The enterprise budgets for Rollings Plains I
are based on yields as shown on form 05000600.
Budgets for irrigated crops in Rolling Plains I
area were developed only for alfalfa and coastal
since almost no irrigation is used on other crops.
Pertinent facts include the following: the
"high level" managers use mostly 6-row equip
ment and farm 1,000 acres of cropland, while
the "typical" manager uses 4-row equipment and
farms about 600 acres of cropland. Budgets for
irrigated crops in Rolling Plains I are based on
sprinkler irrigation.
The following customary rent arrangements
were used:
Cotton—One-fourth of production and land
lord pays one-fourth of insecticide, fertilizer
r
and ginning.
Vegetables—One-fifth production and land
lord pays one-fifth of insecticide, fertilizer,
fungicide, harvesting and processing.
All Other Crops—One-third of production
and landlord pays one-third of fertilizer and
harvest. Landlord's share of hay baling is
based on 300 per bale when renter owns and
operates his own equipment.
Income from government payments is shown
after the landlord's share has been deducted for
rent. For information on groundwater resources
and soils for these areas, consult the Area Re
sources Section of (he Rolling Plains Economic
Program Report.
05000400
TEXAS ROLLING PLAINS I
r
Assumed Prices Paid And Received By Farmers
Item
Unit
Price
Prices Paid
r
Seed:
Cotton (Di-Syston treated)
Cotton (delinted)
Grain Sorghum
Guar
Wheat (cleaned and treated)
Alfalfa
Forage Sorghum Ensilage
Sudan
Custom Rates:
Combining wheat
Combining grain sorghum
Combining guar
Hay harvest, Mow, rake, bale, haul
Ensilage, Chop, haul, pack
Hauling:
Grain sorghum
Guar
Wheat
Chemical spraying
Hoeing
Cotton ginning
Fuel and lubricants:
Gasoline
L. P. gas
Diesel fuel
Motor oil (heavy duty, detergent)
Lubricant
Fertilizer (bulk):
Nitrogen
Phosphorus
Labor (except hoeing)
Capital
Chemicals:
Pre-emergence herbicide
Methyl parathion
Malathion
Hail insurance (wheat)
cwt.
cwt.
cwt.
cwt.
bu.
cwt.
cwt.
cwt.
ac.
ac.
ac.
bale
$ 19.50
15.00
21.00
9.00
2.50
n 4o.oo
21.00
20.00
3.00 2/
3.50
4.00
.35
ton
3.00
cwt.
cwt.
.10
.10
bu.
ac.
hr.
500// gross wt. bale
gal.
gal.
gal.
gal.
lb.
lb.
lb.
hr.
$
5 gal.
gal.
gal.
ac.
.05 3/
1.00 "
1.50
20.30 4V
.27
.11
.15
1.50
.21
.095
.075
2.00
.08
110.00
5.25
11.00
2.00
r
New, 1972
05000400
TEXAS ROLLING PLAINS I
Assumed Prices Paid And Received By Farmers
Item
Unit
Price
lb. Lint
cwt.
$ .185 5/
5.00
58.00
1.18 5/
2.00 5/
40.00
25.00
8.00
25.00
8.00
2.75
Prices Received
Cotton
Guar
Cotton seed
Wheat
Grain sorghum
Alfalfa hay
Forage sorghum hay
Ensilage
Coastal hay
Pasture grazing
Potatoes
ton
bu.
cwt.
ton
ton
ton
ton
AUM
cwt.
JL/ These price assumptions are not to be interpreted as predictions or
prospective prices.
2/ $3.00 per acre plus $0.05 per bushel of yield over 20 bushels per acre.
3/ Hauling-combine to elevator $0.05/bu. + $0.005/bu./mi. over 5 miles.
47 Ginning, $14.30; bagging and tying, $6.00.
_5/ Does not include government payment which a farmer might receive for
participating in farm programs.
^S
S"^k
05000510
TEXAS ROLLING PLAINS I
Estimated Machinery And Equipment Cost Per Hour Of Use, High Level Management
New
Cost
Estimated
Typical Yrs.
ut use
21
22
23
24
25
26
27
28
29
30
31
32
34
35
36
37
38
39
$11,500
8,000
3,500
1,800
1,600
1,600
2,000
1,000
2,000
1,700
1,600
1,400
7,000
3,000
5,400
1,500
1,800
300
5
8
12
8
8
8
8
8
8
8
10
8
5
5
5
10
10
10
$6,015
4,896
3,500
1,343
1,194
1,194
1,492
746
1,492
1,268
1,274
1,044
4,312
2,022
3,640
1,194
1,343
215
4,500
6,400
8,000
1,200
1,600
1,600
1,600
1,600
1,600
1,600
1,200
1,000
1,500
1,500
1,600
1,000
1,500
1,000
$1.34
.77
.44
1.12
.75
.75
.93
.47
.93
.79
1.06
1.04
2.87
1.35
2.27
1.19
.90
.21
$ .75
.56
.21
.60
.40
.40
.50
.25
.50
.43
.64
.56
1.29
.53
.89
.72
.60
.12
$1.58
1.24
.67
1.38
.86
.56
.69
53
.69
.91
.44
.77
5.47
1.26
1.84
.32
.63
.30
40
3,000
10
1,800
3,000
.60
.56
.40
Machinery
I t e mi
Item and Size No.
Tractor, 100 HP
Tractor, 80 HP
Tractor, 45 HP
L i s t e r, P l a n t e r, 6 R
Cultivator,
6R
Ta n d e m D i s c , 1 6 '
Offset
Disc
Chisel,
17*
Moldboard, 5 Btm.
Rolling Cultivator
Grain Drill, 16f8"
Shredder,
4R
Swather,
S . P.
Baler
Stripper & Basket
Float
O n e w a y,
15f
S a n d fi g h e r ,
8R
Bale Accumulator &
Front End Loader
1/
2/
3/
47
To t a l
D e p r. l /
Estimated
Depr.
Total Hrs. Per Hr.2/
Of Use
Interest on
Investment
Per Hour 3/
Fuel, Oil,
Lub., Rep.,
Per Hr. 47
• yJ -J
New cost less value at time of trade, or less salvage value.
Assumes straight line depreciation.
(Investment + Salvage) -. 2 (8%) divided by annual hours of use.
Fuel, oil, lubrication, repair cost estimate taken from Bowers, Modern Concepts of Farm Machinery Management.
New, 1972
05000510
TEXAS ROLLING PLAINS I
Estimated Irrigation Machinery And Equipment Cost Per Hour Of Use
Machinery
Item and Size
Item
No.
Interest on
New
J 3 11 ™ ^
T o t a l Estimated
--.——
D
C o s t T y rp. irc a l t tY~ r_s . _^ ToQtfa l U
H sr es . p_ / £ 2p /e rI n v He os ut m
r e n3t ^
Of Use
Fuel, Oil,
Lub., Rep.,
Per Hr. 4/
Irrigation Equipment - 200 gallon/minute well, sprinkler
Well,1100 ft.,
75 ft. lift
47
$ 1,200
20
$1,200
43,000
Motor, 15 HP, Elec.
48
500
4
500
8,560
.058
.009
.258
Pump
49
800
10
800
19,260
.047
.017
.011
Electric Panel
50
150
16
150
34,000
.004
.003
.001
Sprinkler System
51
2,800
10
2,800
21,400
.131
.052
.294
Total
1/
2/
3/
47
$
$
.028
.268
$
$
.022
.103
$
$
.002
.566
New cost less value at time of trade, or less salvage value.
Assumes straight line depreciation.
(Investment + Salvage) * 2 (8%) divided by annual hours of use.
Fuel, oil, lubrication, repair cost estimate taken from Bowers, Modern Concepts of Farm Machinery Management,
^J
/"^%
V-TI^
/ ^ ^ k
05000520
TEXAS ROLLING PLAINS I
Estimated Machinery And Equipment Cost Per Hour Of Use, Typical Management
Machinery
Item and Size
Item
No.
Tractor, 100 HP 1
Tractor, 80 HP 2
Tractor, 45 HP 3
L i s t e r, P l a n t e r 4 R 4
Cultivator
4R
5
Ta n d e m D i s c 1 3 ' 6
Chisel
13f
7
Moldboard 4 Btm. 8
Shredder
2R
9
Swather,
Pull
10
Baler
14
Stripper
15
Grain Drill 13f 10" 16
Oneway
12'
17
S a n d fi g h t e r 8 R 1 8
Knife
4R
19
1/
2/
3/
4/
New
Cost
$10,000
8,000
3,500
1,200
1,000
1,400
800
1,400
350
2,500
3,000
3,600
1,300
1,400
300
800
Estimated
Typical Yrs.
Of Use
5
8
12
8
8
8
8
8
8
5
5
5
10
10
10
10
To t a l
Depr.jV
$5,230
4,896
3,500
895
746
1,044
597
1,044
261
1,540
2,022
2,426
1,035
1,114
215
597
Estimated n
To t a l H r s . „ * £ , ,
Of
Use
—
4,500
6,400
8,000
1,200
1,600
1,600
1,600
1,600
1,000
1,500
1,500
1,500
1,200
1,500
1,000
1,200
$1.16
.77
.44
.74
.47
.65
.37
.65
.26
1.03
1.35
1.62
.86
.74
.21
.50
Interest on
Investment
Per Hour 3/
$ .66
.56
.21
.40
.25
.35
.20
.35
.14
.46
.53
.64
.52
.45
.12
.33
Fuel, Oil,
Lub., Rep.,
Per Hr. 4/
$1.37
1.24
.67
.92
.53
.49
.43
.49
.19
1.96
1.26
1.31
.35
.49
.30
.38
New cost less value at time of trade, or less salvage value.
Assumes straight line depreciation.
(Investment + Salvage) * 2 (8%) divided by annual hours of use.
Fuel, oil, lubrication, repair cost estimate taken from Bowers, Modern Concepts of Farm Machinery Management,
New, 1972
05000520
TEXAS ROLLING PLAINS I
Estimated Irrig ation Machinery And Equlipment Cost Per Hour Of Use
Machinery
Item and Size
Item New
No. Cost
Estimated _, _ .
T y p i i c a li - Y rl os t .a l .
O f U s e D e p r. l /
-n
Estimated
Depr.
Total Hrs. Per
Hr.jIJ
Of Use
Interest on
Inves tment
Per Hour 3/
Fuel, Oil,
Lub., Rep.,
Per Hr. 4/
Irrigation Equipment - 200 gallon/minute well, sprinkler
Well,1100 ft.,
75 ft. lift
47 $ 1,200
Motor, 15 HP, Elec.
48
500
Pump
49
Electric Panel
Sprinkler System
20
$1,200
43,000
$ .028
$ .022
$ .002
4
500
8,560
.058
.009
.258
800
10
800
19,260
.047
.017
.011
50
150
16
150
34,000
.004
.003
.001
51
2,800
10
2,800
21,400
.131
.052
.294
$ .268
$ .103
$ .566
Total
1/
2/
3/
4/
New cost less value at time of trade, or less salvage value.
Assumes straight line depreciation.
(Investment + Salvage) * 2 (8%) divided by annual hours of use.
Fuel, oil, lubrication, repair cost estimate taken from Bowers, Modern Concepts of Farm Machinery Management.
^J
^J
■^J
05000600
TEXAS ROLLING PLAINS I
Yield Per Acre For Typical And High Level Management
Crop
Alfalfa
Typical
tons
Irrigated
High
Level
6.5
8.0
Typical
Dryland
High
2.5
Level
3.5
Cotton
lbs.*
175
225
Silage
tons*
10
15
Wheat
bu.*
20
30
Guar
lbs.*
600
1000
Coastal
f^-
Unit
tons
7
10
*Almost no acreage irrigated at the present time. Alfalfa receives 85-90
percent of irrigation water.
New, 1972
05006112
ALFALFA ESTABLISHMENT, IRRIGATED, ROLLING PLAINS I
Estimated Costs And Returns Per Acre Of Alfalfa
Establishment, High Level Management
Item
Unit
Price or
Cost/Unit
Quantity
Value or
Cost
1. No Income
2. Variable Costs:
Seed
Fertilizer (16-20-0)
Machinery
Tractor (21)
Tractor (22)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinery
Interest on Op. Cap.
lb.
ac.
ac.
h r.
h r.
h r.
h r.
ac.
$
$
.40
3.02
.78
1.58
1.24
2.00
2.00
1.16
.08
25
1
1
$ 10.00
3.02
.78
.50
.62
2.06
4.12
2.00
1.16
1
1
.95
11.86
$ 24.68
Total Variable Costs
3. Fixed Costs:
Machinery
Tractor (21)
Tractor (22)
Irrigation
2.03
1.29
ac.
h r.
h r.
ac.
2.14
2.09
1.33
1.78
1
1. 29
. 50
1
Developeo by Extension Economists-Management, TAES, TAMU.
