r 08000300 TEXAS TRANS-PECOS REGION FOREWORD r r The enterprise budgets for the Trans-Pecos region are based on yields as shown on form 08000500. The data contained in this report are based on estimates and actual records of operations within the two-county area (ReevesPecos). Even in a region so narrowly defined as this, variations in inputs and returns exist among farms and among managers. However, these budgets should serve as useful guides in planning and decision-making for persons con cerned with the area described above. Basic assumptions which are necessary to complete the budgeting process include a com pilation of crops to be budgeted, expected yields for irrigated only, and according to typical and high-level management. Farm size and machin ery complements for both levels of managment are required. Production practices, machinery operating rates and, finally, the budget develop ment complete the undertaking. In order, then, the assumptions were: farm size varied from 600 acres for the typical man ager to 1,000 acres for the high-level operator. Fully two-thirds of the land on die typical farm is fallowed while only one-third is handled in this manner on the high-level farm. Cotton is grown on approximately one-fourth of the typical farm and two-fifths of the larger unit. Small grains are produced on fully 50 percent of the acreage in both cases. Calf grazing is heavily utilized. Irrigation systems vary from two wells of 1,000 GPM each on the smaller operation to four wells of 1,000 GPM capacity each on the larger unit. Management differences centered primarily on timing of operations rather than variations in cropping patterns or input levels. That is, the high level manager extracts greater yields, and usually greater profits from his enterprises due to superior ability to prepare for, plant, tend to and sell his crops in an optimum fashion. Land rent (net) is computed for cotton based on the landlord receiving one-fourth of the crop and government payment while supplying all of the land, the well, pump and irrigation system, and one-fourth of the fertilizer, herbicide, insec ticide, harvesting and ginning. No typical arrangements for cropsharing or cash leasing were identifiable; therefore, the opportunity cost concept on land value is used. TEXAS CROSS TIMBERS REGION Assumed Prices Paid and Received by Farmers Item Unit Prices Paid (1975) Seed: Coastal Sprigs Forage Sorghum Grain Sorghum Kleingrass Oats Peanuts Sudangrass Wheat Fertilizer: Nitrogen Phosphorus Potash 15-15-7 14-7-11 10-20-10 6-24-24 0.27 0.22 0.10 186.00 176.00 167.00 184.00 Labor: Irrigation Tr a c t o r Custom Rates: Baling Combining Hauling grain Hay Hauling Peanut drying Sprigging bale acre bu. bale ton .45 8.00 0.10 0.15 8.00 17.00 Capital: Investment Operating Fumigants: D D Pic Fumazone 86 Nemagon 12.1 Telone Fuel: Gasoline Diesel 3.50 11.50 11.50 3.50 Assumed Prices Paid and Received by Farmers (cont'd.) Item Unit Price Her bicides: T r e fl a n Cob ex Balan Simazine 80W Dianap Lasso 2, 4-D (amine) 2, 4-D (ester) Vernam, 10G Vernam, 6E 5 gal 5 gal. gal. lb. gal. gal. gal. gal. cwt. gal. Insecticides: Dasanit, 15G Dasanit, liquid Dyfonate, 10G Sevin, 80W Malathion (55 gal.) Azodrin Methyl parathion Diazinon, 14G lb. gal. lb. lb. gal. gal. gal. lb. 0.59 28.50 0.47 1.52 12.00 20.00 10.00 0.60 Fungicides: Bravo Benlate Manzate 200 Terrachlor, 10G Terrachlor, 2EC Terrachlor, 75WP Lannate, 10G Lanate Nudrin gal. lb. lb. cwt. gal. lb. lb. gal. gal. 25.50 8.30 1.25 22.00 5.50 1.25 .29 17.00 17.00 ton cwt. ton 45.00 4.00 45.00 0.18 45.00 0.30 142.50 120.00 8.55 3.45 7.25 15.00 8.75 9.50 29.40 15.40 Prices Received (1975) Coastal Grain Kleingrass Peanuts Sorghum Stocker Hay Sorghum Hay Hay Gain lb. ton lb. 1/ These price assumptions are not to be interpreted as predictions or Prospective prices. 08000400 TEXAS TRANS-PECOS REGION Assumed Prices Paid And Received By Farmers Item Unit Price Prices Paid Seed: Cotton (delinted) Grain Sorghum Wheat (cleaned and treated) Alfalfa Forage Sorghum Barley, Oats Cantaloupe Fertilizer: Nitrogen Phosphorus Herbicide: Pre-emerge Insecticide: Methyl Parathion Dusting Sulfur Labor: Hoeing Irrigation Tr a c t o r Custom Rates: Fertilizer Application Insecticide Application Cotton Picking Cotton Ginning (Upland) Cotton Ginning (Pima) Combining: Grain Sorghum Wheat Barley Hauling Grain Alfalfa Harvest: Swath, bale, haul Cube Cantaloupe Harvest Fuel and lubricants: Gasoline L.P. Gas Diesel Motor Oil Lubricant cwt. cwt. bu. cwt. cwt. cwt. lb. lb. lb. $ 12.00 17.00 4.00 50.00 17.00 4.00 3.00 .045 .09 qt, 6.25 gal. 5.00 lb. .04 h r. h r. h r. 1.50 1.50 1.50 ac. ac. 1.00 1.25 lb. of lint bale bale ac. ac. ac. cwt. ton ton .05 22.00 32.00 5.00 5.00 5.00 .10 10.00 12.00 crate .90 gal. gal. gal. gal. .295 lb. .10 .158 1.45 .35 f^ New, 1972 08000400 TEXAS TRANS-PECOS REGION Assumed Prices Paid And Received By Farmers Item Unit Price Capital: Investment Operating Hail Insurance: Cotton Grain Prices Received Cotton (Upland) Cotton (Pima) Cottonseed Grain Sorghum Wheat Barley Alfalfa Cantaloupes Livestock Grazing $ .075 $ $ .09 12.50 13.15 $100 $100 lb. lint lb. lint ton cwt. cwt. cwt. ton Net Per Pound crate Of Gain .30 2/ .47 2/ 65.00 2.10 2/ 2.10 2.10 35.00 5.30 .17 ^ 1/ These prices are not to be interpreted as predictions or prospective prices. 2/ Does not include government payment which a farmer might receive for participating in farm programs. 08000600 TEXAS TRANS-PECOS REGION f^ Yield Per Acre For Typical And High Level Management Irrigated Ty p i c a l H i g h L e v e l Crop Unit Cotton (Upland) lbs. 700 875 Cotton (Pima) lbs. 450 700 Grain Sorghum lbs. 4,000 5,500 Wheat for Grain lbs. 2,700 4,200 Barley for Grain cwt. 3,120 4,320 Oats for Graze lbs./ac. 470 630 Forage for Graze lbs./ac. 875 1,000 Alfalfa tons 6 8 Cantaloupe crates 100 150 ^ New, 1972 ^ % 08000520 TEXAS TRANS-PECOS REGION Estimated Machinerv And Equipment Cost Per Hour Of Use, Typical Management Machinery Item and Size Item No. Tractor, 100 HP Tractor, 45 HP Shredder, 2 Row Offset Disc, 9' Plow, 3 Btm. Float Lister, 3 Btm. Rotary Cult., 4R Cultivator, 4R Planter, tool bar 4R Spray Rig, 4R Grain Drill, 14' Border Disc Disc Ridger, 4R Vegetable Planter,, 2R 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 New Cost Estimated Typical Yrs. Of Use $10,500 3,500 350 1,200 900 1,250 350 1,000 850 800 350 1,300 250 700 925 6 15 8 8 8 10 8 8 10 10 10 10 10 10 10 Total Depr.l/ $5 ,828 3 ,500 261 900 670 1,000 260 750 670 640 280 1 ,000 200 550 800 Estimated Total Hrs. Of Use Depr. Per Hr.2/ 5,000 7,200 1,000 2,500 3,500 1,200 1,200 1,600 1,200 600 500 800 500 500 1,000 $1.17 .49 .26 .36 .19 .83 .22 .47 .56 1.06 .56 1.25 .40 1.10 .80 Interest on Investment Per Hour 3/ $ .68 .23 .14 .18 .10 .47 .11 .25 .32 .60 .32 .75 .23 .64 .29 Fuel, Oil, Lub., Rep., Per Hr. 4/ $1.54 .65 .19 .17 .33 .25 .27 .53 .59 .45 .71 .99 .05 .12 .76 2-8" Wells and equipment 5/ 1/ New cost less value at time of trade, or less salvage value. ~2] Assumes straight line depreciation. 3/ (Investment + salvage) divided by 2 (7.5%) divided by annual hours of use. "4/ Fuel, oil, lubrication, repair cost estimate taken from Bower, Modern Concepts of Farm Machinery Management. 