r 07000300 TEXAS EL PASO REGION FOREWORD r r The data contained in this report are based on estimates and actual records of operations within an area described as the Texas El Paso Region. This area includes the El Paso and Hudspeth county area in extreme West Texas. Even in a region so narrowly defined, variation in inputs and returns exists among farms and managers. However, these budgets should serve as useful guides in planning and decision making for agriculturalists concerned with the area de scribed above. The enterprise budgets for this region are based on yields as shown on 07000600. The assumptions used in the development of these budgets include the following things. Farm size varied from 350 acres for the typical manager to 750 acres for the high level manager. Ap proximately two-thirds of the acreage for both management levels was planted to cotton. Adjust ments in the government programs have led to a slight increase in the percentage of total cotton acreage which is planted in pima cotton. It was assumed that pima was planted on 55 per cent of the cotton acreage in this region and upland cotton planted on 45 percent. Annual rotations are practiced on the typical farm using small grains or grain sorghum, and occasionally alfalfa in rotation. The high level fanner typ ically uses rotation which may include 4 years of alfalfa and 1 year of cotton in an attempt to maximize cotton yields per acre. Cotton yields tend to increase 125 pounds per acre for cotton produced under a 2-year rotation with grain sorghum and another 125 pounds for the rota tion with 4 years of alfalfa. Both typical and high level managers enjoy this increase. Pima cotton responds somewhat less to the two differ ent rotation systems. Small grain grazing is practiced by both management levels but with greater intensity on farms of the above average manager. Irrigation is supplied in both cases from the Rio Grande Project. Management differences center primarily on timing of operation, varia tion in rotation pattern and, to some degree, input levels. The high level manager extracts greater yields and usually greater profits from his enterprises due to a superior ability for preparing, planting, tending to and selling his crop. No typical crop share or cash rent determi nation was available. Land rent was therefore computed on present market value and current interest rates on long-term capital investments. 07000400 TEXAS EL PASO REGION Assumed Prices Paid And Received By Farmers | ^ V Item Unit Price cwt. cwt. cwt. cwt. cwt. $ 15.00 17.00 28.00 8.00 65.00 Prices Paid Seed: Cotton (delinted) Grain Sorghum Corn Barley Alfalfa Bermuda Sprigs Fertilizer: Nitrogen Phosphorus Herbicide: Pre-emerge Labor: Hoeing Irrigation Tr a c t o r Custom Rates: Insecticide plus materials Fertilizer application Cotton picking Cotton ginning, upland Cotton ginning, pima Grain Harvest Grain Hauling Swath, bale, haul hay Capital: Investment Operating Hail Insurance: Cotton Taxes: Land and Water bu. .75 lb. lb. .05 .08 qt. 6.25 h r. h r. h r. 1.30 1.50 2.00 ac. ac. 3.25 1.50 28.00 24.00 33.00 7.00 bale bale bale ac. cwt. bale .10 .40 $ $ .075 .08 7.50 $100 ac. 25.00 Prices Received Cotton, upland Cotton, pima Cottonseed Grain Sorghum Corn Silage, in field Barley Alfalfa Grazing, calf Government Payments Upland Cotton Pima Cotton lb./lint