.66
7.27
$ 31.95
4. Total Costs
6 . To t a l C o s t
2.14
2.69
1.78
$
Total Fixed Costs
5 . L e s s L a n d l o r d ' s s h a r e F e r t i l i z e r aac.
c
$
1.01
1
$ -1.01
$ 30.94
New, 1972
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
05006111
ALFALFA ESTABLISHMENT, IRRIGATED, ROLLING PLAINS I
Estimated Costs, And Requirements Per Acre Of
Alfalfa Establishment. High Level Management
Labor
Fuel,
Oil,
__._
Operation
'e: °ate £rrs h°»™
s:_MLs!
i-*-.
*»• *%?£?•
(1)
Per
Acre
Moldboard
21,29 July
Offset Disc
21,27 Aug.
.71
.57
$ .39
$ .82
1
.38
.30
.20
.42
Float
22,37 Aug-Sep 11
.35
.28
.09
.53
Fertilize
21 Sep-Oct 1
.35
.28
-
-
Drill
22,26 Sep-Oct 1
.27
.22
.10
.37
2.06
1.65
$ .78
$2.14
1.00
3.25
$1.16
$1.78
To t a l
Irrigation
47-51 Sep-Nov 1
^
^
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
Developed by Extension Economists-Management, TAES, TAMU.
2r^C_^V_?_^_S._^.7Va,\51
iSP*™??^,"1?
H°me of
^°nwnia'
A&M of
University
and as
the
United States
Department
of
Agriculture cooperating. Distributed
in furtherance
the ActsTexa»
of Congress
May 8, 1914.
amended,
and June
SO. 1914.
AECO 6
^
05005112
ALFALFA, IRRIGATED, ROLLING PLAINS I_
Estimated Costs And Returns Per Acre Of Alfalfa, High Level Management
"em
Price
Cost/Unlt
Unit
1. Gross receipts, from production:
Hay
ton
$
40.00
or ~ _.__
Quantity
8
Va l u e o r
....
$320.00
2. Variable Costs:
Pre-Harvest:
1/8 Establishment Cost
Fertilizer (200 lbs., 0-46-0)
Tractor (22)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinery
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Wire
Machinery
Tractor (23)
Labor
Subtotal, Harvest
ac.
ac.
h r.
h r.
h r.
ac.
ac.
$
bale
ac.
ac.
h r.
1
1
3.87
6.90
1.24
2.00
2.00
5.84
2.00
.10
.20
5.0
1
1
.08
14.56
.03
264
1
3.5
7.54
1.24
2.00
5.25
Total Variable Costs
$
3.87
6.90
.12
.40
10.00
5.84
2.00
1.16
$ 30.29
7.92
7.54
4.34
10.50
$ 30.30
$
$ 60.59
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (22)
Irrigation
Land Charge (Rent)
$259.41
ac.
h r.
ac.
ac.
1
3.6
1
1
7.21
1.33
8.91
77.22
Total Fixed Costs
$
7.21
4.79
8.91
77.22
$ 96.13
5. Total Costs
$158.72
6. Net Returns
$161.28
7. Government Payments
8.
Net
Return
Including
Government
Payment
$161.28
f^
Developeo
by
Extension
Economists-Management,
TA E S ,
New 1972
TA M U .
'
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
05005111
ALFALFA, IRRIGATED, ROLLING PLAINS I
Estimated Costs, And Requirements Per Acre Of Alfalfa, High Level Management
Operation
Labor
Fuel,
Oil,
Item *%_«.__ Times ««„-_. Tractor or T . D^„ Fixed costs
No. Date Over H^8 Mach. Hrs. L"b.,Rep. Per Acre
(1)
Per
Acre
Fertilize
22
Swather
22.34 Apr-Sep 5
1.25
1.00
5.47
4.16
Baler
22.35 Apr-Sep 5
2.00*
1.25
1.57
2.35
Accumulator &
Front End
Loader
22,35 Apr-Sep 5 2.00* 1.25
.50
.70
Apr
1
Total
Irrigation
47-51 Apr-Aug 5
.20*
.10
$
-
$
-
5.45
3.60
$ 7.54
$ 7.21
5.00
15.75
$ 5.84
$ 8.91
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
Developed by Extension Economists-Management, TAES. TAMU.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30. 1914.
AECO 6
05006122
ALFALFA ESTABLISHMENT. IRRIGATED, ROLLING PLAINS I
Estimated Costs And Returns Per Acre Of Alfalfa
Establishment, Typical Management
Item
Unit
Price or
Cost/Unit
Quantity
Value or
Cost
1. No Income
2. Variable Costs:
Pre-Harves t:
Seed
Fertilizer (16-20-0)
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinerv
Interest on Op. Cap.
lb.
ac,
ac.
hr.
hr.
h r.
h r.
ac.
$
.40
3.02
.78
1.37
1.24
2.00
2.00
1.16
.08
25
1
1
.50
.58
$ 10.00
3.02
1.34
2.68
2.00
1.16
1
1
10.52
Total Variable Costs
3. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Irrigation
.78
.68
.72
.84
$ 21.88
ac.
h r.
h r.
ac.
Total Fixed Costs
4 . To t a l C o s t s
5. Less Landlord's share of fertilizer
6 . To t a l C o s t
2.40
1.82
1.33
1.78
.50
.58
$ 2.40
.91
.77
1.78
$ 5.86
$ 27.74
$ -1.01
$ 26.73
Mr sz^n^Tszzrjzr. ::]ci_ir==5Sw
ftEygLQPEO by Extension Economists-Management, TAES, */*MU.
New, 1972
a ir*~_-» /?
05006121
ALFALFA ESTABLISHMENT. IRRIGATED. ROLLING PLAINS I_
Estimated Costs, And Requirements Per Acre Of
Alfalfa Establishment, Typical Management
Labor
Operation
-,
Fuel»
°il»
„_,
Chisel
1,7
July
1
.31
.25
.11
.14
Tandem Disc
2,6
Aug
1
.37
.30
.15
.30
Fertilize
2
Aug-Sep
1
.35
.28
Drill
1,16
Sep-Oct
1
.31
.25
.09
.34
1.34
i n«
$ .35
$ .78
1.00
3.25
$ 1.16
$ 1.78
Total
Irrigation
__
^\
I t e m D a t e Ti m e s H _ . _ i r « Tr a c t o r o r T . R ' F i x e d c o s t s /
No. Date Over ™" Mach. Hrs. Lub., Rep. per ^^
(1)
Per
Acre
47-51 Sep-Nov 1
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
Developed by Extension Economists-Management, TAES, TAM'l.
o ^agriculture
£ 7 c u t r e ^cooperating.
H o m C EDistributed
c o n o m i cins furtherance
. Te x a s of
A&
the
M Acts
U n-i vCongress
e r s i t y of
a nMay
d t8.
h e1914.
U nas
i t eamended,
d S t a t eand
s D
June
e p a30.
rtm
1914.
ent
05005122
ALFALFA, IRRIGATED. ROLLING PLAINS I
Estimated Costs And Returns Per Acre Of Alfalfa, Typical Management
Item
1.
Gross receipts, from production:
Hay
Unit
Price or
Cost/Unit
ton
$ 40.00
ac.
ac.
h r.
h r.
h r.
ac.
ac.
4.45
3.45
1.24
2.00
2.00
5.84
2.00
.08
Quantity
Value or
Cost
6.5
$260.00
1
1
4.45
3.45
.12
.20
10.00
5.84
2.00
1.06
$ 27.12
2. Variable Costs:
Pre-Harvest:
1/6 Establishment cost
Fertilizer (100 lbs.-0-46-0)
Tractor (2)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinery
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Wire
Machinery
Tr a c t o r
Labor, stack on trl.
Labor
Subtotal, Harvest
$
bale
ac.
hr.
hr.
h r.
.03
3.23
1.24
2.00
2.00
.1
.1
5.0
1
1
13.30
215
1
2.12
4
3.31
Total Variable Costs
$ 53.76
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (2)
Irrigation
Land Charge (Rent)
6.45
3.23
2.36
8.00
6.62
$ 26.66
$
$206.22
ac.
h r.
ac.
ac.
Total Fixed Costs
5. Total Costs
6. Net Returns
3.67
1.33
8.91
62.22
1
2.22
1
1
$
3.67
2.95
8.91
62.22
$ 77.75
$131.53
$128.47
7. Government Payments
8. Net Returns Including Government Payment
Developed by Extension Economists-Management, TAES, ~AtW.
$128.47
New, 1972
A F C O fi
05005121
ALFALFA. IRRIGATED. ROLLING PLAINS I
Estimated Costs, And Requirements Per Acre Of Alfalfa. Typical Management
Labor
Fuel,
Oil,
Item n __•.__. Times u-.„.0 Tractor or ¥ . „__._, Fixed costs
No. Date Over Ho"" Mach. Hrs. L«b.,Rep. Per Acre
(1)
Per
Acre
Operation
Fertilize
2
Apr
1
.20
.10
Swather
2,10
May-Sep 4
1.00
.80
1.57
1.19
Baler
2,14
May-Sep 4
2.31*
1.32
1.66
2.48
3.51
2.22
$ 3.23
$ 3.67
5.00
15.75
$ 5.84
$ 8.91
To t a l
Irrigation
47-51 Apr-Aug 5
$
-
$
-
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
Oevelopep by Extension Economists-Management, TAES, T/MC
of Agriculture cooperating. HomC
Distributed
in furtherance7■"««
of the Acts
oi Congress
of May
8. 1914.
amended,
and June
30. 1914.
^aSSSuuYS^^^^^T\^
Economics'
A&M
University
and
the as
United
States
Department
AECO 6
'^%j
05006212
ALFALFA ESTABLISHMENT, DRYLAND, ROLLING PLAINS I_
f^
Estimated Costs And Returns Per Acre Of Alfalfa
Establishment, High Level Management
Item
Unit
Price or
Cost/Unit
Quantity
Value or
Cost
1. No Income
2. Variable Costs:
Pre-Harvest:
Seed
Fertilizer (16-20-0)
Machinery
Tractor (21)
Tractor (22)
Labor, Tractor & Machinery
Interest on Op. Cap.
lb.
ac.
ac
h r.
h r.
h r.
$
$
.40
3.02
.29
1.58
1.24
2.00
.08
.20
1
1
.63
.20
1.04
7.31
Total Variable Costs
3. Fixed Costs:
Machinery
Tractor (21)
Tractor (22)
$ 8.00
3.02
.29
.99
.25
2.08
.58
$ 15.31
ac.
h r.
h r.
.62
2.09
1.33
1
.63
.20
Total Fixed Costs
.62
1.32
.27
$ 2.21
4 . To t a l C o s t s
ac.
5. Less landlord's share of fertilizer • ac.
$
$ 17.42
1.01
1
$ -1.01
6. Government Payments
7. Net Returns Including Government Payments
$ 16.41
J^N
Developed by Extension Economists-Management, TAES, TAMU.
New, 1972
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
05006211
ALFALFA ESTABLISHMENT. DRYLAND. ROLLING PLAINS _I
Estimated Costs, And Requirements Per Acre Of
Alfalfa Establishment, High Level Management
Operation
Item
No.
Date
«~
Over
Labor
Fuel,
Oil,
Hours
* » *■« £
(1)
Per
■£ * £ < •
Acre
Chisel
1
July
1
.25
.20
. 11
$ .07
Offset Disc
1
Aug-Sep 1
.19
.15
.10
.21
Fertilize
1
Sep-Oct 1
.35
.28
Drill
1
Sep-Oct 1
.25
.20
.08
.34
1.04
.83
$ .29
$ .62
To t a l
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
Developed by Extension Economists-Management, TAES, TAMU.
^Kil^«X^i«.W^nl^^fi!S1?refcM?
of
Agriculture cooperating. DistributedHome
in furtherance
*">*">**<*>
of the Acts
Texa«
of Congress
A&M University
of May 8.and
1914.the
as United
amended,
States
and June
Department
30. 1914.
AECO 6
05005212
ALFALFA. DRYLAND. ROLLING PLAINS I
Estimated Costs And Returns Per Acre Of Alfalfa, High Level Management
Item
1. Gross receipts, from production:
Hay
Unit
Price or
Cost/Unit
ton
$ 40.00
ac.
ac.
h r.
h r.
ac
2.73
2.25
1.24
2.00
2.00
.08
Quantity
Value or
Cost
3.5
$140.00
1
1
$ 2.73
2.25
.12
.24
2.00
.29
$ 7.63
2. Variable Costs:
Pre-Harvest:
Seed - 1/6 Establishment cost
Fertilizer (0-30-0)
Tractor (22)
Labor, Hand
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harves t:
Custom - Mow, bale, & haul
$
bale
.1
.12
1
3.67
.35
1155
Total Variable Costs
$ 40.25
$ 47.88
3. Income Above Variable Costs
4. Fixed Costs:
Tractor (22)
Land Charge (Rent)
$ 92.12
h r.
ac.