1/ See attached irrigation cost analysis. Assumes 350 ft. well, 1000 gom, natural gas unit, and furrow irrigation, New, 1972 08000510 TEXAS TRANS-PECOS REGION E s t i m a t e d Mac h:inery And Equipment Cost: Per Hour Of Use, High Level Management Machinery Item and Size Item No. Tractor 118 HP Tractor, 90 HP Tractor, 45 HP Shredder, 4 Row Offset Disc Moldboard Plow, 5 Btm. Float L i s t e r, 6 R o w Spray Rig, 4 Row R o t o t i l l e r, 8 0 " P l a n t e r t o o l b a r, 4R Rolling Cultivator Grain Drill, 16* Border Disc Disc Ridger, 4 Row Ve g e t a b l e P l a n t e r, 2R 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 New Cost Estimated Ty p i c a l Y r s . Of Use $13,500 9,000 3,500 1,400 2,000 1,750 1,250 1,100 6 8 15 10 8 8 10 10 10 10 10 8 10 10 10 10 350 2,500 800 1,700 1,600 250 700 925 To t a l D e p r. l . / Estimated Deor. To t a l H r s . ]Per Hr._2/ Of Use $7,500 5,500 3,500 1,100 1,500 1,300 1,000 4,200 5,000 7,200 1,200 1,600 1,600 1,200 2,000 $1.79 1.10 1,900 1,600 1,600 1,600 1,200 1.19 800 280 640 1,268 1,274 200 550 800 500 800 800 1,000 .49 .92 .94 .81 .83 .40 .56 .40 .79 1.06 .25 .69 .80 Interest on Investment Per Hour 3/ Fue!1 , O i l , Lub . , Rep., Per H r. 4 / $1.04 $1.89 1.35 .75 .23 .53 .47 .41 .47 .26 .32 .73 .23 .43 .64 .14 .40 .29 .65 .73 .75 1.35 .25 .69 .71 2.58 .78 .91 1.79 .06 .15 .26 4-8" Wells and equipment 5/ 1/ New cost less value at time of trade, or less salvage value. 2/ Assumes straight line depreciation. _3/ (Investment + salvage) divided by 2 (7.5%) divided by annual hours of use. 4 / F u e l , o i l , l u b r i c a t i o n , r e p a i r c o s t e s t i m a t e t a k e n f r o m B o w e r, M o d e r n C o n c e p t s o f F a r m M a c h i n e r y M a n a g e m e n t . _5/ See attached irrigation cost analysis. Assumes 350 ft. well, 1000 gpm, natural gas unit, and furrow irrigation. New, 197? ^__# 08005122 ALFALFA, IRRIGATED, TRANS--PEC0S REGION Estimated Costs And Returns Per Acre Of Alfalfa, Typical Management Item 1. Gross receipts, from production: Hay Unit Price or Cost/Unit ton $ 35.00 1/ ac. ac. h r. ac. ac. 24.40 4.50 2.00 24.00 7.00 Quantity Value or Cost $210.00 2. Variable Costs: Pre-Harvest: 1/4 Establishment Fertilizer (0-50-0) L a b o r, I r r i g a t i o n Irrigation, Machinery Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Machinery (custom) $ ton .09 10.00 1 1 5. 90 1 1 35. 85 6 Total Variable Costs ^ $ 75.07 ac. $ Total Fixed Costs ^ $ 60.00 $134.93 3. Income Above Variable Costs 4. Fixed Costs: Irrigation Land Charge $ 24.40 4.50 11.80 24.00 7.00 3.23 $ 74.93 41.28 .06 1 300 $ 41.28 18.00 $ 59.28 5 . To t a l C o s t s $194.21 6. Net Returns $ 15.79 s 1/ Alfalfa for cubing would add $3./ton to the gross value but costs $2./ton additional for harvesting. Developeo by Extension Economists-Management, TAES, TAMU. New, 1972 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914. AECO 6 08005121 ALFALFA, IRRIGATED, TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Alfalfa, Typical Management Operation * gN" o . Irrigation (2) Labor Fuel, Oil, u £"tr0s5.J__ _ r p- Lneu!rb° .-, r A DO a tvee r _ £HM eo T _R !ce P a rcsh .2«. r° a»H r e< « • ' . ■ * • May-Sep 8 5.90 $24.00 WiST ^ $41.28 (1) Labor hours calculated at 1.25 times tractor hours except where noted by (2) Same as other except 6 acre inches per irrigation. ^ Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, aa amended, and June SO, 1914. AECO 6 \ 08005112 ALFALFA, IRRIGATED, TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Alfalfa, High Level Management Itera Unlt 1. Gross receipts, from production: Hay ton $ „ o. s_ t_/ UPnr ii tc e C 35.00 1/ o r Qn^ ^„ t y. . . VaC l uoe s to r 8 $280.00 2. Variable Costs: Pre-Harvest: 1/5 Establishment Fertilizer (0-100-0) L a b o r, I r r i g a t i o n Irrigation Machinery Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Machinery (custom) ac. ac. ac. ac. ac. $ ton 19.48 9.00 1.75 30.00 5.00 .09 10.00 1 1 7. 38 1 1 38. 20 8 Total Variable Costs f^ Total Fixed Costs $ 80.00 $159.84 3. Income Above Variable Costs 4. Fixed Costs: Irrigation Land Charge $ 19.48 9.00 12.92 30.00 5.00 3.44 $ 79.84 $120.16 ac. $ 51.60 .06 1 300 $ 51.60 18.00 $ 69.60 5 . To t a l C o s t s $229.44 6. Net Returns $ 50.56 1/ Alfalfa for cubing would add $3./ton to the gross value but costs $2./ton additional for harvesting. D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6 0800.5111 ALFALFA, IRRIGATED, TRANS-PECOS •____.-»_-__-_ REGION ' * —_■_»»_._■_—_•_—_' —_____—B-W-B-W——• Estimated Costs, And Requirements Per Acre Of Alfalfa. High l^evel ManaggmpntLabor F_u_e_l , FOu iel ,l , Oil, /^^ Item ~ Times « Tractor or T . D_^ Fixed costs ^ Operation X^ra Date ^8 Hours ^ Hr8# Lub., Rep. Per Acre J (1) Per Acre Irrigation (2) May-Sep 10 7.38 $30.00 $51.60 (1) Labor hours calculated at 1.25 times tractor hours except where noted by (2) Same as other except 6 acre inches per irrigation. Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914. AECO 6 08015112 BARLEY FOR GRAIN, IRRIGATED, TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Barley For Grain, Higjh Level Management Item l u0e8 to r C, ,o s_ t, /_U_n iPt r i c e o rQ un ^ _ i t_y . _ _ V a C Unit 1. Gross receipts, from production: Grain cwt. $ Grazing lbs./gain 2.10 43.2 $ .17 90.72 95.20 560 To t a l $185.92 2. Variable Costs: Pre-Harvest: Seed cwt. 4.00 1 $ Fertilizer (200-0-0) ac. 9.00 1 Machinery ac. 1.29 1 Tractor (15) hr. 1.89 .45 Tractor (16) hr. 1.35 1.30 Tractor (17) hr. .65 .13 Labor, Tractor & Machinery ac. 2.00 2.35 Labor, Irrigation ac. 1.75 2.95 Irrigation Machinery ac. 12.00 1 Pickup Expense ac. 5.00 1 Hail Insurance $100 13.15 .5 Interest on Op. Cap. $ .09 25.21 Subtotal, Pre-Harvest 4.00 9.00 1.29 .85 1.76 .08 4.70 5.16 12.00 5.00 6.58 2.27 $ 52.69 Harvest: Machinery (custom) Hauling Subtotal, Harvest $ 5.00 4.32 $ 9.32 ac. cwt. 1 5.00 .10 43.2 Total Variable Costs $ 61.01 3. Income Above Variable Costs $123.91 4. Fixed Costs: Machinery Tractor (15) Tractor (16) Tractor (17) Irrigation Land Charge ac. h r. h r. h r. ac. $ To t a l To t a l 6. Net $ 2.45 1.27 2.41 .45 1.30 .72 1 300 20.64 .06 Fixed 5. 