The data contained in this report are based
on estimates and actual records of operations
within an area described as the Texas El Paso
Region. This area includes the El Paso and
Hudspeth county area in extreme West Texas.
Even in a region so narrowly defined, variation
in inputs and returns exists among farms and
managers. However, these budgets should serve
as useful guides in planning and decision making
for agriculturalists concerned with the area de
scribed above.
The enterprise budgets for this region are
based on yields as shown on 07000600. The
assumptions used in the development of these
budgets include the following things. Farm size
varied from 350 acres for the typical manager
to 750 acres for the high level manager. Ap
proximately two-thirds of the acreage for both
management levels was planted to cotton. Adjust
ments in the government programs have led to
a slight increase in the percentage of total cotton
acreage which is planted in pima cotton. It
was assumed that pima was planted on 55 per
cent of the cotton acreage in this region and
upland cotton planted on 45 percent. Annual
rotations are practiced on the typical farm using
small grains or grain sorghum, and occasionally
alfalfa in rotation. The high level fanner typ
ically uses rotation which may include 4 years
of alfalfa and 1 year of cotton in an attempt to
maximize cotton yields per acre. Cotton yields
tend to increase 125 pounds per acre for cotton
produced under a 2-year rotation with grain
sorghum and another 125 pounds for the rota
tion with 4 years of alfalfa. Both typical and
high level managers enjoy this increase. Pima
cotton responds somewhat less to the two differ
ent rotation systems. Small grain grazing is
practiced by both management levels but with
greater intensity on farms of the above average
manager.
Irrigation is supplied in both cases from the
Rio Grande Project. Management differences
center primarily on timing of operation, varia
tion in rotation pattern and, to some degree,
input levels. The high level manager extracts
greater yields and usually greater profits from
his enterprises due to a superior ability for
preparing, planting, tending to and selling his
crop.
No typical crop share or cash rent determi
nation was available. Land rent was therefore
computed on present market value and current
interest rates on long-term capital investments.
07000400
TEXAS EL PASO REGION
Assumed Prices Paid And Received By Farmers
| ^ V
Item
Unit
Price
cwt.
cwt.
cwt.
cwt.
cwt.
$ 15.00
17.00
28.00
8.00
65.00
Prices Paid
Seed:
Cotton (delinted)
Grain Sorghum
Corn
Barley
Alfalfa
Bermuda Sprigs
Fertilizer:
Nitrogen
Phosphorus
Herbicide:
Pre-emerge
Labor:
Hoeing
Irrigation
Tr a c t o r
Custom Rates:
Insecticide plus materials
Fertilizer application
Cotton picking
Cotton ginning, upland
Cotton ginning, pima
Grain Harvest
Grain Hauling
Swath, bale, haul hay
Capital:
Investment
Operating
Hail Insurance:
Cotton
Taxes:
Land and Water
bu.
.75
lb.
lb.
.05
.08
qt.
6.25
h r.
h r.
h r.
1.30
1.50
2.00
ac.
ac.
3.25
1.50
28.00
24.00
33.00
7.00
bale
bale
bale
ac.
cwt.
bale
.10
.40
$
$
.075
.08
7.50
$100
ac.
25.00
Prices Received
Cotton, upland
Cotton, pima
Cottonseed
Grain Sorghum
Corn Silage, in field
Barley
Alfalfa
Grazing, calf
Government Payments
Upland Cotton
Pima Cotton
lb./lint
lb./lint
ton
cwt.
ton
cwt.
ton
$
.30
.48
65.00
2.25
6.00
2.20
35.00
lb./gain
.17
lb./lint
lb/lint
.1269
.15
New, 1972
/
07000510
TEXAS EL PASO REGION
Estimated Machinery And Equipment Cost Per Hour Of Use, High Level Management
Machinery
Item and Size
Tractor, 118 HP (2)
Tractor, 50 HP (1)
Shredder, 2-Row
Offset Disc
Plow, 4 Btm.
Float
Lister, 4-Row
Rotovator
Planter Toolbar, 4-Row
Rolling Cultivator
Spray Rig, 4-Row
Grain Drill, 14!
Border Disc
Hydrolie Sprayer
Pruner
Shaker
1/
2/
3/
4/
Item
No.
New
Cost
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
$13,500
3,500
350
2,000
1,350
1,250
500
2,500
800
1,700
350
1,300
250
2,000
750
2,000
Estimated
Typical Yrs.
Of Use
6
15
8
8
8
10
8
10
10
8
10
10
10
10
10
10
Total
Depr.l/
$7,500
3,500
261
1,500
1,000
1,000
375
1,900
640
1,268
280
1,000
200
2,000
750
2,000
Estimated
Total Hrs,
Of Use
4,200
7,200
1,000
1,600
1,600
1,200
1,200
1,600
1,600
1,600
500
800
800
Interest on
Depr. / Inves tment
Per Hr.2/
Per Hour 3/
$ 1.79
.49
.26
.94
.63
.83
.31
1.19
.40
.79
.56
1.25
4,000
.25
.50
1,500
1.25
1.33
600
$ 1.04
.23
.14
.47
.44
.47
.22
.73
.2.3
.43
.32
.75
.14
.20
.50
.53
Fuel, Oil,
Lub., Rep.,
Per Hr. 47
$ 1.89
.65
.19
.75
.84
.25
.41
2.58
.78
.91
.71
.99
.06
.50
1.25
1.33
New cost less value at time of trade, or less salvage value.
Assumes straight line depreciation.
(Investment + Salvage) divided by 2 (7.5%) divided by annual hours of use.
Fuel, Oil, Lubrication, repair cost estimate taken from Bower, Modern Concepts of Farm Machinery Management
New, 1972
^J
1
^
^
r-^^
07000520
TEXAS EL PASO REGION
Estimated Machinery And Equipment Cost Per Hour Of Use, Typical Management
Machinery
Item and Size
Item
No.
Tractor, 105 HP (1)
Tractor, 45 HP (1)
Shredder, 2-Row
Disc, 91
Plow
Float
Lister
Rolling Cultivator
Planter, Toolbar
Cultivator
Spray Rig
Border Disc
1
2
3
4
5
6
7
8
10
11
12
13
1/
2J
3/
4/
Estimated
New
Total
* D e p r. l /
Cost TyP±cal
Yrs<
Ot Use
$10,500
3,500
350
1,200
900
1,200
500
1,000
800
850
350
250
8
15
8
8
8
10
8
8
10
10
10
10
$6,500
3,500
261
900
670
1,000
375
750
640
670
280
200
Estimated
Total Hrs.
Of Use
5,000
7,200
1,000
2,500
3,500
1,200
1,200
1,600
600
1,200
500
800
Depr.
