r TEXAS ROLLING PLAINS I 05000300 FOREWORD r The enterprise budgets for Rollings Plains I are based on yields as shown on form 05000600. Budgets for irrigated crops in Rolling Plains I area were developed only for alfalfa and coastal since almost no irrigation is used on other crops. Pertinent facts include the following: the "high level" managers use mostly 6-row equip ment and farm 1,000 acres of cropland, while the "typical" manager uses 4-row equipment and farms about 600 acres of cropland. Budgets for irrigated crops in Rolling Plains I are based on sprinkler irrigation. The following customary rent arrangements were used: Cotton—One-fourth of production and land lord pays one-fourth of insecticide, fertilizer r and ginning. Vegetables—One-fifth production and land lord pays one-fifth of insecticide, fertilizer, fungicide, harvesting and processing. All Other Crops—One-third of production and landlord pays one-third of fertilizer and harvest. Landlord's share of hay baling is based on 300 per bale when renter owns and operates his own equipment. Income from government payments is shown after the landlord's share has been deducted for rent. For information on groundwater resources and soils for these areas, consult the Area Re sources Section of (he Rolling Plains Economic Program Report. 05000400 TEXAS ROLLING PLAINS I r Assumed Prices Paid And Received By Farmers Item Unit Price Prices Paid r Seed: Cotton (Di-Syston treated) Cotton (delinted) Grain Sorghum Guar Wheat (cleaned and treated) Alfalfa Forage Sorghum Ensilage Sudan Custom Rates: Combining wheat Combining grain sorghum Combining guar Hay harvest, Mow, rake, bale, haul Ensilage, Chop, haul, pack Hauling: Grain sorghum Guar Wheat Chemical spraying Hoeing Cotton ginning Fuel and lubricants: Gasoline L. P. gas Diesel fuel Motor oil (heavy duty, detergent) Lubricant Fertilizer (bulk): Nitrogen Phosphorus Labor (except hoeing) Capital Chemicals: Pre-emergence herbicide Methyl parathion Malathion Hail insurance (wheat) cwt. cwt. cwt. cwt. bu. cwt. cwt. cwt. ac. ac. ac. bale $ 19.50 15.00 21.00 9.00 2.50 n 4o.oo 21.00 20.00 3.00 2/ 3.50 4.00 .35 ton 3.00 cwt. cwt. .10 .10 bu. ac. hr. 500// gross wt. bale gal. gal. gal. gal. lb. lb. lb. hr. $ 5 gal. gal. gal. ac. .05 3/ 1.00 " 1.50 20.30 4V .27 .11 .15 1.50 .21 .095 .075 2.00 .08 110.00 5.25 11.00 2.00 r New, 1972 05000400 TEXAS ROLLING PLAINS I Assumed Prices Paid And Received By Farmers Item Unit Price lb. Lint cwt. $ .185 5/ 5.00 58.00 1.18 5/ 2.00 5/ 40.00 25.00 8.00 25.00 8.00 2.75 Prices Received Cotton Guar Cotton seed Wheat Grain sorghum Alfalfa hay Forage sorghum hay Ensilage Coastal hay Pasture grazing Potatoes ton bu. cwt. ton ton ton ton AUM cwt. JL/ These price assumptions are not to be interpreted as predictions or prospective prices. 2/ $3.00 per acre plus $0.05 per bushel of yield over 20 bushels per acre. 3/ Hauling-combine to elevator $0.05/bu. + $0.005/bu./mi. over 5 miles. 47 Ginning, $14.30; bagging and tying, $6.00. _5/ Does not include government payment which a farmer might receive for participating in farm programs. ^S S"^k 05000510 TEXAS ROLLING PLAINS I Estimated Machinery And Equipment Cost Per Hour Of Use, High Level Management New Cost Estimated Typical Yrs. ut use 21 22 23 24 25 26 27 28 29 30 31 32 34 35 36 37 38 39 $11,500 8,000 3,500 1,800 1,600 1,600 2,000 1,000 2,000 1,700 1,600 1,400 7,000 3,000 5,400 1,500 1,800 300 5 8 12 8 8 8 8 8 8 8 10 8 5 5 5 10 10 10 $6,015 4,896 3,500 1,343 1,194 1,194 1,492 746 1,492 1,268 1,274 1,044 4,312 2,022 3,640 1,194 1,343 215 4,500 6,400 8,000 1,200 1,600 1,600 1,600 1,600 1,600 1,600 1,200 1,000 1,500 1,500 1,600 1,000 1,500 1,000 $1.34 .77 .44 1.12 .75 .75 .93 .47 .93 .79 1.06 1.04 2.87 1.35 2.27 1.19 .90 .21 $ .75 .56 .21 .60 .40 .40 .50 .25 .50 .43 .64 .56 1.29 .53 .89 .72 .60 .12 $1.58 1.24 .67 1.38 .86 .56 .69 53 .69 .91 .44 .77 5.47 1.26 1.84 .32 .63 .30 40 3,000 10 1,800 3,000 .60 .56 .40 Machinery I t e mi Item and Size No. Tractor, 100 HP Tractor, 80 HP Tractor, 45 HP L i s t e r, P l a n t e r, 6 R Cultivator, 6R Ta n d e m D i s c , 1 6 ' Offset Disc Chisel, 17* Moldboard, 5 Btm. Rolling Cultivator Grain Drill, 16f8" Shredder, 4R Swather, S . P. Baler Stripper & Basket Float O n e w a y, 15f S a n d fi g h e r , 8R Bale Accumulator & Front End Loader 1/ 2/ 3/ 47 To t a l D e p r. l / Estimated Depr. Total Hrs. Per Hr.2/ Of Use Interest on Investment Per Hour 3/ Fuel, Oil, Lub., Rep., Per Hr. 47 • yJ -J New cost less value at time of trade, or less salvage value. Assumes straight line depreciation. (Investment + Salvage) -. 2 (8%) divided by annual hours of use. Fuel, oil, lubrication, repair cost estimate taken from Bowers, Modern Concepts of Farm Machinery Management. New, 1972 05000510 TEXAS ROLLING PLAINS I Estimated Irrigation Machinery And Equipment Cost Per Hour Of Use Machinery Item and Size Item No. Interest on New J 3 11 ™ ^ T o t a l Estimated --.—— D C o s t T y rp. irc a l t tY~ r_s . _^ ToQtfa l U H sr es . p_ / £ 2p /e rI n v He os ut m r e n3t ^ Of Use Fuel, Oil, Lub., Rep., Per Hr. 4/ Irrigation Equipment - 200 gallon/minute well, sprinkler Well,1100 ft., 75 ft. lift 47 $ 1,200 20 $1,200 43,000 Motor, 15 HP, Elec. 48 500 4 500 8,560 .058 .009 .258 Pump 49 800 10 800 19,260 .047 .017 .011 Electric Panel 50 150 16 150 34,000 .004 .003 .001 Sprinkler System 51 2,800 10 2,800 21,400 .131 .052 .294 Total 1/ 2/ 3/ 47 $ $ .028 .268 $ $ .022 .103 $ $ .002 .566 New cost less value at time of trade, or less salvage value. Assumes straight line depreciation. (Investment + Salvage) * 2 (8%) divided by annual hours of use. Fuel, oil, lubrication, repair cost estimate taken from Bowers, Modern Concepts of Farm Machinery Management, ^J /"^% V-TI^ / ^ ^ k 05000520 TEXAS ROLLING PLAINS I Estimated Machinery And Equipment Cost Per Hour Of Use, Typical Management Machinery Item and Size Item No. Tractor, 100 HP 1 Tractor, 80 HP 2 Tractor, 45 HP 3 L i s t e r, P l a n t e r 4 R 4 Cultivator 4R 5 Ta n d e m D i s c 1 3 ' 6 Chisel 13f 7 Moldboard 4 Btm. 8 Shredder 2R 9 Swather, Pull 10 Baler 14 Stripper 15 Grain Drill 13f 10" 16 Oneway 12' 17 S a n d fi g h t e r 8 R 1 8 Knife 4R 19 1/ 2/ 3/ 4/ New Cost $10,000 8,000 3,500 1,200 1,000 1,400 800 1,400 350 2,500 3,000 3,600 1,300 1,400 300 800 Estimated Typical Yrs. Of Use 5 8 12 8 8 8 8 8 8 5 5 5 10 10 10 10 To t a l Depr.jV $5,230 4,896 3,500 895 746 1,044 597 1,044 261 1,540 2,022 2,426 1,035 1,114 215 597 Estimated n To t a l H r s . „ * £ , , Of Use — 4,500 6,400 8,000 1,200 1,600 1,600 1,600 1,600 1,000 1,500 1,500 1,500 1,200 1,500 1,000 1,200 $1.16 .77 .44 .74 .47 .65 .37 .65 .26 1.03 1.35 1.62 .86 .74 .21 .50 Interest on Investment Per Hour 3/ $ .66 .56 .21 .40 .25 .35 .20 .35 .14 .46 .53 .64 .52 .45 .12 .33 Fuel, Oil, Lub., Rep., Per Hr. 4/ $1.37 1.24 .67 .92 .53 .49 .43 .49 .19 1.96 1.26 1.31 .35 .49 .30 .38 New cost less value at time of trade, or less salvage value. Assumes straight line depreciation. (Investment + Salvage) * 2 (8%) divided by annual hours of use. Fuel, oil, lubrication, repair cost estimate taken from Bowers, Modern Concepts of Farm Machinery Management, New, 1972 05000520 TEXAS ROLLING PLAINS I Estimated Irrig ation Machinery And Equlipment Cost Per Hour Of Use Machinery Item and Size Item New No. Cost Estimated _, _ . T y p i i c a li - Y rl os t .a l . O f U s e D e p r. l / -n Estimated Depr. Total Hrs. Per Hr.jIJ Of Use Interest on Inves tment Per Hour 3/ Fuel, Oil, Lub., Rep., Per Hr. 4/ Irrigation Equipment - 200 gallon/minute well, sprinkler Well,1100 ft., 75 ft. lift 47 $ 1,200 Motor, 15 HP, Elec. 48 500 Pump 49 Electric Panel Sprinkler System 20 $1,200 43,000 $ .028 $ .022 $ .002 4 500 8,560 .058 .009 .258 800 10 800 19,260 .047 .017 .011 50 150 16 150 34,000 .004 .003 .001 51 2,800 10 2,800 21,400 .131 .052 .294 $ .268 $ .103 $ .566 Total 1/ 2/ 3/ 4/ New cost less value at time of trade, or less salvage value. Assumes straight line depreciation. (Investment + Salvage) * 2 (8%) divided by annual hours of use. Fuel, oil, lubrication, repair cost estimate taken from Bowers, Modern Concepts of Farm Machinery Management. ^J ^J ■^J 05000600 TEXAS ROLLING PLAINS I Yield Per Acre For Typical And High Level Management Crop Alfalfa Typical tons Irrigated High Level 6.5 8.0 Typical Dryland High 2.5 Level 3.5 Cotton lbs.* 175 225 Silage tons* 10 15 Wheat bu.* 20 30 Guar lbs.* 600 1000 Coastal f^- Unit tons 7 10 *Almost no acreage irrigated at the present time. Alfalfa receives 85-90 percent of irrigation water. New, 1972 05006112 ALFALFA ESTABLISHMENT, IRRIGATED, ROLLING PLAINS I Estimated Costs And Returns Per Acre Of Alfalfa Establishment, High Level Management Item Unit Price or Cost/Unit Quantity Value or Cost 1. No Income 2. Variable Costs: Seed Fertilizer (16-20-0) Machinery Tractor (21) Tractor (22) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinery Interest on Op. Cap. lb. ac. ac. h r. h r. h r. h r. ac. $ $ .40 3.02 .78 1.58 1.24 2.00 2.00 1.16 .08 25 1 1 $ 10.00 3.02 .78 .50 .62 2.06 4.12 2.00 1.16 1 1 .95 11.86 $ 24.68 Total Variable Costs 3. Fixed Costs: Machinery Tractor (21) Tractor (22) Irrigation 2.03 1.29 ac. h r. h r. ac. 2.14 2.09 1.33 1.78 1 1. 