lb./lint ton cwt. ton cwt. ton $ .30 .48 65.00 2.25 6.00 2.20 35.00 lb./gain .17 lb./lint lb/lint .1269 .15 New, 1972 / 07000510 TEXAS EL PASO REGION Estimated Machinery And Equipment Cost Per Hour Of Use, High Level Management Machinery Item and Size Tractor, 118 HP (2) Tractor, 50 HP (1) Shredder, 2-Row Offset Disc Plow, 4 Btm. Float Lister, 4-Row Rotovator Planter Toolbar, 4-Row Rolling Cultivator Spray Rig, 4-Row Grain Drill, 14! Border Disc Hydrolie Sprayer Pruner Shaker 1/ 2/ 3/ 4/ Item No. New Cost 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 $13,500 3,500 350 2,000 1,350 1,250 500 2,500 800 1,700 350 1,300 250 2,000 750 2,000 Estimated Typical Yrs. Of Use 6 15 8 8 8 10 8 10 10 8 10 10 10 10 10 10 Total Depr.l/ $7,500 3,500 261 1,500 1,000 1,000 375 1,900 640 1,268 280 1,000 200 2,000 750 2,000 Estimated Total Hrs, Of Use 4,200 7,200 1,000 1,600 1,600 1,200 1,200 1,600 1,600 1,600 500 800 800 Interest on Depr. / Inves tment Per Hr.2/ Per Hour 3/ $ 1.79 .49 .26 .94 .63 .83 .31 1.19 .40 .79 .56 1.25 4,000 .25 .50 1,500 1.25 1.33 600 $ 1.04 .23 .14 .47 .44 .47 .22 .73 .2.3 .43 .32 .75 .14 .20 .50 .53 Fuel, Oil, Lub., Rep., Per Hr. 47 $ 1.89 .65 .19 .75 .84 .25 .41 2.58 .78 .91 .71 .99 .06 .50 1.25 1.33 New cost less value at time of trade, or less salvage value. Assumes straight line depreciation. (Investment + Salvage) divided by 2 (7.5%) divided by annual hours of use. Fuel, Oil, Lubrication, repair cost estimate taken from Bower, Modern Concepts of Farm Machinery Management New, 1972 ^J 1 ^ ^ r-^^ 07000520 TEXAS EL PASO REGION Estimated Machinery And Equipment Cost Per Hour Of Use, Typical Management Machinery Item and Size Item No. Tractor, 105 HP (1) Tractor, 45 HP (1) Shredder, 2-Row Disc, 91 Plow Float Lister Rolling Cultivator Planter, Toolbar Cultivator Spray Rig Border Disc 1 2 3 4 5 6 7 8 10 11 12 13 1/ 2J 3/ 4/ Estimated New Total * D e p r. l / Cost TyP±cal Yrs< Ot Use $10,500 3,500 350 1,200 900 1,200 500 1,000 800 850 350 250 8 15 8 8 8 10 8 8 10 10 10 10 $6,500 3,500 261 900 670 1,000 375 750 640 670 280 200 Estimated Total Hrs. Of Use 5,000 7,200 1,000 2,500 3,500 1,200 1,200 1,600 600 1,200 500 800 Depr. Per Hr. 2/ $ 1.30 .49 .26 .36 .19 .83 .31 .47 1.06 .56 .56 .25 Interest on Investment Per Hour I t $ .84 .23 .14 .18 .10 .47 .22 .25 .60 .32 .32 .14 Fuel, Oil, Lub., Rep., Per Hr. 4/ $ 1.54 .65 .19 .17 .33 .25 .41 .53 .45 .59 .71 .06 New cost less value at time of trade, or less salvage value. Assumes straight line depreciation. (Investment + Salvage) divided by 2 (7.5%) divided by annual hours of use. Fuel, Oil, Lubrication, repair cost estimate taken from Bower, Modern Concepts of Farm Machinery Management New, 1972 07000600 /'^\ TEXAS EL PASO REGION Y i e l d Per Acre For Typical And High Level Management Irrigated Ty p i c a l H i g h L e v e l Crop Unit Cotton, Upland //lint 700 825 Cotton, Pima 1/ //lint 500 600 Grain Sorghum lbs. 3250 5000 Corn for Silage tons Barley lbs. 3500 4500 Alfalfa tons 6 8 Bermudagrass Pasture //gain - — 25 750 ***% 1/ Weighted average yields over past 10 years as reported in Annual Production Report, Rio Grande Project, Bureau of Reclamation indicates pima cotton yields 72.2 percent of upland cotton. ^ ^ 0/006112 ALFALFA ESTABLISHMENT, IRRIGATED, EL PASO REGION Estimated Costs And Returns Per Acre Of Alfalfa Establishment, High