Per Hr. 2/
$ 1.30
.49
.26
.36
.19
.83
.31
.47
1.06
.56
.56
.25
Interest on
Investment
Per Hour I t
$
.84
.23
.14
.18
.10
.47
.22
.25
.60
.32
.32
.14
Fuel, Oil,
Lub., Rep.,
Per Hr. 4/
$ 1.54
.65
.19
.17
.33
.25
.41
.53
.45
.59
.71
.06
New cost less value at time of trade, or less salvage value.
Assumes straight line depreciation.
(Investment + Salvage) divided by 2 (7.5%) divided by annual hours of use.
Fuel, Oil, Lubrication, repair cost estimate taken from Bower, Modern Concepts of Farm Machinery Management
New, 1972
07000600
/'^\
TEXAS EL PASO REGION
Y i e l d Per Acre For Typical And High Level Management
Irrigated
Ty p i c a l H i g h L e v e l
Crop
Unit
Cotton, Upland
//lint
700
825
Cotton, Pima 1/
//lint
500
600
Grain Sorghum
lbs.
3250
5000
Corn for Silage
tons
Barley
lbs.
3500
4500
Alfalfa
tons
6
8
Bermudagrass Pasture
//gain
-
—
25
750
***%
1/ Weighted average yields over past 10 years as reported in Annual Production
Report, Rio Grande Project, Bureau of Reclamation indicates pima cotton
yields 72.2 percent of upland cotton.
^
^
0/006112
ALFALFA ESTABLISHMENT, IRRIGATED, EL PASO REGION
Estimated Costs And Returns Per Acre Of Alfalfa Establishment, High Level Management
Item
Price or
Cost/Unit
Unit
Quantity
Value or
Cost
1. No Income
2. Variable Costs:
Seed
Fertilizer (0-80-0)
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor
L a b o r, I r r i g a t i o n
Pickup Expense
Well operation & maintenance
Interest on Op. Cap.
cwt.
$ 65.00
6.40
1.06
1.89
ac.
ac.
h r.
h r.
h r.
h r.
ac.
1
1
2.07
.65
2.00
1.50
5.00
15.00
ac/ft.
$ 26.00
6.40
1.06
3.91
.42
.27
3.10
3.00
6.20
4.50
2.50
15.00
3.29
.5
1.0
.08
$
.40
32.92
Total Variable Costs
$ 69.13
3. No Income
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Irrigation (water & land tax)l/
Land Charge (Rent) 1/
ac.
h r.
h r.
ac.
1
2.56
2.81
2.07
.72
25.00
.075
$
375
Total Fixed Costs
.42
.5
$ 2.56
5.82
.30
12.50
28.13
$ 49.13
5. Total Costs
$118.44
1/ One half rate due to double cropping.
Developed by Extension Economists-Management, TAES, TAMU.
_
New,
1972
Cm.pcra.ivc Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture coopcrar.ng. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June 30. 1014.
AECO 6
ALFALFA ESTABLISHMENT, IRRIGATED, EL PASO REGION
Estimated Costs, And Requirements Per Acre
Of Alfalfa Establishment, High Level Management
Operation
07006111
LaborFuel,
Oil,~"
I t e m n - 4 . a T i m e s H r t l l ^ 0 T r a c t o r o r T. „ . _ _ F i x e d c o s t s
No. Date Over H°!f *s Mach. Hrs. ^ub. t Bep. per Acre
(1)
Per
Acre
Shred Stalks
1.3 Sep
1
.50
.40
.08
$ .16
Disc
1.4 Sep
1
.31
.25
.19
.35
Plow
1.5 Sep
1
.31
.25
.21
.27
Disc
1,4 Sep
1
.31
.25
.19
.35
Float
1.6 Sep
2
1.00
.80
.20
1.04
Border
1,13 Sep
1
.15
.12
.01
.05
Fertilize
2
Sep
1
.31
.25
Plant
2,12 Sep
1
.21
.17
.18
.34
3.10
2.49
$ 1.06
$ 2.56
To t a l
Irrigation:
Preplant
1.00
Postplant
2.00
To t a l
3.00
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
/^B%\
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30, 1914.
AECO 6
07005112
ALFALFA, IRRIGATED, EL PASO REGION
^ ^ E s t i mated Costs And Returns Per A c r e O f A l f a l f a , H i g h L e v e l M a n a g e m e n t
_-m
i i U n •i _t
Price
_
_ .Q. u
_a
. ntiV
or
ITt fe- m
_ _ / „ .o_r _
t ya l u e
Cost/Unit
J
Cost
1. Gross receipts, from production:
Hay
ton
$
35.00
8
$280.00
2. Variable Costs:
Pre-Harvest:
1/4
Establishment
ac.
29.61
Fertilizer
(0-100-0)
ac.
8.00
Tractor
(2)
hr.
.65
Labor,
Tractor
hr.
2.00
Labor,
Irrigation
hr.
1.50
Pickup
Expense
ac.
5.00
Well operation & maintenance ac/ft. 15.00
Interest
on
Op.
Cap.
$
.08
Subtotal,
Pre-Harvest
Harvest:
Swath,
bale,
To t a l
3.
haul
(custom)
Va r i a b l e
Income
Above
4. Fixed Costs:
Tractor
(2)
Irrigation
(water
Land
Charge
1/
bale
1
1
hr.
&
land
(Rent)
.72
tax)
$
.75
.93
.49
1.86
15.00
5.00
15.00
3.00
77.96
10
1
1.0
37.48
$
.40
Costs
Va r i a b l e
29.61
8.00
225
$
90.00
§167
Costs
96
$ 11 2
.75
$
ac.
25.00
1
.075
750
04
.54
25
00
56*25
Total Fixed Costs
$ 81.79
5. Total Costs
$249.75
6. Net Returns
$ 30.25
1/ Costs per ton for cubing alfalfa estimated to be approximately the same
as these baling costs
Developed
by
Extension
Economists-Management,
TA E S ,
TA M U .
New
1972
ALFALFA, IRRIGATED, EL PASO REGION
07005111
Estimated Costs, And Requirements Per Acre Of Alfalfa, High Level Management
Operation
Fertilize
Total
Irrigation:
No.
Labor
Fuel, Oil,
D a t e AOl m
e
S
H
o
u
r
s
i
r
a
f
t
o
S
°
r
v e r " : M a c h . H r s . * - «L"u• b». , ^ cRfe»p .p e* *r x eAVc °r S
e
Per Acre
(1)
2 Mar-Sep 3
.93
.75
.93
.75
10 10.00
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June 30, 1914.
