PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 531 CHRISTMAS TREE PRODUCTION (CHOOSE AND CUT), FOURTH YEAR NORTHEAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE CATEGORY PROJECTED YIELD UNIT GROSS RECEIPTS TREES TOTAL PROJECTED RETURNS 630.00 VARIABLE COSTS PREHARVEST COSTS ♦POISON GRAIN ♦POST-EMERGE HERB ♦INSECTICIDE SHEARING LABOR PRE-EMERGE HERB. INSEC APPL LABOR FUEL & LUBE--TRACTOR R E PA I R S T R A C T O R EOUIPMENT LABOR MACHINERY OPERATING CAPITAL SUBTOTAL, PREHARVEST HARVEST COSTS ♦COLORING COLORING LABOR ADVERTISING P-RATED EQP COST SAWS HARVEST LABOR SUBTOTAL, HARVEST PROJECTED YOUR S/UNIT VALUE ESTIMATE EACH 15.00 LB. GAL. LB. HOUR LB. HOUR ACRE ACRE ACRE HOUR DOL. ACRE 0.65 90.00 7.70 4.50 13.00 4.88 GAL. HOUR TREE ACRE EACH HOUR ACRE 9.50 4.50 1.00 21. 10 5.75 4.50 ACRE $ 9450.00 $ 9450.00 $ INPUT USE 1.50 0.66 7.50 35.00 2.00 16.20 8.02 -501.97 6.00 6.00 630.00 1.00 5.00 36.00 TOTAL VARIABLE COSTS BREAK-EVEN PRICE, VARIABLE COSTS j0l^\ B-1241(C11) 5.50 0. 140 $ 0.97 59.40 57.75 157.50 26.00 79.06 16.46 3.52 3.07 44.12 -70.28 377.57 $ $ 57.00 27.00 630.00 21.10 28.75 162.00 925.85 $ 1303.42 $. $ 2.07/EACH TREES 3. INCOME ABOVE VARIABLE COSTS ACRE 4. FIXED COSTS DEPREC..INTEREST,TAXES & INSUR. TRACTOR EQUIPMENT LAND-CASH RENT 1.00 P R O R AT E D E S TA B L 1 6 3 6 . 7 8 RETURN ON INVEST 1636.78 TOTAL FIXED COSTS ACRE ACRE ACRE DOL. DOL. ACRE 60.48 66.36 15.00 15.00 1.00 1636.78 O. 18 294.62 $ 2073.24 $" 5. TOTAL PROJECTED COSTS ACRE $ BREAK-EVEN PRICE. TOTAL COSTS 6. NET PROJECTED RETURNS $ 8146.58 $ 3376.66 $. $ 5.36/EACH TREES ACRE $ 6073.34 $ ESTAB COST INCLUDES ALL DEV AND MAIN COSTS FROM YEAR 1 TO THE CURRENT YEAR RET ON INV COST IS INTEREST CHARGE ON DEVELOPMENT COSTS IN PAST YEARS. PREPARED BY WAYNE D. TAYLOR. TAEX. OVERTON. TEXAS. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. C11.47 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84, 531 B - 1 2 4 K C 11 ) CHRISTMAS TREE PRODUCTION (CHOOSE AND CUT). FOURTH YEAR NORTHEAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER ACRE MACHINERY OPERATION GOPHER POISONER SHREDDER(2R) T SPRAYER. C. TREE SHREDDER(2R) T SPRAYER, C. TREE SHREDDER(2R) T SPRAYER, C. TREE SHREDDER(2R) T SPRAYER, C. TREE SHREDDER(2R) T SPRAYER, C. TREE SHREDDER(2R) T SPRAYER, C. TREE SHREDDER(2R) T TANDEM DISC T MACH ITEM OPER TIMES LABOR MACHINE OPER LABOR NO. MONTH OVER HOURS HOURS COSTS COSTS 5,41 5,30 5,99 5,30 5.99 5,30 5,99 5,30 5,99 5,30 5.99 5,30 5,99 5,30 5,33 FEB APR APR MAY MAY JUNE JUNE JULY JULY AUG AUG SEPT SEPT OCT OCT TOTALS 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 2.00 1.00 1.00 1.00 1.00 1.00 0. 12 0. 101 0.549 1.008 0.549 0.504 0.549 0.504 0.549 1.008 0.549 0.504 0.549 0.504 0.549 0.044 0.076 0.416 0.764 0.416 0.382 0.416 0.382 0.416 0.764 0.416 0.382 0.416 0.382 0.416 0.033 8.022 6.077 0.27 1.43 3. 16 1.43 1.58 1 .43 1.58 1 .43 3. 16 1.43 1.58 1.43 1.58 1.43 0. 12 0.55 3.02 5.55 3.02 2.77 3.02 2.77 3.02 5.55 3.02 2.77 3.02 2.77 3.02 0.24 APPL. MACH INPUT FIXED COSTS COSTS TOTAL OPER. COST 0 . 9 7 1.07 0.0 6.89 39.32 19.28 0.0 6.89 9.62 9.64 0.0 6.89 9.62 9.64 0.0 6.89 39.32 19.28 0.0 6.89 9.62 9.64 0.0 6.89 9.62 9.64 6.89 0.0 0.41 0.0 2.87 11.34 67.31 11.34 23.62 11.34 23.62 11.34 67.31 11.34 23.62 11.34 23.62 11.34 0.77 23.04 44. 12 118.12126.84 312.12 RESIDUAL RETURNS AT ALTERNATIVE YIELDS AND PRICES ADJUSTED FOR YIELD-RELATED COSTS AND CHANGES IN SHARE-RENT INCOME ABOVE VARIABLE COSTS LESS SHARE-RENT PRICE OF TREES (DOLLARS) 12 00 13.50 15.00 16 50 504.00 4925 53 5681.53 6437.53 7193 53 7949 53 | 567.00 5591 05 6441.55 7292.05 8142 55 8993 05 ! 630.00 6256 58 7201.58 8146.58 9091 58 10036 58 | 693.00 6922 11 7961.61 9001.11 10040 61 11080 11 | 756.00 7587 63 8721.63 9855.63 10989 63 12123 63 | EACH 18 0 0 i QUANTITY OF TREES L C11.48 -k oi4k coro-k ii u ii ii ii O O H 0 3 X > O O C m r-NZ> . . O -^ Oto co -jo) ii ii ii ii ii > o x > o o o o o > S-CCTJi— cn TJmm _X _t _* -. 4k coro-k ii n ti ii O TJ|-> H . i -Z4 m - iOt H Z _k -I. _•. -L oo -j cd in it ii ii ii |4> VD o o o o • N€0 W» HITl • • rororo-k ro -»Oto n ii n ti o tn > -n • OTjm X "n Tjm OHI- H rororo ro cntn j> to -<intn73iiOTJtv)TJO00TJ00inin-noootntninintnooooEOOOOO00-ii37JTJOO00O00lin-Tim3 C 0 3 - 0 > 0 > S > 0 7 3 i - « 0 0 0 » - « > T 3 0 C > > > O O O m m X > T J O m m 7 3 m > > O C C C 7 3 m H m O i - « OCm<<stni/i>ni6)>€€Zr>ZDrrr<HHimm-i>nTi-iioniJjMrMrrrmHninior X-i ci 3H Hinm tj i-i-HMO tjh H hob hhm4-4> tn mzm 4-44-4Q 7^ tnr-tji-r-r~ m Timoin 3^ ocoCHOtn > • ii n ii ti S7\Gim OJETJ> ■n l J O I z ooi-mmi-im< omTjm I-I H m 3 z5 c z I t —{ oi in in 4k 4* 4k j> 4k 4k j> j> 4k j> 4k Jk 4k j> j> 4k j>j> 4k j>j^ j» 0303 to to to to to co 03 to to to rororororororororororororo OOOtoioiotototocoooa)cnc^in4kio-k-k-*oooootoiocoo)(xiJ>jA4k-kCDCD^^ijit:n4kco M-^Otooocninio-*m4k4kCoooioMCD4kOtDtoro-*otoroo3^coco-kOco-kOoocnoi-*o-'Ow o o I i n r - i i n r o t n i n t n i m 7 3 C i - « O i — < < < < 3 3 H 3 3 3 3 3 3 O O O O X 0 3 O t n o r o 4 - 4 | - T J T J Z - n - n " Ti I - < mm4-4mX4-4r-CCOr-mHZr-T3mmmmi-44-4>4-40>>>>ccco>OHm i z»-iOIi-immmj>c xjmH>>HmTJTJTJCmHi-icnm HHHHininxin3TJ737373intninwcOHTJ-n4kin3HOHTJTJTJ-<:o 00OHH<H> TJTJTJI-OCI-OO O O m O H 7\ 7\ 7Z 7\ H H H H X~ to H m O i m m J> in TJ H H H I 4-4 m Mmzr-r*r-MHTJMtjz>3333• • tn mmmmooooouron tmjo ~.*t O 73 > Z 73 4-4 4-4 4-4 4-4 Z 73 Z H- Mtnmmmm mTJHHHH3333 HZ •-• H IIO^^^T) 4-4 O m Z Gi zmmmOM •-» Z oooomm x m m m m i-i oj> V>> *t mutjzxtjm Oinintn O O m TJ CD hhhXX TJOZZZZIOOOOTJOOS) Z O HZ www o Z mo mzwtj cpoootjtj mooooo>>>r2(/iHH m m OZ ZC tj H m HHHinm z 73 cr-r->TJZ> O >>> O > c -<•-• 3 MZZZZZ ino r-m4-4Zfiomzc m tjtjtjoo z x~ Z it smmminin mm m z h m h m its tj tj o c o i< C T3 mm Z730 ooz rr-i-cormm m 3 • o o C • O * "* _: -• *". H tn in co ooOwH H Z o o o o o o o > o o > O T j m m i n i o o 3 - n T J O O i n 3 " n o x o i n i n o o o o o J > O O O H O O > I T J O O > H I T J O > O O S O O O O O m C O O X O > i - i O i - i O m 7 ; O i - « > - o > 6 ) H H H H H TJH TJCnr-TJOOi—r-TJTJOOf4—737J22222 m 3 Cl 73 o o > x- > i - H O r - H m l o m o * O l m m o i O X X I X O I X X I I i m r o o o > m m o o > O r - H r r . — i — r - r - a i > O C 0 O O O O > m O > € £ O m > > > m o m m m m o m m m m m m > > > O > J > £ £ O H 0 0 O C 0 0 0 a J C 0 a j a j J > o 73zr>zo>rOHlr>oor>r>>>>r>>>>>>rrr?jrr hhtj* • z i—tj m • o XO* X• OilOOOOO000000mmmmmm« • m mm 3> m t/i z 3 o o O m r~ Tl 3 m > cno -k roo -JtnOfoo-^O moo oo oo to -j tno -JJ> tno -4-001 4k -k co co j> co oooo oo -j QOO oro -joOOOO co 00 4kroooiroooo0 4kOOOOOOtnOOOOOa)tnoto-Jt000 4kOlooooitDOiOOOOinoiOOOOOO If-in Z o o H X m TJ TJ 4-i 4-1 z _* _» ro tn j > c o - k j > c n o o r o - * - *■ - •■- » • - k t o - k ^ o o o c n j > t n t o 4 k c n - > j - > i r o - 4 . -k oooo oi ro->ioio ■* too) to co cooo->. to ooo-*-* too ooooooo-* 4k roo -* J> otoorooo 4k ooo -omo to to J J ! 