1 2.45 2.83 1.85 .13 .09 20.64 18.00 $ 44.86 Costs Returns $106.87 $ 79.05 f ^ Developed by Extension Economists-Management, TA E S , TA M U . New, 1972 Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6 08015111 BARLEY FOR GRAIN, IRRIGATED, TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Barley For Grain, High Level Management Operation Labor Fuel, Oil, _. I t e m ^Date „_ Times Hftnrn Tractor or L . ^ Fixed costs Over H°^8 Mach. Hrs. Lub.» Rep. per Acre No. Per Acre Plow 15,20 Aug 1 .31 .25 Disc 16,19 Aug 2 .63 .50 .38 .71 Float 16,21 Aug 2 1.00 .80 .20 1.04 List 15,22 Aug 1 .25 .20 .14 .17 Drill 17,27 Sep 1 .16 .13 .23 .22 2.35 1.88 $ 1.29 $ 2.45 To t a l $ .34 $ ^ % .31 Irrigation: Preplant (2) Aug .98 $ 4.00 $ 6.88 Postplant (2) Oct-Apr 4 1.97 8.00 13.76 2.95 $ 12.00 $ 20.64 To t a l 1 ^ \ (1) Labor hours calculated at 1.25 times tractor houts except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 8 acre inches preplant and four acre inches per postplant. /*^\ Developed by Extension Economists-Management, TAES, TAtr Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914. AECO 6 08015122 BARLEY FOR GRAIN, IRRIGATED, TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Barley For Grain, Typical Management Item Unit 1. Gross receipts, from production: Grain cwt. $ Grazing lbs./gain Price or Cost/Unit 2.10 .17 Quantity Value or Cost 31.2 480 $ 65.52 81.60 To t a l $147.12 2 . Va r i a b l e C o s t s : Pre-Harvest: Seed Fertilizer (100-0-0) Machinery Tractor (1) Tractor (2) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinery Pickup Expense Hail Insurance Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Machinery (custom) Hauling Subtotal, Harvest cwt. ac. ac. h r. h r. ac. ac. ac. ac. $100 $ ac. cwt. 4.00 4.50 .86 1.54 .65 2.00 1.25 12.00 7.00 13.15 .09 5.00 .10 1 1 1 2.66 .17 3.53 2.95 1 1 .5 25.69 1 $ 31.2 $ Total Variable Costs Total Fixed Costs ^ 5.00 3.12 8.12 $ 61.81 $ 85.31 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation Land Charge $ 4.00 4.50 .86 4.10 .11 7.06 5.16 12.00 7.00 6.58 2.31 $ 53.69 ac. h r. h r. ac. $ 1.80 1.85 .72 20.64 .06 1 $ 2.66 1 300 .17 1.80 4.92 .12 20.64 18.00 $ 45.48 5 . To t a l C o s t s $107.29 6. Net Returns $ 39.83 ^ D e v e l o p e o b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics, Texas AfcM University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6 08015121 BARLEY FOR GRAIN, IRRIGATED, TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Barley For Grain, Typical Management Labor Fuel, Oil, _. , It_ T i f s T r a c t o r ^ " £ * _%?• Date Operation No. (1) Per Acre Plow 1,5 Aug 1 1.11 .90 $ .30 $ .26 Disc 1,4 Aug 2 .83 .66 .11 .06 Float 1,6 Aug 2 1.00 .80 .20 1.04 List 1,7 Aug 1 .38 .30 .08 .10 Drill 2,12 Sep 1 .21 .17 .17 .34 3.53 2.83 $ .86 $ 1.80 To t a l s^. Irrigation: Preplant (2) Aug 1 .98 $ 4.00 $ 6.88 Postplant (2) Oct-Apr 4 1.97 8.00 13.76 2.95 $12.00 $20.64 To t a l (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 8 acre inches preplant and four acre >-~ inches per postplant. ^ Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914. AECO 6 08035112 CANTALOUPES, IRRIGATED, TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Cantaloupes, High Level Management Item 1. Gross receipts, from production: Melons Unit Price or Cost/Unit crate $ 5.30 Quantity Value or Cost 150 $795.00 2 1 1 $ 6.00 12.60 1.86 2. Variable Costs: Pre-Harvest: Seed Fertilizer (180-50-0) Machinery Tractor <15) Tractor (16) Tractor (17) Labor, Tractor & Machinery Labor, Hand L a b o r, I r r i g a t i o n Irrigation Machinery Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest ( ^ Harvest: Hand Harvest Pack and Sell Subtotal, Harvest lb. ac. ac. h r. h r. h r. h r. h r. h r. ac. ac. $ crate crate 3.00 12.60 1.86 1.89 1.35 .25 .47 2.08 2.81 .62 .40 2.00 1.50 1.75 14.00 5.00 3.70 30.00 3.45 .09 50.79 7.40 45.00 6.04 14.00 5.00 4.57 $106.15 .65 .90 2.30 1 1 150 150 $135.00 345.00 $480.00 Total Variable Costs $586.15 Income Above Variable Costs $208.85 Fixed Costs: Machinery Tractor (15) Tractor (16) Tractor (17) Irrigation Land Charge ac. h r. h r. h r. ac. $ 3.40 2.83 1.85 .72 24.08 .06 1 .25 2.08 1 300 .62 $ 3.40 .71 3.85 .45 24.08 18.00 Total Fixed Costs $ 50.49 Total Costs $636.64 Net Returns $158.36 Developed by Extension Economists-Management, TAES, TAMU. New, 1972 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30, 1914. AECO 6 08035111 CANTALOUPES, IRRIGATED, TRANS-PECOS REGION Estimated Costs, And Requirements Per . - Of Cantaloupes, High Level Management ^*% Operation ^No. m D a t e A r . !Over _t Hour8 Mach. Hrs. Lub#', p* Per Acre (1) Per Acre Plow 15,20 Jan 1 .31 .25 $ .34 $ .31 Disc 16,19 Feb 2 .63 .50 .38 .71 Float 16,21 Feb 2 1.00 .80 .20 1.04 List 15,22 May 1 .25 .20 .14 .17 Disc Ridge 16,29 May 1 .28 .22 .03 .24 Cultivate 17,26 May 1 .15 .12 .11 .15 Plant 17,30 May 1 .63 .50 .38 .55 Cultivate 16,25 Jun-•Jul 3 .45 .36 .28 .23 Jun-■Jul 2 30.00 2.95 $ 1.86 $ 3.40 Turn Vines 33.70 To t a l Irrigation: Preplant (2) Mar 1 1.48 $ 6.00 $10.32 Postplant (2) Jun-Aug 4 1.97 8.00 13.76 3.45 $14.00 $24.08 To t a l (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 12 acre inches preplant and four acre ^_ inches per postplant. / Developed by Extension Economists-Management, TAES, TAMU Cooperative Extension Work in Agriculture ami Home Economics. Texas A&M University and the United States D^"™*"1 of Agriculture cooperating. Distributed in furtherance of the Act* of Congress of May 8. 1914. as amended, and June SO. 1914. AECO 6 08035122 CANTALOUPES, IRRIGATED, TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Cantaloupes, Typical Management Item 1. Gross receipts, from production: Melons Unit Price or Cost/Unit crate $ 5.30 Quantity 100 Value or Cost $530.00 2. Variable Costs: Pre-Harvest: Seed Fertilizer (160-50-0) Machinery Tractor <1) Tractor (2) Labor, Tractor & Machinery Labor, Hand L a b o r, I r r i g a t i o n Irrigation Machinery Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Hand Harvest Pack and Sell Subtotal, Harvest lb. ac. ac. h r. h r. ac. h r. h r. ac. ac. $ crate crate 3.00 11.70 1.46 1.54 .65 2.00 1.50 1.75 12.00 7.00 .09 .90 2.30 2 1 1 3.24 .74 4.97 30.00 2.96 1 1 51.88 100 100 Total Variable Costs $ 90.00 230.00 $320.00 $428.42 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation Land Charge $ 6.00 11.70 1.46 4.99 .48 9.94 45.00 5.18 12.00 7.00 4.67 $108.42 $101.58 ac. h r. h r. ac. Total Fixed Costs 2.91 1.85 .72 20.64 .06 1 3.24 .74 1 300 $ 2.91 5.99 .53 20.64 18.00 $ 48.07 5 . To t a l C o s t s $476.49 6. Net Returns $ 53.51 Developed by Extension Economists-Management, TAES, TAMU. New, 1972 Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acta of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6 08035121 CANTALOUPES, IRRIGATED, TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Cantaloupes, Typical Management Operation Labor Fuel, Oil, I t e m -Date . _ _ _ TiiuMSB i m e s Hoi1T.n „ T r a c tTractor o r o r or - , T ' . - «^ _ _ ' -.__-,_.« F i x e d _.««,, costs Over H<^8 Mach. Hrs. L"b" ***' Per Acre No. (1) Per Acre Plow 1,5 Jan 1 1.10 .90 $ .30 $ .26 Disc 1,4 Feb 2 .83 .66 .11 .06 Float 1,6 Feb 2 1.00 .80 .20 1.04 List 1,7 Mar 1 .38 .30 .08 .10 Disc Ridge 11,14 May 1 .28 .22 .03 .38 Cultivate 22,8 May 1 .18 .14 .07 .10 Plant 2,15 May 1 .75 .60 .46 .65 Cultivate 1,9 Jun-•Jul 3 .45 .36 .21 .32 Jun-J u l 2 30.00 3.98 $ 1.46 $ 2.91 Turn Vines To t a l 34.97 /^% Irrigation: Preplant (2) Mar 1 1.48 $ 6.00 $10.32 Postplant (2) Jun-Aug 3 1.48 6.00 10.32 2.96 $12.00 $20.64 To t a l (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 12 acre inches preplant and four acre ^_ inches per postplant. ^ Developed by Extension Economists-Management,, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO. 1914. AECO 6 08085112 FORAGE SORGHUM FOR GRAZING. IRRIGATED, TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Forage Sorghum For Grazing, High Level Management Item Unit 1. Gross receipts, from production: Grazing lbs./gain 2. Variable Costs: Seed Fertilizer (300-80-0) Machinery Tractor (15) Tractor (16) Tractor (17) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinery Pickup Expense Interest on Op. Cap. lb. ac. ac. h r. h r. h r. h r. h r. ac. ac. $ Price or Cost/Unit $ Quantity .17 1,000 $170.00 .17 10 1 1 1.70 20.70 1.77 .85 2.84 .08 6.68 6.02 14.00 5.00 2.68 20.70 1.77 1.89 1.35 .65 2.00 1.75 14.00 5.00 .09 .45 2.10 .12 3.34 3.44 1 1 29.82 Total Variable Costs $ 62.32 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (15) Tractor (16) Tractor (17) Irrigation Land Charge Total Fixed Costs Value or Cost $107.68 ac. h r. h r. h r. ac. $ 3.38 2.83 1.85 .72 24.08 .06 1 .45 2.10 1 300 .12 $ 3.38 1.27 3.89 .09 24.08 18.00 $ 50.71 5 . To t a l C o s t s $113.03 6. Net Returns $ 56.97 D e v e l o p e o b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w. 