ALFALFA ESTABLISHMENT. IRRIGATED. EL PASO REGION 07006122
Estimated Costs And Returns Per Acre Of Alfalfa Establishment, Typical Management
Item
Unit
Price or
Cost/Unit
Quantity
Value or
Cost
1. No Income
2 . Va r i a b l e C o s t s :
Seed
Fertilizer (0-80-0)
Machinery
Tr a c t o r ( 1 )
Tractor (2)
Labor, Tractor
L a b o r, I r r i g a t i o n
Pickup Expenses
Well operation & maintenance
Interest on Op. Cap.
cwt.
ac.
ac.
h r.
h r.
h r.
hr.
ac.
ac/ft.
$
$ 65.00
6.40
.79
1.54
.65
2.00
1.50
5.00
15.00
.08
.38
$ 24.70
6.40
. 2.52
3.88
.45
.29
1
1
.79
3.73
3
1
1
34.01
Total Variable Costs
7.46
4.50
5.00
15.00
2.72
$ 70.74
3. No Income
4. Fixed Costs:
Machinery
Tractor
(1)
Tractor
(2)
Irrigation (water & land tax)JL/
Land Charge (Rent) 1/
ac.
hr.
hr.
ac.
$
Total Fixed Costs
5 . To t a l C o s t s
2.25
2.14
1
2.52
.72
25.00
.075
375
.45
.5
$ 2.25
5.39
.32
12.50
28.13
$ 48.59
$119.33
JPN
JL/ One half rate due to double cropping.
Developed by Extension Economists-Management, TAES, TAMU.
New, 1972
n-Vriaiivc Extension Work in Agriculture and Home Economics. Texas A&M University and the United State. Department of
MpMuliure cooperating, li.str.buied in furtherance of the Acts of Congress of May 8. 1914. as amended ami J.ile 30 19.4
A _.•_-#» /_
A L FA L FA E S TA B L I S H M E N T. I R R I G AT E D . E L PA S O R E G I O N 0 7 0 0 6 1 2 1
Estimated Costs, And Requirements Per Acre
O f A l f a l f a E s t a b l i s h m e n t , Ty p i c a l M a n a g e m e n t
Labor
Fuel, Oil,
_
»
.
.
_
_
_
.
,
_
*
_
_
_
,
I
t
e
m
n
^
t
^
T
i
m
e
s
* p„ ._ * pFei xr e dA cc or se i
Operation
No
Date
Qver
H o u r «s * %^. .^- . «H Tr r8a#c t oLr uobr . . . .R e
(1)
Per
Shred S t a l k s
1.3
Sep
1
.50
.40
Disc
1.4
Sep
1
.38
Plow
1,5
Sep
1
Disc
1.4
Sep
Float
1,6
Fertilize
Plant
To t a l
/a9%
Acre
.08
$ .16
.30
.05
.16
.63
.50
.17
.15
1
.38
.30
.05.
.16
Oct
2
1.13
.90
.23
1.17
2,13
Oct
1
.31
.25
-
2,12
Oct
1
.25
.20
.20
.40
3.73
2.97
$ .79
$ 2.25
$
Irrigation:
Preplant
1.00
Postplant
2.00
To t a l
3.00
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
>-^%
Oevelopeo by Extension Economists-Management, TAES, TAW.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Arts of Congress of May 8. 1914. as amended, and June 30. 1914.
07005122
ALFALFA, IRRIGATED, EL PASO REGION
Estimated Costs And Returns Per Acre Of Alfalfa, Typical Management
Price
[*»
»nlt
Cost/Unit
1. Gross receipts, from production:
Hay
ton
$
or
_-..__
Va l u e
Quantlty
35.00
6
or
Cost
$210.00
2. Variable Costs:
Pre-Harves t:
1/4
Establishment
aac.
c.
2 29.82
9.82
1
$
ac. a c . 8.00 8 . 0 0
Fertilizer
(0-100-0)
1
Tractor
(2)
h rh.r.
. .65
65
.75
.93
2.00
h r.
Labor, Tractor
h hr. r .
1.50
Labor,
Irrigation
1.50
10
ac.
5.00
Pickup
Expense
ac.
5.00
1
. c e 15.00
Well
operation
&
m a i n t aecn/ fat n
ac/ft.
15.00
1
Interest
on
Op.
C $a p .
$ .08 . 0 8
37.59
Subtotal, Pre-Harvest
29.82
8.00
.49
1.86
15.00
5.00
15.00
3.01
$ 78.18
Harvest:
Swath, bale, haul (custom) 1/
$ 67.60
169
.40
bale
Total Variable Costs
$145.78
3.
Income Above Variable Costs
$ 64.22
4.
Fixed Costs:
Tractor (2)
Irrigation (water & land tax)
Land Charge (Rent)
To t a l
Fixed
5.
To t a l
6.
Net
h r.
ac.
.72
25.00
.075
$
Costs
Costs
Returns
1
750
.75
$
$
.54
25.00
56.25
81.79
$227.57
$(17.57)
1/ Costs per ton for cubing alfalfa estimated to be approximately the same
as these baling costs.
Developed
by
Extension
Economists-Management,
TA E S ,
TA M U .
New,
1972
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30. 1914.
AECO 6
ALFALFA, IRRIGATED, EL PASO REGION
07005121
Estimated Costs, And Requirements Per Acre Of Alflafa, Typical Management
Operation
Fertilize
I£2
Date
Irrigation:
™?
Mar-Sep
To t a l
Labor
Fuel,
Oil,
«°™ ^n.°_rs! ">>•. Rep.
(1)
Per
Acre
3
.93
.93
10
,
^%
*g?_°?- 7
.75
.75
10.00
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30. 1914.
AECO 6
07015112
BARLEY, IRRIGATED, EL PASO REGION
Estimated Costs And Returns Per Acre Of Barley, High Level Management
Item
Unit
1. Gross receipts, from production:
Grain
cwt.
$
Grazing
lb./gain
Price or
Cost/Unit
2.20
.17
Quantity
Value or
Cost
45
250
$ 99.00
42.50
To t a l
$141.50
2. Variable Costs:
Pre-Harvest:
Seed
Fertilizer (150-0-0)
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor
L a b o r, I r r i g a t i o n
Pickup Expenses
Well operation & maintenance
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Machinery (custom)
Hauling
Subtotal, Harvest
cwt.
ac.
ac.
h r.
h r.
h r.
h r.
ac.
ac/ft.
$
ac.
cwt.
8.00
7.50
.63
1.89
.65
1
1
1
$
.08
24.75
1
1
1
45
Total Variable Costs
.27
5.34
4.50
5.00
15.00
1.98
$ 51.47
7.00
4.50
$ 11.50
$
$ 62.97
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Irrigation (water & land tax)j7
Land Charge (Rent)U
3.25
.42
2.67
3.00
7.00
.10
.63
1.72
2.00
1.50
5.00
15.00
8.00
7.50
$ 78.53
ac.
h r.
h r.
ac.
