M r i l TEXAS MIDDLE GULF COAST r FOREWORD The enterprise budgets for Texas Middle Gulf Coast Region are based on estimates of yields, production input quantities, and production prac tices which represent the best judgment of local producers, county Extension agents-agriculture, fi nancial institution representatives, farm machinery dealers and others knowledgeable of the area. Vari ation in yields, production inputs and production practices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. The machinery inventory is applicable to both typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock, enterprises. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs. A per acre land charge was made when crop share was not used. PROJECTICNS FOR PLANNING PURPOSES ONLY NOT TO BE U3£0 WITHOUT UPDATING AFTER 11/05/80. r COTTCN, DRYLAND. TEXAS MIDDLE GULF CCAST REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT CATEGORY GROSS RECEIPTS COTTON LINT COTTONSEED TOTAL PROJECTED RETURNS VARIABLE COSTS PREHARVEST COSTS SEED (UPLAND) NITROGEN PHOSPHATE POTASH BIDRIN GUTHION TQX-METHYL HERB. PREMERGE HERB. POSTEMERGE CUST AIR INSECT FUEL &• LUBE—TRACTCR EQUIPMENT PROJECTED UNIT YIELD 300.00 0.24 LB. TON YOUR ESTIMATE PROJECTED S/UNIT VALUE C.80 100.00 240.00 S —2A*22 264.00 S INPUT USE EQUIPMENT r B-124KC21I O P E R AT I N G C A P I TA L SUBTOTAL. PREHARVEST HARVEST COSTS CUST HARV & HAUL GIN. BAG. ETC SUBTOTAL. HARVEST 35.00 54.00 45.00 13.00 2.00 2.00 2.00 1 .00 1 .00 3.00 4.83 51 .46 3.00 0 .60 LB. LB. LB. LB. ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE HOUR DOL. ACRE 0.47 0.24 0.26 0.1 1 1.90 1.81 4.31 7.00 6.00 2.00 CWT. BALE ACRE 9.13 58.84 16.45 12.96 I 1.70 1.43 3.80 3.62 8.62 7.00 6.00 6.00 16.40 7.55 4.73 4.58 24.44 5.06 0.10 ___ _L_,_-__ $ 140.43 27.39 _____________ $ 62.69 s TOTAL VARIABLE COSTS ACRE $ 203.12 INCOME ABOVE VARIABLE CO;»TS ACRE % 60.88 FIXED COSTS D E P R E C . • I N T E R E S T. TA X E S & I N S U R . TRACTOR EQUIPMENT LAND (NET SHARE-RENT. TOTAL FIXED COSTS ACRE ACRE ACRE ACRE %~ TOTAL PROJECTED COSTS ACRE % 274.41 s NET PROJECTED RETURNS ACRE $ -10.41 $ ' s 16.00 8.65 _._-__6j_6£i 71.29 $ - LAND RENT BASED ON LANDLORDS SHARE OF 1/4 GROSS INCOME LESS 1/4 OF FERTILIZER. INSECTICIDE. AND GINNING. GOV'T PYMNT NOT INCLUDED. INFORMATION PRESENTED IS FREPARED SOLELY AS A GENERAL GUIDELINE AND IS NOT IMENDEO TO RECOGNIZE OR PREDICT THE COSTS AND RETURNS FROM ANY ONE PARTICULAR FARM OR RANCH OPERATION. THESE PROJECTIONS WERE COLLECTED AND/OR DEVELOPED BY STAFF MEM8ERS OF THE TEXAS AGRICULTURAL EXTENSION SERVICE AND APPROVED FOR PUBLICATION. r l-xus Agricultural Kxtension Service . The Texas A&M University System . Daniel C. Pfannstiel, Director . College Station,Texas COTTON. DRYLAND. TEXAS MIDDLE GULF CCAST REGION E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT O P E R AT I O N R O L L I N G C U LT PICKUP BEDDER S P R AY R I G S P R AY E R ( H E R B ) PICKUP PICKUP R O L L I N G C U LT PLANTER 4R PICKUP C U LT I VAT O R 6 R S P R AY E R ( H E R B ) PICKUP C U LT I VAT O R 6 R S P R AY E R ( H E R B ) PICKUP C U LT I VAT O R 6 R S P R AY E R ( H E R B ) PICKUP PICKUP SHREDDER 4R D I S K TA N D E M BEDDER PICKUP R O L L I N G C U LT PICKUP BEDDER PICKUP T O TA L S I TEM NO. C AT E 5.58 11 5.59 5.45 NOV NOV CEC DEC CEC CEC FEB MAR 6 4 11 11 5.58 5.55 11 5.60 6 4 11 5.60 6 4 11 5.60 6 4 11 11 5.91 3 4 5.59 11 5.58 11 5.59 11 . AR MAR APR APR APR N AY M AY M AY JUNE JUNE JUNE J U LY AUG AUG AUG AUG SEPT SEPT OCT OCT TIMES OVER 1 .00 0.1 0 1.00 1.00 1 .00 0.30 0.10 1 .00 1 .00 0.20 1.00 1 .00 0.10 1.00 1.00 0.1 0 1.00 1.00 0.10 0.20 1 .00 1 .00 1.00 0.30 1 .00 0.1 0 1 .00 0.15 FUEL.OIL. FIXED LABOR MACHINE L U E . . R E P . COSTS HOURS HOURS PER ACRE PER ACRE 0.191 0. 125 0.340 0.226 0 . 0 0.375 0.125 0. 191 0.142 0.250 0.157 0 . 0 0.125 0.157 0 . 0 0.125 0.157 0 . 0 0.125 0.250 0.208 0 . 0 0.340 0.375 0.191 0.125 0.340 0.145 0.100 0.258 0.172 0.143 0.300 0.100 0.145 0.107 0.200 0.1 19 0.143 0.100 0.1 19 0.143 0.100 0.1 19 0.143 0.100 0.200 0.158 0.146 0.258 0.30 0 0.145 0.100 0.258 -3x131 - 3 * 1 5 3 4.829 4.470 1 .75 0.54 2.97 1.92 0.03 1.61 0 .54 1.75 1 .38 1 .07 1.40 0 .03 0.54 1.40 0.03 0.54 1.40 0.03 0.54 1 .0 7 1 .90 0.20 2.97 1 .61 1.75 0.54 2.97 ~ s 1.56 0.20 2.27 1.75 0.11 0.59 0.20 1.56 1 .46 0.39 1.23 0 . 11 0.20 1.23 0. 1 1 0.20 1.23 0.14 0.20 0.39 1.80 0.54 2.27 0.59 1.56 0.20 2.27 ,Q*8Q -3x33 33.26 24.65 . . P R O J E C T I C N S F O R P L A N N I N G P U R P O S E S O N LY N O T T O B E U S E D W I T H O U T U P D AT I N G A F T E R 11 / 0 5 / 8 0 . r r B-124KC21) COTTON, DRYLAND. TEXAS MIDDLE GULF COAST REGION E S T I M AT E D C O S T S A N O R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT CATEGORY GRCSS RECEIPTS COTTON LINT COTTONSEED TUTAL PROJECTED RETURNS 2 . VA R I A B L E C O S T S PREHARVEST COSTS SEED (UPLAND) NITROGEN P H O S P H AT E P O TA S H BIDRIN GUTHION TOX-METHYL HERB. PREMERGE HERB. POSTEMERGE CUST AIR INSECT FUEL & LUBE—TRACTCR EQUIPMENT R E PA I R S - — — T R A C T C R EQUIPMENT LABOR————MACHINERY O P E R AT I N G C A P I TA L S U B T O TA L , P R E H A R V E S T HARVEST COSTS CUST HARV & HAUL GIN, BAG. ETC S U B T O TA L . H A R V E S T PROJECTED YIELD 400.00 0 .32 YOUR E S T I M AT E S/UNIT LB. TON 0.80 320.00 10 0.00 3.2x33 S 352.00 S VA L U E INPUT USE 35.00 54.00 45.00 13.00 2 .00 2.00 2 .00 1 .00 1 .00 7.00 4.83 53.80 4,00 0.80 T O TA L VA R I A B L E C O S T S 3 . I N C O M E A B O V E V A R I A B L E C O S T S5 4. FIXED COSTS D E P R E C . . I N T E R E S T. T A X E S TRACTOR EQUIPMENT LAND (NET SHARE-RENT) T O TA L F I X E D C O S T S .152— UNIT INSUR. LB. LB. LB. LB. ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE ACRE HOUR DOL. ACRE C.47 0.24 0.26 0.1 1 1.90 1.8 1 4.31 7.00 6.0 0 2.00 CWT. BALE ACRE 9.13 58.84 16.45 12.96 1 1.70 1.43 3.80 3.62 8.62 7.00 6.00 14.00 16.40 7.55 4.73 4.58 24.44 5.06 0.10 _ 5*33 $ 148.66 36.52 <.7_07 S 83.59 ACRE $ 232.25 ACRE $ 11 9 . 7 5 ACRE ACRE ACRE ACRE 5 . T C TA L P R O J E C T E D C O S T S ACRE 6. NET PROJECTED RETURNS ACRE s s s_. s 16.00 8.65 s~"— 852*23 6.85 s 319.10 s 32.90 — S LAND RENT BASED ON LANOLORDS SHARE OF 1/4 GROSS INCOME LESS 1/4 OF FERTILIZER. INSECTICIOE, AND GINNING. GOV'T PYMNT NOT INCLUDED. P R E PA R E D B Y O R . A U T H U R G E R L O W. TA E X , B R YA N . T E X A S P R O J E C T E O 1 9 7 8 I N F O R M A T I O N P R E S E N T E D I S P R E PA R E D S O L E L Y A S A G E N E R A L G U I D E L I N E A N D I S N O T INTENDED TU RECOGNIZE Oft PREDICT THE COSTS AND RETURNS FROM ANY ONE PA R T I C U L A R F A R M O R R A N C h O P E R AT I O N . T H E S E P R O J E C T I O N S W E R E C O L L E C T E D _ER _ V I_C_EF DAANND_ LA_P^PnR_O JV - -ESDL ^FFO oR M ePMU8BELRI C SA T °F TH S ION . E T E X A S A G R I C U LT U R A L E X T E N S I O N r COTTON. ORYLANO. TEXAS MIDDLE GULF CCAST REGION E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT O P E R AT I O N R O L L I N G C U LT PICKUP BEDDER S P R AY R I G S P R AY E R ( H E R B ) PICKUP FICKUP R O L L I N G C U LT PLANTER 4R PICKUP C U LT I VAT O R 6 R S P R AY E R ( H E R B ) PICKUP C U LT I VAT O R 6 R S P R AY E R ( H E R B ) PICKUP C U LT I VAT O R 6 R S P R AY E R ( H E R B ) PICKUP PICKUP SHREDDER 4R D I S K TA N D E M BEDOER PICKUP R O L L I N G C U LT PICKUP BEDDER PICKUP T O TA L S ITEM NO. 5.58 11 5.59 5.45 64 11 11 5.58 5.55 11 5.60 64 11 5,60 64 11 5,60 64 11 11 5.91 34 5.59 11 5.58 11 5.59 11 FIXED FUEL.OIL. L U B . . R E P. COSTS PER ACRE PER ACRE D AT E TIMES OVER LABOR M A C H I N E HOURS HOURS NOV NOV CEC OEC CEC DEC FEB MAR MAR MAR APR APR APR MAY MAY MAY JUNE JUNE JUNE J U LY AUG AUG AUG AUG SEPT SEPT OCT OCT 1 .00 0.10 1 .00 1.00 1 .00 0.30 0.1 0 1.00 1 .00 0.20 1.00 1.00 0.1 0 1 .00 1 .00 0.1 0 1.00 1.00 0.10 0.20 1.00 1 .00 1 .00 0.30 1 .00 0.10 1 .00 0.15 0.191 0. 125 0.340 0.226 0.0 0.3 75 0.125 0.191 0.142 0.250 0.157 0.0 0. 125 0.157 0 . 0 0.125 0.157 0.0 0.125 0.250 0.208 0.0 0.340 0.375 0.191 0.125 0.340 0,187 0.145 0.100 0.258 0.172 0.143 0.300 0. 100 0.145 0.107 0.200 0.119 0.143 0.100 0.1 19 0.143 0.10C 0.1 19 0 . 1 . 3 0.100 0.200 0.158 0.146 0.258 0.300 0.145 0.100 0.256 -3*153 1.75 0.54 2.97 1.92 0.03 1.6 1 0.54 1.75 1 .38 1.07 1.40 0.03 0.54 1.40 0.03 0.54 1.40 0.03 0.54 1 .0 7 1.90 0.20 2.97 1 .61 1.75 0.54 2.97 0.80 -2*33 4.829 4.470 3 3.26 24.65 1 .56 0.20 2.27 1.75 0. 1 1 0.59 0.20 1.56 1 .46 0.39 1.23 0.11 0.20 1.23 0.1 1 0.20 1.23 0.1 1 0.20 0.39 1.60 0.54 2.27 0.59 1.56 0.20 2.2 7 .