0 C C C C C m O C h ZZr-r-r-r-r-73inr-7J O tOCO-v! moooon r - o a r - r - H o o > > > x > l o o o o o o o o o i l i - o o H r - 0 3 r ' O J O O o o o o o o o r - o x o x o o o i o o o o o 00C0300O>OOOmOm€€€€:€e£€:smm00CO00C 0DCCCC £C • 00€mmcsicmCCE€ • • • • Zr 7JTJTJ>TJ>HHHHHHHHHJ>>- • Z H • H • I • H > in > H H H > H H H O H Honor co rororo zmr- >> OOTJTJTJTJTJOmTJO m oo > mtnrsi o -ri-ntn m73>TJ z tjtjtj > i-i h TimmX "n zm>cp >2Zmi-4 ititmTi-iZ-i OOOhjj tj OTJ>mTJ m. mr~ z >mmmi-4m3 H3Z Ztn mm in m m 73 oinm>>oz o r2H(/io rOTjmoOZmi-iT3mo3 mmt~ZZ O Z 2 tn TJ I CMr»tOO>i/i OZO mTJTJ 00 HO ff)OXJ>Z it IHhOO TJ OO hQI I-TJ < to > t~ H < tj in* om> m m rci hhsz o Z <-< Cl <■< OOm r-< m I r~ < m mmtnmo C Z in tj tj > m tj m - v. 4 - 4 . h X ininTJ in m<mm TJ>mmo 3HH om> tntnz tjtj c tjtj o oo nmwTJ tnmotn m c tj hhh >m S3 3 33 >o -ntn tn tn O H 73 > • • »h |TJ HH HH 73 X~ £ m o w m tn o H> m <in tj h z rTJ m in O O t n « 1 TJ T J I o o o o o o i x x i x o o i n o i n o 1 I o o > o o > 0 > 0 0 0 0 0 > » H O H O o o O X 1 I c -< 4-4 TJH TJ m 1 c l-l>4-400000»-l4-4^>3^> TJ i - i tj r* 73 cn in tn in in 73 73 tj r-tj rZH ci-i 1 r* r~ ii ti ii ii 73 >• o o o o OiDioio^^tJitnoitnoiJ>cococotorororo-kOOOOiotDiotoiD^^^^^^CD4kJiJ>roN3roro-k-A_i_k 0 4krooo)0»toro-iOioco^winiOJ^o-kCoJ>to-kC0 4kto-kOtn4kcoN3-kO-kioco-'^ro-'0^w hio^« o 1 ~ ) 4-4 O m m H 1 O TJ 7» i t O m < m o H O 73 73 m o •H o H m 3 > 3 m z z c X to m 71 • -* • a Z 3 O o c z o 5 H m •• 4-4 H _ k -* J> ro ro-J ro -k ro-kOtoooi J>cnoi ro -*io - »■ -k-k ro O-'in-^OOO^JOOOOOOOOO to-k in 4kO-*-* cno oo roo ooo J>o to too-^oi-4-^ co->iooooooido oroooooooooioo-*ooo^^ooiooiooootno-kioco0 4^otootjioco^oo-*torotoro-k-k0) O O O O O O O O O O t o m O o O O O O o o i O O O O O O O O O O O t n O O O i O O O O -L - j o o w o m o o i w c n o TJ TJ 4-4 o m o ■ si CO J> LISTING OF THE NAME SET AND PRICE VECTOR REGION NUMBER: 11 DATE: CODE ITEM NAME NMOD UNIT PRICE CODE 503 CUSTOM HARVEST CORN BU. 0.30 504 CUSTOM HAUL CORN BU. 0.25 505 INSECTICIDE CORN ACRE 8.00 510 SEED COTN LB. 0.42 5 11 H E R B I C I D E C O T N A C R E 1 6 . 0 0 512 INSECTICIDE COTN APPL 9.00 520 SEED GSRG LB. 0.75 521 HERBICIDE GSRG ACRE 17.00 522 INSECTICIDE GSRG APPL 9.00 525 CUSTOM HARV/HAUL GSRG CWT. 0.67 530 H AY BALE 2.00 531 H AY H.L. BALE 2.00 532 SPRIGS ACRE 20.00 5 3 3 H E R B I C I D E H AY A C R E 7 . 0 0 540 SEED O AT LB. 0.20 541 INSECTICIDE SMGN APPL 6.00 542 CUSTOM COMBINE OAT ACRE 15.00 5 4 3 C U S T O M H A U L O AT B U . 0 . 1 8 5 4 4 S E E D ( T R E AT E D ) W H E T L B . 0 . 1 5 545 CUSTOM COMBINE WHET ACRE 20.00 546 CUSTOM HAUL WHET BU. 0.25 547 HERBICIDE WHET OZ. 15.00 550 SEED SYBN LB. 0.21 551 HERBICIDE SYBN ACRE 15.50 552 INSECTICIDE SYBN APPL 9.00 553 CUSTOM COMBINE SYBN ACRE 20.00 554 CUSTOM HAUL SYBN BU. 0.25 555 INNOCULANT SYBN ACRE 1.35 556 CUSTOM COMBINE SYBN ACRE 20.00 560 SEED SPEA LB. 0.85 561 HAND HARVEST SPEA BU. 3.00 562 CUSTOM HAUL SPEA BU. 0.55 563 SACKS SPEA EACH 0.25 564 HERBICIDE SPEA ACRE 8.45 565 INSECTICIDE SPEA ACRE 5.25 568 TREES CHOS EACH 15.00 569 ADVERTISING CTRE TREE 1.00 571 POST-EMERGE HERB CTRE GAL. 90.00 572 POISON GRAIN CTRE LB. 0.65 573 SEEDLINGS CTRE EACH 0.06 574 PLANTING LABOR CTRE HOUR 4.50 575 HERB APPL LABOR CTRE HOUR 4.88 576 INSECTICIDE CTRE LB. 7.70 577 INSEC APPL LABOR CTRE HOUR 4.88 578 SHEARING LABOR CTRE HOUR 4.50 579 TREES CTRE EACH 9.50 580 COLORING CTRE GAL. 9.50 581 COLORING LABOR CTRE HOUR 4.50 582 NETTING CTRE TREE 0.30 583 ADVERTISING CTRE TREE 0.50 HEAD BU. TON DOZ. GAL. 6 - BALE 7 = ACRE 8 = HOUR 9 = DAYS 10 = AUM 11 12 13 14 = = = = 584 585 586 588 589 590 591 ITEM NAME NMOD UNIT PRICE P-RATED EQP COST CTRE ACRE 21 GRADING LABOR HOUR 4 HARV/LOAD LABOR HOUR 4 PHEROMONE TRAP CTRE EACH 2 PRE-EMERGE HERB. CTRE LB. 13 HARVEST LABOR CTRE HOUR 4 SAWS CTRE EACH 5 ACIN 15 = DOL. 19 = FEET LB. 16 = CWT. 20 = APPL PINT 17 = OZ. 21 = SOFT QT. 18 = C.SF 22 = C.HD C11.50 110784 10 50 50 00 00 50 75 /*^k '*%. 23 24 25 26 = = = = LOAD C.DZ BAGS TREE 27 28 29 30 = = = = EACH GPM KWH MCF DEFAULT PARAMETER VALUES AND DEFINITIONS R E G I O N : 11 D AT E : 11 0 7 8 4 ROW PA R A M E T E R DEFINITION 1. P R I C E PER GALLON 2. P R I C E PER GALLON 3. P R I C E PER OF GASOLINE OF GALLON D E FA U LT L . P. OF GAS DIESEL VA L U E 1.1000 0.7800 1.0000 4. PRICE PER KILOWATT HOUR OF ELECTRICITY 0.0600 5. P R I C E P E R 1 0 0 0 C U . F T. O F N AT U R A L G A S 0 . 0 6. N O M I N A L INTEREST R AT E 0.1400 7. MACHINERY INSUR. RATE (AVERAGE INVESTMENT) 0.0100 8. M A C H I N E R Y TA X R AT E ( P U R C H A S E VA L U E ) 0 . 0 9. I R R I G A T I O N 10. H O U R L Y 11. H O U R L Y SYSTEM MACHINERY OTHER NUMBER WAGE LABOR R AT E WAGE R AT E 0. 5.50 4.00 12. H O U R L Y I R R I G . / L I V E S T O C K W A G E R A T E 4 . 0 0 13. DEATH LOSS (PERCENT OF TOTAL RECEIPTS) 0.0 14. LIVESTOCK INSUR. RATE (AVERAGE INVESTMENT) 0.0100 15. EQUIPMENT INSUR. RATE (AVERAGE INVESTMENT) 0.0100 16. L I V E S T O C K TA X R AT E ( AV E R A G E VA L U E ) 0 . 0 0 5 0 17. E Q U I P M E N T T A X R A T E ( A V E R A G E V A L U E ) 0 . 0 18. I R R I G AT I O N L A B O R M U LT I P L I E R ( H R S / A C I N ) 0 . 6 3 0 0 19. FACTOR TO CONVERT MACHINE HRS TO TRACTOR HRS 1.1000 20. FACTOR TO CONVERT TRACTOR HRS TO LABOR HRS 1.2000 21. FACTOR TO CONVERT SELF-POWERED MACHINERY HRS TO LABOR HRS 1.2500 22. LUBRICATION COST MULTIPLE OF MACHINERY FUEL COSTS 23. I N F L A T I O N R AT E 24. LUBRICATION COST MULTIPLE OF EQUIPMENT FUEL COSTS C11.51 O.1000 0.0 0.0500 DATE:110684 LISTING OF ECONOMIC AND ENGINEERING DATA FOR MACHINERY IN REGION 11 1 MACHINE TRACTOR TRACTOR TRACTOR TRACTOR TRACTOR TRACTOR 4 HH DR PICKUP TRUCK TRUCK SHREDDER(2R) T T SHREDDER(4R) OFFSET DISC T TANDEH DISC T TANDEH DISC T HB PLOHUB) T HB PLOHOB) T PLANTER T GOPHER POISONER GRAIN DRILL T TOOL BAR CULT. T TOOL BAR CULT. T LISTER-BEDDER T SPRAYER T SPRAYER T HARROW, MELON T PLANT-CULT T SHREDDER<4R) H OFFSET DISC H TANDEH DISC H MB PL0H(4B) H MB PLOHOB) . H PLANTER H GRAIN DRILL H TOOL BAR CULT. H LISTER-BEDDER H SPRAYER H RENTD.FERT.APPLI BROADCAST SEEDER PLANT-CULTIVATOR ROLL. CULT H SPRAYER, PAST. H SPRAYER, C. TREE 2 CODE WIDTH NO. (FT) 1. 2. 3. 4. 5. 6. 10. 11. 30. 31. 32. 33. 34. 37. 38. 39. 41. 42. 43. 44. 47. 49. 50. 52. 5B. 65. 66. 68. 71. 72. 73. 76. 77. 81. 83. 86. 87. 93. 94. 98. 99. 150.0 125.0 100.0 75.0 40.0 225.0 0.5 2.0 6.7 13.3 10.0 8.0 13.0 5.3 4.0 13.3 30.0 10.0 13.3 20.0 13.3 13.3 20.0 9.0 12.0 13.3 10.0 13.0 5.3 4.0 13.3 10.0 13.3 13.3 13.3 30.0 20.0 12.0 12.0 30.0 8.0 3 4 LIST PRICE 53250. 47650. 39050. 25450. 14975. 92725. 10500. 9600. 1795. 3250. 2125. 1400. 2800. 1680. 1200. 1680. 560. 