The enterprise budgets for the Trans-Pecos
region are based on yields as shown on form
08000500. The data contained in this report
are based on estimates and actual records of
operations within the two-county area (ReevesPecos). Even in a region so narrowly defined
as this, variations in inputs and returns exist
among farms and among managers. However,
these budgets should serve as useful guides in
planning and decision-making for persons con
cerned with the area described above.
Basic assumptions which are necessary to
complete the budgeting process include a com
pilation of crops to be budgeted, expected yields
for irrigated only, and according to typical and
high-level management. Farm size and machin
ery complements for both levels of managment
are required. Production practices, machinery
operating rates and, finally, the budget develop
ment complete the undertaking.
In order, then, the assumptions were: farm
size varied from 600 acres for the typical man
ager to 1,000 acres for the high-level operator.
Fully two-thirds of the land on die typical farm
is fallowed while only one-third is handled in
this manner on the high-level farm. Cotton is
grown on approximately one-fourth of the typical
farm and two-fifths of the larger unit. Small
grains are produced on fully 50 percent of the
acreage in both cases. Calf grazing is heavily
utilized.
Irrigation systems vary from two wells of
1,000 GPM each on the smaller operation to
four wells of 1,000 GPM capacity each on the
larger unit.
Management differences centered primarily
on timing of operations rather than variations
in cropping patterns or input levels. That is,
the high level manager extracts greater yields,
and usually greater profits from his enterprises
due to superior ability to prepare for, plant, tend
to and sell his crops in an optimum fashion.
Land rent (net) is computed for cotton based
on the landlord receiving one-fourth of the crop
and government payment while supplying all of
the land, the well, pump and irrigation system,
and one-fourth of the fertilizer, herbicide, insec
ticide, harvesting and ginning. No typical
arrangements for cropsharing or cash leasing
were identifiable; therefore, the opportunity cost
concept on land value is used.
TEXAS CROSS TIMBERS REGION
Assumed Prices Paid and Received by Farmers
Item
Unit
Prices Paid (1975)
Seed:
Coastal Sprigs
Forage Sorghum
Grain Sorghum
Kleingrass
Oats
Peanuts
Sudangrass
Wheat
Fertilizer:
Nitrogen
Phosphorus
Potash
15-15-7
14-7-11
10-20-10
6-24-24
0.27
0.22
0.10
186.00
176.00
167.00
184.00
Labor:
Irrigation
Tr a c t o r
Custom Rates:
Baling
Combining
Hauling grain
Hay Hauling
Peanut drying
Sprigging
bale
acre
bu.
bale
ton
.45
8.00
0.10
0.15
8.00
17.00
Capital:
Investment
Operating
Fumigants:
D D Pic
Fumazone 86
Nemagon 12.1
Telone
Fuel:
Gasoline
Diesel
3.50
11.50
11.50
3.50
Assumed Prices Paid and Received by Farmers (cont'd.)
Item
Unit
Price
Her bicides:
T r e fl a n
Cob ex
Balan
Simazine 80W
Dianap
Lasso
2, 4-D (amine)
2, 4-D (ester)
Vernam, 10G
Vernam, 6E
5 gal
5 gal.
gal.
lb.
gal.
gal.
gal.
gal.
cwt.
gal.
Insecticides:
Dasanit, 15G
Dasanit, liquid
Dyfonate, 10G
Sevin, 80W
Malathion (55 gal.)
Azodrin
Methyl parathion
Diazinon, 14G
lb.
gal.
lb.
lb.
gal.
gal.
gal.
lb.
0.59
28.50
0.47
1.52
12.00
20.00
10.00
0.60
Fungicides:
Bravo
Benlate
Manzate 200
Terrachlor, 10G
Terrachlor, 2EC
Terrachlor, 75WP
Lannate, 10G
Lanate
Nudrin
gal.
lb.
lb.
cwt.
gal.
lb.
lb.
gal.
gal.
25.50
8.30
1.25
22.00
5.50
1.25
.29
17.00
17.00
ton
cwt.
ton
45.00
4.00
45.00
0.18
45.00
0.30
142.50
120.00
8.55
3.45
7.25
15.00
8.75
9.50
29.40
15.40
Prices Received (1975)
Coastal
Grain
Kleingrass
Peanuts
Sorghum
Stocker
Hay
Sorghum
Hay
Hay
Gain
lb.
ton
lb.
1/ These price assumptions are not to be interpreted as predictions or
Prospective prices.
08000400
TEXAS TRANS-PECOS REGION
Assumed Prices Paid And Received By Farmers
Item
Unit
Price
Prices Paid
Seed:
Cotton (delinted)
Grain Sorghum
Wheat (cleaned and treated)
Alfalfa
Forage Sorghum
Barley, Oats
Cantaloupe
Fertilizer:
Nitrogen
Phosphorus
Herbicide:
Pre-emerge
Insecticide:
Methyl Parathion
Dusting Sulfur
Labor:
Hoeing
Irrigation
Tr a c t o r
Custom Rates:
Fertilizer Application
Insecticide Application
Cotton Picking
Cotton Ginning (Upland)
Cotton Ginning (Pima)
Combining:
Grain Sorghum
Wheat
Barley
Hauling Grain
Alfalfa Harvest:
Swath, bale, haul
Cube
Cantaloupe Harvest
Fuel and lubricants:
Gasoline
L.P. Gas
Diesel
Motor Oil
Lubricant
cwt.
cwt.
bu.
cwt.
cwt.
cwt.
lb.
lb.
lb.
$ 12.00
17.00
4.00
50.00
17.00
4.00
3.00
.045
.09
qt,
6.25
gal.
5.00
lb.
.04
h r.
h r.
h r.
1.50
1.50
1.50
ac.
ac.
1.00
1.25
lb. of lint
bale
bale
ac.
ac.
ac.
cwt.
ton
ton
.05
22.00
32.00
5.00
5.00
5.00
.10
10.00
12.00
crate
.90
gal.
gal.
gal.
gal.
.295
lb.
.10
.158
1.45
.35
f^
New, 1972
08000400
TEXAS TRANS-PECOS REGION
Assumed Prices Paid And Received By Farmers
Item
Unit
Price
Capital:
Investment
Operating
Hail Insurance:
Cotton
Grain
Prices Received
Cotton (Upland)
Cotton (Pima)
Cottonseed
Grain Sorghum
Wheat
Barley
Alfalfa
Cantaloupes
Livestock
Grazing
$ .075
$
$
.09
12.50
13.15
$100
$100
lb. lint
lb. lint
ton
cwt.
cwt.
cwt.
ton
Net
Per
Pound
crate
Of
Gain
.30 2/
.47 2/
65.00
2.10 2/
2.10
2.10
35.00
5.30
.17
^
1/ These prices are not to be interpreted as predictions or prospective prices.
2/ Does not include government payment which a farmer might receive for
participating in farm programs.
08000600
TEXAS TRANS-PECOS REGION
f^
Yield Per Acre For Typical And High Level Management
Irrigated
Ty p i c a l H i g h L e v e l
Crop
Unit
Cotton (Upland)
lbs.
700
875
Cotton (Pima)
lbs.
450
700
Grain Sorghum
lbs.
4,000
5,500
Wheat for Grain
lbs.
2,700
4,200
Barley for Grain
cwt.
3,120
4,320
Oats for Graze
lbs./ac.
470
630
Forage for Graze
lbs./ac.
875
1,000
Alfalfa
tons
6
8
Cantaloupe
crates
100
150
^
New, 1972
^ %
08000520
TEXAS TRANS-PECOS REGION
Estimated Machinerv And Equipment Cost Per Hour Of Use, Typical Management
Machinery
Item and Size
Item
No.
Tractor, 100 HP
Tractor, 45 HP
Shredder, 2 Row
Offset Disc, 9'
Plow, 3 Btm.
Float
Lister, 3 Btm.
Rotary Cult., 4R
Cultivator, 4R
Planter, tool bar 4R
Spray Rig, 4R
Grain Drill, 14'
Border Disc
Disc Ridger, 4R
Vegetable Planter,, 2R
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
New
Cost
Estimated
Typical Yrs.
Of Use
$10,500
3,500
350
1,200
900
1,250
350
1,000
850
800
350
1,300
250
700
925
6
15
8
8
8
10
8
8
10
10
10
10
10
10
10
Total
Depr.l/
$5 ,828
3 ,500
261
900
670
1,000
260
750
670
640
280
1 ,000
200
550
800
Estimated
Total Hrs.
Of Use
Depr.
Per Hr.2/
5,000
7,200
1,000
2,500
3,500
1,200
1,200
1,600
1,200
600
500
800
500
500
1,000
$1.17
.49
.26
.36
.19
.83
.22
.47
.56
1.06
.56
1.25
.40
1.10
.80
Interest on
Investment
Per Hour 3/
$ .68
.23
.14
.18
.10
.47
.11
.25
.32
.60
.32
.75
.23
.64
.29
Fuel, Oil,
Lub., Rep.,
Per Hr. 4/
$1.54
.65
.19
.17
.33
.25
.27
.53
.59
.45
.71
.99
.05
.12
.76
2-8" Wells and equipment 5/
1/ New cost less value at time of trade, or less salvage value.
~2] Assumes straight line depreciation.
3/ (Investment + salvage) divided by 2 (7.5%) divided by annual hours of use.
"4/ Fuel, oil, lubrication, repair cost estimate taken from Bower, Modern Concepts of Farm Machinery Management.
1/ See attached irrigation cost analysis. Assumes 350 ft. well, 1000 gom, natural gas unit, and furrow irrigation,
New, 1972
08000510
TEXAS TRANS-PECOS REGION
E s t i m a t e d Mac h:inery And Equipment Cost: Per Hour Of Use, High Level Management
Machinery
Item and Size
Item
No.
Tractor 118 HP
Tractor, 90 HP
Tractor, 45 HP
Shredder, 4 Row
Offset Disc
Moldboard Plow, 5 Btm.
