Office of Financial Management Washington State Major Project Status Report June 30, 2009 Agency Number: 699 Agency: State Board for Community & Technical Colleges Project Number: 04-2-692 School/Campus (if applicable): Everett Community College Project Title: Undergraduate Education Center Bill Reference: Chapter 26, Section 802, Laws of 2003, 1st Special Session Contact Name, phone number, email: Patrick Sisneros, Vice President College Services, 425-388-9026, psisneros@everettcc.edu Thom Watson, Interim Director of Facilities, 425-388-9516, twatson@everettcc.edu Project Description: Located on the main campus of Everett Community College in the City of Everett, the Undergraduate Education Center (Gray Wolf Hall) is a 77,000 gross square foot growth building that includes critically needed new space for classrooms, labs, faculty offices and support space. The facility provides space for programs focused on students that obtain a two-year and then seek to transfer to a university for a four-year degree. As a result of ESSHB 1794 (2005) and SHB 3113 (2006), the legislature provided funding to relocate the University Center of North Puget Sound into this facility. The facility provides space to expand existing and create new partnerships with universities. To support the additional students, staff and faculty generated by the Undergraduate Center, a 3,300 gross square foot addition to the Early Learning Center (ELC) (childcare) at the College is included as part of this project. To accommodate continuing growth in college enrollment, the acquisition of property and the construction of parking is required and is also included as part of this project. As a result of significant construction cost inflation, strategies were employed including reducing the scope of this project to ensure the project remained within budget. Project Total Cost Phase Predesign Design Property Acquisition Construction* Other (Approp/Non Approp) Biennium 2003-05 2005-07 2005-07 2007-09 2007-09 Appropriation G44 – Fund 060 H73 – Fund 057 H73 – Fund 057 Amount 126,000 3,109,000 7,800,000 35,777,000 5,125,000 51,937,000 Total *MACC = $32,171,000 (Includes GC/CM Risk Contingency & General Conditions) 1 Schedule: Predesign Complete Start Design Bid Date Notice to Proceed 50% Complete Substantial Completion Final Acceptance Budget Schedule 05/01/04 07/01/05 04/01/07 07/01/07 02/01/08 09/01/08 11/01/08 Actual/Forecast 06/01/04 02/01/06 05/01/07 09/04/07 05/01/08 12/12/08 06/01/09 Variance (wks) 4 31 1 9 13 15 30 Project Status and discussion of Critical Path for Construction: The project utilized the General Contractor/Construction Manager (GC/CM) contract method. The GC/CM was M. A. Mortenson Company. The Maximum Allowable Construction Cost was signed in August 2007 and M. A. Mortenson was issued their Notice to Proceed on September 4, 2007. Substantial completion was issued December 12, 2008, and final completion was issued June 1, 2009. We have submitted LEED documentation and anticipate achieving a Leadership in Energy & Environmental Design Gold rating. Everett Community College has fully occupied this building’s classrooms and offices. We are working to resolve some heating and cooling issues. Contract Award History A/E Agreement Original Agreement $ 1,961,300 Amendments Other Agreements Pending Changes $ $ $ 1,288,000 430,000 0 Total $ 3,679,300 $ 0 0 Current Design Contingency Construction Contract (excl. sales tax) Bid Award GC/CM $ 30,856,000 Bid Award ELC $ 2,194,000 UEC Change Orders $ 0 UEC Pending Changes$ 0 ELC Change Orders $ 393,000 ELC Pending Changes $ Total $ 33,443,000 UEC Bid Savings $ Current Contingency $ 2 0 0 Potential for Project Cost Overruns/Claims At this phase of the project there are no claims pending, and the potential for claims is perceived to be low. Discussion of Project Quality The project follows established campus building standards and complies with City of Everett and State of Washington codes and practices. The final site location selected for the project is consistent with the intent of the College Master Plan to create a strong “heart” at the center of the campus. The building is designed to meet the needs of partnering with four-year institutions as well as the transfer program needs of Everett Community College. Sustainable design practices were implemented to the fullest extent feasible to make the building as energy efficient, long-lived, easy-to-maintain and as healthy as possible; LEED Silver certification or better is the design goal and initial feedback from the U.S. Green Building Council is that a Gold rating is likely. Project parking needs identified in the Master Plan and by agreement with the City of Everett has been accommodated through the acquisition of property adjacent to the campus. Project Photographs Project photographs follow on the next pages. 3 Everett Community College - Gray Wolf Hall Everett Community College - Gray Wolf Hall – North Wing 4 Everett Community College - Gray Wolf Hall – University Center Reception Area Everett Community College - Gray Wolf Hall – Faculty Office Hallway 5 Everett Community College - Gray Wolf Hall – First Floor Student Study Area Everett Community College - Gray Wolf Hall- Third Floor Student Study Area 6 Everett Community College - Gray Wolf Hall – Double Classroom w/Sliding Partition Everett Community College - Gray Wolf Hall – Anthropology Classroom 7 Everett Community College - Gray Wolf Hall - The Studio Flexibility in furnishings, and technology including portable whiteboards, notebook PC’s & Smart Board (interactive whiteboard) Everett Community College - Gray Wolf Hall The Studio 8 Everett Community College - Gray Wolf Hall - Video Conference Room Everett Community College – Gray Wolf Hall Classroom with Retractable Computer Modules 9