Office of Financial Management Washington State Major Project Status Report December 18, 2007 Agency Number: 290 Agency: SBCTC Project Number: COP 06-3-022 School/Campus: Clover Park Technical College Project Title: Student Center Bill Reference(s): Chapter 488, Section 909(5)(c), Laws of 2005 Contact Name, phone number, email: Tony Robinson, 253/589-5845, tony.robinson@cptc.edu Project Description: Clover Park Technical College serves 4,702 FTE's, with a total headcount of nearly 23,000 students annually. As the number of students at CPTC continues to increase, the demand for a Student Center on campus has grown. Currently, services for students are scattered throughout the campus. This lack of centralization makes it inconvenient and timeconsuming for students to access services. Existing facilities are inadequate in size to accommodate large gatherings, which limits student participation in campus events. Furthermore, there are no facilities on the campus that provide access to recreational or social activities. As students are typically within a program for 6 hours a day, they do not have the opportunity to network with other programs, socialize with other students, or go home between classes. A Student Center is essential to provide these social/recreational opportunities on campus, improve access to student services, and meet the needs of the CPTC students. During the design of the Student Center facility, it became apparent that the city of Lakewood would benefit from this project by expanding the size of the auditorium. With this in mind, the auditorium has been increased by 10,700 sq. ft., in order to accommodate seating of 1,500 people. The city of Lakewood agreed to furnish the College with $2,037,000.00, payable over a 20-year period in equal payments. This will allow the College and city to partner on future events that will benefit all. Square feet: Original request 36,500; Current Design 48,037 Scope Changes: During the pre-design phase, the auditorium and culinary arts spaces were increased to meet program and college needs. Additionally, due to the partnership with the city of Lakewood on the auditorium space, the total building size was increased by 11,537 sq. ft. This included the expansion of the auditorium space and related public spaces required by the expansion. The design of the building allows for open, internal gathering space, in addition to the auditorium that can support both College and city functions such as meetings, events, conferences, etc. 5/28/2016 1 Project Total Cost: Phase Predesign Design Construction * Other (Approp/NonApprop) Total Biennium 2003-05 2003-05 2005-07 2005-07 Appropriation Amount Local $188,150 Local $1,289,851 COP $14,000,000 City of Lakewood $2,037,000 $17,515,001 * MACC = $13,260,000 Schedule: Predesign Complete Start Design Bid Date Notice to Proceed 50% Complete Substantial Completion Final Acceptance Budget Schedule Jun 04 Sep 04 Mar 06 Apr 06 Dec 06 Jun 07 Sep 07 Actual/Forecast Jun 04 Dec 04 Apr 19, 2006 May 25, 2006 Dec 06 Jun 07 Oct 07 Variance (wks) 0 12 4 4 0 0 1 Project Status and discussion of Critical Path for Construction: Contract Award History A/E Agreement Original Agreement Amendments Pending Changes Total Current Design Contingency $ $ $ $ 824,875.00 653,126.00 .00 1,478,001.00 $ 75,000.00 Construction Contract (excl. sales tax) Bid Award Amount $ 11,641,900.00 Change Orders $ 160,752.00 Pending Changes $ 44,068.00 Total $ 11,846,720.00 Current Construction Contingency $ 987,709 Potential for Project Cost Overruns/Claims None at this time Discussion of Project Quality The project quality is excellent, and the contractor and architect worked as a team to ensure that the facility was completed on time. The only thing remaining is completion of some minor punch-list items. The building was opened and occupied on October 23, 2007. Project Photographs Attached are photographs of the completed building. 5/28/2016 2