29 . 50 1 Developeo by Extension Economists-Management, TAES, TAMU. .66 7.27 $ 31.95 4. Total Costs 6 . To t a l C o s t 2.14 2.69 1.78 $ Total Fixed Costs 5 . L e s s L a n d l o r d ' s s h a r e F e r t i l i z e r aac. c $ 1.01 1 $ -1.01 $ 30.94 New, 1972 Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6 05006111 ALFALFA ESTABLISHMENT, IRRIGATED, ROLLING PLAINS I Estimated Costs, And Requirements Per Acre Of Alfalfa Establishment. High Level Management Labor Fuel, Oil, __._ Operation 'e: °ate £rrs h°»™ s:_MLs! i-*-. *»• *%?£?• (1) Per Acre Moldboard 21,29 July Offset Disc 21,27 Aug. .71 .57 $ .39 $ .82 1 .38 .30 .20 .42 Float 22,37 Aug-Sep 11 .35 .28 .09 .53 Fertilize 21 Sep-Oct 1 .35 .28 - - Drill 22,26 Sep-Oct 1 .27 .22 .10 .37 2.06 1.65 $ .78 $2.14 1.00 3.25 $1.16 $1.78 To t a l Irrigation 47-51 Sep-Nov 1 ^ ^ (1) Labor hours calculated at 1.25 times tractor hours except where noted by * Developed by Extension Economists-Management, TAES, TAMU. 2r^C_^V_?_^_S._^.7Va,\51 iSP*™??^,"1? H°me of ^°nwnia' A&M of University and as the United States Department of Agriculture cooperating. Distributed in furtherance the ActsTexa» of Congress May 8, 1914. amended, and June SO. 1914. AECO 6 ^ 05005112 ALFALFA, IRRIGATED, ROLLING PLAINS I_ Estimated Costs And Returns Per Acre Of Alfalfa, High Level Management "em Price Cost/Unlt Unit 1. Gross receipts, from production: Hay ton $ 40.00 or ~ _.__ Quantity 8 Va l u e o r .... $320.00 2. Variable Costs: Pre-Harvest: 1/8 Establishment Cost Fertilizer (200 lbs., 0-46-0) Tractor (22) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinery Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Wire Machinery Tractor (23) Labor Subtotal, Harvest ac. ac. h r. h r. h r. ac. ac. $ bale ac. ac. h r. 1 1 3.87 6.90 1.24 2.00 2.00 5.84 2.00 .10 .20 5.0 1 1 .08 14.56 .03 264 1 3.5 7.54 1.24 2.00 5.25 Total Variable Costs $ 3.87 6.90 .12 .40 10.00 5.84 2.00 1.16 $ 30.29 7.92 7.54 4.34 10.50 $ 30.30 $ $ 60.59 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (22) Irrigation Land Charge (Rent) $259.41 ac. h r. ac. ac. 1 3.6 1 1 7.21 1.33 8.91 77.22 Total Fixed Costs $ 7.21 4.79 8.91 77.22 $ 96.13 5. Total Costs $158.72 6. Net Returns $161.28 7. Government Payments 8. Net Return Including Government Payment $161.28 f^ Developeo by Extension Economists-Management, TA E S , New 1972 TA M U . ' Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6 05005111 ALFALFA, IRRIGATED, ROLLING PLAINS I Estimated Costs, And Requirements Per Acre Of Alfalfa, High Level Management Operation Labor Fuel, Oil, Item *%_«.__ Times ««„-_. Tractor or T . D^„ Fixed costs No. Date Over H^8 Mach. Hrs. L"b.,Rep. Per Acre (1) Per Acre Fertilize 22 Swather 22.34 Apr-Sep 5 1.25 1.00 5.47 4.16 Baler 22.35 Apr-Sep 5 2.00* 1.25 1.57 2.35 Accumulator & Front End Loader 22,35 Apr-Sep 5 2.00* 1.25 .50 .70 Apr 1 Total Irrigation 47-51 Apr-Aug 5 .20* .10 $ - $ - 5.45 3.60 $ 7.54 $ 7.21 5.00 15.75 $ 5.84 $ 8.91 (1) Labor hours calculated at 1.25 times tractor hours except where noted by * Developed by Extension Economists-Management, TAES. TAMU. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30. 1914. AECO 6 05006122 ALFALFA ESTABLISHMENT. IRRIGATED, ROLLING PLAINS I Estimated Costs And Returns Per Acre Of Alfalfa Establishment, Typical Management Item Unit Price or Cost/Unit Quantity Value or Cost 1. No Income 2. Variable Costs: Pre-Harves t: Seed Fertilizer (16-20-0) Machinery Tractor (1) Tractor (2) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinerv Interest on Op. Cap. lb. ac, ac. hr. hr. h r. h r. ac. $ .40 3.02 .78 1.37 1.24 2.00 2.00 1.16 .08 25 1 1 .50 .58 $ 10.00 3.02 1.34 2.68 2.00 1.16 1 1 10.52 Total Variable Costs 3. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation .78 .68 .72 .84 $ 21.88 ac. h r. h r. ac. Total Fixed Costs 4 . To t a l C o s t s 5. Less Landlord's share of fertilizer 6 . To t a l C o s t 2.40 1.82 1.33 1.78 .50 .58 $ 2.40 .91 .77 1.78 $ 5.86 $ 27.74 $ -1.01 $ 26.73 Mr sz^n^Tszzrjzr. ::]ci_ir==5Sw ftEygLQPEO by Extension Economists-Management, TAES, */*MU. New, 1972 a ir*~_-» /? 05006121 ALFALFA ESTABLISHMENT. IRRIGATED. ROLLING PLAINS I_ Estimated Costs, And Requirements Per Acre Of Alfalfa Establishment, Typical Management Labor Operation -, Fuel» °il» „_, Chisel 1,7 July 1 .31 .25 .11 .14 Tandem Disc 2,6 Aug 1 .37 .30 .15 .30 Fertilize 2 Aug-Sep 1 .35 .28 Drill 1,16 Sep-Oct 1 .31 .25 .09 .34 1.34 i n« $ .35 $ .78 1.00 3.25 $ 1.16 $ 1.78 Total Irrigation __ ^\ I t e m D a t e Ti m e s H _ . _ i r « Tr a c t o r o r T . R ' F i x e d c o s t s / No. Date Over ™" Mach. Hrs. Lub., Rep. per ^^ (1) Per Acre 47-51 Sep-Nov 1 (1) Labor hours calculated at 1.25 times tractor hours except where noted by * Developed by Extension Economists-Management, TAES, TAM'l. o ^agriculture £ 7 c u t r e ^cooperating. H o m C EDistributed c o n o m i cins furtherance . Te x a s of A& the M Acts U n-i vCongress e r s i t y of a nMay d t8. h e1914. U nas i t eamended, d S t a t eand s D June e p a30. rtm 1914. ent 05005122 ALFALFA, IRRIGATED. ROLLING PLAINS I Estimated Costs And Returns Per Acre Of Alfalfa, Typical Management Item 1. Gross receipts, from production: Hay Unit Price or Cost/Unit ton $ 40.00 ac. ac. h r. h r. h r. ac. ac. 4.45 3.45 1.24 2.00 2.00 5.84 2.00 .08 Quantity Value or Cost 6.5 $260.00 1 1 4.45 3.45 .12 .20 10.00 5.84 2.00 1.06 $ 27.12 2. Variable Costs: Pre-Harvest: 1/6 Establishment cost Fertilizer (100 lbs.-0-46-0) Tractor (2) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinery Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Wire Machinery Tr a c t o r Labor, stack on trl. Labor Subtotal, Harvest $ bale ac. hr. hr. h r. .03 3.23 1.24 2.00 2.00 .1 .1 5.0 1 1 13.30 215 1 2.12 4 3.31 Total Variable Costs $ 53.76 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (2) Irrigation Land Charge (Rent) 6.45 3.23 2.36 8.00 6.62 $ 26.66 $ $206.22 ac. h r. ac. ac. Total Fixed Costs 5. Total Costs 6. Net Returns 3.67 1.33 8.91 62.22 1 2.22 1 1 $ 3.67 2.95 8.91 62.22 $ 77.75 $131.53 $128.47 7. Government Payments 8. Net Returns Including Government Payment Developed by Extension Economists-Management, TAES, ~AtW. $128.47 New, 1972 A F C O fi 05005121 ALFALFA. IRRIGATED. ROLLING PLAINS I Estimated Costs, And Requirements Per Acre Of Alfalfa. Typical Management Labor Fuel, Oil, Item n __•.__. Times u-.„.0 Tractor or ¥ . „__._, Fixed costs No. Date Over Ho"" Mach. Hrs. L«b.,Rep. Per Acre (1) Per Acre Operation Fertilize 2 Apr 1 .20 .10 Swather 2,10 May-Sep 4 1.00 .80 1.57 1.19 Baler 2,14 May-Sep 4 2.31* 1.32 1.66 2.48 3.51 2.22 $ 3.23 $ 3.67 5.00 15.75 $ 5.84 $ 8.91 To t a l Irrigation 47-51 Apr-Aug 5 $ - $ - (1) Labor hours calculated at 1.25 times tractor hours except where noted by * Oevelopep by Extension Economists-Management, TAES, T/MC of Agriculture cooperating. HomC Distributed in furtherance7■"«« of the Acts oi Congress of May 8. 1914. amended, and June 30. 1914. ^aSSSuuYS^^^^^T\^ Economics' A&M University and the as United States Department AECO 6 '^%j 05006212 ALFALFA ESTABLISHMENT, DRYLAND, ROLLING PLAINS I_ f^ Estimated Costs And Returns Per Acre Of Alfalfa Establishment, High Level Management Item Unit Price or Cost/Unit Quantity Value or Cost 1. No Income 2. Variable Costs: Pre-Harvest: Seed Fertilizer (16-20-0) Machinery Tractor (21) Tractor (22) Labor, Tractor & Machinery Interest on Op. Cap. lb. ac. ac h r. h r. h r. $ $ .40 3.02 .29 1.58 1.24 2.00 .08 .20 1 1 .63 .20 1.04 7.31 Total Variable Costs 3. Fixed Costs: Machinery Tractor (21) Tractor (22) $ 8.00 3.02 .29 .99 .25 2.08 .58 $ 15.31 ac. h r. h r. .62 2.09 1.33 1 .63 .20 Total Fixed Costs .62 1.32 .27 $ 2.21 4 . To t a l C o s t s ac. 5. Less landlord's share of fertilizer • ac. $ $ 17.42 1.01 1 $ -1.01 6. Government Payments 7. Net Returns Including Government Payments $ 16.41 J^N Developed by Extension Economists-Management, TAES, TAMU. New, 1972 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6 05006211 ALFALFA ESTABLISHMENT. DRYLAND. ROLLING PLAINS _I Estimated Costs, And Requirements Per Acre Of Alfalfa Establishment, High Level Management Operation Item No. Date «~ Over Labor Fuel, Oil, Hours * » *■« £ (1) Per ■£ * £ < • Acre Chisel 1 July 1 .25 .20 . 11 $ .07 Offset Disc 1 Aug-Sep 1 .19 .15 .10 .21 Fertilize 1 Sep-Oct 1 .35 .28 Drill 1 Sep-Oct 1 .25 .20 .08 .34 1.04 .83 $ .29 $ .62 To t a l (1) Labor hours calculated at 1.25 times tractor hours except where noted by * Developed by Extension Economists-Management, TAES, TAMU. ^Kil^«X^i«.W^nl^^fi!S1?refcM? of Agriculture cooperating. DistributedHome in furtherance *">*">**<*> of the Acts Texa« of Congress A&M University of May 8.and 1914.the as United amended, States and June Department 30. 