r TEXAS EDWARDS AQUIFER r FOREWORD The enterprise budgets for Texas Edwards Aquifer Region are based on estimates of yields, production input quantities, and production prac tices which represent the best judgment of local producers, county Extension agents-agriculture, fi nancial institution representatives, farm, machinery dealers and others knowledgeable of the area. Vari ation in yields, production inputs and production practices should be expected for particular farms. Budgets for all major crops produced in the area are included for two levels of management, when applicable. Crop yields are directly related to levels of management. These differences are due largely to timing of operational practices which may not be evident in the budgets. r The machinery inventory is applicable to both typical and high level management. In some bud gets custom rates, primarily harvesting, were used in lieu of the assumption that harvesting equip ment was owned. Budgets for establishing permanent type pasture grasses were prepared and used for prorating estab lishment costs in the respective pasture and hay budgets. Forage crops include expenses only be cause it is expected that the income will be derived from livestock enterprises. Land charges were based on the customary land lord's crop share less his proportionate share of certain production and harvesting inputs. A per acre land charge was made when crop share was not used. TEXAS EDWARDS AQUIFER REGION Assumed Prices Paid and Received by Farmers \J tern Unit Price lb. lb. lb. lb. lb. lb. lb. lb. $ 50.00 10.00 Prices paid (1976) Seed Cabbage Carrots Corn Cotton Grain Sorghum Oats Sudan X Wheat Custom rates Coastal Sprigging (w/sprigs) Mow, Rake, Bale Hay Haul Hay Aerial AppIications Insecticide Defoliant Fungicide Pick and Haul Cotton Gin, Bag, and Tie Harvest, Pack and Market Cabbage Carrots Custom Combine Corn Grain Sorghum Wheat Haul Corn and Grain Sorghum Haul Wheat FertiIizer Nitrogen Phosphorus Potash Labor Tractor Irrigation and Hand Operating Capital .75 .25 .35 .12 .29 .25 acre bale bale 25.00 appl . appl . appl . cwt. bale 1.75 2.00 2.25 2.75 30.00 50# bag 50# bag acre cwt. acre cwt. .50 .20 1 .25 3.00 15.00 .25 9.00 bu. .20 .12 lb. lb. lb. .23 .21 .08 hr. h r. 2.50 2.00 $ .10 -2- Item Unit Price Fuels and lubricants Diesel Gasoline gal . gal . .45 .50 Land Rent (cash) Irrigated Dryland acre acre 40.00 20.00 Insecticides Cabbage Carrots Corn Cotton Grain Sorghum appl appl appl appl appl 5.00 1.50 1.75 3.00 3.00 Fungicides Cabbage Carrots appl appl 7.00 3.00 Cotton Defoliant acre 7.50 Herbicides Cabbage Carrots Coastal Bermudagrass Corn Cotton Grain Sorghum acre acre acre acre acre acre 5.00 15.00 6.00 