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30, 1914. a w_»_rv_r-_. A F r n _-*a FORAGE SORQ-UM FOR GRAZING, IRRIGATED. TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Forage Sorghum For Grazing, High Level Management Operation 08085111 Labor Fuel, Oil, I t e m rDate . * T i m e s « Hours Tractor or ,._,_ ' -__' Fixed costs Over Mach. Hrs. L"b•* ***' Per Acre No. Per Acre (1) Plow 15,20 Jan 1 .31 .25 $ .34 $ .31 Disc 16,19 Feb 2 .63 .50 .38 .71 Float 16,21 Feb 2 1.00 .80 .20 1.04 List 15,22 May 1 .25 .20 .14 .17 Cultivate 17,26 May 1 .15 .12 .11 .15 Plant 16,25 May 1 .25 .20 .16 .13 Shred 16,18 Jun- Sep 3 .75 .60 .44 .87 3.34 2.67 $ 1.77 $ 3.38 To t a l ^ Irrigation: Preplant (2) Apr 1 .98 $ 4.00 $ 6.88 Postplant (2) Jun-Oct 5 2.46 10.00 17.20 3.44 $14.00 $24.08 To t a l (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 8 acre inches preplant and four acre inches per postplant. Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Dis-iboted in furtherance of the Acts of Congress of May 8, 1914. as amended, and June SO, 1914. AECO 6 "^\ 08085122 FORAGE SORGHUM FOR GRAZING, IRRIGATED, TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Forage Sorghum For Grazing, Typical Management Item 1. Gross receipts, from production: Grazing 2. Variable Costs: Seed Fertilizer (200-80-0) Machinery Tractor (1) Tractor (2) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinery Pickup Expense Interest on Op. Cap. Unit Price or Cost/Unit t./gain $ .17 lb. ac. ac. h r. h r. h r. h r. ac. ac. $ .17 16.20 1.03 1.54 .65 2.00 1.75 14.00 7.00 .09 Quantity 875 $148.75 10 1 1 3.83 .14 4.95 3.44 1 1 30.92 Total Variable Costs f^ Total Fixed Costs 1.70 16.20 1.03 5.90 .09 9.90 6.02 14.00 7.00 2.78 $ 64.62 3. Income Above Variable Costs 4. Fixed Costs Machinery Tractor (1) Tractor (2) Irrigation Land Charge Value or Cost $ 84.13 ac. h r. h r. ac. _ $ 2.24 1.85 1 3.83 .14 .72 24.08 .06 1 300 $ 2.24 7.09 .10 24.08 18.00 $ 51.51 5 . To t a l C o s t s $116.13 6. Net Returns $ 32.62 D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, arid June 30, 1914. AECO 6 FORAGE SOR(__UM FOR GRAZING, IRRIGATED. TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Forage Sorghum For Grazing, Typical Management 08085121 Labor Fuel, Oil, _. . . 4 I t e m _ T i m e s H o i l , a T r a c t o r o r T . R _ _ F i x e d O p e r a t i o n N D a t e ^ H o u f 8 M a c h . H r s . L u b • » / « * • P e r Accor set s Per Acre (1) Plow 1,5 Jan 1.10 .90 $ .30 $ .26 Disc 1,4 Feb .83 .66 . 11 .06 Float 1,6 Feb 1.00 .80 .20 1.04 List 1,7 Mar .38 .30 .08 .10 Cultivate 2,8 May .18 .14 .07 .10 Plant 1,10 May .21 .17 .08 .28 Shred 1,3 Jun-Sep 3 1.25 1.00 .19 .40 4.95 3.97 $ 1.03 $ 2.24 Total s*^*\ Irrigation: Preplant (2) Apr .98 $ 4.00 $ 6.88 Postplant (2> Jun-Oct 5 2.46 10.00 17.20 3.44 $14.00 $24.08 To t a l 1 ^ * \ (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 8 acre inches preplant and four acre ^_ inches per postplant. ^^\ Developed by Extension Economists-Management, TAES. TAMU. Cooperative Extension Work in Agriculture and Heme Eci.uouilts, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Act* of Congress of May 8.1914. as amended, and June SO. 1914. AECO 6 08070112 PIMA COTTON, IRRIGATED, TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Pima Cotton, High Level Management Item 1. Gross receipts, from production: Lint Seed To t a l 2. Variable Costs: Pre-Harvest: Seed Fertilizer (180-50-0) Herbicide Machinery Tractor (15) Tractor (16) Tractor (17) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinery Insecticide (custom) Pickup Expense Hail Insurance Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Machinery (custom) Ginning Subtotal, Harvest Unit lb. ton cwt. ac. qt. ac. h r. h r. h r. h r. h r. ac. ac. $100 $ lb. bale Price or Cost/Unit $ Quantity .47 65.00 700 12.00 12.60 6.25 3.36 1.89 1.35 .65 2.00 1.75 14.00 2.50 5.00 12.50 .09 36 1 1 1 .05 32.00 .56 .85 2.30 .60 4.69 3.45 1 5 1 1 45.19 700 1.4 3.64 12.60 6.25 3.36 1.61 3.11 .39 9.38 6.04 14.00 12.50 5.00 12.50 4.07 $ 94.45 $ 35.00 44.80 $ 79.80 $191.15 3. Income Above Variable Costs Fixed Costs: Machinery Tr a c t o r Tr a c t o r Tr a c t o r Irrigation Land Charge (Rent) $329.00 36.40 $365.40 $174.25 Total Variable Costs 4. Value or Cost ac. h r. h r. h r. ac. ac. 5.12 2.83 1.85 .72 24.08 61.69 Total Fixed Costs 1 .85 2.30 1 1 .60 $ 5.12 2.41 4.26 .43 24.08 61.69 $ 97.99 5 . To t a l C o s t s $272.24 6. Net Return $ 93.16 7. Government Payments (less rent) (700 lbs @ 12.69c/lb) 1/ $ 66.62 8. Net Return Including Government Payment $159.78 1/ Based on planted acres. No allowance made for set-aside acreage of 30.89% Developeo by Extension Economists-Management, TAES, TAMU. New, 1972 Cooperative Extension Work in Agriculture and Home Economics, Tex_s A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6 08070111 PIMA COTTON, IRRIGATED, TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Pima Cotton, High Level Management Operation Item Times ^ x*£ Date ™£8 Tractor or _"*' ™* Fixed costs <*\ Hours |fad|# Hr8# ^'£»' Per Acre 1 Shred Stalks 16,18 Jan 1 .50 .40 $ .29 $ 1.06 Plow 15,20 Jan 1 .31 .25 .34 .31 Disc 16,19 Feb 2 .63 .50 .38 .71 Float 16,21 Feb 2 1.00 .80 .20 1.04 List 15,22 Feb 1 .25 .20 .14 .17 Cultivate 17,26 Feb 1 .15 .12 .11 .15 Apply Herbicide 17,23 Mar 1 .25 .20 .14 .18 Cultivate 17,26 Mar 1 .15 .12 .11 .15 Rototill 15,24 Apr 1 .50 .40 1.03 .77 Plant 16,25 Apr 1.2 .30 .24 .19 .15 Cultivate 17,26 May 1 .20 .16 .15 .20 Cultivate 16,25 Jun-Jul 3 .45 .36 .28 .23 4.69 3.75 $ 3.36 $ 5.12 To t a l rigation: $ 6.00 Preplant (2) Mar 1 1.48 Postplant (2) Jun-Aug 4 1.97 8.00 3.45 $14.00 To t a l $10.32 13.76 $24.08 (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 12 acre inches preplant and four acre inches per postplant. ^ Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June *>£»H^ 08070122 PIMA COTTON. IRRIGATED. TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Pima Cotton, Typical Management -.ITt te- m nU«n4i ^t P rCi co es t / Uonri t 1. Gross receipts, from production: Lint lb. $ Seed ton To t a l 2. Variable Costs: Pre-Harvest: Seed Fertilizer (250-100-0) Herbicide Machinery Tractor (1) Tractor (2) Labor, Tractor & Machinery Labor, Irrigation Irrigation Machinery Insecticide (custom) Pickup Expense Hail Insurance Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Machinery (custom) Ginning Subtotal, Harvest _ .47 65.00 cwt. ac. qt. ac. h r. h r. h r. h r. ac. 450 .36 $ 12.00 20.25 6.25 1.38 1.54 .36 2.00 1.75 14.00 2.50 7.00 12.00 .09 lb. bale .05 32.00 ac. $100 f ct i t y V a l u e Q fuca. n C o s to r $ 2 11 . 