$
Total Fixed Costs
5 . To t a l C o s t s
6. Net Returns
1.39
2.81
.72
25.00
.075
1
$
1.72
.42
.5
375
1.39
4.83
.30
12.50
28.13
$ 47.15
$110.12
$ 31.38
1/ One half rate due to double cropping.
Developeo by Extension Economists-Management, TAES, TAMU.
«r «™wo;S^^
New, 1972
07015111
BARLEY, IRRIGATED, EL PASO REGION
Estimated Costs, And Requirements Per Acre Of Barley, High Level Management
Fuel , O i l ,
Labor
Fixed costs
Tractor or Lub.
Item
Hours
D
u
a
a
t
e
O
Ti
v
m
e
e
r
s
, Rep.
Per Acre
Mach. Hrs.
Operation
No.
Per Acre
(1)
.08
$ .16
.80
.16
.32
.50
.40
.20
.52
1
.15
.12
.01
.05
Dec
1
.31
.25
-
-
Dec
1
.21
.17
.18
.34
2.67
2.14
.63
$ 1.39
Shred Stalks
1,3
Nov
1
.50
.40
Disc
1,4
Nov
2
1.00
Float
1,6
Nov
1
Border
1,13
Nov
Fertilize
2
Plant
2,12
To t a l
$
$
/^%
Irrigation:
Postplant
3.00
/^*%L
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
BARLEY, IRRIGATED, EL PASO REGION
07015122
Estimated Costs And Returns Per Acre Of Barley, Typical Management
f^'
Item
Unit
Price or
Cost/Unit
1. Gross receipts, from production:
Grain
cwt.
Grazing
lb./gain
2.20
.17
Value or
Cost
Quantity
31.2
175
$ 68.64
29.75
To t a l
$106.75
2 . Va r i a b l e C o s t s :
Pre-Harvest:
Seed
Fertilize (100-0-0)
Machinery
Tractor (1)
Tr a c t o r ( 2 )
Labor, Tractor
L a b o r, I r r i g a t i o n
Pickup Expenses
Well operation & maintenance
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Machinery (custom)
Hauling
Subtotal, Harvest
cwt.
8.00
5.00
Ac.
ac.
h r.
h r.
h r.
h r.
ac.
.58
1.54
.65
2.00
1.50
5.00
15.00
ac/ft.
.08
$
ac.
cwt.
7.00
.10
1
1
1
1.57
.45
2.54
3
1
1
22.94
8.00
5.00
.58
2.42
.29
5.08
4.50
5.00
15.00
1.84
$ 47.71
1
31.2
$ 7.00
3.12
$ 10.12
Total Variable Costs
$ 57.83
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Irrigation (water & land tax)l/
Land Charge (Rent) 1/
$ 48.92
ac.
h r.
h r.
ac.
1.91
2.14
.72
25.00
.075
$
1
1.57
.45
.5
375
$ 1.91
3.36
.32
12.50
28.13
Total Fixed Costs
$ 46.22
5 . To t a l C o s t s
$104.05
6. Net Returns
$ 2.70
1/ One half rate due to double cropping.
Developeo
by Extension
Economists-Management,
TAES,
TAMU.
_
.„
—
.
—
,
w
^^
1N6W
_L_7
/
Z.
New,
<:.«.|Kialiv<- Extension Work in Agriculture and Home Economics. Texas A&M University and the tlnii-i <■■■...
.__'1972
■■- ■ ,
A « " ™ T- " i * » » » " > " . « . i n f u r t h e r a n c e o f t h . A c o f C o n _ r e » o T M a y ™ . 1 9 H . * a n , " " * . ! Z j S ^ i
AECO 6
B A R L E Y, I R R I G A T E D , E L P A S O R E G I O N 0 7 0 1 5 1 2 1
Estimated Costs, And Requirements Per Acre Of Barley, Typical Management
Labor
Fuel,
Oil,
__,__
..4 Item nat.a Times u-,fr.a Tractor or , . «__ Fixed costs
operation N Date Qver Hours Mach# Hr8# Lub., Rep. Per Acre
(1)
Per
Acre
Shred Stalks
1,3
Nov
1
.50
.40
Disc
1,4
Nov
2
.76
.60
.10
.32
Float
1,6
Nov
1
.57
.45
.19
.98
Border
1,13
Nov
1
.15
.12
.01
.05
Fertilize
2
Nov
1
.31
.25
Plant
2,12
Dec
1
.25
.20
.20
.40
2.54
2.02
To t a l
$
$
.08
.58
$
$
.16
1.91
Irrigation:
Postplant
3
3.00
^ * \
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
07171112
f^
BERMUDAGRASS ESTABLISHMENT, IRRIGATED, EL PASO REGION
Estimated Costs And Returns Per Acre Of
Bermudagrass Establishment, High Level Management
Item
1. Gross receipts, from production:
Grazing
calf
days
2. Variable Costs:
Sprigs
Fertilize (80-80-0)
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor
L a b o r, I r r i g a t i o n
Pickup Expense
Well operation & maintenance
Interest on Op. Cap.
Price or
Cost/Unit
Unit
bu.
ac.
ac.
h r.
h r.
h r.
h r.
ac.
ac/ft.
$
$
.10
.75
10.40
.88
1.89
.65
2.00
1.50
5.00
15.00
.08
Quantity
Value or
Cost
180
$ 18.00
30
1
1
2.07
.25
2.89
6.00
1
1
36.32
Total Variable Costs
$ 75.54
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Irrigation (water & land tax)
Land Charge (Rent)
$ 22.50
10.40
.88
3.91
.16
5.78
9.00
5.00
15.00
2.91
$(57.54)
ac.
h r.
h r.
ac.
$
2.22
2.81
1
2.07
.72
25.00
.075
Total Fixed Costs
.25
1
750
$ 2.22
5.82
.18
25.00
56.25
$ 89.47
5. Total Costs
$165.01
6. Annual Establishment @ 10 year life
$ 14.70
Oeveloped by Extension Economists-Management,
TAES, TAMU.
.
New.
1972
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30. 1914.
AECO 6
07171111
Operation
BERMUDAGRASS ESTABLISHMENT, IRRIGATED, EL PASO REGION
Estimated Costs, And Requirements Per Acre Of
Bermudagra ss Establishment, High Level Management
Labor
Fuel , O i l ,
Times Hours Tractor or Lub. , Rep.
Item
Date
Mach. Hrs.
Over
No.