Float
L i s t e r, 6 R o w
Spray Rig, 4 Row
R o t o t i l l e r, 8 0 "
P l a n t e r t o o l b a r, 4R
Rolling Cultivator
Grain Drill, 16*
Border Disc
Disc Ridger, 4 Row
Ve g e t a b l e P l a n t e r, 2R
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
New
Cost
Estimated
Ty p i c a l Y r s .
Of Use
$13,500
9,000
3,500
1,400
2,000
1,750
1,250
1,100
6
8
15
10
8
8
10
10
10
10
10
8
10
10
10
10
350
2,500
800
1,700
1,600
250
700
925
To t a l
D e p r. l . /
Estimated
Deor.
To t a l H r s . ]Per Hr._2/
Of Use
$7,500
5,500
3,500
1,100
1,500
1,300
1,000
4,200
5,000
7,200
1,200
1,600
1,600
1,200
2,000
$1.79
1.10
1,900
1,600
1,600
1,600
1,200
1.19
800
280
640
1,268
1,274
200
550
800
500
800
800
1,000
.49
.92
.94
.81
.83
.40
.56
.40
.79
1.06
.25
.69
.80
Interest on
Investment
Per Hour 3/
Fue!1 , O i l ,
Lub . , Rep.,
Per H r. 4 /
$1.04
$1.89
1.35
.75
.23
.53
.47
.41
.47
.26
.32
.73
.23
.43
.64
.14
.40
.29
.65
.73
.75
1.35
.25
.69
.71
2.58
.78
.91
1.79
.06
.15
.26
4-8" Wells and equipment 5/
1/ New cost less value at time of trade, or less salvage value.
2/ Assumes straight line depreciation.
_3/ (Investment + salvage) divided by 2 (7.5%) divided by annual hours of use.
4 / F u e l , o i l , l u b r i c a t i o n , r e p a i r c o s t e s t i m a t e t a k e n f r o m B o w e r, M o d e r n C o n c e p t s o f F a r m M a c h i n e r y M a n a g e m e n t .
_5/ See attached irrigation cost analysis. Assumes 350 ft. well, 1000 gpm, natural gas unit, and furrow irrigation.
New, 197?
^__#
08005122
ALFALFA, IRRIGATED, TRANS--PEC0S REGION
Estimated Costs And Returns Per Acre Of Alfalfa, Typical Management
Item
1. Gross receipts, from production:
Hay
Unit
Price or
Cost/Unit
ton
$ 35.00 1/
ac.
ac.
h r.
ac.
ac.
24.40
4.50
2.00
24.00
7.00
Quantity
Value or
Cost
$210.00
2. Variable Costs:
Pre-Harvest:
1/4 Establishment
Fertilizer (0-50-0)
L a b o r, I r r i g a t i o n
Irrigation, Machinery
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Machinery (custom)
$
ton
.09
10.00
1
1
5. 90
1
1
35. 85
6
Total Variable Costs
^
$ 75.07
ac.
$
Total Fixed Costs
^
$ 60.00
$134.93
3. Income Above Variable Costs
4. Fixed Costs:
Irrigation
Land Charge
$ 24.40
4.50
11.80
24.00
7.00
3.23
$ 74.93
41.28
.06
1
300
$ 41.28
18.00
$ 59.28
5 . To t a l C o s t s
$194.21
6. Net Returns
$ 15.79
s
1/ Alfalfa for cubing would add $3./ton to the gross value but costs $2./ton additional
for harvesting.
Developeo by Extension Economists-Management, TAES, TAMU.
New, 1972
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914.
AECO 6
08005121
ALFALFA, IRRIGATED, TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of Alfalfa, Typical Management
Operation
* gN" o .
Irrigation
(2)
Labor
Fuel,
Oil,
u
£"tr0s5.J__ _
r p- Lneu!rb° .-, r A
DO
a tvee r _ £HM
eo T
_R !ce P
a rcsh .2«. r° a»H
r e< « • ' . ■ * •
May-Sep
8
5.90
$24.00
WiST
^
$41.28
(1) Labor hours calculated at 1.25 times tractor hours except where noted by
(2) Same as other except 6 acre inches per irrigation.
^
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, aa amended, and June SO, 1914.
AECO 6
\
08005112
ALFALFA, IRRIGATED, TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of Alfalfa, High Level Management
Itera
Unlt
1. Gross receipts, from production:
Hay
ton
$
„ o. s_ t_/ UPnr ii tc e
C
35.00
1/
o r Qn^ ^„ t y. . .
VaC
l uoe s to r
8
$280.00
2. Variable Costs:
Pre-Harvest:
1/5 Establishment
Fertilizer (0-100-0)
L a b o r, I r r i g a t i o n
Irrigation Machinery
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Machinery (custom)
ac.
ac.
ac.
ac.
ac.
$
ton
19.48
9.00
1.75
30.00
5.00
.09
10.00
1
1
7. 38
1
1
38. 20
8
Total Variable Costs
f^
Total Fixed Costs
$ 80.00
$159.84
3. Income Above Variable Costs
4. Fixed Costs:
Irrigation
Land Charge
$ 19.48
9.00
12.92
30.00
5.00
3.44
$ 79.84
$120.16
ac.
$
51.60
.06
1
300
$ 51.60
18.00
$ 69.60
5 . To t a l C o s t s
$229.44
6. Net Returns
$ 50.56
1/ Alfalfa for cubing would add $3./ton to the gross value but costs $2./ton additional
for harvesting.
D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
0800.5111
ALFALFA,
IRRIGATED,
TRANS-PECOS •____.-»_-__-_
REGION
' * —_■_»»_._■_—_•_—_'
—_____—B-W-B-W——•
Estimated Costs, And Requirements Per Acre Of Alfalfa. High l^evel ManaggmpntLabor
F_u_e_l ,
FOu iel ,l ,
Oil,
/^^
Item ~ Times « Tractor or T . D_^ Fixed costs ^
Operation X^ra Date ^8 Hours ^ Hr8# Lub., Rep. Per Acre J
(1)
Per
Acre
Irrigation
(2)
May-Sep
10
7.38
$30.00
$51.60
(1) Labor hours calculated at 1.25 times tractor hours except where noted by
(2) Same as other except 6 acre inches per irrigation.
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914.
AECO 6
08015112
BARLEY FOR GRAIN, IRRIGATED, TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of Barley For Grain, Higjh Level Management
Item
l u0e8 to r
C, ,o s_ t, /_U_n iPt r i c e o rQ un ^ _
i t_y . _ _ V a C
Unit
1. Gross receipts, from production:
Grain
cwt.
$
Grazing
lbs./gain
2.10
43.2
$
.17
90.72
95.20
560
To t a l
$185.92
2. Variable Costs:
Pre-Harvest:
Seed
cwt.
4.00
1
$
Fertilizer
(200-0-0)
ac.
9.00
1
Machinery
ac.
1.29
1
Tractor
(15)
hr.
1.89
.45
Tractor
(16)
hr.
1.35
1.30
Tractor
(17)
hr.
.65
.13
Labor,
Tractor
&
Machinery
ac.
2.00
2.35
Labor,
Irrigation
ac.
1.75
2.95
Irrigation
Machinery
ac.
12.00
1
Pickup
Expense
ac.
5.00
1
Hail
Insurance
$100
13.15
.5
Interest
on
Op.
Cap.
$
.09
25.21
Subtotal, Pre-Harvest
4.00
9.00
1.29
.85
1.76
.08
4.70
5.16
12.00
5.00
6.58
2.27
$ 52.69
Harvest:
Machinery (custom)
Hauling
Subtotal, Harvest
$ 5.00
4.32
$ 9.32
ac.
cwt.
1
5.00
.10
43.2
Total Variable Costs
$ 61.01
3. Income Above Variable Costs
$123.91
4. Fixed Costs:
Machinery
Tractor (15)
Tractor (16)
Tractor (17)
Irrigation
Land Charge
ac.
h r.
h r.
h r.
ac.
$
To t a l
To t a l
6.
Net
$ 2.45
1.27
2.41
.45
1.30
.72
1
300
20.64
.06
Fixed
5.
1
2.45
2.83
1.85
.13
.09
20.64
18.00
$
44.86
Costs
Returns
$106.87
$
79.05
f ^
Developed
by
Extension
Economists-Management,
TA E S ,
TA M U .
New,
1972
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
08015111
BARLEY FOR GRAIN, IRRIGATED, TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of Barley For Grain, High Level Management
Operation
Labor
Fuel,
Oil,
_.
I t e m ^Date
„_ Times Hftnrn Tractor or L . ^ Fixed costs
Over H°^8 Mach. Hrs. Lub.» Rep. per Acre
No.
Per Acre
Plow
15,20
Aug
1
.31
.25
Disc
16,19
Aug
2
.63
.50
.38
.71
Float
16,21
Aug
2
1.00
.80
.20
1.04
List
15,22
Aug
1
.25
.20
.14
.17
Drill
17,27
Sep
1
.16
.13
.23
.22
2.35
1.88
$ 1.29
$ 2.45
To t a l
$
.34
$
^ %
.31
Irrigation:
Preplant (2)
Aug
.98
$ 4.00
$ 6.88
Postplant (2)
Oct-Apr 4 1.97
8.00
13.76
2.95
$ 12.00
$ 20.64
To t a l
1
^
\
(1) Labor hours calculated at 1.25 times tractor houts except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 8 acre inches preplant and four acre
inches
per
postplant.
/*^\
Developed by Extension Economists-Management, TAES, TAtr
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914.
AECO 6
08015122
BARLEY FOR GRAIN, IRRIGATED, TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of Barley For Grain, Typical Management
Item
Unit
1. Gross receipts, from production:
Grain
cwt.