Level Management Item Price or Cost/Unit Unit Quantity Value or Cost 1. No Income 2. Variable Costs: Seed Fertilizer (0-80-0) Machinery Tractor (1) Tractor (2) Labor, Tractor L a b o r, I r r i g a t i o n Pickup Expense Well operation & maintenance Interest on Op. Cap. cwt. $ 65.00 6.40 1.06 1.89 ac. ac. h r. h r. h r. h r. ac. 1 1 2.07 .65 2.00 1.50 5.00 15.00 ac/ft. $ 26.00 6.40 1.06 3.91 .42 .27 3.10 3.00 6.20 4.50 2.50 15.00 3.29 .5 1.0 .08 $ .40 32.92 Total Variable Costs $ 69.13 3. No Income 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation (water & land tax)l/ Land Charge (Rent) 1/ ac. h r. h r. ac. 1 2.56 2.81 2.07 .72 25.00 .075 $ 375 Total Fixed Costs .42 .5 $ 2.56 5.82 .30 12.50 28.13 $ 49.13 5. Total Costs $118.44 1/ One half rate due to double cropping. Developed by Extension Economists-Management, TAES, TAMU. _ New, 1972 Cm.pcra.ivc Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture coopcrar.ng. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June 30. 1014. AECO 6 ALFALFA ESTABLISHMENT, IRRIGATED, EL PASO REGION Estimated Costs, And Requirements Per Acre Of Alfalfa Establishment, High Level Management Operation 07006111 LaborFuel, Oil,~" I t e m n - 4 . a T i m e s H r t l l ^ 0 T r a c t o r o r T. „ . _ _ F i x e d c o s t s No. Date Over H°!f *s Mach. Hrs. ^ub. t Bep. per Acre (1) Per Acre Shred Stalks 1.3 Sep 1 .50 .40 .08 $ .16 Disc 1.4 Sep 1 .31 .25 .19 .35 Plow 1.5 Sep 1 .31 .25 .21 .27 Disc 1,4 Sep 1 .31 .25 .19 .35 Float 1.6 Sep 2 1.00 .80 .20 1.04 Border 1,13 Sep 1 .15 .12 .01 .05 Fertilize 2 Sep 1 .31 .25 Plant 2,12 Sep 1 .21 .17 .18 .34 3.10 2.49 $ 1.06 $ 2.56 To t a l Irrigation: Preplant 1.00 Postplant 2.00 To t a l 3.00 (1) Labor hours calculated at 1.25 times tractor hours except where noted by * /^B%\ Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30, 1914. AECO 6 07005112 ALFALFA, IRRIGATED, EL PASO REGION ^ ^ E s t i mated Costs And Returns Per A c r e O f A l f a l f a , H i g h L e v e l M a n a g e m e n t _-m i i U n •i _t Price _ _ .Q. u _a . ntiV or ITt fe- m _ _ / „ .o_r _ t ya l u e Cost/Unit J Cost 1. Gross receipts, from production: Hay ton $ 35.00 8 $280.00 2. Variable Costs: Pre-Harvest: 1/4 Establishment ac. 29.61 Fertilizer (0-100-0) ac. 8.00 Tractor (2) hr. .65 Labor, Tractor hr. 2.00 Labor, Irrigation hr. 1.50 Pickup Expense ac. 5.00 Well operation & maintenance ac/ft. 15.00 Interest on Op. Cap. $ .08 Subtotal, Pre-Harvest Harvest: Swath, bale, To t a l 3. haul (custom) Va r i a b l e Income Above 4. Fixed Costs: Tractor (2) Irrigation (water Land Charge 1/ bale 1 1 hr. & land (Rent) .72 tax) $ .75 .93 .49 1.86 15.00 5.00 15.00 3.00 77.96 10 1 1.0 37.48 $ .40 Costs Va r i a b l e 29.61 8.00 225 $ 90.00 §167 Costs 96 $ 11 2 .75 $ ac. 25.00 1 .075 750 04 .54 25 00 56*25 Total Fixed Costs $ 81.79 5. Total Costs $249.75 6. Net Returns $ 30.25 1/ Costs per ton for cubing alfalfa estimated to be approximately the same as these baling costs Developed by Extension Economists-Management, TA E S , TA M U . New 1972 ALFALFA, IRRIGATED, EL PASO REGION 07005111 Estimated Costs, And Requirements Per Acre Of Alfalfa, High Level Management Operation Fertilize Total Irrigation: No. Labor Fuel, Oil, D a t e AOl m e S H o u r s i r a f t o S ° r v e r " : M a c h . H r s . * - «L"u• b». , ^ cRfe»p .p e* *r x eAVc °r S e Per Acre (1) 2 Mar-Sep 3 .93 .75 .93 .75 10 10.00 (1) Labor hours calculated at 1.25 times tractor hours except where noted by * Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June 30, 1914. ALFALFA ESTABLISHMENT. IRRIGATED. EL PASO REGION 07006122 Estimated Costs And Returns Per Acre Of Alfalfa Establishment, Typical Management Item Unit Price or Cost/Unit Quantity Value or Cost 1. No Income 2 . Va r i a b l e C o s t s : Seed Fertilizer (0-80-0) Machinery Tr a c t o r ( 1 ) Tractor (2) Labor, Tractor L a b o r, I r r i g a t i o n Pickup Expenses Well operation & maintenance Interest on Op. Cap. cwt. ac. ac. h r. h r. h r. hr. ac. ac/ft. $ $ 65.00 6.40 .79 1.54 .65 2.00 1.50 5.00 15.00 .08 .38 $ 24.70 6.40 . 2.52 3.88 .45 .29 1 1 .79 3.73 3 1 1 34.01 Total Variable Costs 7.46 4.50 5.00 15.00 2.72 $ 70.74 3. No Income 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation (water & land tax)JL/ Land Charge (Rent) 1/ ac. hr. hr. ac. $ Total Fixed Costs 5 . To t a l C o s t s 2.25 2.14 1 2.52 .72 25.00 .075 375 .45 .5 $ 2.25 5.39 .32 12.50 28.13 $ 48.59 $119.33 JPN JL/ One half rate due to double cropping. Developed by Extension Economists-Management, TAES, TAMU. New, 1972 n-Vriaiivc Extension Work in Agriculture and Home Economics. Texas A&M University and the United State. Department of MpMuliure cooperating, li.str.buied in furtherance of the Acts of Congress of May 8. 1914. as amended ami J.ile 30 19.4 A _.•_-#» /_ A L FA L FA E S TA B L I S H M E N T. I R R I G AT E D . E L PA S O R E G I O N 0 7 0 0 6 1 2 1 Estimated Costs, And Requirements Per Acre O f A l f a l f a E s t a b l i s h m e n t , Ty p i c a l M a n a g e m e n t Labor Fuel, Oil, _ » . . _ _ _ . , _ * _ _ _ , I t e m n ^ t ^ T i m e s * p„ ._ * pFei xr e dA cc or se i Operation No Date Qver H o u r «s * %^. .^- . «H Tr r8a#c t oLr uobr . . . .R e (1) Per Shred S t a l k s 1.3 Sep 1 .50 .40 Disc 1.4 Sep 1 .38 Plow 1,5 Sep 1 Disc 1.4 Sep Float 1,6 Fertilize Plant To t a l /a9% Acre .08 $ .16 .30 .05 .16 .63 .50 .17 .15 1 .38 .30 .05. .16 Oct 2 1.13 .90 .23 1.17 2,13 Oct 1 .31 .25 - 2,12 Oct 1 .25 .20 .20 .40 3.73 2.97 $ .79 $ 2.25 $ Irrigation: Preplant 1.00 Postplant 2.00 To t a l 3.00 (1) Labor hours calculated at 1.25 times tractor hours except where noted by * >-^% Oevelopeo by Extension Economists-Management, TAES, TAW. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Arts of Congress of May 8. 1914. as amended, and June 30. 1914. 07005122 ALFALFA, IRRIGATED, EL PASO REGION Estimated Costs And Returns Per Acre Of Alfalfa, Typical Management Price [*» »nlt Cost/Unit 1. Gross receipts, from production: Hay ton $ or _-..__ Va l u e Quantlty 35.00 6 or Cost $210.00 2. Variable Costs: Pre-Harves t: 1/4 Establishment aac. c. 2 29.82 9.82 1 $ ac. a c . 8.00 8 . 0 0 Fertilizer (0-100-0) 1 Tractor (2) h rh.r. . .65 65 .75 .93 2.00 h r. Labor, Tractor h hr. r . 1.50 Labor, Irrigation 1.50 10 ac. 5.00 Pickup Expense ac. 5.00 1 . c e 15.00 Well operation & m a i n t aecn/ fat n ac/ft. 15.00 1 Interest on Op. C $a p . $ .08 . 