology to be acquired
with Ed Tech formula and /or competitive funds)?
yes
This is addressed under Goal 2 Objective 2 and Activity 2
6. Does the county plan include strategies that address how to encourage the development and use of
innovative strategies for the delivery of specialized or rigorous courses (e.g., distance learning)?
yes
This is addressed under Goal 2 Objective 1 and Activity 3
7. Does the county plan include strategies that address how to use technology to promote parental
involvement to increase communication with parents?
yes
This is addressed under Goal 4 Objective 1 and Activity 2
Page 42 of 45
8. Does the county plan include strategies that address how the technology programs will be developed
in collaboration with adult literacy providers?
yes
This is addressed under Goal 4 Objective 1 and Activity 3
9. Does the county plan include strategies that address how the county will evaluate the extent to which
activities funded in formula and competitive funds are effective in integrating technology?
yes
This is addressed under Goal 2 Objective 1 and Activity 10
E-rate Compliance Checklist
1. Does the county plan include the E-rate requirements for clear goals and a realistic strategy for using
telecommunications?
yes
This is addressed under Goal 1 Objective 1 and Activity 8
2. Does the county plan include strategies that address the computer equipment currently available or
budgeted for purchase?
yes
This is addressed under Goal 2 Objective 1 and Activity 4
3. Does the county plan include strategies that address the internal connections that the county has in
place or budgeted to install in the current, next or future academic years?
yes
This is addressed under Goal 1 Objective 1 and Activity 9
4. Does the county plan include strategies that address the computer software necessary to
communicate with other computers over an internal network?
yes
This is addressed under Goal 3 Objective 1 and Activity 1
5. Does the county plan include the professional development plan for professionals using the
equipment connected to the telecommunications network?
yes
This is addressed under Goal 5 Objective 1 and Activity 3
6. Does the county plan include the existing or budgeted maintenance contracts to maintain computers?
yes
This is addressed under Goal 2 Objective 1 and Activity 4
7. Does the county plan include specific plans for using telecommunications technologies and how they
Page 43 of 45
integrate the use of these technologies into the curriculum?
yes
This is addressed under Goal 5 Objective 1 and Activity 3
8. Does someone else other than your county personnel submit your local E-rate application?
yes
This is addressed under Goal Objective and Activity
9. E-rate requires that we report the number of schools in each county that have the following Internet
Connections:
Number of schools in the county with Dial up modem connections to the Internet?
0
Number of schools in the county with 56 K frame relay connection to the Internet?
0
Number of schools in the county that have T-1 frame relay connections to the Internet? 27
Number of schools in the county that have ATM T-1 Internet connections?
0
Number of schools in the county that have cable modem connections to the Internet? 0
Page 44 of 45
Policies and Procedures
Do you have an Acceptable Use Policy?
yes
If yes, what is the last date of adoption/revision?
5/17/2004
When was the public meeting held for CIPA Compliance?
9/23/2004
Provide the URL to your acceptable use policy.
http://boe.berk.k12.wv.us/pdf/berkeley%20county%20
Page 45 of 45