$
Grazing
lbs./gain
Price or
Cost/Unit
2.10
.17
Quantity
Value or
Cost
31.2
480
$ 65.52
81.60
To t a l
$147.12
2 . Va r i a b l e C o s t s :
Pre-Harvest:
Seed
Fertilizer (100-0-0)
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinery
Pickup Expense
Hail Insurance
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Machinery (custom)
Hauling
Subtotal, Harvest
cwt.
ac.
ac.
h r.
h r.
ac.
ac.
ac.
ac.
$100
$
ac.
cwt.
4.00
4.50
.86
1.54
.65
2.00
1.25
12.00
7.00
13.15
.09
5.00
.10
1
1
1
2.66
.17
3.53
2.95
1
1
.5
25.69
1
$
31.2
$
Total Variable Costs
Total Fixed Costs
^
5.00
3.12
8.12
$ 61.81
$ 85.31
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Irrigation
Land Charge
$ 4.00
4.50
.86
4.10
.11
7.06
5.16
12.00
7.00
6.58
2.31
$ 53.69
ac.
h r.
h r.
ac.
$
1.80
1.85
.72
20.64
.06
1
$
2.66
1
300
.17
1.80
4.92
.12
20.64
18.00
$ 45.48
5 . To t a l C o s t s
$107.29
6. Net Returns
$ 39.83
^
D e v e l o p e o b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics, Texas AfcM University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
08015121
BARLEY FOR GRAIN, IRRIGATED, TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of Barley For Grain, Typical Management
Labor
Fuel,
Oil,
_.
,
It_
T
i
f
s
T
r
a
c
t
o
r
^
"
£
*
_%?•
Date
Operation
No.
(1)
Per
Acre
Plow
1,5
Aug
1
1.11
.90
$ .30
$ .26
Disc
1,4
Aug
2
.83
.66
.11
.06
Float
1,6
Aug
2
1.00
.80
.20
1.04
List
1,7
Aug
1
.38
.30
.08
.10
Drill
2,12
Sep
1
.21
.17
.17
.34
3.53
2.83
$ .86
$ 1.80
To t a l
s^.
Irrigation:
Preplant (2)
Aug
1
.98
$ 4.00
$ 6.88
Postplant (2)
Oct-Apr 4
1.97
8.00
13.76
2.95
$12.00
$20.64
To t a l
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 8 acre inches preplant and four acre >-~
inches
per
postplant.
^
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914.
AECO 6
08035112
CANTALOUPES, IRRIGATED, TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of Cantaloupes, High Level Management
Item
1. Gross receipts, from production:
Melons
Unit
Price or
Cost/Unit
crate $ 5.30
Quantity
Value or
Cost
150
$795.00
2
1
1
$ 6.00
12.60
1.86
2. Variable Costs:
Pre-Harvest:
Seed
Fertilizer (180-50-0)
Machinery
Tractor <15)
Tractor (16)
Tractor (17)
Labor, Tractor & Machinery
Labor, Hand
L a b o r, I r r i g a t i o n
Irrigation Machinery
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
(
^
Harvest:
Hand Harvest
Pack and Sell
Subtotal, Harvest
lb.
ac.
ac.
h r.
h r.
h r.
h r.
h r.
h r.
ac.
ac.
$
crate
crate
3.00
12.60
1.86
1.89
1.35
.25
.47
2.08
2.81
.62
.40
2.00
1.50
1.75
14.00
5.00
3.70
30.00
3.45
.09
50.79
7.40
45.00
6.04
14.00
5.00
4.57
$106.15
.65
.90
2.30
1
1
150
150
$135.00
345.00
$480.00
Total Variable Costs
$586.15
Income Above Variable Costs
$208.85
Fixed Costs:
Machinery
Tractor (15)
Tractor (16)
Tractor (17)
Irrigation
Land Charge
ac.
h r.
h r.
h r.
ac.
$
3.40
2.83
1.85
.72
24.08
.06
1
.25
2.08
1
300
.62
$ 3.40
.71
3.85
.45
24.08
18.00
Total Fixed Costs
$ 50.49
Total Costs
$636.64
Net Returns
$158.36
Developed by Extension Economists-Management, TAES, TAMU.
New, 1972
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30, 1914.
AECO 6
08035111
CANTALOUPES, IRRIGATED, TRANS-PECOS REGION
Estimated Costs, And Requirements Per . - Of Cantaloupes, High Level Management
^*%
Operation
^No.
m D a t e A r . !Over
_t Hour8 Mach. Hrs. Lub#', p* Per Acre
(1)
Per
Acre
Plow
15,20
Jan
1
.31
.25
$ .34
$ .31
Disc
16,19
Feb
2
.63
.50
.38
.71
Float
16,21
Feb
2
1.00
.80
.20
1.04
List
15,22
May
1
.25
.20
.14
.17
Disc Ridge
16,29
May
1
.28
.22
.03
.24
Cultivate
17,26
May
1
.15
.12
.11
.15
Plant
17,30
May
1
.63
.50
.38
.55
Cultivate
16,25
Jun-•Jul
3
.45
.36
.28
.23
Jun-■Jul
2
30.00
2.95
$ 1.86
$ 3.40
Turn Vines
33.70
To t a l
Irrigation:
Preplant (2)
Mar
1
1.48
$ 6.00
$10.32
Postplant (2)
Jun-Aug 4
1.97
8.00
13.76
3.45
$14.00
$24.08
To t a l
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 12 acre inches preplant and four acre ^_
inches
per
postplant.
/
Developed by Extension Economists-Management, TAES, TAMU
Cooperative Extension Work in Agriculture ami Home Economics. Texas A&M University and the United States D^"™*"1
of Agriculture cooperating. Distributed in furtherance of the Act* of Congress of May 8. 1914. as amended, and June SO. 1914.
AECO 6
08035122
CANTALOUPES, IRRIGATED, TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of Cantaloupes, Typical Management
Item
1. Gross receipts, from production:
Melons
Unit
Price or
Cost/Unit
crate $ 5.30
Quantity
100
Value or
Cost
$530.00
2. Variable Costs:
Pre-Harvest:
Seed
Fertilizer (160-50-0)
Machinery
Tractor <1)
Tractor (2)
Labor, Tractor & Machinery
Labor, Hand
L a b o r, I r r i g a t i o n
Irrigation Machinery
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Hand Harvest
Pack and Sell
Subtotal, Harvest
lb.
ac.
ac.
h r.
h r.
ac.
h r.
h r.
ac.
ac.
$
crate
crate
3.00
11.70
1.46
1.54
.65
2.00
1.50
1.75
12.00
7.00
.09
.90
2.30
2
1
1
3.24
.74
4.97
30.00
2.96
1
1
51.88
100
100
Total Variable Costs
$ 90.00
230.00
$320.00
$428.42
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Irrigation
Land Charge
$ 6.00
11.70
1.46
4.99
.48
9.94
45.00
5.18
12.00
7.00
4.67
$108.42
$101.58
ac.
h r.
h r.
ac.
Total Fixed Costs
2.91
1.85
.72
20.64
.06
1
3.24
.74
1
300
$ 2.91
5.99
.53
20.64
18.00
$ 48.07
5 . To t a l C o s t s
$476.49
6. Net Returns
$ 53.51
Developed by Extension Economists-Management, TAES, TAMU.
New, 1972
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acta of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
08035121
CANTALOUPES, IRRIGATED, TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of Cantaloupes, Typical Management
Operation
Labor
Fuel,
Oil,
I t e m -Date
. _ _ _ TiiuMSB
i m e s Hoi1T.n
„ T r a c tTractor
o r o r or
- , T ' . - «^
_ _ ' -.__-,_.«
F i x e d _.««,,
costs
Over H<^8 Mach. Hrs. L"b" ***' Per Acre
No.
(1)
Per
Acre
Plow
1,5
Jan
1
1.10
.90
$ .30
$ .26
Disc
1,4
Feb
2
.83
.66
.11
.06
Float
1,6
Feb
2
1.00
.80
.20
1.04
List
1,7
Mar
1
.38
.30
.08
.10
Disc Ridge
11,14
May
1
.28
.22
.03
.38
Cultivate
22,8
May
1
.18
.14
.07
.10
Plant
2,15
May
1
.75
.60
.46
.65
Cultivate
1,9
Jun-•Jul
3
.45
.36
.21
.32
Jun-J u l
2
30.00
3.98
$ 1.46
$ 2.91
Turn Vines
To t a l
34.97
/^%
Irrigation:
Preplant (2)
Mar
1
1.48
$ 6.00
$10.32
Postplant (2)
Jun-Aug 3
1.48
6.00
10.32
2.96
$12.00
$20.64
To t a l
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 12 acre inches preplant and four acre ^_
inches
per
postplant.
^
Developed by Extension Economists-Management,, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO. 1914.
AECO 6
08085112
FORAGE SORGHUM FOR GRAZING. IRRIGATED, TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of
Forage Sorghum For Grazing, High Level Management
Item
Unit
1. Gross receipts, from production:
Grazing
lbs./gain
2. Variable Costs:
Seed
Fertilizer (300-80-0)
Machinery
Tractor (15)
Tractor (16)
Tractor (17)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinery
Pickup Expense
Interest on Op. Cap.
lb.
ac.
ac.
h r.
h r.
h r.
h r.
h r.
ac.
ac.
$
Price or
Cost/Unit
$
Quantity
.17
1,000
$170.00
.17
10
1
1
1.70
20.70
1.77
.85
2.84
.08
6.68
6.02
14.00
5.00
2.68
20.70
1.77
1.89
1.35
.65
2.00
1.75
14.00
5.00
.09
.45
2.10
.12
3.34
3.44
1
1
29.82
Total Variable Costs
$ 62.32
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (15)
Tractor (16)
Tractor (17)
Irrigation
Land Charge
Total Fixed Costs
Value or
Cost
$107.68
ac.
h r.
h r.
h r.
ac.
$
3.38
2.83
1.85
.72
24.08
.06
1
.45
2.10
1
300
.12
$ 3.38
1.27
3.89
.09
24.08
18.00
$ 50.71
5 . To t a l C o s t s
$113.03
6. Net Returns
$ 56.97
D e v e l o p e o b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w. 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30, 1914.
a w_»_rv_r-_.
