r 08000300 TEXAS TRANS-PECOS REGION FOREWORD r r The enterprise budgets for the Trans-Pecos region are based on yields as shown on form 08000500. The data contained in this report are based on estimates and actual records of operations within the two-county area (ReevesPecos). Even in a region so narrowly defined as this, variations in inputs and returns exist among farms and among managers. However, these budgets should serve as useful guides in planning and decision-making for persons con cerned with the area described above. Basic assumptions which are necessary to complete the budgeting process include a com pilation of crops to be budgeted, expected yields for irrigated only, and according to typical and high-level management. Farm size and machin ery complements for both levels of managment are required. Production practices, machinery operating rates and, finally, the budget develop ment complete the undertaking. In order, then, the assumptions were: farm size varied from 600 acres for the typical man ager to 1,000 acres for the high-level operator. Fully two-thirds of the land on die typical farm is fallowed while only one-third is handled in this manner on the high-level farm. Cotton is grown on approximately one-fourth of the typical farm and two-fifdis of the larger unit. Small grains are produced on fully 50 percent of die acreage in both cases. Calf grazing is heavily utilized. Irrigation systems vary from two wells of 1,000 GPM each on the smaller operation to four wells of 1,000 GPM capacity each on the larger unit. Management differences centered primarily on timing of operations rather than variations in cropping patterns or input levels. That is, the high level manager extracts greater yields, and usually greater profits from his enterprises due to superior ability to prepare for, plant, tend to and sell his crops in an optimum fashion. Land rent (net) is computed for cotton based on the landlord receiving one-fourth of the crop and government payment while supplying all of the land, the well, pump and irrigation system, and one-fourth of the fertilizer, herbicide, insec ticide, harvesting and ginning. No typical arrangements for cropsharing or cash leasing were identifiable; therefore, the opportunity cost concept on land value is used. TEXAS TRANS-PECOS REGION 1/ Assumed Prices Paid And Received By Farmers — Item Unit Price cwt. cwt. cwt. $ 29.00 43.00 10.00 10.00 150.00 29.00 43.00 10.00 3.00 Prices Paid (1975) Seed: Cotton (delinted) - Upland Grain Sorghum Barley Wheat (cleaned and treated) Alfalfa Cotton - Pima Forage Sorghum Oats Cantaloupe Custom Rates: Cotton (harvest and haul) - Upland Cotton (harvest and haul) - Pima Combining barley Combining wheat Combining grain sorghum Hay harvest Harvest cantaloupe Hauling: Grain sorghum Hay Wheat Barley Chemical spraying (aerial) Cotton ginning - Upland Cotton ginning - Pima Fuel and lubricants: Gasoline L.P. gas Diesel fuel Motor oil (heavy duty, detergent) Fertilizer (bulk): Nitrogen (anhydrous) Nitrogen (granular) Phosphorous Labor (except hoeing & irrigation) Labor (irrigation) Labor (hoeing) bu. cwt. cwt. cwt. cwt. lb. lb. Lint lb. Lint acre acre acre ton crat cwt. .07 .08 10.00 10.00 10.00 21.45 1.75 .20 ton bu. bu. 6.00 acre bale bale 2.00 26.00 35.50 gal. gal. gal. gal. .36 .24 .35 lb. lb. lb. hour hour hour .15 .15 1.75 .15 .30 .24 2.75 2.75 2.00 Assumed Prices Paid And Received By Farmers ijS^v Item Capital Chemicals: Pre-emergence herbicide Methyl parathion Malathion Hail insurance: Wheat Cotton Interest Capital Operating Unit 5 gal. gal. gal. Price $135.00 5.25 11.00 acre acre 13.50 37.50 .08 .09 $ $ Prices Received (1975) Cotton - Upland Cotton - Pima Cotton seed Wheat Grain sorghum Alfalfa hay Ensilage standing in field Pasture grazing Cantaloupe Barley lb. Lint lb. Lint ton bu. cwt. ton ton $ .40 .80 120.00 4.00 3.50 55.00 12.00 lb. gain crat cwt. 1/ These price assumptions are not to be interpreted as predictions or prospective prices. .20 6.50 4.00 ^ TEXAS TRANS-PECOS REGION Estimated Machinery and Equipment Cost Per Hour of Use Machinery Item and Size Tractor - 118 HP Tractor - 100 HP Tractor - 90 HP Tractor - 45 HP Pickup - 1/2 ton Swather, self-propelled - 14 feet Shredder - 2 row Shredder - 4 row Offset Disc - 9 feet Offset Disc - 12 feet Plow - 3 bottom Plow - 5 bottom Float - 12 feet Lister - 4 row Lister - 6 row Rolling Cultivator - 4 row Rolling Cultivator - 6 row Rototiller - 2 row Cultivator - 4 row Cultivator - 6 row Bed Planter - 4 row Spray Rig - 4 row Border Disc Grain Drill - 14 feet Grain Drill - 16 feet Disc Ridger - 4 row Vegetable Planter - 2 row Baler Purchase Price Estimated Years of Use Estimated Hours of Use Fixed Costs Per Hour Variable Costs Per Hour $13283 10395 9818 4043 4620 11550 6 6 8 15 4 6 8 10 8 8 8 8 10 8 10 8 8 10 10 10 10 10 10 10 10 10 10 5 7200 7200 8800 9000 4000 $ 1.94 1.52 1.39 1.22 1.09 14.63 $4.16 3.23 3.12 1.73 3.11 6.20 .77 .13 .49 .15 .70 .19 .93 .29 .24 .49 .28 .81 462 1617 1386 2310 1040 2021 1444 693 1271 809 1964 2888 982 1502 1386 404 289 1502 1848 809 1069 6353 900 800 1000 2000 2400 2400 2400 5000 1200 1500 800 1600 1600 2000 2500 2000 1500 800 500 500 800 1000 1500 2.42 .92 1.28 .58 1.12 .43 .76 1.26 1.34 1.63 2.69 .73 .90 1.03 .40 .54 4.48 5.51 1.51 1.59 4.54 1.20 .44 .77 .46 .42 .08 .31 .23 .24 .32 1.61 Co A L F A L F A F S T A B L I S H M F N T. I R R I G A T F D , T F X A S T R A N S - P E C O S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P F P A C R F TYPICAL MANAGEMENT JNIT PPTCE HR VA L U E HR COST/UNIT QUANTITY COST 1. GPnss PFCFIPTS FROM PPODUCTIOM TDTAL 0.0 ?, VAPTARLE COSTS r»-?-HAPVFST seed FPRT<^-46-n) FERTH.I7FR APPLI MACHINERY TRACTORS IP^TGATTON MACHINEPY I A 3 0 P ( T R A C TO P & M A C H I N E P Y ) I At?OP( TRP IGATION) T N T- P E S T O N O P. C A P. S U B TO TA L . P R E - H A P V F S T _RS. ACRF ACRACRC ACRE ACRF HOJR HOUR DOL. 1.5^ 1 1.™ 1.75 1.31 7.^0 63. 7C 2.75 2.75 0,f>Q l.on l.DD 1.C0 1.00 1.00 3.47 3.2C 32.46 2*22 151 .31 $ $ HA^vrsT costs SUBTOTAL. HARVFST 0.? $ 151.31 TDTAL VA^TABLF COST s-- 1 5 1 . 3 1 7 o IMTIM= ARnvF VARIABLE COSTS A. FIXFO COSTS MA'-H INFPY TRACTORS I RO I GATTCN MACHINEPY LAND (NFT RENT) TOTAL FIXED COSTS 45. CO 11 .00 1.75 1.31 7.30 63.7? 9.53 8.79 30. )C ACPE ACRE ACRE ACRF P. 6 0 3.53 38.22 3 0 . P C 1 .C3 1.00 1.00 0.0 7 2.60 3.53 38.22 $ 65.35 <^. TDTAL COSTS $ 216.66 6. N„T orJUPNS $-- 2 1 6 . 6 6 * ON_Y PHOSPHORUS REQUIPPD. R U D G F T I D E N T I F I C AT I O N N U M B E R 8 11 P 0 8 7 P 2 8 5 7 A N N U A _ C A P I TA L M O N T H 1 2 PROJECTED. 1975 A . FA L FA E S TA B L I S H M E N T. I R R I G AT E D . T E X A S T R A N S - P E C O S R E G I O N FSTIMATED COSTS AND RETURNS PFR ACRE TYPICAL MANAGEMENT D P F PAT I O N NO. FUEL.OIL. FIXED ITEM TIMES LABOR MACHINF LUB..REO. COSTS D AT F O V E R H O U R S H O U R S P E R A C R E P E R A C P E PLDW ^3 2,36 AUG 1.0C C.943 0.629 0.12 OFFSET DISC 2,34 AUG l.OC D.345 C.23C 0.C4 nppSFT pic.c 2,34 AUG l.OC D.345 C.230 0.04 ^ L ' l AT 2,38 AUG 2.DC 1.026 0.684 0.13 "ICKIP IH AUG 0.10 0.125 CIOC ^.23 ( . GRAIN DRILL 4,52 SEPT 1.00 0.307 0.205 0.C6 PTCKU^ I? SFPT 0.10 }.125 C.lCf 0.23 PICKU"5 ID OCT CIO 0.125 C.10C 0.23 ^ • ^TCKU' 10 TO TA L S * HN.Y NOV 0.10 _1a.1___5. 