Projections for Planning Purposes Only Not to be Used without Updating after December 15, 2002 Table 4.A Estimated costs and returns per Dryland St. Lawrence Area 2 x 1 2002 Projected Costs and Returns per Acre _______________________________________________________________________ ITEM UNIT PRICE QUANTITY AMOUNT YOUR FARM _______________________________________________________________________ dollars dollars INCOME cotton lint lb. 0.40 150.0000 60.00 _________ cotton seed lb 0.04 234.0000 9.36 _________ -------TOTAL INCOME 69.36 _________ DIRECT EXPENSES SEED seed (1st planting) seed (replant) CROP INSURANCE crop insurance HERBICIDES RU banded w/ planter RU banded with repla spot spray cyclone defoliant HARVEST custom ginning cttn hvst. var. cost OPERATOR LABOR Tractors cotton module DIESEL FUEL Tractors cotton harvester FC cotton module REPAIR & MAINTENANCE Implements Tractors cotton module INTEREST ON OP. CAP. lb. lb. 1.10 0.24 9.0000 3.0000 9.90 0.72 _________ _________ 18.00 1.0000 18.00 _________ pt. pt. pt oz. 1.00 1.00 1.50 0.25 1.5000 0.8000 2.5000 20.0000 1.50 0.80 3.75 5.00 _________ _________ _________ _________ lb. lb. 0.09 0.05 150.0000 150.0000 13.50 7.50 _________ _________ hour hour 5.75 5.75 1.7321 2.0000 9.95 11.50 _________ _________ gal gal gal 1.10 1.10 1.10 13.5797 8.0000 8.0000 14.93 8.80 8.80 _________ _________ _________ 7.87 11.32 3.00 5.45 1.0000 1.0000 1.0000 1.0000 7.87 11.32 3.00 5.45 -------142.32 -72.96 _________ _________ _________ _________ 14.32 23.95 6.75 2.00 -------47.03 -------189.35 -119.99 _________ _________ _________ _________ acre acre TOTAL DIRECT EXPENSES RETURNS ABOVE DIRECT EXPENSES FIXED EXPENSES Implements Tractors cotton harvester FC cotton module 14.32 23.95 6.75 2.00 TOTAL FIXED EXPENSES TOTAL SPECIFIED EXPENSES RETURNS ABOVE TOTAL SPECIFIED EXPENSES 1.0000 1.0000 1.0000 1.0000 _________ _________ _________ _________ _________ ALLOCATED COST ITEMS Prop. Tax Dry Land acre 15.00 1.0000 15.00 _________ RESIDUAL RETURNS -134.99 _________ _______________________________________________________________________ Universal Parameters for Distict 6 were taken from District 8. Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of Texas Cooperative Extension and approved for publication. B-1241 (C6) Projections for Planning Purposes Only Not to be Used without Updating after December 15, 2002 B-1241 (C6) Table 4.B Estimated resource use and costs for field operations, per Dryland St. Lawrence Area 2 x 1 2002 Projected Costs and Returns per Acre ____________________________________________________________________________________________________________________________________________ _ TRACTOR COST EQUIP COST ALLOC LABOR OPERATING INPUT OPERATION/ SIZE/ TRACTOR PERF TIMES -------------- -------------- ---------------------------------TOTAL OPERATING INPUT UNIT SIZE RATE OVER MTH DIRECT FIXED DIRECT FIXED HOURS COST AMOUNT PRICE COST COST ____________________________________________________________________________________________________________________________________________ _ ------------dollars----------dollars -------dollars-------shredder chisel lister 8 row planter / replanter seed (1st planting) lb. RU banded w/ planter pt. row cultivator planter / replanter seed (replant) lb. RU banded with repla pt. row cultivator 3-point sprayer spot spray pt row cultivator 3-point sprayer cyclone defoliant oz. cotton harvester FC acre cotton module acre boll buggy custom ginning lb. cttn hvst. var. cost lb. crop insurance acre 150 180 180 150 0.597 0.133 0.133 0.137 1.00 1.00 1.00 1.00 Dec Jan Feb May 9.12 1.94 1.94 2.09 8.54 1.50 1.50 1.96 0.93 0.23 0.69 2.17 3.14 0.50 1.10 3.46 0.597 0.133 0.133 0.137 3.43 0.76 0.76 0.79 25.19 4.95 6.00 10.50 9.0000 1.10 9.90 9.90 1.5000 1.00 1.50 1.50 150 0.103 1.00 May 1.57 1.47 0.49 0.77 0.103 0.59 4.90 150 0.137 1.00 Jun 2.09 1.96 2.17 3.46 0.137 0.79 10.50 3.0000 0.24 0.72 0.72 0.8000 1.00 0.80 0.80 150 0.103 1.00 Jul 1.57 1.47 0.49 0.77 0.103 0.59 4.90 150 0.125 1.00 Jul 1.90 1.78 0.05 0.08 0.125 0.71 4.54 2.5000 1.50 3.75 3.75 150 0.103 1.00 Aug 1.57 1.47 0.49 0.77 0.103 0.59 4.90 150 0.125 1.00 Oct 1.90 1.78 0.05 0.08 0.125 0.71 4.54 20.0000 0.25 5.00 5.00 1.00 Nov 8.80 6.75 1.0000 15.55 1.00 Nov 11.80 2.00 2.000 11.50 1.0000 25.30 150 0.033 1.00 Nov 0.50 0.47 0.07 0.14 0.033 0.19 1.39 1.00 Nov 150.0000 0.09 13.50 13.50 150.0000 0.05 7.50 7.50 1.00 Nov 1.0000 18.00 18.00 18.00 ------- ------- ------- ------- ------ ------------- ------TOTALS 26.26 23.95 28.47 23.07 3.732 21.45 60.67 183.90 INTEREST ON OPERATING CAPITAL 5.45 UNALLOCATED LABOR 0.00 TOTAL SPECIFIED COST 189.35 ____________________________________________________________________________________________________________________________________________ _ Universal Parameters for Distict 6 were taken from District 8. Information presented is prepared solely as a general guide and is not intended to recognize or predict the costs and returns from any one particular farm or ranch operation. These projections were collected and developed by staff members of Texas Cooperative Extension and approved for publication.