1.33
32.17
.1
L
Total Fixed Costs
$
.13
32.17
$ 32.30
5. Total Costs
$ 80.18
6. Net Returns
$ 59.82
7. Government Payments
8. Net Return Including Government Payment
■-
■P g _ g J - p P g P.
by
. E x t e n s i o n-
,
. . . . . T_A E. S,,
Economists-Management,
TA M U .
$ 59.82
.....,.
^^
New
1972
ui congress oi May 8, 1914, as amended, and June 30, 1914.
AECO 6
05005211
ALFALFA, DRYLAND, ROLLING PLAINS I
Estimated Costs, And Requirements Per Acre Of Alfalfa, High Level Management
Operation
Fertilize
^
Labor
Fuel,
Oil,
Item _-. _ Times u Tractor or T . 0«^ Fixed costs
Date ^e*s Hours ^ Hrg# Lub., Rep. Per Acre
(1)
Per
Acre
22
Apr
1
.12
.10
$
-
$
-
/ - ^ k
(i) Labor hours calculate' a_ 1.25 ti tes v:tor hours except where noted by *
Developed by Extension lconomists-Minagement, TAES, ta.v .
Cooperative Extension Work in Agriculture and Home Econoroi. ?s A&M University and the United States Department
of Agriculture coopciating. Distributed in furtherancr of the Ari_ >f Congress of May 8. 1914, as amended, and June SO. 1914.
AECO 6
05006222
ALFALFA ESTABLISHMENT. DRYLAND. ROLLING PLAINS I_
Estimated Costs And Returns Per Acre Of Alfalfa
Establishment, Typical Management
(
^
Item
Unit
Price or
Cost/Unit
Quantity
Value or
Cost
1. No Income
2. Variable Costs:
Pre-Harvest:
Seed
Fertilizer
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor & Machinery
Interest on Op. Cap.
lb.
ac.
ac.
h r.
h r.
h r.
$
$
.40
3.02
.45
1.37
1.24
2.00
.08
20
1
1
$ 8.00
3.02
.45
1.03
.72
2.70
.64
.75
.58
1.35
7.96
Total Variable Costs
$ 16.56
3. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
ac.
h r.
h r.
.92
1.82
1.33
1
$
.75
.58
Total Fixed Costs
^
\
$ 3.05
4 . To t a l C o s t s
$ 19.61
5. Less landlord's shrre of fert.
ac
1.01
1
$ -1.01
6 . To t a l C o s t
Oeveloped
by
.92
1.36
.77
$ 18.60
Extension
Economists-Management,
TA E S ,
■
t>m.
New
i972
AECO 6
05006221
ALFALFA ESTABLISHMENT. DRYLAND, ROLLING PLAINS I_
Estimated Costs, And Requirements Per Acre Of
Alfalfa Establishment, Typical Management
Labor
Fuel,
Oil,
_.
_
*
a
I
t
e
m
n
a
«
.
0
T
i
m
e
s
„
_
„
_
_
T
r
a
c
t
o
r
o
r
T
,
R
p
_
F
i
x
e
d
O p e r a t i o n N D a t e Q H o u r s ^ h H L u b . , R e p . P e r A cc or se t s
Per Acre
(1)
Chisel
1,7
July
1
.31
.50
.21
$ .28
Tandem Disc
2,6
Aug-Sep
1
.37
.30
.15
.30
Fertilize
2
Sep-Oct
1
.35
.28
Drill
1,16
Sep-Oct
1
.32
.25
.09
.34
1.35
1.33
$ .45
$ .92
Total
/^%
(1) Labor hours calculated at 1.25 times factor hours except where noted by *
Developed sy Extension Economists-Management, TAES, TAMl.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO. 1914.
AECO 6
05005222
ALFALFA, DRYLAND, ROLLING PLAINS I
/ " ^
Estimated Costs And Returns Per Acre Of Alfalfa, Typical Management
Item
1. Gross receipts, from production:
Hay
Unit
Price or
Cost/Unit
ton
$ 40.00
ac.
ac.
ac.
h r.
ac.
3.10
1.50
1.24
2.00
2.00
.08
Quantity
Value or
Cost
2.5
$100.00
1
1
$
2. Variable Costs:
Pre-Harves t:
1/6 Establishment cost
Fertilizer (0-20-0)
Tractor (2)
Labor, Tractor & Machinery
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Custom - Mow, bale & haul
$
.10
.12
1
3.48
$
bale
.35
2
$ 28.70
Total Variable Costs
$ 35.94
3. Income Above Variable Costs
4. Fixed Costs:
Tractor
(2)
Land
Charge
(Rent)
^
3.10
1.50
.12
.24
2.00
.28
7.24
$ 64.06
ac.
ac.
Total Fixed Costs
1.33
23.03
1
.10
$
.13
23.03
$ 23.16
5 . To t a l C o s t s
$ 59.10
6. Net Returns
$ 40.90
7. Government Payments
8. Net Returns Including Government Payment
^
$ 40.90
v
P_e__?J_oped_by Extension Economists-Management, TAES, TAMU.
New, 1972
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30. 1914.
AF.rn a
05005221
ALFALFA, DRYLAND, ROLLING PLAINS I_
Estimated Costs, And Requirements Per Acre Of Alfalfa, Tvp-irai Mflnag0m0nf
Labor
Fuel,
Oil,
^^
,O. p
, .e_r*a. t. i_o_n. . N
I *o* # I tDeamt e n ?
_
^
0
T
i
m
e
s
H
r
.
.
.
o
T
r
a
c
t
o
r
o
r
T
_
.
D
q
t
%
F
i
x
e
d
c
o
s
t
s
/
Qver Hours ljlAdhm Bxam Lub., Rep. Per Acre
(1)
Fertilize
2
Apr
1
.12
Per
'
.10
Acre
$
-
$
-
(1) Labor hours calculated at 1.25 times ractor hours except where noted by *
Oevelopeo by Extension Economists-Management, TAES, TAMU
o fAgriculture
of
X k u U u r ^cooperating.
^ H ° m C Distributed
E c o n o m yin. furtherance
" ' , x a s Aof
& the
M Acts
U n i rv Congress
e r s i t y aofnMay
d t h8.e1914.
U n ias
t eamended,
d S t a t eand
s DJune
e p a30.
rtm
1914.
ent
AECO fi
COASTAL BERMUDAGRASS ESTABLISHMENT, IRRIGATED, ROLLING PLAINS I
05058112
Estimated Costs And Returns Per Acre Of Coastal
Bermudagrass Establishment, High Level Management
Item
Unit
Price or
Cost/Unit
ac.
ac.
ac.
ac
h r.
h r.
h r.
h r.
ac.
$
$ 20.00
3.02
5.50
.29
1.58
1.24
2.00
2.00
2.41
.08
Quantity
Value or
Cost
1. No Income
2. Variable Costs:
Pre-Harvest:
Sprigging (custom)
Fertilizer (16-20-0)
Herbicide
Machinery
Tr a c t o r. ( 2 1 )
Tractor (22)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinery
Interest on Op. Cap.
1
1
1
1
.44
.35
.79
2
1
18.96
Total Variable Costs
3. Fixed Costs:
Machinery
Tractor (21)
Tractor (22)
Irrigation
$ 39.45
ac.
h r.
h r.
ac.
.62
2.07
1.33
3.68
1
.44
*.35
4
1
Total Fixed Costs
$
.62
.92
.46
3.68
$ 5.68
4. Total Costs
5. Less Landlord's share of fert,
$ 20.00
3.02
5.50
.29
.70
.43
1.58
4.00
2.41
1.52
$ 45.13
ac.
6 . To t a l C o s t
1.01
1
$ -1.01
$ 44.12
J^N
Developed by Extension Economists-Management, TAES, TAMU.
New, 1972
<:«H.pera.ivc Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Apiculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30. 1914
A _.-_"•_-_ R
05058111
COASTAL BERMUDAGRASS ESTABLISHMENT, IRRIGATED. ROLLING PLAINS _I
Estimated Costs, And Requirements Per Acre Of Coastal
Bermudagrass Establishment, High Level Management
Labor
Fuel,
Oil,
__,,
Item na#.0 Times nrtlI-.0 Tractor or T . p„ Fixed costs
Operation
No. Date Over H<^8 Mach. Hrs. L«b.,Rep. Per A c r e
(1)
Per
Acre
Chisel
Jan
1
.25
.20
$ . 11
$ .07
Offset Disc
Feb
1
.19
.15
.10
.21
Fertilize
Apr
1
.35
.20
.08
.34
.79
.55
$ .29
$ .62
2.00
6.50
$ 2.41
$ 3.68
Total
Irrigation
47-51 Apr-Jun 2
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
^
Oevelopeo by Extension Economists-Management. TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO. 1914.
AECO 6
05057112
COASTAL BERMUDAGRASS, IRRIGATED, ROLLING PLAINS I_
Estimated Costs And Returns Per Acre Of Coastal
Bermudagrass, High Level Management
Item
Unit
1. Gross receipts, from production:
Hay
Price or
Cost/Unit
Quantity
Value or
Cost
ton
$ 25.00
10
$250.00
ac.
ac.
ac.
hr.
hr.
h r.
ac.
ac.
4.40
42.64
1
1
1
$ 4.40
42.64
2. Variable Costs:
Pre-Harvest:
Establishing Cost, $44, 10 yrs.
F e r t i l i z e r ( 4 11 - 4 8 - 1 )
Machinery
Tractor (23)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinery
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Custom Operations:
Mow,
bale,
haul
$
bale
.62
1.24
2.00
2.00
7.23
2.00
.08
.35
1
6
1
1
35. 76
334
2.00
12.00
7.23
2.00
2.86
$ 74.37
$116.90
Total Variable Costs
$191.27
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor
(23)
Irrigation
Land
Charge
(Rent)
.62
.62
• 50
$ 58.73
ac.
hr.
ac
ac
Total Fixed Costs
5. Total Costs
6. Net Returns
.66
1.33
11.04
29.85
.50
$
.66
.67
11.04
29.85
$ 42.22
$233.49
$ 16.51
7. Government Payments
8. Net Returns Including Government Payment
Developeo by Extension Economists-Management, TAES, TAMU.
M: ^X^^^
$ 16.51
New, 1972
AECO 6
COASTAL BERMUDAGRASS, IRRIGATED, ROLLING PLAINS I
Estimated Costs, And Requirements Per Acre Of
Coastal Bermudagrass, High Level Management
Operation
05057111
Labor
Fuel,
Oil,
_,
Item nat-** Times HntirQ Tractor or T , Dort Fixed costs
No. Date Over H°?" Mach. Hrs. L«b.,Rep. Per Acre
(1)
Per
Acre
Fertilizer
32
Irrigation
47-51 Apr-Aug 6
Apr-Aug 5 1.00*
6.00
.50
$ .62
$ .66
19.50
$ 7.23
$11.04
^
\
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
■~*X
Developed by Extension Economists-Management, TAES, TAMU
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, anT June SO^H
AECO 6
05058122
COASTAL BERMUDAGRASS ESTABLISHMENT. IRRIGATED, ROLLING PLAINS I
Estimated Costs And Returns Per Acre Of Coastal
Bermudagrass Establishment, Typical Management
jf^
Item
Unit
Price or
Cost/Unit
ac.
ac.
ac.
ac.
h r.
h r.
h r.
h r.
h r.
$
$ 20.00
3.02
5.50
.36
1.37
1.24
2.00
2.00
2.41
.08
Quantity
Value or
Cost
1
1
1
1
.31
.72
1
2
1
18.30
$ 20.00
3.02
5.50
.36
.42
.89
2.00
2.00
2.41
1.46
1. No Income
2. Variable Costs:
Pre-Harvest:
Sprigging (custom)
Fertilizer (16-20-0)
Herbicide
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor & Machinery
L a b o r, I r r i g a t i o n
Irrigation Machinery
Interest on Op. Cap.
Total Variable Costs
jf*^
3. Fixed Costs:
Tractor (1)
Tractor (2)
Irrigation
$ 38.06
h r,
h r,
ac.
Total Fixed Costs
4. Total Costs
5. Less landlord's share of fertilizer
6 . To t a l C o s t
ife_^g|.OP.Eo by Extension Economists-Management. TAES, TAMU.
1.82
1.33
3.68
.31
.72
$
.56
.96
3.68
$ 5.20
$ 43.26
$ -1.01
$ 42.25
New, 1972
AECO 6
05058121
COASTAL BERMUDAGRASS ESTABLISHMENT. IRRIGATED. ROLLING PLAINS I_
Estimated Costs, And Requirements Per Acre Of Coastal
Bermudagrass Establishment, Typical Management
Labor
Fuel,
Oil,
_^
Times «_„__ Tractor or T , DaT> Fixed costs
Item
Date
Operation
Over Ho"" Mach. Hrs. L"b'»A ReP • Per Acre
No.