0 8 37.59 Subtotal, Pre-Harvest 29.82 8.00 .49 1.86 15.00 5.00 15.00 3.01 $ 78.18 Harvest: Swath, bale, haul (custom) 1/ $ 67.60 169 .40 bale Total Variable Costs $145.78 3. Income Above Variable Costs $ 64.22 4. Fixed Costs: Tractor (2) Irrigation (water & land tax) Land Charge (Rent) To t a l Fixed 5. To t a l 6. Net h r. ac. .72 25.00 .075 $ Costs Costs Returns 1 750 .75 $ $ .54 25.00 56.25 81.79 $227.57 $(17.57) 1/ Costs per ton for cubing alfalfa estimated to be approximately the same as these baling costs. Developed by Extension Economists-Management, TA E S , TA M U . New, 1972 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30. 1914. AECO 6 ALFALFA, IRRIGATED, EL PASO REGION 07005121 Estimated Costs, And Requirements Per Acre Of Alflafa, Typical Management Operation Fertilize I£2 Date Irrigation: ™? Mar-Sep To t a l Labor Fuel, Oil, «°™ ^n.°_rs! ">>•. Rep. (1) Per Acre 3 .93 .93 10 , ^% *g?_°?- 7 .75 .75 10.00 (1) Labor hours calculated at 1.25 times tractor hours except where noted by * Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30. 1914. AECO 6 07015112 BARLEY, IRRIGATED, EL PASO REGION Estimated Costs And Returns Per Acre Of Barley, High Level Management Item Unit 1. Gross receipts, from production: Grain cwt. $ Grazing lb./gain Price or Cost/Unit 2.20 .17 Quantity Value or Cost 45 250 $ 99.00 42.50 To t a l $141.50 2. Variable Costs: Pre-Harvest: Seed Fertilizer (150-0-0) Machinery Tractor (1) Tractor (2) Labor, Tractor L a b o r, I r r i g a t i o n Pickup Expenses Well operation & maintenance Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Machinery (custom) Hauling Subtotal, Harvest cwt. ac. ac. h r. h r. h r. h r. ac. ac/ft. $ ac. cwt. 8.00 7.50 .63 1.89 .65 1 1 1 $ .08 24.75 1 1 1 45 Total Variable Costs .27 5.34 4.50 5.00 15.00 1.98 $ 51.47 7.00 4.50 $ 11.50 $ $ 62.97 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation (water & land tax)j7 Land Charge (Rent)U 3.25 .42 2.67 3.00 7.00 .10 .63 1.72 2.00 1.50 5.00 15.00 8.00 7.50 $ 78.53 ac. h r. h r. ac. $ Total Fixed Costs 5 . To t a l C o s t s 6. Net Returns 1.39 2.81 .72 25.00 .075 1 $ 1.72 .42 .5 375 1.39 4.83 .30 12.50 28.13 $ 47.15 $110.12 $ 31.38 1/ One half rate due to double cropping. Developeo by Extension Economists-Management, TAES, TAMU. «r «™wo;S^^ New, 1972 07015111 BARLEY, IRRIGATED, EL PASO REGION Estimated Costs, And Requirements Per Acre Of Barley, High Level Management Fuel , O i l , Labor Fixed costs Tractor or Lub. Item Hours D u a a t e O Ti v m e e r s , Rep. Per Acre Mach. Hrs. Operation No. Per Acre (1) .08 $ .16 .80 .16 .32 .50 .40 .20 .52 1 .15 .12 .01 .05 Dec 1 .31 .25 - - Dec 1 .21 .17 .18 .34 2.67 2.14 .63 $ 1.39 Shred Stalks 1,3 Nov 1 .50 .40 Disc 1,4 Nov 2 1.00 Float 1,6 Nov 1 Border 1,13 Nov Fertilize 2 Plant 2,12 To t a l $ $ /^% Irrigation: Postplant 3.00 /^*%L (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6 BARLEY, IRRIGATED, EL PASO REGION 07015122 Estimated Costs And Returns Per Acre Of Barley, Typical Management f^' Item Unit Price or Cost/Unit 1. Gross receipts, from production: Grain cwt. Grazing lb./gain 2.20 .17 Value or Cost Quantity 31.2 175 $ 68.64 29.75 To t a l $106.75 2 . Va r i a b l e C o s t s : Pre-Harvest: Seed Fertilize (100-0-0) Machinery Tractor (1) Tr a c t o r ( 2 ) Labor, Tractor L a b o r, I r r i g a t i o n Pickup Expenses Well operation & maintenance Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Machinery (custom) Hauling Subtotal, Harvest cwt. 8.00 5.00 Ac. ac. h r. h r. h r. h r. ac. .58 1.54 .65 2.00 1.50 5.00 15.00 ac/ft. .08 $ ac. cwt. 7.00 .10 1 1 1 1.57 .45 2.54 3 1 1 22.94 8.00 5.00 .58 2.42 .29 5.08 4.50 5.00 15.00 1.84 $ 47.71 1 31.2 $ 7.00 3.12 $ 10.12 Total Variable Costs $ 57.83 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation (water & land tax)l/ Land Charge (Rent) 1/ $ 48.92 ac. h r. h r. ac. 1.91 2.14 .72 25.00 .075 $ 1 1.57 .45 .5 375 $ 1.91 3.36 .32 12.50 28.13 Total Fixed Costs $ 46.22 5 . To t a l C o s t s $104.05 6. Net Returns $ 2.70 1/ One half rate due to double cropping. Developeo by Extension Economists-Management, TAES, TAMU. _ .