1450. 1125. 1700. 1400. 1250. 1375. 875. 1700. 3250. 2125. 2800. 1680. 1200. 1680. 1450. 1125. 1400. 675. 1. 495. 600. 300. 775. 1695. 5 6 SPEED FIELD RC1 (MPH) EFF. 4.5 4.5 4.5 4.5 4.5 4.5 30.0 40.0 3.7 3.7 4.8 4.5 4.5 4.5 4.5 4.5 4.5 4.0 3.8 3.8 4.5 4.0 4.0 4.5 4.8 4.8 4.8 4.8 4.0 4.0 5.0 4.0 3.8 4.0 4.0 5.0 4.0 4.8 5.0 4.0 4.5 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.80 0.80 0.83 0.83 0.83 0.80 0.80 0.60 0.80 0.72 0.67 0.67 0.80 0.65 0.65 0.80 0.60 0.77 0.77 0.77 0.77 0.77 0.66 0.70 0.74 0.66 0.55 0.70 0.67 0.66 0.66 0.55 0.60 1.20 1.20 1.20 1.20 1.20 1.20 0.80 1.20 0.60 0.60 0.65 0.65 0.65 1.00 1.00 0.80 0.60 0.75 0.60 0.60 1.00 1.00 1.00 0.65 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.65 1.20 0.60 0.60 0.60 0.60 7 AGE 8 9 10 RC3 ,ANNUAL YEARS HRS OWNED (HRS) 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.60 1.80 1.80 1.80 1.80 1.80 1.30 1.30 1.60 1.30 1.80 1.30 1.30 1.80 1.80 1.80 1.80 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.60 1.80 1.30 1.30 1.30 1.30 500. 600. 500. 300. 300. 600. 700. 300. 50. 50. 100. 100. 100. 100. 100. 75. 25. 50. 150. 175. 100. 35. 35. 35. 100. 125. 150. 150. 175. 175. 60. 100. 150. 175. 100. 100. 50. 100. 300. 50. 20. 7. 7. 7. 7. 7. 7. 3. 10. 8. 6. 8. 8. 8. 8. 8. 8. 8. 10. 8. 8. 8. 8. 8. 10. 8. 8. 8. 8. 8. 8. 8. 10. 8. 8. 8. 10. 8. 8. 6. 10. 8. 14 11 12 RFV1 RFV2 PURCH FUEL LIFE PRICE TYPE (HRS) 13 0.68 0.68 0.68 0.68 0.68 0.68 0.60 0.68 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.60 0.92 0.92 0.92 0.92 0.92 0.92 0.88 0.92 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 O.BB 0.88 0.88 47925. 42900. 35150. 22900. 13475. 83450. 9500. 7665. 1625. 2600. 1700. 1260. 2520. 1350. 1080. 1350. 495. 1150. 900. 1350. 1120. 1100. 1225. 700. 4000. 2600. 1700. 2520. 1350. 1080. 1350. 1150. 900. 1120. 525. 1. 425. 510. 250. 620. 1500. 3. 3. 3. 3. 3. 3. 1. 1. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 15 12000. 12000. 12000. 12000. 12000. 12000. 2800. 3750. 2000. 2000. 2000. 2000. 2000. 2000. 2000. 1200. 800. 1000. 1500. 1750. 2000. 1200. 1200. 2000. 1000. 1250. 1500. 1500. 1750. 1750. 600. 1250. 1500. 1750. 1000. 2000. 1200. 1000. 2250. 625. 750. 16 H P 150. 125. 100. 75. 40. 225. 30. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. 0. /<*% C11.52 B - 1 2 4 K L 11 ) TEXAS AGRICULTURAL EXTENSION SERVICE . THE TEXAS A&M UNIVERSITY SYSTEM Z e r l e L . C a r p e n t e r , D i r e c t o r . C o l l e g e s t a t i o n , Te x a s r TEXAS LIVESTOCK ENTERPRISE BUDGETS NORTHEAST TEXAS REGION Projected for 1985 E d u c a t i o n a l p r o g r a m s c o n d u c t e d b y t h e Te x a s A g r i c u l t u r a l E x t e n s i o n S e r v i c e s e r v e p e o p l e o f a l l a g e s r e g a r d l e s s o f socio-economic level, race, color, sex, religion or national origin. C o o p e r a t i v e ' E x t e n s i o n W o r k i n A g r i c u l t u r e a n d H o m e E c o n o m i c s , T h e Te x a s A S M U n i v e r s i t y S y s t e m a n d t h e U n i t e d S t a t e s Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May S, 1914, as amended, and June 30, 19 14. 160 12-54, New ECO 7-2 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 540 B - 1 2 4 K L 11 ) COW-CALF (LEASE) PRODUCTION, NORTHEAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER COW INVESTMENT REQUIREMENTS NUMBER UNIT SIZE BEEF COW PURCH. 1.00 HEAD 1.00 BEEF BULL PURCH. 0.03 HEAD 1.00 TOTAL LIVESTOCK INVESTMENT PRODUCTION NUMBER STEER CALVES 0.43 HEIFER CALVES 0.43 CULL COWS 0.08 TOTAL PROJECTED RETURNS OPERATING INPUTS HAY (PROD COST) CUSTOM BALE ROUN SUPPLEMENT/SALT SALT & MIN. VET MEDICINE MISC EXPENSE MARKETING PASTURE RENT TRACTOR FUEL AND LUBE TRACTOR REPAIR COST EQUIPMENT FUEL AND LUBE EQUIPMENT REPAIR TOTAL OPERATING COST W G T. EACH 4.85 4.65 9.75 PROJECTED YOUR $ / U N I T V A L U E ESTIMATE 501.87 501.87 813.75 26.85 $ 528.73 $ TO TA L P R O J E C T E D UNITS UNIT $/UNIT RETURN 2 . 1 C W T. 7 6 . 0 0 158.50 2 . 0 C W T. 6 7 . 0 0 133.97 0 . 8 C W T. 3 8 . 7 5 30.22 $ 322.69 |_ INPUT USE 2.50 2.50 3.00 0.75 1.00 1.00 1.00 3.00 UNIT BALE BALE CWT. HEAD HEAD HEAD HEAD ACRE PROJECTED S/UNIT COST 9. 16 22.90 14.00 35.00 11.70 35. 10 13.50 10.08 5.60 5.60 16.00 16.00 8.25 8.25 15.00 45.00 1. 13 0.24 4.85 6.65 $ 190.80 $ RESIDUAL RETURNS TO LAND, LABOR. CAPITAL. OWNERSHIP, MANAGEMENT, AND PROFIT CAPITAL INVESTMENT ANNUAL OPERATING CAPITAL TRACTOR INVESTMENT MACHINERY INVESTMENT EQUIPMENT INVESTMENT LIVESTOCK INVESTMENT TOTAL CAPITAL COST QUANTITY UNIT INVESTED 4.49 DOL. 16.34 DOL. 9.94 DOL. DOL. 298.55 DOL. 528.73 OWNERSHIP COSTS (DEPRECIATION, TAXES, AND INSURANCE) TRACTOR MACHINERY EQUIPMENT LIVESTOCK TOTAL OWNERSHIP COST RESIDUAL RETURNS TO LAND, LABOR, MANAGEMENT, AND PROFIT MACHINERY EQUIPMENT LIVESTOCK TOTAL LABOR COST LABOR USE UNIT 0..55 2., 16 5.,00 HOUR HOUR HOUR 131.89 $ RATE OF PROJECTED RETURN COST 0.63 0.140 0.140 2.29 0.140 1.39 41.80 0. 140 74.02 0. 140 $ 120.13 $ RESIDUAL RETURNS TO LAND. LABOR, OWNERSHIP. MANAGEMENT, AND PROFIT OPERATOR LABOR COSTS $ RATE OF RETURN 5.50 4.00 4.00 $ 11.77 $ PROJECTED COST 1.85 1.36 36. 19 26.88 66.28 $ $ $ -54.52 $ PROJECTED COST 3.02 8.63 20.00 $ 31.66 $_ ? RESIDUAL RETURNS TO LAND, MANAGEMENT, AND PROFIT $ -86..17 RESIDUAL RETURNS TO MANAGEMENT AND PROFIT $ -86..17 * TOTAL PROJECTED COST OF PRODUCTION $ 408..86 s 30 COW, 1 BULL UNIT, FALL CALVING, NO CREEP FEED, GRADE GOOD CALVES, PURCHASED REPLACEMENT EVERY 8 YR., 86% CALF CROP. 2% COW DEATH LOSS. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. Lll.l PROJECTIONS FOR PLANNING PURPOSES ONLY ... NOT TO BE USED HITHOUT UPDATING AFTER 11-17-84. 540 COH-CALF (LEASE) PRODUCTION, NORTHEAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER COW 2 FEB 1 JAN 3 MAR 4 APR 5 MAY 6 JUN 0.0 0.0 0.0 0.0 0.0 0.0 0.18 0.75 0.18 0.75 0.18 0.60 0.18 0.50 0.18 0.50 0.18 0.40 0.68 0.68 0.58 0,. 9 3 0 . 9 3 0 . 7 8 TOTAL LABOR 8 AUG 10 OCT 9 SEP (HOURS) 0.55 0.0 0.18 0.18 0.25 0.25 0.98 0.43 TRACTOR SHREDDER(2R) CODE DEPR I N T. 5 30 3.71 3.05 5.00 3.34 T INS. TA X 0.34 0.22 R E PA I R 0.0 0.0 FUEL 0.53 0.15 CODE PASTURE FENCE LOT FENCE BARN POND STOCK TRAILER PICKUP TRUCK HINERAL FEEDER BEEF COH PURCH. BEEF BULL PURCH. 1 2 3 4 5 10 31 52 54 DEPR 140.00 2.40 1.50 0.90 280.00 1057.14 28.00 13.75 157.50 I N T. INS. 205.80 1.85 2.20 1.32 215.60 886.00 11.76 70.26 113.92 TA X 14.70 0.13 0.16 0.09 15.40 63.29 0.84 5.02 8.14 R E PA I R 0.0 0.0 0.18 0.50 0.18 0.50 0.18 0.18 0.0 0.0 TOTAL 0.55 2.16 5.00 0 ,. 6 8 0.68 0.18 0.18 7.71 LUB. TOTAL OHN. TOTAL OPER. HR/ ACRE HOURS 0.22 0.0 9.05 6.61 2.99 0.15 1.00 0.42 0.46 0.42 TOTAL OHN. TOTAL OPER. HOURS LABOR ALLOC 360.50 28.00 4.38 0.48 3.86 0.30 2.32 0.09 5 11 . 0 0 56.00 7 7 . 0 0 2006.42 1869.00 0.0 40.60 1.40 0.0 91.54 0.0 0 . 