(1)
Per
Acre
Chisel
1,7
Jan
1
.31
.50
$ .21
$ .28
Tandem Disc
2,6
Feb
1
.37
.30
.15
.30
Fertilize
2
Apr
1
.35
.28
1.03
1.08
$ .36
$ .58
2.00
6.50
$ 2.41
$ 3.68
Total
Irrigation
47,51 Apr-Jun 2
^
\
^
\
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
Developed by Extension Economists-Management, TAES, TAMU.
e^AoV£Z~l™i0n
WOfkn!nDistributed
2Fk2tlu^1Bd
Home EconomicsT*™
A&M University
and as
theamended,
United States
Department
of
Agriculture cooperating.
in furtherance
of the Acts of
Congress
of May 8. 1914.
and June
30. 1914.
AECO 6
05057122
COASTAL BERMUDAGRASS, IRRIGATED, ROLLING PLAINS I_
Estimated Costs And Returns Per Acre Of Coastal
Bermudagrass, Typical Management
J ^
Item
Unit
1, Gross receipts, from production:
Hay
Price or
Cost/Unit
ton
$ 25.00
ac.
ac
ac
hr.
h r.
hr.
ac.
ac
$
4.20
23.49
.49
1.24
2.00
2.00
4.82
2.00
.08
Quantity
Value or
Cost
$175.00
2, Variable Costs:
Pre-Harvest:
Establishing Cost $42, 10 yrs.
Fertilizer
( 2 11 - 4 6 - 0 )
Machinery
Tractor
(2)
L a b o r, Tr a c t o r & M a c h i n e r y
Labor,
Irrigation
Irrigation
Machinery
Pickup
Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Custom Operations:
Mow,
bale,
haul
bale
.35
1
1
1
$ 4.20
23.49
.40
.80
4
1
1
22.65
231
1.60
8.00
4.82
2.00
1.81
$ 46.91
$
Total Variable Costs
80 .85
$127 .76
3, Xncome Above Variable Costs
4, Fixed Costs:
Machinery
Tractor
(2)
Irrigation
Land Charge (Cash Rent)
.49
.50
ac
hr.
ac
ac
Total Fixed Costs
.53
1.33
7.36
23.32
$
47,.24
$
.53
.53
7..36
23,.32
$
31.,74
.40
5, Total Costs
$159.,50
6, Net Returns
$
15.,50
7, Government Payments
8, Net Return Including Government Payment
Developed by Extension Eoonomists-Management, TAES, tamu.
$ 15.50
New, 1972
<..H-peratiYc Extension Work in Agriculture and Home Economics. Texas A&M University and the United States DcDartme~7f
AK.iru.tuvc roopc,a„„g. Distributed in furtherance of the Acts of Congress of May 8.'1914. as amendedL and Ju!.c 30.1914
AECO 6
05057121
COASTAL BERMUDAGRASS, IRRIGATED, ROLLING PLAINS I
Estimated Costs, And Requirements Per Acre Of
Coastal Bermudagrass, Typical Management
Labor
Fuel,
Oil,
„.
3
^^k
tO\ p *e4r ~a t Ii toenm Nno-#* - _
_
T
i
m
e
s
«
«
„
„
T
r
a
c
t
o
r
o
r
T
.
D
a
f
,
F
i
x
e
d
c
o
s
t
D a t e Q v e r H o u r s ^ ^ H r g # L u b . , R e p . P e r A c rse 1'
(1)
Per
Acre
Fertilize
2
Apr-Aug
4
Irrigation
47-51 Apr-Aug
.80*
4
4.00
.40
13.00
$
$
.49
$
.53
4.82
$
7.36
(1) Labor hours calculated at 1.25 times tractor hours except where noted by
^
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June 30, 1914.
AECO 6
\
05075212
COTTON, DRYLAND, ROLLING PLAINS I
Estimated Costs And Returns Per Acre Of Cotton, High Level Management
Item
Unit
1. Gross receipts, from production: _/
Lint
lb.
Seed
ton
Price
or
~
.
Va l u e
or
Cost/Unit ^Uan X y Cost
$ .185
58.00
225
.27
To t a l
$ 41.62
15.66
$ 57.28
2. Variable Costs:
Pre-Harvest:
Seed
Fertilizer (33-0-0)
Machinery
Tractor (21)
Tractor (22)
Tractor (23)
Labor, Tractor & Machinery
Labor, Hand (hoe)
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
lb.
ac.
ac.
h r.
h r.
h r.
h r.
h r.
ac
$
$ .195
3.13
1.64
1.58
1.24
.67
2.00
1.50
2.00
.08
Harvest:
Labor
Tractor (2)
Hauling, ginning B/T
Subtotal, Harvest
h r.
h r.
bale
2.00
1.24
20.30
15
1
1
1.19
.72
.12
2.52
1
1
9.54
.50
.25
.45
Total Variable Costs
1.00
.31
9.13
$ 10.44
$
$ 30.28
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (21)
Tractor (22)
Tractor (23)
Land Charge (Rent)
$ 2.92
3.13
1.64
1.88
.89
.08
5.04
1.50
2.00
.76
$ 19.84
$ 27.00
ac.
h r.
h r.
h r.
ac.
2.31
2.09
1.33
.65
11.25
Total Fixed Costs
5 . To t a l C o s t s
6. Net Returns
7. Government Payments, less rent (.15/lb. x 225 lbs.)2/
8, Net Return Including Government Payment
1
1.19
.97
.12
1
$
2.31
2.49
1.29
.08
11.25
$ 17.42
$ 47.70
$ 9.58
$ 25.31
$ 34.89
JL/ 450 pounds on acre of cotton.
2/ Based on planted acres. No allowance is made for set-aside acreage of 20%.
O g v g L O P E O b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United Stales .Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, a.Pamended^ and JuncTim
AECO 6
05075211
COTTON, DRYLAND, ROLLING PLAINS I
Estimated Costs, And Requirements Per Acre Of Cotton, High Level Management
Labor
m
Fuel,
Oil,
/**\
Item t. fc Times u „ Tractor or T . PoT1 Fixed costs ^
Operation ^ Date Qver Hours m^. Hr8- Lub., Rep. Per Acre ;
(1)
Per
Acre
Shred
23,32
Nov-Dec
1
.12
.10
.07
Offset Disc
21,27
Nov-Dec
1
.19
.15
.10
.21
Moldboard
21,29
Dec-Jan
.3
.29
.23
.16
.33
Chisel
21,28
Dec-Jan
.7
.17
.14
.07
.10
Fertilize
22
Mar
.35
.28
Tandem Disc
21,26
Mar
.10
.08
.09
.05
Ust
21,24
Mar-Apr
1
.27
.22
.31
.38
Plant
21,24
May-Jun
1.2
.27
.22
.31
.38
Sandfight
23,39
May-Jun
1
.02
.02
.01
Rolling Cult.
21,30
Jun
1
.19
.15
.14
.18
Cultivate
22,25
Jun-Aug
2
.55
.44
.38
.51
2.52
2.03
Total
Harvest
Strip
22,36
1
.3
Nov-Dec
1
.50
$
.25
1.64
$
.46
$
.
.16
.01
$
2.31
$
.79
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
Developed
Extension
Economists-Management.
TAES, TAMU.
- — r — by
——
—
w.
'
^
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
pf Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO. 1914.
AECO 6
05075222
COTTON, DRYLAND, ROLLING PLAINS I
f^
Estimated Costs And Returns Per Acre Of Cotton, Typical Management
Item
Unit
or
" " " " ^ . .Price
"t.
Cost/Unit
1. Gross receipts, from production: 1/
Lint
lb.
Seed
ton
$ .185
58.00
Quantity
Value or
Cost
175
$ 32.37
12.18
.21
To t a l
$ 44.55
2. Variable Costs:
Pre-Harvest:
Seed
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Labor, Tractor & Machinery
Labor, Hand
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
lb,
ac,
h r.
h r.
h r.
h r.
h r.
ac
$
Harvest:
Labor
Machinery
Tractor (2)
Ginning, B/T
Subtotal, Harvest
h r.
ac
h r.
bale
.15
1.33
1.37
1.24
.67
2.00
1.50
2.00
.08
2.00
.33
1.24
20.30
15
1
1.69
.60
.35
3.27
2.00
1
9.21
.75
1
$
$
1.50
.33
.31
7.10
9.24
$ 28.39
3, Income Above Variable Costs
$ 16.16
ac.
h r.
h r.
h r.
ac.
2.69
1.82
1.33
.65
9.36
Total Fixed Costs
5. Total Costs
6. Net Returns
7. Government Payments, Less Rent (.15/It. x 175 lbs.)2/
JP*\
2.25
1.33
2.32
.74
.23
6.54
3.00
2.00
.74
$ 19.15
.25
.35
Total Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Land Charge (Rent)
$
8. Net Return Including Government Payment
1
1.69
.85
.35
1
$ 2.69
3.08
1.13
.23
9.36
$ 16.49
$ 44.88
$
(.33)
$ 19.69
$ 19.36
1/ 350 pounds on acre of cotton.
2/ Based on planted acres. No allowance is made for set-aside acreage of 20%
Oeveloped
by
Extension
Economists-Management,
TA E S ,
TA M U .
„
*
Cooperative Extension Work in Agriculture and Home Fconomirc TVv_c a_.„* n ■ ~. 7~;—^7~.—. New, lb>/Z
AECO 6
05075221
COTTON, DRYLAND, ROLLING PLAINS I_
Estimated Costs, And Requirements Per Acre Of Cotton, Typical Management
Labor
Fuel,
Oil,
_,_
. . _ . , I t e m - , . „ T i m e s u « . , - . _ , T r a c t o r o r T. « „ F i x e d c o s t s
Operation No# Date 0yer Hours j,^. Hr8. Lub., Rep. Per Acre
(1)
Per
Acre
Shred
3,9
Nov-Dec
1
.41
.33
$ .06
$ .13
Tandem Disc
2,6
Dec-Jan
1
.37
.30
.15
.30
Moldboard
1,8
Dec-Jan
3
.17
.14
.07
.14
Chisel
1,7
Dec-Jan
7
.37
.30
.13
.17
Tandem Disc
2,6
Mar
•3
.12
.10
.05
.10
List
1,4
Mar-Apr
1
.31
.25
.23
.33
Plant
1,4
May-Jun
1
.31
.25
.23
.33
Sandfight
3,18
May-Jun
1
.02
.02
.01
.01
Knife
2,19
Jun
1
.25
.20
.08
.17
Cultivate
1,5
Jun-Aug
3
.94
.75
.32
.45
3.27
2.64
$ 1.33
$ 2.13
Harvest Strip 2,15 Nov-Dec 1 .75
.25
$ .33
$ .56
To t a l
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30. 1914.
AECO 6
^S
05090212
FORAGE SORGHUM SILAGE, DRYLAND, ROLLING PLAINS I_
Estimated Costs And Returns Per Acre Of
Forage Sorghum Silage, High Level Management
Unit
Item
1. Gross receipts, from production:
Silage, 15 tons green weight25%
shrink
ton
Price or
Cost/Unit
Quantity
Value or
Cost
$ 8.00
11.25
$ 90.00
$
10
1
1
$
2. Variable Costs:
Pre-Harvest:
Seed
Fertilizer (60-0-0)
Machinery
Tractor (21)
Tractor (22)
Tractor (23)
Labor, Tractor & MachineryPickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Chop, haul, pack
lb.
ac.
ac.
hr.
h r.
h r.
h r.
ac.
.21
5.70
1.64
1.58
1.24
.72
.12
.89
.08
2.52
5.04
2.00
.77
$ 20.10
.67
2.00
2.00
.08
$
ton
1.19
2.10
5.70
1.64
1.88
3.00
1
9.67
15
$ 45.00
Total Variable Costs
$ 65.10
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (21)
Tractor (22)
Tractor (23)
Land Charge (Rent)
$ 24.90
ac.
hr.
hr.
hr.
ac.
2.31
2.09
1.33
1
.65
12.97
$
1.19
1
Total Fixed Costs
.72
.12
2.31
2.49
.96
.08
12.97
$ 18.81
5. Total Costs
$ 83.91
6. Net Returns
$
6.09
7. Government Payments
8. Net Return Including Government Payment
$ 6.09
j ^ \
Oeveloped by Extension Economists-Management, TAES, TAMU.
.
u
.
,„
,
.---
~New.
1972
(...operative Extension Work ,n Agriculture and Home Economics. Texas A&M University and the United States DepartmlnTol
Agriculture cooperating. Distributed ,n furtherance of the Ams of Congress oi May 8, 1914, as amended, and June 30. 1914.