A
F r n _-*a
FORAGE SORQ-UM FOR GRAZING, IRRIGATED. TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of
Forage Sorghum For Grazing, High Level Management
Operation
08085111
Labor
Fuel, Oil,
I t e m rDate
. * T i m e s « Hours
Tractor or ,._,_ ' -__' Fixed costs
Over
Mach. Hrs. L"b•* ***' Per Acre
No.
Per Acre
(1)
Plow
15,20
Jan
1
.31
.25
$ .34
$ .31
Disc
16,19
Feb
2
.63
.50
.38
.71
Float
16,21
Feb
2
1.00
.80
.20
1.04
List
15,22
May
1
.25
.20
.14
.17
Cultivate
17,26
May
1
.15
.12
.11
.15
Plant
16,25
May
1
.25
.20
.16
.13
Shred
16,18
Jun- Sep
3
.75
.60
.44
.87
3.34
2.67
$ 1.77
$ 3.38
To t a l
^
Irrigation:
Preplant (2)
Apr
1
.98
$ 4.00
$ 6.88
Postplant (2)
Jun-Oct 5
2.46
10.00
17.20
3.44
$14.00
$24.08
To t a l
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 8 acre inches preplant and four acre
inches
per
postplant.
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Dis-iboted in furtherance of the Acts of Congress of May 8, 1914. as amended, and June SO, 1914.
AECO 6
"^\
08085122
FORAGE SORGHUM FOR GRAZING, IRRIGATED, TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of
Forage Sorghum For Grazing, Typical Management
Item
1. Gross receipts, from production:
Grazing
2. Variable Costs:
Seed
Fertilizer (200-80-0)
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinery
Pickup Expense
Interest on Op. Cap.
Unit
Price or
Cost/Unit
t./gain
$ .17
lb.
ac.
ac.
h r.
h r.
h r.
h r.
ac.
ac.
$
.17
16.20
1.03
1.54
.65
2.00
1.75
14.00
7.00
.09
Quantity
875
$148.75
10
1
1
3.83
.14
4.95
3.44
1
1
30.92
Total Variable Costs
f^
Total Fixed Costs
1.70
16.20
1.03
5.90
.09
9.90
6.02
14.00
7.00
2.78
$ 64.62
3. Income Above Variable Costs
4. Fixed Costs
Machinery
Tractor (1)
Tractor (2)
Irrigation
Land Charge
Value or
Cost
$ 84.13
ac.
h r.
h r.
ac. _
$
2.24
1.85
1
3.83
.14
.72
24.08
.06
1
300
$ 2.24
7.09
.10
24.08
18.00
$ 51.51
5 . To t a l C o s t s
$116.13
6. Net Returns
$ 32.62
D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, arid June 30, 1914.
AECO 6
FORAGE SOR(__UM FOR GRAZING, IRRIGATED. TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of
Forage Sorghum For Grazing, Typical Management
08085121
Labor
Fuel,
Oil,
_.
.
.
4
I
t
e
m
_
T
i
m
e
s
H
o
i
l
,
a
T
r
a
c
t
o
r
o
r
T
.
R
_
_
F
i
x
e
d
O p e r a t i o n N D a t e ^ H o u f 8 M a c h . H r s . L u b • » / « * • P e r Accor set s
Per Acre
(1)
Plow
1,5
Jan
1.10
.90
$ .30
$ .26
Disc
1,4
Feb
.83
.66
. 11
.06
Float
1,6
Feb
1.00
.80
.20
1.04
List
1,7
Mar
.38
.30
.08
.10
Cultivate
2,8
May
.18
.14
.07
.10
Plant
1,10
May
.21
.17
.08
.28
Shred
1,3
Jun-Sep 3
1.25
1.00
.19
.40
4.95
3.97
$ 1.03
$ 2.24
Total
s*^*\
Irrigation:
Preplant (2)
Apr
.98
$ 4.00
$ 6.88
Postplant (2>
Jun-Oct 5 2.46
10.00
17.20
3.44
$14.00
$24.08
To t a l
1
^ * \
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 8 acre inches preplant and four acre ^_
inches
per
postplant.
^^\
Developed by Extension Economists-Management, TAES. TAMU.
Cooperative Extension Work in Agriculture and Heme Eci.uouilts, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Act* of Congress of May 8.1914. as amended, and June SO. 1914.
AECO 6
08070112
PIMA COTTON, IRRIGATED, TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of Pima Cotton, High Level Management
Item
1. Gross receipts, from production:
Lint
Seed
To t a l
2. Variable Costs:
Pre-Harvest:
Seed
Fertilizer (180-50-0)
Herbicide
Machinery
Tractor (15)
Tractor (16)
Tractor (17)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinery
Insecticide (custom)
Pickup Expense
Hail Insurance
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Machinery (custom)
Ginning
Subtotal, Harvest
Unit
lb.
ton
cwt.
ac.
qt.
ac.
h r.
h r.
h r.
h r.
h r.
ac.
ac.
$100
$
lb.
bale
Price or
Cost/Unit
$
Quantity
.47
65.00
700
12.00
12.60
6.25
3.36
1.89
1.35
.65
2.00
1.75
14.00
2.50
5.00
12.50
.09
36
1
1
1
.05
32.00
.56
.85
2.30
.60
4.69
3.45
1
5
1
1
45.19
700
1.4
3.64
12.60
6.25
3.36
1.61
3.11
.39
9.38
6.04
14.00
12.50
5.00
12.50
4.07
$ 94.45
$ 35.00
44.80
$ 79.80
$191.15
3. Income Above Variable Costs
Fixed Costs:
Machinery
Tr a c t o r
Tr a c t o r
Tr a c t o r
Irrigation
Land Charge (Rent)
$329.00
36.40
$365.40
$174.25
Total Variable Costs
4.
Value or
Cost
ac.
h r.
h r.
h r.
ac.
ac.
5.12
2.83
1.85
.72
24.08
61.69
Total Fixed Costs
1
.85
2.30
1
1
.60
$ 5.12
2.41
4.26
.43
24.08
61.69
$ 97.99
5 . To t a l C o s t s
$272.24
6. Net Return
$ 93.16
7. Government Payments (less rent) (700 lbs @ 12.69c/lb) 1/
$ 66.62
8. Net Return Including Government Payment
$159.78
1/ Based on planted acres. No allowance made for set-aside acreage of 30.89%
Developeo by Extension Economists-Management, TAES, TAMU.
New, 1972
Cooperative Extension Work in Agriculture and Home Economics, Tex_s A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
08070111
PIMA COTTON, IRRIGATED, TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of Pima Cotton, High Level Management
Operation
Item
Times
^
x*£
Date
™£8
Tractor
or
_"*'
™*
Fixed
costs
<*\
Hours
|fad|#
Hr8#
^'£»'
Per
Acre
1
Shred Stalks
16,18
Jan
1
.50
.40
$ .29
$ 1.06
Plow
15,20
Jan
1
.31
.25
.34
.31
Disc
16,19
Feb
2
.63
.50
.38
.71
Float
16,21
Feb
2
1.00
.80
.20
1.04
List
15,22
Feb
1
.25
.20
.14
.17
Cultivate
17,26
Feb
1
.15
.12
.11
.15
Apply Herbicide 17,23
Mar
1
.25
.20
.14
.18
Cultivate
17,26
Mar
1
.15
.12
.11
.15
Rototill
15,24
Apr
1
.50
.40
1.03
.77
Plant
16,25
Apr
1.2
.30
.24
.19
.15
Cultivate
17,26
May
1
.20
.16
.15
.20
Cultivate
16,25
Jun-Jul
3
.45
.36
.28
.23
4.69
3.75
$ 3.36
$ 5.12
To t a l
rigation:
$
6.00
Preplant (2)
Mar
1
1.48
Postplant (2)
Jun-Aug 4
1.97
8.00
3.45
$14.00
To t a l
$10.32
13.76
$24.08
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 12 acre inches preplant and four acre inches
per
postplant.
^
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June *>£»H^
08070122
PIMA COTTON. IRRIGATED. TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of Pima Cotton, Typical Management
-.ITt te- m
nU«n4i ^t
P rCi co es t / Uonri t
1. Gross receipts, from production:
Lint
lb.
$
Seed
ton
To t a l
2. Variable Costs:
Pre-Harvest:
Seed
Fertilizer (250-100-0)
Herbicide
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor & Machinery
Labor, Irrigation
Irrigation Machinery
Insecticide (custom)
Pickup Expense
Hail Insurance
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Machinery (custom)
Ginning
Subtotal, Harvest
_
.47
65.00
cwt.
ac.
qt.
ac.
h r.
h r.
h r.
h r.
ac.
450
.36
$
12.00
20.25
6.25
1.38
1.54
.36
2.00
1.75
14.00
2.50
7.00
12.00
.09
lb.
bale
.05
32.00
ac.
$100
f ct i t y V a l u e
Q fuca. n
C o s to r
$ 2 11 . 5 0
23.40
$234.90
.36
1
1
1
4.52
.65
5.60
3.45
1
10
1
1
57.23
450
.9
Total Variable Costs
$ 22.50
28.80
$ 51.30
$170.90
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor
Tractor
Irrigation
Land
Charge
$ 3.64
20.25
6.25
1.38
6.96
.23
11.20
6.04
14.00
25.00
7.00
12.50
5.15
$119.60
ac#
hr.
hr.
ac.
(Rent)
$ 64.00
ac.
2.83
1.85
.72
24.08
23.22
Total Fixed Costs
5. Total Costs
6. Net Returns
7. Government Payments (less rent) (450 lbs @ 12.69c/lb) 1/
8. Net Return Including Government Payment
1
4.52
.65
1
1
$ 2.83
8.36
.47
24.08
23.22
$ 58.96
$229.86
$ 5.04
$ 42.83
$ 47.87
1/ Based on planted acres. No allowance made for set-aside acreage of 30.89%.