5 0 23.40 $234.90 .36 1 1 1 4.52 .65 5.60 3.45 1 10 1 1 57.23 450 .9 Total Variable Costs $ 22.50 28.80 $ 51.30 $170.90 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor Tractor Irrigation Land Charge $ 3.64 20.25 6.25 1.38 6.96 .23 11.20 6.04 14.00 25.00 7.00 12.50 5.15 $119.60 ac# hr. hr. ac. (Rent) $ 64.00 ac. 2.83 1.85 .72 24.08 23.22 Total Fixed Costs 5. Total Costs 6. Net Returns 7. Government Payments (less rent) (450 lbs @ 12.69c/lb) 1/ 8. Net Return Including Government Payment 1 4.52 .65 1 1 $ 2.83 8.36 .47 24.08 23.22 $ 58.96 $229.86 $ 5.04 $ 42.83 $ 47.87 1/ Based on planted acres. No allowance made for set-aside acreage of 30.89%. D e v e l o p e o b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United S_a„~ i^LtI!*, Agr.cu.ture cooperating. Distributed in furtherance of the Acts of Congress «M^ S_l t%m"ntd aS ^^9.4 AECO 6 08070121 PIMA COTTON, IRRIGATED, TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Pima Cotton, Typical Management Operation Labor Fuel, Oil, _,_ I t e m n a i . _ Ti m e s H f t l 1 Y. r Tr a c t o r o r , _ _ , _ « _ _ F i x e d c o s t s N o . D a t e O v e r H ^ r Mach. Hrs. L"b" ***' Per Acre Per Acre Shred S t a l k s 1,3 Jan 1 .50 .40 $ .08 $ .16 Pic- 1,5 Jan 1 1 . 11 .90 .30 .26 Disc 1,4 Feb 2 .83 .66 .11 .06 Float 1,6 Feb 2 1.00 .80 .20 1.04 List 1,7 Mar 1 .38 .30 .08 .10 Apply Herbicide 2 , 11 Apr 1 .28 .22 .16 .19 Disc 1,4 Apr 1 .38 .30 .05 .16 Disc 1,4 May 1 .25 .20 .03 .11 Plant 1,10 May 1.2 .24 .20 .09 .33 Cultivate 2,8 May 1 .18 .14 .07 .10 Cultivate 1,9 Jun-Jul 3 .45 .36 .21 .32 5.60 4.88 $ 1.38 $ 2.83 To t a l •rigation: Preplant (2) Apr 1 1.48 $ 6.00 $10.32 Postplant (2) Jun-Aug 4 1.97 8.00 13.76 3.45 $14.00 $24.08 To t a l (1) Labor hours calculated at 1.25 tirpes tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 12 acre inches preplant and four are ^__~ inches per postplant. ^ Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914. AECO 6 08075112 UPLAND COTTON, IRRIGATED, TRANS-PECOS REGION f^ Estimated Costs And Returns Per Acre Of Upland Cotton, High Level Management Item Unit 1. Gross receipts, from production: Lint Seed To t a l lb. ton Price or Cost/Unit $ Quantity .30 65.00 875 12.00 12.60 6.25 3.36 1.89 1.35 .65 2.00 1.75 14.00 2.50 5.00 12.50 .09 36 1 1 1 .7 Value or Cost $262.50 45.50 $308.00 2 . Va r i a b l e C o s t s : Pre-Harvest: Seed cwt. Fertilizer (180-50-0) ac. Herbicide qt. Machinery ac. Tractor (15) hr. Tractor (16) hr. Tractor (17) hr. L a b o r, Tr a c t o r & M a c h i n e r y h r. Labor, Irrigation hr. Irrigation Machinery ac. Insecticide (custom) Pickup Expense ac. Hail Insurance $100 Interest on Op. Cap. $ Subtotal, Pre-Harvest Harvest: Machinery (custom) Ginning Subtotal, Harvest lb. bale .05 22.00 .85 2.30 .60 4.69 3.45 1 5 1 1 45.19 875 1.,75 Total Variable Costs $ 43..75 38..50 $ 82,.25 $176..70 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor Tractor Tractor Irrigation Land Charge 3.64 12.60 6.25 3.36 1.61 3.11 .39 9.38 6.04 14.00 12.50 5.00 12.50 4.07 $ 94..45 (Rent) $131..30 ac. hr. hr. hr. ac. ac. 5.12 2.83 1.85 .72 24.08 57.32 Total Fixed Costs 1 ,85 2.,30 «,60 1 1 $ 5 ..12 2..41 4..26 .43 24,.08 57,.32 $ 93.62 5 . To t a l C o s t s $270.32 6. Net Returns $ 37.68 7. Government Payment (less rent) (875 lbs @ 15c/16) 1/ $ 98.44 8. Net Return Including Government Payment $136.12 1/ Based on planted acres. No all owance made for set-aside acreage of 20%. D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w 1 9 7 2 (-.operative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30. 1914. 08075111 UPLAND COTTON, IRRIGATED. TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Upland Cotton, High Level Management Operation Labor Fuel, Oil, I t e m _Date _ . . - T i_xu*-» m e s „ ii.-...-.-. T r a c t oTractor r o r »or _ _ ,-_. _ '«__ « _ _«.-.__«*«' F i x e d *_««, costs Over H™*8 Mach. Hrs. L<*., Rep. Per Acre No. (1) Per Acre Shred Stalks 16,18 Jan 1 .50 .40 $ .29 $ 1.06 Plow 15,20 Jan 1 .31 .25 .34 .31 Disc 16,19 Feb 2 .63 .50 .38 .71 Float 16,21 Feb 2 1.00 .80 .20 1.04 List 15,22 Feb 1 .25 .20 .14 .17 Cultivate 17,26 Feb 1 .15 .12 .11 .15 Apply Herbicide 17,23 Mar 1 .25 .20 .14 .18 Cultivate 17,26 Mar 1 .15 .12 .11 .15 Rototill 15,24 Apr 1 .50 .40 1.03 .77 Plant 16,25 Apr 1.2 .30 .24 .19 .15 Cultivate 17,26 May 1 .20 .16 .15 .20 Cultivate 16,25 Jun-Jul 3 .45 .36 .28 .23 4.69 3.75 $ 3.36 $ 5.12 To t a l ^ rigation: Preplant (2) Mar 1 1.48 $ 6.00 $10.32 Postplant (2) Jun-Aug 4 1.97 8.00 13.76 3.45 $14.00 $24.08 To t a l (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 12 acre inches preplant and four acre ^^ inches per postplant. ^ Developed by Extension Economists-Management, TAES. TAW. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914. AECO 6 08075122 UPLAND COTTON, IRRIGATED, TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Upland Cotton, Typical Management Item . , o_ s, _t /_U nPi rt i c e C Unit 1. Gross receipts, from production: Lint lb. $ Seed ton To t a l .30 65.00 o r E nr tt i t.y . . V a lCu oe g to r 700 .56 $210.00 36.40 $246.40 2. Variable Costs: Pre-Harvest: Seed cwt. 12.00 .36 $ Fertilizer (250-100-0) ac. 20.25 1 Herbicide qt. 6.25 1 Machinery ac. 1.38 1 Tractor (1) hr. 1.54 4.52 Tractor (2) hr. .65 .36 Labor, Tractor & Machinery hr. 2.00 5.60 Labor, Irrigation hr. 1.75 3.45 Irrigation Machinery ac. 14.00 1 Insecticide (custom) 2.50 10 Pickup Expense ac. 7.00 1 Hail Insurance $100 12.50 1 Interest on Op. Cap. $ .09 57.23 Subtotal, Pre-Harvest Harvest: Machinery Ginning Subtotal, Harvest lb. .05 bale 700 1.4 22.00 $ 35.00 30.80 $ 65.80 Total Variable Costs $185.40 3. Income Above Variable Costs $ 61.00 4. Fixed Costs: Machinery . Tractor (1) Tractor (2) Irrigation Land Charge (Rent) To t a l ac. h r. h r. ac. ac. Fixed 5. Net 1 2.83 1.85 4.52 .72 1 1 24.08 34.45 Costs To t a l 6. 3.64 20.25 6.25 1.38 6.96 .23 11 . 2 0 6.04 14.00 25.00 7.00 12.50 5.15 $119.60 .65 .47 24.08 34.45 $ 70.19 Costs Returns $ 2.83 8.36 $255.59 $ (9.19) 7. Government Payments (less rent) (700 lbs (_ 15c/lb) 1/ $ 78.75 8. Net Return Including Government Payment $ 69.56 1/ Based on planted acres. No allowance made for set-aside acreage of 20%. N e w. 1 9 7 2 Developed by Extension Economists-Management, TA E S , TA M U . ' ('.