AECO 6
FORAGE SORGHUM SILAGE, DRYLAND, ROLLING PLAINS I_
Operation
05090211
Estimated Costs, And Requirements Per Acre Of
Forage Sorghum Silage, High Level Management
Labor
Fuel,
Oil,
__
I t e m nDa a# t.e- T
, .™
„ - - MTar cahc.t oH
r r so .r LTu b. . ,~B e^p . F iPxeerd Accor e
sts
Oi vmeer s H«° u
No.
(1)
Per
Acre
Shred
23,32
Dec
1
.12
.10
$ .07
$ .16
Offset Disc
21,27
Jan
1
.19
.15
.10
.21
Moldboard
21,29
Jan-Feb .3 .29
.23
.16
.33
Chisel
21,28
Jan-Feb .7 .17
.14
.07
.10
Fertilize
22
Mar-Apr 1 .35
.28
Tandem Disc
21,26
Mar-Apr .3 .10
.08
.09
.05
List
21,24
Mar-Apr 1 .27
.22
.31
.38
Plant
21,24
May
.27
.22
.31
.38
Sandfight
23,39
May-Jun 1 .02
.02
.01
.01
Rolling Cult.
21,30
May-Jun 1 .19
.15
.14
.18
Cultivate
22,25
Jun-Aug 2 .55
.44
.38
.51
2.52
2.03
$ 1.64
$ 2.31
To t a l
1.2
^
\
^
\
(1) Labor hours calculated at 1.25 times • actor hourr, except where noted by *
Developed by Extension Economists-Management, TAES, ta;-.'.
Cooperative Extension Work in Agriculture and Home Economics, exas A&M University and the United States Department
o? Agriculture cooperating. Distributed in furtherance of the Act- o Congress of May 8. 1914. as amended, and June 80. 1914.
AECO 6
05090222
FORAGE SORGHUM SILAGE, DRYLAND, ROLLING PLAINS I_
Estimated Costs And Returns Per Acre Of
Forage Sorghum Silage, Typical Management
Item
Unit
1. Gross receipts, from production:
Silage, 10 tons green weight,
25%
shrink
ton
Price or
Cost/Unit
$ 8.00
Quantity
Va l u e o r
Cost
7.5
$ 60.00
10
1
1
1.44
.88
.35
3.30
1
9.53
$ 2.10
3.80
1.27
1.97
1.09
.23
6.60
2.00
.76
2. Variable Costs:
Pre-Harvest:
Seed
Fertilizer (40-0-0)
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Labor, Tractor & Machinery
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
lb.
ac.
ac.
h r.
h r.
h r.
h r.
ac.
$
$
.21
3.80
1.27
1.37
1.24
.67
2.00
2.00
.08
$ 19.82
Harvest:
Chop,
haul,
pack
ton
3.00
0
Total Variable Costs
$ 49.82
3. Income Above Variable Costs
Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Land Charge (Rent)
$ 30.00
$ 10.18
ac.
h r.
h r.
h r.
a<-.
Total ^ixed Costs
2.04
1.82
1.33
.65
8.65
1
1.44
.88
.35
1
$
2.04
2.62
1.17
.23
8.65
$ 14.71
5 . To t a l C o s t s
$ 64.53
6. Net Returns
$ (4.53)
7. Government Payments
8. Net Return Including Government Pavmer
$ (4.53)
Developeo by Extension Economists-Management, TAES, Ta: 1U.
New, 1972
Cooperative Extension Work in Agriculture and Home Econon :< Texas A&M Unvcrsiiv and the United States Department cf
AkmiiiIiiii-c ioopnating. Distributed in furtherance of the A- - . Congress ol May 8. 1914. as amended, and June 30. H>14.
AECO 6
FORAGE SORGHUM SILAGE, DRYLAND, ROLLING PLAINS I_
05090221
Estimated Costs, And Requirements Per Acre Of
Forage Sorghum Silage, Typical Management
Labor
Fuel, Oil,
r. - « . « I i m e 6 » « . , - . _ _ i r a c c o r o r T . D „ n x e a c u s i
No. Date Over Ho^s Mach. Hrs. L«b.,Rep. Per Acre
(1)
Per
Acre
Operation
Shred
3,9
Dec
1
.41
.33
$ .06
$ .13
Tandem Disc
2,6
Jan
1
.37
.30
.15
.30
Moldboard
1,8
Jan-Feb .3 .3 7
.14
.07
.14
Chisel
1,7
Jan-Feb .7 .37
.30
.13
.17
Fertilize
2
Mar-Apr 1 .35
.28
Tandem Disc
2,6
Mar-Apr .3 .12
.10
.05
.10
List
M
Mar-Apr 1 .31
.25
.23
.33
Plant
1,4
May
.31
.25
.23
.33
Sandfight
3,18
May-Jun 1 .02
.02
.01
.01
Knife
2,19
May-Jun 1 .25
.20
.08
.17
Cultivate
1,5
Jun-Aug 2 .62
.50
.26
.36
3.30
2.67
$ 1.27
$ 2.04
To t a l
1.2
(1) Labor hours calculated at 1.25 times tractor hours except where noted by
^
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO. 1914.
AECO 6
\
05110212
GUAR, DRYLAND, ROLLING PLAINS I_
Estimated Costs And Returns Per Acre Of Guar, High Level Management
Unit
Price or
Cost/Unit
cwt.
$ 5.00
Pre-Harvest:
Seed
Machinery
Tractor (21)
Tractor (22)
Tractor (23)
Labor, Tractor & Machinery
Labor, Hand (hoe)
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
lb.
ac.
h r.
h r.
h r.
h r.
h r.
ac.
$
$
Harvest:
Combine
Hauling
Subtotal, Harvest
ac.
cwt,
Item
1. Gross receipts, from production:
Guar Beans
Quantity
10
Value or
Cost
$ 50.00
2. Variable Costs:
.09
1.50
1.58
1.24
.67
2.00
1.50
2.00
.08
4.00
.10
5
1
1.11
.44
.04
1.96
1
1
5.85
1
10
Total Variable Costs
$
.45
1.50
1.75
.55
.03
3.92
1.50
2.00
.47
$ 12.17
$ 4.00
1.00
$ 5.00
$ 17.17
3. Income Above Variable Costs
$ 32.85
4. Fixed Costs:
Machinery
Tractor (21)
Tractor (22)
Tractor (23)
Land Charge (Rent)
ac.
h r.
h r.
h r.
h r.
Total Fixed Costs
1.97
2.09
1.33
.65
14.85
1
1.11
.44
.04
1
$ 1.97
2.32
.58
.03
14.85
$ 19.75
5. Total Costs
$ 36.92
6. Net Returns
$ 13.08
7. Government Payments
8. Net Return Including Government Payment
■P - e - - g . l . p P g _ L ! - J L _ E x T E N s i O N
Economists-Management,
scssr "".r^^^
TA E S ,
TA M U .
$ 13.08
New, 1972
AECO
6
05110211
GUAR, DRYLAND, ROLLING PLAINS I
Estimated Costs, And Requirements Per Acre Of Guar, High Level Management
Labor _ . Fuel, Oil, F±xed costs
Operation
**~
Moldboard
21,29
Chisel
21,28
Ta n d e m
Disc
List
21,24
Rolling
S a n d fi g h t
Plant
Rolling
Cultivate
To t a l
«.
«T
Hours
Dec
.3
1.4
Mar
Mar-Apr
Cult.
21,30
23,39
1
1.1
21,30
Jun
22,36
Jul
1.96
1.59
.19
1
.22
.19
.27
1.50
$
.20
.09
.05
.38
.18
.02
.02
.31
.38
.14
.19
$
~
.33
.14
.14
.15
.22
«™
.31
.15
.04
.27
$
.08
.22
.04
1
.16
.28
.10
.27
2
Jun
$
.34
1
Apr
Lub.^Rep.
.23
.3
May
21,24
Cult.
.29
Jan-Feb
21,26
*™?<£
.18
.25
1.97
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *..
^
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June SO, 1914.
AECO 6
05110222
GUAR, DRYLAND, ROLLING PLAINS I
Estimated Costs And Returns Per Acre Of Guar, Typical Management
Item
1. Gross receipts, from production:
Guar Beans
Unit
Price or
Cost/Unit
cwt,
$ 5.00
lb.
ac.
h r.
h r.
h r.
h r.
h r.
ac.
$
$
Quantity
Value or
Cost
$ 30.00
2. Variable Costs:
Pre-Harvest:
Seed
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Labor, Tractor & Machinery
Labor, Hand
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
j
^
\
Harvest:
Materials:
Combine
Hauling
Subtotal, Harvest
ac.
cwt,
.09
1.09
1.37
1.24
.67
2.00
1.50
2.00
.08
8
1
1.49
.50
.04
2.5
2
1
7.25
4.00
.10
.72
1.09
2.04
.62
.03
5.00
3.00
2.00
.58
$ 15.08
$ 4.00
.60
$ 4.60
Total Variable Costs
$ 19.68
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Land Charge (Rent)
$
$ 10.32
ac.
h r.
h r.
h r.
ac.
Total Fixed Costs
1.75
1.82
1.33
.65
8.48
1
1.49
.50
.04
1
$
1.75
2.71
.67
.03
8.48
$ 13.64
5. Total Costs
$ 33.32
6. Net Returns
$ (3.32)
7. Government Payments
8. Net Return Including Government Payment
Developed by Extension Economists-Management, TAES, TAMU.
$ (3.32)
New, 1972
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8.'1914. as amended and Ju^"^ 19.4
AECO 6
05110221
GUAR, DRYLAND, ROLLING PLAINS I_
Estimated Costs, And Requirements Per Acre Of Guar, Typical Management
Operation
Labor
Fuel,
Oil,
I t e m r. _ « - _ _ Ti m e s u ~ , . - . _ Tr a c t o r o r T . - „ F i x e d c o s t s
No. Date Over H°!f*s Mach. Hrs. Lub., Rep. Per Acre
(1)
Per
Acre
Moldboard
1,8
Dec
.3
.17
.14
$ .03
$ .14
Chisel
1,7
Jan-•Feb 1.4
.74
.60
.26
.34
Tandem Disc
2,6
Mar
.12
.10
.05
.10
List
1,4
Mar-•Apr 1
.31
.25
.23
.33
Sandfight
3,18
May
2
.04
.04
.02
.02
Knife
2,19
Apr
1
.25
.20
.08
.17
Plant
1,4
Jun
1.1
.31
.25
.23
.33
Knife
2,19
Jun
1
.25
.20
.08
.17
Cultivate
1,5
Jul
1
.31
.25
.11
.15
2.50
2.03
$ 1.09
$ 1.75
To t a l
.3
^ * \
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
■^ \
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and J^ne^WM.
AECO 6
06225212
WHEAT, DRYLAND, ROLLING PLAINS I_
Estimated Costs And Returns Per Acre Of Wheat, High Level Management
Item
1.
Gross receipts, from production:
Wheat
Grazing
Unit
Price or
Cost/Unit
bu.
AUM
$ 1.18
8.00
Quantity
30
.6
To t a l
2.
Value or
Cost
$ 35.40
4.80
$ 40.20
Variable Costs:
Pre-Harvest:
Seed
Fertilizer (49-20-0)
Machinery
Tractor (21)
Tractor (22)
Labor, Tractor & Machinery
Crop Insurance
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Custom Operations:
Combine
Hauling
Subtotal, Harvest
bu.
ac.
ac.
hr.
h r.
h r.
ac.
ac.
$
$ 2.50
6.15
.41
1.58
1.24
2.00
2.00
2.00
.08
1
1
.75
$
1.87
6.15
.41
.88
.48
1.7
1
1
1.39
.60
3.40
2.00
2.00
8.91
.71
$ 18.53
ac.
bu.
3.00
.05
1
30
$
$
3.00
1.50
4.50
Total Variable Costs
$ 23.03
3.
Income Above Variable Costs
$ 17.17
4.
Fixed Costs:
Machinery
Tractor (21)
Tractor (22)
Land Charge (Rent)
ac.
hr.
hr.
ac.
.62
2.09
1.33
9.75
$
.88
.48
.62
1.84
.64
9.75
Total Fixed Costs
$ 12.85
5.
Total Costs
$ 35.88
6.
Net Returns
$ 4.32
7.
Government Payments, Less Rent ($1.57/bu x 30 bu.)l/
$ 35.32
8.
Net Return Including Government Payment
$ 39.64
_L/ Based on planted acres. No allowance is made for set-aside acreage of 75%.
D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30. 1914.
AECO 6
05225211
WHEAT, DRYLAND, ROLLING PLAINS I
Estimated Costs, And Requirements Per Acre Of Wheat, High Level Management
Operation
Labor Fuel, Oil, ___.