0 283.63 0.0 0.15 0.05 0.10 0.01 0.10 700.00 0.10 0.033 0.033 0.033 0.033 0.020 0.003 0.020 1.000 0.033 2.24 0.0 FUEL 0.17 0.79 0.0 EQUIPHENT FIXED AND VARIABLE COSTS PER YEAR EQUIPHENT 12 DEC 0.0 MACHINERY FIXED AND VARIABLE COSTS PER HOUR MACHINE 11 NOV (DOLLARS) 1.77 -10.88 -10.71 -10.53 -10.99 AV E R . A N N U A L C A P I TA L 6 . 9 2 7 . 9 8 9 . 0 6 1 0 . 3 7 1 0 . 5 5 LABOR REQUIREMENTS MACHINERY LABOR EQUIPMENT LABOR LIVESTOCK LABOR 7 JUL LUB. 0.0 0.0 0.0 0.0 0.0 28.00 0.0 0.48 0.0 0.30 0.0 0.09 0.0 56.00 0.0 0 . 0 2 5 2 . 0 0 1540.00 0.0 1.40 0.0 2.51 0.0 0.0 4.07 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 (.%) SELECTED MACHINERY COHPLEHENT INFORMATION MACHINE TRACTOR SHREDDER(2R) 1 2 3 4 5 6 7 8 CODE HIDTH LIST SPEED FIELD RC1 AGE RC3 NO. (FT) PRICE (MPH) EFF. (HRS) 5. 30. 40.0 6.7 14975. 1795. 4.5 3.7 0.88 1.20 0.80 0.60 0. 0. 1.60 1.80 9 10 11 12 ANNUAL YEARS RFV1 RFV2 HRS OHNED 300. 50. 7. 8. 0.68 0.60 0.92 0.88 13 14 15 PURCH FUEL LIFE PRICE TYPE (HRS) 16 HP 13475. 1625. 40. 0. 12000. 2000. SELECTED EQUIPHENT COHPLEHENT INFORMATION 1 EQUIPMENT CODE NO. PASTURE FENCE LOT FENCE BARN POND STOCK TRAILER PICKUP TRUCK HINERAL FEEDER BEEF COH PURCH. BEEF BULL PURCH., 2 3 4 5 SIZE UNIT TYPE LIST PRICE 1. 840. FEET 2. 30. FEET 3. 60. 4. 1000. SQFT 10. FEET 5. 10. 1. TON 31. 1. DOL. 52. 1. HEAD 54. 1. HEAD son 2. 2800. 2. 24. 2. 30. 2. 18. 2. 2800. 2. 10500. 2. 140. 1. 550. 1. 1050. 6 PURCH PRICE 2800. 24. 30. 18. 2800. 9500. 140. 550. 1050. L11.2 7 8 9 10 LIFE SALV. REPAIR FUEL (YRS) (XLP) (%LP) USE 20. 10. 20. 20. 10. 7. 5. 8. 4. 0.0 0.0 0.0 0.0 0.0 0.20 0.0 0.80 0.40 0.20 0.0 0.20 0.0 0.20 0.0 0.10 0.0 0.20 0.0 0 . 1 7 1400.0 0.05 0.0 0.0 0.0 0.0 0.0 11 12 13 14 ANNUAL ANNUAL XXXXXX XXXXXX LABOR USE 0.1 0.1 0.1 0.0 0.1 700.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.0 0.0 15 EFF. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 541 COW-CALF PRODUCTION NORTH EAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER COW INVESTMENT REQUIREMENTS PROJECTED YOUR VALUE ESTIMATE S/UNIT 501.87 501.87 813.75 26.85 ~ $ 528.73 $ PRODUCTION PROJECTED RETURN S/UNIT 76.00 158.50 67.00 133.97 38.75 30.22 $ 322.69 $ NUMBER UNIT SIZE BEEF COW PURCH. 1.00 HEAD 1.00 BEEF BULL PURCH. 0.03 HEAD 1.00 TOTAL LIVESTOCK INVESTMENT W G T. TO TA L NUMBER EACH UNITS UNIT S T E E R C A LV E S 0 . 4 3 4 . 8 5 2 . 1 C W T. H E I F E R C A L V E S 0 . 4 3 . 4 . 6 5 2 . 0 C W T. C U L L C O W S 0 . 0 8 9 . 7 5 0 . 8 C W T. TOTAL PROJECTED RETURNS OPERATING INPUTS HAY (PROD COST) COASTAL BER PAST COMMON LEGUME CUSTOM BALE ROUN SUPPLEMENT/SALT SALT & MIN. VET MEDICINE MISC EXPENSE MARKETING EOUIPMENT FUEL AND LUBE EQUIPMENT REPAIR TOTAL OPERATING COST INPUT USE 2.50 0.75 1.00 2.50 3.00 0.75 1.00 1.00 1.00 PROJECTED S/UNIT COST 9.16 22.90 89.14 66.85 87.62 87.62 14.00 35.00 11.70 35.10 10.08 13.50 5.60 5.60 16.00 16.00 8.25 8.25 4.85 6.59 $ 298.84 S UNIT BALE ACRE ACRE BALE CWT. HEAD HEAD HEAD HEAD RESIDUAL RETURNS TO LAND, LABOR, CAPITAL, OWNERSHIP, MANAGEMENT. AND PROFIT CAPITAL INVESTMENT ANNUAL OPERATING CAPITAL EQUIPMENT INVESTMENT LIVESTOCK INVESTMENT TOTAL CAPITAL COST J$PN B - 1 2 4 K L 11 ) QUANTITY INVESTED 32.33 298.55 528.73 UNIT DOL. DOL. DOL. RATE OF RETURN 0. 140 0. 140 0.140 RESIDUAL RETURNS TO LAND, LABOR, OWNERSHIP, MANAGEMENT, AND PROFIT OWNERSHIP COSTS (DEPRECIATION. TAXES. AND INSURANCE) EQUIPMENT LIVESTOCK TOTAL OWNERSHIP COST $ 23.85 $ PROJECTED COST 4.53 41.80 74.02 $ 120.34 $ $ -96.50 $ PROJECTED COST 36.19 _ 26.88 $ 63.07 $~ RESIDUAL RETURNS TO LAND, LABOR, MANAGEMENT, AND PROFIT $ -159.57 $_ OPERATOR LABOR COSTS LABOR USE UNIT EQUIPMENT LIVESTOCK TOTAL LABOR COST 2.16 5.00 HOUR HOUR RATE OF RETURN 4.00 4.00 RESIDUAL RETURNS TO LAND, MANAGEMENT, AND PROFIT LAND COSTS COASTAL BER PAST COMMON LEGUME TOTAL LAND COST INPUT USE UNIT ACRE ACRE 0.75 1.00 PROJECTED COST 8.63 20. OO 28.63 $ $ $ -188.20 $ RATE OF RETURN 20.00 10.00 PROJECTED COST 15.00 _ 10.00 $ 25.00 £ RESIDUAL RETURNS TO MANAGEMENT AND PROFIT $ -213.20 $ TOTAL PROJECTED COST OF PRODUCTION $ 535.89 $ 30 COW, 1 BULL UNIT, FALL CALVING, NO CREEP FEED, GRADE GOOD CALVES, PURCHASED REPLACEMENT EVERY 8 YR., 86% CALF CROP, 2% COW DEATH LOSS. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. L11.3 541 NOT TO BE USED HITHOUT UPDATING AFTER 11-17-84. PROJECTIONS FOR PLANNING PURPOSES ONLY COH-CALF PRODUCTION NORTH EAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER COH 1 JAN 2 FEB 3 HAR 4 APR 5 HAY 6 JUN AVER. ANNUAL CAPITAL 3.59 4.64 5.93 11.79 12.17 3.60 LABOR REQUIREMENTS MACHINERY LABOR EQUIPMENT LABOR LIVESTOCK LABOR TOTAL LABOR 0.0 0.0 0.0 0.0 0.0 0.0 0.18 0.75 0.18 0.75 0.18 0.60 0.18 0.50 0.18 0.50 0.18 0.40 7 JUL 8 AUG 9 SEP (DOLLARS) -4.87 -3.69 -2.50 11 NOV 12 DEC TOTAL 0 . 1 0 0 . 3 8 1 . 2 0 32.33 TOTAL (HOURS) 0.0 0.0 0.18 0.18 0.25 0.25 0.0 0.0 0.0 0.0 0.0 0.18 0.50 0.18 0.50 0.18 0.18 0.0 0.0 2.16 5.00 0.93 0.93 0.78 0.68 0.68 0.58 0.43 0.43 0.68 0.68 0.18 0.18 7.16 EQUIPHENT FIXED AND VARIABLE COSTS PER YEAR EQUIPHENT 10 OCT CODE DEPR 1 2 3 4 5 10 31 52 54 PASTURE FENCE LOT FENCE BARN POND STOCK TRAILER PICKUP TRUCK HINERAL FEEDER BEEF COH PURCH. BEEF BULL PURCH. 140.00 2.40 1.50 0.90 280.00 1057.14 28.00 13.75 157.50 I N T. I N S . T A X R E P A I R F U E L L U B . 205.80 1.85 2.20 1.32 215.60 886.00 11 . 7 6 70.26 113.92 14.70 0.13 0.16 0.09 15.40 63.29 0.84 5.02 8.14 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.51 4.07 28.00 0.0 0.48 0.0 0.30 0.0 0.09 0.0 56.00 0.0 252.00 1540.00 1.40 0.0 0.0 0.0 0.. 0 0,. 0 0,. 0 0.. 0 0,. 0 77,.00 0,. 0 0,. 0 0.. 0 0.0 0.0 TOTAL OHN. TOTAL OPER. HOURS LABOR ALLOC 360.50 28.00 4.38 0.48 3.86 0.30 2.32 0.09 5 11 . 0 0 56.00 2006.42 1869.00 40.60 1.40 91.54 0.0 283.63 0.0 0.15 0.05 0.10 0.01 0.10 700.00 0.10 0.033 0.033 0.033 0.033 0.020 0.003 0.020 1.000 0.033 0.0 0.0 (.%) SELECTED EQUIPHENT COHPLEHENT INFORMATION 1 EQUIPMENT PASTURE FENCE LOT FENCE BARN POND STOCK TRAILER PICKUP TRUCK MINERAL FEEDER BEEF COH PURCH. BEEF BULL PURCH. 2 3 4 5 6 CODE: SIZE UNIT TYPE LIST PURCH NO. PRICE: PRICE 1. 840. FEET 2. 30. FEET 3. 60. SQFT 4. 1000. SQFT 5. 10. FEET 10. 1. TON 31. 1. DOL. 52. 1. HEAD 54. 1. HEAD 2. 2. 2. 2. 2. 2. 2. 1. 1. 2800. 24. 30. 18. 2800. 10500. 140. 550. 1050. 2800. 24. 30. 18. 2800. 9500. 140. 550. 1050. L11.4 7 8 9 10 LIFE SALV. 1REPAIR FUEL (YRS) ( U P ) (%LP) USE 20. 10. 20. 20. 10. 7. 5. 8. 4. 0.0 0.0 0.0 0.0 0.0 0.20 0.0 0.80 0.40 0.20 0.0 0.20 0.0 0.20 0.0 0.10 0.0 0.20 0.0 0.17 1400.0 0.05 0.0 0.0 0.0 0.0 0.0 11 12 13 14 ANNUAL ANNUAL XXXXXX XXXXXX LABOR USE 0.1 0.1 0.1 0.0 0.1 700.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.0 0.0 15 EFF. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 y^SK PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 542 B-1241(L11) STOCKER CALF PRODUCTION NORTH EAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER CALF WINTER PROGRAM PRODUCTION NUMBER FEEDER STEERS 0.98 TOTAL PROJECTED RETURNS OPERATING INPUTS SM. GR. PASTURE BULL CALVES CONCENTRATES HAY VET MED & IMP. MARKETING SALT AND MINERAL EQUIPMENT FUEL AND LUBE EQUIPMENT REPAIR TOTAL OPERATING COST WGT. TOTAL EACH UNITS UNIT* 6.31 6 . 2 CWT. INPUT USE 0.57 4.00 2.20 7.00 1.00 0.98 1.00 PROJECTED YOUR S/UNIT RETURN ESTIMATE 70.00 432.87 $ 432.87 S PROJECTED COST S/UNIT 140.28 79.96 64.25 257.00 10.00 22.00 2.75 19.25 3.75 3.75 8.50 8.33 1.40 1.40 1.62 4.05 $ 397.35 $_ UNIT ACRE CWT. CWT. • BALE HEAD HEAD HEAD RESIDUAL RETURNS TO LAND, LABOR. CAPITAL, OWNERSHIP, MANAGEMENT, AND PROFIT CAPITAL INVESTMENT ANNUAL OPERATING CAPITAL EQUIPMENT INVESTMENT TOTAL CAPITAL COST QUANTITY INVESTED 251.91 178.29 UNIT DOL. DOL. RATE OF RETURN 0.140 0.140 RESIDUAL RETURNS TO LAND, LABOR, OWNERSHIP, MANAGEMENT. AND PROFIT OWNERSHIP COSTS (DEPRECIATION, TAXES, AND INSURANCE) EQUIPMENT TOTAL OWNERSHIP COST $ 35.51 |_ PROJECTED COST 35.27 24.96 60.23 $ $ PROJECTED COST 22.45 22.45 $ $ RESIDUAL RETURNS TO LAND. LABOR. MANAGEMENT, AND PROFIT $ OPERATOR LABOR COSTS LABOR USE UNIT EQUIPMENT LIVESTOCK TOTAL LABOR COST 0.73 2.00 HOUR HOUR RATE OF RETURN 4.00 4.00 LAND COSTS INPUT SM. GR. PA S T U R E TOTAL LAND COST USE 0.57 UNIT ACRE RATE OF RETURN 15.00 ■47. 17 $ PROJECTED COST 2.93 8.00 10.93 $ $ $ RESIDUAL RETURNS TO LAND, MANAGEMENT, AND PROFIT ■24.71 $ ■58.10 $ PROJECTED COST 8.55 $ 8.55 $ RESIDUAL RETURNS TO MANAGEMENT AND PROFIT $ -66.65 $ TOTAL PROJECTED COST OF PRODUCTION $ 499.52 $ 50 STEER UNIT, STOCKING RATE 1.75 HEAD/ACRE, SMALL GRAIN WINTER PASTURE, NOVEMBER-JUNE. 2% DEATH LOSS AND 3% SHRINKAGE ADJUSTMENT SHOWN IN MARKET WEIGHT SOLD. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. L11.5 542 NOT TO BE USED HITHOUT UPDATING AFTER 11-17-84. PROJECTIONS FOR PLANNING PURPOSES ONLY STOCKER CALF PRODUCTION NORTH EAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER CALF HINTER PROGRAH 2 FEB 1 JAN 3 HAR 4 APR 5 MAY 6 JUN AVER. ANNUAL CAPITAL 31.03 32.91 32.97 33.03 33.09 -2.25 LABOR REQUIREMENTS MACHINERY LABOR EQUIPHENT LABOR LIVESTOCK LABOR TOTAL LABOR 7 JUL 8 AUG 9 SEP (DOLLARS) 0.03 0.70 0.0 0.0 0.0 0.0 0.0 0.0 0.11 0.35 0.07 0.30 0.07 0.20 0.07 0.10 0.11 0.35 0.00 0.40 (HOURS) 0.0 0.0 0.00 0.00 0.0 0.0 0.46 0.37 0.27 0.17 0.46 0.40 0.00 10 OCT 11 NOV 4.87 27.26 27.78 12 DEC TOTAL 30.50 251.91 TOTAL 0.00 0.0 0.0 0.0 0.0 0.0 0.00 0.14 0.0 0.0 0.07 0.15 0.07 0.15 0.73 2.00 0.00 0.14 0.22 0.22 2.73 EQUIPMENT FIXED AND VARIABLE COSTS PER YEAR EQUIPHENT CODE PASTURE FENCE LOT FENCE BARN POND STOCK TRAILER PICKUP TRUCK HINERAL FEEDER 1 2 3 4 5 10 31 DEPR 140.00 2.40 1.50 0.90 280.00 1057.14 28.00 I N T. I N S . TA X 14.70 0.13 0.16 0.09 15.40 63.29 0.84 205.80 1.85 2.20 1.32 215.60 886.00 11 . 7 6 iSELECTED 1 EQUIPHENT CODE NO. PASTURE FENCE LOT FENCE BARN POND STOCK TRAILER PICKUP TRUCK HINERAL FEEDER 2 3 4 5 SIZE UNIT TYPE LIST PRICE 1. 840. FEET 2. 30. FEET 3. 60. SQFT 4. 1000. SQFT 5. 10. FEET 10. 1. TON 31. 1. DOL. 2. 2800. 2. 24. 2. 30. 2. 18. 2. 2800. 2. 10500. 2. 140. R E PA I R 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FUEL LUB. 28.00 0.0 0.48 0.0 0.30 0.0 0.09 0.0 56.00 0.0 252.00 1540.00 1.40 0.0 TOTAL TOTAL HOURS OHN. OPER. LABOR 0.0 360.50 28.00 0.0 4.38 0.48 0.0 3.86 0.30 0.0 2.32 0.09 0.0 511.00 56.00 77.00 2006.42 1869.00 0.0 40.60 1.40 0.15 0.05 0.10 0.01 0.10 700.00 0.10 ALLOC (.%) 0.020 0.020 0.020 0.020 0.020 0.001 0.020 EQUIPHENT COMPLEMENT INFORMATION 6 PURCH PRICE 2800. 24. 30. 18. 2800. 9500. 140. 7 8 9 10 LIFE SALV. REPAIR FUEL (YRS) (%LP) (%LP) USE 20. 10. 20. 20. 10. 7. 5. 0.0 0.0 0.0 0.0 0.0 0.20 0.0 0.20 0.0 0.20 0.0 0.20 0.0 0.10 0.0 0.20 0.0 0.17 1400.0 0.05 0.0 11 12 13 14 ANNUAL ANNUAL XXXXXX XXXXXX LABOR USE 0.1 0.1 0.1 0.0 0.1 700.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 15 EFF. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 **■* /"*•!■* L 11 . 6 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 543 B - 1 2 4 1 ( L 11 ) FEEDER PIG PRODUCTION NORTH EAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER SOW INVESTMENT REQUIREME:nts number unit size SOW PURCHASED 1.00 HEAD 1.00 BOAR PURCHASED 0.05 HEAD 1.00 TOTAL LIVESTOCK INVESTMENT PRODUCTION WGT. TOTAL NUMBER EACH UNITS UNIT FEEDER PIGS 18.00 5 5 . 0 0 9 9 0 . 0 LB. TOTAL PROJECTED RETURNS OPERATING INPUTS SOW FEED GEST. SOW FEED LACT. BOAR FEED PIG STARTER PASTURE VET MEDICINE MARKETING MISC. EXPENSE EQUIPMENT FUEL ANC) LUBE EQUIPMENT REPAIR INPUT USE 5. 10 12.32 0.73 9.00 0.50 1.50 18.00 18.00 UNIT CWT. CWT. CWT. CWT. HEAD DOL. HEAD HEAD TOTAL OPERATING COST PROJECTED YOUR VALUE ESTIMATE S/UNIT 129.94 129.94 262.50 13. 12 $ 143.06 $ PROJECTED RETURN S/UNIT 0.89 881.10 $ 881.10 * PROJECTED COST S/UNIT 44.88 8.80 8.80 108./, 2 6J42 8.80 13.50 121.50 161.00 80.50 1.00 1.50 0.10 1.80 J.00 18.00 11.32 17.68 $ 412.02 $ RESIDUAL RETURNS TO LAND. LABOR. CAPITAL, OWNERSHIP, MANAGEMENT, AND PROFIT CAPITAL INVESTMENT ANNUAL OPERATING CAPITAL EQUIPMENT INVESTMENT LIVESTOCK INVESTMENT TOTAL CAPITAL COST QUANTITY INVESTED -235.51 525.35 143.06 UNIT DOL. DOL. DOL. RATE OF RETURN 0.140 0.140 0.140 RESIDUAL RETURNS TO LAND. LABOR, OWNERSHIP, MANAGEMENT, AND PROFIT OWNERSHIP COSTS (DEPRECIATION, TAXES. AND INSURANCE) EOUIPMENT LIVESTOCK TOTAL OWNERSHIP COST $ 469.08 $ PROJECTED COST -32.97 73.55 20.03 60.61 $ $ $ 408.47 $ PROJECTED COST 98.75 _ 16.02 _ $ 11 4 . 7 7 $ RESIDUAL RETURNS TO LAND, LABOR, MANAGEMENT, AND PROFIT $ 293.70 $_ OPERATOR LABOR COSTS EQUIPMENT LIVESTOCK TOTAL LABOR COST OR USE UNIT 6.75 14.00 HOUR HOUR RATE OF RETURN 4.00 4.00 $ 210.69 $ RESIDUAL RETURNS TO LAND, MANAGEMENT, AND PROFIT LAND COSTS LAND RENT TOTAL LAND COST INPUT USE UNIT 200.00 DOL, PROJECTED COST 27.01 56.00 $ 83.01 $ RATE OF RETURN 0.08 PROJECTED COST 16.00 16.OO $_ $ RESIDUAL RETURNS TO MANAGEMENT AND PROFIT $ 194.69 $ TOTAL PROJECTED COST OF PRODUCTION $ 686.41 $ 20 SOW UNIT, FALL-SPRING FARROWING, 56 DAY WEANING,18 PIGS PRODUCED PER SOW ANNUALLY. REPLACEMENT SOWS PURCHASED WITH A 2 YR. PRODUCTIVE LIFE. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. L 11 . 7 543 PROJECTIONS FOR PLANNING PURPOSES ONLY ... NOT TO BE USED HITHOUT UPDATING AFTER 11-17-84. FEEDER PIG PRODUCTION NORTH EAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER SOH 1 JAN 2 FEB 3 MAR 4 APR 6 JUN 5 MAY AVER. ANNUAL CAPITAL -16.03 -24.87 -23.17 -31.95 -30.25 -37.76 7 JUL 8 AUG 9 SEP 10 OCT 11 NOV 12 DEC TOTAL -7.32 -16.72 -15.65 -24.48-235.51 (DOLLARS) 1.07 -8.39 LABOR REQUIREMENTS (HOURS) TO TA L MACHINERY LABOR 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 EQUIPMENT LABOR 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 0.56 6.75 LIVESTOCK LABOR 1.17 1.16 1.17 1.16 1.17 1.16 1.17 1.17 1.16 1.17 1.17 1.17 14.00 TOTAL LABOR 1.73 1.72 1.73 1.72 1.73 1.72 1.73 1.73 1.72 1.73 20.75 TOTAL TOTAL OHN. OPER. HOURS LABOR ALLOC 0 . 