Per Acre
(1)
Shred Stalks
1,3
Jan
1
.50
.40
Disc
1,4
Jan
1
.31
.25
.19
.35
Plow
1,5
Feb
1
o31
.25
.21
.27
Disc
1,4
Feb
1
.31
.25
.19
.35
Float
1,6
Mar
2
1.00
.80
.20
1.04
Border
1,13
Mar
1
.15
.12
.01
.05
Fertilize
2
Mar
1
.31
.25
—
-
2.89
2.32
To t a l
$
$
.08
Fixed costs
Per Acre
.88
$
.16
$ 2.22
Irrigation:
Preplant
1
1.00
Postplant
5
5.00
To t a l
6.00
(1) Labor hours calculated at 1.25 times tractor hours except where noted by
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas AfeM University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
/*"%
07170112
BERMUDAGRASS PASTURE, IRRIGATED, EL PASO REGION
Estimated Costs And Returns Per Acre Of Bermudagrass Pasture, High Level Management
Item
Unit
Price or
Cost/Unit
1. Gross receipts, from production:
cow days $ .15
Grazing
2. Variable Costs:
Establishment
Fertilizer (250-50-0)
Tractor (2)
Labor, Tractor
L a b o r, I r r i g a t i o n
Pickup Expenses
Interest on Op. Cap.
3.
ac.
ac.
h r.
h r.
h r.
ac.
$
14.70
16.50
Quantity
Value or
Cost
365 1/
$ 54.75
1
1
$ 14.70
2.00
1.50
5.00
.08
16.50
.75
.93
.65
.49
1.86
9.00
5.00
1.90
6.00
1
23.78
Total Variable Costs
$ 49.45
Income Above Variable Costs
$
4. Fixed Costs:
h r.
Tractor (2)
ac.
Irrigation (water and land tax) ac.
$
Land Charge (Rent)
.72
25.00
.075
Total Fixed Costs
1
750
.75
$
5.30
.54
25.00
56.25
$ 81.79
5. Total Costs
$131.24
6. Net Returns
$(76.49)
1/ 8 months grazing @ 1.5 cows per acre = 365 cow days.
Developed by Extension Economists-Management, TAES, TAMU.
New, 1972
Cocpciaiivc Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculiure cooperating. Distributed in furtherance of the Arts of Congress of May 8, 1914. as amended, and June 30, 1914.
AECO 6
BERMUDAGRASS PASTURE, IRRIGATED, EL PASO REGION
Estimated Costs, And Requirements Per Acre
Of Bermudagrass Pasture, High Level Management
Operation
Fertilize
Total
Irrigation
07170111
Labor
Fuel,
Oil,
I t e m n M Ti m e s H o u r s Tr a c t o r o r L . R F i x e d c o s t s
No. Date Over ,? *s Mach. Hrs. L"D'».Kep" Per Acre
(1)
Per
Acre
Mar-Sep 3
.93
.75
.93
.75
6.00
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
Developeo by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914.
07065112
CORN FOR SILAGE, IRRIGATED, EL PASO REGION
Estimated Costs And Returns Per Acre Of Corn For Silage, High Level Management
Item
Unit
1. Gross receipts, from production:
S i l a g e , s t a n d i n g i n fi e l d
ton
Price or
Cost/Unit
$ 6.00
Quantity
25
Value or
Cost
$150.00
2. Variable Costs:
Pre-Harvest:
Seed
Fertilize (200-80-0)
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor
L a b o r, I r r i g a t i o n
Pickup Expense
Insecticide (custom)
Interest on Op. Cap.
Subtotal, Pre-Harvest
cwt.
ac.
ac.
h r.
h r.
h r.
h r.
ac.
application
$
28.00
16.40
.95
1
1
.15
$ 4.20
16.40
.95
1.89
1.40
.65
2.65
.85
.55
2.81
4.00
5.62
6.00
5.00
3.00
1.77
$ 46.14
2.00
1.50
5.00
3.00
.08
1
1
22.19
Harvest: (Sold in field)
Total Variable Costs
$ 46.14
3.
Income Above Variable Costs
$103.86
4.
Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Irrigation (water & land tax)
Land Charge (Rent)
ac.
ac.
h r.
ac.
$
2.39
2.81
.72
25.00
.075
1
1.,40
• 85
1
750
$ 2.39
3.93
.61
25.00
56.25
Total Fixed Costs
$ 88.18
5.
Total Costs
$134.32
6.
Net Returns
$ 15.68
Developeo by Extension Economists-Management, TAES, TAMU.
New, 1972
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and tht» Tlnir^ «■_._. » -, . , .
a r?r*r\ /z
07065111
CORN FOR SILAGE, IRRIGATED, EL PASO REGION
Estimated Costs, And Requirements Per Acre Of Corn For Silage, High Level Management
Operation
Labor
Fuel,
Oil,
__.
Item ~ ___ Times u Tractor or ,__,_ „ Fixed costs
No. Date OveT Ho"" Mach. Hrs. Lub., Rep. Per Acre
(1)
Per
Acre
Disc
1,4
Dec
2
1.00
.80
$ .16
$ .32
Float
1,6
Jan
1
.50
.40
.20
.52
List
1,7
Feb
1
.25
.20
.08
.16
Mulch
2,10
Apr
1
.20
.16
.15
.20
Fertilize
2
Apr
1
.31
.25
Plant
2,9
Jun
1
.25
.20
.16
.13
Cultivate
2,10
Jul
1
.15
.12
.11
.98
Cultivate
2,9
Jul
1
.15
.12
.09
.08
2.81 2.25
$ .95
$ 2.39
To t a l
Irrigation:
Preplant
1.00
Postplant
3.00
To t a l
4.00
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
Developeo by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
^ " \
07070112
PIMA COTTON. IRRIGATED. EL PASO REGION
Estimated Costs And Returns Per Acre Of Pima Cotton, High Level Management
Item
Price or
Cost/Unit
Unit
1. Gross receipts, from production:
Lint
Seed
To t a l
2. Variable Costs:
Pre-Harvest:
Seed
Fertilize (120-60-0)
Herbicide
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor
Labor, Hoeing
L a b o r, I r r i g a t i o n
Insecticide (custom)
Scouting
Pickup Expense
Hail Insurance
Interest on Op. Cap.
Subtotal, Pre-Harvest
lb.
ton
$
cwt.
ac.
qt.
ac.
h r.
h r.
h r.
hr.
h r.
application
ac.
ac.
$100
$
Harvest:
Chemicals
Machinery (custom)
Ginning
Subtotal, Harvest
ac.
bale
bale
Quantity
Value or
Cost
.48
65.00
600
15.00
10.80
6.25
3.69
1.89
.36
1
1
1
3.18
1.13
5.38
8.00
5.00
4
1
1
1.5
46.65
5.40
10.80
6.25
3.69
6.01
.73
10.76
10.40
7.50
13.00
2.50
5.00
11.25
3.73
$ 97 .02
1
1..2
1,.2
$ 4 .00
.48
.65
2.00
1.30
1.50
3.25
2.50
5.00
7.50
.08
4.00
28 .00
33 .00
Total Variable Costs
$288.00
31.20
$319.20
33 .60
39 .60
$ 77,.20
$174,.22
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Irrigation (water & land tax)
Land Charge (Rent)
$144.,98
ac.
h r.
h r.
ac.
