r TEXAS TRANS PECOS

advertisement
1
r
TEXAS TRANS PECOS
r
FOREWORD
The enterprise budgets for Texas Trans Pecos
Region are based on estimates of yields, production
input quantities, and production practices which
represent the best judgment of local producers,
county Extension agents-agriculture, financial in
stitution representatives, farm marchinery dealers
and others knowledgeable of the area. Variation
in yields, production inputs and production prac
tices should be expected for particular farms.
Budgets for all major crops produced in the
area are included for two levels of management,
when applicable. Crop yields are directly related
to levels of management. These differences are due
largely to timing of operational practices which
may not be evident in the budgets.
The machinery inventory is applicable to both
r
typical and high level management. In some bud
gets custom rates, primarily harvesting, were used
in lieu of the assumption that harvesting equip
ment was owned.
Budgets for establishing permanent type pasture
grasses were prepared and used for prorating estab
lishment costs in the respective pasture and hay
budgets. Forage crops include expenses only be
cause it is expected that the income will be derived
from livestock enterprises.
Land charges were based on the customary land
lord's crop share less his proportionate share of
certain production and harvesting inputs. A per
acre land charge was made using a fair market
value times an interest rate when crop share was
not used.
TEXAS TRANS-PECOS REGION
Assumed Prices Paid and Received by Farmers \J
tern
Unit
Price
Prices paid (1976)
Seed
Alfalfa
Barley
Cantaloupe
Cotton - Pima
Cotton - Up land
Forage Sorghum
Grain Sorghum
Oats
Wheat - Spring
Wheat - Winter
Custom rates
Cantaloupe (harvest)
Cantaloupe (process and
Cotton (harvest & haul) Cotton (harvest & haul)
Cotton (ginning, bags &
Cotton (ginning, bags &
Grain (harvest)
Grain (haul)
Fertilizer application
Chemical spray (aerial)
Hay (harvest)
cwt.
cwt.
lb.
cwt.
cwt.
cwt.
cwt.
cwt.
bu.
bu.
market)
pi ma
- upland
ties) - pima
ties) - upland
$1 15.00
8.50
5.00
27.00
27.00
35.00
35.00
9.00
13.50
6.50
crate
crate
lb. lint
lb. lint
ba le
ba le
acre
cwt.
acre
acre
1.75
3.00
.09
.07
34.50
28.50
10.00
.15
1.75
2.00
21.50
ton
Fuel and lubricants
Gasoline
Diesel
LP Gas
M o t o r O i I ( h e a v y d u t y, d e t e r g e n t )
gal .
gal.
gal.
gal.
FertiIizer
Nitrogen (granular)
Phosphorus
lb.
lb.
Labor
Labor (except Hoeing)
Labor (hoeing)
hour
hour
•
.42
.37
.26
1.75
.21
.18
2.75
2.00
-2-
I tern
Unit
ChemicaIs
Pre-emergence herbicide
Ma lath ion
Methyl Parathion
ga
ga
ga
HaiI Insurance
Cotton
Wheat
$100
$100
Price
28.50
13.50
7.50
Prices received (1976)
Alfalfa Hay
Barley
Cantaloupe
Cotton - Pima
Cotton - Upland
Cotton seed
E n s i l a g e ( s t a n d i n g i n fi e l d )
Grain Sorghum
Wheat
Grazing
ton
55.00.
4.00
6.50
cwt.
crate
lb. lint
lb. lint
ton
ton
cwt.
bu.
.80
.40
1 10.00
12.00
4.50
4.00
lb. gain
\J These price assumptions are not to be interpreted as predictions or
prospective prices.