1914. AECO 6 05005212 ALFALFA. DRYLAND. ROLLING PLAINS I Estimated Costs And Returns Per Acre Of Alfalfa, High Level Management Item 1. Gross receipts, from production: Hay Unit Price or Cost/Unit ton $ 40.00 ac. ac. h r. h r. ac 2.73 2.25 1.24 2.00 2.00 .08 Quantity Value or Cost 3.5 $140.00 1 1 $ 2.73 2.25 .12 .24 2.00 .29 $ 7.63 2. Variable Costs: Pre-Harvest: Seed - 1/6 Establishment cost Fertilizer (0-30-0) Tractor (22) Labor, Hand Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest Harves t: Custom - Mow, bale, & haul $ bale .1 .12 1 3.67 .35 1155 Total Variable Costs $ 40.25 $ 47.88 3. Income Above Variable Costs 4. Fixed Costs: Tractor (22) Land Charge (Rent) $ 92.12 h r. ac. 1.33 32.17 .1 L Total Fixed Costs $ .13 32.17 $ 32.30 5. Total Costs $ 80.18 6. Net Returns $ 59.82 7. Government Payments 8. Net Return Including Government Payment ■- ■P g _ g J - p P g P. by . E x t e n s i o n- , . . . . . T_A E. S,, Economists-Management, TA M U . $ 59.82 .....,. ^^ New 1972 ui congress oi May 8, 1914, as amended, and June 30, 1914. AECO 6 05005211 ALFALFA, DRYLAND, ROLLING PLAINS I Estimated Costs, And Requirements Per Acre Of Alfalfa, High Level Management Operation Fertilize ^ Labor Fuel, Oil, Item _-. _ Times u Tractor or T . 0«^ Fixed costs Date ^e*s Hours ^ Hrg# Lub., Rep. Per Acre (1) Per Acre 22 Apr 1 .12 .10 $ - $ - / - ^ k (i) Labor hours calculate' a_ 1.25 ti tes v:tor hours except where noted by * Developed by Extension lconomists-Minagement, TAES, ta.v . Cooperative Extension Work in Agriculture and Home Econoroi. ?s A&M University and the United States Department of Agriculture coopciating. Distributed in furtherancr of the Ari_ >f Congress of May 8. 1914, as amended, and June SO. 1914. AECO 6 05006222 ALFALFA ESTABLISHMENT. DRYLAND. ROLLING PLAINS I_ Estimated Costs And Returns Per Acre Of Alfalfa Establishment, Typical Management ( ^ Item Unit Price or Cost/Unit Quantity Value or Cost 1. No Income 2. Variable Costs: Pre-Harvest: Seed Fertilizer Machinery Tractor (1) Tractor (2) Labor, Tractor & Machinery Interest on Op. Cap. lb. ac. ac. h r. h r. h r. $ $ .40 3.02 .45 1.37 1.24 2.00 .08 20 1 1 $ 8.00 3.02 .45 1.03 .72 2.70 .64 .75 .58 1.35 7.96 Total Variable Costs $ 16.56 3. Fixed Costs: Machinery Tractor (1) Tractor (2) ac. h r. h r. .92 1.82 1.33 1 $ .75 .58 Total Fixed Costs ^ \ $ 3.05 4 . To t a l C o s t s $ 19.61 5. Less landlord's shrre of fert. ac 1.01 1 $ -1.01 6 . To t a l C o s t Oeveloped by .92 1.36 .77 $ 18.60 Extension Economists-Management, TA E S , ■ t>m. New i972 AECO 6 05006221 ALFALFA ESTABLISHMENT. DRYLAND, ROLLING PLAINS I_ Estimated Costs, And Requirements Per Acre Of Alfalfa Establishment, Typical Management Labor Fuel, Oil, _. _ * a I t e m n a « . 0 T i m e s „ _ „ _ _ T r a c t o r o r T , R p _ F i x e d O p e r a t i o n N D a t e Q H o u r s ^ h H L u b . , R e p . P e r A cc or se t s Per Acre (1) Chisel 1,7 July 1 .31 .50 .21 $ .28 Tandem Disc 2,6 Aug-Sep 1 .37 .30 .15 .30 Fertilize 2 Sep-Oct 1 .35 .28 Drill 1,16 Sep-Oct 1 .32 .25 .09 .34 1.35 1.33 $ .45 $ .92 Total /^% (1) Labor hours calculated at 1.25 times factor hours except where noted by * Developed sy Extension Economists-Management, TAES, TAMl. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO. 1914. AECO 6 05005222 ALFALFA, DRYLAND, ROLLING PLAINS I / " ^ Estimated Costs And Returns Per Acre Of Alfalfa, Typical Management Item 1. Gross receipts, from production: Hay Unit Price or Cost/Unit ton $ 40.00 ac. ac. ac. h r. ac. 3.10 1.50 1.24 2.00 2.00 .08 Quantity Value or Cost 2.5 $100.00 1 1 $ 2. Variable Costs: Pre-Harves t: 1/6 Establishment cost Fertilizer (0-20-0) Tractor (2) Labor, Tractor & Machinery Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Custom - Mow, bale & haul $ .10 .12 1 3.48 $ bale .35 2 $ 28.70 Total Variable Costs $ 35.94 3. Income Above Variable Costs 4. Fixed Costs: Tractor (2) Land Charge (Rent) ^ 3.10 1.50 .12 .24 2.00 .28 7.24 $ 64.06 ac. ac. Total Fixed Costs 1.33 23.03 1 .10 $ .13 23.03 $ 23.16 5 . To t a l C o s t s $ 59.10 6. Net Returns $ 40.90 7. Government Payments 8. Net Returns Including Government Payment ^ $ 40.90 v P_e__?J_oped_by Extension Economists-Management, TAES, TAMU. New, 1972 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30. 1914. AF.rn a 05005221 ALFALFA, DRYLAND, ROLLING PLAINS I_ Estimated Costs, And Requirements Per Acre Of Alfalfa, Tvp-irai Mflnag0m0nf Labor Fuel, Oil, ^^ ,O. p , .e_r*a. t. i_o_n. . N I *o* # I tDeamt e n ? _ ^ 0 T i m e s H r . . . o T r a c t o r o r T _ . D q t % F i x e d c o s t s / Qver Hours ljlAdhm Bxam Lub., Rep. Per Acre (1) Fertilize 2 Apr 1 .12 Per ' .10 Acre $ - $ - (1) Labor hours calculated at 1.25 times ractor hours except where noted by * Oevelopeo by Extension Economists-Management, TAES, TAMU o fAgriculture of X k u U u r ^cooperating. ^ H ° m C Distributed E c o n o m yin. furtherance " ' , x a s Aof & the M Acts U n i rv Congress e r s i t y aofnMay d t h8.e1914. U n ias t eamended, d S t a t eand s DJune e p a30. rtm 1914. ent AECO fi COASTAL BERMUDAGRASS ESTABLISHMENT, IRRIGATED, ROLLING PLAINS I 05058112 Estimated Costs And Returns Per Acre Of Coastal Bermudagrass Establishment, High Level Management Item Unit Price or Cost/Unit ac. ac. ac. ac h r. h r. h r. h r. ac. $ $ 20.00 3.02 5.50 .29 1.58 1.24 2.00 2.00 2.41 .08 Quantity Value or Cost 1. No Income 2. Variable Costs: Pre-Harvest: Sprigging (custom) Fertilizer (16-20-0) Herbicide Machinery Tr a c t o r. ( 2 1 ) Tractor (22) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinery Interest on Op. Cap. 1 1 1 1 .44 .35 .79 2 1 18.96 Total Variable Costs 3. Fixed Costs: Machinery Tractor (21) Tractor (22) Irrigation $ 39.45 ac. h r. h r. ac. .62 2.07 1.33 3.68 1 .44 *.35 4 1 Total Fixed Costs $ .62 .92 .46 3.68 $ 5.68 4. Total Costs 5. Less Landlord's share of fert, $ 20.00 3.02 5.50 .29 .70 .43 1.58 4.00 2.41 1.52 $ 45.13 ac. 6 . To t a l C o s t 1.01 1 $ -1.01 $ 44.12 J^N Developed by Extension Economists-Management, TAES, TAMU. New, 1972 <:«H.pera.ivc Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Apiculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30. 1914 A _.-_"•_-_ R 05058111 COASTAL BERMUDAGRASS ESTABLISHMENT, IRRIGATED. ROLLING PLAINS _I Estimated Costs, And Requirements Per Acre Of Coastal Bermudagrass Establishment, High Level Management Labor Fuel, Oil, __,, Item na#.0 Times nrtlI-.0 Tractor or T . p„ Fixed costs Operation No. Date Over H<^8 Mach. Hrs. L«b.,Rep. Per A c r e (1) Per Acre Chisel Jan 1 .25 .20 $ . 11 $ .07 Offset Disc Feb 1 .19 .15 .10 .21 Fertilize Apr 1 .35 .20 .08 .34 .79 .55 $ .29 $ .62 2.00 6.50 $ 2.41 $ 3.68 Total Irrigation 47-51 Apr-Jun 2 (1) Labor hours calculated at 1.25 times tractor hours except where noted by * ^ Oevelopeo by Extension Economists-Management. TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO. 1914. AECO 6 05057112 COASTAL BERMUDAGRASS, IRRIGATED, ROLLING PLAINS I_ Estimated Costs And Returns Per Acre Of Coastal Bermudagrass, High Level Management Item Unit 1. Gross receipts, from production: Hay Price or Cost/Unit Quantity Value or Cost ton $ 25.00 10 $250.00 ac. ac. ac. hr. hr. h r. ac. ac. 4.40 42.64 1 1 1 $ 4.40 42.64 2. Variable Costs: Pre-Harvest: Establishing Cost, $44, 10 yrs. F e r t i l i z e r ( 4 11 - 4 8 - 1 ) Machinery Tractor (23) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinery Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Custom Operations: Mow, bale, haul $ bale .62 1.24 2.00 2.00 7.23 2.00 .08 .35 1 6 1 1 35. 76 334 2.00 12.00 7.23 2.00 2.86 $ 74.37 $116.90 Total Variable Costs $191.27 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (23) Irrigation Land Charge (Rent) .62 .62 • 50 $ 58.73 ac. hr. ac ac Total Fixed Costs 5. Total Costs 6. Net Returns .66 1.33 11.04 29.85 .50 $ .66 .67 11.04 29.85 $ 42.22 $233.49 $ 16.51 7. Government Payments 8. Net Returns Including Government Payment Developeo by Extension Economists-Management, TAES, TAMU. M: ^X^^^ $ 16.51 New, 1972 AECO 6 COASTAL BERMUDAGRASS, IRRIGATED, ROLLING PLAINS I Estimated Costs, And Requirements Per Acre Of Coastal Bermudagrass, High Level Management Operation 05057111 Labor Fuel, Oil, _, Item nat-** Times HntirQ Tractor or T , Dort Fixed costs No. Date Over H°?" Mach. Hrs. L«b.,Rep. Per Acre (1) Per Acre Fertilizer 32 Irrigation 47-51 Apr-Aug 6 Apr-Aug 5 1.00* 6.00 .50 $ .62 $ .66 19.50 $ 7.23 $11.04 ^ \ (1) Labor hours calculated at 1.25 times tractor hours except where noted by * ■~*X Developed by Extension Economists-Management, TAES, TAMU Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, anT June SO^H AECO 6 05058122 COASTAL BERMUDAGRASS ESTABLISHMENT. IRRIGATED, ROLLING PLAINS I Estimated Costs And Returns Per Acre Of Coastal Bermudagrass Establishment, Typical Management jf^ Item Unit Price or Cost/Unit ac. ac. ac. ac. h r. h r. h r. h r. h r. $ $ 20.00 3.02 5.50 .36 1.37 1.24 2.00 2.00 2.41 .08 Quantity Value or Cost 1 1 1 1 .31 .72 1 2 1 18.30 $ 20.00 3.02 5.50 .36 .42 .89 2.00 2.00 2.41 1.46 1. No Income 2. Variable Costs: Pre-Harvest: Sprigging (custom) Fertilizer (16-20-0) Herbicide Machinery Tractor (1) Tractor (2) Labor, Tractor & Machinery L a b o r, I r r i g a t i o n Irrigation Machinery Interest on Op. Cap. Total Variable Costs jf*^ 3. Fixed Costs: Tractor (1) Tractor (2) Irrigation $ 38.06 h r, h r, ac. Total Fixed Costs 4. Total Costs 5. Less landlord's share of fertilizer 6 . To t a l C o s t ife_^g|.OP.Eo by Extension Economists-Management. TAES, TAMU. 1.82 1.33 3.68 .31 .72 $ .56 .96 3.68 $ 5.20 $ 43.26 $ -1.01 $ 42.25 New, 1972 AECO 6 05058121 COASTAL BERMUDAGRASS ESTABLISHMENT. IRRIGATED. ROLLING PLAINS I_ Estimated Costs, And Requirements Per Acre Of Coastal Bermudagrass Establishment, Typical Management Labor Fuel, Oil, _^ Times «_„__ Tractor or T , DaT> Fixed costs Item Date Operation Over Ho"" Mach. Hrs. L"b'»A ReP • Per Acre No. (1) Per Acre Chisel 1,7 Jan 1 .31 .50 $ .21 $ .28 Tandem Disc 2,6 Feb 1 .37 .30 .15 .30 Fertilize 2 Apr 1 .35 .28 1.03 1.08 $ .36 $ .58 2.00 6.50 $ 2.41 $ 3.68 Total Irrigation 47,51 Apr-Jun 2 ^ \ ^ \ (1) Labor hours calculated at 1.25 times tractor hours except where noted by * Developed by Extension Economists-Management, TAES, TAMU. e^AoV£Z~l™i0n WOfkn!nDistributed 2Fk2tlu^1Bd Home EconomicsT*™ A&M University and as theamended, United States Department of Agriculture cooperating. in furtherance of the Acts of Congress of May 8. 