3.467 PHOSPHORUS _Ca1£1 0.2 2.378 REQUIRED. 4 U D G F T I D E N T I F I C AT I O N N U M B E R 0 8 11 0 C 8 7 0 2 8 5 A N N U A L C A P I TA L M O N T H 1 2 1.31 3 C.36 0.21 f.21 C.49 1 0 0.92 CIO 1 0 _C.jl.LCL ?•6C PROJECTED, 1975 A L FA L FA , I R R I G AT F D , T E X A S T R A N S - P E C O S R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT JNIT GPOSS RFCEIPTS FROM PRODUCTION HAY TDTAL PRICF DR VA L U E OR COST/UNIT QUANTITY COST 55.00 6.0 0 -aiaa_i.£.aL $ 330.00 VAPTABLF COSTS DRFHAPVEST FERT(o-46-0) ACRE 11 . 0 0 Fr:?TlLI7FR APPLI ACRE 1.75 MACHINERY ACRE 1.62 I R R I G AT I O N MACHINEPY ACRE 11 7 . 6 T L A B O R ( T PA C T O R F, M A C H I N F P Y ) H O U P 2 . 7 5 LAB<DR< IRR I G AT I O N ) HOUR 2.75 INTEREST ON O P. C A P. DOL. O.C9 SUBTOTAL, PRE-HARVFST 1.00 I.00 1.00 1.C0 C.87 5.90 48.84 11. CO 1.75 1.62 11 7 . 6 r 2.41 16.24 HARVEST COSTS MAYING ^STACKING SUBTOTAL, HARVEST T3N TON 21.45 6.00 _1_28.__.7C $ 128.70 TDTAL VARIABLE COST "*. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINEPY TRACTORS I R R I G AT I O N M A C H I N E RY PRORATED ESTAB. COST LAND (NET RENT) TDTAL FIXFD COSTS fi_t.f_.2L 155.01 * 283.71 $ 46.29 $ ACRE ACRE ACRE ACRF ACRE 0.71 0.0 70.56 225.33 3^0.OC 1.00 1 .00 l.OC 0.25 0.07 0.71 C O 70.56 56.33 -__U_t.&& $ 148.60 5 . T O TA L C O S T S s 6. NzT RrTURNS $-102.31 432.31 ESTABLISHMENT COST PROPATFD OVFR 4 YEARS. CUBING ADDS S3/TON VALUE RUr ADDS S2/TON HARVESTING COST. ONLY PHOSPHORUS REQUIRED. PROJECTED, 1975 B U D G F T I D E N T I F I C AT I O N N U M B F R 8 1 0 0 8 9 0 2 8 5 ^ 0 A N N U A . C A P I TA L M O N T H 1 0 ALFALFA, IRRIGATED, TFXAS TRANS-PECOS REGION FSTIMATFD COSTS AND RETURNS PEP ACRE TYPICAL MANAGEMENT FUEL.OIL, FIXED I T E M T I M E S L A 3 0 R M A C H I N E L U B . . P E P. C O S T S 0 C - E Q AT I 3 N N O . D AT F O V E R H O U R S H O U R S P E P A C R E P E R A C R E PICKU=> PICKUP PICKja PICKUP PICKU° PICKU^ pickup 10 15 1" 10 10 10 io TO TA L S APR M AY JUNE J U LY AUG SEPT oct c.io 0.10 0.10 0.10 0.10 n.lr OolO 0.125 2.125 0.125 ?.125 3.125 7.125 _iAias 0.875 O.1C0 0.100 C100 0.1OC 0.10C C.100 _£ilO£) 0.23 0.23 0.23 0.23 0.23 0.23 -0*22 C.700 1.62 CIO 0.1O 0.10 0.10 ^.10 f.10 _0j_lO C.71 FSTA1LISHMFNT COST PRORATED OVER 4 YEARS. CUBING ADDS S3/TON VALUF BUT ADDS S2/TON HARVESTING COST. ONLY PHOSPHORUS REQUIRED. PROJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E * 0 8 1 0 0 8 9 0 2 8 5 ANNUA_ CAPITAL MONTH 10 /^% 8 A L F A L F A F S T A B L I S H M F N T, I R R I G A T E D , T E X A S T R A N S - P E C O S R F G I O N E S T I M AT E D C O S T S A N D P F T U ^ N S P E R A C ^ E HIGH LFVFL MANAGEMENT JNIT PRICF OR VA L U E np COST/UNIT QUANTITY COST 1. G30SS RFCEIPTS FROM PRODUCTION TDTAL ? • VA R I A B L E C O S T S PREHARVEST SEED FFPTC0-92-0) FF»TILI7ER APPLI MACHINERY TPAC TOPS IPPTGATTON MACHINEPY LA30R(TRACTOR !> MACHINERY) LAPOP( TPR IGATION) I N T E P F S T O N O P. C A ° . S U B TO TA L , P P F - H A P V F S T c r .3S. ACRE ACRE ACRF ACRE ACRE HOUR HOUR DOL. 1.50 22.00 1 .75 2.07 6. 14 5?.9A 2.75 2.75 0.O9 3C.0 0 1.C0 1 .00 1 .00 1.00 1 .00 2.99 2.71 34.84 45.^0 22.C0 1.75 2.07 6. 1 A 53.90 7.93 7.44 3*14 $ 149.^7 HARVEST COSTS SUBTOTAL, HARVFST $ TDTAL VARIABLE COST s 0.^ 149.37 3. T^CDM=- ABOVE VARIABLF COSTS $ -- 1 4 9 . 3 7 A. FIXFD COSTS MACHINFRY T=*AC TO?S IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS $ ACRE ACRE ACPE ACRE 2.59 2. 59 2.79 32. 34 1 .CO l.or 32.34 30CC0 1.00 0.07 s -_?is.00 58.71 5 . T D TA L C P S T S $ 2 0 8.08 *. NrT RETURNS *-2.}8. 08 * PN_V PHOSPHORUS REQUIRED. BUDGFT IDENTIFICATION NUMBER A N N J A . C A P I TA L M O N T H 1 2 PPCJECTED, 1975 8 11 O C 8 6 0 1 8 5 ! A I r A L FA E S TA B L I S H M E N T, I R R I G AT E D , T E X A S T PA N S - R F C O S R E G I O N ESTIMATED COSTS AND RFTURNS PFR ACRF HIGH LEVEL MANAGEMENT n p e r R AT T- i N Pt OW SR HFFSFT DISC nFFS^r DISC F L O AT PI CK')"> G PAT N D R I L L PTCKJ3 RICKU^ ^ICKU3 NO. -UFL.OIL, FIXED I T F M T I M E S _ . A 3 0 P M A C H I N E L U B . , R E P. C O S T S D AT F O V E R H 3 U R S H O U R S ^ F R A C R E P E P A C P E 1 » 35 3,3 3 3,33 3,^7 11 5,51 11 11 11 AUG 1.00 AUG AUG AUG AUG i. :• o SEPT SFnT OCT NOV T3T&l.e. 4 O N LY 1 .00 2 .00 0.10 1 .00 0.10 0.10 0.10 0.572 3.259 3 .259 1 .026 0.125 3 .269 3.125 3 .125 o.icc _2_.i2_i _____!__£_ 2.884 PHOSPHORUS 0.381 0. 1 73 0.1 73 0.684 0. IOC 0.179 0. 100 1 .989 PFOUlRFD. B U D G E T i n F N T I F T C AT I O N N U M B E R 0 8 11 3 0 8 f t 0 1 H 5 A N N U A . C A P I TA L M O N T H 1 2 0.35 0.12 0.12 0.20 0.31 0.C4 0.31 0.31 0.4 3 0.2 2 o .22 __L__3I JL*1L 2.07 2.59 0.29 0.11 0.99 0.11 O . l l PPOJECTED, 1975 /S% 10 A L FA L FA , I R R I G AT F D , T ^ X A S T PA N S - P F C O S R F G I C N F S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT JNIT 1. GROSS RFCEIPTS FROM PRODUCTION HAY TDTAL ? . VA R I A B L E C O S T S RREHARVFST -E=>T( 0-92-O) FERTIL T2ER APPLI MACHINFRY IRRIGATION MACHINERY L A 3 P R ( T PA C TO P t M A C H I N E RY ) LABOP( IRR IGATION) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST HARVEST COSTS pAI_pd WIRE CJSTOM HAULING MACHINERY TRACTORS I. AHOP( TRACTOR & MACHINERY) SUBTOTAL, HARVFST PRICE OR VA L U F OP COST/UNIT QUANTITY COST $ TON ACRE ACRE ACRF ACRE HOUR HOUR DOL. 5 5.0 8.00 __ti-_.__Q.__ * 4 40.CO 22. <^ 1.75 2.1 7 11 7 . 6 0 2.75 2.75 0.09 1.00 l.CO l.CO 1.00 0.87 5.9> 56.61 22.CO 1. 75 2. 17 11 7 . 6 0 2. 41 16.24 $ S TON TON ACRE ACRE HOUR 4.95 6.0 0 6.75 5.48 2.75 9.00 8.33 l.CO 1.00 3.0 8 39.6C 48.00 6. 75 5.48 84.49 108.32 $ TDTAL VARIABLF COST 275.58 $ 164.42 3 • INCOME ABOVE VAPIABLP COSTS 4 . FIXED COSTS MACHINFRY TRACTORS I R R I G AT I O N M A C H I N E RY PRORATED ESTAB. COST LAND (NFT RENT) TOTAL FIXFD COSTS _U.I£ 167.26 ACRE ACRE ACRE ACRE ACPE 1 7.78 2.4.5 70.56 215.40 300.00 5 . T D TA L C O S T S NFT RETURN' 1.30 1.00 l.CO 0.20 0,(7 17.78 2.45 70.56 43.08 s I 54.88 s 430.45 $ 9.55 F S TA 3 L I S H M F N T C O S T P R O R AT E D O V E R 5 Y E A R S . C U B I N G A D D S S 3 / TO N VA L U F n'JT ADDS H2/TON HARVESTING COST. ONLY PHOSPHORUS REQUIRED. PPOJECTED, 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 8 1 3 0 8 9 3 1 8 5 0 0 A N N U A . C A P I TA L M O N T H 1 0 11 A L FA L FA , I R R I G AT E D , T E X A S T R A N S - P E C O S R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT O P E R AT I O N PICKUP °TCKU° S WAT H E R BALER "TCKIJR S WAT H E R BALER PICKLJR S WAT H E R BAl.FR oTCKU3 SWATHER BALER PTCK'J3 S WAT H E R PALFR PICKU° NO. S . P. FUEL,OIL, FIXED I T E M T I M E S L A 3 Q P M A C H I N E L U B . , R E P. C O S T S D AT E O V E R H O U R S H O U R S » E R A C R E P F P A C P E 11 11 21 3,63 S . P. 11 21 3.63 S . P. 11 21 3,63 S.R. 11 21 3,63 11 S . P. TO TA L S 21 3,63 11 APR MAY MAY MAY JUNE JUNE JUNF J U LY J U LY J U LY AUG AUG AUG SEPT SEPT SEPT OCT 3.960 0.1 c 3.125 0.10 3 .125 1.00 0.177 l.OC 3.440 0.1O 3.125 1 .00 D.177 l.OC 3.440 0.10 0.125 1 .00 3.177 1.30 0.440 0.10 3.125 1.30 3.177 1 .00 3.440 0.10 3.125 1.30 3.177 1.00 0.440 0 . 1 0 -1+125 2.874 0. 142 0.293 O.IOC C 142 0.293 C.100 0. 142 0.293 C 1 OC C. 142 0.293 C IOC 0. 142 0.293 0.31 0.31 0.88 0.47 0.31 0.88 0.47 0.31 0.88 0.47 C.31 0.88 0.47 0.31 0.88 0.47 0 . 