$
5.,80
2. 81
72
25. 00
• 075
1
3. 18
1. 13
1
750
Total Fixed Costs
$ 5 . 80
8. 94
81
25. 00
56. 25
$ 96.80
5. Total Costs
$271.02
6. Net Returns
$ 48.18
7. Government Payments (600 lbs. fi 12.69c/lb.) 1/
$ 76.14
8. Net Return Including Government Payment
$124.32
tPe2elppeo.imP^
f f fi fi e
for
set-aside
acreage
of
30
89%
07070111
PIMA COTTON, IRRIGATED, EL PASO REGION
Estimated Costs, And Requirements Per Acre Of Pima Cotton, High Level Management
Labor
__
Fuel,
Oil,
..-.__
..«_«•
■.-.-.
Item
n««.__
Times
«_-..-_,
Tractor
or
T
.
O p e r a t i o n N q # D a t e Q v e r H o u r s j ^ . H r 8 - L u b . , R e p__,
. P Fixed
e r A ccosts
re
(1)
Per
Acre
Shred Stalks
1,3
Jan
1
.50
.40
$ .08
$ .16
Disc
1,4
Jan
1
.31
.25
.19
.35
Plow
1,5
Jan
1
.31
.25
.21
.27
Disc
1,4
Feb
1
.31
.25
.19
.35
Float
1,6
Feb
2
1.00
.80
.20
1.04
List
1,7
Feb
1
.25
.20
.08
.16
Mulch
1,8
Feb
2
.84
.67
1.73
1.54
Fertilize
2
Mar
1
.31
.25
Cultivate
2,10
Apr
1
.15
.12
.11
.98
Herbicide
2,11
Apr
1
.25
.20
.14
.18
Plant
2,9
May
1.2
.30
.24
.19
.15
Cultivate
2,10
May- Jun
2
.40
.32
.29
.39
Cultivate
1,9
Jun-■Aug
3
.45
.36
.28
.23
5.38
4.31
$ 3.69
$ 5.80
To t a l
Irrigation:
Preplant
1.00
Postplant
4.00
To t a l
5.00
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June 30, 1914.
A FOO fi
^
^
07070122
PIMA COTTON, IRRIGATED, EL PASO REGION
Estimated Costs And Returns Per Acre Of Pima Cotton, Typical Management
Item
1. Gross receipts, from production:
Lint
Seed
To t a l
2. Variable Costs:
Pre-Harvest:
Seed
Fertilize (100-60-0)
Herbicide
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor
Labor, Hoeing
L a b o r, I r r i g a t i o n
Insecticide, (custom)
Pickup Expense
Hail Insurance
Interest on Op. Cap.
Subtotal, Pre-Harvest
^
N
Harvest:
Chemicals
Machinery (custom)
Ginning
Subtotal, Harvest
Price or
Cost/Unit
Unit
lb.
ton
cwt.
ac.
qt.
ac.
h r.
hr.
h r.
h r.
h r.
$
.48
65.00
15.00
9.80
6.25
1.53
1.54
ac.
$100
$
bale
bale
500
.4
.36
1
1
1
4.12
.65
application
ac.
Quantity
$ 5.40
9.80
6.25
1.53
6.34
.57
.37
5.88
6.00
5.00
6.00
.08
46.25
11.76
7.80
7.50
19.50
5.00
11.25
3.70
$ 96.20
4.00
28.00
33.00
1
1.5
1
1
1
$ 4.00
28.00
33.00
$ 65.00
$161.20
3. Income Above Variable Costs
$104.80
3.45
2.14
.72
25.00
.075
Total Fixed Costs
5 . To t a l C o s t s
6. Net Returns
7. Government Payments (500 lbs. @ 12.69c/lb.) 1/
8. Net Return Including Government Payment
$240.00
26.00
$266.00
2.00
1.30
1.50
3.25
5.00
7.50
Total Variable Costs
4. Fixed Costs:
Machinery
ac<
Tractor
(1)
hr!
Tractor
(2)
hr.
Irrigation (water & land tax) ac.
Land
Charge
(Rent)
$
Value or
Cost
1
4.12
1
750
.57
$ 3.45
8.82
.41
25.00
56.25
$ 93.93
$255.13
$ 10.87
$ 63.45
$ 74.32
1/ Based on planted acres. No allowance made for set-aside acreage of 30.89%,
Developed by Extension Economists-Management, TAES, TAMU.
(..M-pcrativc Extension Work in Agriculture and Home Economics. Texas A&M University and the United StatesNpw,
Department
197?of
AKr.cui.ure cooperating. Distributed in furtherance of the Acts of Congress of May 8.\9H. Ts amended and June 30 1014
AECO 6
07070121
PIMA COTTON, IRRIGATED, EL PASO REGION
Estimated Costs, And Requirements Per Acre Of Pima Cotton, Typical Management
Operation
Labor
Fuel,
Oil,
__,.
^N oD. a t e O T
F iexr e d Accor set s
v iemr e s MHa c Th r. a c t Ho r s .o r *L u b v R P
(1)
Per
Acre
Shred Stalks
1,3
Jan
1
.50
.40
$ .08
$ .16
Disc
1,4
Jan
1
.38
.30
.05
.16
Plow
1,5
Feb
1
,63
.50
.17
.15
Disc
1,4
Feb
1
.38
.30
.05
.16
Float
1,6
Feb
2
1.13
.90
.23
1.17
List
1,7
Mar
1
.31
.25
.10
.13
Fertilize
2
Apr
1
.31
.25
Disc
1,4
Apr
1
.38
.30
.05
.16
List
1,7
Apr
1
.31
.25
.10
.13
Herbicide
1,12
Apr
1
.25
.20
.14
.18
Plant
1,10
May
1.2
.30
.24
.11
.40
Cultivate
2,8
Jun
2
.40
.32
.17
.23
Cultivate
1,11
Jul-Aug
4
.60
.48
.28
.42
5.88
4.69
$ 1.53
$ 3.45
To t a l
Irrigation:
Preplant
1.00
Postplant
4.00
To t a l
5.00
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
Developed by Extension Economists-Management, TAES, TAMU-
ST_t^?.EXtCn8i0n
Work_An
Agriculture
and Home of
Economics.
A&MofUniversity
and as
theamended,
United States
Department
of Agnculture cooperaung.
Distributed
in furtherance
the Acts ofTexas
Congress
May 8. 1914.
and June
30^9?.!
AECO 6
/^%
07075112
UPLAND COTTON, IRRIGATED. EL PASO REGION
Estimated Costs And Returns Per Acre Of Upland Cotton, High Level Management
Item
Unit
1. Gross receipts, from production:
Lint
Seed
To t a l
2. Variable Costs:
Pre-Harvest:
Seed
Fertilize (140-60-0)
Herbicide
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor
Labor, Hoeing
L a b o r, I r r i g a t i o n
Insecticide (custom)
Scouting
Pickup Expense
Hail Insurance
Interest on Op. Cap.