9.00 9.00 7.50 50# bag 50# bag 2.25 5.00 3.25 12.00 Prices received (1976) Cabbage Carrots Corn Corn si I age Cotton Ii nt Cottonseed Grain Sorghum Sudan hay Wheat bu. t o n , i n fi e l d lb. ton cwt. ton bu. .48 100.00 5.00 40.00 5.00 ]_/ These price assumptions are not to be interpreted as predictions of prospective prices. " > TEXAS EDWARDS AQUIFER REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Purchase Price Tractor 11 5 HP $ 1 4 , 11 8 Tractor 90 HP 10,588 Tractor 60 HP 7,059 Pickup 1/2 ton 5,100 SP Combine - 14 feet 19,000 Shredder 12 feet 1,900 Chisel Plow 12 feet 850 Moldboard Plow - 5.3 feet 2,000 Offset Disc - 10 feet 2,000 Offset Disc - 13 feet 2,200 Bedder 12 feet 1,000 Bedder 20 feet 1,500 Rolling cultivator - 12 feet 1,250 Rolling cultivator - 20 feet 2,000 To o l b a r c u l t i v a t o r - 1 2 f e e t 1 , 1 0 0 To o l b a r c u l t i v a t o r - 2 0 f e e t 1 , 8 0 0 Planter 12 feet 800 Planter 20 feet 1,100 Ve g e t a b l e p l a n t e r - 1 2 f e e t 1 , 0 0 0 Grain drill 12 feet 1,100 Bed shaper 12 feet 575 Land plane - 12 feet 2,400 Herbicide sprayer - 12 feet 750 Herbicide sprayer - 20 feet 1,100 V-type ditcher - 8 feet 250 Scrape blade 8 feet 350 Estimated Years of Use 5 6 8 3 6 10 8 8 8 8 10 10 10 10 10 10 15 15 15 15 10 20 8 8 15 15 Estimated Hours of Use 7000 5400 4800 2100 1500 1200 1400 1800 1600 2000 1400 2000 1800 2500 1600 1500 1200 1200 900 900 600 1800 1000 1000 2505 2505 Fixed Costs Per Hour $ 1.99 2.15 1.91 2.02 14.64 2.46 .84 1.53 1.72 1.51 1.11 1.16 1.08 1.24 1.07 1.86 1.29 1.79 2.14 2.36 1.48 3.02 1.03 1.51 .19 .27 Variable Costs Per Hour $4.55 3.88 2.73 3.95 7.12 .77 .26 .83 .54 .48 .40 .42 .52 .60 .39 .67 .37 .51 .62 .57 .43 1.05 .33 .48 .04 .11 I I U3 -4- CABBAGE, IRRIGATED, TEXAS EDWARDS AQUIFER REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT 1. GROSS RECEIPTS FROM PRODUCTION CABBAGE TOTAL 2 . VA R I A B L E C O S T S PREHARVEST SEED FERT( 200-80-0) HERBICIDE INSECTICIDE I N S E C T. A P P L I . FUNGICIDE FUNGfclNSEC APPLI MACHINERY TRACTORS IRRIGATION MACHINERY LABOR (TRACTOR € MACHINERY) LABOR(IRRIGATION) OTHER LABOR INTEREST ON GP. CAP. SUBTOTALt PRE-HARVEST HARVEST COSTS HARV,PACK,MARKET SUBTOTAL, HARVEST VALUE OR COST PRICE OR C O S T / U N I T QUANTITY BAGS 2.25 650.00 L$&Zm.5& $1462.50 LBS. ACRE ACRE APPL APPL APPL APPL ACRE ACRE ACRE HOUR HOUR HOUR DOL. 50.00 62.80 15.00 5.00 1.75 7.00 2.25 6.63 14.49 25.50 2.50 2.00 2.00 0.10 1.50 1.00 1.00 15.00 15.00 4.00 4.00 1.00 1.00 1.00 6.05 4.50 20.00 200.88 75.00 62.80 15.00 75.00 26.25 28.00 9.00 6.63 14.49 25.50 15.12 9.00 40.00 __2Q*Q2 $ 421.88 $ BAGS 1.25 650.00 _ fl L 2 * 5 Q $ 812.50 $1234.38 TOTAL VARIABLE COST 1.899 3 . B R E A K E V E N P