11 0 . 11 2.07 1 .33 C.ll 2.07 1 .33 O.ll 2.0 7 1.33 C . l l 2.0 7 1 .33 O.ll 2.07 1 .33 _fi_a-__: -0*21 _<U1I C 10." c.icr 8.92 17.78 E S TA B L I S H M E N T C O S T P R O R AT E D O V E P 5 Y E A R S . C U B I N G A D D S S 3 / T 0 N VA L U E BUT ADDS S2/TON HARVESTING COST. DNLY PHOSPHORUS REQUIRED. PROJECTED, 1975 B U D G F T I D E N T I F I C AT I O N N U M B F R 0 8 1 ( - 3 8 9 0 1 8 5 A N N U A . C A P I TA L M O N T H 1 0 12 B A R L E Y F O R G R A I N , I R R I G AT E D , T E X A S T R A N S - P E C O S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E TYPICAL MANAGEMENT JNIT GROSS RECEIPTS FROM PRODUCTION BARLEY GRAZING TDTAL PRICE OR VA L U E OR COST/UNIT QUANTITY COST CWT. LBS. 4.00 0.20 31.20 240.00 124.80 _______ S 172.80 2. VARIABLE COSTS PREHARVEST SFED FERT(ICO-O-O) HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LABORCTPACTOR & MACHINERY) LABORtIRR IGATION) INTEREST ON OP. CAP. SUBTOTAL, PRE-HARVEST CWT. ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. 10.00 15.CO 13.16 2.76 8.43 81.70 2.75 2.75 0.09 1.00 1.00 1.00 1.00 1.00 1.00 4.70 4.67 68.29 10.OC 15.00 13.16 2.76 8.43 81.70 12.92 12.85 fetli $ 162.97 HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL, HARVEST ACRE CWT. 10.00 o.l5 l.CO 31.20 $ s 177.65 TDTAL VARIABLE COST -4.85 3. IMCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTOPS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 10.00 4.66 14.68 ACRE ACRE ACRE ACRE 3.40 4.09 43.70 300.00 1.00 1.00 1.00 0.07 3.40 4.09 43.70 $ __ai___ 72.19 5. TOTAL COSTS $ 249.84 6. NET RETURNS $ -77.04 * 1974-1975 CROP. BUDGET IDENTIFICATION NUMBER ANNUAL CAPITAL MONTH 5 PROJECTED, 1975 71 008902 850 0 13 BARLEY FOP GRAIN, IRPIGATFD. TEXAS TRANS-PECOS REGION ESTIMATED COSTS AND RETURNS PEP ACRE TYPICAL MANAGEMENT OPERATION ITFM NO. PLOW 3fiI OFFSET D I S C F F R T. a p P LT, R E N T D O F r s - T DISC r | _ O AT o l CK'JR 2 . 2 . 4 , 2 • 2 , LISTER 4P GRAIN DRILL MCKU"> PICKIJ* pIrkU3 2 • 40 4 , 5 2 10 i o 10 10 RICKU3 PICKUR PICKUP PICKU3 PICKU3 3 6 3 4 8 6 34 3 8 10 13 10 10 13 13 pickup DATE AUG AUG AUG AUG AUG AUG AUG SEPT SEPT OCT NOV DEC JAN ~EB MAR APR M AY TDTAL ? FUEL,OIL, FIXED TIMES LABOR MACHINE LUB.,REP. COSTS OVER HOURS HOURS PER ACRE PFP ACRE 1 .00 l.OC 1.0 0 1.0 0 2.00 0.10 1.30 1 .00 0.10 0.10 0.10 o.to c i e 0.1 0.1 0.1 0.1 0 0 0 0 0.943 3.345 0.097 0.345 1 .026 3.125 3.385 3.307 3.125 3.125 0.125 3.125 3.125 3 .125 0.125 ? .125 _li.l25 0.629 C2 30 ( .0 64 0.12 0.04 0 . 3 6 C.21 o.o 0 . 0 C 2 30 o . 6 84 CIOC 0.257 0.205 C.100 C I O C C.100 C.100 C. 1*C C.100 0.21 C.49 C I O 0.20 C.92 0.10 C I O C 0.04 0. 13 0.23 0.06 0.C6 0.23 0.23 0.23 0.23 0.23 0.23 0.23 0.23 _.i-aaQ. -0*22 0.10 C fl O 4.698 3.299 2.76 3.40 cioc * 1974-1975 CROP. BUDGFT IDCNTIFICATION NUMBER ANNUA. CAPITAL MONTH 5 c.io C I O 0.10 0.10 C .10 c.io /^% PROJECTED. 1975 071 0089 028 5 14 if* B A R L E Y F O R G PA I N , I R R I G AT E D , T E X A S T R A N S - P E C O S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P E R A C R E HIGH LEVEL MANAGEMENT JNIT GPOSS RECEIPTS FROM PRODUCTION BARLFY GRAZING TOTAL C VA R I A B L E C O S T S PREHARVFST SEED F F RT ( ? r. r - t - 0 ) HAIL INSURANCE MACHINERY TRACTOPS IPRIGATTON MACHINERY LA30R{TRACTOR f, MACHINERY) L A B O R ( I P R I G AT I O N ) I N T E R E S T O N O P. C A P. SUBTOTAL, PRE-HARVEST HARVFST COSTS CUSTOM COMBINF CUSTOM HAUL SU3TOTAL, HARVEST PRICE OR VA L U E OP COST/UNIT QUANTITY COST CWT. _BS. 4.00 0.20 43.20 300.00 S 232.80 ACRE ACRE ACRF ACRE ACRE ACRE HOUR HOUR DOL. 10.00 30.00 13.16 4.01 8.0C 81.7A 2.75 2.75 0.09 1.00 l.CO 1.00 1.00 1.00 1.00 3.96 4.67 79.77 10.00 30.0 0 13. 16 4.CI 8.00 81.70 10.89 12.85 $ ACPE CWT. 10.CO C.15 1.00 43.20 1*15 177.80 10.CO _s.±_ 16.48 S 194.28 TDTAL VARTABLF COST $ "*. INCOME ABOVE VARIABLE COSTS 4 . fi x F D C O S T S MACHINEPY TRACTORS I R R I G AT I O N M A C H I N F RY LAND (NET PENT) TOTAL FIXFD COSTS 172.80 38.52 <6 ACRE ACRE ACRE ACRp 3.43 3.69 43.70 3C0.00 1.30 l.CO 1 .00 C.C7 3.4 3 3.69 43.70 —21+02 $ 71.83 5 . TO TA L C O S T S $ 266.1 1 6. NrT P~TURNS * -33.31 1 Q 7 4 - 1 9 7 5 C R O P. PUDGET IDF.NT IFTCATTON NUMBER A N N U A . C A P I TA L M O N T H 5 PROJECTED, 1975 71 308901 85' 15 BARLEY FOR GRAIN, IRRIGATED, TEXAS TRANS-PECOS REGION ESTIMATED COSTS AND RETURNS PEP ACRF HIGH LEVEL MANAGEMENT OPERATION PLOW 5 3 OFFSFT DTSC P F P T # / V P P LT , R E N T D OFFSET DTSC F L O AT .ISTFR 6P PICKU3 GRAIN DRILL PICKUP PICKU° PICKIJR PICKUP PICKUP PICKUP PICKUP PTCKU3 PICKUP /^% FUEL.OIL, FIXED ITEM TIMES . A B O R M A C H I N E l _ U B . , R E P. C O S T S HOURS 3ER ACRE PEP ACP: N O . D AT F O V F R H O U R S 1 • 35 3,33 3.87 3 • 33 1 • 37 1 • 39 11 5 .51 AUG AUG AUG AUG AUG AUG AUG SEPT SEPT OCT NOV DEC JAN = E8 MAR APR M AY T O TA L S 1 .00 l.OC 1 .00 l.«C 2.00 1.00 0.10 1 .30 0*10 o.io 0.572 o • 259 D.097 0.259 1 .026 3.231 0.125 3.269 3.125 3.125 3.125 3 .125 0.125 3.125 0.125 0.125 0.381 0.173 f . 0 64 0. 173 0.684 0. 1 54 C 100 0. 179 C IOC c. 100 C 1 OC C 1 CO 0 . 0 0.12 0.20 0.08 0.31 0.04 0.31 0.31 0.31 0.31 0.31 0.31 0.31 0.31 C.43 0.22 C O 0 . 2 2 C.29 0 . 1 9 0.11 0.99 Cl 1 C . l l C . l l C . l l 0.11 C . l l 0.11 0.10 0.10 0.10 0.1C 0.10 0.1C 0 . 1 0 _2-_JL2__ 0 . 1 oc ______ _____ o . n _____ 3.962 2.808 4.01 3.43 o • i or C.100 0. 100 PROJECTED, 1975 * I Q 7 4 - 1 9 7 * C R O P. BUDGET IDENTIFICATION NUMBFR A N N U A . C A P I TA L M O N T H 5 0.35 0.12 071 0089 018 5 16 CANTALOUPS, IRRIGATED, TEXAS TRANS-PECOS REGION FSTIMATFD COSTS AND RETURNS PFP ACRE TYPTCAL MANAGEMENT VALUF OR COST PRICF OR JNIT COST/UNIT QUANTITY 1. GROSS RECEIPTS FROM PRODUCTION MFL3NS TDTAL C R AT 2 . VA R I A B L E C O S T S PREHARVEST SEED F-RT(16f-5C-C) BEF RENT MACHINERY TRACTORS IRRIGATION MACHINEPY LABOR(TRACTOR & MACHINERY) L A 3 0 R < I R R I G AT I O N ) QTH^R LABOR I N T E R F ^ T O N O P. C A P. SUBTOTAL, PPE-HARVFST L3S. ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. HARVFST COSTS HAND HARVEST RROCFSSeMARKET SUBTOTAL, HARVEST 6.50 3.0C 36.00 10.CC 4.02 12.94 51.6C 2.75 2.75 2.75 0.09 1 50. 0 0 _9i5«.e.a $ 975.00 $ 6.00 36.00 4.0C 4.C2 12.94 51.60 18.87 6. 12 82.50 4*39 228.43 2.0* 1.00 O.40 l.CO 1.00 l.CC 6.86 2.95 30.00 48.73 $ C R AT C R AT 1.75 3.0 0 15C0C 150.00 262.50 .£_.&&*.-!.-_. $ 712.50 $ 94C.93 TDTAL VARIABLE COST 34.C7 7. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS TPPIGATION MACHINERY LAND (NET RENT) TO TA L F I X E D C O S T S S ACRE ACRE ACRE ACR^ 4.34 6.20 27.60 300.00 4. 34 6.20 27.60 1.00 1.00 l.CO C C 7 $ —-1*00 59. 13 $1000.07 5 . T D TA L C O S T S $ -25.07 A. NET P'TUPNS PPOJECTFD, 1975 B U D G F T I D E N T I F I C AT I O N N U M B F P A N N U A . C A P I TA . M O N T H 9 9743O8602 85<* C 17 CANTALOUPS. IRRIGATED, TEXAS TRANS-PECOS REGION ESTIMATFD COSTS AND RETURNS PER ACRF TYPICAL MANAGEMENT ITEM O R E PAT I O N NO. D AT E PI OW 3B p ICK'JP 2.36 JAN 10 OFFSET DISC F F P T. A P P U I » P F N T D OFFSET DISC F|. OAT PTCKU3 LISTER 4R piCKin PICKUP R O L L . C U . T I VAT O R VEG.PLANTER pICKUP C U LT I VAT O R 4 R PTCKIJP C U LT I VAT O R 4 R PICKUP PICKUP PICKUP 2 4 2 2 JAN FFB FEB FFB FFB ,34 ,86 ,34 ,38 10 2,40 IC 10 4,42 2.55 10 2»44 10 2,44 10 IC 1 " FEB MAR MAP APR M AY M AY M AY JUNF JUNF J U LY J U LY AUG SEPT T O TA L S T I M E S LABOR MACHINE OVER HOURS HOURS 1 . *C 0.15 1.00 1 .00 1.00 2.00 0.15 1.00 0.15 0.15 l.OC l.OC 0.15 2.00 0.15 1 .00 0.15 0.1 5 0.15 0.94 3 3.187 0.345 3.097 o .345 FUEL.OIL. FIXED L U B . , R E P. COSTS " E R A C R E PEP ACRE 0.629 0.150 C.23C CO 64 0.2 30 0.6 84 C 1 5 0 0.2 57 C 1 5 0 C.15C 0.1 81 0.4 59 0. 