D e v e l o p e o b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United S_a„~ i^LtI!*,
Agr.cu.ture cooperating. Distributed in furtherance of the Acts of Congress «M^ S_l t%m"ntd aS ^^9.4
AECO 6
08070121
PIMA COTTON, IRRIGATED, TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of Pima Cotton, Typical Management
Operation
Labor
Fuel,
Oil,
_,_
I t e m n a i . _ Ti m e s H f t l 1 Y. r Tr a c t o r o r , _ _ , _ « _ _ F i x e d c o s t s
N o . D a t e O v e r H ^ r Mach. Hrs. L"b" ***' Per Acre
Per Acre
Shred S t a l k s
1,3
Jan
1
.50
.40
$ .08
$ .16
Pic-
1,5
Jan
1
1 . 11
.90
.30
.26
Disc
1,4
Feb
2
.83
.66
.11
.06
Float
1,6
Feb
2
1.00
.80
.20
1.04
List
1,7
Mar
1
.38
.30
.08
.10
Apply Herbicide 2 , 11
Apr
1
.28
.22
.16
.19
Disc
1,4
Apr
1
.38
.30
.05
.16
Disc
1,4
May
1
.25
.20
.03
.11
Plant
1,10
May
1.2
.24
.20
.09
.33
Cultivate
2,8
May
1
.18
.14
.07
.10
Cultivate
1,9
Jun-Jul
3
.45
.36
.21
.32
5.60
4.88
$ 1.38
$ 2.83
To t a l
•rigation:
Preplant (2)
Apr
1
1.48
$ 6.00
$10.32
Postplant (2)
Jun-Aug 4
1.97
8.00
13.76
3.45
$14.00
$24.08
To t a l
(1) Labor hours calculated at 1.25 tirpes tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 12 acre inches preplant and four are ^__~
inches
per
postplant.
^
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914.
AECO 6
08075112
UPLAND COTTON, IRRIGATED, TRANS-PECOS REGION
f^
Estimated Costs And Returns Per Acre Of Upland Cotton, High Level Management
Item
Unit
1. Gross receipts, from production:
Lint
Seed
To t a l
lb.
ton
Price or
Cost/Unit
$
Quantity
.30
65.00
875
12.00
12.60
6.25
3.36
1.89
1.35
.65
2.00
1.75
14.00
2.50
5.00
12.50
.09
36
1
1
1
.7
Value or
Cost
$262.50
45.50
$308.00
2 . Va r i a b l e C o s t s :
Pre-Harvest:
Seed
cwt.
Fertilizer
(180-50-0)
ac.
Herbicide
qt.
Machinery
ac.
Tractor
(15)
hr.
Tractor
(16)
hr.
Tractor
(17)
hr.
L a b o r, Tr a c t o r & M a c h i n e r y h r.
Labor,
Irrigation
hr.
Irrigation
Machinery
ac.
Insecticide (custom)
Pickup
Expense
ac.
Hail
Insurance
$100
Interest
on
Op.
Cap.
$
Subtotal, Pre-Harvest
Harvest:
Machinery
(custom)
Ginning
Subtotal, Harvest
lb.
bale
.05
22.00
.85
2.30
.60
4.69
3.45
1
5
1
1
45.19
875
1.,75
Total Variable Costs
$ 43..75
38..50
$ 82,.25
$176..70
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor
Tractor
Tractor
Irrigation
Land
Charge
3.64
12.60
6.25
3.36
1.61
3.11
.39
9.38
6.04
14.00
12.50
5.00
12.50
4.07
$ 94..45
(Rent)
$131..30
ac.
hr.
hr.
hr.
ac.
ac.
5.12
2.83
1.85
.72
24.08
57.32
Total Fixed Costs
1
,85
2.,30
«,60
1
1
$ 5 ..12
2..41
4..26
.43
24,.08
57,.32
$ 93.62
5 . To t a l C o s t s
$270.32
6. Net Returns
$ 37.68
7. Government Payment (less rent) (875 lbs @ 15c/16) 1/
$ 98.44
8. Net Return Including Government Payment
$136.12
1/ Based on planted acres. No all owance made for set-aside acreage of 20%.
D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w 1 9 7 2
(-.operative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30. 1914.
08075111
UPLAND COTTON, IRRIGATED. TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of Upland Cotton, High Level Management
Operation
Labor
Fuel,
Oil,
I t e m _Date
_ . . - T i_xu*-»
m e s „ ii.-...-.-.
T r a c t oTractor
r o r »or
_ _ ,-_.
_ '«__
« _ _«.-.__«*«' F i x e d *_««,
costs
Over H™*8 Mach. Hrs. L<*., Rep. Per Acre
No.
(1)
Per
Acre
Shred Stalks
16,18
Jan
1
.50
.40
$ .29
$ 1.06
Plow
15,20
Jan
1
.31
.25
.34
.31
Disc
16,19
Feb
2
.63
.50
.38
.71
Float
16,21
Feb
2
1.00
.80
.20
1.04
List
15,22
Feb
1
.25
.20
.14
.17
Cultivate
17,26
Feb
1
.15
.12
.11
.15
Apply Herbicide 17,23
Mar
1
.25
.20
.14
.18
Cultivate
17,26
Mar
1
.15
.12
.11
.15
Rototill
15,24
Apr
1
.50
.40
1.03
.77
Plant
16,25
Apr
1.2
.30
.24
.19
.15
Cultivate
17,26
May
1
.20
.16
.15
.20
Cultivate
16,25
Jun-Jul
3
.45
.36
.28
.23
4.69
3.75
$ 3.36
$ 5.12
To t a l
^
rigation:
Preplant (2)
Mar
1
1.48
$ 6.00
$10.32
Postplant (2)
Jun-Aug 4
1.97
8.00
13.76
3.45
$14.00
$24.08
To t a l
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 12 acre inches preplant and four acre ^^
inches
per
postplant.
^
Developed by Extension Economists-Management, TAES. TAW.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914.
AECO 6
08075122
UPLAND COTTON, IRRIGATED, TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of Upland Cotton, Typical Management
Item
. , o_ s, _t /_U nPi rt i c e
C
Unit
1. Gross receipts, from production:
Lint
lb.
$
Seed
ton
To t a l
.30
65.00
o r E nr tt i t.y . .
V a lCu oe g to r
700
.56
$210.00
36.40
$246.40
2. Variable Costs:
Pre-Harvest:
Seed
cwt.
12.00
.36
$
Fertilizer
(250-100-0)
ac.
20.25
1
Herbicide
qt.
6.25
1
Machinery
ac.
1.38
1
Tractor
(1)
hr.
1.54
4.52
Tractor
(2)
hr.
.65
.36
Labor,
Tractor
&
Machinery
hr.
2.00
5.60
Labor,
Irrigation
hr.
1.75
3.45
Irrigation
Machinery
ac.
14.00
1
Insecticide
(custom)
2.50
10
Pickup
Expense
ac.
7.00
1
Hail
Insurance
$100
12.50
1
Interest
on
Op.
Cap.
$
.09
57.23
Subtotal, Pre-Harvest
Harvest:
Machinery
Ginning
Subtotal, Harvest
lb.
.05
bale
700
1.4
22.00
$ 35.00
30.80
$ 65.80
Total Variable Costs
$185.40
3. Income Above Variable Costs
$ 61.00
4. Fixed Costs:
Machinery .
Tractor (1)
Tractor (2)
Irrigation
Land Charge (Rent)
To t a l
ac.
h r.
h r.
ac.
ac.
Fixed
5.
Net
1
2.83
1.85
4.52
.72
1
1
24.08
34.45
Costs
To t a l
6.
3.64
20.25
6.25
1.38
6.96
.23
11 . 2 0
6.04
14.00
25.00
7.00
12.50
5.15
$119.60
.65
.47
24.08
34.45
$
70.19
Costs
Returns
$ 2.83
8.36
$255.59
$
(9.19)
7. Government Payments (less rent) (700 lbs (_ 15c/lb) 1/ $ 78.75
8.
Net
Return
Including
Government
Payment
$
69.56
1/ Based on planted acres. No allowance made for set-aside acreage of 20%.
N e w. 1 9 7 2
Developed
by
Extension
Economists-Management,
TA E S ,
TA M U .
'
('.♦•operative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
08075121
UPLAND COTTON, IRRIGATED, TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of Upland Cotton. Typical Management
Labor
Fuel,
Oil,
__,_,
Item no„_ Times Hrtl„.0 Tractor or T . «__ Fixed costs
Operation
No. Date Over H^8 Mach. Hrs. L"b" ***' Per Acre
(1)
Per
Acre
Shred Stalks
1,3
Jan
1
.50
.40
$ .08
$ .16
Plow
1,5
Jan
1
1.11
.90
.30
.26
Disc
1,4
Feb
2
.83
.66
.11
.06
Float
1,6
Feb
2
1.00
.80
.20
1.04
List
1,7
Mar
1
.38
.30
.08
.10
Apply Herbicide 2,11
Apr
1
.28
.22
.16
.19
Disc
1,4
Apr
1
.38
.30
.05
.16
Disc
1,4
May
1
.25
.20
.03
.11
Plant
1,10
May
1.2
.24
.20
.09
.33
Cultivate
2,8
May
1
.18
.14
.07
.10
Cultivate
1,9
Jun-Jul
3
.45
.36
.21
.32
5.60
4.88
$ 1.38
$ 2.83
To t a l
/ * \
Irrigation:
Preplant (2)
Apr
1
1.48
$ 6.00
$10.32
Postplant (2)
Jun-Aug 4
1.97
8.00
13.76
3.45
$14.00
$24.08
To t a l
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pump i n g u n i t; 1 2 a cre i n ch e s p re p l a n t a n d fo u r a cre ^ ^
inches
per
postplant.
/^\
Oeveloped by Extension Economists-Management,. TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June SO. 1914.
AECQ 6
08095112
GRAIN SORGHUM. IRRIGATED. TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of Grain Sorghum, High Level Management
T_.