♦•operative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6 08075121 UPLAND COTTON, IRRIGATED, TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Upland Cotton. Typical Management Labor Fuel, Oil, __,_, Item no„_ Times Hrtl„.0 Tractor or T . «__ Fixed costs Operation No. Date Over H^8 Mach. Hrs. L"b" ***' Per Acre (1) Per Acre Shred Stalks 1,3 Jan 1 .50 .40 $ .08 $ .16 Plow 1,5 Jan 1 1.11 .90 .30 .26 Disc 1,4 Feb 2 .83 .66 .11 .06 Float 1,6 Feb 2 1.00 .80 .20 1.04 List 1,7 Mar 1 .38 .30 .08 .10 Apply Herbicide 2,11 Apr 1 .28 .22 .16 .19 Disc 1,4 Apr 1 .38 .30 .05 .16 Disc 1,4 May 1 .25 .20 .03 .11 Plant 1,10 May 1.2 .24 .20 .09 .33 Cultivate 2,8 May 1 .18 .14 .07 .10 Cultivate 1,9 Jun-Jul 3 .45 .36 .21 .32 5.60 4.88 $ 1.38 $ 2.83 To t a l / * \ Irrigation: Preplant (2) Apr 1 1.48 $ 6.00 $10.32 Postplant (2) Jun-Aug 4 1.97 8.00 13.76 3.45 $14.00 $24.08 To t a l (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pump i n g u n i t; 1 2 a cre i n ch e s p re p l a n t a n d fo u r a cre ^ ^ inches per postplant. /^\ Oeveloped by Extension Economists-Management,. TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June SO. 1914. AECQ 6 08095112 GRAIN SORGHUM. IRRIGATED. TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Grain Sorghum, High Level Management T_. ^~ ti ... Unlt Price or Cost/Unit 1. Gross receipts, from production: Grain Sorghum cwt. $ n ... Va l u e or Q~»t_ty Co8t 2.10 55 $ 11 5 . 5 0 2. Variable Costs: Pre-Harvest: Seed lb. .17 7 $ 1.19 Fertilizer (180-60-0) ac. 13.50 1 13.50 Machinery ac. 1.68 1 1.68 Tractor <15) hr. 1.89 .45 .85 Tractor (16) hr. 1.35 1.75 2.36 Tractor (17) hr. .65 .28 .18 Labor, Tractor & Machinery hr. 2.00 3.09 6.18 Labor, Irrigation hr. 1.75 2.95 5.16 Irrigation Machinery ac. 12.00 1 12.00 Pickup Expense ac. 5.00 1 5.00 Insecticide (custom) ac. 6.00 1 6.00 Interest on Op. Cap. $ .09 27.05 2.43 Subtotal, Pre-Harvest $ 56.54 Harvest: Machinery (custom) Hauling Subtotal, Harvest ac. cwt. 5.00 .10 1 55 $ 5.00 5.50 $ 10.50 Total Variable Costs $ 67.04 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (15) Tractor (16) Tractor (17) Irrigation Land Charge ac. h r. h r. h r. ac. 6. 2.87 2.83 1.85 .72 20.64 .06 $ To t a l 5. $ 48.46 Fixed To t a l Net Costs 1 • 45 1. 75 « 28 1 300 $ Costs Returns $ 2.87 1.29 3.24 .20 20.64 18.00 46.24 $ 11 3 . 2 8 $ 2.22 D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30, 1914. AECO 6 GRAIN SORGHUM, IRRIGATED, TRANS-PECOS REGION 08095111 ■ ■ ■ ... h " i i. . i * i up i.iumu.,.1 i v ~> ' ii i Estimated Costs, And Requirements Per Acre Of Grain Sorghum, High Level Management Operation Labor m Fuel, Oil, _. . __ /^ Item nal._ Times Hrtl,~.a Tractor or TllK «__ Fixed costs 1 m o D a t e O v e r H ° * * 8 M a c h . H r s - * * * • • * « p . P - A « e ■' No. Per Acre Plow 15,20 Jan 1 .31 .25 $ .34 $ .31 Disc 16,19 Feb 2 .63 .50 .38 .71 Float 16,21 Feb 2 1.00 .80 .20 1.04 List 15,22 Mar 1 .25 .20 .14 .17 Cultivate 17,26 May 1 .15 .12 .11 .15 Plant 16,25 Jun 1 .25 .20 .16 .13 Cultivate 17,26 Jun 1 .20 .16 .15 .20 Cultivate 16,25 Jun-Jul 2 .30 .25 .20 .16 3.09 2.48 $ 1.68 $ 2.87 To t a l Irrigation: Preplant (2) May 1 .98 $ 4.00 $ 6.88 Postplant (2) Jun-Jul 4 1.97 8.00 13.76 2.95 $12.00 $20.64 Total (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 8 acre inches preplant and four acre inches per postplant. Developed by Extension Economists-Manaqementt TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30, 1914. AECQ6 08095122 GRAIN SORCaUM, IRRIGATED, TRANS-PECOS REGION f^ Estimated Costs And Returns Per Acre Of Grain Sorghum, Typical Management -I t_e m ti Uj n. .l t P r iC ce o a t / Uonr i t 1. Gross receipts, from production: Grain Sorghum cwt. 2 . Va r i a b l e C o s t s : Seed Fertilizer (100-50-0) Machinery Tractor (1) Tractor (2) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinery Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Machinery (custom) Hauling Subtotal, Harvest $ lb. ac. ac. h r. h r. h r. h r. ac. ac. $ ac. cwt. _■» Q _ .u_a_n, t l t y V a l u e C o s to r 2.10 .17 9.00 1.06 1.54 40 $ 7 1 1 $ 3.08 .65 .28 .18 4.19 2.46 .09 22.93 8.38 4.31 10.00 7.00 2.06 47.92 * 5.00 .10 1 1 1 40 $ $ 5.00 4.00 9.00 $ 56.92 3. Income Above Variable Costs Total Fixed Costs 1.19 9.00 1.06 4.74 2.00 1.75 10.00 7.00 Total Variable Costs 4. Fixed Costs: Machinery Tractor (It) Tractor (2) Irrigation Land Charge 84.00 $ 27.08 ac. h r. h r. ac. $ 1 2.16 1.85 3.08 .72 .28 17.20 .06 1 300 $ 2.16 5.70 .20 17.20 18.00 $ 43.26 5 . To t a l C o s t s $100.18 6. Net Returns $(16.18) D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . . N e w 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acta of Congress of May 8. 1914. as amended, and June 80. 1914. AECO 6 08095121 GRAIN SORGHUM, IRRIGATED. TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Grain Sorghum, Typical Management Operation Labor _, Fuel, Oil, „_, _ Item nfll.0 Times Hnil_._ Tractor or L . «_ Fixed costs No. Date Over H^6 Mactu Hrs. L"b••***• Per Acre (1) Per Acre Plow 1,5 Jan 1 1.10 .90 $ .30 $ .26 Disc 1,4 Feb 2 .83 .66 .11 .06 Float 1,6 Feb 2 1.00 .80 .20 1.04 List 1,7 Mar 1 .38 .30 .08 .10 Cultivate 2,8 May 1 .18 .14 .07 .10 Plant 1,10 Jun 1 .21 .17 .08 .28 Cultivate 2,8 Jun 1 .18 .14 .07 .10 Cultivate 1,9 Jun-Jul 2 .31 .25 .15 .22 4.19 3.36 $ 1.06 $ 2.16 .98 $ 4.00 $ 6.88 1.48 6.00 10.32 2.46 $10.00 $17.20 To t a l Irrigation: Preplant (2) May Postplant (2) Jun-Jul 3 Total 1 —m—m——mmm (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 8 acre inches preplant and four acre ^__ inches per postplant. /^\ Developeo by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture aod Home Economics, Texas A&M University and (he United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914. AECO 6 «————vn—w—f—m—*—-•———«n^vmm4F#mm^*9rm—\—*n^mmp^■■■*—wmmm—mm—mmW**m—mm*mmmmmmm*mn—mm—wm*mmm*m 08125122 OATS FOR GRAZING, IRRIGATED. TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Oats For Grazing, Typical Management ^- Unlt t t _■_ . P r i c e o r n . . . V a l u e o r Cost/Unit Quantlty Cost 1. Gross receipts, from production: Grazing lbs./gain $ .17 470 $ 79.90 1 1 1 2.66 .17 3.53 2.95 1 1 23.52 $ 4.00 6.75 .86 4.10 .11 7.06 5.16 12.00 7.00 2.12 2. Variable Costs: Pre-Harvest: Seed cwt. 4.00 Fertilizer (150-0-0) ac. 6.75 Machinery ac. .86 Tractor (1) hr. 1.54 Tractor (2) hr. .65 L a b o r, Tra cto r & Ma ch i n e ry a c. 2 .0 0 Labor, Irrigation ac. 1.75 Irrigation Machinery ac. 12.00 Pickup Expense ac. 7.00 Interest on Op. Cap. $ .09 Subtotal, Pre-Harvest To t a l 3. Income 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation Land Charge Total Fixed Costs Va r i a b l e Above $ Costs Va r i a b l e ac. h r. h r. ac. $ 49.16 $ Costs 1.80 1.85 .72 20.64 .06 49.16 $ 30.74 1 2. 66 • 17 1 300 $ 1.80 4.92 .12 20.64 18.00 $ 45.48 5. Total Costs $ 94.64 6. Net Returns $(14.74) jgP^N D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO. 1914. AECO 6 08125121 OATS FOR GRAZING, IRRIGATED, TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Oats For Grazing, Typical Management Operation Labor Fuel, Oil, I t e m -D. a_r_- C . _ OTv iem , aTcrhar S c rt so.r Lo" b r "-& . _R.e pF* i xPeedr Ac cor se t s r "e s* « . M No. (1) Per Acre Plow 1,5 Aug 1 1.11 .90 $ .30 $ .26 Disc 1,4 Aug 2 .83 .66 .11 .06 Float 1,6 Aug 2 1.00 .80 .20 1.04 List 1,7 Aug 1 .38 .30 .08 .10 Drill 2,12 Sep 1 .21 .17 .17 .34 3.53 2.83 $ .86 $ 1.80 To t a l " > Irrigation: Preplant (2) Aug 1 .98 $ 4.00 $ 6.88 Postplant (2) Oct-Apr 4 1.97 8.00 13.76 2.95 $12.00 $20.64 To t a l (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 8 acre inches preplant and 4 acre inches ^^^ per postplant. Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30. 