150 0.4 76 0.1 5C 0.238 C.15C C 1 5 C 0. 12 0.35 0.C4 C.36 0.15 C.21 0 . 0 0 . 0 0.04 0. 13 0.35 0.06 0.35 C.35 0.C5 0. 15 0.35 0.21 0.35 0.11 0.35 0.35 C.21 C 4 9 0.15 C.20 0.15 C.15 0.24 C 7 3 C.15 0.35 0.15 C .17 -1*121 _ _ _ _ _ _ _____ J0*15 4.02 4.34 1 .026 3.187 3.385 0.187 3.187 3.271 3 .5 39 3.187 ^ .714 3 3 0 0 .187 .357 .187 .187 5.860 4.799 C. 15 0.15 PROJFCTFD. 1975 flUOGFT IDENTIFICATION NUM3FP ANNUA. CAPITAL MONTH 9 09743086 C28 5 18 CANTALOUPS. IRRIGATED. TEXAS TRANS-PECOS REGION ESTIMATED COSTS AND RETURNS PER ACRF HIGH LFVEL MANAGEMENT UNIT 1. GROSS RECEIPTS FROM PRODUCTION MELONS TOTAL 2 . VA R I A B L F C O S T S PREHARVEST SEEP" FEPT(18f-50-0) BEF PFNT MACHINFPY TRACTOPS IRPIf-ATTON MACHINERY LABORITPACTOR £ MACHINFRY) L A B O R ! I R P I G AT I O N ) OTHEP LABOR I N T E R F S T O N O P. C A P. SUBTOTAL, PRE-HARVEST # ^ HAPVFST COSTS HAND HARVEST PROCFSSF-MARKET SUBTOTAL, HARVEST RAT .BS. ACRE ACRE ACRE ACRE ACRE HOUR HOUR HOUR DOL. PRICE OR VA L U E OP COST/UNIT QUANTITY COST 6.50 3.00 39.00 10. OC 5.77 9.16 60.20 2.75 2.75 2.75 0.09 2OC.00 13__i2.__Q.-l $1300.00 2.00 1.00 0.67 1.00 l.CO 1.00 5.85 3.44 30.00 52.43 6.00 39.00 6.67 5.77 9. 16 60.20 16. 10 9.47 82. 5C 4*72 S 239.58 C R AT C R AT S 1.75 200.00 350.00 3.0 0 200.00 _S.0JLi.Q.Q. * 950.00 $ 11 8 9 . 5 8 TO TA L VA R I A B L F C O S T 3. INCOME ABOVE VARIABLE COSTS $ 4. FIXFD COSTS MACHINEPY TRACTORS I R R I G AT I O N M A C H I N E RY LAND (NET PFNT) TOTAL FIXED COSTS $ ACRE ACRE ACRE ACRF 4.6 4.1 32.2 300.0 8 5 0 0 1.00 1.00 l.CO C C 7 1 10.42 4.68 4. 15 32.20 $ ___l_co 62.04 5 . T D TA L C O S T S $1251.62 C NET RETURNS $ 48. 38 PROJECTED, 1975 BUDGET IDENTIFICATION NUMBFR A N N U A . C A P I TA L M O N T H 9 97430973 1 850 C 19 C A N TA L O U P S . I R P I G AT E D , T F X A S T PA N S - P F C O S R E G I O N ESTIMATED COSTS AND RETURNS 3ER ACRF HIGH LEVEL MANAGEMENT OPFPATION "LOW 5B PICKUP OFFSET DISC F E R T. A P P L I . R E N T D OFFSFT DISC FLOAT PICKU3 PTCKU3 PICKUP .ISTE5 6R R O L L . C U LT I VAT O R VFG.PLANTEP PICKUP P O L L . C U LT I VAT O R PICKUP R O L L . C U LT I VAT O R PICKIJR "ICKUP PICKU* FUEL.OIL, FIXED ITEM TIMES L A B O R M A C H I N E L U B . . R E P. C O S T S HOURS RFR ACRE PER ACPE N O . D AT F O V E R H O U R S 1,35 11 3,33 5,87 3,33 3,37 11 11 11 1 ,39 5.41 5,55 11 5,41 11 5,41 11 11 11 JAN JAN FEB FFB FEB FEB FEB MAR APR MAY M AY M AY MAY JUNE JUNF J U LY J U LY AUG SEPT TO TA L S C.381 1 .00 0.572 0.15 0.187 C.15C 3.259 C. 173 1.30 0 • 0 64 1 .00 0.397 0.173 l.Oo 0.259 0.6 84 2.30 1 .026 0.15 3.187 0.1 50 0.15 0.187 0.150 0.150 0.15 0.187 1 .00 3.231 0 • 1 54 0.172 l.OC 3.258 1 .00 3 .689 0.4 59 0.15 3.187 C150 0.345 2.00 3 .51 7 0.15 3.187 0. 150 LOG 0.258 0.172 0.187 C150 0. 15 C 1 50 0.15 3.187 0 . 1 5 -2.1.1.87 _ _ _ _ _ _ 5.854 4.127 0.35 0.47 0. 12 0.43 0.16 0.22 C C C O 0.12 0.20 0.47 0.47 0.47 0.08 0.14 0. 15 0.47 0.28 0.47 0.14 0.47 0.47 0.22 C .29 C .16 0.16 0.16 C.19 0.28 C 7 3 0.16 0.56 0.16 0.28 C 16 0.16 -0*±1 JL*15 5.77 4.68 PROJECTED• 1975 BUDGFT IDENTIFICATION NUMBER A N N U A . C A P I TA L M O N T H 9 09743087 CI8 5 PIMA COTTON, IRRIGATED, TEXAS TRANS-PECOS REGION FSTIMATED COSTS AND RETURNS PER ACRF TYPICAL MANAGEMENT JNIT GROSS RECFIPTS FROM PRODUCTI3N COTTON LINT COTTONSEED TDTAL C VA P I A B L F C O S T S PREHARVFST SFEO F^RT(250-10C-0) FERTILIZER APPLI HER3ICIDF INSECTICIDE HAIL INSURANCE MACHINERY TRACTOPS IRRIGATION MACHINERY L A 3 0 P ( T PA C T 0 R & M A C H I N E RY ) LABOR!TPR IGATION) I N T F P E S T O N O P. C A P. SUBTOTAL, PRE-HARVEST HAPVEST COSTS CUST COTTON PICK GIN, RAG, TIFS SUBTOTAL, HARVEST .BS. TON 20 PRICE OR VA L U F OR COST/UNIT QUANTITY COST 0.80 120•0C 360.CO 45C.00 o.36 —±2*20 $ C W T. ACRE ACRE ACRE APPL ACRE ACRE ACRF ACRE HOUR HOUR DOL. 29.OC 61.50 1.75 12.00 5.50 37.50 3.55 14.85 94.60 2.75 2.75 0 . 0 9 403.20 10.44 61.53 1.75 12.00 55.0 0 37.50 3.55 14.85 94.60 21. 17 14.88 C 3 6 1.00 l.CO 1.00 1C.C3 1.00 l.CO 1.00 1.00 7.70 5.41 150.27 __1__52 $ 340.77 _BS. BALE 0.08 35.50 36.00 450.00 0.90 TOTAL VAPIABLF COST _ _ 11 _ 2 5 $ 67.95 $ 408.72 -5.52 -t. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINERY TRACTORS I R R I G AT I O N M A C H I N E RY LAND (NET PENT) TO TA L F I X E D C O S T S ACRF ACRE ACRE ACRE 4.86 7.47 50.60 63.69 1.30 1.00 1.00 l.OC 4.86 7.47 5C.60 §2+52 $ 126.62 5 . T D TA L C O S T S $ 535.33 *. NFT RETURNS $-132.13 LAND CHARGE BASED ON LANDLORD SHARE OF 1/4 OF GROSS F E R T I L I Z F P. I N S E C T I C I D F. A N D G I N N I N G . B U D G E T I D E N T I F I C AT I O N N U M B E P 9 3 1 D 0 8 6 0 2 8 5 C 0 A M N U A L C A P I TA L M O N T H 11 INCOMF LESS 1/4 OF PROJECTED. 1975 21 P I M A C O T T O N . I R R I G AT E D . T F X A S T PA N S - P F C O S P F G I O N F S T I M AT F D C O S T S A N D R E T U R N S P F R A C R F TYPICAL MANAGEMENT OPFPAT TON SHREDFR ?P PLOW *B PICKUP OFFSET DISC S P R AY R I G OFFSET DICC q . i A T PTCKIJR LT S T F 5 4 P PICKUP POLL. C U . T I VATO R PICKU3 BFD-PLANTFR R O L L . C U LT T VAT D R PICKUP C U LT I VATO R 4 R PTCKU3 C U LT I VATO R 4 R PICKUP RICKUD PICKUP PICKUP TO TA L S FUEL.OIL. FIXED ITEM TIMES L A B O R MACHINF LUB..REP. COSTS HOURS PER ACRE PER ACR? N O . D AT E O V E R H O U R S 4 , 3 2 2 , 3 6 10 2 . 3 4 4 , 4 8 2 , 3 4 2 , 3 8 10 2.40 10 4 , 4 2 13 2 , 4 6 4 , 4 2 10 2 , 4 4 10 2 , 4 4 13 10 ! 0 13 JAN JAN JAN FFB FEB FEB eFB FFB MAR MAR APR APR M AY M AY M AY JUNE JUNE JULY JULY AUG SFPT OCT ' 0.354 o.629 C I O C 0.2 30 0.302 0.460 0.684 0. 100 0.257 0.1 OO 0.181 C I O C 0.308 0.181 0.1 00 0.476 Cl 00 0.238 C IOC 0.100 C 1 00 C 0 5 0.12 0.23 0.04 0 . 0 7 0.07 0.13 0.23 0.06 0.23 0.05 0.23 0.28 0.05 0.23 0.21 C 2 3 0.11 0.23 0.23 0.23 - 1 * 1 2 5 ___122. -&*22 c.io -2-10. 3.55 4.86 1 .▶ 00 1 ., 0 0 0 «, 1 0 1 .▶ 00 3 .530 1 .. 0 0 2 ,▶ 00 2 ,▶ 30 C ▶ 10 3 . 4 D.6 1 .0 0 . 1 3 . 3 1«, 0 0 0 <, 1 0 1 ,▶ 30 0 ..1 0 1 ,. 2 0 1 .▶ 00 0 ,. 1 0 2 ,▶ 00 0 i. 1 0 I ,. 0 0 0 ,. 1 0 0 .. 1 0 0 .. 1 0 0 ,. 1 0 3 . 9 4 3 o .125 3 . 3 4 5 5 2 90 26 2 5 8 5 : 3 3 3 3 3 . . . . . .125 2 7 1 1 2 5 4 6 2 2 7 1 1 2 5 3 3 3 3 3 . . . . . 7 1 3 1 1 1 2 5 2 2 4 5 7 5 5 3 . 