I t e m n a f . 0 Ti m e s H n n r a Tr a c t o r o r T , R F i x e d c o s t s
No. Date Over H°?*8 Mach. Hrs. L«l>.,Rep. Per Acre
(1)
Per
Acre
Chisel
21,28
Jun-Aug
2
.50
.40
$ .22
.14
Sweep
21,28
Jul-Sep
1
.25
.20
.11
.14
Fertilize
21
Aug-Sep
1
.35
.28
Drill
22,31
Sep-Nov
1
.25
.20
.08
.34
Fertilize
22
Feb
1
.35
.28
1.70
1.36
$ .41
$ .62
Total
/ ^ \
^ * \
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
/**X
D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . ^
Cooperative Extension Work in Agriculture and Home Economics, Texas AfeM University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June SO, 1914.
AECO 6
05225222
WHEAT, DRYLAND, ROLLING PLAINS I
Estimated Costs And Returns Per Acre Of Wheat, Typical Management
Item
1.
Gross receipts, from production:
Wheat
Grazing
Unit
Price or
Cost/Unit
bu.
AUM
$
1.18
8.00
Quantity
20
.4
To t a l
Value or
Cost
$ 23.60
3.20
$ 26.80
2. Variable Costs:
Pre-Harvest:
Seed
Fertilizer (16-20-0)
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor & Machinery
Crop Insurance
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Custom Operations:
Combine
Hauling
Subtotal, Harvest
bu.
ac.
ac.
h r.
h r.
h r.
ac.
ac.
$
2.50
3.02
.42
1.37
1,24
2.00
2.00
2.00
.08
1
1
1
.75
.42
1.37
.28
.35
1.68
3.36
2.00
2.00
1
1
.57
7.19
$ 14.96
ac,
bu.
3.00
.05
1
20
$
$
Total Variable Costs
3.00
1.00
4.00
$ 18.96
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Land Charge (Rent)
$ 1.87
3.02
$
ac.
h r,
h r,
ac.
.92
1.82
1.33
6.53
Total Fixed Costs
7.84
.92
$
1.82
.37
.28
6.53
$
9.64
5 . To t a l C o s t s
$ 28.60
6. Net Returns
$ (1.80)
7. Government Payments, Less Rent ($1.57/bu. x 20 bu.)_L/
$ 23.55
8. Net Return Including Government Payment
$ 21.75
1/ Based on planted acres. No allowance is made for set-aside acreage of 75%.
O e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of
Agriculture cooperaung. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and ju!.e 30, 1914.
AECO 6
05225221
WHEAT, DRYLAND, ROLLING PLAINS I
Estimated Costs, And Requirements Per Acre Of Wheat, Typical Management
Labor
Operation
■S . "
«•
ST
";;;•
Fuel, Oil,
SSK-T
■* • *■
Fixed costs
'•*»«•
Oneway
1,17 Jun-Aug 1
.31
.25
$ .12
$ .30
Chisel or
Sweep
1,7
Jul-Sep
2
.62
.50
.21
.28
Fertilize
2
Aug-Sep
1
.35
.28
Drill
1,16
Sep-Nov
1
.40*
.25
.09
.34
1.28
$ .42
$ .92
To t a l
1.68
■ >
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
~ >
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
04075112
COTTON. IRRIGATED. HIGH PLAINS IV
Estimated Costs And Returns Per Acre Of Cotton, High Level Management
Item
Unit
1. Gross receipts, from production:
Lint
Cottonseed
To t a l
^
\
2. Variable Costs:
Pre-Harvest:
Custom Deep Break 1/
Seed
Fertiliser (60-40-0)
Herbicide
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Labor, Tractor & Machinery
Labor Irrigation
Irrigation Machinery
Crop Insurance
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Strip Machinery
Labor
Ginning
Subtotal, Harvest
lb.
ton
ac.
lb.
ac.
ac.
ac.
h r.
h r.
h r.
h r.
h r.
ac. in.
$100
mo.
ac.
h r.
bale
Price or
Cost/Unit
Quantity
$
.20
60.00
700
14.00
.2
27
1
1
1
1.5
.8
.1
3.1
.8
13
.9
4
.21
6.00
4.19
2.32
1.48
1.38
.63
2.00
2.00
.78
8.54
.085
1.82
2.00
21.50
$140.00
36.00
$176.00
.6
2.80
5.67
6.00
4.19
2.32
2.22
1.10
$
.06
6.20
1.60
10.14
7.69
1.42
$ 51.41
1
1
1.4
1.82
2.00
30.10
$ 33.92
$
Total Variable Costs
$ 85.33
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Irrigation
Land Charge
Value or
Cost
$ 90.67
ac.
h r.
h r.
h r.
ac. in.
ac.
9.41
1.72
1.19
.72
1.25
20.73
1
1.5
.8
.1
13
1
$
9.41
2.58
.95
.07
16.25
20.73
Total Fixed Costs
$ 49.99
5 . To t a l C o s t s
$135.32
6. Net Returns
$ 40.68
7. Government Payment ($.15/lb. x yield less rent)_2/
$ 78.75
8. Net Return Including Government Payment
$119.43
1/ Assumes deep breaking every five years.
2/ Based on planted acres. No allowance made for set-aside acreage of 20%.
Developed
by
Extension
Economists-Management,
TA E S ,
TA M U .
N
0M.,Krativc Extension Work in Agriculture and Home Economics. Texas A&M University and the Unit^ <..a,~ n* . ^^
Ag,.<u„u.e grating. Distributed in furtherance of the Act, of Congress of Ma7£ 19M. *2££fiZ jSTSl?
AECO 6
04075111
COTTON. IRRIGATED. HIGH PLAINS IV
Estimated Costs, And Requirements Per Acre Of Cotton, High Level Management
Labor
Fuel,
Oil,
.o»p- .e_r, -a. <
_
#
.
«
.
I
t
e
m
n
_
.
#
*
T
i
m
e
s
u
~
,
_
_
T
r
a
c
t
o
r
o
r
,
.
t i o n N o # D a t e Q v e r H o u r s ^ ^ H r 8 L u b . , R e Va
p . „ PFei xre dA cc ro es t s
(1)
Per
Acre
Shred
&
Disc
Moldboard
Ta n d e m
1,6
Disk
Apply & Inc.
Herbicide
List
&
2,5
S a n d fi g h t
Cultivate
To t a l
1,9
Apr
2
1
1
.30
.38
.38
.10
.19
.15
$
2.32
1.00*
.50
$
.62
.40
.21
.30
.12
.40
.20
.50
.47
2.46
Nov
.38
1
$
.40
.63
1.5
3.08
18,19
2
Jun
.33
.50
1.2
May-Jun
2,13
.41
.8
Mar
May
3,14
1
Jan-Feb
1,5,8
2,9
Dec
Feb
Fertilize
Plant
StriP
1,4,5
$
.28
.48
.62
.38
.62
.49
.78
.02
.02
.14
.18
$
3.52
1.82
$
5.89
Irrigation: (20
Preplant
Postplant
To t a l
Apr.
1
Jun-Aug
.25*
3
.82*
$
.57*
$10.14
3.12
7.02
$
5.00
11.25
$16.25
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 600 GPM feet well, sprinkler
irrigation, natural gas pumping unit, 4 acre-inches preplant and 3 acre-inches
at each postplant.
Developed by Extension Economist^Manacehent,, TAES, TAMU.
Sl^^n^W^"1!1
HbfMDistributed
Rjonowio,
TexasofA&M
the
United
States
Department
of
Agriculture cooperating.
in furtherance
the ActaUniversity
of Congress ofand
May 8.
1914.
as amended,
and June
SO. 1914.
AECO 6
/
04075122
COTTON. IRRIGATED, HIGH PLAINS IV
Estimated Costs And Returns Per Acre Of Cotton, Typical Management
Item
1.
2.
Gross receipts, from production:
Lint
Cottonseed
To t a l
Variable Costs:
Pre-Harvest:
Custom Deep Break 1/
Seed
Fertilizer (60-40-0)
Herbicide
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Labor, Tractor & Machinery
Labor Irrigation
Irrigation Machinery
Crop Insurance
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Strip Machinery
Labor
Ginning
Subtotal, Harvest
Unit
lb.
ton
ac.
lb.
ac.
ac.
ac.
h r.
h r.
h r.
h r.
h r.
ac. in.
$100
mo.
ac.
h r.
bale
Price or
Cost/Unit
Quantity
$
500
.20
60.00
14.00
.21
6.00
4.19
2.26
1.48
1.38
.63
2.00
2.00
.78
8.54
.085
1.82
2.00
21.50
.4
.14
27
1
1
1
1.7
.7
.3
3.3
.8
13
.6
4
1
1
1
Total Variable Costs
$100.00
24.00
$124.00
$
1.96
5.67
6.00
4.19
2.26
2.52
.97
.19
6.60
1.60
10.14
5.12
1.34
$ 48.56
1.82
2.00
21.50
$ 25.32
$
$ 73.88
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Irrigation
Land Charge
Value or
Cost
$ 50.12
ac.
h r.
h r.
h r.
ac. in.
ac.
9.39
1.72
1.19
.72
1.25
10.08
Total Fixed Costs
1
1.7
.7
.3
13
1
$ 9.39
2.92
.83
.22
16.25
10.08
$ 39.69
5 . To t a l C o s t s
$113.57
6. Net Returns to Management
$ 10.43
7. Government Payment ($.15/lb. x yield less rent)2/
$ 50.02
8. Net Return Including Government Payment
$ 60.45
1/ Assumes deep breaking every seven years.
2/ Based on planted acres. No allowance made for required set-aside acreage of 20%,
D e v e l o p e o b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . > * e w 1 9 7 ?
C-M.|M.raiivc Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agnrulmic cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30, 1914.
AECO 6
04075121
COTTON, IRRIGATED. HIGH PLAINS IV
Estimated Costs, And Requirements Per Acre Of Cotton, Typical Management
Operation
Labor
Fuel,
Oil,
I t e m n o t - . * Ti m e s u _ - , _ . - _ _ Tr a c t o r o r , . - . _ _ F i x e d c o s t s
No. Date Over H^8 Mach. Hrs. !**•.**• Per Acre
(1)
Per
Acre
Shred & Disc
1,4,5 Dec
Moldboard
1,6,15 Feb
Tandem Disk
1
.41
.33
$ .40
$ .62
.84
.53
.42
.23
.54
2,5 Jan-Feb
1.14
.35
.29
.21
.26
Fertilize
3
Mar
1
.25
.20
Tandem Disk
2,5
Mar
1
.31
.25
.18
.23
Apply & Inc.
Herbicide
1,5,8 Mar
1
.31
.25
.24
.31
List
1,9
Apr
1
.34
.27
.35
.56
Plant
1,9
May
1.50 .47
.38
.49
.78
Sandfight
3,14 May-Jun
2
.12
.10
.02
.02
Cultivate
2,13 Jun
1
.19
.15
.14
.18
3.28
2.64
$ 2.26
$ 3.50
.50
$ 1.82
$ 5.89
To t a l
Strip
18,19 Nov
1
1.00*
Irrigation: (2)
Preplant
Apr
1
.25*
$ 3.12
$ 5.00
Postplant
Jun-Aug 3
.57*
7.02
11.25
.82*
$10.14
$16.25
To t a l
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 600 GPM, 250 feet well, sprinkler
irrigation, natural gas pumping unit, 4 acre-inches preplant and 3 acre-inches
at
each
postplant.
^^\
Developed by Extension Economists-Management. TAES, TAMU.
Cooperative Extension Work in Agriculture and Home _U»oomics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acta of Congress of May 8, 1914. as amended, and June 50, 1914.
AECO 6
04075212
COTTON, DRYLAND, HIGH PLAINS IV
Estimated Costs And Returns Per Acre Of Cotton, High Level Management
Item
1.
n t l .t .y.
C o„ s t. /_U. n iPt r i c e Qo ur a n
Unit
Gross receipts, from production:
Lint
Cottonseed
Total
2. Variable Costs:
Pre-Harvest:
Seed
^ * \
lb.
ton
lb.
ac.
ac.
ac.
h r.
h r.
h r.
h r.
$100
mo.
Fertilizer (30-20-0)
Herbicide
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Labor, Tractor & Machinery
Crop Insurance
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harves t:
Strip Machinery
Labor
Ginning
Subtotal, Harvest
ac.
h r.
bale
$ .20
60.00
.21
3.00
4.19
2.13
1.48
1.38
.63
2.00
9.11
.085
1.82
2.00
21.50
V a lC
uo
e s to r
325 $ 65.00
.3
18.00
$ 83.00
18
1
1
1
1.7
.4
.1
2.8
.4
4
1
1
3.78
3.00
4.19
2.13
2.52
.55
.06
3.60
3.64
.67
24.14
$
$
1.82
2.00
15.05
$ 18.87
$
.7
Total Variable Costs
$
43.01
$
39.99
$
9.32
2.92
.48
.07
15.19
$
27.98
5. Total Costs
$
70.99
6. Net Returns to Management
$
12.01
7. Government Payment ($.15/cwt. x yield less rent)1/
$
36.56
8. Net Return Including Government Payment
$
48.57
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor
(1)
Tractor
(2)
Tractor
(3)
Land
Charge
ac.
hr.
hr.
hr.
ac.