Subtotal, Pre-Harvest
Harvest:
Chemicals
Machinery (custom)
Ginning
Subtotal, Harvest
lb.
ton
cwt.
ac.
qt.
ac.
h r.
h r.
h r.
h r.
h r.
application
ac.
ac.
$100
$
ac.
bale
bale
Price
or
Cost/Unit
$
.30
65.00
15.00
11.80
6.25
3.69
1.89
.65
2.00
1.30
1.50
3.25
2.50
5.00
7.50
.08
4.00
28.00
24.00
_
t.
Va l u e
or
Quantity Cost
825
.66
1
1
1
.36
3.18
1.13
5.38
8.00
6.00
4
1
1
1.5
47.90
1
1.65
1.65
Total Variable Costs
$ 5.40
11.80
6.25
3.69
6.01
.73
10.76
10.40
9.00
13.00
2.50
5.00
11.25
3.83
$ 99.62
$ 4.00
46.20
39.60
$ 89.80
$189.52
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Irrigation (water & land tax)
Land Charge (Rent)
$247.50
42.90
$290.40
$100.88
ac,
h r.
h r.
ac.
5.80
2.81
.72
25.00
.075
1
3.18
1.13
1
'50
Total Fixed Costs
5. Total Costs
6. Net Returns
7. Government Payment (825 lbs. @ 15c/lb.) 1/
j ^ ^
8. Net Return Including Government Payment
$ 5.80
8.94
.81
25.00
56.25
$ 96.80
$286.32
$ 4.08
$123.75
$127.83
1/ Based on planted acres. No allowance for set-aside acreage of 20%.
of 20%.
Developed by Extension Economists-Management, TAES, TAMU.
New, 1972
07075111
UPLAND COTTON, IRRIGATED, EL PASO REGION
Estimated Costs, And Requirements Per Acre of Upland Cotton, High Level Management
Labor
Fuel,
Oil,
_,.
.
Item -. Times u Tractor or T _. » Fixed costs
Operation *££ Date ^s Hours ^-h. Hr8. Lub.. Rep. Per Acre
Per Acre
Shred Stalks
1,3
Jan
1
.50
.40
$ .08
Disc
1,4
Jan
1
.31
.25
.19
.35
Plow
1,5
Jan
1
.31
.25
.21
.27
Disc
1,4
Feb
1
.31
.25
.19
.35
Float
1,6
Feb
2
1.00
.80
.20
1.04
List
1,7
Feb
1
.25
.20
.08
.16
Mulch
1,8
Feb
2
.84
.67
1.73
1.54
Fertilize
2
Mar
1
.31
.25
Cultivate
2,10
Apr
1
.15
.12
.11
.98
Herbicide
2,11
Apr
1
.25
.20
.14
.18
Plant
2,9
May
1.2
.30
.24
.19
.15
Cultivate
2,10
May- Jun
2
.40
.32
.29
.39
Cultivate
1,9
Jun- Aug
3
.45
.36
.28
.23
5.38
4.31
$ 3.69
$ 5.80
To t a l
$
.16
Irrigation:
Preplant
1.00
Postplant
5.00
To t a l
6.00
^■\
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June SO, 1914.
^
\
UPLAND COTTON, IRRIGATED, EL PASO REGION 07075122
Estimated Costs And Returns Per Acre Of Upland Cotton, Typical Management
Unit
Item
1.
2.
Gross receipts, from production:
Lint
Seed
To t a l
Variable Costs:
Pre-Harvest:
Seed
Fertilize (120-60-0)
Herbicide
Machinery
Tractor (1)
Tractor (2)
Labor, Tractor
Labor, Hoeing
L a b o r, I r r i g a t i o n
Insecticide (custom)
Pickup Expense
Hail Insurance
Interest on Op. Cap.
Subtotal, Pre-Harvest
lb.
ton
cwt.
ac.
qt.
ac.
h r.
h r.
h r.
h r.
hr.
application
Harvest:
Chemicals
Machinery (custom)
Ginning
Subtotal, Harvest
ac.
$100
$
ac.
bale
bale
Price or
Cost/Unit
$
.30
65.00
15.00
10.80
6.25
1.53
1.54
Quantity
700
$210.00
36.40
$246.40
.56
.36
1
1
1
4.12
$ 5.40
10.80
6.25
1.53
6.34
.65
.57
2.00
1.30
1.50
3.25
5.00
7.50
5.88
6.00
6.00
6.00
.37
.08
47.50
4.00
28.00
24.00
11.76
7.80
9.00
19.50
5.00
11.25
3.80
$ 98.80
1
1.5
1
1.4
1.4
$ 4.00
39.20
33.60
$ 76.80
Total Variable Costs
$175.60
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor
(1)
Tractor
(2)
Irrigation (water & land tax)
Land
Charge
(Rent)
Value or
Cost
$ 70.80
ac.
hr.
hr.
ac.
$
3.45
2.14
.72
25.00
.075
1
$ 3.45
8.82
4.12
1
750
.57
.41
25.00
56.25
Total Fixed Costs
$ 93.93
5 . To t a l C o s t s
$269.53
6. Net Returns
$(23.13)
7. Government Payment (700 lbs. @ 15c/lb.) 1/
$105.00
8. Net Return Including Government Payment
$ 81.87
20%,
1/ Based on planted acres. No allowance for set-aside acreage ofof 20%.
f
Developed by Extension Economists-Management, TAES, TAMU.
New, 1972
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30. 1914.
AECO 6
07075121
UPLAND COTTON, IRRIGATED, EL PASO REGION
Estimated Costs, And Requirements Per Acre Of Upland Cotton, Typical Management
Operation
Labor
Fuel,
Oil,
Item _._..._. Times u Tractor or T__-_ -_ Fixed costs
No. Date oCeT Ho"" tachTHrs. ^b. Rep. *£?££
(1)
Per
Acre
Shred Stalks
1,3
Jan
1
.50
.40
$ .08
$ .16
Disc
1,4
Jan
1
.38
.30
.05
.16
Plow
1,5
Feb
1
.63
.50
.17
.15
Disc
1,4
Feb
1
.38
.30
.05
.16
Float
1,6
Feb
2
1.13
.90
.23
1.17
List
1,7
Mar
1
.31
.25
.10
.13
Fertilize
2
Apr
1
.31
.25
Disc
1,4
Apr
1
.38
.30
.05
.16
List
1,7
Apr
1
.31
.25
.10
.13
Herbicide
1,12
Apr
1
.25
.20
.14
.18
Plant
1,10
May
1.2
.30
.24
.11
.40
Cultivate
2,8
Jun
2
.40
.32
.17
.23
Cultivate
1 , 11
Jul-Aug
4
.60
.48
.28
.42
5.88
4.69
$ 1.53
$ 3.45
To t a l
Irrigation:
Preplant
1.00
Postplant
5.00
To t a l
6.00
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30/1914.