1 2 5 7.698 5.299 C.27 0.36 C.IO 0.21 C 2 4 C.42 C .49 c m 0 .20 C.IO r .24 0.10 C.64 C.24 c m 0.35 •3.10 C I 7 C I O C I O LAMD CHARGE BASED ON LANDLORD SHARE OF 1/4 OF GROSS INCOME LESS 1/4 CF FERTILIZER. INSFCTICIDE, AND GINNING. PROJECTED, 1975 BUDGFT IDENTIFICATION NUMBEP ANNUAL CAPITAL MONTH 11 09310086 028 5 P I M A C O T T O N , I R R I G AT E D , T E X A S T R A N S - P E C O S R E G I O N E S T I M AT E D C O S T S A N D R E T U R N S P F R A C R F HIGH LEVEL MANAGEMENT JNIT 1. GROSS PECEIPTS FROM PRODUCTION COTTON LINT COTTONSEED TOTAL ? . VA R I A B L E C O S T S PREHARVEST c;-rpn FeRT(19C-50-0) FERTILIZER APPLI HERBICIDE INSEC TICIDE HAIL INSURANCE MACHINEPY TRACTOPS IRRIGATION MACHINERY LABOR!TRACTOR & MACHINERY) LABOR!IPR IGATION) I N T E R E S T O N O P. C A P. SU3TOTAL. PRE-HARVEST HARVEST COSTS CJST COTTON PICK GIN, BAG, TIES SUBTOTAL, HARVEST LBS. TON 22 PRICF OR VA L U E OR COST/UNIT QUANTITY COST C B O 120.CO 7CO.0C C 5 6 $ C W T. ACRE ACRE ACRF APPL ACRE ACRF ACRF ACRE HOUR HOUR DOL. 29.CO 39.CO 1.75 12.00 5.50 37.50 5.43 14.34 77.40 2.75 2.75 C.09 L3S. BALE 0.08 35.50 56.00 7CC00 1.40 —±2-10 $ 105.70 $ 372.27 $ 254.93 $ ACRE ACRE ACRE ACRE 5.26 6.58 41 .40 127.75 1.00 1.00 1.00 1.00 5.26 6.58 41.40 $ -121*15 180.99 $ 553.25 C T D TA L C O S T S LAND CHARGE FFRTILlZFR• —10*12 $ 266.57 3. INCOME ABOVE VARIABLE COSTS 6. NET RETURNS 67^20 627.20 10.44 39.00 1.75 12. CO 27.50 37.50 5.43 14. 34 77.40 18.25 12. 18 C.36 1.00 l.OC 1.00 5.00 1.00 ! . 0 0 1.00 1.00 6.64 4.43 11 9 . 7 5 TO TA l VA R I A B L E C O S T 4. FIXFD COSTS MACHINEPY TRACTOPS I R R I G AT I O N M A C H I N E P Y LAND (NET PENT) TDTAL FIXED COSTS 560.00 . BASED ON LANDLORD SHARE OF 1/4 OF GROSS INSECTICIDE, AND GINNIMS. B U D G E T I D E N T I F I C AT I O N N U M B E R 9 3 1 0 0 8 9 3 1 8 5 0 C A N N U A . C A P I TA L M O N T H 11 $ 73.95 INCOME LESS 1/4 0' PROJFCTED, 1975 I I HiNOW DViloVD "VflNNV daawnN NoiivDidiiNJGi idoane 9 810 68001E60 SZ6I *aaiD3road •9NINNID ONV • 301 Z liDdSN 1 * d3Z III i k ji 3 0 * / l SS31 3W0DNI SSGdS> JO Wl -0 3dVHS GdOiaNVI NO 03SV9 39dVhD GNVD \^/ 92»9 £**S TT*3" TT»"7jl£*0 l£*0 I !•!> I l»0 I l»G EI°0 I !• 0 92#G 11 * 0 82 °0 I 1*0 2 f 0 Z8» J I l»0 82*0 tl#w £1*0 6l» J 62*0 22#0 2I80 22»0 I \90 £trQG £*»C l£»g I I ° 0 l£#0 ze*o l£*0 W°C l£*0 W »0 6£#0 l£#G W#G l£*0 ll#0 80*0 02*0 21 *0 £IaC 21 #0 l£»u 9£*C 60»0 569°1? 9£9#9 G0lT0~ JO I *G 0OI°0 00l°w» £*I °0 JO I • J 982*0 001 aO 2_.l#0 301 #0 80£°0 *2£0O 0Gl»0 2-.l#0 00 I • 0 £*l •$ *9l#0 *89#0 £2. I *G 20£»0 £_P0 00l»'J 18£*0 Z_.l °o s-gT'X_.cI°C 92l»C S2I •€ *12-C 92l°C 82*»C 921 • L 892* C 92I»C 29VC 98t>*C 92l»C 692# C 92l°C *12BC l£2#C 920* I 692-o 2&**C 692»C 92I•C 219aC 992-C SDViOX JI'O *>l#Q •Jl-0 *il*Q Ot*l 01*0 ao»2 0 !•!) 00# I Jl»0 02M JO- I Ol#0 OOM Ol#0 COM 0C# I 0C*2 00* I OtM JC9 I 0 l#0 00" I J W l 3 d 3 V d 3 d 3 d D V d 3 d S t i O O H S d fl O H d 3 A 0 SiSOD •d3d*«8m 3NIHDVW ti08V" S3Wii 03X13 •HO*-|303 10Q id3S cjnv A~inr Ainr 3NOC 3Nnr AV W AV W ddV ddV ddV dVW dVW 8 8 8 8 3 3 3 3 3 3 3 3 8 3 3 8 3 3 * - d Nvr n v t n v t 3J.V0 i t i i c fl > O i a a()>'Jlc d fi > 0 1 d a fl X D I d 11 u Z94£ I I Z9*£ l l l*49 I I SV*£ £** I I I 117*9 l l Z9*9 6£» I Z£* I ££*£ Z**9 ££• I d - 9 d Q l VA l l i n o cnxjid d - 9 d O ^ VA I x D O D cHMDla d U l VA i n n o 'llUd cfl>»Jla d3iNV~d-U^fc t3"nii.0x0_j cn^Dici •mob enfold d - 9 d L i VA J i i n D duivAiiino ti9 _>SIO J.3S___JG S i t ) AV c i c i b dsic ias_)_iu l l 9fc» I l£4£ dOXJlc fc_ flu "Id dV d^CiadHS •ON W3il 1NHW39VNVW 13A31 HOIH 3 t i D V d 3 d S N d fl i 3 d O N V S i S O D 0 3 1 V M I 1 S 3 NQID3d SOD3d-SNVdi SVX3i •Q3iV9IddI •NOliDD VWIc £Z tjlSll iva i__ NCllVdjaU is UPLAND COTTON, IRPIGATFD, TEXAS TRANS-PECOS REGION FSTIMATFD COSTS AND RETURNS PPR ACRE TYPICAL MANAGEMENT JNIT GROSS RECEIPTS FROM COTTON LINT COTTON^FED TDTAL fF* PRICF OR VA L U E OR COST/UNIT QUANTITY COST $ PRODUCTION ? . VA R I A B L F C O S T S PPEHAPVEST SEFD FFPT!250-1OC-C) FERTILIZER APPLI HF-?3IC!PE INSECTICIDE HAIL INSURANCE MACHINERY TRACTORS I P P I G AT I O N M A C H I N E RY LABOR!TRACTOR F, MACHINERY) L A B O R ! I R R I G AT I O N ) I N T E R E S T O N O P. C A P. SUBTOTAL, PRE-HARVEST HARVEST COSTS CJST COTTON PICK GIN, BAG, TIES SUBTOTAL, HARVEST 0.4 0. 120.00 7CC00 C56 C W T. ACRE ACRE ACRE APPL ACRE ACRE ACRE ACRE HOUR HOUR DOL. 29.CO 61. 50 1.75 12.OC 5.5C 37.50 3.57 14.97 94.60 2.75 2.75 0.09 0.36 1.00 1.00 l.OC 10.00 1.00 l.oo 1.00 1.00 7.62 5.41 126.04 LBS. 3ALE CO 7 26.00 7CO.00 1.40 _BS< TON 1C.44 61.50 1.75 12.00 55.00 37. 5C 3.57 14.97 94.60 20.97 14.88 _ _ i i _ _ 3 fl $ 338.52 49.00 $ —23.*±0 85.4C $ 423.92 $ -76.72 ^. INCOME ABOVE VARIABLE COSTS $ ACRE ACRE ACRE ACRE 4.89 7.44 50.60 48.57 1 .or l.OC 1 .CO 1.30 4.89 7.44 50.60 —±3+51 $ I 11 . 5 1 C T D TA L C O S T S $ 535.42 6. NET RETURNS $ -- 1 8 8 . 2 2 LAMD CHAPGF BASED ON LANDLORD SHARE OF FERTILIZER, INSECTICI 0- • AND GINNING. ^ 280.CO 67,.? 0 $ 347.20 $ TOTAL VARIABLE COST 4. FIXED COSTS MACHINERY TRACTORS IRRIGATION MACHINERY LAND !NFT RENT) TOTAL FIXFD COSTS 24 OUOGET IDENTIFICATION NUM9FR A N N U A . C A P I TA L M O N T H 1 0 1/4 OF GROSS INCOME LESS 1/4 OF PROJECTED. 1975 93 ^08602 850 0 25 UPLAND COTTON, IRRIGATED, TEXAS TRANS-PECOS REGION ESTIMATED COSTS AND RETURNS PFR ACPE TYPICAL MANAGEMENT ITEM NO. O P E R AT I O N SHP^DER 2R 2 . 3 2 2 , 3 6 IC 2 , 3 4 4 , 4 8 2 , 3 4 2 , 3 8 IC 2 . 4 0 10 PLOW 33 P TCKUR OFFSFT DISC S P R AY R I G OFFSET DISC F L O AT PICKIJR L I S Tc r ? - i R PICKUP ROLL. C U LT I VAT D P PICKIJ3 POLL. C U LT I VATO R B F D - P. A N T E P ROLL. C U LT I VATO R PICKUP C U LT I VATO R 4R PICKUP C U LT I VATO R 4R PTCKUP PICKUP PTCKUR PICK'JP 4 , 4 2 1*> 4 , 4 2 2 , 4 6 4 , 4 2 10 2 , 4 4 13 2 , 4 4 10 13 13 10 D AT E JAN JAN TIMES LABOR MACHINE OVER HOURS HOURS 1 . 0 0 0 . 5 3 0 0.3 54 JAN FFB FEB 1.3 0 C I O 1.00 1 .3 0 3 3 3 0 3 5 5 2 C 6 2 9 C 1 0 0 0.23C 0 . 3 0 2 FEB FEB FEB MAR MAR APP APR M AY l.OC 2.0C 0.1C l.OC 0.1C 1 .30 0 . 1 0 1.30 3 . 3 4 5 1 .026 3 .125 0 . 3 8 5 0 . 1 2 5 0 . 2 7 1 3 . 1 2 5 3 . 2 7 1 0 • 2 30 0.6 84 C I O C 0 . 2 5 7 0. 100 0.1 81 0.10C M AY M AY M AY JUNF 1.20 1 .oc 3 . 4 6 2 3.271 0 . 1 0 2 . 0 0 0 . 1 0 l.OC 3 3 0 3 o.ir 3 . 1 2 5 3 . 1 2 5 3 . 1 2 5 0.1CO C • 1 OC' C I O C .__.2t.ia5 7 . 6 2 4 JUNF JULY JULY AUG SEPT O . l o OCT 0.10 TO TA L S o.ir . . . . . . . . 9 1 3 4 1 7 1 3 4 2 4 5 2 1 2 5 5 4 5 7 0 . 1 8 1 0 . 3 0 8 0 . 1 8 1 0. 100 C4 76 C.100 0. 238 FIXED F U E L . O I L . L U B ,. . R E P . COSTS P E R ACPE P E R A C P E 0 ,▶ 05 0 .> 12 0 ,▶ 23 0 .▶ 04 O i, 0 7 O i▶ 04 0 ., 13 0 ,▶ 23 O i▶ 06 C i▶ 23 O i. 0 5 0 ,, 2 3 O i▶ 05 0 ,▶ 28 0 4. 0 5 0 i▶ 23 O i▶ 21 o., 2 3 O i> 11 0 i▶ 23 C . 2 7 0 . 3 6 0. 10 0 . 2 1 f .24 0 . 2 1 C .49 C . I O 0 . 2 0 0 . 1 0 0 . 2 4 0 . 1 0 C . 2 4 0 . 6 4 0 . 2 4 C I O 3 . 3 5 C I O C 1 7 O i, 2 3 O i▶ 23 0 . 1 0 C . I O 0 . 1 0 _£*!££. _&*£2 J0*10 5.2 50 3 . 5 7 4 . 8 9 I AND CHARGE BASFD ON LANDLORD SHARE OF 1/4 OF GROSS INCOME LESS 1/4 OF F F R T H I Z F R , I N S E C T I C I D F, A N D G I N N I N G . P R O J E C T E D , 1 9 7 5 BUDGET IDENTIFICATION NUMBER ANNUA. CAPITAL MONTH 10 093 0086 C28 5 UPLAND COTTON, IRRIGATED, TEXAS TRANS-PECOS REGION ESTIMATED COSTS AND RETURNS PEP ACPE HIGH LEVEL MANAGEMENT JNIT GROSS RECEIPTS FROM PRODUCTION COTTON LINT COTTONSEFD TDTAL VARIABLE COSTS PREHAPVFST SEED FERT!18C-5C-0) FFPTILIZER APPLI INSFCTICIDF HERBICIDE HAIL INSURANCE MACHINEPY TRACTORS IRRIGATION MACHINERY LABOR!TRACTOR & MACHINERY) LABOR! IRR IGATION) I N T E R E S T O N O P. C A P. SUBTOTAL, PRE-HARVEST HARVEST COSTS CuST COTTON PICK GIN, BAG, TIES SJBTOTAL, HARVEST _BS. TON PRICE OR COST/UNIT QUANTITY 0.4O 1 2C0O 875.00 0.70 VALUF OR COST 35C.C0 —3±-00 $ 4 34.CO CWT. ACRE ACRE A POL ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. 29.00 3 9.00 1.75 5.50 12.CO 37.50 5.32 13.81 77.4 0 2.75 2.75 0.09 C.36 I.00 1,03 5.00 1.00 1.00 1.00 l.CO l.Do 6.42 4.43 98.67 10. A4 39.OC 1.75 27.50 12.00 37.50 5.32 13.81 77.40 17.66 12. 