.15
" >
" >
TEXAS TRANS-PECOS REGION
Estimated Machinery and Equipment Cost Per Hour of Use
Machinery
Item and Size
Tractor - 115 HP
Tractor - 100 HP
Tractor - 80 HP
Tractor - 45 HP
Pickup - 1/2 ton
Swather S.P. - 14 feet
Shredder - 13 feet
Shredder - 6 feet
Offset disc - 12 feet
Offset disc - 9 feet
Plow 5B - 6.6 feet
Plow 3B - 4 feet
Float - 12 feet
Lister 6R - 20 feet
Lister 4R - 12 feet
Roll, cultivator - 20 feet
Roll, cultivator - 12 feet
Rototiller - 6.7 feet
Cultivator 4R - 12 feet
Bed planter - 12 feet
Spray rig - 12 feet
Grain drill - 20 feet
Grain drill - 14 feet
Veg. planter - 6.7 feet
Cultivator 6R - 20 feet
Baler - 14 feet
Purchase
Price
$13,500
10,500
9,775
4,000
5,100
11,000
1,300
400
2,200
1,350
1,925
1,000
1,320
1,250
700
1,900
1,350
2,800
950
1,450
400
1,800
1,450
1,050
1,450
6,000
Estimated
Years of Use
6
8
8
15
4
6
8
8
8
10
8
10
10
10
8
8
8
10
10
10
10
10
10
10
10
5
Estimated
Hours of Use
5400
9600
8800
10500
2800
900
1000
1000
1600
2000
2400
2000
1200
1500
1200
1680
1200
1600
2000
1800
1500
500
500
1000
2500
1500
Fixed Costs
Per Hour
$ 2.69
1.40
1.45
.70
2.15
14.05
1.77
.54
1.86
1.03
1.08
.76
1.67
1.27
.79
1.53
1.51
2.66
.73
1.22
.41
5.46
4.40
1.60
.88
4.30
Variable Costs
Per Hour
$ 4.78
3.11
2.71
1.91
3.34
13.03
.74
.23
.70
.34
.70
.43
.51
.54
.38
1.01
.98
1.52
.31
.52
.14
1.83
1.47
.68
.38
2.96
y
-4Al.FAI.FA ESTABLISHMENT, SPRINKLFP, IRRIOATFD, TEXAS TRANS-PFCOS DFGin^
FSTiMArrn costs and returns ^fp acrf
TYPICAL MANAGEMENT
UNIT
PRICF
GR
VA L U E
OR
COST/UNIT QUANTITY COST
I. GROSS RECEIPTS FROM PRCDUCTICN
TOTAL
VARIABLE COSTS
PREHARVEST
SEEO
FERT( 0-46-0)
FERTILIZER APPLI
MACHINERY
TRACTORS
IRRIGATION MACHINFRY
LAB0R(TRACTOR £ MACHINERY)
LABOR{IRRIGATION)
INTEREST ON OP. CAP.
0.0
LBS.
ACRE
ACRE
ACRE
ACRE
ACRE
HCUR
HOUR
DCL.
1.15
8.28
1.75
2.42
7.08
<?8.54
2.75
2.75
0.09
30.00
i.00
1.00
1.00
1.00
1.00
3.47
3.90
37.75
SUBTOTAL, PRE-HARVEST
34.50
8.28
1.75
2.4?
7.0?
98.54
9.53
10.72
1^1
$ 176.41
HARVEST COSTS
SUBTOTAL, HARVEST
$
*
TOTAL VARIABLE COST
* 176.41
INCOME ABOVE VARIABLE COSTS
$-176.41
FIXED COSTS
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LAND (NET RENT)
TOTAL FIXFD COSTS
ACRE
ACRE
ACRE
ACRE
3.85
3.14
75.40
300,00
I.00
1.00
1.00
0.08
0.0
3.R5
3.14
7 5.40
—2**Q2
$ 106.39
TOTAL COSTS
$ 282.80
NFT RETURNS
<i-28 2.30
* ONLY PHOSPHORUS REQUIRED.
PROJECTED, 1076
A L FA L FA E S TA B L I S H M E N T, S P R I N K L E R , I R R I G AT E D , T E X A S
ESTIMATED COSTS AND RETURNS PER ACRE
TYPICAL MANAGEMENT
OPERAT ION
PLOW 3B
OFFSET DISC
OFFSFT DISC
FLOAT
PICKUP
GRAIN DRILL
PICKUP
PICKUP
PICKUP
ITEM
NO.
2,36
2,34
2,34
2,37
10
4,52
10
10
10
DATE
AUG
AUG
AUG
AUG
AUG
SEPT
SEPT
OCT
NOV
TOTALS
TIMES
OVER
FUEL,OIL,
FIXFO
LABOR MACHINE L U Q . , R E P.