9.32
1.72
1.19
.72
15.19
Total Fixed Costs
1
1.7
.4
.1
1
1/ Based on planted acres. No allowance is made for required set-aside acreage
of 20%.
D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agiiniltiiie cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
04075211
COTTON. DRYLAND. HIGH PLAINS IV
Estimated Costs, And Requirements Per Acre Of Cotton, High Level Management
operation
Labor m Fuel, Oil,
I t e m D a t e Ti m e s H m i r n Tr a c t o r o r . , n ' F i x e d c o s t s
No. Date Over Ho"r* Mach. Hrs. L«b.,Rep. Per Acre
(1)
Per
Acre
Shred & Disc
1,4,5 Jan
1
.41
.33
$ .40
$ .62
Moldboard
1,6,15 Feb
1
.63
.50
.27
.64
Tandem Disc
2,5 Mar
1
.31
.25
.18
.23
1.25
.47
.38
.49
.78
List & Fertilize 1,9
Mar
Cultivate
2,13 Apr
1
.19
.15
.14
.18
Plant
1,4 May
1.5
.47
.38
.49
.78
Sandfight
23
& 14 Jun
2
.12
.10
.02
.02
1,13 Jun
1
.19
.15
.14
.18
2.79
2.24
$ 2.13
$ 3.43
1.00*
.50
$ 1.82
$ 5.89
Cultivate
Total
Strip
18,19 Nov
^
\
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
*~\
Developeo by Extension EcoNOMisTs-MANACEHgNT, TAES, TAMU.
S rAgnculture
of
X ^ u r f l ncooperating.
^ H o m e Distributed
a * " " * * inTfurtherance
« - A * M ofUthe
n iActs
v e r of
s iCongress
t y a n dof tMay
h e 8.U1914.
n i t eas
d amended,
S t a t e sandDJune
e p aSO.
r t m1914.
ent
AECO 6
04075222
COTTON, DRYLAND, HIGH PLAINS IV
Estimated Costs And Returns Per Acre Of Cotton, Typical Management
„
_^
Unlt
..
Price
or
Cost/Unit
1. Gross receipts, from production:
Lint
lb.
$
Cottonseed
ton
To t a l
.20
$
250
60.00
2. Variable Costs:
Pre-Harvest:
Seed
lb.
.21
Herbicide
ac
.
4.19
Machinery
ac.
2.05
Tractor
(1)
hr.
1.48
Tractor
(2)
hr.
1.38
Tractor
(3)
hr.
.63
Labor, Tractor & Machinery hr. 2.00
Crop
Insurance
$100
9 . 11
Interest
on
Op.
Cap.
mo.
.085
Subtotal, Pre-Harvest
Harvest:
Strip
Machinery
ac.
1.82
Labor
hr.
2.00
Ginning
bale
21.50
Subtotal, Harvest
n
...
Va l u e
Quantity
$
or
^
50.00
12.00
62.00
.2
18
1
1
1.7
.3
.1
2.6
.3
4
$
1
1
$
.5
Total Variable Costs
3.78
4.19
2.05
2.52
.41
.06
5.20
2.73
.59
$ 21.53
1.82
2.00
10.75
$ 14.57
$ 36.10
3. Income Above Variable Costs
$ 25.90
4. Fixed Costs:
Machinery
Tractor
(1)
Tractor
(2)
Tractor
(3)
Land
Charge
ac.
hr.
hr.
hr.
ac.
9.22
1.72
1.19
.72
10.81
Total Fixed Costs
1
1.7
.3
.1
1
$
9.22
2.92
.36
.07
10.81
$ 23.38
5. Total Costs
$ 59.48
6. Net Returns to Management
$
7. Government Payment ($.15/lb. x yield less rent)_L/
$ 28.12
8. Net Return Including Government Payment
$ 30.64
2.52
1/ Based on planted acres. No allowance is made for required set-aside acreage
of 20%.
D e v e l o p e o b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w 1 ^ 9 7 2
(•.•operative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30. 1914.
AECO 6
04075221
COTTON. DRYLAND. HIGH PLAINS IV
Estimated Costs, And Requirements Per Acre Of Cotton, Typical Management
Operation
u
Labor
aDUl
rue—.,
V / J Oil,
.J-,
Fuel,
I t e m n * t * T l m e s Hloun
o n r fl T r a c t o r o rjub.,
, . Rep,
^ Fixed costs
No. Date Over H™f8 Mach. Hrs. Lxxh''. ***' Per Acre
Per Acre
(1)
Shred & Disc
1,4,5 Dec
1
.41
.33
$ .40
$ .62
Moldboard
1,6,15 Feb
1
.63
.50
.27
.64
Tandem Disc
2,5 Mar
1
.31
.25
.18
.23
List
1,9 Mar
1.25
.47
.38
.49
.78
Cultivate
2,13 Apr
.50
.10
.08
.07
.09
Plant
1,4 May
1.50
.47
.38
.49
.78
Sandfight
23
& 15 Jun
1
.06
.05
.01
.01
1,13 Jun
1
.19
.15
.14
.18
2.64
2.12
$ 2.05
$ 3.33
1.00*
.50
$ 1.82
$ 5.89
Cultivate
Total
Strip
18,19 Nov
/
^
^
\
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
^
Developeo by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Boonomfci. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO, 1914.
AECO 6
04095112
GRAIN SORGHUM. IRRIGATED. HIGH PLAINS IV
Estimated Costs And Returns Per Acre Of Grain Sorghum, High Level Management
T
l theomn ,
i t * * *U- n i t
Price
.
or
n Q u a n tVi at lyu e
Cost/Unit
1. Gross receipts, from production:
Grain
cwt.
2.00
45
x
'
$
or
Cost
90.00
2. Variable Costs:
Pre-Harvest:
Cus
torn
Deep
B r e a k ac.1 /
Seed
lb.
Fertilizer
(80-40-0)
ac.a c .
Herbicide
ac.
ac.
Machinery
ac.
Tractor
(1)
h r .h r.
Tractor
(2)
h rh. r.
Tractor
(3)
h rh
. r.
Labor,
Tractor
&
M a c hh ir.n e r y
Labor
Irrigation
hhr.r .
Irrigation
Machinery
a c . in.
ac.
Crop
Insurance
$ $100
100
Interest
on
Op.
C mo.
ap.
Subtotal, Pre-Harvest
Harvest:
Combine
Haul
Subtotal, Harvest
a c14.00
.
14.00
.2
12
6^80
*l
6.80
2.50
1
^ 4 1.42
2
l
1 1.48
.48
1.2
11.38
.38
.-8. 6.63
3
.1
h
r.
2.00
2.6
2.00
2
.
0
0
l
"
2.00
i n . .78 . 7 8
16
4
.
0
9
.
5
4.09
m o .085
.
.085
4
.21
$ 41.86
cwt.
cwt.
.15
.10
45
45
6.75
4.50
11.25
$
$
Total Variable Costs
$ 53.11
3. Income Above Variable Costs
$ 36.89
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Irrigation
Land Charge
Fixed
5.
6.
To t a l
Net
ac.
h r.
h r.
h r.
2.23
1.72
1.19
ac. in.
1.25
7.15
.72
ac.
To t a l
$ 2.80
2.52
6.80
2.50
1.42
1.78
1'1°
.06
5.20
2.00
12.48
2.05
l]l5
Costs
$
Costs
Returns
to
1
1. 2
•8
•1
16
1
32
$
2.23
2.06
.95
.07
20.00
7.15
a6
85
Management
$
57
$
4.43
7. Government Payment ($.52/cwt. x yield x h allotment less rent)_2/ $ 7.80
8.
Net
Return
Including
Government
Payment
$
12.23
1/ Assumes deep breaking every five years.
2/ Based on planted acres. No allowance is made for required set-aside acreage
0EVEL°opy9Y^TrECN^^
of
the
allotment.
(-•operative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States^Srtn^.^f
Ag.uulturc cooperating. Distributed in furtheram* of the Acts of Congress of May 8.'1914. a*^amended[and June 30 1914
AECO 6
GRAIN SORGHUM. IRRIGATED. HIGH PLAINS IV 04095111
Estimated Costs, And Requirements Per Acre Of Grain Sorghum, High Level Management
t
l£-
operation
#-_,-,
Date
-,_
Times
Labor
Fuel,
Oil,
gg^
Lub.,
Rep.
^f^f*
(1)
Ta n d e m
Disc
Moldboard
1,5
Jun
1,6
1
Feb
"
.31
.8
Per
,25
.50
Acre
$
.18
.40
$ .23
.40
.20
Ta n d e m D i s c 2 , 5 J a n - F e b 1 . 2
•38
.30
.21
.28
List
•38
.30
.38
.62
&
Fertilize
Plant
2>9
S a n d fi g h t
Spray
To t a l
Mar
1
May
3,14
Herbicide
Sidedress
Fertilizer
1,9
1
1.2
May-Jun
2,8
Jun
.38
.38
.62
2
.12
.10
.02
.02
1
.25
.20
.05
.06
jun
2.57
.30
.25
2.05
.20
$
1.42
$ 2.23
I r r i g a t i o n : (2)
Preplant
Apr
1
.25*
Postplant
Jun-Aug
4
.76*
Total
i m*
$
3.12
9.36
$12.48
$
5.00
15.00
$20.00
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) ^I'm^ Ration cost sheet. Assumed at 600 GPM, 250 feet well, sprinkler
irrigation, natural gas pumping unit, 4 acre-inches preplant and 3 acre-inches
at each postplant.
Developed by Extension Economists-Management, TAES. TAMU.
AECO 6
/*\
?
04095122
GRAIN SORGHUM, IRRIGATED. HIGH PLAINS IV
Estimated Costs And Returns Per Acre Of Grain Sorghum, Typical Management
Item
Unit
1. Gross receipts, from production:
Grain
cwt,
Price or
Cost/Unit
$ 2.00
Value or
Cost
Quantity
35
$ 70.00
2. Variable Costs:
Pre-Harvest:
Custom Deep Break 1/
Seed
Fertilizer (60-40-0)
Herbicide
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Labor, Tractor & Machinery
Labor Irrigation
Irrigation Machinery
Crop Insurance
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Combine
Haul
Subtotal, Harvest
ac.
lb.
ac.
ac.
ac.
h r.
h r.
h r.
h r.
h r.
ac. in.
$100
mo.
cwt.
cwt.
.14
14.00
.21
6.00
2.50
1.40
1.48
1.38
.63
2.00
2.00
.78
4.09
.085
.15
.10
1.96
2.52
6.00
2.50
1.40
1.48
1.10
.06
4.60
1.60
10.14
1.64
.99
$ 35.99
12
1
1
1
1
.8
.1
2.3
.8
13
.4
4
35
35
$
$
Total Variable Costs
$ 44.74
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Irrigation
Land Charge
5.25
3.50
8.75
$ 25.26
ac.
h r.
h r.
h r.
2.29
1.72
1.19
ac. in.
1.25
4.58
ac.
.72
1
1
13
1
$
•8
•1
2.29
1.72
.95
.07
16.25
4.58
Total Fixed Costs
$ 25.86
5 . To t a l C o s t s
$ 70.60
6. Net Returns to Management
$ (.60)
7. Government Payment ($.52/cwt. x yield x J_ allotment less rent)2/ $ 6.07
8.
Net
Return
Including
Government
Payment
$
5.47
1/ Assumes deep breaking every seven years.
2/ Based on planted acres. No allowance is made for required set-aside
acreage of 20%. Assumes planting 100 percent of the allotment.
D e v e l o p e d ^ b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of
Agiii-iiliiirc cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30. 1914.
AECO 6
04095121
GRAIN SORGHUM. IRRIGATED. HIGH PLAINS IV
Estimated Costs, And Requirements Per Acre Of Grain Sorghum, Typical Management
Operation
Labor
Fuel,
Oil,
I t e m nDaa. 0t e T ^i m
eH
s oH
o
»r«
TH
r arc8t oLr uobr. , , R. e R
„
u
r
s
^
^
p . FPi xeer d A ccor se t s
Over
No.