18 2*55 $ 263.44 LBS. BALE 0.07 26.00 875.00 1.75 TOTAL VARIABLE COST 61.25 __4___2 $ 106.75 $ 3 70.19 INCOME ABOVF VARIABLE COSTS 4 . FIXFD COSTS MACHINFRY TRACTORS IRRIGATION MACHINEPY LAND (NET RENT) TDTAL FIXEO COSTS 26 63.81 ACRF ACRE ACRE ACRF 5. 13 6.32 4 1.40 80.50 1 .00 1.00 l.CO 1.30 5. 13 6.32 41.40 __8_«.50 $ 133.36 5 . T D TA L C O S T S $ 503.55 N-T RETURNS $ -69.55 LAND CHARGE f-RTII I 7F^ , BASED ON LANDLORD SHARE OF I N S E C T I C I D F, A N D G I N N I N G . B U D G F T I D E N T I F I C AT I O N N U M B F " A N N U A . C A P I TA L M O N T H 1 0 1/4 OF GROSS I N C O M E L F S S 1 / 4 O F 9 3 0 0 8901 850 0 PROJFCTED. 1975 27 UPLAND COTTON, IRRIGATED, TEXAS TRANS-PECOS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT OPERATION TTFM NO. DATE FUEL.OIL, FIXED TIMES LABOR MACHINE L U B . , R E P. C O S T S OVER HOURS HOURS REP ACPE PFP ACPE SHPFDBR 4o 3,31 JAN l.OC 0.265 C177 O.C9 Riow 5B 1.35 JAN 1.30 3.572 0.38I 0.35 PICKUP 11 JAN C.IO 3.125 CIOC 0.31 DFFSFT DISC 3.33 FFB 1.00 3.259 0.173 C.12 S P R AY PIG 5,47 FFB 1.00 C.452 0.302 0.13 OFFSET DISC 3.33 FEB l.ft0 3.259 0.173 0.12 F L O AT 1,37 FFB 2.30 1.026 0.684 0.20 LISTrR 6R 1.39 FEB 1.00 3.231 0.154 0.08 PICK'jR 11 FFB C.IO 3.125 CIOC D.31 ROLL, C U LT I VATO R 5.41 MAR l.OC 3.258 0.172 0.14 PICKUP 11 MAR O.U 3.125 CIOC 0.31 ROTDTIL.FR 1.43 APR l.OC 3.486 C.324 0.39 3FD-RLANTER .3,45 APR 1.20 3.462 0.308 0.14 PICKUP 11 APR 0.10 3.125 CIOC 0.31 ROLL. C U . T I VAT D P 5,41 M AY l.OC 3.258 0.172 0.14 PICKjp 11 M AY 0.10 3.125 CIOC 0.31 C U LT I VATO R 6-P 3.57 JUNE 2.CO 3.428 0.286 0.22 PICKUP 11 JUNE 0.10 3.125 CIOC 0.31 C U LT I VATO R 6-R 3.57 J U LY 1.30 0.214 0.143 O.ll PICKUP U J U LY 0.10 0.125 0.100 0.31 PICKUP 11 AUG CIO 3.125 O.IOO 0.31 RTCKUP 11 SERT C1C 0.125 C 100 0.31 "ICKUP U OCT 0.10 .1*125 ___!__ ____! TOTALS 6.421 4.448 5.32 LANP CHARGE BASED ON LANDLORD SHAR= OF 1/4 OF GROSS FERTILIZER, INSECTICIDE, AND GINNING. BUDGFT IDENTIFICATION NUMBER A N N U A . C A P I TA L M O N T H 1 0 093 0C89 018 5 C.43 C43 o.n C.22 C.12 0.22 C.29 0.19 0 . 11 C28 C.ll 0.87 C32 O.ll 0.28 0 . 11 C26 O.ll C.13 O.ll O.ll C.ll _£ill 5.13 IN C 3 M E L E S S 1 /4 OF PROJFCTED, 1975 28 #*\ F O R A G E S O P G H U M S I L A G F, I R R I G A T E D , T E X A S T P A N S - P F C O S R E G I O N F S T I M AT E D C O S T S A N D R F T U R N S P E P A C R E TYPICAL MANAGEMENT UNIT GROSS RECEIPTS FROM PRODUCTION SORGHUM SILAGE TDTAL 2 . VA R I A B L E C O S T S PREHARVEST SFFD FERT(2'* 0-80-0) FERTILIZER APPLI MACHINFRY TRACTORS IRRIGATION MACHINERY LA30P!TPACT0R F, MACHINERY) L A B O R ! I R P I G AT I O N ) INTEREST ON HP9 CAP. SUBTOTAL, PRE-HAPVEST J^*s PRICE OR VA L U F OR COST/UNIT QUANTITY COST TON 12.0c LBS. ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. 0.4 3 49.20 1.75 2.99 9.25 77.40 2.75 2.75 0.09 20.00 $ _2._Q.__a $ 240.00 10.00 1.00 l.OC 1.00 l.OC 1.00 4.95 4.43 70.90 4.30 49.20 1.75 2.99 9. 25 77.40 13.61 12. 18 5*32 $ 177.05 HARVEST COSTS SUBTOTAL, HARVEST $_ $ T O TA L VA R I A B L E C O S T $ 177.05 ^. INCOME ABOVE VARIABLE COSTS A. FIXED COSTS MACHINFRY TRACTORS IRRIGATION MACHINERY LAND !NET RENT) TOTAL FIXED COSTS $ c r 62. 95 $ ACRE ACRE ACRE ACRE 3.2 4.4 41.4 300.0 6 3 0 0 1.00 1.09 1.00 C 0 7 3.26 4.43 41.40 $ __ai___ 70. C9 5 . T D TA L C O S T S $ 247.14 6. NET R-TUPNS $ C P D P S O L D S TA N D I N G I N F I E L D . B U D G E T I D E N T I F I C AT I O N N U M B E R 8 7 6 0 0 8 7 0 2 8 5 0 C A N N U A . C A P I TA L M O N T H 1 0 -7. 14 PPCJECTFD, 1975 9 820 Z8009Z80 G l H i N Q W I V i l c V D " V fl N N V ■— d 3 8 W O N N Q I l V D 1 3 I i N 3 a i x 3 l J Q f l b •G~I3I3 Nl DNlQNViS Q1US dCdJ 9Z6 1 *a3i->3rudd \^/ snviGi 92*£ 66*2 Z9**£ ST^T" f ? T 0?3TT3" g ? T T I " 0 1 * 0 i O G 01* Ol* 01* 01 • 01* £2*G £2*0 £2*0 £2*0 £2#0 * 2 * 0 90*0 £2*0 £2*0 90*0 £2*0 £l*C Z0*0 £2*0 21*0 OGl *0 001*0 001*0 JO 1*0 oOl *0 Z92*0 18 I *J 30 1*j> 001*0 Z92*i 00 1 *0 t?89'0 01*0 wl#0 01*0 01*0 01*0 00*1 00* I 01*0 01*0 00*1 wl»0 0w*2 0C*2 0l#0 OC* I id3S 90 V 0 0 0 3 0 £9* a *2*G Ol * 01* 02* 01* 6** 2t?» 01* 9fc* J J 3 0 3 J J J 09**u oo i#o 629*0 196*1? 92l*C 92l*C 9cl*C 92l*Q 921* C 98£*C IZ.2*C 92l*C 921* C 98£* C 921*0 920* I 069*0 92l»C £*6*U 6)3 AO SdHUH SdOOH idDV d3d 3dDV d3a • o 3 d « - 8 m 3NIHDVW d 0 8 V ~ S 3 W I i SiSOD •lIO#T303 G3XI 3 \mtis Ainr 3NOC AV W wl C l AV W AV W ddV 9t?*2 2t7*t7 tiViA CI 0**2 dVW 8 3 3 8 3 3 bad nvt nvt 3iva dOXDlc c fl X J l d cOXDId c n > j i cj cHXJl c 01 01 C l 01 cnxoi -; 9£*2 fcdlNVld-GJb d U i VA i i i n 'n.cHXDId cfDtDld at; t3iSI1 cOXOld J.VUD3 DSIC i3S33L cHXJld Bfc MOIci •ON NU1iVd3dO C l . 1 8£*2 *£*2 U l W3±I iN=W30VNVW IVDIdAi 3dDV d3d SNtiHi3d ONV SiSOD 031VWliS3 NGI_>3d SOD3d-SNVdi SVX3i *Q31V9IddI *39V1IS WHHSdOS 63 3->VdU3 0 098 lCZ8GVi9Z8 9Z6 1 *Q3iD3r0dd 0 1 HiNOW !VJ.ldV3 "VHNNV d38WON NOI iVD131 J.N3UI !3L.Gn8 *a"131d Nl DNIONViS ODDS cLoJ 90*Z£ S N d fl i ^ a i - ^ N * * 176*292 * biSOD $ 96#89 0^"»T2~ OVlt/ 99 *£ 66*2 $ ±09J 00*1 CO* I GJ*l 0O»OD£ JVM P 99*£ 66*2 3dDV 3dDV 3t»DV 3dDV iViLi SiSGD G3Xid DVJ.C1 (iN3d i3N) CNVD Ad3MHDVW NOllVUIddl i>tui3Vdl A P 3 N I H D V V. SiSUD C13X1__ •* 10*901 $ 66*£6l $ i S G D 3 T: 8 V l d VA D V i C X & $ iS3AdVH •ivioxans SiSOD ISaAdVH 0*0 66*£6l 2*TZ 81 *2l 9 9 * 11 OV*ZZ 99 *Z £2*V 9Z *l C2*Z9 S i S G D 3 H 8 V I d VA d A J b V 5 W 0 3 M * L $ ij£*t7 *17»28 £1/** 172 *♦/ 00*1 00* I CO* I 00*1 00*1 C 0 * 01 60*0 9Z*2 9Z*2 98»i_ £2** 9Z.*l C2*Z9 £**0 •10 0 dOGH dOOH 3dDV 3dD* 3dDV 3dDV 3tDV •S-~ CJ*S2 00*21 NUi. o**zz iS3AeVH-3tid •TViOilsins *dVD *dO NU lb3d3lM CNOIiVSlddl)dOQVD lAd3N!HDVh 3 dOiDVdl>dC8VI A d 3 N l H D V W N G l - LV D l d d l SdUiJVdi Ad3Nl*DVW I Dddv aazniid.d tJ-w8-Ju£)ldjJ G33S iS3AuVH3ec_ S i S O D 3 1 8 V I - J VA ' & D3*0G£ * NOi iDOGOdd $ iSOD AiliNVOO i l N fl / i S O D dO 3 0 3 VA dO 3Dldd DViLa. 39VI IS fcOHSdCS W0d3 SidI3D3d SSGt9 ilNH iN3fc39VNVW 13A31 H91H 3dDV d3d SNdfU=d ONV SiSOD 03iVl».IiS3 N O ! _ ) 3 d S 0 D 3 d - S N V d i S V X 3 i * Q : = i V 9 1 d d I * 3 0 V 11 S V. 0 H 9 d 0 S oe *cj dVVtQJ 9 8 10 Z8009Z8^ 0 1 H i N O W " I Vi l d V D " V O N N V •— ddSWON N0liVDl3liN3ai i.39Uflti •Q13I3 Nl 9NI0NViS Q 1US oCbD SZ6 1 *a3iD3r0dd 66*2 £2*17 £66*2 J*2»t ttto~ TT'TJ- a o To " ^TPT 11*0 11*0 I l*G ll- 0 11*0 Z2#0 82*0 61* J 11*0 11*0 11*0 62* 3 17**0 I 1*0 £**G l £ * 0 l £ * 0 l £ * 0 l £ * 0 l£*0 2l*Ci VI *0 80*0 I£*C l£*0 l£*0 02 • 3 172*0 l£*C 9£*0 001*0 00 I *0 J0l*0 001*0 JO 1*0 Z92*0 ZL I * 0 *9l *0 00 1*0 001*0 00 1 *0 t789*0 9*£*0 X) 1*0 18£*0 921*^ 92l*C 92l*C 92l*C 92l*C 98£* C 892* C l£2«0 92l*C 921*0 921* 0 92L* I 819*C S2l*C 2Z9* 0 SDViCJi 01*0 01*0 Jl*0 01*0 01*0 01*0 00*1 Jw*l 00*1 01*0 01*0 ol*0 uG*2 0C*2 01*0 og*i i D U id3S 9CIV Ainr 3Nnr AV W AV W AV W AV W ddV dVW 8 3 d 8 3 3 8 3 3 NVT NVT S d D V d 3 d 3 d D V d 3 d S d fl O H S d fl O H d 3 A G 3 i V C S i S O D * d 3 a * * 8 m 3 N I H D V W d O f c V l S 3 W 11 Q3XI3 *DIO* 1303 l l I I I I l l l l l l g**£ 117*9 6£* I l l l l l l Z£*£ ££•£ l l 9£*l •ON W311 d fl X D i c cOXDid c fi X D l d cOXDld cfXDla dHXJla d 3 i N \' " d - G _ d t d G i V A l i D fi :) • l D G c j dS c fl X D i d cf iXDl a cOXDla XVLDii DblG i d S 3 J u cOXDld cf J S M L l d Ml JLVd3uU iN3W39VNVW 13A3D H9IH 3 d D V d 3 d S N d fi i H d G N V S i S G D G B i V W l i S d N O I 9 3 d S O D 3 d - S N V d i S V X d i * G H l V 9 i a d I • 3 9 V 1 I S W f l H G d G S 39VdO_: TG t - i s n 32 GRAIN SORGHUM, IRRIGATFD, TEXAS TRANS-PECOS REGION ESTIMATED COSTS AND RETURNS PFR ACRF TYPICAL MANAGEMENT PRICE OR VA L U E OP UNIT COST/UNIT QUANTITY COST GROSS RFCEIPTS FROM PRODUCTION GRAIN SORGHUM TDTAL C VA P I A B L F C O S T S PRFHARVEST SEFD F^RT!ICC-50-0) FERTILIZER APPLI MACHINFRY TRACTORS IRRIGATION MACHINFRY LABOR!TRACTOR & MACHINFRY) L A B O P ! I R P I G AT I O N ) I N T F P F S T O N O P. C A P. CWT. 3.50 LBS. ACRE ACRE ACRE ACRE ACRE HOUR HOUR DDL. C.43 27.00 1.75 3.25 1 1.47 60.20 2.75 2.75 0.09 $ 122.50 7.00 1.00 1.00 1.00 1.00 1.00 5.94 3.44 48.06 3.C1 27.00 1.75 3.25 11 . 