1914. AECO 6 08225112 WHEAT FOR GRAIN, IRRIGATED, TRANS-PECOS REGION' Estimated Costs And Returns Per Acre Of Wheat For Grain, High Level Management f^ " "■ Unlt tost/Unit 1. Gross receipts, from production: Grain cwt. $ Grazing lbs./gain Price 2.10 .17 or _-. . quaPtlty 42 Va l u e o r Cost $ 88.20 95.20 560 To t a l $183.40 2. Variable Costs: Pre-Harvest: Seed cwt. 4.00 1 $ Fertilizer (200-0-0) ac. 9.00 1 Machinery ac. 1.29 1 Tractor (15) hr. 1.89 .45 Tractor (16) hr. 1.35 1.30 Tractor (17) hr. .65 .13 Labor, Tractor & Machinery ac. 2.00 2.35 Labor, Irrigation ac. 1.75 2.95 Irrigation Machinery ac. 12.00 1 Pickup Expense ac. 5.00 1 Hail Insurance $100 13.15 .5 Interest on Op. Cap. $ .09 25.21 Subtotal, Pre-Harvest 4.00 9.00 1.29 .85 1.76 .08 4.70 5.16 12.00 5.00 6.58 2.27 $ 52.69 Harvest: Machinery (custom) Hauling Subtotal, Harvest $ 5.00 4.20 $ 9.20 ac. 1 42 5.00 cwt. .10 Total Variable Costs $ 61.89 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (15) Tractor (16) Tractor (17) Irrigation Land Charge To t a l 6. ac. h r. h r. h r. ac. ,45 1. 30 «13 1 300 e .72 20.64 .06 Costs To t a l Net 1 2.45 2.83 1.85 $ Fixed 5. $121.51 $ Costs Returns $ 2.45 1.27 2.41 .09 20.64 18.00 44.86 $106.75 $ 76.65 ^ D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30. 1914. AECO 6 08225111 REGION ~WHEAT ™ — —FOR GRAIN. — — IRRIGATED, ' " ■ ' TRANS-PECOS i ui i n Estimated Costs, And Requirements Per Acre Of Wheat For Grain, High Level Management Labor Fuel. Oil, Item « *. Times « Tractor or T u _♦-._- Fixed costs «£ Date Qmr Hours ^ ^ Lub., Rep. _er ^ (1) Per Acre Operation Plow 15,20 Disc Float List Drill Aug 16,19 .31 Aug 16,21 15,22 17,27 To t a l 1 2 $ .34 .63 .50 $ .38 .71 2 1.00 .80 Aug 1 .25 .20 .14 .17 1 .16 .13 .23 .22 1.88 $ .20 .31 Aug Sep 2.35 .25 1.29 $ 1.04 2.45 Irrigation: Preplant Postplant To t a l (2) (2) Aug 1 Oct-Apr 2.95 .98 4 $ 1.97 $12.00 4.00 8.00 $ 6.88 13.76 $20.64 (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 8 acre inches preplant and four acre ^^ inches per postplant. , } Oeveloped by Extension Economists-Management, TA E S , TA M U . __ Cooperative Extension Work in Agriculture and Home Efrmorairt, Texas A&M University and the United Sates Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO. 1914. AECO 6 08225122 WHEAT FOR GRAIN, IRRIGATED. TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Wheat For Grain, Typical Management ^ Item Unit 1. Gross receipts, from production: Grain cwt. $ Grazing lbs./gain Price or Cost/Unit 2.10 .17 Quantity 27 480 Value or Cost $ 56.70 81.60 To t a l $138.30 2. Variable Costs: Pre-Harvest: Seed Fertilizer (100-0-0) Machinery Tractor (1) Tractor (2) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinery Pickup Expense Hail Insurance Interest on Op. Cap. Subtotal, Pre-Harvest ^ Harvest: Machinery (custom) Hauling Subtotal, Harvest cwt. ac. ac. h r. h r. ac. ac. ac. ac. $100 $ ac. cwt. 4.00 4.50 .86 1.54 1 1 1 .65 .09 25.69 1 1 .5 1 27 .11 7.06 5.16 12.00 7.00 6.58 2.31 $ 53.69 $ $ Total Variable Costs 5.00 2.70 7.70 $ 61.39 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor Tractor Irrigation Land 4.10 .17 3.53 2.95 4.00 4.50 .86 2.66 2.00 1.75 12.00 7.00 13.15 5.00 .10 $ (1) (2) Charge $ 76.91 ac. hr. hr. ac. $ Total Fixed Costs 5 . To t a l C o s t s 6. Net Returns 1.80 1.85 .72 20.64 .06 1 2.66 1 300 .17 $ 1.80 4.92 .12 20.64 18.00 $ 45.48 $106.87 $ 31.43 JPN Oeveloped by Extension Economists-Management, TAES, TAMU. New, 1972 C«H.pcrativc Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agnculture coopcrat.ng. Distributed in furtherance of the Act, of Congress of May 8. 1914. as amended^Tnd Ju„e 30. Toil AECO 6 08225121 WHEAT FOR GRAIN. IRRIGATED. TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Wheat For Grain, Typical Management Operation No. Date Labor Fuel, Oil, £ *v*e*r H, ,ot uM r sa cfha.c tHorrs .o r* • »L» •b» ^- - vr x xp ee a O r Accorsei (1) Per Acre Pic- 1,5 Aug 1 1.11 .90 Disc 1,4 Aug 2 .83 Float 1,6 Aug 2 List 1,7 Aug Drill 2,12 Sep .30 $ .26 .66 . 11 .06 1.00 .80 .20 1.04 1 .38 .30 .08 .10 1 .21 .17 .17 .34 3.53 2.83 $ .86 $ 1.80 Total $ • ^ Irrigation: Preplant (2) Aug 1 .98 $ 4.00 $ 6.88 Postplant (2) Oct-Apr 4 1.97 8.00 13.76 2.95 $12.00 $20.64 Total ^ * \ (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 8 acre inches preplant and four acre ^~ inches per postplant. /^^ Developeo by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30. 1914. AECO 6 08000700 TEXAS TRANS-PECOS REGION Estimated Costs Of Irrigation Water Well Distribution Depth GPM System feet Per Acre Inch P o w e r _ / O p e r a t i n g F i x e d L a b o r L a b o r To t a l Source Cost 2/ Cost 3/ Requirement Cost Cost dollars dollars hrs. dollars dollars 150 75 h.m sprinkler electricity Sidemove-tow electricity .77 1.07 1.63 1.91 .211 .047 .37 .08 2.77 3.08 200 100 h.m sprinkler electricity skid tow line electricity 150 h.m sprinkler electricity skid tow line electricity nat. gas 250 side roll furrow nat. gas 400 side roll nat. gas s. propelled nat. gas nat. gas furrow nat. gas 600 side roll s. propelled n a t . gas n a t . gas furrow nat. gas 800 side roll s. propelled nat. gas furrow nat. gas .89 .97 .83 .91 .75 .42 .75 .42 .46 .75 1.13 .44 .74 1 . 11 .44 1.63 1.83 1.24 1.44 1.43 .98 1.27 .98 .82 1.18 1.29 .73 1.11 1.22 .66 .211 .063 .211 .063 .063 .123 .063 .123 .123 .063 .022 .123 .063 .022 .123 .37 . 11 .37 .11 . 11 .22 .11 .22 .22 .11 .04 .22 .11 .04 .22 2.89 2.91 2.44 2.46 2.29 1.62 2.13 1.62 1.50 2.04 2.46 1.39 1.96 2.37 1.32 250 300 side roll nat. furrow nat. 400 side roll nat. s. propelled nat. furrow nat. 600 side roll nat. s. propelled nat. furrow nat. gas gas gas gas gas gas gas gas .78 .50 .77 1.14 .46 .78 1.15 .46 1.45 1.00 1.36 1.48 .92 1.25 1.37 .81 .063 .123 .063 .022 .123 .063 .022 .123 .11 .22 .11 .04 .22 .11 .04 .22 2.34 1.72 2.24 2.66 1.60 2.14 2.56 1.49 250 800 side roll nat. gas s. propelled nat. gas furrow nat. gas .77 1.12 .46 1.19 1.31 .75 .063 .022 .123 .11 .04 .22 2.07 2.47 1.43 .79 1.16 .48 .80 1.15 .48 .78 1.14 .48 .77 1.13 .47 1.47 1.57 1.01 1.33 1.45 .88 1.26 1.37 .81 1.24 1.36 .80 .063 .022 .123 .063 .022 .123 .063 .022 .123 .063 .022 .123 .11 .04 .22 . 11 .04 .22 .11 .04 .22 .11 .04 .22 2.37 2.77 1.71 2.24 2.64 1.58 2.15 2.55 1.51 2.12 2.53 1.49 300 400 side roll nat. s. propelled nat. furrow nat. 600 side roll nat. s. propelled nat. furrow nat. 800 side roll nat. s. propelled nat. furrow nat. 1000 side roll nat. s. propelled nat. furrow nat. gas gas gas gas gas gas gas gas gas gas gas gas New, 1972 08000700 TEXAS TRANS-PECOS REGION Estimated Costs Of Irrigation Water Per Acre Inch Well Distribution . GPM Depth System 350 400 s i d e r o l l s. propelled furrow 600 s i d e r o l l s. propelled furrow 800 s i d e r o l l s. propelled furrow 1000 s i d e r o l l s. propelled furrow 500 600 800 s i d e r o l l Power 1/ Source nat. nat. nat. nat. nat. nat. nat. nat. nat. nat. nat. nat. gas gas gas gas gas gas gas gas gas gas gas gas Operating Fixed Cost 2/ Cost 3/ dollars dollars .83 1.20 .52 .81 1.18 .52 .80 1.16 .50 .80 1.16 .50 .86 s. propelled furrow n a t . gas n a t . gas n a t . gas 1.21 1000 s i d e r o l l s. propelled furrow n a t . gas n a t . gas n a t . gas 1.24 .56 .89 .60 Labor Labor To t a l Cost Cost Requirement hrs. dollars dollars .86 .063 .022 .123 .063 .022 .123 .063 .022 .123 .063 .022 .123 .11 .04 .22 .11 .04 .22 .11 .04 .22 .11 .04 .22 2.50 2.91 1.85 2.32 2.74 1.70 2.23 2.64 1.60 2.21 2.62 1.58 1.47 1.59 1.02 .063 .022 .123 .11 .04 .22 2.44 2.84 1.80 1.45 1.56 1.00 .063 .022 .123 .11 .04 .22 2.45 2.8_-^|v 1.82 / 1.56 1.67 1.11 1.40 1.52 .96 1.32 1.44 .88 1.30 1.42 1/. LP gas as a power source can be fit into this table by increasing the operating cost for self-propelled sprinklers by 1.65; by 1.80 for all other sprinklers, and by 1.95 for furrow irrigation. 