„ — . — , w ^^ 1N6W _L_7 / Z. New, <:.«.|Kialiv<- Extension Work in Agriculture and Home Economics. Texas A&M University and the tlnii-i <■■■... .__'1972 ■■- ■ , A « " ™ T- " i * » » » " > " . « . i n f u r t h e r a n c e o f t h . A c o f C o n _ r e » o T M a y ™ . 1 9 H . * a n , " " * . ! Z j S ^ i AECO 6 B A R L E Y, I R R I G A T E D , E L P A S O R E G I O N 0 7 0 1 5 1 2 1 Estimated Costs, And Requirements Per Acre Of Barley, Typical Management Labor Fuel, Oil, __,__ ..4 Item nat.a Times u-,fr.a Tractor or , . «__ Fixed costs operation N Date Qver Hours Mach# Hr8# Lub., Rep. Per Acre (1) Per Acre Shred Stalks 1,3 Nov 1 .50 .40 Disc 1,4 Nov 2 .76 .60 .10 .32 Float 1,6 Nov 1 .57 .45 .19 .98 Border 1,13 Nov 1 .15 .12 .01 .05 Fertilize 2 Nov 1 .31 .25 Plant 2,12 Dec 1 .25 .20 .20 .40 2.54 2.02 To t a l $ $ .08 .58 $ $ .16 1.91 Irrigation: Postplant 3 3.00 ^ * \ (1) Labor hours calculated at 1.25 times tractor hours except where noted by * Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. 07171112 f^ BERMUDAGRASS ESTABLISHMENT, IRRIGATED, EL PASO REGION Estimated Costs And Returns Per Acre Of Bermudagrass Establishment, High Level Management Item 1. Gross receipts, from production: Grazing calf days 2. Variable Costs: Sprigs Fertilize (80-80-0) Machinery Tractor (1) Tractor (2) Labor, Tractor L a b o r, I r r i g a t i o n Pickup Expense Well operation & maintenance Interest on Op. Cap. Price or Cost/Unit Unit bu. ac. ac. h r. h r. h r. h r. ac. ac/ft. $ $ .10 .75 10.40 .88 1.89 .65 2.00 1.50 5.00 15.00 .08 Quantity Value or Cost 180 $ 18.00 30 1 1 2.07 .25 2.89 6.00 1 1 36.32 Total Variable Costs $ 75.54 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation (water & land tax) Land Charge (Rent) $ 22.50 10.40 .88 3.91 .16 5.78 9.00 5.00 15.00 2.91 $(57.54) ac. h r. h r. ac. $ 2.22 2.81 1 2.07 .72 25.00 .075 Total Fixed Costs .25 1 750 $ 2.22 5.82 .18 25.00 56.25 $ 89.47 5. Total Costs $165.01 6. Annual Establishment @ 10 year life $ 14.70 Oeveloped by Extension Economists-Management, TAES, TAMU. . New. 1972 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30. 1914. AECO 6 07171111 Operation BERMUDAGRASS ESTABLISHMENT, IRRIGATED, EL PASO REGION Estimated Costs, And Requirements Per Acre Of Bermudagra ss Establishment, High Level Management Labor Fuel , O i l , Times Hours Tractor or Lub. , Rep. Item Date Mach. Hrs. Over No. Per Acre (1) Shred Stalks 1,3 Jan 1 .50 .40 Disc 1,4 Jan 1 .31 .25 .19 .35 Plow 1,5 Feb 1 o31 .25 .21 .27 Disc 1,4 Feb 1 .31 .25 .19 .35 Float 1,6 Mar 2 1.00 .80 .20 1.04 Border 1,13 Mar 1 .15 .12 .01 .05 Fertilize 2 Mar 1 .31 .25 — - 2.89 2.32 To t a l $ $ .08 Fixed costs Per Acre .88 $ .16 $ 2.22 Irrigation: Preplant 1 1.00 Postplant 5 5.00 To t a l 6.00 (1) Labor hours calculated at 1.25 times tractor hours except where noted by Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas AfeM