4 7 60.20 16.32 9.47 ±*22 $ S U B T O TA L , P R F - H A R V E S T HARVEST COSTS CJSTOM COMBINE CUSTOM HAUL SUBTOTAL. HARVEST -122*50 35.30 136.8C $ ACRE C W T. 10.00 0.2O 10,00 1.30 35.00 TDTAL VARIABLE COST 1*00 $ 17.00 $ 153.80 ^. INCOME ABOVF VARIABLE COSTS $ -31.30 4. FIXED rOSTS MACHINEPY TRACTORS IRRIGATION MACHINERY LAND !NET RENT) TDTAL FIXED COSTS $ ACRF ACRE ACRE ACRE 3.85 5.56 32.20 300.00 l.CO 1.00 1.00 C C 7 3.85 5.56 32.20 $ —21*00 62.61 5 . T D TA L C O S T S $ 216.41 6. NET RETURNS $ -93.91 PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M 3 E P - - • A N N U A . C A P I TA L M O N T H 1 0 73 008702 850 O 33 GRAIN SORGHUM, IRRIGATED. TEXAS TRANS-PEC3S REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPFRATI3N PLOW 3B PICKUP OFFSFT DISC FLOAT PICKUP LISTER 4R PICKUP PICKU3 ROLL. CULTIVATOR PTCKJR BED-PLANTER ROLL. CULTIVATOR CULTIVATOR 4R PICKUP CULTIVATOR 4P PICKUP P1CKU° PICKUP PICKU3 ITEM NO. 2.36 ID 2.34 2,38 13 2.40 10 10 4.42 10 2.46 4.42 2.44 10 2,44 13 10 10 10 ^*% DATE FIXED FUEL.OIL. COSTS MACHINE L U B . . R E P. TIMES LABOR PER ACRE HOURS PER ACRE OVER HOURS JAN JAN FEB FEB FEB MAR MAR APR MAY MAY JUNE JUNE JUNE JUNE JULY JULY AUG SEPT OCT C629 l.OC 3.943 3.125 CIOC 0.1C 0.460 2.00 0.690 2 . 0 0 1 .026 0.6 84 0.10 0.125 0.100 1.00 3.385 0.257 0.10 0.125 0.100 3.125 C.100 0.10 0.181 l.OC 0.271 0 . 1 0 0 . 1 2 5 O.IOC 1.00 3.385 0.257 0. 181 3.271 1.00 l.OC 0.357 C 2 3 8 C.IO 3.125 0.100 C.2 38 1.00 0.357 0. IOC 0.10 3.125 0 . 1 0 0 . 1 2 5 C1CC 3 . 1 2 5 0. 100 0.10 0 . 1 0 _2.__1__§ _£U.ia-- T3TALS 5.936 4.124 -0*22 C .36 0.10 C.42 0.49 CIO 0.20 0.10 0.10 0.24 C.IO C53 0 .24 0.17 0.10 C .17 0.10 0.10 CIO _£jJL£ 3.25 3.85 0.12 0.23 0.07 0.13 0.23 3.06 0.23 0.23 0.05 0.23 0.24 0.C5 0 . 11 0.23 0 . 11 0.23 0.23 0.23 PROJECTED. 1975 BUDGET IDENTIFICATION NUMBER — ANNUA. CAPITAL MONTH 10 073 0087 028 5 34 GRAIN SORGHUM. IRRIGATFD. TEXAS TRANS-PECOS REGION FSTIMATED COSTS AND RETURNS °FR ACRE HIGH LEVEL MANAGEMENT UNIT 1. GROSS RECEIPTS FROM PRODUCTION GRAIN SORGHUM T O TA L 2. VARIABLF COSTS PREHARVEST SEED FFRT(18C-60-0) FERTILIZER APPLI MACHINERY TRACTORS IRRIGATION MACHINERY LABOP!TRACTOR & MACHINERY) LABOPIIRR IGATION) INTEREST ON OP. CAP. SUBTOTAL. PRE-HARVEST HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL. HARVEST PRICE OR VA L U F OR COST/UNIT QUANTITY COST $ CWT, 3.50 55.OG $ .BS. ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. C.43 41.40 1.75 4.59 9.3C 68.80 2.75 2.75 0.09 3.C1 41.40 1.75 4.59 9.3C 68.80 13.55 1C82 7.00 1.00 1.00 1.00 1.00 l.CO 4.93 3.94 58.60 5*21 $ 158.49 $ ACRE C W T. 10.00 0.2O 1.00 55.CO 1C.C0 $ TOTAL VARIABLE COST 3. INCOME ABOVE VARIABLE COSTS 4. FIXED COSTS MACHINEPY TRACTORS IRRIGATION MACHINEPY LAND !NET RENT) TOTAL FIXED COSTS _!____& 192.50 _11*.Q£ 21.00 $ 179.49 $ 13.01 $ ACRE ACRE ACRE ACRE 3.53 4.21 36.80 300.00 1.00 1.00 1.00 C 0 7 3.53 4.21 36. 8C $ —21*00 65.54 5. TDTAL COSTS $ 245.C3 6. NET PETURNS $ -52.53 PROJECTED. 1975 B U D G E T I D E N T I F I C AT I O N N U M B E R 7 3 0 0 8 8 0 1 8 5 0 C ANNUAL CAPITAL MONTH 10 01 HiNOW "IVildVD 'VPNNV d38W0N N0llVDl3liN3ai i39Gn8 9 810 8800 £10 9Z61 *CJ3iD3CQdd 'tej^y SlVlUi £9*£ 69*1? I917*£ Z26*t? TT*rr Tr'TJ"* 0-3TT0~ 9TY*?r 0 1 * 0 11 * 0 l 1*0 11 * 0 £1*0 I 1*0 £1*0 82*0 Z2*0 11 * 3 82*0 11 * 0 11 * 0 61*0 I 1*0 62 • 0 l£*0 l£*0 l£*0 11 * 0 l£*G 11 * 0 *l*C 21*0 l£*0 VI'O l£*0 l£*G 80*0 l£*0 02*0 V2*0 l£*0 S£*G 001*0 00 1*0 001*0 £Vl*0 001*0 £Vl*0 2Zl*u Z92*0 001*0 ZL\*» 001*0 001*0 V9l*0 001*0 178 9*0 9*£*0 001*0 18£*0 v*#a 11 * 0 £V#0 921*0 92I*C 92l*C V12*C 92l*C W2*C 892 * ti 98£#C 92I*C 892 *C 92l*C 92l*C l£2*U 921*C 92C* I 819*C 92l*C 2Z9*C 01*0 Jl*0 01*0 00*1 01*0 00*1 00#l OC*l 01*0 00*1 01*0 01*0 00*1 01*0 0C*2 00*2 01*0 00*1 d3A0 SdflOH SdflOH 3dDV d3d 3dDV d3d SiSOD • d 3 d * * 8 m 3NIHDVW a o e v i S3WI1 G3XI3 • 11 0 * 1 3 0 3 IDC id3S 90V Ainr Ainr 3Nnr 3 N fl f 3N0C 3Nnr AVW AVW ddV dVW dVW 833 833 833 n n u u ZS*£ l l Z9*£ l**9 9V*£ U IV*9 l l l l 6£* I l l Z£*£ ££•£ cOXDld cOXDId d fl X D I d cOXDIc d -- 9 d G i V A l i l O D cOXDId d -- 9 d G i V A l i l O D dQivAiiino mod d3J.NV~P-G38 cOXDlo d G x VA l l " l f l D • D D U d cHXDIo cOXDId dS t3iSIl cOX'Jld J LV U l d nvt nvt 9£*l DSIG i3S330 d fl X D I d 99 MG Id 3iva •ON N0IlVd3dG l l W3il 1N3W39VNVW 13A31 H9IH dtiOyt d3d SNdfU3d GNV SiSOD G31VW11S3 N G 1 9 3 d S O D 3 d - S N V d i S V X S i * a 3 i V 9 1 d d I * W fl H 9 d Q S K l V d 9 se 36 O AT G R A Z I N G , I R R I G AT E D , T E X A S T R A N S - P F C O S R F G I O N FSTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT JNTT G30SS RECEIPTS FROM PRODUCTION GRAZING TDTAL .BS, PPICF OP VA L U E OP COST/UNIT QUANTITY COST 0.2C 4 8C0O .9J5*-1 96.00 10.On 2 2.50 1.83 8.43 51.60 2.75 2.75 0.09 1.00 1 .00 1.00 1.00 1 .00 4.20 2.95 55.16 $ 10•C0 22. 5C 1.83 8.43 51.60 11 . 5 4 8. 12 4_l96 11 8 . 9 9 $ C C $ 1 18.99 2 . VARIABLE COSTS p r = H A RV E S T SErn FF3T( 150-C-r ) MACHINERY TRACTORS TRPIGATION MACHINERY LABOR!TRACTOP G MACHINERY) L A 3 0 P ! I R R I G AT I O N ) I N T E R F S T O N O P. C A P. SUBTOTAL. PRE-HARVEST HARVEST COSTS S U B TO TA L . C W T. ACRE ACRE ACRE ACRE HOUR HOUR DOL. HARVFST TDTAL VARIABLE COST $ -22.99 •>. INCOME ABOVF VARIABLE COSTS CIXFP COSTS MACHINEPY TRACTORS IRRIGATION MACHINERY LAND (NFT PENT) TDTAL FIXFD COSTS ACPE ACRE ACRE ACRE 3.00 4.09 27.60 300.00 3. CO 4.09 27.60 1.30 1.00 1.00 C 0 7 —__a.tv._2 $ 55.69 5, TOTAL COSTS $ 174.68 6. NrT PFTURNS $ -78.6 8 * 1 9 7 4 - 1 9 7 5 C R O P. B U D G E T I D E N T I F I C AT I O N N U M B E R 7 4 1 0 0 8 6 0 2 8 5 0 0 A N N U A . C A P I TA L M O N T H 5 PPOJECTFD, 1975 37 O AT G R A Z I N G . I R R I G AT E D , T E X A S T R A N S - P E C O S R E G I O N ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPERATIDN PLOW 3B OFFSET DISC F F p T. A P P L I . R F N T D OFFSET DISC FLOAT LISTFR 4P PICKUP GRAIN DRILL pICKUP PTCKU3 PTCKU3 PICKUP RTCKU3 ITFM NO. 2,36 2,34 4,86 2,34 2,38 2,40 10 4,52 10 10 10 10 10 DATE FUEL,OIL, FIXED T I M E S L A B O R M A C H I N E L U B . . P E P. C O S T S OVER HOURS HOURS PER ACPE PER ACRE AUG AUG AUG AUG AUG AUG AUG SEPT SEPT OCT DEC FEB APP l.OC 1.00 1 .00 l.OC 2.0C l.OC 0.10 l.OC 0.1C C1C 0.10 C I O 0.1 c TOTALS C .943 3 .345 0.097 0 .345 1 .026 0.385 3.125 3.307 3.125 o .125 3.125 0.125 0.629 0.2 30 C064 C2 30 0.6 84 0.257 C100 0.205 0.100 C 1 OC 0 . 