^~
ti
...
Unlt
Price
or
Cost/Unit
1. Gross receipts, from production:
Grain
Sorghum
cwt.
$
n
...
Va l u e
or
Q~»t_ty
Co8t
2.10
55
$ 11 5 . 5 0
2. Variable Costs:
Pre-Harvest:
Seed
lb.
.17
7
$
1.19
Fertilizer
(180-60-0)
ac.
13.50
1
13.50
Machinery
ac.
1.68
1
1.68
Tractor
<15)
hr.
1.89
.45
.85
Tractor
(16)
hr.
1.35
1.75
2.36
Tractor
(17)
hr.
.65
.28
.18
Labor,
Tractor
&
Machinery
hr.
2.00
3.09
6.18
Labor,
Irrigation
hr.
1.75
2.95
5.16
Irrigation
Machinery
ac.
12.00
1
12.00
Pickup
Expense
ac.
5.00
1
5.00
Insecticide
(custom)
ac.
6.00
1
6.00
Interest
on
Op.
Cap.
$
.09
27.05
2.43
Subtotal, Pre-Harvest
$ 56.54
Harvest:
Machinery (custom)
Hauling
Subtotal, Harvest
ac.
cwt.
5.00
.10
1
55
$ 5.00
5.50
$ 10.50
Total Variable Costs
$ 67.04
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (15)
Tractor (16)
Tractor (17)
Irrigation
Land Charge
ac.
h r.
h r.
h r.
ac.
6.
2.87
2.83
1.85
.72
20.64
.06
$
To t a l
5.
$ 48.46
Fixed
To t a l
Net
Costs
1
• 45
1. 75
« 28
1
300
$
Costs
Returns
$ 2.87
1.29
3.24
.20
20.64
18.00
46.24
$ 11 3 . 2 8
$
2.22
D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30, 1914.
AECO 6
GRAIN SORGHUM, IRRIGATED, TRANS-PECOS REGION 08095111
■
■
■
...
h
"
i
i.
.
i
*
i
up
i.iumu.,.1
i
v
~>
'
ii
i
Estimated Costs, And Requirements Per Acre Of Grain Sorghum, High Level Management
Operation
Labor m Fuel, Oil, _. . __ /^
Item nal._ Times Hrtl,~.a Tractor or TllK «__ Fixed costs 1
m o D a t e O v e r H ° * * 8 M a c h . H r s - * * * • • * « p . P - A « e ■'
No.
Per Acre
Plow
15,20
Jan
1
.31
.25
$ .34
$ .31
Disc
16,19
Feb
2
.63
.50
.38
.71
Float
16,21
Feb
2
1.00
.80
.20
1.04
List
15,22
Mar
1
.25
.20
.14
.17
Cultivate
17,26
May
1
.15
.12
.11
.15
Plant
16,25
Jun
1
.25
.20
.16
.13
Cultivate
17,26
Jun
1
.20
.16
.15
.20
Cultivate
16,25
Jun-Jul
2
.30
.25
.20
.16
3.09
2.48
$ 1.68
$ 2.87
To t a l
Irrigation:
Preplant (2)
May
1
.98
$ 4.00
$ 6.88
Postplant (2)
Jun-Jul 4
1.97
8.00
13.76
2.95
$12.00
$20.64
Total
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 8 acre inches preplant and four acre
inches per postplant.
Developed by Extension Economists-Manaqementt TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30, 1914.
AECQ6
08095122
GRAIN SORCaUM, IRRIGATED, TRANS-PECOS REGION
f^
Estimated Costs And Returns Per Acre Of Grain Sorghum, Typical Management
-I t_e m
ti
Uj n. .l t
P r iC
ce
o a t / Uonr i t
1. Gross receipts, from production:
Grain
Sorghum
cwt.
2 . Va r i a b l e C o s t s :
Seed
Fertilizer (100-50-0)
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinery
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Machinery (custom)
Hauling
Subtotal, Harvest
$
lb.
ac.
ac.
h r.
h r.
h r.
h r.
ac.
ac.
$
ac.
cwt.
_■» Q
_ .u_a_n, t l t y V a l u e C o s to r
2.10
.17
9.00
1.06
1.54
40
$
7
1
1
$
3.08
.65
.28
.18
4.19
2.46
.09
22.93
8.38
4.31
10.00
7.00
2.06
47.92
*
5.00
.10
1
1
1
40
$
$
5.00
4.00
9.00
$ 56.92
3. Income Above Variable Costs
Total Fixed Costs
1.19
9.00
1.06
4.74
2.00
1.75
10.00
7.00
Total Variable Costs
4. Fixed Costs:
Machinery
Tractor (It)
Tractor (2)
Irrigation
Land Charge
84.00
$ 27.08
ac.
h r.
h r.
ac.
$
1
2.16
1.85
3.08
.72
.28
17.20
.06
1
300
$
2.16
5.70
.20
17.20
18.00
$ 43.26
5 . To t a l C o s t s
$100.18
6. Net Returns
$(16.18)
D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . . N e w 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acta of Congress of May 8. 1914. as amended, and June 80. 1914.
AECO 6
08095121
GRAIN SORGHUM, IRRIGATED. TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of Grain Sorghum, Typical Management
Operation
Labor _, Fuel, Oil, „_, _
Item nfll.0 Times Hnil_._ Tractor or L . «_ Fixed costs
No. Date Over H^6 Mactu Hrs. L"b••***• Per Acre
(1)
Per
Acre
Plow
1,5
Jan
1
1.10
.90
$ .30
$ .26
Disc
1,4
Feb
2
.83
.66
.11
.06
Float
1,6
Feb
2
1.00
.80
.20
1.04
List
1,7
Mar
1
.38
.30
.08
.10
Cultivate
2,8
May
1
.18
.14
.07
.10
Plant
1,10
Jun
1
.21
.17
.08
.28
Cultivate
2,8
Jun
1
.18
.14
.07
.10
Cultivate
1,9
Jun-Jul
2
.31
.25
.15
.22
4.19
3.36
$ 1.06
$ 2.16
.98
$ 4.00
$ 6.88
1.48
6.00
10.32
2.46
$10.00
$17.20
To t a l
Irrigation:
Preplant (2)
May
Postplant (2)
Jun-Jul 3
Total
1
—m—m——mmm
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 8 acre inches preplant and four acre ^__
inches
per
postplant.
/^\
Developeo by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture aod Home Economics, Texas A&M University and (he United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914.
AECO 6
«————vn—w—f—m—*—-•———«n^vmm4F#mm^*9rm—\—*n^mmp^■■■*—wmmm—mm—mmW**m—mm*mmmmmmm*mn—mm—wm*mmm*m
08125122
OATS FOR GRAZING, IRRIGATED. TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of Oats For Grazing, Typical Management
^-
Unlt
t t _■_ . P r i c e o r n . . . V a l u e o r
Cost/Unit
Quantlty
Cost
1. Gross receipts, from production:
Grazing
lbs./gain
$
.17
470
$
79.90
1
1
1
2.66
.17
3.53
2.95
1
1
23.52
$ 4.00
6.75
.86
4.10
.11
7.06
5.16
12.00
7.00
2.12
2. Variable Costs:
Pre-Harvest:
Seed
cwt.
4.00
Fertilizer
(150-0-0)
ac.
6.75
Machinery
ac.
.86
Tractor
(1)
hr.
1.54
Tractor
(2)
hr.
.65
L a b o r, Tra cto r & Ma ch i n e ry a c. 2 .0 0
Labor,
Irrigation
ac.
1.75
Irrigation
Machinery
ac.
12.00
Pickup
Expense
ac.
7.00
Interest
on
Op.
Cap.
$
.09
Subtotal,
Pre-Harvest
To t a l
3.
Income
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Irrigation
Land Charge
Total Fixed Costs
Va r i a b l e
Above
$
Costs
Va r i a b l e
ac.
h r.
h r.
ac.
$
49.16
$
Costs
1.80
1.85
.72
20.64
.06
49.16
$
30.74
1
2. 66
• 17
1
300
$ 1.80
4.92
.12
20.64
18.00
$ 45.48
5. Total Costs
$ 94.64
6. Net Returns
$(14.74)
jgP^N
D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO. 1914.
AECO 6
08125121
OATS FOR GRAZING, IRRIGATED, TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of Oats For Grazing, Typical Management
Operation
Labor
Fuel,
Oil,
I t e m -D. a_r_- C
. _ OTv iem
, aTcrhar S
c rt so.r Lo" b
r "-&
. _R.e pF* i xPeedr Ac cor se t s
r "e s* « . M
No.
(1)
Per
Acre
Plow
1,5
Aug
1
1.11
.90
$ .30
$ .26
Disc
1,4
Aug
2
.83
.66
.11
.06
Float
1,6
Aug
2
1.00
.80
.20
1.04
List
1,7
Aug
1
.38
.30
.08
.10
Drill
2,12
Sep
1
.21
.17
.17
.34
3.53
2.83
$ .86
$ 1.80
To t a l
"
>
Irrigation:
Preplant (2)
Aug
1
.98
$ 4.00
$ 6.88
Postplant (2)
Oct-Apr
4
1.97
8.00
13.76
2.95
$12.00
$20.64
To t a l
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 8 acre inches preplant and 4 acre inches ^^^
per postplant.
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30. 1914.
AECO 6
08225112
WHEAT FOR GRAIN, IRRIGATED, TRANS-PECOS REGION'
Estimated Costs And Returns Per Acre Of Wheat For Grain, High Level Management
f^
" "■
Unlt
tost/Unit
1. Gross receipts, from production:
Grain
cwt.
$
Grazing
lbs./gain
Price
2.10
.17
or _-. .
quaPtlty
42
Va l u e o r
Cost
$
88.20
95.20
560
To t a l
$183.40
2. Variable Costs:
Pre-Harvest:
Seed
cwt.
4.00
1
$
Fertilizer
(200-0-0)
ac.