AECO 6
/J""\
07095112
GRAIN SORGHUM, IRRIGATED. EL PASO REGION
r
Estimated Costs And Returns Per Acre Of Grain Sorghum, High Level Management
Item
Unit
1. Gross receipts, from production:
Grain
sorghum
cwt.
Price or
Cost/Unit
Quantity
Value or
Cost
$ 2.25
50
$112.50
.17
8
1
1
$ 1.36
9.00
1.17
3.74
2. Variable Costs:
Pre-Harvest:
Seed
Fertilize (100-50-0)
Machinery
Tractor.(1)
Tractor (2)
Labor, Tractor
Labor, Irrigation
Pickup Expense
Insecticide (custom)
Interest on Op. Cap.
Subtotal, Pre-Harvest
lb.
ac.
ac.
h r.
h r.
h r.
hr.
ac.
application
$
9.00
1.17
1.89
.65
1.98
.24
2.00
1.50
5.00
3.00
2.77
4.00
.08
17.49
1
1
.16
5.54
6.00
5.00
3.00
1.40
$ 36.37
Harvest:
r
Machinery (custom)
Haul
Subtotal, Harvest
ac.
cwt.
7.00
.10
1
50
Total Variable Costs
$ 48.37
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
Tractor (1)
Tractor (2)
Irrigation (water & land tax)
Land Charge (Rent)
7.00
5.00
12.00
$
$
$ 64.13
ac.
h r.
h r.
ac.
$
Total Fixed Costs
5 . To t a l C o s t s
6. Net Returns
3.56
2.81
.72
25.00
.075
1
1 . 98
24
1
750
$
3.56
5.56
.17
25.00
56.25
$ 90.54
$138.91
$(26.41)
r
Developed by Extension Economists-Management. TAES, TAMU.
New, 1972
S E E S % ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ AECO
^ ^fi
GRAIN SORGHUM, IRRIGATED, EL PASO REGION 07095111
Estimated Costs, And Requirements Per Acre Of Grain Sorghum, High Level Management
Operation
Labor
Fuel.
Oil,
IN
J j oe .B O
D va e
t er T, i„m
s aHc hT.r aH
c tr osr. o"r« «
Lu
. eM
• »b . , «R~e =p .f Fp iex re dA cc or se t s
(1)
Per
Acre
Shred Stalks
1,3
Dec
1
.50
.40
Disc
1,4
Dec
1
.31
.25
.19
.35
Float
1,6
Jan
1
.50
.40
.20
.52
List
1,7
Feb
1
.25
.20
.08
.16
Mulch
2,10
Apr
1
.20
.16
.15
.20
Fertilize
2
Apr
1
.31
.25
Plant
2,9
Jun
1
.25
.20
.16
.13
Cultivate
2,10
Jun
2
.30
.24
.22
1.96
Cultivate
1,9
Jul
1
.15
.12
.09
.08
2.77
2.22
$ 1.17
$ 3.56
To t a l
$
.08
$
.16
/*'^%
Irrigation:
Preplant
1.00
Postplant
3.00
To t a l
4.00
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amendeS, aS7une^0??9M
AECO 6
0/095122
GRAIN SORGHUM, IRRIGATED, EL PASO REGION
Estimated Costs And Returns Per Acre Of Grain Sorghum, Typical Management
Item
Unit
1. Gross receipts, from production:
Grain
Sorghum
cwt.
$
Price or
Cost/Unit
Quantity
2.25
30
.17
8
1
1
Value or
Cost
$ 67.50
2. Variable Costs:
Pre-Harvest:
Seed
Fertilize (100-50-0)
Machinery
Tr a c t o r. ( 1 )
Tractor (2)
Labor, Tractor
L a b o r, I r r i g a t i o n
Insecticide (custom)
Pickup Expense
Interest on Op. Cap.
Subtotal, Pre-Harvest
lb.
ac.
ac.
h r.
h r.
h r.
h r.
application
Harvest:
Machinery
(custom)
Haul
cwt.
Subtotal, Harvest
ac.
$
ac.
9.00
.83
$
.83
1.54
1.84
2.83
.65
.73
.47
2.00
1.50
3.00
5.00
3.21
4.00
.08
17.46
6.42
6.00
3.00
5.00
1.40
$ 36.31
7.00
.10
1
1
1
30
7.00
3.00
$ 10.00
$
Total Variable Costs
$ 46.31
3. Income Above Variable Costs
4. Fixed Costs:
Machinery
ac.
1.93
Tractor
(1)
hr.
2.14
Tractor
(2)
hr.
.72
Irrigation (water and land tax) ac. 25.00
Land
Charge
(Rent)
$
.075
Total Fixed Costs
1.36
9.00
$ 21.19
1
$
1.84
1
750
.73
1.93
3.94
.53
25.00
56.25
$ 87.65
5. Total Costs
$123.96
6. Net Returns
$(56.46)
Jffp^
Oeveloped by Extension Economists-Management, TAES, TAMU.
New, 1972
Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of
Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30, ?914.
AECO 6
07095121
GRAIN SORGHUM, IRRIGATED, EL PASO REGION
Estimated Costs, And Requirements Per Acre Of Grain Sorghum, Typical Management
Labor
Fuel,
Oil,
Item ^_
_ _ _ Ti m e s uH_o uTr
a cS
t ocrh .o° r5 r,s_!" . L
• _u_b . '. tR. e' p .F i *xpe -d~ Ac ~
o s~t s
r
s
Date
Over
No.
Per Acre
(1)
Operation
Shred
Stalks
Disc
1,4
Float
List
1,3
1
.50
.40
$ .08
$
.16
Jan
1
.38
.30
.05
.16
Feb
1
.56
.45
.12
.59
.31
.25
.10
.13
.16
.08
.12
1,6
1,7
Jan
Mar
1
Cultivate
2,8
Fertilize
2
Apr
1
.31
.25
1,10
Jun
1
.25
.20
.09
.33
Plant
Cultivate
2,8
Cultivate
1 , 11
To t a l
Mar
1
.20
Jun
2
.40
.32
.17
.23
Jul
2
.30
.24
.14
.21
2.57
$ .83
$ 1.93
3.21
/rt^
^X
Irrigation:
Preplant
Postplant
To t a l
1
3
1.00
3.00
4.00
(1) Labor hours calculated at 1.25 times tractor hours except where noted by *.
Developed by Extension Economists-Management, TAES, TAMU.
Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department
of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914.
AECO 6
Download