1914. and June 30. 1914. AECO 6 05057122 COASTAL BERMUDAGRASS, IRRIGATED, ROLLING PLAINS I_ Estimated Costs And Returns Per Acre Of Coastal Bermudagrass, Typical Management J ^ Item Unit 1, Gross receipts, from production: Hay Price or Cost/Unit ton $ 25.00 ac. ac ac hr. h r. hr. ac. ac $ 4.20 23.49 .49 1.24 2.00 2.00 4.82 2.00 .08 Quantity Value or Cost $175.00 2, Variable Costs: Pre-Harvest: Establishing Cost $42, 10 yrs. Fertilizer ( 2 11 - 4 6 - 0 ) Machinery Tractor (2) L a b o r, Tr a c t o r & M a c h i n e r y Labor, Irrigation Irrigation Machinery Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Custom Operations: Mow, bale, haul bale .35 1 1 1 $ 4.20 23.49 .40 .80 4 1 1 22.65 231 1.60 8.00 4.82 2.00 1.81 $ 46.91 $ Total Variable Costs 80 .85 $127 .76 3, Xncome Above Variable Costs 4, Fixed Costs: Machinery Tractor (2) Irrigation Land Charge (Cash Rent) .49 .50 ac hr. ac ac Total Fixed Costs .53 1.33 7.36 23.32 $ 47,.24 $ .53 .53 7..36 23,.32 $ 31.,74 .40 5, Total Costs $159.,50 6, Net Returns $ 15.,50 7, Government Payments 8, Net Return Including Government Payment Developed by Extension Eoonomists-Management, TAES, tamu. $ 15.50 New, 1972 <..H-peratiYc Extension Work in Agriculture and Home Economics. Texas A&M University and the United States DcDartme~7f AK.iru.tuvc roopc,a„„g. Distributed in furtherance of the Acts of Congress of May 8.'1914. as amendedL and Ju!.c 30.1914 AECO 6 05057121 COASTAL BERMUDAGRASS, IRRIGATED, ROLLING PLAINS I Estimated Costs, And Requirements Per Acre Of Coastal Bermudagrass, Typical Management Labor Fuel, Oil, „. 3 ^^k tO\ p *e4r ~a t Ii toenm Nno-#* - _ _ T i m e s « « „ „ T r a c t o r o r T . D a f , F i x e d c o s t D a t e Q v e r H o u r s ^ ^ H r g # L u b . , R e p . P e r A c rse 1' (1) Per Acre Fertilize 2 Apr-Aug 4 Irrigation 47-51 Apr-Aug .80* 4 4.00 .40 13.00 $ $ .49 $ .53 4.82 $ 7.36 (1) Labor hours calculated at 1.25 times tractor hours except where noted by ^ Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June 30, 1914. AECO 6 \ 05075212 COTTON, DRYLAND, ROLLING PLAINS I Estimated Costs And Returns Per Acre Of Cotton, High Level Management Item Unit 1. Gross receipts, from production: _/ Lint lb. Seed ton Price or ~ . Va l u e or Cost/Unit ^Uan X y Cost $ .185 58.00 225 .27 To t a l $ 41.62 15.66 $ 57.28 2. Variable Costs: Pre-Harvest: Seed Fertilizer (33-0-0) Machinery Tractor (21) Tractor (22) Tractor (23) Labor, Tractor & Machinery Labor, Hand (hoe) Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest lb. ac. ac. h r. h r. h r. h r. h r. ac $ $ .195 3.13 1.64 1.58 1.24 .67 2.00 1.50 2.00 .08 Harvest: Labor Tractor (2) Hauling, ginning B/T Subtotal, Harvest h r. h r. bale 2.00 1.24 20.30 15 1 1 1.19 .72 .12 2.52 1 1 9.54 .50 .25 .45 Total Variable Costs 1.00 .31 9.13 $ 10.44 $ $ 30.28 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (21) Tractor (22) Tractor (23) Land Charge (Rent) $ 2.92 3.13 1.64 1.88 .89 .08 5.04 1.50 2.00 .76 $ 19.84 $ 27.00 ac. h r. h r. h r. ac. 2.31 2.09 1.33 .65 11.25 Total Fixed Costs 5 . To t a l C o s t s 6. Net Returns 7. Government Payments, less rent (.15/lb. x 225 lbs.)2/ 8, Net Return Including Government Payment 1 1.19 .97 .12 1 $ 2.31 2.49 1.29 .08 11.25 $ 17.42 $ 47.70 $ 9.58 $ 25.31 $ 34.89 JL/ 450 pounds on acre of cotton. 2/ Based on planted acres. No allowance is made for set-aside acreage of 20%. O g v g L O P E O b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United Stales .Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, a.Pamended^ and JuncTim AECO 6 05075211 COTTON, DRYLAND, ROLLING PLAINS I Estimated Costs, And Requirements Per Acre Of Cotton, High Level Management Labor m Fuel, Oil, /**\ Item t. fc Times u „ Tractor or T . PoT1 Fixed costs ^ Operation ^ Date Qver Hours m^. Hr8- Lub., Rep. Per Acre ; (1) Per Acre Shred 23,32 Nov-Dec 1 .12 .10 .07 Offset Disc 21,27 Nov-Dec 1 .19 .15 .10 .21 Moldboard 21,29 Dec-Jan .3 .29 .23 .16 .33 Chisel 21,28 Dec-Jan .7 .17 .14 .07 .10 Fertilize 22 Mar .35 .28 Tandem Disc 21,26 Mar .10 .08 .09 .05 Ust 21,24 Mar-Apr 1 .27 .22 .31 .38 Plant 21,24 May-Jun 1.2 .27 .22 .31 .38 Sandfight 23,39 May-Jun 1 .02 .02 .01 Rolling Cult. 21,30 Jun 1 .19 .15 .14 .18 Cultivate 22,25 Jun-Aug 2 .55 .44 .38 .51 2.52 2.03 Total Harvest Strip 22,36 1 .3 Nov-Dec 1 .50 $ .25 1.64 $ .46 $ . .16 .01 $ 2.31 $ .79 (1) Labor hours calculated at 1.25 times tractor hours except where noted by * Developed Extension Economists-Management. TAES, TAMU. - — r — by —— — w. ' ^ Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department pf Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO. 1914. AECO 6 05075222 COTTON, DRYLAND, ROLLING PLAINS I f^ Estimated Costs And Returns Per Acre Of Cotton, Typical Management Item Unit or " " " " ^ . .Price "t. Cost/Unit 1. Gross receipts, from production: 1/ Lint lb. Seed ton $ .185 58.00 Quantity Value or Cost 175 $ 32.37 12.18 .21 To t a l $ 44.55 2. Variable Costs: Pre-Harvest: Seed Machinery Tractor (1) Tractor (2) Tractor (3) Labor, Tractor & Machinery Labor, Hand Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest lb, ac, h r. h r. h r. h r. h r. ac $ Harvest: Labor Machinery Tractor (2) Ginning, B/T Subtotal, Harvest h r. ac h r. bale .15 1.33 1.37 1.24 .67 2.00 1.50 2.00 .08 2.00 .33 1.24 20.30 15 1 1.69 .60 .35 3.27 2.00 1 9.21 .75 1 $ $ 1.50 .33 .31 7.10 9.24 $ 28.39 3, Income Above Variable Costs $ 16.16 ac. h r. h r. h r. ac. 2.69 1.82 1.33 .65 9.36 Total Fixed Costs 5. Total Costs 6. Net Returns 7. Government Payments, Less Rent (.15/It. x 175 lbs.)2/ JP*\ 2.25 1.33 2.32 .74 .23 6.54 3.00 2.00 .74 $ 19.15 .25 .35 Total Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Tractor (3) Land Charge (Rent) $ 8. Net Return Including Government Payment 1 1.69 .85 .35 1 $ 2.69 3.08 1.13 .23 9.36 $ 16.49 $ 44.88 $ (.33) $ 19.69 $ 19.36 1/ 350 pounds on acre of cotton. 2/ Based on planted acres. No allowance is made for set-aside acreage of 20% Oeveloped by Extension Economists-Management, TA E S , TA M U . „ * Cooperative Extension Work in Agriculture and Home Fconomirc TVv_c a_.„* n ■ ~. 7~;—^7~.—. New, lb>/Z AECO 6 05075221 COTTON, DRYLAND, ROLLING PLAINS I_ Estimated Costs, And Requirements Per Acre Of Cotton, Typical Management Labor Fuel, Oil, _,_ . . _ . , I t e m - , . „ T i m e s u « . , - . _ , T r a c t o r o r T. « „ F i x e d c o s t s Operation No# Date 0yer Hours j,^. Hr8. Lub., Rep. Per Acre (1) Per Acre Shred 3,9 Nov-Dec 1 .41 .33 $ .06 $ .13 Tandem Disc 2,6 Dec-Jan 1 .37 .30 .15 .30 Moldboard 1,8 Dec-Jan 3 .17 .14 .07 .14 Chisel 1,7 Dec-Jan 7 .37 .30 .13 .17 Tandem Disc 2,6 Mar •3 .12 .10 .05 .10 List 1,4 Mar-Apr 1 .31 .25 .23 .33 Plant 1,4 May-Jun 1 .31 .25 .23 .33 Sandfight 3,18 May-Jun 1 .02 .02 .01 .01 Knife 2,19 Jun 1 .25 .20 .08 .17 Cultivate 1,5 Jun-Aug 3 .94 .75 .32 .45 3.27 2.64 $ 1.33 $ 2.13 Harvest Strip 2,15 Nov-Dec 1 .75 .25 $ .33 $ .56 To t a l (1) Labor hours calculated at 1.25 times tractor hours except where noted by * Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30. 1914. AECO 6 ^S 05090212 FORAGE SORGHUM SILAGE, DRYLAND, ROLLING PLAINS I_ Estimated Costs And Returns Per Acre Of Forage Sorghum Silage, High Level Management Unit Item 1. Gross receipts, from production: Silage, 15 tons green weight25% shrink ton Price or Cost/Unit Quantity Value or Cost $ 8.00 11.25 $ 90.00 $ 10 1 1 $ 2. Variable Costs: Pre-Harvest: Seed Fertilizer (60-0-0) Machinery Tractor (21) Tractor (22) Tractor (23) Labor, Tractor & MachineryPickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Chop, haul, pack lb. ac. ac. hr. h r. h r. h r. ac. .21 5.70 1.64 1.58 1.24 .72 .12 .89 .08 2.52 5.04 2.00 .77 $ 20.10 .67 2.00 2.00 .08 $ ton 1.19 2.10 5.70 1.64 1.88 3.00 1 9.67 15 $ 45.00 Total Variable Costs $ 65.10 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (21) Tractor (22) Tractor (23) Land Charge (Rent) $ 24.90 ac. hr. hr. hr. ac. 2.31 2.09 1.33 1 .65 12.97 $ 1.19 1 Total Fixed Costs .72 .12 2.31 2.49 .96 .08 12.97 $ 18.81 5. Total Costs $ 83.91 6. Net Returns $ 6.09 7. Government Payments 8. Net Return Including Government Payment $ 6.09 j ^ \ Oeveloped by Extension Economists-Management, TAES, TAMU. . u . ,„ , .