9.00
1
Machinery
ac.
1.29
1
Tractor
(15)
hr.
1.89
.45
Tractor
(16)
hr.
1.35
1.30
Tractor
(17)
hr.
.65
.13
Labor,
Tractor
&
Machinery
ac.
2.00
2.35
Labor,
Irrigation
ac.
1.75
2.95
Irrigation
Machinery
ac.
12.00
1
Pickup
Expense
ac.
5.00
1
Hail
Insurance
$100
13.15
.5
Interest
on
Op.
Cap.
$
.09
25.21
Subtotal, Pre-Harvest
4.00
9.00
1.29
.85
1.76
.08
4.70
5.16
12.00
5.00
6.58
2.27
$ 52.69
Harvest:
Machinery (custom)
Hauling
Subtotal, Harvest
$ 5.00
4.20
$ 9.20
ac.
1
42
5.00
cwt.
.10
Total Variable Costs
$ 61.89
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (15)
Tractor (16)
Tractor (17)
Irrigation
Land Charge
To t a l
6.
ac.
h r.
h r.
h r.
ac.
,45
1. 30
«13
1
300
e
.72
20.64
.06
Costs
To t a l
Net
1
2.45
2.83
1.85
$
Fixed
5.
$121.51
$
Costs
Returns
$ 2.45
1.27
2.41
.09
20.64
18.00
44.86
$106.75
$
76.65
^
D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30. 1914.
AECO 6
08225111
REGION
~WHEAT
™ — —FOR GRAIN.
— — IRRIGATED,
'
" ■ ' TRANS-PECOS
i
ui
i
n
Estimated Costs, And Requirements Per Acre Of Wheat For Grain, High Level Management
Labor
Fuel.
Oil,
Item « *. Times « Tractor or T u _♦-._- Fixed costs
«£
Date
Qmr
Hours
^
^
Lub.,
Rep.
_er
^
(1)
Per
Acre
Operation
Plow
15,20
Disc
Float
List
Drill
Aug
16,19
.31
Aug
16,21
15,22
17,27
To t a l
1
2
$
.34
.63
.50
$
.38
.71
2
1.00
.80
Aug
1
.25
.20
.14
.17
1
.16
.13
.23
.22
1.88
$
.20
.31
Aug
Sep
2.35
.25
1.29
$
1.04
2.45
Irrigation:
Preplant
Postplant
To t a l
(2)
(2)
Aug
1
Oct-Apr
2.95
.98
4
$
1.97
$12.00
4.00
8.00
$
6.88
13.76
$20.64
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 8 acre inches preplant and four acre ^^
inches
per
postplant.
,
}
Oeveloped
by
Extension
Economists-Management,
TA E S ,
TA M U .
__
Cooperative Extension Work in Agriculture and Home Efrmorairt, Texas A&M University and the United Sates Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO. 1914.
AECO 6
08225122
WHEAT FOR GRAIN, IRRIGATED. TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of Wheat For Grain, Typical Management
^
Item
Unit
1. Gross receipts, from production:
Grain
cwt.
$
Grazing
lbs./gain
Price or
Cost/Unit
2.10
.17
Quantity
27
480
Value or
Cost
$ 56.70
81.60
To t a l
$138.30
2. Variable Costs:
Pre-Harvest:
Seed
Fertilizer (100-0-0)
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinery
Pickup Expense
Hail Insurance
Interest on Op. Cap.
Subtotal, Pre-Harvest
^
Harvest:
Machinery
(custom)
Hauling
Subtotal, Harvest
cwt.
ac.
ac.
h r.
h r.
ac.
ac.
ac.
ac.
$100
$
ac.
cwt.
4.00
4.50
.86
1.54
1
1
1
.65
.09
25.69
1
1
.5
1
27
.11
7.06
5.16
12.00
7.00
6.58
2.31
$ 53.69
$
$
Total Variable Costs
5.00
2.70
7.70
$ 61.39
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor
Tractor
Irrigation
Land
4.10
.17
3.53
2.95
4.00
4.50
.86
2.66
2.00
1.75
12.00
7.00
13.15
5.00
.10
$
(1)
(2)
Charge
$ 76.91
ac.
hr.
hr.
ac.
$
Total Fixed Costs
5 . To t a l C o s t s
6. Net Returns
1.80
1.85
.72
20.64
.06
1
2.66
1
300
.17
$
1.80
4.92
.12
20.64
18.00
$ 45.48
$106.87
$ 31.43
JPN
Oeveloped by Extension Economists-Management, TAES, TAMU.
New, 1972
C«H.pcrativc Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agnculture coopcrat.ng. Distributed in furtherance of the Act, of Congress of May 8. 1914. as amended^Tnd Ju„e 30. Toil
AECO 6
08225121
WHEAT FOR GRAIN. IRRIGATED. TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of Wheat For Grain, Typical Management
Operation
No.
Date
Labor
Fuel,
Oil,
£ *v*e*r H, ,ot uM
r sa cfha.c tHorrs .o r* • »L» •b» ^- - vr x xp ee a
O
r Accorsei
(1)
Per
Acre
Pic-
1,5
Aug
1
1.11
.90
Disc
1,4
Aug
2
.83
Float
1,6
Aug
2
List
1,7
Aug
Drill
2,12
Sep
.30
$ .26
.66
. 11
.06
1.00
.80
.20
1.04
1
.38
.30
.08
.10
1
.21
.17
.17
.34
3.53
2.83
$ .86
$ 1.80
Total
$
•
^
Irrigation:
Preplant (2)
Aug
1
.98
$ 4.00
$ 6.88
Postplant (2)
Oct-Apr 4
1.97
8.00
13.76
2.95
$12.00
$20.64
Total
^ * \
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 8 acre inches preplant and four acre ^~
inches
per
postplant.
/^^
Developeo by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30. 1914.
AECO 6
08000700
TEXAS TRANS-PECOS REGION
Estimated Costs Of Irrigation Water
Well Distribution
Depth GPM System
feet
Per Acre Inch
P o w e r _ / O p e r a t i n g F i x e d L a b o r L a b o r To t a l
Source Cost 2/ Cost 3/ Requirement Cost Cost
dollars dollars hrs. dollars dollars
150 75 h.m sprinkler electricity
Sidemove-tow electricity
.77
1.07
1.63
1.91
.211
.047
.37
.08
2.77
3.08
200 100 h.m sprinkler electricity
skid tow line electricity
150 h.m sprinkler electricity
skid tow line electricity
nat. gas
250 side roll
furrow
nat. gas
400 side roll
nat. gas
s. propelled nat. gas
nat. gas
furrow
nat. gas
600 side roll
s. propelled n a t . gas
n a t . gas
furrow
nat. gas
800 side roll
s. propelled nat. gas
furrow
nat. gas
.89
.97
.83
.91
.75
.42
.75
.42
.46
.75
1.13
.44
.74
1 . 11
.44
1.63
1.83
1.24
1.44
1.43
.98
1.27
.98
.82
1.18
1.29
.73
1.11
1.22
.66
.211
.063
.211
.063
.063
.123
.063
.123
.123
.063
.022
.123
.063
.022
.123
.37
. 11
.37
.11
. 11
.22
.11
.22
.22
.11
.04
.22
.11
.04
.22
2.89
2.91
2.44
2.46
2.29
1.62
2.13
1.62
1.50
2.04
2.46
1.39
1.96
2.37
1.32
250
300 side roll nat.
furrow
nat.
400 side roll nat.
s. propelled nat.
furrow
nat.
600 side roll nat.
s. propelled nat.
furrow
nat.
gas
gas
gas
gas
gas
gas
gas
gas
.78
.50
.77
1.14
.46
.78
1.15
.46
1.45
1.00
1.36
1.48
.92
1.25
1.37
.81
.063
.123
.063
.022
.123
.063
.022
.123
.11
.22
.11
.04
.22
.11
.04
.22
2.34
1.72
2.24
2.66
1.60
2.14
2.56
1.49
250
800 side roll nat. gas
s. propelled nat. gas
furrow
nat.
gas
.77
1.12
.46
1.19
1.31
.75
.063
.022
.123
.11
.04
.22
2.07
2.47
1.43
.79
1.16
.48
.80
1.15
.48
.78
1.14
.48
.77
1.13
.47
1.47
1.57
1.01
1.33
1.45
.88
1.26
1.37
.81
1.24
1.36
.80
.063
.022
.123
.063
.022
.123
.063
.022
.123
.063
.022
.123
.11
.04
.22
. 11
.04
.22
.11
.04
.22
.11
.04
.22
2.37
2.77
1.71
2.24
2.64
1.58
2.15
2.55
1.51
2.12
2.53
1.49
300
400 side roll nat.
s. propelled nat.
furrow
nat.
600 side roll nat.
s. propelled nat.
furrow
nat.
800 side roll nat.
s. propelled nat.
furrow
nat.
1000 side roll nat.
s. propelled nat.
furrow
nat.
gas
gas
gas
gas
gas
gas
gas
gas
gas
gas
gas
gas
New, 1972
08000700
TEXAS TRANS-PECOS REGION
Estimated Costs Of Irrigation Water
Per Acre Inch
Well
Distribution
.