0 5 11 . 0 0 56.00 77.00 2006.42 1869.00 0.0 463.50 9.00 0.0 22.99 2.52 0.0 22.71 1.15 0.0 8.37 0.50 0.0 8.76 0.48 0.0 1.00 15.25 0.0 8.64 52.56 3.48 0.24 0.0 0.0 30.27 0.0 0.0 0.0 115.69 0.10 700.00 10.00 0.10 0.05 0.05 0.05 0.25 1.00 0.05 0.0 0.0 0.020 0.007 0.030 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 0.050 EQUIPHENT FIXED AND VARIABLE COSTS PER YEAR EQUIPMENT CODE STOCK TRAILER PICKUP TRUCK HATER SYSTEM HOG FENCE FARROHING HOUSE PASTURE SHEDS FEED STORAGE FEEDERS-HOGS BOAR PEN HATERERS-HOG SOH PURCHASED BOAR PURCHASED DEPR I N T. INS. TA X 280.00 215.60 15.40 10 1057.14 886.00 63.29 23 180.00 264.60 18.90 12.60 9.70 0.69 24 10.46 25 11 . 5 0 0.75 26 5.00 3.15 0.23 27 4.80 3.70 0.26 28 10.00 4.90 0.35 29 28.80 22.18 1.58 30 2.40 0.07 1.01 72 10.13 18.19 1.30 74 2.63 75.00 36.75 R E PA I R FUEL LUB. 0.0 0.0 56. 0 0 0 . 0 2 5 2 , 00 1540.00 0.0 00 0.0 0.0 0.0 ,52 0.0 0.0 ,15 0.0 ,50 0.0 0.0 ,48 0.0 0.0 ,00 0.0 0.0 ,64 0.0 0.0 0.0 ,24 ,0 0.0 0.65 ,0 0.0 1.31 1.73 1.73 (.%) SELECTED EQUIPMENT COMPLEMENT INFORMATION 1 EQUIPMENT CODE NO. STOCK TRAILER PICKUP TRUCK HATER SYSTEM HOG FENCE FARROHING HOUSE PASTURE SHEDS FEED STORAGE FEEDERS-HOGS BOAR PEN HATERERS-HOG SOH PURCHASED BOAR PURCHASED 5. 10. 23. 24. 25. 26. 27. 28. 29. 30. 72. 74. 2 3 4 5 SIZE UNIT TYPE LIST 'PRICE 10. 1. 1. 1. 1. 1. 1. 1. 1. 1. 1. 1. FEET TON DOL. DOL. DOL. DOL. DOL. DOL. DOL. DOL. HEAD HEAD 2. 2800. 2. 10500. 2. 3600. 2. 126. 2. 138. 2. 40. 2. 48. 2. 60. 2. 288. 2. 12. 1. 135. 1. 300. 6 PURCH PRICE 2800. 9500. 3600. 126. 138. 40. 48. 60. 288. 12. 135. 300. L11.8 7 8 9 10 LIFE SALV. REPAIR FUEL (YRS) (%LP) (%LP) USE 10. 7. 20. 10. 12. 8. 10. 6. 10. 5. 2. 2. 0.0 0.20 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.85 0.50 0.20 0.0 0.17 :1400.0 0.0 0.05 0.20 0.0 0.10 0.0 0.10 0.0 0.10 0.0 0.10 0.0 0.30 0.0 0.10 0.0 0.0 0.0 0.0 0.0 11 12 13 14 ANNUAL ANNUAL XXXXXX XXXXXX LABOR USE 0.1 700.0 10.0 0.1 0.1 0.1 0.1 0.3 1.0 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 15 EFF. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 544 B - 1 2 4 K L 11 ) MARKET HOG PRODUCTION NORTH EAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER HOG PRODUCTION NUMBER MARKET HOGS 0.98 TOTAL PROJECTED RETURNS WGT. TOTAL EACH UNITS UNIT 2 . 3 5 2 . 3 CWT. OPERATING INPUTS FINISHING RATION FEEDER PIGS VET MEDICINE MARKETING MISC. EXPENSE EQUIPMENT FUEL AND LUBE EQUIPMENT REPAIR TOTAL OPERATING COST INPUT USE 7.20 55.00 1.50 0.98 1.00 PROJECTED YOUR RETURN ESTIMATE S/UNIT 49.75 114.57 $ 114.57 $ PROJECTED S/UNIT COST 81.36 11.30 0.89 48.95 1.00 1.50 1.96 2.00 0.60 0.60 1.62 0.85 $ 136.84 $ UNIT CWT. LB. DOL. HEAD HEAD RESIDUAL RETURNS TO LAND. LABOR, CAPITAL, OWNERSHIP, MANAGEMENT, AND PROFIT CAPITAL INVESTMENT ANNUAL OPERATING CAPITAL EQUIPMENT INVESTMENT TOTAL CAPITAL COST QUANTITY INVESTED 57.18 55.79 UNIT DOL. DOL. RATE OF RETURN 0.140 0.140 RESIDUAL RETURNS TO LAND, LABOR, OWNERSHIP, MANAGEMENT. AND PROFIT OWNERSHIP COSTS (DEPRECIATION, TAXES, AND INSURANCE) EQUIPMENT TOTAL OWNERSHIP COST $ PROJECTED COST 8.01 7.81 $ 15.82 T $ EQUIPMENT LIVESTOCK TO TA L LABOR IR USE UNIT 0.92 0.55 HOUR HOUR COST RATE OF RETURN 4.00 4.00 RESIDUAL RETURNS TO LAND, MANAGEMENT, AND PROFIT LAND COSTS INPUT USE LAND RENT TOTAL LAND COST 1.60 UNIT DOL. •38.08 $_ PROJECTED COST 7.41 $ 7.41 $ RESIDUAL RETURNS TO LAND, LABOR, MANAGEMENT, AND PROFIT $ O P E R AT O R L A B O R C O S T S L -22.26 $ ■45.49 $ PROJECTED COST 3.68 2.21 5.89 $ $" $ -51.37 $_ RATE OF RETURN 0.08 PROJECTED COST O. 13 O. 13 $ $ RESIDUAL RETURNS TO MANAGEMENT AND PROFIT $ -51.50 $ TOTAL PROJECTED COST OF PRODUCTION $ 166.07 $ 250 FED PER YEAR, 100 FED PER BUNCH, 4 POUNDS FEED PER POUND OF GAIN, 2% DEATH LOSS SHOWN IN MKT. WT. SOLD. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. L11.9 PROJECTIONS FOR PLANNING PURPOSES ONLY 544 NOT TO BE USED HITHOUT UPDATING AFTER 11-17-84. HARKET HOG PRODUCTION NORTH EAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER HOG 1 JAN 3 MAR 2 FEB 4 APR 5 HAY 6 JUN AV E R . A N N U A L C A P I TA L 4 . 11 8 . 8 5 9 . 4 3 1 0 . 0 1 1 0 . 5 9 1 . 8 7 LABOR REQUIREMENTS MACHINERY LABOR EQUIPMENT LABOR LIVESTOCK LABOR 7 JUL 8 AUG (DOLLARS) 0.58 1.16 10 OCT 1.75 2.36 11 NOV 12 DEC 2.95 3.53 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.08 0.05 0.08 0.05 0.08 0.05 0.08 0.05 0.08 0.05 0.08 0.05 0.08 0.05 0.08 0.05 0.08 0.05 0.08 0.05 0.08 0.05 0.08 0.05 0.92 0.55 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 0.12 1.47 CODE 5 10 23 24 27 28 30 49 TOTAL 57.18 0.0 EQUIPMENT FIXED AND VARIABLE COSTS PER YEAR STOCK TRAILER PICKUP TRUCK HATER SYSTEM HOG FENCE FEED STORAGE FEEDERS-HOGS HATERERS-HOG FEEDING SLAB /^|v TOTAL (HOURS) TOTAL LABOR EQUIPMENT 9 SEP DEPR 280.00 1057.14 180.00 12.60 4.80 10.00 -2.40 13.20 I N T. I N S . TA X 215.60 886.00 ,264.60 9.70 3.70 4.90 1.01 10.16 15.40 63.29 18.90 0.69 0.26 0.35 0.07 0.73 R E PA I R 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 FUEL LUB. 56.00 0.0 252.00 1540.00 9.00 0.0 0.0 2.52 0.48 0.0 1.00 0.0 0.24 0.0 2.64 0.0 TOTAL TOTAL HOURS OHN. OPER. LABOR 0 . 0 5 11 . 0 0 5 6 . 0 0 77.00 2006.42 1869.00 0.0 9.00 463.50 0.0 22.99 2.52 0.0 8.76 0.48 0.0 1.00 15.25 0.0 3.48 0.24 0.0 24.09 2.64 0.10 700.00 10.00 0.10 0.05 0.25 0.05 1.00 ALLOC (.%) 0.002 0.001 0.020 0.110 0.004 0.010 0.030 0.004 SELECTED EQUIPMENT COMPLEMENT INFORMATION 1 EQUIPMENT CODE NO. STOCK TRAILER PICKUP TRUCK HATER SYSTEH HOG FENCE FEED STORAGE FEEDERS-HOGS HATERERS-HOG FEEDING SLAB 5. 10. 23. 24. 27. 28. 30. 49. 2 3 4 5 SIZE UNIT TYPE LIST PRICE 10. 1. 1. 1. 1. 1. 1. FEET TON DOL. DOL. DOL. DOL. DOL. 160. SQFT 2. 2800. 2. 10500. 2. 3600. 2. 126. 2. 48. 2. 60. 2. 12. 2. 132. 6 PURCH PRICE 2800. 9500. 3600. 126. 48. 60. 12. 132. L11.10 7 8 9 10 LIFE SALV. REPAIR FUEL (YRS) (%LP) (XLP) USE 10. 7. 20. 10. 10. 6. 5. 10. 0.0 0.20 0.0 0.0 0.0 0.0 0.0 0.0 0.20 0.0 0.17 1400.0 0.05 0.0 0.20 0.0 0.10 0.0 0.10 0.0 0.10 0.0 0.20 0.0 11 12 13 14 ANNUAL ANNUAL XXXXXX XXXXXX LABOR USE 0.1 700.0 10.0 0.1 0.1 0.3 0.1 1.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.0 0.0 0.0 0.0 0.0 15 EFF. 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. B-1241(L11) 545 CONTRACT BROILERS, NORTHEAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER 15800 CAPACITY BROILER HOUSE BASED ON A 4 HOUSE UNIT WITH 5.25 BATCHES PER YEAR PRODUCTION W G T. TO TA L NUMBER EACH UNITS UNIT BROILERS 791.28 1.00 791.3 C.HD HEAT ALLOWANCE 610.00 1.00 610.0 DOL. TOTAL PROJECTED RETURNS OPERATING INPUTS ELECTRICITY LP GAS SHAVINGS INSUR. PREMIUMS SUPPLIES EQUIPMENT FUEL AND LUBE EQUIPMENT REPAIR TOTAL OPERATING COST INPUT USE 3983.00 2564.00 6.00 1.00 1.00 UNIT KWH GAL. LOAD EACH EACH PROJECTED YOUR S/UNIT RETURN ESTIMATE 1 4 . 