--- ~New. 1972 (...operative Extension Work ,n Agriculture and Home Economics. Texas A&M University and the United States DepartmlnTol Agriculture cooperating. Distributed ,n furtherance of the Ams of Congress oi May 8, 1914, as amended, and June 30. 1914. AECO 6 FORAGE SORGHUM SILAGE, DRYLAND, ROLLING PLAINS I_ Operation 05090211 Estimated Costs, And Requirements Per Acre Of Forage Sorghum Silage, High Level Management Labor Fuel, Oil, __ I t e m nDa a# t.e- T , .™ „ - - MTar cahc.t oH r r so .r LTu b. . ,~B e^p . F iPxeerd Accor e sts Oi vmeer s H«° u No. (1) Per Acre Shred 23,32 Dec 1 .12 .10 $ .07 $ .16 Offset Disc 21,27 Jan 1 .19 .15 .10 .21 Moldboard 21,29 Jan-Feb .3 .29 .23 .16 .33 Chisel 21,28 Jan-Feb .7 .17 .14 .07 .10 Fertilize 22 Mar-Apr 1 .35 .28 Tandem Disc 21,26 Mar-Apr .3 .10 .08 .09 .05 List 21,24 Mar-Apr 1 .27 .22 .31 .38 Plant 21,24 May .27 .22 .31 .38 Sandfight 23,39 May-Jun 1 .02 .02 .01 .01 Rolling Cult. 21,30 May-Jun 1 .19 .15 .14 .18 Cultivate 22,25 Jun-Aug 2 .55 .44 .38 .51 2.52 2.03 $ 1.64 $ 2.31 To t a l 1.2 ^ \ ^ \ (1) Labor hours calculated at 1.25 times • actor hourr, except where noted by * Developed by Extension Economists-Management, TAES, ta;-.'. Cooperative Extension Work in Agriculture and Home Economics, exas A&M University and the United States Department o? Agriculture cooperating. Distributed in furtherance of the Act- o Congress of May 8. 1914. as amended, and June 80. 1914. AECO 6 05090222 FORAGE SORGHUM SILAGE, DRYLAND, ROLLING PLAINS I_ Estimated Costs And Returns Per Acre Of Forage Sorghum Silage, Typical Management Item Unit 1. Gross receipts, from production: Silage, 10 tons green weight, 25% shrink ton Price or Cost/Unit $ 8.00 Quantity Va l u e o r Cost 7.5 $ 60.00 10 1 1 1.44 .88 .35 3.30 1 9.53 $ 2.10 3.80 1.27 1.97 1.09 .23 6.60 2.00 .76 2. Variable Costs: Pre-Harvest: Seed Fertilizer (40-0-0) Machinery Tractor (1) Tractor (2) Tractor (3) Labor, Tractor & Machinery Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest lb. ac. ac. h r. h r. h r. h r. ac. $ $ .21 3.80 1.27 1.37 1.24 .67 2.00 2.00 .08 $ 19.82 Harvest: Chop, haul, pack ton 3.00 0 Total Variable Costs $ 49.82 3. Income Above Variable Costs Fixed Costs: Machinery Tractor (1) Tractor (2) Tractor (3) Land Charge (Rent) $ 30.00 $ 10.18 ac. h r. h r. h r. a<-. Total ^ixed Costs 2.04 1.82 1.33 .65 8.65 1 1.44 .88 .35 1 $ 2.04 2.62 1.17 .23 8.65 $ 14.71 5 . To t a l C o s t s $ 64.53 6. Net Returns $ (4.53) 7. Government Payments 8. Net Return Including Government Pavmer $ (4.53) Developeo by Extension Economists-Management, TAES, Ta: 1U. New, 1972 Cooperative Extension Work in Agriculture and Home Econon :< Texas A&M Unvcrsiiv and the United States Department cf AkmiiiIiiii-c ioopnating. Distributed in furtherance of the A- - . Congress ol May 8. 1914. as amended, and June 30. H>14. AECO 6 FORAGE SORGHUM SILAGE, DRYLAND, ROLLING PLAINS I_ 05090221 Estimated Costs, And Requirements Per Acre Of Forage Sorghum Silage, Typical Management Labor Fuel, Oil, r. - « . « I i m e 6 » « . , - . _ _ i r a c c o r o r T . D „ n x e a c u s i No. Date Over Ho^s Mach. Hrs. L«b.,Rep. Per Acre (1) Per Acre Operation Shred 3,9 Dec 1 .41 .33 $ .06 $ .13 Tandem Disc 2,6 Jan 1 .37 .30 .15 .30 Moldboard 1,8 Jan-Feb .3 .3 7 .14 .07 .14 Chisel 1,7 Jan-Feb .7 .37 .30 .13 .17 Fertilize 2 Mar-Apr 1 .35 .28 Tandem Disc 2,6 Mar-Apr .3 .12 .10 .05 .10 List M Mar-Apr 1 .31 .25 .23 .33 Plant 1,4 May .31 .25 .23 .33 Sandfight 3,18 May-Jun 1 .02 .02 .01 .01 Knife 2,19 May-Jun 1 .25 .20 .08 .17 Cultivate 1,5 Jun-Aug 2 .62 .50 .26 .36 3.30 2.67 $ 1.27 $ 2.04 To t a l 1.2 (1) Labor hours calculated at 1.25 times tractor hours except where noted by ^ Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO. 1914. AECO 6 \ 05110212 GUAR, DRYLAND, ROLLING PLAINS I_ Estimated Costs And Returns Per Acre Of Guar, High Level Management Unit Price or Cost/Unit cwt. $ 5.00 Pre-Harvest: Seed Machinery Tractor (21) Tractor (22) Tractor (23) Labor, Tractor & Machinery Labor, Hand (hoe) Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest lb. ac. h r. h r. h r. h r. h r. ac. $ $ Harvest: Combine Hauling Subtotal, Harvest ac. cwt, Item 1. Gross receipts, from production: Guar Beans Quantity 10 Value or Cost $ 50.00 2. Variable Costs: .09 1.50 1.58 1.24 .67 2.00 1.50 2.00 .08 4.00 .10 5 1 1.11 .44 .04 1.96 1 1 5.85 1 10 Total Variable Costs $ .45 1.50 1.75 .55 .03 3.92 1.50 2.00 .47 $ 12.17 $ 4.00 1.00 $ 5.00 $ 17.17 3. Income Above Variable Costs $ 32.85 4. Fixed Costs: Machinery Tractor (21) Tractor (22) Tractor (23) Land Charge (Rent) ac. h r. h r. h r. h r. Total Fixed Costs 1.97 2.09 1.33 .65 14.85 1 1.11 .44 .04 1 $ 1.97 2.32 .58 .03 14.85 $ 19.75 5. Total Costs $ 36.92 6. Net Returns $ 13.08 7. Government Payments 8. Net Return Including Government Payment ■P - e - - g . l . p P g _ L ! - J L _ E x T E N s i O N Economists-Management, scssr "".r^^^ TA E S , TA M U . $ 13.08 New, 1972 AECO 6 05110211 GUAR, DRYLAND, ROLLING PLAINS I Estimated Costs, And Requirements Per Acre Of Guar, High Level Management Labor _ . Fuel, Oil, F±xed costs Operation **~ Moldboard 21,29 Chisel 21,28 Ta n d e m Disc List 21,24 Rolling S a n d fi g h t Plant Rolling Cultivate To t a l «. «T Hours Dec .3 1.4 Mar Mar-Apr Cult. 21,30 23,39 1 1.1 21,30 Jun 22,36 Jul 1.96 1.59 .19 1 .22 .19 .27 1.50 $ .20 .09 .05 .38 .18 .02 .02 .31 .38 .14 .19 $ ~ .33 .14 .14 .15 .22 «™ .31 .15 .04 .27 $ .08 .22 .04 1 .16 .28 .10 .27 2 Jun $ .34 1 Apr Lub.^Rep. .23 .3 May 21,24 Cult. .29 Jan-Feb 21,26 *™?<£ .18 .25 1.97 (1) Labor hours calculated at 1.25 times tractor hours except where noted by *.. ^ Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June SO, 1914. AECO 6 05110222 GUAR, DRYLAND, ROLLING PLAINS I Estimated Costs And Returns Per Acre Of Guar, Typical Management Item 1. Gross receipts, from production: Guar Beans Unit Price or Cost/Unit cwt, $ 5.00 lb. ac. h r. h r. h r. h r. h r. ac. $ $ Quantity Value or Cost $ 30.00 2. Variable Costs: Pre-Harvest: Seed Machinery Tractor (1) Tractor (2) Tractor (3) Labor, Tractor & Machinery Labor, Hand Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest j ^ \ Harvest: Materials: Combine Hauling Subtotal, Harvest ac. cwt, .09 1.09 1.37 1.24 .67 2.00 1.50 2.00 .08 8 1 1.49 .50 .04 2.5 2 1 7.25 4.00 .10 .72 1.09 2.04 .62 .03 5.00 3.00 2.00 .58 $ 15.08 $ 4.00 .60 $ 4.60 Total Variable Costs $ 19.68 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Tractor (3) Land Charge (Rent) $ $ 10.32 ac. h r. h r. h r. ac. Total Fixed Costs 1.75 1.82 1.33 .65 8.48 1 1.49 .50 .04 1 $ 1.75 2.71 .67 .03 8.48 $ 13.64 5. Total Costs $ 33.32 6. Net Returns $ (3.32) 7. Government Payments 8. Net Return Including Government Payment Developed by Extension Economists-Management, TAES, TAMU. $ (3.32) New, 1972 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8.'1914. as amended and Ju^"^ 19.4 AECO 6 05110221 GUAR, DRYLAND, ROLLING PLAINS I_ Estimated Costs, And Requirements Per Acre Of Guar, Typical Management Operation Labor Fuel, Oil, I t e m r. _ « - _ _ Ti m e s u ~ , . - . _ Tr a c t o r o r T . - „ F i x e d c o s t s No. Date Over H°!f*s Mach. Hrs. Lub., Rep. Per Acre (1) Per Acre Moldboard 1,8 Dec .3 .17 .14 $ .03 $ .14 Chisel 1,7 Jan-•Feb 1.4 .74 .60 .26 .34 Tandem Disc 2,6 Mar .12 .10 .05 .10 List 1,4 Mar-•Apr 1 .31 .25 .23 .33 Sandfight 3,18 May 2 .04 .04 .02 .02 Knife 2,19 Apr 1 .25 .20 .08 .17 Plant 1,4 Jun 1.1 .31 .25 .23 .33 Knife 2,19 Jun 1 .25 .20 .08 .17 Cultivate 1,5 Jul 1 .31 .25 .11 .15 2.50 2.03 $ 1.09 $ 1.75 To t a l .3 ^ * \ (1) Labor hours calculated at 1.25 times tractor hours except where noted by * ■^ \ Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and J^ne^WM. AECO 6 06225212 WHEAT, DRYLAND, ROLLING PLAINS I_ Estimated Costs And Returns Per Acre Of Wheat, High Level Management Item 1. Gross receipts, from production: Wheat Grazing Unit Price or Cost/Unit bu. AUM $ 1.18 8.00 Quantity 30 .6 To t a l 2. Value or Cost $ 35.40 4.80 $ 40.20 Variable Costs: Pre-Harvest: Seed Fertilizer (49-20-0) Machinery Tractor (21) Tractor (22) Labor, Tractor & Machinery Crop Insurance Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Custom Operations: Combine Hauling Subtotal, Harvest bu. ac. ac. hr. h r. h r. ac. ac. $ $ 2.50 6.15 .41 1.58 1.24 2.00 2.00 2.00 .08 1 1 .75 $ 1.87 6.15 .41 .88 .48 1.7 1 1 1.39 .60 3.40 2.00 2.00 8.91 .71 $ 18.53 ac. bu. 3.00 .05 1 30 $ $ 3.00 1.50 4.50 Total Variable Costs $ 23.03 3. Income Above Variable Costs $ 17.17 4. Fixed Costs: Machinery Tractor (21) Tractor (22) Land Charge (Rent) ac. hr. hr. ac. .62 2.09 1.33 9.75 $ .88 .48 .62 1.84 .64 9.75 Total Fixed Costs $ 12.85 5. Total Costs $ 35.88 6. Net Returns $ 4.32 7. Government Payments, Less Rent ($1.57/bu x 30 bu.)l/ $ 35.32 8. Net Return Including Government Payment $ 39.64 _L/ Based on planted acres. No allowance is made for set-aside acreage of 75%. D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30. 1914. AECO 6 05225211 WHEAT, DRYLAND, ROLLING PLAINS I Estimated Costs, And Requirements Per Acre Of Wheat, High Level Management Operation Labor Fuel, Oil, ___. I t e m n a f . 