R I C E , VA R I A B L E C O S T S B A G S 4. FIXED COSTS MACHINERY TRACTORS I R R I G AT I O N M A C H I N E RY LAND (NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 1.00 1.00 1.00 1.00 7.81 7.51 33.00 $ 88.32 $1322.70 5. TOTAL COSTS 6. BREAKEVEN PRICE, TOTAL COSTS 7.81 7.51 33.00 40.00 BAGS 2.035 PROJECTED, 1976 -5- ^ CABBAGE, IRRIGATED, TEXAS EDWARDS AQUIFER REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION SHREDDER OFFSET DISC MOLDBOARD PLOW CHISEL PLOW PICKUP OFFSET DISC OFFSET DISC HERBICIDE SPRAYR OFFSET DISC LAND PLANE BEDDER F E R T. A P P L I , R E N T D BEODER PICKUP VEGETABLE PLANTR PICKUP HERBICIDE SPRAYR PICKUP ROLLING CULT TOOLBAR CULT F E R T. A P P L I , R E N T D PICKUP PICKUP F E R T. A P P L I , R E N T D PICKUP TOOLBAR CULT PICKUP F E R T. A P P L I , R E N T D PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NO. 4,30 2,37 1,34 1,32 10 2,37 1,37 55 2,37 1,52 2,39 2,86 2,39 10 2,46 10 2,55 10 1,41 2,43 4,86 10 10 4,86 10 2,43 10 4,86 10 10 10 10 DATE FIXED FUEL,OIL, TIMES LABOR MACHINE L U B . , R E P. COSTS HCURS HOURS PER ACRE PER ACRE OVER J U LY J U LY J U LY J U LY J U LY AUG AUG AUG AUG AUG AUG AUG AUG AUG SEPT SEPT OCT OCT NOV NOV NOV NOV DEC JAN JAN FEB FEB MAR MAR APR MAY JUNE 1.00 1.00 0.50 0.50 0.10 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.10 1.00 0.10 1.00 0.10 1.00 1.00 1.00 0.10 0.10 1.00 0.10 1.00 0.10 1.00 0.10 0.10 0.10 0 .10 0.265 0.239 0.356 0.157 0.125 0.239 0.239 0.0 0.239 0.702 0.231 0.097 0.231 0.125 0.385 0.125 0.271 0.125 0.181 0.214 0.097 0.125 0.125 0.097 0.125 0.214 0.125 0.097 0.125 0.125 0.125 _a^i25 0.177 0.159 0.23 7 0.105 0.100 0.159 0.159 0.181 0.159 0.468 0.154 0.064 0.154 0.100 0.257 0.100 0.181 0.100 0.121 0.143 0.064 0.100 0.100 0.064 0.100 0.143 0.100 0.064 0.100 0.100 0.100 0.71 0.82 1.49 0.60 0.40 0.82 0.95 0.09 0.82 3.05 0.78 0.30 0.78 0.40 1.35 0.40 0.93 0.40 0.73 0.76 0.21 0.40 0.40 0.21 0.40 0.76 0.40 0.2L 0.40 0.40 0.40 0.84 0.65 0.93 0.34 0.20 0.65 0.62 0.27 0.65 2.53 0.58 0.17 0.58 0.20 1.21 0.20 0.74 0.20 0.44 0.63 0.15 0.20 0.20 0.15 0.20 0.63 0.20 0.15 0.20 0.20 0.20 -Q*LQQ -Q±.ka _Q-2Q 6.050 4.414 21.12 15.32 PROJECTED, 1976 B U O G E T I D E N T I F I C AT I O N N U M B E R 9 9 8 1 6 8 0 11 6 5 0 0 A N N U A L C A P I TA L M O N T H 6 -6CARROTS, IRRIGATED, TEXAS EDWARDS AQUIFER REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT VALUE OR COST PRICE OR C O S T / U N I T QUANTITY GROSS RECEIPTS FRCM PRODUCTICN CARROTS TOTAL BAGS 5.00 VARIABLE COSTS PREHARVEST SEED FERT(60-40-0) HERBICIDE INSECTICIDE I N S E C T. A P P L I . FUNGICIDE FUNGSINSEC APPLI MACHINERY TRACTORS I R R I G AT I O N M A C H I N E RY LABOR!TRACTOR S MACHINERY) L A B O R ( I R