COSTS
HOURS
HOURS
PEP ACRE PER ACPF
1.00
1.00
1.00
2.00
0.10
1.00
O.iO
0.10
0.943
0 .345
0.345
1.026
0.125
0.307
0.125
0.125
0.629
0.230
0.230
0.684
0.100
0.205
O.iOO
0. 100
0.10 _aA125 _JLl1QG
.2*22
L.53
0.62
0.62
2.29
0.21
1.07
0.21
0.21
.Q±21
3.467 2.378
9.49
6.9^
* ONLY PHOSPHORUS REQUIRED.
B U D G E T I D E N T I F I C AT I O N N U M B E R - ANNUAL CAPTTAL MONTH 12
TRANS-PFCOS REGION
2.62
0.94
0.94
2.90
0.33
0.77
0.33
0.33
PROJECTED, 1976
811008702 850 0
^
-6A L FA L FA , S P R I N K L E R I R R I G AT E D , T E X A S T R A N S - P E C O S R E G I O N
ESTIMATED COSTS AND RETURNS PER ACRE
TYPICAL MANAGEMENT
UNIT
GROSS RECEIPTS FROM PRODUCTION
HAY
TOTAL
VARIABLE CCSTS
PREHARVEST
FERT( 0-46-0)
FERTILIZER APPLI
MACHINERY
IRRIGATION MACHINERY
LABOR(TRACTOR £ MACHINERY)
LABOR(IRRIGATION)
INTEREST CN OP. CAP.
TON
PRICE OR
C O S T / U N I T QUANTITY
55.00
6.00
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
8.28
1.75
2.34
131.92
2.75
2.75
0.09
1.00
1.00
1.00
1.00
0.8 7
7.20
66.63
TON
21.50
6.00
6x23
_I22xQC.
$ 129.00
$ 3 51.83
3 . B R E A K E V E N P R I C E , VA R I A B L E C O S T S T O N
ACRE
ACRE
ACRE
ACRE
ACRE
58.633
1.50
0.0
139.20
268.42
300.00
TOTAL COSTS
BREAKEVEN PRICE, TOTAL COSTS
8.23
1.75
2.34
181.92
2.41
19.80
$ 222.33
TOTAL VARIABLE CCST
FIXED COSTS
MACHINERY
TRACTORS
IRRIGATION MACHINERY
PRORATED ESTAB. COST
LAND (NET RENT)
TOTAL FIXED COSTS
_22Q*QQ
$ 330.on
SUBTOTAL, PRE-HARVEST
HARVFST COSTS
H AY I N G ^ S TA C K I N G
SUBTCTAL, HARVEST
VALUE OP
COST
1.00
I.00
1.00
0.25
0.03
1.50
0.0
139.20
67.10
__24._i0_2
$ 231.81
$ 583.64
TON
ESTABLISHMENT COST PRCRATED OVER 4 YEARS. CUBING
BUT ADDS $2/T0M HARVESTING COST. ONLY PHOSPHORUS
97.273
AODS S3/T0N VALUE
REQUIRED.
PROJECTED, 1976
-7-
A L FA L FA , S P R I N K L E R I R R I G AT E D , T E X A S T R A N S - P E C O S R E G I O N
FSTIMATED COSTS AND RETURNS PER ACRE
TYPICAL MANAGEMENT
OPERATION
PICKUP
P I CK UP
PICKUP
PICKUP
PICKUP
PICKUP
PICKUP
ITEM
NO.
10
10
10
10
10
10
10
TOTALS
OATE
FUEL, OIL,
FIXED
TIMES LABOR MACHINE L U 9 . , R E P.
COSTS
OVER
HCURS
HOURS
PER ACRE PER ACRE
APR
MAY
JUNE
J U LY
AUG
SEPT
OCT
0.10
0.125
0.10
0.125
0.10
0.125
0.10
0.12S
0.10
0.125
0.10
0.125
0 . 1 0 .-Q*125_
0.875
0.100
0.100
0.100
0. 100
0.100
0. 100
-a*iaQ
0.33
0.33
0.33
0.33
0.3 3
0.33
0.21
0.21
0.21
0.21
0.21
n.21
-£..23
_fl*21
0.700
2.34
1.50
ESTABLISHMENT COST PRORATED OVER 4 YEARS. CUBING ADDS $3/TPN VALUE
BUT ADDS S2/T0N HARVESTING COST. ONLY PHOSPHORUS REQUIRED.