0 Ti m e s H n n r a Tr a c t o r o r T , R F i x e d c o s t s No. Date Over H°?*8 Mach. Hrs. L«l>.,Rep. Per Acre (1) Per Acre Chisel 21,28 Jun-Aug 2 .50 .40 $ .22 .14 Sweep 21,28 Jul-Sep 1 .25 .20 .11 .14 Fertilize 21 Aug-Sep 1 .35 .28 Drill 22,31 Sep-Nov 1 .25 .20 .08 .34 Fertilize 22 Feb 1 .35 .28 1.70 1.36 $ .41 $ .62 Total / ^ \ ^ * \ (1) Labor hours calculated at 1.25 times tractor hours except where noted by * /**X D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . ^ Cooperative Extension Work in Agriculture and Home Economics, Texas AfeM University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June SO, 1914. AECO 6 05225222 WHEAT, DRYLAND, ROLLING PLAINS I Estimated Costs And Returns Per Acre Of Wheat, Typical Management Item 1. Gross receipts, from production: Wheat Grazing Unit Price or Cost/Unit bu. AUM $ 1.18 8.00 Quantity 20 .4 To t a l Value or Cost $ 23.60 3.20 $ 26.80 2. Variable Costs: Pre-Harvest: Seed Fertilizer (16-20-0) Machinery Tractor (1) Tractor (2) Labor, Tractor & Machinery Crop Insurance Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Custom Operations: Combine Hauling Subtotal, Harvest bu. ac. ac. h r. h r. h r. ac. ac. $ 2.50 3.02 .42 1.37 1,24 2.00 2.00 2.00 .08 1 1 1 .75 .42 1.37 .28 .35 1.68 3.36 2.00 2.00 1 1 .57 7.19 $ 14.96 ac, bu. 3.00 .05 1 20 $ $ Total Variable Costs 3.00 1.00 4.00 $ 18.96 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Land Charge (Rent) $ 1.87 3.02 $ ac. h r, h r, ac. .92 1.82 1.33 6.53 Total Fixed Costs 7.84 .92 $ 1.82 .37 .28 6.53 $ 9.64 5 . To t a l C o s t s $ 28.60 6. Net Returns $ (1.80) 7. Government Payments, Less Rent ($1.57/bu. x 20 bu.)_L/ $ 23.55 8. Net Return Including Government Payment $ 21.75 1/ Based on planted acres. No allowance is made for set-aside acreage of 75%. O e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperaung. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and ju!.e 30, 1914. AECO 6 05225221 WHEAT, DRYLAND, ROLLING PLAINS I Estimated Costs, And Requirements Per Acre Of Wheat, Typical Management Labor Operation ■S . " «• ST ";;;• Fuel, Oil, SSK-T ■* • *■ Fixed costs '•*»«• Oneway 1,17 Jun-Aug 1 .31 .25 $ .12 $ .30 Chisel or Sweep 1,7 Jul-Sep 2 .62 .50 .21 .28 Fertilize 2 Aug-Sep 1 .35 .28 Drill 1,16 Sep-Nov 1 .40* .25 .09 .34 1.28 $ .42 $ .92 To t a l 1.68 ■ > (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. ~ > Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6 04075112 COTTON. IRRIGATED. HIGH PLAINS IV Estimated Costs And Returns Per Acre Of Cotton, High Level Management Item Unit 1. Gross receipts, from production: Lint Cottonseed To t a l ^ \ 2. Variable Costs: Pre-Harvest: Custom Deep Break 1/ Seed Fertiliser (60-40-0) Herbicide Machinery Tractor (1) Tractor (2) Tractor (3) Labor, Tractor & Machinery Labor Irrigation Irrigation Machinery Crop Insurance Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Strip Machinery Labor Ginning Subtotal, Harvest lb. ton ac. lb. ac. ac. ac. h r. h r. h r. h r. h r. ac. in. $100 mo. ac. h r. bale Price or Cost/Unit Quantity $ .20 60.00 700 14.00 .2 27 1 1 1 1.5 .8 .1 3.1 .8 13 .9 4 .21 6.00 4.19 2.32 1.48 1.38 .63 2.00 2.00 .78 8.54 .085 1.82 2.00 21.50 $140.00 36.00 $176.00 .6 2.80 5.67 6.00 4.19 2.32 2.22 1.10 $ .06 6.20 1.60 10.14 7.69 1.42 $ 51.41 1 1 1.4 1.82 2.00 30.10 $ 33.92 $ Total Variable Costs $ 85.33 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Tractor (3) Irrigation Land Charge Value or Cost $ 90.67 ac. h r. h r. h r. ac. in. ac. 9.41 1.72 1.19 .72 1.25 20.73 1 1.5 .8 .1 13 1 $ 9.41 2.58 .95 .07 16.25 20.73 Total Fixed Costs $ 49.99 5 . To t a l C o s t s $135.32 6. Net Returns $ 40.68 7. Government Payment ($.15/lb. x yield less rent)_2/ $ 78.75 8. Net Return Including Government Payment $119.43 1/ Assumes deep breaking every five years. 2/ Based on planted acres. No allowance made for set-aside acreage of 20%. Developed by Extension Economists-Management, TA E S , TA M U . N 0M.,Krativc Extension Work in Agriculture and Home Economics. Texas A&M University and the Unit^ <..a,~ n* . ^^ Ag,.<u„u.e grating. Distributed in furtherance of the Act, of Congress of Ma7£ 19M. *2££fiZ jSTSl? AECO 6 04075111 COTTON. IRRIGATED. HIGH PLAINS IV Estimated Costs, And Requirements Per Acre Of Cotton, High Level Management Labor Fuel, Oil, .o»p- .e_r, -a. < _ # . « . I t e m n _ . # * T i m e s u ~ , _ _ T r a c t o r o r , . t i o n N o # D a t e Q v e r H o u r s ^ ^ H r 8 L u b . , R e Va p . „ PFei xre dA cc ro es t s (1) Per Acre Shred & Disc Moldboard Ta n d e m 1,6 Disk Apply & Inc. Herbicide List & 2,5 S a n d fi g h t Cultivate To t a l 1,9 Apr 2 1 1 .30 .38 .38 .10 .19 .15 $ 2.32 1.00* .50 $ .62 .40 .21 .30 .12 .40 .20 .50 .47 2.46 Nov .38 1 $ .40 .63 1.5 3.08 18,19 2 Jun .33 .50 1.2 May-Jun 2,13 .41 .8 Mar May 3,14 1 Jan-Feb 1,5,8 2,9 Dec Feb Fertilize Plant StriP 1,4,5 $ .28 .48 .62 .38 .62 .49 .78 .02 .02 .14 .18 $ 3.52 1.82 $ 5.89 Irrigation: (20 Preplant Postplant To t a l Apr. 1 Jun-Aug .25* 3 .82* $ .57* $10.14 3.12 7.02 $ 5.00 11.25 $16.25 (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 600 GPM feet well, sprinkler irrigation, natural gas pumping unit, 4 acre-inches preplant and 3 acre-inches at each postplant. Developed by Extension Economist^Manacehent,, TAES, TAMU. Sl^^n^W^"1!1 HbfMDistributed Rjonowio, TexasofA&M the United States Department of Agriculture cooperating. in furtherance the ActaUniversity of Congress ofand May 8. 1914. as amended, and June SO. 1914. AECO 6 / 04075122 COTTON. IRRIGATED, HIGH PLAINS IV Estimated Costs And Returns Per Acre Of Cotton, Typical Management Item 1. 2. Gross receipts, from production: Lint Cottonseed To t a l Variable Costs: Pre-Harvest: Custom Deep Break 1/ Seed Fertilizer (60-40-0) Herbicide Machinery Tractor (1) Tractor (2) Tractor (3) Labor, Tractor & Machinery Labor Irrigation Irrigation Machinery Crop Insurance Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Strip Machinery Labor Ginning Subtotal, Harvest Unit lb. ton ac. lb. ac. ac. ac. h r. h r. h r. h r. h r. ac. in. $100 mo. ac. h r. bale Price or Cost/Unit Quantity $ 500 .20 60.00 14.00 .21 6.00 4.19 2.26 1.48 1.38 .63 2.00 2.00 .78 8.54 .085 1.82 2.00 21.50 .4 .14 27 1 1 1 1.7 .7 .3 3.3 .8 13 .6 4 1 1 1 Total Variable Costs $100.00 24.00 $124.00 $ 1.96 5.67 6.00 4.19 2.26 2.52 .97 .19 6.60 1.60 10.14 5.12 1.34 $ 48.56 1.82 2.00 21.50 $ 25.32 $ $ 73.88 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Tractor (3) Irrigation Land Charge Value or Cost $ 50.12 ac. h r. h r. h r. ac. in. ac. 9.39 1.72 1.19 .72 1.25 10.08 Total Fixed Costs 1 1.7 .7 .3 13 1 $ 9.39 2.92 .83 .22 16.25 10.08 $ 39.69 5 . To t a l C o s t s $113.57 6. Net Returns to Management $ 10.43 7. Government Payment ($.15/lb. x yield less rent)2/ $ 50.02 8. Net Return Including Government Payment $ 60.45 1/ Assumes deep breaking every seven years. 2/ Based on planted acres. No allowance made for required set-aside acreage of 20%, D e v e l o p e o b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . > * e w 1 9 7 ? C-M.|M.raiivc Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agnrulmic cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30, 1914. AECO 6 04075121 COTTON, IRRIGATED. HIGH PLAINS IV Estimated Costs, And Requirements Per Acre Of Cotton, Typical Management Operation Labor Fuel, Oil, I t e m n o t - . * Ti m e s u _ - , _ . - _ _ Tr a c t o r o r , . - . _ _ F i x e d c o s t s No. Date Over H^8 Mach. Hrs. !**•.**• Per Acre (1) Per Acre Shred & Disc 1,4,5 Dec Moldboard 1,6,15 Feb Tandem Disk 1 .41 .33 $ .40 $ .62 .84 .53 .42 .23 .54 2,5 Jan-Feb 1.14 .35 .29 .21 .26 Fertilize 3 Mar 1 .25 .20 Tandem Disk 2,5 Mar 1 .31 .25 .18 .23 Apply & Inc. Herbicide 1,5,8 Mar 1 .31 .25 .24 .31 List 1,9 Apr 1 .34 .27 .35 .56 Plant 1,9 May 1.50 .47 .38 .49 .78 Sandfight 3,14 May-Jun 2 .12 .10 .02 .02 Cultivate 2,13 Jun 1 .19 .15 .14 .18 3.28 2.64 $ 2.26 $ 3.50 .50 $ 1.82 $ 5.89 To t a l Strip 18,19 Nov 1 1.00* Irrigation: (2) Preplant Apr 1 .25* $ 3.12 $ 5.00 Postplant Jun-Aug 3 .57* 7.02 11.25 .82* $10.14 $16.25 To t a l (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 600 GPM, 250 feet well, sprinkler irrigation, natural gas pumping unit, 4 acre-inches preplant and 3 acre-inches at each postplant. ^^\ Developed by Extension Economists-Management. TAES, TAMU. Cooperative Extension Work in Agriculture and Home _U»oomics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acta of Congress of May 8, 1914. as amended, and June 50, 1914. AECO 6 04075212 COTTON, DRYLAND, HIGH PLAINS IV Estimated Costs And Returns Per Acre Of Cotton, High Level Management Item 1. n t l .t .y. C o„ s t. /_U. n iPt r i c e Qo ur a n Unit Gross receipts, from production: Lint Cottonseed Total 2. Variable Costs: Pre-Harvest: Seed ^ * \ lb. ton lb. ac. ac. ac. h r. h r. h r. h r. $100 mo. Fertilizer (30-20-0) Herbicide Machinery Tractor (1) Tractor (2) Tractor (3) Labor, Tractor & Machinery Crop Insurance Interest on Op. Cap. Subtotal, Pre-Harvest Harves t: Strip Machinery Labor Ginning Subtotal, Harvest ac. h r. bale $ .20 60.00 .21 3.00 4.19 2.13 1.48 1.38 .63 2.00 9.11 .085 1.82 2.00 21.50 V a lC uo e s to r 325 $ 65.00 .3 18.00 $ 83.00 18 1 1 1 1.7 .4 .1 2.8 .4 4 1 1 3.78 3.00 4.19 2.13 2.52 .55 .06 3.60 3.64 .67 24.14 $ $ 1.82 2.00 15.05 $ 18.87 $ .7 Total Variable Costs $ 43.01 $ 39.99 $ 9.32 2.92 .48 .07 15.19 $ 27.98 5. Total Costs $ 70.99 6. Net Returns to Management $ 12.01 7. Government Payment ($.15/cwt. x yield less rent)1/ $ 36.56 8. Net Return Including Government Payment $ 48.57 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Tractor (3) Land Charge ac. hr. hr. hr. ac. 9.32 1.72 1.19 .72 15.19 Total Fixed Costs 1 1.7 .4 .1 1 1/ Based on planted acres. No allowance is made for required set-aside acreage of 20%. D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agiiniltiiie cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6 04075211 COTTON. DRYLAND. HIGH PLAINS IV Estimated Costs, And Requirements Per Acre Of Cotton, High Level Management operation Labor m Fuel, Oil, I t e m D a t e Ti m e s H m i r n Tr a c t o r o r . , n ' F i x e d c o s t s No. Date Over Ho"r* Mach. Hrs. L«b.,Rep. Per Acre (1) Per Acre Shred & Disc 1,4,5 Jan 1 .41 .33 $ .40 $ .62 Moldboard 1,6,15 Feb 1 .63 .50 .27 .64 Tandem Disc 2,5 Mar 1 .31 .25 .18 .23 1.25 .47 .38 .49 .78 List & Fertilize 1,9 Mar Cultivate 2,13 Apr 1 .19 .15 .14 .18 Plant 1,4 May 1.5 .47 .38 .49 .78 Sandfight 23 & 14 Jun 2 .12 .10 .02 .02 1,13 Jun 1 .19 .15 .14 .18 2.79 2.24 $ 2.13 $ 3.43 1.00* .50 $ 1.82 $ 5.89 Cultivate Total Strip 18,19 Nov ^ \ (1) Labor hours calculated at 1.25 times tractor hours except where noted by * *~\ Developeo by Extension EcoNOMisTs-MANACEHgNT, TAES, TAMU. S rAgnculture of X ^ u r f l ncooperating. ^ H o m e Distributed a * " " * * inTfurtherance « - A * M ofUthe n iActs v e r of s iCongress t y a n dof tMay h e 8.U1914. n i t eas d amended, S t a t e sandDJune e p aSO. r t m1914. ent AECO 6 04075222 COTTON, DRYLAND, HIGH PLAINS IV Estimated Costs And Returns Per Acre Of Cotton, Typical Management „ _^ Unlt .. Price or Cost/Unit 1. Gross receipts, from production: Lint lb. $ Cottonseed ton To t a l .20 $ 250 60.00 2. Variable Costs: Pre-Harvest: Seed lb. .21 Herbicide ac . 4.19 Machinery ac. 2.05 Tractor (1) hr. 1.48 Tractor (2) hr. 1.38 Tractor (3) hr. .63 Labor, Tractor & Machinery hr. 2.00 Crop Insurance $100 9 . 11 Interest on Op. Cap. mo. .085 Subtotal, Pre-Harvest Harvest: Strip Machinery ac. 1.82 Labor hr. 2.00 Ginning bale 21.50 Subtotal, Harvest n ... Va l u e Quantity $ or ^ 50.00 12.00 62.00 .2 18 1 1 1.7 .3 .1 2.6 .3 4 $ 1 1 $ .5 Total Variable Costs 3.78 4.19 2.05 2.52 .41 .06 5.20 2.73 .59 $ 21.53 1.82 2.00 10.75 $ 14.57 $ 36.10 3. Income Above Variable Costs $ 25.90 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Tractor (3) Land Charge ac. hr. hr. hr. ac. 9.22 1.72 1.19 .72 10.81 Total Fixed Costs 1 1.7 .3 .1 1 $ 9.22 2.92 .36 .07 10.81 $ 23.38 5. Total Costs $ 59.48 6. Net Returns to Management $ 7. Government Payment ($.15/lb. x yield less rent)_L/ $ 28.12 8. Net Return Including Government Payment $ 30.64 2.52 1/ Based on planted acres. No allowance is made for required set-aside acreage of 20%. D e v e l o p e o b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w 1 ^ 9 7 2 (•.•operative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30. 1914. AECO 6 04075221 COTTON. DRYLAND. HIGH PLAINS IV Estimated Costs, And Requirements Per Acre Of Cotton, Typical Management Operation u Labor aDUl rue—., V / J Oil, .J-, Fuel, I t e m n * t * T l m e s Hloun o n r fl T r a c t o r o rjub., , . Rep, ^ Fixed costs No. Date Over H™f8 Mach. Hrs. Lxxh''. ***' Per Acre Per Acre (1) Shred & Disc 1,4,5 Dec 1 .41 .33 $ .40 $ .62 Moldboard 1,6,15 Feb 1 .63 .50 .27 .64 Tandem Disc 2,5 Mar 1 .31 .25 .18 .23 List 1,9 Mar 1.25 .47 .38 .49 .78 Cultivate 2,13 Apr .50 .10 .08 .07 .09 Plant 1,4 May 1.50 .47 .38 .49 .78 Sandfight 23 & 15 Jun 1 .06 .05 .01 .01 1,13 Jun 1 .19 .15 .14 .18 2.64 2.12 $ 2.05 $ 3.33 1.00* .50 $ 1.82 $ 5.89 Cultivate Total Strip 18,19 Nov / ^ ^ \ (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. ^ Developeo by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Boonomfci. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO, 1914. AECO 6 04095112 GRAIN SORGHUM. IRRIGATED. HIGH PLAINS IV Estimated Costs And Returns Per Acre Of Grain Sorghum, High Level Management T l theomn , i t * * *U- n i t Price . or n Q u a n tVi at lyu e Cost/Unit 1. Gross receipts, from production: Grain cwt. 2.00 45 x ' $ or Cost 90.00 2. Variable Costs: Pre-Harvest: Cus torn Deep B r e a k ac.1 / Seed lb. Fertilizer (80-40-0) ac.a c . Herbicide ac. ac. Machinery ac. Tractor (1) h r .h r. Tractor (2) h rh. r. Tractor (3) h rh . r. Labor, Tractor & M a c hh ir.n e r y Labor Irrigation hhr.r . Irrigation Machinery a c . in. ac. Crop Insurance $ $100 100 Interest on Op. C mo. ap. Subtotal, Pre-Harvest Harvest: Combine Haul Subtotal, Harvest a c14.00 . 14.00 .2 12 6^80 *l 6.80 2.50 1 ^ 4 1.42 2 l 1 1.48 .48 1.2 11.38 .38 .-8. 6.63 3 .1 h r. 2.00 2.6 2.00 2 . 0 0 l " 2.00 i n . .78 . 7 8 16 4 . 0 9 . 5 4.09 m o .085 . .085 4 .21 $ 41.86 cwt. cwt. .15 .10 45 45 6.75 4.50 11.25 $ $ Total Variable Costs $ 53.11 3. Income Above Variable Costs $ 36.89 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Tractor (3) Irrigation Land Charge Fixed 5. 6. To t a l Net ac. h r. h r. h r. 2.23 1.72 1.19 ac. in. 1.25 7.15 .72 ac. To t a l $ 2.80 2.52 6.80 2.50 1.42 1.78 1'1° .06 5.20 2.00 12.48 2.05 l]l5 Costs $ Costs Returns to 1 1. 2 •8 •1 16 1 32 $ 2.23 2.06 .95 .07 20.00 7.15 a6 85 Management $ 57 $ 4.43 7. Government Payment ($.52/cwt. x yield x h allotment less rent)_2/ $ 7.80 8. Net Return Including Government Payment $ 12.23 1/ Assumes deep breaking every five years. 2/ Based on planted acres. No allowance is made for required set-aside acreage 0EVEL°opy9Y^TrECN^^ of the allotment. (-•operative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States^Srtn^.^f Ag.uulturc cooperating. Distributed in furtheram* of the Acts of Congress of May 8.'1914. a*^amended[and June 30 1914 AECO 6 GRAIN SORGHUM. IRRIGATED. HIGH PLAINS IV 04095111 Estimated Costs, And Requirements Per Acre Of Grain Sorghum, High Level Management t l£- operation #-_,-, Date -,_ Times Labor Fuel, Oil, gg^ Lub., Rep. ^f^f* (1) Ta n d e m Disc Moldboard 1,5 Jun 1,6 1 Feb " .31 .8 Per ,25 .50 Acre $ .18 .40 $ .23 .40 .20 Ta n d e m D i s c 2 , 5 J a n - F e b 1 . 2 •38 .30 .21 .28 List •38 .30 .38 .62 & Fertilize Plant 2>9 S a n d fi g h t Spray To t a l Mar 1 May 3,14 Herbicide Sidedress Fertilizer 1,9 1 1.2 May-Jun 2,8 Jun .38 .38 .62 2 .12 .10 .02 .02 1 .25 .20 .05 .06 jun 2.57 .30 .25 2.05 .20 $ 1.42 $ 2.23 I r r i g a t i o n : (2) Preplant Apr 1 .25* Postplant Jun-Aug 4 .76* Total i m* $ 3.12 9.36 $12.48 $ 5.00 15.00 $20.00 (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) ^I'm^ Ration cost sheet. Assumed at 600 GPM, 250 feet well, sprinkler irrigation, natural gas pumping unit, 4 acre-inches preplant and 3 acre-inches at each postplant. Developed by Extension Economists-Management, TAES. TAMU. AECO 6 /*\ ? 04095122 GRAIN SORGHUM, IRRIGATED. HIGH PLAINS IV Estimated Costs And Returns Per Acre Of Grain Sorghum, Typical Management Item Unit 1. Gross receipts, from production: Grain cwt, Price or Cost/Unit $ 2.00 Value or Cost Quantity 35 $ 70.00 2. Variable Costs: Pre-Harvest: Custom Deep Break 1/ Seed Fertilizer (60-40-0) Herbicide Machinery Tractor (1) Tractor (2) Tractor (3) Labor, Tractor & Machinery Labor Irrigation Irrigation Machinery Crop Insurance Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Combine Haul Subtotal, Harvest ac. lb. ac. ac. ac. h r. h r. h r. h r. h r. ac. in. $100 mo. cwt. cwt. .14 14.00 .21 6.00 2.50 1.40 1.48 1.38 .63 2.00 2.00 .78 4.09 .085 .15 .10 1.96 2.52 6.00 2.50 1.40 1.48 1.10 .06 4.60 1.60 10.14 1.64 .99 $ 35.99 12 1 1 1 1 .8 .1 2.3 .8 13 .4 4 35 35 $ $ Total Variable Costs $ 44.74 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Tractor (3) Irrigation Land Charge 5.25 3.50 8.75 $ 25.26 ac. h r. h r. h r. 2.29 1.72 1.19 ac. in. 1.25 4.58 ac. .72 1 1 13 1 $ •8 •1 2.29 1.72 .95 .07 16.25 4.58 Total Fixed Costs $ 25.86 5 . To t a l C o s t s $ 70.60 6. Net Returns to Management $ (.60) 7. Government Payment ($.52/cwt. x yield x J_ allotment less rent)2/ $ 6.07 8. Net Return Including Government Payment $ 5.47 1/ Assumes deep breaking every seven years. 2/ Based on planted acres. No allowance is made for required set-aside acreage of 20%. Assumes planting 100 percent of the allotment. D e v e l o p e d ^ b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agiii-iiliiirc cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30. 