Tandem Disc
1,5
Moldboard
1,6,15 Feb
Tandem Disc
2,5
(1)
1
Acre
.31
.25
$ .18
$ .23
.84
.53
.42
.23
.54
Jan-Feb
1.14
.35
.29
.21
.26
List & Fertilize 1,9
1,9
Mar
1
.38
.30
.38
.62
Plant
2,9
May
1.20
.38
.30
.38
.62
Sandfight
3,14
May-Jun
2
.12
.10
.02
.02
Jun
1
.25
.20
-
2.32
1.86
Spray Herbicide 2,8
Jan
Per
To t a l
$ 1.40
$ 2.29
I r r i g a t i o n : (2)
Preplant
Apr
1
.25*
$ 3.12
$ 5.00
Postplant
Jun-Aug
3
.57*
7.20
11.25
.82*
$10.14
$16.25
Total
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
(2) See attached irrigation cost sheet. Assumed at 600 GPM, 250 feet well, sprinkler
irrigation, natural gas pumping unit, 4 acre-inches preplant and 3 acre-inches
at each postplant.
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United Stales Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June SO, 1914.
AECO 6
04095212
GRAIN SORGHUM, DRYLAND. HIGH PLAINS IV
Estimated Costs And Returns Per Acre Of Grain Sorghum, High Level Management
tI .t .e m
11
U n• -i t
P r i „c e
1. Gross receipts, from production:
Grain
cwt.
$
o. „r
~ ..
.
or
Q .u. a n t iVt ya l u e
Cost/Unit
H
J
Cost
2.00
12
$
24.00
2. Variable Costs:
Pre-Harvest:
Seed
lb.
.21
3
$
Fertilize
(30-0-0)
ac.
1.20
1
Machinery
ac.
1.18
1
Tractor.(1)
hr.
1.48
1.1
Tractor
(2)
hr.
1.38
.3
Tractor
(3)
hr.
.63
.1
Labor,
Tractor
&
Machinery
hr.
2.00
1.8
Crop
Insurance
$100
6.63
.1
Interest
on
Op.
Cap.
mo.
.085
4
Subtotal, Pre-Harvest
Harvest:
Combine
Haul
Subtotal, Harvest
^
\
ac.
cwt.
3.50
.10
1
12
$
$
Total Variable Costs
To t a l
6.
ac.
To t a l
Net
1.78
1.72
1.19
.72
6.03
hr.
hr.
hr.
ac.
Fixed
5.
3.50
1.20
4.70
$ 14.34
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor
(1)
Tractor
(2)
Tractor
(3)
Land
Charge
.63
1.20
1.18
1.63
.41
.06
3.60
.66
.27
$ 9.64
Costs
Costs
Returns
1
1.1
.3
.1
1
to
$
9.66
$
1.78
1.89
.36
.07
6.03
10.13
$
Management
$
24.47
$
(.47)
7. Government Payment ($.52/cwt. x yield x h allotment less rent)l/ $ 2.08
8.
Net
Return
Including
Government
Payment
$
1#61
JL/ Based on planted acres. No allowance is made for required set-aside acreage
of 20%. Assumes planting 100 percent of the allotment.
J^\
D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the uinTcd State7Dc^tmem~o~f
Agi-iMiltinc cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June 30, 1914.
AECO 6
04095211
GRAIN SORGHUM. DRYLAND. HIGH PLAINS IV
Estimated Costs And Requirements Per Acre Of Grain Sorghum, High Level Management
Operation
Chisel
Labor
Fuel,
Oil,
_,_,
__
I t e m n a # . ^ Ti m e s « _ , . . - _ , Tr a c t o r o r , . B o _ F i x e d c o s t s
No. Date Over H™*8 Hach. Hrs. Lub., Rep. per Acre
(1)
Per
Acre
1,7
Mar
2
.62
.50
Ta n d e m D i s c 1 , 5
Apr
1
.31
.25
.18
.23
List & Fertilize 2,9
Apr
1
.38
.30
.38
.62
Plant
1,9
May
1.25
.38
.30
.38
.62
S a n d fi g h t
2,3
& 14
Jun
2
.12
.10
.02
.02
1.81
1.45
$ 1.18
$ 1.78
To t a l
$
.22
$
.29
(1) Labor hours calculated at 1.25 times tractor hours except where noted by
■~ }
Developeo by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economic., Texas AfcM University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, aa amended, and June SO. 1914.
AECO 6
04095222
GRAIN SORGHUM, DRYLAND, HIGH PLAINS IV
r
Estimated Costs And Returns Per Acre Of Grain Sorghum, Typical Management
Item
1. Gross receipts, from production:
Grain
Price or
Cost/Unit
Unit
cwt.
$
2.00
Value or
Cost
Quantity
10
$ 20.00
2. Variable Costs:
Pre-Harvest:
Seed
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Labor, Tractor & Machinery
Crop Insurance
Interest on Op. Cap.
Subtotal, Pre-Harvest
lb.
ac.
h r.
h r.
h r.
h r.
$100
mo.
.21
1.18
1.48
1.38
.63
2.00
6.63
.085
Harvest:
Combine
Haul
Subtotal, Harvest
ac.
cwt.
3.50
.10
3
1
1.1
.3
.1
1.8
.1
4
1
10
Total Variable Costs
.63
1.18
1.63
.41
.06
3.60
.66
.23
$ 8.40
$ 3.50
1.00
$ 4.50
$ 12.90
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Tractor (3)
Land Charges
$
ac.
h r.
h r.
h r.
ac.
1.78
1.72
1.19
.72
5.17
1
1.1
.3
.1
1
Total Fixed Costs
5 . To t a l C o s t s
6. Net Returns to Management
7. Government Payment ($.52/cwt. x yield x H allotment less rent)l/
8. Net Return Including Government Payment
$
7.10
$
1.78
1.89
.36
.07
5.17
$ 9.27
$ 22.17
$ (2.17)
$ 1.73
$ (.44)
< ~
- Bf ™*°n Planted acres* No allowance is made for required set-aside acreage
of ZQ/0. Assumes planting 100 percent of the allotment.
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and thr llniiPrt ^^^SSST~L7
AgnniUuic cooperating. Distributee, in furtherance of the Acts of Congress oV M,?? 19H. ^JSSLfS W^Olt
AECO f>
GRAIN SORGHUM. DRYLAND. HIGH PLAINS IV 04095221
*Sti*ated C°ate> ** R^^rements Per Acre Of Grain Sorghum, Typical Management
operation
t
Ig-
-».,
Date
i - aLabor
Dor
«-.
„ours
(1)
Fuel,
^-"r^r
Per
Chisel
1,7
Mar
2
.62
.50
Tandem Disc
1,5
Apr
1
.31
List
2,9
Apr
1
Plant
1,9
May
Sandfight
2,3
& 14
Jun
Total
Oil,
^
^
Acre
Fixed
F i x e costs
rs
.22
$ .29
.25
.18
.23
.38
.30
.38
.62
1.25
.38
.30
.38
.62
2
.12
.10
.02
.02
1.81
1.45
$ :1.18
$ 1.78
$
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
^
Developed by Extension Economists-Manaqemeht. TAES, TAKU.
or Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO, 1914.
ofA£"u^rS
AECO 6
\
04000400
TEXAS HIGH PLAINS IV
Assumed Prices Paid And Received By Farmers
Item
Unit
Price
cwt.
cwt.
$ 21.00
21.00
2.50
50.00
30.00
20.00
5.00
135.00
85.00
Prices Paid
Seed:
Cotton
Grain Sorghum
Wheat
Alfalfa
Corn
Sorghum Sudan
Soybean
Switchgrass
Western Wheatgrass
Midland Bermuda (sprigs)
Castors
Southern Peas
Custom Rates:
Combining southern peas
Harvest castors
Combining wheat
Combining grain sorghum
Hay harvest
swath, bale, and haul
Hauling
grain sorghum, castors & southern peas
soybean
wheat
Chemical spraying
Cotton ginning
Fuel and lubricants:
Gasoline
L. P. gas
Diesel fuel
Motor oil (heavy duty detergent)
Lubricant
Fertilizer (bulk):
Nitrogen - anhydrous
Nitrogen - nitrate
Phosphorus
Potash
Labor (except hoeing)
Hoeing
Capital
Chemicals:
Pre-emergence herbicide
Methyl parathion
Malathion
bu.
cwt.
cwt.
cwt.
cwt.
cwt.
cwt.
bu.
cwt.
cwt.
ac.
cwt.
ac.
cwt.
.50
33.00
15.50
6.00
.75 2/
3.00 3/
.15 4/
bale
.45
cwt.
cwt.
.10
.08
.05
bu.
ac.
500#
gross wt. bale
gal.
gal.
gal.
gal.
1.25
21.50
.20
.11
.155
1.05
lb.
.39
lb.
lb.
lb.
lb.
h r.
h r.
.04
.08
.09
.05
$
5 gal.
gal.
gal.
2.00
1.50
.085
110.00
5.25
11.00
New, 1972
04000400
TEXAS HIGH PLAINS IV
Assumed Prices Paid And Received By Farmers
Item
s*%
Unit
Price
Hail Insurance:
Cotton
irrigated
$100
$
Cotton
dryland
$100
Grain
Sorghum
irrigated
$100
Grain
Sorghum
dryland
$100
Wheat
irrigated
$100
Wheat
dryland
$100
Castors
$100
8.54
9 . 11
4.09
6.63
10.20
11 . 1 5
8.36
Prices Received
Cotton
Cotton
Wheat
Grain
Alfalfa
Forage
Ensilage
Pasture
Corn
Soybeans
Southern
Castors
lb.
lint
.20
5/
seed
ton
60.00
bu.
1.30
5/
Sorghum
cwt.
2.00
5/
hay
ton
20.00
6/
sorghum
hay
ton
20.00
corn
ton
5.50
grazing
AUM
12.00
bu.
1.15
5/
bu.
2.50
peas
cwt.
6.00
cwt.
5.50
^\
'
1/ These price assumptions are not be interpreted act predictions or prospective prices.
2/ Minimum charge of $10.00 per acre
3/ $3.00 per acre plus $0.05 per bushel of yield over 20 bushels per acre.
4/ Minimum charge of $3.50 per acre
5/ Does not include government payment which a farmer might receive for
participating in farm programs.
6/
Sold
standing
in
fi e l d
to
alfalfa
cuber
operator.
)
04000500
TEXAS HIGH PLAINS IV
Estimated Machinery And Equipment Cost Per Hour Of Use
Machinery
Item and Size
Item
No.
Tractor,
100
HP
l
Tractor,
80
HP
2
Tractor,
45
HP
3
Shredder,
4R
4
Ta n d e m D i s k 1 3 * 5
Moldboard Plow, 4B 6
Chisel
13*
7
Herbicide Spray Rig 8
Lister-Planter
9
Float
10
Flex
Planter
11
Grain Drill, 16* 12
(2) Rolling
Cultivator
6R
13
(2)
S a n d fi g h t e r
14
Clod
Buster
15
To o l
Bar
6R
16
8-6 Wells & Equip. 5/ 17
Cotton
Stripper
18
(9) Cotton Trailers 19
1/
1/
2/
y5 /
Estimated
To t a l
Ty p i c a l Y r s . n . .
Of Use ^'-1/
New
Cost
Estimated
Total Hrs.
Of Use
Depr.
Per Hr.2/
Interest on
Investment
Per Hour 3/
Fuel, Oil
Lub., Rep.,
Per Hour 4/
$10,500
8,000
3,500
1,400
1,600
1,400
800
500
1,800
1,500
580
1,600
5
10
12
8
8
8
8
10
8
10
5
10
$5,492
5,304
3,500
1,044
1,194
1,044
597
400
1,343
1,194
375
1,274
5,000
8,000
7,200
1,500
2,000
1,600
1,600
2,000
1,000
1,000
1,000
1,200
$1.10
.66
.49
.70
.60
.65
.37
.20
1.34
1.19
.38
1.06
.62
.53
.23
.37
.32
.35
.20
.12
.72
.72
.16
.64
1.48
1.38
.63
.59
.70
.49
.43
.26
1.28
.32
.39
.44
1,700
300
385
200
8
10
12
12
1,268
215
350
175
1,600
2,000
2,000
2,000
.79
.11
.18
.09
.43
.06
.10
.05
.91
.10
.05
.05
9,000
4,500
10
12
6,957
4,000
1,500
1,500
4.64
2.67
2.95
1.51
2.89
.74
New cost less value at time of trade, or less salvage value.
Assumes straight line depreciation.
(Investment & Salvage) * 2 x .08 divided by annual hours of use
^^t^chedMrigat^on^sl:
SS^U^
'*"
'""
*°"X''
"^
^^
°f
*"
New, 1972
"""^
*"*—*.
04000600
TEXAS HIGH PLAINS IV
Yield Per Acre For Typical And High Level Management
Irrigated
Dryland
Ty p i c a l H i g h L e v e l Ty p i c a l H i g h L e v e l
Crop
Unit
Alfalfa
tons
Castorbeans
cwt.
15
20
-
Cotton
lbs.
500
700
250
325
Grain Sorghum
cwt.
35
45
10
12
Permanent Pasture
AUM
10
-
Southern Peas
cwt.
13
17
-
Wheat
bu.
30
35
12
6.5
6.5
8.5
—
^ X
New, 1972
Download