R I G AT I O N ) OTHER LABOR INTEREST GN OP. CAP. SUBTOTAL, PRE-HARVEST LBS. ACRE ACRE APPL APPL APPL APPL ACRE ACRE ACRE HOUR HOUR HOUR DOL. 10.00 22.20 15.00 1.50 1.75 3.00 2.25 5.82 14.10 25.50 2.50 2.00 2.00 0.10 2.00 1.00 1.00 3.00 3.00 5.00 5.00 1.00 1.00 1.00 6.08 4.50 5.00 97.04 HARVEST COSTS HARV,PACK,MARKET SUBTOTAL, HARVEST BAGS 3.00 250.00 250.00 L25.Qm.QQ. $1250.00 20.00 22.20 15.00 4.50 5.25 15.00 11.25 5.82 14.10 25.50 15.20 9.00 10.00 2..ZQ $ 182.53 $ 750.00 $ 932.53 TOTAL VARIABLE COST 3. BREAKEVEN PRICE, VARIABLE COSTS 8AGS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACRE ACRE 6.45 7.99 33.00 40.00 1.00 1.00 1.00 1.00 6.45 7.99 33.00 __AQ*QQ $ 5. TOTAL COSTS 6. BREAKEVEN PRICE, TOTAL COSTS 3.730 87.44 $1019.97 BAGS 4.080 PRICE BASED ON 1961-1970 SEASON WEIGHTED AVERAGE P R I C E . PROJECTED, 1976 -7- ~ CARROTS, IRRIGATED, TEXAS EDWARDS AQUIFER REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATION OFFSET DISC CHISEL PLOW MOLDBO ARD PLOW OFFSET DI SC BEDDER PICKUP FERT.A PPLI,RENTD ROLLIN G CULT BED SH APER PICKUP VEGETA BLE PLANTR PICKUP HER8IC IDE SPRAYR TOOLBA R CULT PICKUP PICKUP TOOLBA R CULT PICKUP PICKUP TOOLBA R CULT PICKUP PICKUP PICKUP PICKUP TOTALS ITEM NO. 2,36 2,32 2,34 2,36 2,38 10 4,86 2,40 2,50 10 2,46 10 4,54 2,42 10 10 2,42 10 10 2,42 10 10 10 10 DATE FUEL,OIL, FIXED TIMES LABOR MACHINE LUB.,REP. COSTS OVER HOURS HOURS PER ACRE PER ACRE J U LY J U LY J U LY J U LY J U LY J U LY AUG AUG AUG AUG SEPT SEPT OCT OCT OCT NOV DEC DEC JAN FEB FEB MAR APR MAY 1 . 0 0 0 . 3 11 0.50 0.157 0.50 0.356 2.00 0.621 1.00 0 . 3 8 5 0.10 0.125 1.00 0.097 1.00 0.302 1.00 0.491 0.10 0.125 1.20 0 . 4 6 2 0.10 0.125 1.00 0.452 1.00 0.357 0.10 0.125 0.10 0.125 1.00 0 . 3 5 7 0.10 0.125 0.10 0.125 1 . 0 0 0.3 57 0.10 0.125 0.10 0.125 0.10 0.125 0 . 1 0 .Qm.LZ1 0.207 0. 105 0.237 0.414 0.257 0.100 0.064 0.201 0.327 0.100 0.308 0.100 0.302 0.238 0.100 0.100 0.238 0.100 0.100 0.238 0.100 0.100 0.100 .Qm.LQQ 1.08 0.52 1.30 2.15 1.30 0.40 0.21 1.04 1.67 0.40 1.63 0.40 1.08 1.20 0.40 0.40 1.20 0.40 0.40 1.20 0.40 0.40 0.40 0.89 0.36 0.97 1.78 0.95 0.20 0.15 0.73 1.33 0.20 1.45 0.20 1.00 0.87 0.20 0.20 0.87 0.20 0.20 0.87 0.20 0.20 0.20 -Qm.2Q 6.079 4.236 19.92 14.44 PRICE BASED CN 1961-1970 SEASON WEIGHTED AVERAGE PRICE. PROJECTED, 1976 B U D G E T I D E N T I F I C AT I O N N U M B E R 9 1 5 0 1 6 8 0 2 1 6 5 0 0 A N N U A L C A P I TA L M O N T H 6 > -8- CARROTS, IRRIGATED, TEXAS EDWARDS AQUIFER REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT 1. GROSS RECEIPTS CARROTS FROM PRODUCTION TOTAL 2 . VA R I A B L E C O S T S PREHARVEST SEED FERT( 80-70-0) HERBICIDE INSECTICIDE I N S E C T. A P P L I . FUNGICIDE FUNG&INSEC APPLI MACHINERY