GPM
Depth
System
350
400 s i d e r o l l
s. propelled
furrow
600 s i d e r o l l
s. propelled
furrow
800 s i d e r o l l
s. propelled
furrow
1000 s i d e r o l l
s. propelled
furrow
500
600
800 s i d e r o l l
Power 1/
Source
nat.
nat.
nat.
nat.
nat.
nat.
nat.
nat.
nat.
nat.
nat.
nat.
gas
gas
gas
gas
gas
gas
gas
gas
gas
gas
gas
gas
Operating Fixed
Cost 2/ Cost 3/
dollars dollars
.83
1.20
.52
.81
1.18
.52
.80
1.16
.50
.80
1.16
.50
.86
s. propelled
furrow
n a t . gas
n a t . gas
n a t . gas
1.21
1000 s i d e r o l l
s. propelled
furrow
n a t . gas
n a t . gas
n a t . gas
1.24
.56
.89
.60
Labor
Labor To t a l
Cost
Cost
Requirement
hrs.
dollars dollars
.86
.063
.022
.123
.063
.022
.123
.063
.022
.123
.063
.022
.123
.11
.04
.22
.11
.04
.22
.11
.04
.22
.11
.04
.22
2.50
2.91
1.85
2.32
2.74
1.70
2.23
2.64
1.60
2.21
2.62
1.58
1.47
1.59
1.02
.063
.022
.123
.11
.04
.22
2.44
2.84
1.80
1.45
1.56
1.00
.063
.022
.123
.11
.04
.22
2.45
2.8_-^|v
1.82 /
1.56
1.67
1.11
1.40
1.52
.96
1.32
1.44
.88
1.30
1.42
1/. LP gas as a power source can be fit into this table by increasing the
operating cost for self-propelled sprinklers by 1.65; by 1.80 for all other
sprinklers, and by 1.95 for furrow irrigation.
2/. Includes fuel, lubrication, maintenance and repair on well, pumping plant,
and distribution system.
3/. Includes depreciation and interest on investment for well, pumping plant,
and distribution system,
* Prepared by Marvin 0. Sartin, Area Farm Management Specialist, Texas
Agricultural Extension Service, Lubbock, Texas; 5/71.
'm\
08006112
ALFALFA ESTABLISHMENT, IRRIGATED, TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of Alfalfa Establishment, High Level Management
"-
Unit
Cost/Unit
Price
or n .....
Quant"y
Va l u e o r
Cost
1. No Income
2. Variable Costs:
Seed
Fertilizer (0-80-0)
Machinery
Tractor (15)
Tractor (16)
Tractor (17)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinery
Pickup Expense
Interest on Op. Cap.
To t a l
lb.
ac.
ac.
h r.
h r.
h r.
ac.
ac.
ac.
ac.
$
Va r i a b l e
$
30
1
1
.50
7.20
1.16
1.89
1.35
.65
2.00
1.75
11.50
5.00
.09
Costs
.25
1.38
.13
2.20
2.84
1
1
25.82
$
$ 15.00
7.20
1.16
.47
1.86
.08
4.40
4.97
11.50
5.00
2.32
53.96
3. No Income
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Irrigation
Land Charge
Total Fixed Costs
5 . To t a l C o s t s
ac.
h r.
h r.
h r.
ac.
$
2.31
2.83
1.85
.72
19.78
.06
1
«,25
1.,38
«,13
1
300
$ 2.31
.71
2.55
.09
19.78
18.00
$ 43.44
$ 97.40
D e v e l o p e d b y E x t e n s i o n E o o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w 1 9 7 2
Cooperative Extension Work an Agriculture and Home Economics, Texas A&M University and the United States Department of
Agriculture -cooperating. (Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30. 1914.
AECO G
Operation
08006111
ALFALFA ESTABLISHMENT, IRRIGATED, TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of
Alfalfa Establishment, High Level Management
Labor
Fuel,
Oil,
Tfpn, Times .. Tractor or T . «_*.__ Fixed costs
"So" Date OvW H°£8 Mach. Hrs. *&•__' P« Acre
Plow
15,20
Aug
1
.31
.25
$ .34
$ .31
Disc
16,19
Aug
2
.63
.50
.38
.71
Float
16,21
Aug
2
1.00
.80
.20
1.04
Establish
Borders
16,28
Aug
1
.10
.08
.01
.03
Plant
17,27
Sep
1
.16
.13
.23
.22
2.20
1.76
$ 1.16
$ 2.31
Total
rigation:
Preplant (2)
Sep
1
1.48
$ 6*00
$10.32
Flash (2)
Sep
3
.74
3.00
5.16
Postplant (2)
Nov
1
.62
2.50
4.30
2.84
$11.50
$19.78
Total
(1) Labor hours calculated at 1.25 times tractor hours except where noted by
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well,
furrow irrigation, natural gas pumping unit; 12 acre inches preplant and
four acre inches per postplant.
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June SO, 1914.
AECO 6
^
\
08006122
ALFALFA ESTABLISHMENT, IRRIGATED, TRANS-PECOS REGION
Estimated Costs And Returns Per Acre Of Alfalfa Establishment, Typical Management
Item
Unit
Price or
Cost/Unit
Quantity
Value or
Cost
30
1
1
$ 15.00
3.60
1. No Income
2. Variable Costs:
Seed
Fertilizer (0-40-0)
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinery
Pickup Expense
Interest on Op. Cap.
lb.
ac.
ac.
h r.
h r.
ac,
ac,
ac.
ac.
.50
3.60
.79
1.54
.65
2.00
1.75
10.50
7.00
.09
.79
2.44
3.76
.17
.11
3.25
2.59
7.50
4.53
10.50
7.00
2.38
1
1
26.40
$ 55.17
Total Variable Costs
3. No Income
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Irrigation
Land Charge
ac.
h r.
h r.
ac.
Total Fixed Costs
5 . To t a l C o s t s
1.75
1.85
.72
18.06
.06
1
2.44
.17
1
300
$ 1.75
4.51
.12
18.06
18.00
$ 42.44
$ 97.61
f^
Developed by Extension Economists-Management, TAES, TAMU.
New, 1972
Cooperative Extension Work in Agriculture and Home Economics. Texas A8cM University and the United Slates Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30, 1914.
AKCC) G
08006121
ALFALFA ESTABLISHMENT, IRRIGATED, TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of
Alfalfa Establishment, Typical Management
Operation
Labor _, Fuel, Oil,
Item -_Times .._.__
' RFixed
costs
u
r . , .Tractor
- _Mach#
T r a cor
t o rT..il
oLub.,
r 'T n .Rep.
"per
« u Acre
wai
Hours
Hr8#
Date
Over
No.
Per Acre
(1)
1,5
Aug
1
1.11
.90
Disc
1,4
Aug
2
.83
.66
.11
.06
Float
1,6
Aug
2
1.00
.80
.20
1.04
Establish
Borders
1,13
Aug
1
.10
.08
.01
.05
Plant
2,12
Sep- Oct
1
.21
.17
.17
.34
3.25
2.61
Total
$
.30
.26
Plow
$
.79
$
$
/"m\
1.75
Irrigation:
Preplant (2)
Sep
1
1.48
$ 6.00
$10.32
Flash
Sep
2
.49
2.00
3.44
Postplant (2)
Nov
1
.62
2.50
4.30
2.59
$10.50
$18.06
To t a l
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 12 acre inches preplant, 2 acre inches per
/ ~ \
flash irrigation, and 5 acre inches per postplant.
Developed by Extension Economists-Management^ TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO. 1914.
AECO 6
08125112
OATS FOR GRAZING, IRRIGATED, TRANS-PECOS REGION »l
Estimated Costs And Returns Per Acre of Oats For Grazing, High Level Management
Item
Unit
„ J f c P r i c e o r n , i a n H f r w Va l u e o r
Cost/Unit
Quantity
Co8t
1. Gross receipts, from production:
Grazing
lbs./gain
$
.17
630
$107.10
2. Variable Costs:
Pre-Harvest:
cwt.
Seed
ac.
Fertilizer (250-0-0)
ac.
Machinery
h r.
Tractor (15)
Tractor (16)
h r.
Tractor (17)
h r.
ac.
Labor, Tractor & Machinery
ac.
L a b o r, I r r i g a t i o n
ac.
Irrigation Machinery
ac.
Pickup Expense
Interest on Op. Cap.
$
Subtotal,
Pre-Harvest
To t a l
3.
Income
4. Fixed Costs:
Machinery
Tractor (15)
Tractor (16)
Tractor (17)
Irrigation
Land Charge
Total Fixed Costs
Va r i a b l e
Above
1
1
1
4.00
11.25
1.29
1.89
1.35
.65
2.00
1.75
12.00
7.00
.09
.45
1.30
.13
2.35
2.95
1
1
24.05
$
Costs
Va r i a b l e
ac.
h r.
h r.
h r.
ac.
$
$
Costs
2.45
2.83
1.85
.72
20.64
.06
$ 4.00
11.25
1.29
.85
1.76
.08
4.70
5.16
12.00
7.00
2.16
50.25
50.25
$
1
56.85
$
•,45
1.,30
•,13
1
300
2.45
1.27
2.41
.09
20.64
18.00
$ 44.86
5 . To t a l C o s t s
$ 95.11
6. Net Returns
$ 11.99
D e v e l o p e o b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914; as amended/and June SO, 1914.
AECO 6
08125111
OATS FOR GRAZING, IRRIGATED. TRANS-PECOS REGION
Estimated Costs, And Requirements Per Acre Of Oats For Grazing, High Level Management
Operation
Labor
Fuel,
Oil,
,_,.
I t e m D a t e I i m e s H o u r s T r at oc rt oor r oT r. . . ' ^« _"_" * F- .i *~- e* _d vc. uo Ds ti s
Mach. Hrs. L«b-»
^P- Per Acre
No.
Over
._.
Per Acre
Plow
15,20
Aug
1
.31
.25
$ .34
$ .31
Disc
16,19
Aug
2
.63
.50
.38
.71
Float
16,21
Aug
2
1.00
.80
.20
1.04
List
15,22
Aug
1
.25
.20
.14
.17
Drill
17,27
Sept
1
.16
.13
.23
.22
2.35
1.88
$ 1.29
$ 2.45
Total
Irrigation:
Preplant (2)
Aug
1
.98
$ 4.00
$ 6.88
Postplant (2)
Oct-Apr 4
1.97
8.00
13.76
2.95
$12.00
$20.64
Total
^
\
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow
irrigation, natural gas pumping unit; 8 acre inches preplant and four acre ^_>.
inches
per
postplant.
j
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating* Distributed in furthfrancr of the Acts of Congress of May 8, 1914. as amended, and June SO. 1914.
AECO 6
Download