1 OC C 1 OC _-._-l_i_> .a^iie. .1*22 -£.Aia 4.198 2.89Q 1 .83 00 * 1 R 7 4 - 1 9 7 5 C R O P. BUDGET IDENTIFICATION NUMBFR A N N U A . C A P I TA L M O N T H 5 0. 12 3.04 0.0 0.04 0. 13 0.06 0.23 0.06 0.23 0.23 0.23 0.23 C.36 0.21 CC 0.21 0 .49 0.20 0.10 0.92 CIO 0.10 CIO C.IO PROJECTED. 1975 07410086 028 5 38 # ^ O AT G R A Z I N G . I R R I G AT E D . T E X A S . T R A N S - P E C O S R E G I O N FSTIMATED COSTS AND RETURNS PEP ACRE HIGH LEVEL MANAGFMENT UNIT G50SS RECEIPTS FROM PRODUCTION GRAZING TOTAL 2 . VARIABLE COSTS PREHARVEST SEED F E RT ( 2 5 T- 0 - C ) MACHINERY TRACTORS IRRIGATION MACHINERY LA30R!TRACTOR & MACHINERY) L A 3 0 R ! I R R I G AT I O N ) I N T E P F S T O N O P. C A P. SUBTOTAL, PRE-HARVEST HARVFST COSTS SUBTOTAL, PPTCE OR VA L U F OP COST/UNIT QUANTITY COST 0.2O -3S, C W T. ACRE ACRE ACRE ACRE HOUR HOUR DOL. $ 132.00 1C.3C 37.50 3.39 7.05 5 1.60 2.75 2.75 0.09 l.OC l.CO l.CO 1.00 l.CO 3.71 2.95 66. 10 HARVEST TOTAL VARIABLE COST "»• INCOME ABOVE VARIABLE COSTS 4 . FIXED COSTS MACHINFRY TRACTORS IRRIGATION MACHINERY LAND (NET PFNT) TOTAL FIXFD COSTS -122*00 66C.00 10.CO 37.50 3.39 7.05 51.6C 10.21 e. 12 $ Sj.95 133.81 $ $ C O $ 133.81 $ -1.81 $ ACRE ACRE ACRE ACRE 3.2 3.2 27.6 300.^ TOTAL COSTS 6. NET RETURNS * 1 9 7 4 - 1 9 7 5 C R O P. B U D G E T I D E N T I F I C AT I O N N U M B E R 7 4 1 0 0 8 6 0 1 8 5 ' A N N U A . C A P I TA L M O N T H 5 2 0 0 0 l.OC 1.00 l.OC C C 7 3.22 3.20 27.60 $ $ —21*co 55.02 188.83 $ -56.83 PPOJFCTED. 1975 39 OAT GRAZING. IRRIGATED, TEXAS TRANS-PECOS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LFVEL MANAGEMENT O P E R AT I D N PLOW 5B OFFSET DISC F E R T. A P P L I • R E N T D OFFSET DISC F L O AT 1 TSTF3 6p PICKUP G R AT N D R I L L PICKU^ RICKU7* PICKUP P ICKIJP PICKUP PTCKUP pICKUP ITEM NO. 1,35 3,33 5,87 3,33 3,37 1.39 11 5,51 D AT E AUG AUG AUG AUG AUG AUG AUG SEPT SEPT OCT NOV DEC FEB APR MAY T O TA L S T I M E S LABOR MACHINE HOURS OVER HOURS I . 0 0 l.OC l.OC l.OC 2.CO l.OC 0.1^ 1.00 0.1C 0.1C 0.10 C1C 0.1C o.ic o.ir C . 1 00 C I O C O.IOC C . 1 00 C.100 0.35 C. 12 0 . 0 0.12 0.20 0.08 0.31 0.04 C.31 0.31 0.31 0.31 0.31 0.31 f .43 C.22 C O 0.22 C.29 C.19 C . l l 0.99 0.11 C . l l C . l l C . l l C . l l C . l l -sums _Ljl1_2_1 ____! _£U.i 3.712 2.608 3.39 3.22 0 .572 0.259 0.097 3.259 1.026 3.231 0.125 3.269 3.125 3.125 3.125 3.125 0.125 3.125 0.381 C 1 7 3 CO 64 C 1 7 3 C.6 84 C 1 54 C I O C 0.179 c.io. PROJECTED. 1975 1974-1975 CROP. BUDGET IDENTIFICATION NUMBER ANNUA. CAPITAL MONTH 5 FIXED FUEL,OIL, COSTS L U B . . R E P. PER ACRE PEP ACRE 0741CC86 C18 5 40 WHEAT. IRRIGATED, TEXAS TRANS-PECOS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT UNIT GROSS PFCETPTS FROM PRODUCTION WHEAT GRA7ING TOTAL C VA R I A B L E C O S T S PPFHARVEST SEED FERT!10^-0-0) HAIL INSURANCE MACHINERY TRACTORS IRRIGATION MACHINERY LA30P!TRACTOR C MACHINERY) L A B O R ! I P P I G AT I O N ) I N T E P E S T O N O P. C A P. SUBTOTAL. PRF-HARVEST HAPVEST COSTS CUSTCM COMBINE CUSTOM HAUL SUBTOTAL, HARVEST BU. LBS. PRICE OR VA L U F OR COST/UNIT QUANTITY COST 4.00 0.20 42.00 24C0C $ BU. ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. 1C0C 15.0^ 13.15 1.83 8.43 51.60 2.75 2.75 0.09 16.00 15.00 13. 15 1.83 8.43 51.6C 11 . 5 4 8. 12 1.60 l.OC 1.00 1.00 1.00 1.00 4.20 2.95 57.92 Sa.21 $ 130.89 $ ACRE 3U. 1C.0C 0.15 1.00 42.00 TDTAL VARIABLE COST 3. INCOMF ABOVE VARIABLE COSTS 4 . fi x e d C O S T S MACHINEPY TPACTORS IRRIGATION MACHINERY LAND (NET RENT) TOTAL FIXED COSTS 168.00 4J_.j_C._L 216.00 10.0* 5*20 $ 16.30 $ 147.19 $ 68.81 $ ACRE ACRE ACRE ACRE 3.00 4.09 27.60 300.00 l.OC 1.00 1.00 C.07 3.CO 4.09 27.60 $ __21«.Cll 55.69 5 . T D TA L C O S T S $ 202.88 6. MET RETURNS $ PROJECTED. 1975 * 1 9 7 4 - 1 9 7 5 C R O P. BUDGET IDENTIFICATION NUMBFR A N N U A L C A P I TA L M O N T H 5 13. 12 76 008602 850 O 41 WHEAT, IRRIGATED, TEXAS TRANS-PECOS REGION ESTIMATED COSTS AND RETURNS PER ACRE TYPICAL MANAGEMENT OPFPATION PLOW 3B OFFSET DISC F F P T. A P P L I , P E N T D OFFSET DISC = LOAT LISTFR 4R PICKUP GRAIN DRILL ->ICKU* PICKU^ PICKU3 PICKUP PICKUP ITEM NO. 2,36 2,34 4,86 2,34 2,38 2,40 13 4,52 10 10 10 10 10 D AT E AUG AUG AUG AUG AUG AUG AUG SEPT SEPT OCT DEC FEB APR TOTAL S FUEL.OIL. FIXFD MACHINE COSTS T I M E S LABOR L U B . . R E P. HOURS PER ACRF PEP ACRE OVFR HOURS 0.10 0.10 0.10 0 . 1 0 -2*.12§ 0.629 0.230 C 0 64 0.23C o .684 C257 CIOC C.205 0.1 00 C.100 0.100 CIOC 0.12 0.04 0.0 0.C4 0.13 0.06 0.23 0.06 0.23 0.23 0.23 0.23 0.36 0.21 C O C .21 C .49 C 2 0 C.IO C .92 0 .10 C.IO C .10 C I O -0*100. -0*22 __l-tl_> 4.198 2.899 1.63 3.00 l.OC 1.00 l.OC. 1.30 2.00 1.00 0.10 1 .oc o.ic 0.943 3.345 0.097 0.345 1 .026 3.385 3 .125 3.307 3.125 3.125 3.125 3.125 PROJECTED. 1975 * 1974-1975 CROP. BUDGET IDENTIFICATION NUMBER ANNUA. CAPITAL MONTH 5 075 0086 C28 5 jjfP^V 42 WHEAT, IRRIGATED, TEXAS TRANS-PFCOS REGION ESTIMATED COSTS AND RETURNS PER ACRE HIGH LEVEL MANAGEMENT UNIT GROSS RFCEIPTS FROM WHEAT GRAZING TDTAL PRICE OR VA L U F OR COST/UNIT QUANTITY COST PRODUCTION BU. LBS. 4.00 0.20 —12*00 $ 352.CC VARIABLE COSTS PREHARVEST SEED FERT(20C-0-0) HAIL TNSJRANCE MACHINEPY TRACTORS IRRIGATION MACHINEPY LABOR!TRACTOR & MACHINERY) L A B O R ! I R R I G AT I O N ) I N T E R F S T O N O P. C A P. SUBTOTAL, PRE-HARVEST BU. ACRE ACRE ACRE ACRE ACRE HOUR HOUR DOL. 10.00 3 0.00 13.15 3.39 7.05 51.60 2.75 2.75 0.09 1.60 1.00 l.OC l.OC l.CO l.OC 3.71 2.95 68.86 HARVEST COSTS CUSTOM COMBINE CUSTOM HAUL SUBTOTAL. HARVEST ACRE BU. 10.00 0.15 I.00 70. OC 16.CO 30.00 13. 15 3.39 7.05 51.60 10.21 8.12 5*20 $ 145.71 TOTAL VARIABLE COST 10.00 _1H_£_ $ 20.50 $ 166.21 $ 185.79 3 . I N C O M - A B O V E VA R I A B L E C O S T S 4. FIXED COSTS MACHINFRY TRACTORS IRRIGATION MACHINERY LAND !NF£T RFNT) TOTAL FIXED COSTS 280.00 70.00 360.00 $ ACRE ACRE ACRE ACRE 3.22 3.20 2 7.6C 300.00 3.22 3.20 27.60 l.OC 1.00 l.CO 0.C7 —21*01 $ 55. C2 5 . TO TA L C O S T S $ 221.23 6. NET P-TURNS $ 130.77 PROJECTED. 1975 * 1 9 7 4 - 1 9 7 5 C R O P. BUDGET IDENTIFICATION NUMBER A N N U A L C A P I TA L M O N T H 5 76 00860 1 850 0 9 H 1 N O W I v / i l d V D " V fl N N V d38W0N N0llVDl31iN3GI i39GnQ 9 8 10 9800 9Z0 •dOdD SZ61-VZ61 * 9Z61 *a3iD3rUdd SDVJ.01 22*£ 6£#£ 809*2 2l_l#£ TT»*7r 1^--l £ * 0 l£*C l£*0 l£*u l£*0 l£*0 V0#0 l£*0 80#0 0Z*0 Z\*0 0*0 21 *0 9£*0 OTJT^O"" 00 1*0 001*0 001*0 00 1*0 001 *0 00 1*0 62.1*0 00 1*0 V9l*0 V89*0 £/.l*0 V90*0 £ZI*i> 18£*0 3 S T- 7 T 0 1 * 0 Xl*0 11*0 II* J 11*0 l l » G 11*0 66#0 11 * 0 61* J ezmo zzm o 0*0 22*0 £ * * 0 92l*C 92l*C 921*0 92l*C 9cl*C 921 *C 692*C 921 *C l£2*C 920* I 692 *C Z60*C 692 *C 2Z9*0 01*0 01*0 01*0 01*0 0 1*0 31*0 OC* I v/l*0 00* I ovz 00*1 00*1 00*1 00*1 sdnoH S d f I G H d 3 A 0 3dDV d3d ddDV d3d SiSOD • a 3 d * # 8 n i 3NIHDVW d 0 8 V l S 3 W I i 03X13 • 11 0 * 1 3 0 3 AVW ddV 83d D3G AON iDQ ic_3S id3S 90V 90V 90V 9 fl V 9 fl V 90V 90V 3iVG IS€9 I I 6£» I Z£*£ ££*£ 18*9 ££*£ 9£*l cHXDlc c fl X D I o o fl X D I . d cOXDla c fl x D l d cOXDId c fi X D l d l l l f a G N I Va ' J cOXDId d9 fcdiSIl iVGld DbIG i3S3dL OiN3d* ilcav*ld3d DSIti idSd3G 8£ WCld •ON W3il iN3W3SVNVW 13A31 H9IH 3dDV d3d SNdfliid ONV SiSOD 031VWliSd N0I93d S0D3d-SNVdl SVX3i •Q3iV91ddI •±V3HM £*? NCIiVdddG