TRACTORS IRRIGATION MACHINERY LABORITRACTOR £ MACHINERY) L A B O R ( I R R I G AT I O N ) OTHER LABOR I N T E R E S T C N O P. C A P. SUBTOTAL, PRE-HARVEST HARVEST COSTS HARV,PACK, MARKET SUBTOTAL, HARVEST PRICE OR VA L U E OR COST/UNIT QUANTITY COST BAGS 5.00 400.00 2QQQ*QQ $2000.00 LBS. ACRE ACRE APPL APPL APPL APPL ACRE ACRE ACRE HOUR HOUR HOUR DOL. 10.CO 33.10 15.00 1.50 1.75 3.00 2.25 6.19 13.29 25.50 2.50 2.00 2.00 0.10 2.00 1.00 1.00 4.00 4.00 6.00 6.00 1.00 1.00 1.00 5.53 4.50 5.00 108.35 20.00 33.10 15.00 6.00 7.00 18.00 13.50 6.19 13.29 25.50 13.81 9.00 10.00 —.LQ*Q.3 $ 201.22 $ BAGS 3.00 400.00 TOTAL VARIABLE COST $1401.22 3 . B R E A K E V E N P R I C E , VA R I A B L E C O S T S BAGS 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS ACRE ACRE ACRE ACRE 3.503 $ 6.54 6.73 33.00 40.00 1.00 1.00 1.00 1.00 6.54 6.73 33.00 $ 86.27 5. TOTAL COSTS 6. BREAKEVEN PRICE, TOTAL COSTS L2QQm.QQ $1200.00 $1487.49 BAGS 3.719 PROJECTED, 1976 -9- CARROTS, IRRIGATED, TEXAS EDWARDS AQUIFER REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION OFFSET DISC CHISEL PLOW MOLDBOARD PLOW OFFSET DI SC PICKUP OFFSET DISC HERBICIDE SPRAYR OFFSET DISC BEDDER F E R T. A P P L I , R E N T D PICKUP ROLLING CULT V- T Y P E D I T C H E R PICKUP VEGETABLE PLANTR HERBICIDE SPRAYR TOOLBAR CULT PICKUP PICKUP TOOLBAR CULT PICKUP TOOLBAR CULT PICKUP TOOLBAR CULT PICKUP PICKUP PICKUP PICKUP PICKUP ITEM NO. 1,37 1,32 1,34 1,37 10 1,37 55 1,37 2,39 2,86 10 2,41 2,56 10 2,46 2,55 2,43 10 10 2,43 10 2,43 10 2,43 10 10 10 10 10 DATE FIXFD FUEL,OIL, TIMES LABOR MACHINE L U B . , R E P. COSTS OVER HOURS HOURS PER ACRE PER ACRE J U LY J U LY J U LY J U LY J U LY AUG AUG AUG AUG AUG AUG SEPT SEPT SEPT OCT OCT OCT OCT NOV DEC DEC JAN JAN FEB FEB MAR APR MAY JUNE 1.00 0.239 0.50 0.157 0.50 0.356 1.00 0.239 0.10 0.125 1.00 0.239 1.00 0.0 1.00 0.239 1.00 0.231 1.00 0.097 0.10 0.125 1.00 0.181 0.419 1.00 0.10 0.125 0.500 1.30 1.00 0.271 1.00 0.214 0.10 0.125 0.10 0.125 1.00 0.214 0.10 0.125 1.00 0.214 0.10 0.125 1.00 0.214 0.10 0.125 0.10 0.125 0.10 0.125 0.10 0.125 0.10 J l i l Z l 5.525 TO TA L S 0.159 0.105 0.237 0.159 0.100 0.159 0.181 0.159 0.154 0.064 0.100 0.121 0.279 0.100 0.333 0.181 0.143 0.100 0.100 0.143 0.100 0.143 0.100 0.143 0.100 0.100 0.100 0.100 _Q*itta 0.95 0.60 1.49 0.95 0.40 0.95 0.09 0.95 0.78 0.30 0.40 0.63 1.31 0.40 1.76 0.93 0.76 0.40 0.40 0.76 0.40 0.76 0.40 0.76 0.40 0.40 0.40 0.40 -Q*.*tQ 0.62 0.34 0.93 0.62 0.20 0.62 0.27 0.62 0.58 0.17 0.20 0.46 0.77 0.20 1.57 0.74 0.63 0.20 0.20 0.63 0.20 0.63 0.20 0.63 0.20 0.20 0.20 0.20 -Q-.2Q 4.064 19.47 13.27 PROJECTED, 1976 BUDGET IDENTIFICATION NUMBERA N N U A L C A P I TA L M O N T H 6 - 9 1 5 0 0 6 8 0 11 6 5 0 0