1914. AECO 6 04095121 GRAIN SORGHUM. IRRIGATED. HIGH PLAINS IV Estimated Costs, And Requirements Per Acre Of Grain Sorghum, Typical Management Operation Labor Fuel, Oil, I t e m nDaa. 0t e T ^i m eH s oH o »r« TH r arc8t oLr uobr. , , R. e R „ u r s ^ ^ p . FPi xeer d A ccor se t s Over No. Tandem Disc 1,5 Moldboard 1,6,15 Feb Tandem Disc 2,5 (1) 1 Acre .31 .25 $ .18 $ .23 .84 .53 .42 .23 .54 Jan-Feb 1.14 .35 .29 .21 .26 List & Fertilize 1,9 1,9 Mar 1 .38 .30 .38 .62 Plant 2,9 May 1.20 .38 .30 .38 .62 Sandfight 3,14 May-Jun 2 .12 .10 .02 .02 Jun 1 .25 .20 - 2.32 1.86 Spray Herbicide 2,8 Jan Per To t a l $ 1.40 $ 2.29 I r r i g a t i o n : (2) Preplant Apr 1 .25* $ 3.12 $ 5.00 Postplant Jun-Aug 3 .57* 7.20 11.25 .82* $10.14 $16.25 Total (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. (2) See attached irrigation cost sheet. Assumed at 600 GPM, 250 feet well, sprinkler irrigation, natural gas pumping unit, 4 acre-inches preplant and 3 acre-inches at each postplant. Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United Stales Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June SO, 1914. AECO 6 04095212 GRAIN SORGHUM, DRYLAND. HIGH PLAINS IV Estimated Costs And Returns Per Acre Of Grain Sorghum, High Level Management tI .t .e m 11 U n• -i t P r i „c e 1. Gross receipts, from production: Grain cwt. $ o. „r ~ .. . or Q .u. a n t iVt ya l u e Cost/Unit H J Cost 2.00 12 $ 24.00 2. Variable Costs: Pre-Harvest: Seed lb. .21 3 $ Fertilize (30-0-0) ac. 1.20 1 Machinery ac. 1.18 1 Tractor.(1) hr. 1.48 1.1 Tractor (2) hr. 1.38 .3 Tractor (3) hr. .63 .1 Labor, Tractor & Machinery hr. 2.00 1.8 Crop Insurance $100 6.63 .1 Interest on Op. Cap. mo. .085 4 Subtotal, Pre-Harvest Harvest: Combine Haul Subtotal, Harvest ^ \ ac. cwt. 3.50 .10 1 12 $ $ Total Variable Costs To t a l 6. ac. To t a l Net 1.78 1.72 1.19 .72 6.03 hr. hr. hr. ac. Fixed 5. 3.50 1.20 4.70 $ 14.34 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Tractor (3) Land Charge .63 1.20 1.18 1.63 .41 .06 3.60 .66 .27 $ 9.64 Costs Costs Returns 1 1.1 .3 .1 1 to $ 9.66 $ 1.78 1.89 .36 .07 6.03 10.13 $ Management $ 24.47 $ (.47) 7. Government Payment ($.52/cwt. x yield x h allotment less rent)l/ $ 2.08 8. Net Return Including Government Payment $ 1#61 JL/ Based on planted acres. No allowance is made for required set-aside acreage of 20%. Assumes planting 100 percent of the allotment. J^\ D e v e l o p e d b y E x t e n s i o n E c o n o m i s t s - M a n a g e m e n t , TA E S , TA M U . N e w, 1 9 7 2 Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the uinTcd State7Dc^tmem~o~f Agi-iMiltinc cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June 30, 1914. AECO 6 04095211 GRAIN SORGHUM. DRYLAND. HIGH PLAINS IV Estimated Costs And Requirements Per Acre Of Grain Sorghum, High Level Management Operation Chisel Labor Fuel, Oil, _,_, __ I t e m n a # . ^ Ti m e s « _ , . . - _ , Tr a c t o r o r , . B o _ F i x e d c o s t s No. Date Over H™*8 Hach. Hrs. Lub., Rep. per Acre (1) Per Acre 1,7 Mar 2 .62 .50 Ta n d e m D i s c 1 , 5 Apr 1 .31 .25 .18 .23 List & Fertilize 2,9 Apr 1 .38 .30 .38 .62 Plant 1,9 May 1.25 .38 .30 .38 .62 S a n d fi g h t 2,3 & 14 Jun 2 .12 .10 .02 .02 1.81 1.45 $ 1.18 $ 1.78 To t a l $ .22 $ .29 (1) Labor hours calculated at 1.25 times tractor hours except where noted by ■~ } Developeo by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economic., Texas AfcM University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, aa amended, and June SO. 1914. AECO 6 04095222 GRAIN SORGHUM, DRYLAND, HIGH PLAINS IV r Estimated Costs And Returns Per Acre Of Grain Sorghum, Typical Management Item 1. Gross receipts, from production: Grain Price or Cost/Unit Unit cwt. $ 2.00 Value or Cost Quantity 10 $ 20.00 2. Variable Costs: Pre-Harvest: Seed Machinery Tractor (1) Tractor (2) Tractor (3) Labor, Tractor & Machinery Crop Insurance Interest on Op. Cap. Subtotal, Pre-Harvest lb. ac. h r. h r. h r. h r. $100 mo. .21 1.18 1.48 1.38 .63 2.00 6.63 .085 Harvest: Combine Haul Subtotal, Harvest ac. cwt. 3.50 .10 3 1 1.1 .3 .1 1.8 .1 4 1 10 Total Variable Costs .63 1.18 1.63 .41 .06 3.60 .66 .23 $ 8.40 $ 3.50 1.00 $ 4.50 $ 12.90 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Tractor (3) Land Charges $ ac. h r. h r. h r. ac. 1.78 1.72 1.19 .72 5.17 1 1.1 .3 .1 1 Total Fixed Costs 5 . To t a l C o s t s 6. Net Returns to Management 7. Government Payment ($.52/cwt. x yield x H allotment less rent)l/ 8. Net Return Including Government Payment $ 7.10 $ 1.78 1.89 .36 .07 5.17 $ 9.27 $ 22.17 $ (2.17) $ 1.73 $ (.44) < ~ - Bf ™*°n Planted acres* No allowance is made for required set-aside acreage of ZQ/0. Assumes planting 100 percent of the allotment. Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and thr llniiPrt ^^^SSST~L7 AgnniUuic cooperating. Distributee, in furtherance of the Acts of Congress oV M,?? 19H. ^JSSLfS W^Olt AECO f> GRAIN SORGHUM. DRYLAND. HIGH PLAINS IV 04095221 *Sti*ated C°ate> ** R^^rements Per Acre Of Grain Sorghum, Typical Management operation t Ig- -»., Date i - aLabor Dor «-. „ours (1) Fuel, ^-"r^r Per Chisel 1,7 Mar 2 .62 .50 Tandem Disc 1,5 Apr 1 .31 List 2,9 Apr 1 Plant 1,9 May Sandfight 2,3 & 14 Jun Total Oil, ^ ^ Acre Fixed F i x e costs rs .22 $ .29 .25 .18 .23 .38 .30 .38 .62 1.25 .38 .30 .38 .62 2 .12 .10 .02 .02 1.81 1.45 $ :1.18 $ 1.78 $ (1) Labor hours calculated at 1.25 times tractor hours except where noted by * ^ Developed by Extension Economists-Manaqemeht. TAES, TAKU. or Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June SO, 1914. ofA£"u^rS AECO 6 \ 04000400 TEXAS HIGH PLAINS IV Assumed Prices Paid And Received By Farmers Item Unit Price cwt. cwt. $ 21.00 21.00 2.50 50.00 30.00 20.00 5.00 135.00 85.00 Prices Paid Seed: Cotton Grain Sorghum Wheat Alfalfa Corn Sorghum Sudan Soybean Switchgrass Western Wheatgrass Midland Bermuda (sprigs) Castors Southern Peas Custom Rates: Combining southern peas Harvest castors Combining wheat Combining grain sorghum Hay harvest swath, bale, and haul Hauling grain sorghum, castors & southern peas soybean wheat Chemical spraying Cotton ginning Fuel and lubricants: Gasoline L. P. gas Diesel fuel Motor oil (heavy duty detergent) Lubricant Fertilizer (bulk): Nitrogen - anhydrous Nitrogen - nitrate Phosphorus Potash Labor (except hoeing) Hoeing Capital Chemicals: Pre-emergence herbicide Methyl parathion Malathion bu. cwt. cwt. cwt. cwt. cwt. cwt. bu. cwt. cwt. ac. cwt. ac. cwt. .50 33.00 15.50 6.00 .75 2/ 3.00 3/ .15 4/ bale .45 cwt. cwt. .10 .08 .05 bu. ac. 500# gross wt. bale gal. gal. gal. gal. 1.25 21.50 .20 .11 .155 1.05 lb. .39 lb. lb. lb. lb. h r. h r. .04 .08 .09 .05 $ 5 gal. gal. gal. 2.00 1.50 .085 110.00 5.25 11.00 New, 1972 04000400 TEXAS HIGH PLAINS IV Assumed Prices Paid And Received By Farmers Item s*% Unit Price Hail Insurance: Cotton irrigated $100 $ Cotton dryland $100 Grain Sorghum irrigated $100 Grain Sorghum dryland $100 Wheat irrigated $100 Wheat dryland $100 Castors $100 8.54 9 . 11 4.09 6.63 10.20 11 . 1 5 8.36 Prices Received Cotton Cotton Wheat Grain Alfalfa Forage Ensilage Pasture Corn Soybeans Southern Castors lb. lint .20 5/ seed ton 60.00 bu. 1.30 5/ Sorghum cwt. 2.00 5/ hay ton 20.00 6/ sorghum hay ton 20.00 corn ton 5.50 grazing AUM 12.00 bu. 1.15 5/ bu. 2.50 peas cwt. 6.00 cwt. 5.50 ^\ ' 1/ These price assumptions are not be interpreted act predictions or prospective prices. 2/ Minimum charge of $10.00 per acre 3/ $3.00 per acre plus $0.05 per bushel of yield over 20 bushels per acre. 4/ Minimum charge of $3.50 per acre 5/ Does not include government payment which a farmer might receive for participating in farm programs. 6/ Sold standing in fi e l d to alfalfa cuber operator. ) 04000500 TEXAS HIGH PLAINS IV Estimated Machinery And Equipment Cost Per Hour Of Use Machinery Item and Size Item No. Tractor, 100 HP l Tractor, 80 HP 2 Tractor, 45 HP 3 Shredder, 4R 4 Ta n d e m D i s k 1 3 * 5 Moldboard Plow, 4B 6 Chisel 13* 7 Herbicide Spray Rig 8 Lister-Planter 9 Float 10 Flex Planter 11 Grain Drill, 16* 12 (2) Rolling Cultivator 6R 13 (2) S a n d fi g h t e r 14 Clod Buster 15 To o l Bar 6R 16 8-6 Wells & Equip. 5/ 17 Cotton Stripper 18 (9) Cotton Trailers 19 1/ 1/ 2/ y5 / Estimated To t a l Ty p i c a l Y r s . n . . Of Use ^'-1/ New Cost Estimated Total Hrs. Of Use Depr. Per Hr.2/ Interest on Investment Per Hour 3/ Fuel, Oil Lub., Rep., Per Hour 4/ $10,500 8,000 3,500 1,400 1,600 1,400 800 500 1,800 1,500 580 1,600 5 10 12 8 8 8 8 10 8 10 5 10 $5,492 5,304 3,500 1,044 1,194 1,044 597 400 1,343 1,194 375 1,274 5,000 8,000 7,200 1,500 2,000 1,600 1,600 2,000 1,000 1,000 1,000 1,200 $1.10 .66 .49 .70 .60 .65 .37 .20 1.34 1.19 .38 1.06 .62 .53 .23 .37 .32 .35 .20 .12 .72 .72 .16 .64 1.48 1.38 .63 .59 .70 .49 .43 .26 1.28 .32 .39 .44 1,700 300 385 200 8 10 12 12 1,268 215 350 175 1,600 2,000 2,000 2,000 .79 .11 .18 .09 .43 .06 .10 .05 .91 .10 .05 .05 9,000 4,500 10 12 6,957 4,000 1,500 1,500 4.64 2.67 2.95 1.51 2.89 .74 New cost less value at time of trade, or less salvage value. Assumes straight line depreciation. (Investment & Salvage) * 2 x .08 divided by annual hours of use ^^t^chedMrigat^on^sl: SS^U^ '*" '"" *°"X'' "^ ^^ °f *" New, 1972 """^ *"*—*. 04000600 TEXAS HIGH PLAINS IV Yield Per Acre For Typical And High Level Management Irrigated Dryland Ty p i c a l H i g h L e v e l Ty p i c a l H i g h L e v e l Crop Unit Alfalfa tons Castorbeans cwt. 15 20 - Cotton lbs. 500 700 250 325 Grain Sorghum cwt. 35 45 10 12 Permanent Pasture AUM 10 - Southern Peas cwt. 13 17 - Wheat bu. 30 35 12 6.5 6.5 8.5 — ^ X New, 1972