PROJECTED, 1976
B U D G E T I D E N T I F I C AT I O N N U M B E R 8 1 0 0 8 9 0 2 8 5 0 0
A N N U A L C A P I TA L M O N T H 1 0
^
A L FA L FA E S TA B L IS H M E N T, S P R IN K L E R IR R IGATE D , TE X A S TR A N S - P E C OS R E GION
ESTIMATED COSTS ANO RETURNS PFR ACRE
HIGH LEVEL MANAGEMENT
UNIT
PRICE
OR
VA L U E
OR
COST/UNIT QUANTITY COST
1. GROSS RECEIPTS FROM PRODUCTION
TOTAL
. VA R I A B L E C O S T S
PREHARVEST
SEED
FERT( 0-92-0)
FERTILIZER APPLI
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LABGR(TRACTOR & MACHINERY)
L A B O R C I R R I G AT I C N )
I N T E R E S T C N O P. C A P.
SUBTOTAL, PRE-HARVEST
0.0
LBS.
ACRE
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
1.15
16.56
1.75
2.45
5.86
83.3 3
2.75
2.75
0.09
30.00
1.00
1.00
1.00
I.00
1.0 0
2.33
3.30
39.13
34.50
16.56
1.75
2.45
5.36
83.38
7.78
9.07
1*.1Z
$" 1 6 5 . 0 3
HARVEST COSTS
SUBTOTAL, HARVEST
$
TOTAL VARIABLE COST
$
0.0
3. INCOME ABOVE VARIABLE COSTS
4. FIXED COSTS
MACHINERY
TRACTORS
IRRIGATION MACHINERY
LAND (NFT RENT)
TOTAL FIXED COSTS
5. TOTAL COSTS
6. NFT RETURNS
* ONLY PHOSPHORUS REQUIRED.
16 5.08
t -- 1 6 5 . 0 8
$
ACRE
ACRE
ACRE
ACRE
3.84
3.10
63.80
300.00
1.00
1.00
I.00
0.08
3.84
3.10
63.30
._24.xQQ
94.74
259.P2
259.82
PROJECTED, 1976
ALFALFA ESTABLISHMENT, SPRINKLER IRRIGATED, TEXAS TRANS-PFCOS RFG ION
ESTIMATED COSTS AND RETURNS PER ACRF
HIGH LEVEL MANAGEMENT
OPERATION
PLOW 5B
OFFSET DISC
OFFSET DISC
FLOAT
PI CK UP
GRAIN DRILL
PICKUP
PICKUP
PICKUP
TO TA L S
I TEM
NO.
It35
3,33
3,33
3,37
10
4,51
10
10
10
DATE
TIMES LA80R
OVER
HOURS
FUEL, CIL,
FIXEO
MACHINE LUB. , PEP.
COSTS
HOURS
PER ACRE PER ACRF
AUG
AUG
AUG
AUG
AUG
SEPT
SEPT
OCT
NOV
I.00
1.00
1.00
2.00
0.10
1.00
0.10
0.10
0.10
0.381
0.173
0.173
0.684
0.100
0. 143
0.100
0.100
-{Ll10_G;
2.45
0.6 3
0.6 8
2.58
0.33
0.59
0.3 3
0.33
1.64
0.61
0.61
2.31
0.21
0.90
0.21
0.21
_a*.22
~a±2i
1.954
.32
6.94
2.830
0.572
0.2 59
0.259
1.026
0.125
0.215
0.125
0.125
_Qxl25
* ONLY PHOSPHORUS REQUIRED.
B U D G E T I D E N T I F I C AT I O N N U M B E R 8 11 0 0 8 6 0 1 8 5 0 0
A N N U A L C A P I TA L M O N T H 1 2
PPOJECTFD, 1976
^
-10A L FA L FA , S P R I N K L E R I R R I G AT E D , T E X A S T R A N S - P E C O S R E G I O N
ESTIMATED COSTS AND RETURNS PER ACRE
HIGH LEVEL MANAGEMENT
UNIT
1. GROSS RECEIPTS FROM PRODUCTION
H AY
TOTAL
2 . VA R I A B L E C O S T S
PREHARVEST
F E RT ( C - 9 2 - 0 )
FERTILIZER APPLI
MACHINERY
IRRIGATION MACHINERY
LABOR(TRACTOR £ MACHINERY)
LABOR! IRR IGATION)
I N T E R E S T C N O P. C A P.