0 5 1111 7 . 4 7 1.00 610.00 $11727.47 $ PROJECTED COST S/UNIT 0.06 238.98 0.78 1999.92 120.00 720.00 260.00 260.00 50.00 50.00 194.04 213.59 $ 3676.53 $_ RESIDUAL RETURNS TO LAND, LABOR, CAPITAL, OWNERSHIP, MANAGEMENT, AND PROFIT CAPITAL INVESTMENT RATE OF RETURN 0.140 0.140 PROJECTED COST -613.07 3058.00 $ 2444.92 $ RESIDUAL RETURNS TO LAND, LABOR, OWNERSHIP, MANAGEMENT, AND PROFIT $ 5606.02 $ ANNUAL OPERATING CAPITAL EQUIPMENT INVESTMENT TOTAL CAPITAL COST QUANTITY INVESTED -4379.11 21842.93 UNIT $ 8050.94 $_ DOL. DOL. OWNERSHIP COSTS (DEPRECIATION, TAXES, AND INSURANCE) EQUIPMENT TOTAL OWNERSHIP COST PROJECTED COST 2972.29 _ $ 2972.29 $ RESIDUAL RETURNS TO LAND. LABOR. MANAGEMENT, AND PROFIT $ 2633.73 $_ OPERATOR LABOR COSTS EQUIPMENT LIVESTOCK TOTAL LABOR COST LABOR USE UNIT 120.50 360.00 HOUR HOUR RATE OF RETURN 4.00 4.00 $ 7 11 . 7 3 $ RESIDUAL RETURNS TO LAND, MANAGEMENT, AND PROFIT LAND COSTS LAND RENT TAXES TOTAL LAND COST INPUT USE UNIT 2000.00 125.00 DOL. DOL, PROJECTED COST 482.00 1440.00 S 1922.00 $ RATE OF RETURN 0.12 1.00 PROJECTED COST 240.00 125.00 $ 365.00 $ RESIDUAL RETURNS TO MANAGEMENT AND PROFIT $ 346.73 * TOTAL PROJECTED COST OF PRODUCTION $11380.74 $ POULTRY HOUSE CLEANED OUT FOR MANURE. WELL AND WATER SYSTEM. COST OF OTHER EOUIPMENT INCLUDES INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. Lll.ll 545 NOT TO BE USED HITHOUT UPDATING AFTER 11-17-84. PROJECTIONS FOR PLANNING PURPOSES ONLY CONTRACT BROILERS, NORTHEAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER 15800 CAPACITY BROILER HOUSE BASED ON A 4 HOUSE UNIT HITH 5.25 BATCHES PER YEAR 12 JAN FEB 3 MAR 4 APR 6 JUN 5 HAY 7 JUL 8 AUG 9 SEP 10 OCT 11 NOV 12 "^^K DEC TOTAL (DOLLARS) 4 . 3 8 - 157.61-148.56-310.12-305.31-459.94-437.44-- 4 4 9 . 0 5 * * * * * * * AVER. ANNUAL CAPITAL-404.88-548.84-521.26-640.50 LABOR REQUIREMENTS MACHINERY LABOR - 0.0 0.0 0.0 0.0 EQUIPMENT LABOR 10.04 10.04 10.04 10.04 L I V E S TO C K L A B O R 2 9 . 0 0 2 2 . 0 0 2 9 . 0 0 3 5 . 0 0 0.0 10.04 26.00 (HOURS) 0.0 0.0 0.0 0.0 0.0 0.0 10.04 10.04 10.04 10.04 10.04 10.04 35.00 35.00 35.00 26.00 32.00 24.00 TOTAL 0.0 0.0 10.04 120.50 3 2 . 0 0 360.00 T O TA L L A B O R 3 9 . 0 4 3 2 . 0 4 3 9 . 0 4 4 5 . 0 4 36.04 45.04 45.04 45.04 36.04 42.04 34.04 42.04 480.50 EQUIPHENT FIXED AND VARIABLE COSTS PER YEAR EQUIPMENT PICKUP TRUCK BROILER HOUSE HATER SYSTEM • • CODE DEPR I N T. INS. TA X 10 1057.14 886.00 63.29 1 5 2 6 0 0 . 0 0 2 9 11 . 9 9 2 0 8 . 0 0 23 180.00 264.60 18.90 0.0 0.0 0.0 TOTAL TOTAL OHN. OPER. HOURS LABOR ALLOC (.X) 252.00 1540.00 77.00 2006.42 1869.00 700.00 182.00 0.0 0.0 5719.98 182.00 35.00 9.00 0.0 0.0 463.50 9.00 10.00 0.120 1.000 0.150 R E PA I R FUEL LUB. SELECTED EQUIPMENT COMPLEMENT INFORMATION EQUIPHENT PICKUP TRUCK BROILER HOUSE HATER SYSTEH 1 2 3 U 5 6 7 8 9 10 11 12 13 14 CODE SIZE UNIT TYPE LIST PURCH LIFE SALV. REPAIR FUEL ANNUAL ANNUAL XXXXXX XXXXXX NO.. PRICE PRICE (YRS) (XLP) (XLP) USE LABOR USE 10. 1. TON 2. 10500. 9500. 15.15000. SQFT 2. 39000. 39000. 23. 1. DOL. 2. 3600. 3600. 7. 15. 20. 0.20 0.0 0.0 0.17 0.07 0.05 1400.0 700.0 0.0 0.0 35.0 0.0 0.0 10.0 0.0 0.0 0.0 0.0 1.00 0.0 0.0 15 EFF. 0.0 0.0 0.0 V ^ y /*S% L11.12 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 B - 1 2 4 K L 11 ) 546 CONTRACT BROILER BREEDER PRODUCTION, NORTHEAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER 6,100 BIRD HOUSE BASED ON A 4 HOUSE UNIT PRODUCTION NUMBER EGGS 698.28 LITTER HEN 120.00 TOTAL PROJECTED RETURNS OPERATING INPUTS ELECTRICITY SHAVINGS CLEANING INSUR. PREMIUMS SUPPLIES EQUIPMENT FUEL AND LUBE EQUIPMENT REPAIR TOTAL OPERATING COST WGT. EACH 1.00 1.00 TOTAL UNITS UNIT 6 9 8 . 3 C.DZ 1 2 0 . 0 TON INPUT USE 21650.02 4.00 1.00 1.00 1.00 UNIT KWH LOAD EACH EACH DOL. PROJECTED YOUR $/UNIT RETURN ESTIMATE 23.00 16060.41 15.00 1800.00 $17860.41 $ PROJECTED COST $/UNIT 0.06 1299.00 120.00 480.00 750.00 750.00 260.00 260.00 200.00 200.00 565.95 290.90 $ 3845.85 $ RESIDUAL RETURNS TO LAND, LABOR, CAPITAL, OWNERSHIP, MANAGEMENT, AND PROFIT CAPITAL INVESTMENT RATE OF RETURN 0.140 0. t40 PROJECTED COST -1108.85 4122.79 $ 3013.94- $ RESIDUAL RETURNS TO LAND, LABOR. OWNERSHIP. MANAGEMENT, AND PROFIT $11000.62 $ ANNUAL OPERATING CAPITAL EOUIPMENT INVESTMENT TOTAL CAPITAL COST QUANTITY INVESTED -7920.39 29448.65 UNIT $14014.57 $ DOL. DOL. OWNERSHIP COSTS (DEPRECIATION. TAXES. AND INSURANCE) EQUIPMENT TOTAL OWNERSHIP COST PROJECTED COST 4051.82 _ $ 4051.82 $ RESIDUAL RETURNS TO LAND. LABOR, MANAGEMENT, AND PROFIT $ 6948.80 $_ OPERATOR LABOR COSTS LABOR USE UNIT EQUIPMENT LIVESTOCK TOTAL LABOR COST RATE OF RETURN HOUR 4.00 HOUR 4.00 278.00 2100.00 $-2563.20 $ RESIDUAL RETURNS TO LAND. MANAGEMENT, AND PROFIT LAND COSTS LAND RENT TAXES TOTAL LAND COST INPUT USE UNIT 2000.00 125.00 DOL. DOL. PROJECTED COST 1112.00 _ 8400.00 $ 9512.00 $~ RATE OF RETURN O. 12 1.00 PROJECTED COST 240.00 _ 125.00 __ $ 365.00 $_ RESIDUAL RETURNS TO MANAGEMENT AND PROFIT $-2928.20 $ TOTAL PROJECTED COST OF PRODUCTION $20788.61 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. L11.13 NOT TO BE USED HITHOUT UPDATING AFTER 11-17-84. PROJECTIONS FOR PLANNING PURPOSES ONLY 546 CONTRACT BROILER BREEDER PRODUCTION, NORTHEAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER 6,100 BIRD HOUSE BASED ON A 4 HOUSE UNIT 1 JAN 2 FEB 3 MAR 4 APR 5 HAY 6 JUN 7 JUL 8 AUG 9 SEP 10 OCT 11 NOV 12 DEC (DOLLARS) TO TA L AVER. ANNUAL CAPITAL-711.75-798.31-894.87-991.43************** -96.56-250.62-347.18-443.74-540.30-636.86******* LABOR REQUIREMENTS MACHINERY LABOR EQUIPMENT LABOR LIVESTOCK LABOR TOTAL LABOR (HOURS) TO TA L 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 23.17 23.17 23.17 23.17 23.17 23.17 23.17 23.17 23.17 23.17 23.17 23.17 278.00 175.00 175.00 175.00 175.00 175.00 175.00 175.00 175.00 175.00 175.00 175.00 175.002100.00 198.17 198.17 198.17 198.17 198.17 198.17 198.17 198 .17 198.17 198. 17 198.17 198.172378.00 EQUIPMENT FIXED AND VARIABLE COSTS PER YEAR EQUIPMENT LAYER HOUSE PICKUP TRUCK HATER SYSTEM CODE DEPR I N T. INS. TA X 7 3333.93 3733.32 266.67 10 1057.14 886.00 63.29 23 180.00 264.60 18.90 R E PA I R 0.0 0.0 0.0 FUEL 200.00 0.0 252.00 1540.00 9.00 0.0 TOTAL LUB. OHN. TOTAL OPER. HOURS LABOR ALLOC (.X) 0 . 0 7 3 3 3 . 3 2 200.00 77.00 2006.42 1869.00 0.0 463.50 9.00 30.00 700.00 10.00 1.000 0.350 0.300 SELECTED EQUIPMENT COMPLEMENT INFORMATION 1 2 3 4 5 6 7 8 9 10 EQUIPMENT CODE. SIZE.UNIT TYPE LIST PURCH LIFE SALV. REPAIR FUEL NO. PRICE P R I C E (YRS) (XLP) (XLP) USE LAYER HOUSE PICKUP TRUCK HATER SYSTEH 7.11520. 10. 1. 23. 1. SQFT TON DOL. 50000. 50000. 10500. 9500. 3600. 3600. L11.14 15. 7. 20. 