University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6 /*"% 07170112 BERMUDAGRASS PASTURE, IRRIGATED, EL PASO REGION Estimated Costs And Returns Per Acre Of Bermudagrass Pasture, High Level Management Item Unit Price or Cost/Unit 1. Gross receipts, from production: cow days $ .15 Grazing 2. Variable Costs: Establishment Fertilizer (250-50-0) Tractor (2) Labor, Tractor L a b o r, I r r i g a t i o n Pickup Expenses Interest on Op. Cap. 3. ac. ac. h r. h r. h r. ac. $ 14.70 16.50 Quantity Value or Cost 365 1/ $ 54.75 1 1 $ 14.70 2.00 1.50 5.00 .08 16.50 .75 .93 .65 .49 1.86 9.00 5.00 1.90 6.00 1 23.78 Total Variable Costs $ 49.45 Income Above Variable Costs $ 4. Fixed Costs: h r. Tractor (2) ac. Irrigation (water and land tax) ac. $ Land Charge (Rent) .72 25.00 .075 Total Fixed Costs 1 750 .75 $ 5.30 .54 25.00 56.25 $ 81.79 5. Total Costs $131.24 6. Net Returns $(76.49) 1/ 8 months grazing @ 1.5 cows per acre = 365 cow days. Developed by Extension Economists-Management, TAES, TAMU. New, 1972 Cocpciaiivc Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculiure cooperating. Distributed in furtherance of the Arts of Congress of May 8, 1914. as amended, and June 30, 1914. AECO 6 BERMUDAGRASS PASTURE, IRRIGATED, EL PASO REGION Estimated Costs, And Requirements Per Acre Of Bermudagrass Pasture, High Level Management Operation Fertilize Total Irrigation 07170111 Labor Fuel, Oil, I t e m n M Ti m e s H o u r s Tr a c t o r o r L . R F i x e d c o s t s No. Date Over ,? *s Mach. Hrs. L"D'».Kep" Per Acre (1) Per Acre Mar-Sep 3 .93 .75 .93 .75 6.00 (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. Developeo by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June SO, 1914. 07065112 CORN FOR SILAGE, IRRIGATED, EL PASO REGION Estimated Costs And Returns Per Acre Of Corn For Silage, High Level Management Item Unit 1. Gross receipts, from production: S i l a g e , s t a n d i n g i n fi e l d ton Price or Cost/Unit $ 6.00 Quantity 25 Value or Cost $150.00 2. Variable Costs: Pre-Harvest: Seed Fertilize (200-80-0) Machinery Tractor (1) Tractor (2) Labor, Tractor L a b o r, I r r i g a t i o n Pickup Expense Insecticide (custom) Interest on Op. Cap. Subtotal, Pre-Harvest cwt. ac. ac. h r. h r. h r. h r. ac. application $ 28.00 16.40 .95 1 1 .15 $ 4.20 16.40 .95 1.89 1.40 .65 2.65 .85 .55 2.81 4.00 5.62 6.00 5.00 3.00 1.77 $ 46.14 2.00 1.50 5.00 3.00 .08 1 1 22.19 Harvest: (Sold in field) Total Variable Costs $ 46.14 3. Income Above Variable Costs $103.86 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation (water & land tax) Land Charge (Rent) ac. ac. h r. ac. $ 2.39 2.81 .72 25.00 .075 1 1.,40 • 85 1 750 $ 2.39 3.93 .61 25.00 56.25 Total Fixed Costs $ 88.18 5. Total Costs $134.32 6. Net Returns $ 15.68 Developeo by Extension Economists-Management, TAES, TAMU. New, 1972 Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and tht» Tlnir^ «■_._. » -, . , . a r?r*r\ /z 07065111 CORN FOR SILAGE, IRRIGATED, EL PASO REGION Estimated Costs, And Requirements Per Acre Of Corn For Silage, High Level Management Operation Labor Fuel, Oil, __. Item ~ ___ Times u Tractor or ,__,_ „ Fixed costs No. Date OveT Ho"" Mach. Hrs. Lub., Rep. Per Acre (1) Per Acre Disc 1,4 Dec 2 1.00 .80 $ .16 $ .32 Float 1,6 Jan 1 .50 .40 .20 .52 List 1,7 Feb 1 .25 .20 .08 .16 Mulch 2,10 Apr 1 .20 .16 .15 .20 Fertilize 2 Apr 1 .31 .25 Plant 2,9 