SUBTOTAL, PRE-HARVEST
HARVEST COSTS
BALER WIRE
CUSTOM HAULING
MACHINERY
TRACTORS
LABOR(TRACTOR & MACHINERY)
SUBTCTAL, HARVEST
TON
PRICE
CR
VA L U E
OP
COST/UNIT QUANTITY COST
55.00
8.00
_£4QxI}Q
$ 440.00
ACRE
ACRE
ACRE
ACRE
HOUR
HOUR
DOL.
16.56
1.75
2.34
181.92
2.75
2.75
0.09
1.00
1.00
1.00
1.00
0.87
7.20
70.43
16.56
1.75
2.34
181.92
2.41
19.80
6_A6_9
$ 231.47
TON
TON
ACRE
ACRE
HOUR
4.95
7.00
13.57
4.77
2.75
8.00
3.00
1.00
1.00
3.08
39.60
56.00
13.57
4.77
Sxfta
122.43
TOTAL VARIABLE COST
353.89
3 . B R E A K E V E N P R I C E , V A R I A B L F C O S T TON
S i
44.237
4. FIXED COSTS
MACHINERY
TRACTORS
IRRIGATION MACHINERY
PRORATED ESTAB. COST
LAND (NET RENT)
TOTAL FIXED COSTS
ACRE
ACRE
ACRE
ACRE
ACRE
5. TOTAL COSTS
6. PREAKEVFN PRICE, TOTAL COSTS
$
17.76
2.49
139.20
247.65
300.00
1.00
I.00
1.00
0.20
0.08
17.76
2. 40
139.20
49.53
-24_x0_0;
$ 232.^9
586.88
TON
73.360
ESTABLISHMENT CCST PRORATEC OVEP 5 YEARS. CUBING ADDS $3/TOM VALUE
BUT ADDS $2/T0N HARVESTING CCST. ONLY PHOSPHORUS REQUIRED.
PROJECTED, 1976
-xx-
A L i - A L FA S P R I N K L E R I P R I G w T E D , T l - X A S < A N ^ > C C D S R P ^ I O N
ESTIMATED COSTS AND RETURNS PE* ACRE
HIGH LEVEL MANAGEMcNT
OPERATION
PICKUP
PICKUP
SWATHER S . P
BALER
PICKUP
SWATHER S.P
BALER
PICKUP
SWATHER S . P .
BALER
PICKUP
SWATHER S.P
BALER
PICKUP
SWATHER S.P
BALEP
PICKUP
ITEM
NO.
10
LO
21
3,63
10
21
3,63
10
21
3,63
10
21
3,63
10
21
3,63
10
DATE
FUEL,OIL, FIXED
TIMES LABOR MACH'. NE LOB., REP. COSTS
OVER HOURS ^ams PER ACRE PER ACRE
APR
MAY
MAY
MAY
JUNE
JUNE
JUNE
J U LY
J U LY
J U LY
AUG
AUG
AUG
SEPT
SEPT
SEPT
OCT
0.10
0.10
1.00
I.00
O.iO
1.00
I.00
O.iO
1.00
1.00
0.10
1.00
1.00
O.iO
1.00
I.00
O.iO
TOTALS
0.12b
0 .125
0.177
0.440
0.125
0.177
0.440
0.125
0 .177
0.440
0.125
0.177
0.440
0.125
0.177
0.440
0.100
0.10 0
0. 142
0.293
0.100
0. 142
0.293
0.100
0. 14?
0.293
0.100
0. 142
0.293
0.100
0. 142
0.293
-axi25 - a x i a Q
3.960
2.874
0.33
0.33
1.85
1.82
0.33
1.85
1.82
0.3 3
1.85
1.82
0.33
1.85
1.82
0.33
1.85
1.82
0.21
0.21
1.99
1.76
0.21
1.90
1.76
0.21
1.99
1.76
0.21
L.99
1.76
0.21
1.99
1.76
-Qx22
_Qx21
20.68
20.26
^
E S TA B L I S H M E N T C O S T P R O R AT E D O V E R 5 Y E A R S . C U B I N G A D D S S 3 / T 0 N VA L U E
RUT ADDS S2/T0N HARVESTING COST. ONLY PHOSPHORUS REQUIRED.
PROJECTED, 1^76
B U D G E T I D E N T I F I C AT I O N N U M B E R - —
A N N U A L C A P I TA L M O N T H 1 0
81 008901 850 0
^
Download