0.0 0.20 0.0 11 12 13 14 15 ANNUAL ANNUAL XXXXXX XXXXXX EFF. LABOR USE 30.0 0.06 0.0 0.17 1400.0 700.0 10.0 0.05 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.0 0.0 PROJECTIONS FOR PLANNING PURPOSES ONLY B-1241(L11) NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84. 548 /fP^ CONTRACT BREEDER PULLET, NORTHEAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER 8,800 BIRD HOUSE BASED ON A 3 HOUSE UNIT WITH 2.0 BATCHES PER YEAR PRODUCTION NUMBER PULLETS 120.00 HEAT ALLOWANCE 200.00 LITTER 33.00 TOTAL PROJECTED RETURNS OPERATING INPUTS ELECTRICITY LP GAS CLEANING PULLET INSUR. PREMIUMS SUPPLIES EQUIPMENT FUEL AND LUBE EQUIPMENT REPAIR TOTAL OPERATING COST WGT. EACH 1.00 1.00 1.00 TOTAL UNITS 120.0 200.0 33.0 INPUT USE 1517.37 1025.60 2.00 1.00 1.00 UNIT C.SF DOL. TON UNIT KWH GAL. EACH EACH DOL. PROJECTED YOUR $/UNIT RETURN ESTIMATE 82.00 9840.00 1.00 200.00 10.00 330.00 $10370.00 $ PROJECTED $/UNIT .COST 0.06 91.04 0.78 799.97 • 400.00 800.00 260.00 260.00 . . 200.00 200.00 565.95 272.90 — $ 2989.86 $ RESIDUAL RETURNS TO LAND, LABOR, CAPITAL, OWNERSHIP, MANAGEMENT. AND PROFIT CAPITAL INVESTMENT ANNUAL OPERATING CAPITAL EQUIPMENT INVESTMENT TOTAL CAPITAL COST QUANTITY UNIT RATE OF INVESTED RETURN - 4 11 3 . 8 3 D O L . 0 . 1 4 0 23582.00 DOL. 0.4-40 RESIDUAL RETURNS TO LAND, LABOR. OWNERSHIP, MANAGEMENT. AND PROFIT OWNERSHIP COSTS (DEPRECIATION. TAXES, AND INSURANCE) EQUIPMENT TOTAL OWNERSHIP COST $ 7380.14 $ PROJECTED COST -575.93 __ 3301.47 __ $ 2725.53 $_ $ 4654.61 $ PROJECTED COST 3259.82 _ $ 3259.82 $_ RESIDUAL RETURNS TO LAND, LABOR, MANAGEMENT, AND PROFIT $ 1394.79 $_ OPERATOR LABOR COSTS LABOR USE UNIT PROJECTED COST 1132.00 971.88 $ 2103.88 T RATE OF RETURN 283.00 HOUR 4.00 242.97 HOUR 4.00 EQUIPMENT LIVESTOCK TOTAL LABOR COST RESIDUAL RETURNS TO LAND, MANAGEMENT, AND PROFIT LAND COSTS LAND RENT TOTAL LAND COST INPUT USE RATE OF RETURN ACRE 0.12 UNIT 2000.00 $ -709.09 $_ PROJECTED COST 240.00 $ 240.00 £ RESIDUAL RETURNS TO MANAGEMENT AND PROFIT $ -949.09 $ TOTAL PROJECTED COST OF PRODUCTION $11319.09 $ INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. /#**** L11.15 NOT TO BE USED HITHOUT UPDATING AFTER 11-17-84. PROJECTIONS FOR PLANNING PURPOSES ONLY 548 CONTRACT BREEDER PULLET, NORTHEAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER 8,800 BIRD HOUSE BASED ON A 3 HOUSE UNIT HITH 2.0 BATCHES PER YEAR 1 JAN 2 FEB 3 MAR 4 APR 5 MAY 6 JUN 7 JUL 8 AUG 9 SEP 10 OCT 11 NOV 12 DEC ^ (DOLLARS) TO TA L AVER. ANNUAL CAPITAL-364.32-418.25-470.52-507.88-553.13-595.01 -61.73-123.44-185.20-224.18-278.12-332.05******* LABOR REQUIREMENTS MACHINERY LABOR EQUIPHENT LABOR LIVESTOCK LABOR "TOTAL LABOR- (HOURS) 0.0 0.0 23.58 23.58 23.33 21.33 0.0 0.0 0.0 23.58 17.33 23.58 21.33 23.58 16.00 0.0 0.0 0.0 0.0 0.0 23.58 19.33 23.58 19.67 23.56 19.33 23.58 23.33 23.58 17.33 23.58 23.33 42.91 43.25 42.91 46.91 40.91 4 6 . 9 1 4 6 . 9 1 4 4 . 9 1 4 0 . 9 1 4 4 . 9 1 3 9 . 5 8 4 4 . 9 1 525.97 EQUIPMENT FIXED AND VARIABLE COSTS PER YEAR EQUIPHENT PICKUP TRUCK BROILER HOUSE : HATER SYSTEM TOTAL 0.0 0.0 23.58 283.00 21.33 242.97 0.0 TOTAL C O D E D E P R . I N T. I N S . TA X R E PA I R F U E L L U B . O H N . 10 1057.14 886.00 63.29 1 5 2 6 0 0 . 0 0 2 9 11 . 9 9 2 0 8 . 0 0 23 180.00 264.60 18.90 0.0 0.0 0.0 252.00 1540.00 182.00 0.0 9.00 0.0 TOTAL HOURS OPER. LABOR ALLOC (.X) 77.00 2006.42 1 8 6 9 . 0 0 7 0 0 . 0 0 0.0 5719.98 182.00 35.00 0.0 463.50 9.00 10.00 0.350 1.000 0.300 SELECTED EQUIPHENT COMPLEMENT INFORMATION .1 2 3 4 5 6 EQUIPMENT CODE SIZE UNIT TYPE LIST PURCH NO. PRICE PRICE PICKUP TRUCK BROILER HOUSE HATER SYSTEH 10. 1 . TON 15.15000. SQFT 23. 1 . DOL. 2 . 10500. 9500. 2 . 39000. 39000. 2 . 3600. 3600. •L11.16 7 8 9 10 LIFE SALV. REPAIR FUEL (YRS) (XLP) (XLP) USE 7. 15. 20. 0.20 0.0 0.0 0.17 1400.0 0.07 0.0 0.05 0.0 11 12 13 14 15 ANNUAL ANNUAL XXXXXX XXXXXX EFF. LABOR USE 700.0 35.0 10.0 0.0 0.0 0.0 0.0 0.0 0.0 1.00 0.0 0.0 0.0 0.0 0.0 PROJECTIONS FOR PLANNING PURPOSES ONLY NOT TO BE USED WITHOUT UPDATING AFTER 11-17-84 547 0*** B-1241(L11) DAIRY PRODUCTION NORTH EAST TEXAS REGION 1985 PROJECTED COSTS AND RETURNS PER COW INVESTMENT REQUIREM!■NTS NUMBER UNIT SIZE DAIRY COW RAISED 1.00 HEAD 1.00 DAIRY HEIFER RA. 0.24 HEAD 1.00 TOTAL LIVESTOCK INVESTMENT PRODUCTION WGT. NUMBER EACH MILK 139.92 1.00 DAIRY BULL CALVE 0.45 1.00 BREEDING HEIFERS 0.20 1.00 CULL DAIRY COWS 0.22 13.00 TOTAL PROJECTED RETURNS O P E R AT I N G TOTAL UNITS UNIT 139.9 CWT. 0.4 HEAD 0.2 HEAD 2.9 CWT. PROJECTED YOUR VALUE ESTIMATE $/UNIT 1150.00 1150.00 400.00 96.00 $ 1246.00 $ • '. PROJECTED RETURN $/UNIT 13.80 1930.9©.. 60.00 27.00540.00 108.00 • 114.4040.00 $ 2180.29- $ . - - - - INPUTS . •-, PROJECTED INPUT USE UNIT S/UNIT .COST GRAIN MIX 70.00 C W T. 8/50 595.00 H AY (PROD.COST) 3.50 TON 46.00 . 161.00 PA S T U R E 1.00 HEAD161.00 161.00 "~ VET MEDICINE 1.00 HEAD 24.00 24.00 ~~ BREEDING 0.95 HEAD 26.00 24.70 _ SUPPLIES 1.00 HEAD 37.00 37.00 MGMT RECORDS 1.00 HEAD 20.00 20.00 "™ UTILITIES 1.00 HEAD 40.00 " 40.00 "~ HAULING 139.92 C W T. 0.92 128.75 Z CALF FEED 1.00 C W T. ... 9.75 9.75 _ RAISING HERD REP 0.87 HEAD -200.00 174.20 __ MISC EXPENSE 12.00 HEAD • 16.:00 ■ 192.00 __ EQUIPMENT FUEL AND LUBE 16.17 _ EQUIPMENT R E PA I R / 4.96 TO TA L O P E R AT I N G COST $1588.50 $_ RESIDUAL RETURNS TO LAND, LABOR, CAPITAL, OWNERSHIP, M A N A G E M E N T. A N D P R O F I T $ 5 9 1 . 8 0 $ _ C A P I TA L I N V E S T M E N T Q U A N T I T Y U N I T R AT E O F P R O J E C T E D INVESTED RETURN COST A N N U A L O P E R AT I N G C A P I TA L - 3 5 6 . 3 3 D O L . 0 . 1 4 0 - 4 9 . 8 9 _ EQUIPMENT INVESTMENT 634.00 DOL. 0.140 88.76 _ LIVESTOCK INVESTMENT 1246.00 DOL. 0.140 174.44 TO TA L C A P I TA L COST $213.31 T RESIDUAL RETURNS TO LAND, LABOR, OWNERSHIP. MANAGEMENT, AND PROFIT OWNERSHIP COSTS (DEPRECIATION, TAXES, AND INSURANCE) EQUIPMENT LIVESTOCK TOTAL OWNERSHIP COST $ 378.48 $_ PROJECTED COST 81.09 _ 18.69 $ 99.78 £ RESIDUAL RETURNS TO LAND, LABOR, MANAGEMENT, AND PROFIT $ 278.71 $_ OPERATOR LABOR COSTS LABOR USE UNIT 7..10 78..00 EQUIPMENT LIVESTOCK TOTAL LABOR COST HOUR HOUR RATE OF RETURN 4.00 4.00 $ -61.69 $_ RESIDUAL RETURNS TO LAND, MANAGEMENT, AND PROFIT LAND COSTS INPUT USE LAND RENT TOTAL LAND COST UNIT ACRE 1.00 PROJECTED COST 28.40 _ 312.00 $ 340.40 £ RATE OF RETURN 15.00 PROJECTED COST 15.00 $ 15.00 £ RESIDUAL RETURNS TO MANAGEMENT AND PROFIT $ -76.69 $ TOTAL PROJECTED COST OF PRODUCTION $ 2256.99 $ 100 COW DAIRY, 13500 LBS. PRODUCTION PER COW, BARN IS DOUBLE 6 HERRINGBONE, FEEDING OUTSIDE MILKING PARLOR. 25% REPLACEMENT, 3% DEATH LOSS ON COWS. INFORMATION PRESENTED IS PREPARED SOLELY AS A GENERAL GUIDE AND IS NOT INTENDED TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND DEVELOPED BY STAFF MEMBERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. L11.17