2/. Includes fuel, lubrication, maintenance and repair on well, pumping plant, and distribution system. 3/. Includes depreciation and interest on investment for well, pumping plant, and distribution system, * Prepared by Marvin 0. Sartin, Area Farm Management Specialist, Texas Agricultural Extension Service, Lubbock, Texas; 5/71. 'm\ 08006112 ALFALFA ESTABLISHMENT, IRRIGATED, TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Alfalfa Establishment, High Level Management "- Unit Cost/Unit Price or n ..... Quant"y Va l u e o r Cost 1. No Income 2. Variable Costs: Seed Fertilizer (0-80-0) Machinery Tractor (15) Tractor (16) Tractor (17) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinery Pickup Expense Interest on Op. Cap. To t a l lb. ac. ac. h r. h r. h r. ac. ac. ac. ac. $ Va r i a b l e $ 30 1 1 .50 7.20 1.16 1.89 1.35 .65 2.00 1.75 11.50 5.00 .09 Costs .25 1.38 .13 2.20 2.84 1 1 25.82 $ $ 15.00 7.20 1.16 .47 1.86 .08 4.40 4.97 11.50 5.00 2.32 53.96 3. No Income 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Tractor (3) Irrigation Land Charge Total Fixed Costs 5 . To t a l C o s t s ac. h r. h r. h r. ac. $ 2.31 2.83 1.85 .72 19.78 .06 1 «,25 1.,38 «,13 1 300 $ 2.31 .71 2.55 .09 19.78 18.00 $ 43.44 $ 97.40 D e v e l o p e d b y E x t e n s i o n E o o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w 1 9 7 2 Cooperative Extension Work an Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture -cooperating. (Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30. 1914. AECO G Operation 08006111 ALFALFA ESTABLISHMENT, IRRIGATED, TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Alfalfa Establishment, High Level Management Labor Fuel, Oil, Tfpn, Times .. Tractor or T . «_*.__ Fixed costs "So" Date OvW H°£8 Mach. Hrs. *&•__' P« Acre Plow 15,20 Aug 1 .31 .25 $ .34 $ .31 Disc 16,19 Aug 2 .63 .50 .38 .71 Float 16,21 Aug 2 1.00 .80 .20 1.04 Establish Borders 16,28 Aug 1 .10 .08 .01 .03 Plant 17,27 Sep 1 .16 .13 .23 .22 2.20 1.76 $ 1.16 $ 2.31 Total rigation: Preplant (2) Sep 1 1.48 $ 6*00 $10.32 Flash (2) Sep 3 .74 3.00 5.16 Postplant (2) Nov 1 .62 2.50 4.30 2.84 $11.50 $19.78 Total (1) Labor hours calculated at 1.25 times tractor hours except where noted by (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 12 acre inches preplant and four acre inches per postplant. Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June SO, 1914. AECO 6 ^ \ 08006122 ALFALFA ESTABLISHMENT, IRRIGATED, TRANS-PECOS REGION Estimated Costs And Returns Per Acre Of Alfalfa Establishment, Typical Management Item Unit Price or Cost/Unit Quantity Value or Cost 30 1 1 $ 15.00 3.60 1. No Income 2. Variable Costs: Seed Fertilizer (0-40-0) Machinery Tractor (1) Tractor (2) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinery Pickup Expense Interest on Op. Cap. lb. ac. ac. h r. h r. ac, ac, ac. ac. .50 3.60 .79 1.54 .65 2.00 1.75 10.50 7.00 .09 .79 2.44 3.76 .17 .11 3.25 2.59 7.50 4.53 10.50 7.00 2.38 1 1 26.40 $ 55.17 Total Variable Costs 3. No Income 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation Land Charge ac. h r. h r. ac. Total Fixed Costs 5 . To t a l C o s t s 1.75 1.85 .72 18.06 .06 1 2.44 .17 1 300 $ 1.75 4.51 .12 18.06 18.00 $ 42.44 $ 97.61 f^ Developed by Extension Economists-Management, TAES, TAMU. New, 1972 Cooperative Extension Work in Agriculture and Home Economics. Texas A8cM University and the United Slates Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30, 1914. AKCC) G 08006121 ALFALFA ESTABLISHMENT, IRRIGATED, TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Alfalfa Establishment, Typical Management Operation Labor _, Fuel, Oil, Item -_Times .._.__ ' RFixed costs u r . , .Tractor - _Mach# T r a cor t o rT..il oLub., r 'T n .Rep. "per « u Acre wai Hours Hr8# Date Over No. Per Acre (1) 1,5 Aug 1 1.11 .90 Disc 1,4 Aug 2 .83 .66 .11 .06 Float 1,6 Aug 2 1.00 .80 .20 1.04 Establish Borders 1,13 Aug 1 .10 .08 .01 .05 Plant 2,12 Sep- Oct 1 .21 .17 .17 .34 3.25 2.61 Total $ .30 .26 Plow $ .79 $ $ /"m\ 1.75 Irrigation: Preplant (2) Sep 1 1.48 $ 6.00 $10.32 Flash Sep 2 .49 2.00 3.44 Postplant (2) Nov 1 .62 2.50 4.30 2.59 $10.50 $18.06 To t a l (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 12 acre inches preplant, 2 acre inches per / ~ \ flash irrigation, and 5 acre inches per postplant. Developed by Extension Economists-Management^ TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO. 1914. AECO 6 08125112 OATS FOR GRAZING, IRRIGATED, TRANS-PECOS REGION »l Estimated Costs And Returns Per Acre of Oats For Grazing, High Level Management Item Unit „ J f c P r i c e o r n , i a n H f r w Va l u e o r Cost/Unit Quantity Co8t 1. Gross receipts, from production: Grazing lbs./gain $ .17 630 $107.10 2. Variable Costs: Pre-Harvest: cwt. Seed ac. Fertilizer (250-0-0) ac. Machinery h r. Tractor (15) Tractor (16) h r. Tractor (17) h r. ac. Labor, Tractor & Machinery ac. L a b o r, I r r i g a t i o n ac. Irrigation Machinery ac. Pickup Expense Interest on Op. Cap. $ Subtotal, Pre-Harvest To t a l 3. Income 4. Fixed Costs: Machinery Tractor (15) Tractor (16) Tractor (17) Irrigation Land Charge Total Fixed Costs Va r i a b l e Above 1 1 1 4.00 11.25 1.29 1.89 1.35 .65 2.00 1.75 12.00 7.00 .09 .45 1.30 .13 2.35 2.95 1 1 24.05 $ Costs Va r i a b l e ac. h r. h r. h r. ac. $ $ Costs 2.45 2.83 1.85 .72 20.64 .06 $ 4.00 11.25 1.29 .85 1.76 .08 4.70 5.16 12.00 7.00 2.16 50.25 50.25 $ 1 56.85 $ •,45 1.,30 •,13 1 300 2.45 1.27 2.41 .09 20.64 18.00 $ 44.86 5 . To t a l C o s t s $ 95.11 6. Net Returns $ 11.99 D e v e l o p e o b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914; as amended/and June SO, 1914. AECO 6 08125111 OATS FOR GRAZING, IRRIGATED. TRANS-PECOS REGION Estimated Costs, And Requirements Per Acre Of Oats For Grazing, High Level Management Operation Labor Fuel, Oil, ,_,. I t e m D a t e I i m e s H o u r s T r at oc rt oor r oT r. . . ' ^« _"_" * F- .i *~- e* _d vc. uo Ds ti s Mach. Hrs. L«b-» ^P- Per Acre No. Over ._. Per Acre Plow 15,20 Aug 1 .31 .25 $ .34 $ .31 Disc 16,19 Aug 2 .63 .50 .38 .71 Float 16,21 Aug 2 1.00 .80 .20 1.04 List 15,22 Aug 1 .25 .20 .14 .17 Drill 17,27 Sept 1 .16 .13 .23 .22 2.35 1.88 $ 1.29 $ 2.45 Total Irrigation: Preplant (2) Aug 1 .98 $ 4.00 $ 6.88 Postplant (2) Oct-Apr 4 1.97 8.00 13.76 2.95 $12.00 $20.64 Total ^ \ (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 1,000 gpm, 350 feet well, furrow irrigation, natural gas pumping unit; 8 acre inches preplant and four acre ^_>. inches per postplant. j Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating* Distributed in furthfrancr of the Acts of Congress of May 8, 1914. as amended, and June SO. 1914. AECO 6