Jun 1 .25 .20 .16 .13 Cultivate 2,10 Jul 1 .15 .12 .11 .98 Cultivate 2,9 Jul 1 .15 .12 .09 .08 2.81 2.25 $ .95 $ 2.39 To t a l Irrigation: Preplant 1.00 Postplant 3.00 To t a l 4.00 (1) Labor hours calculated at 1.25 times tractor hours except where noted by * Developeo by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6 ^ " \ 07070112 PIMA COTTON. IRRIGATED. EL PASO REGION Estimated Costs And Returns Per Acre Of Pima Cotton, High Level Management Item Price or Cost/Unit Unit 1. Gross receipts, from production: Lint Seed To t a l 2. Variable Costs: Pre-Harvest: Seed Fertilize (120-60-0) Herbicide Machinery Tractor (1) Tractor (2) Labor, Tractor Labor, Hoeing L a b o r, I r r i g a t i o n Insecticide (custom) Scouting Pickup Expense Hail Insurance Interest on Op. Cap. Subtotal, Pre-Harvest lb. ton $ cwt. ac. qt. ac. h r. h r. h r. hr. h r. application ac. ac. $100 $ Harvest: Chemicals Machinery (custom) Ginning Subtotal, Harvest ac. bale bale Quantity Value or Cost .48 65.00 600 15.00 10.80 6.25 3.69 1.89 .36 1 1 1 3.18 1.13 5.38 8.00 5.00 4 1 1 1.5 46.65 5.40 10.80 6.25 3.69 6.01 .73 10.76 10.40 7.50 13.00 2.50 5.00 11.25 3.73 $ 97 .02 1 1..2 1,.2 $ 4 .00 .48 .65 2.00 1.30 1.50 3.25 2.50 5.00 7.50 .08 4.00 28 .00 33 .00 Total Variable Costs $288.00 31.20 $319.20 33 .60 39 .60 $ 77,.20 $174,.22 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation (water & land tax) Land Charge (Rent) $144.,98 ac. h r. h r. ac. $ 5.,80 2. 81 72 25. 00 • 075 1 3. 18 1. 13 1 750 Total Fixed Costs $ 5 . 80 8. 94 81 25. 00 56. 25 $ 96.80 5. Total Costs $271.02 6. Net Returns $ 48.18 7. Government Payments (600 lbs. fi 12.69c/lb.) 1/ $ 76.14 8. Net Return Including Government Payment $124.32 tPe2elppeo.imP^ f f fi fi e for set-aside acreage of 30 89% 07070111 PIMA COTTON, IRRIGATED, EL PASO REGION Estimated Costs, And Requirements Per Acre Of Pima Cotton, High Level Management Labor __ Fuel, Oil, ..-.__ ..«_«• ■.-.-. Item n««.__ Times «_-..-_, Tractor or T . O p e r a t i o n N q # D a t e Q v e r H o u r s j ^ . H r 8 - L u b . , R e p__, . P Fixed e r A ccosts re (1) Per Acre Shred Stalks 1,3 Jan 1 .50 .40 $ .08 $ .16 Disc 1,4 Jan 1 .31 .25 .19 .35 Plow 1,5 Jan 1 .31 .25 .21 .27 Disc 1,4 Feb 1 .31 .25 .19 .35 Float 1,6 Feb 2 1.00 .80 .20 1.04 List 1,7 Feb 1 .25 .20 .08 .16 Mulch 1,8 Feb 2 .84 .67 1.73 1.54 Fertilize 2 Mar 1 .31 .25 Cultivate 2,10 Apr 1 .15 .12 .11 .98 Herbicide 2,11 Apr 1 .25 .20 .14 .18 Plant 2,9 May 1.2 .30 .24 .19 .15 Cultivate 2,10 May- Jun 2 .40 .32 .29 .39 Cultivate 1,9 Jun-■Aug 3 .45 .36 .28 .23 5.38 4.31 $ 3.69 $ 5.80 To t a l Irrigation: Preplant 1.00 Postplant 4.00 To t a l 5.00 (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June 30, 1914. A FOO fi ^ ^ 07070122 PIMA COTTON, IRRIGATED, EL PASO REGION Estimated Costs And Returns Per Acre Of Pima Cotton, Typical Management Item 1. Gross receipts, from production: Lint Seed To t a l 2. Variable Costs: Pre-Harvest: Seed Fertilize (100-60-0) Herbicide Machinery Tractor (1) Tractor (2) Labor, Tractor Labor, Hoeing L a b o r, I r r i g a t i o n Insecticide, (custom) Pickup Expense Hail Insurance Interest on Op. Cap. Subtotal, Pre-Harvest ^ N Harvest: Chemicals Machinery (custom) Ginning Subtotal, Harvest Price or Cost/Unit Unit lb. ton cwt. ac. qt. ac. h r. hr. h r. h r. h r. $ .48 65.00 15.00 9.80 6.25 1.53 1.54 ac. $100 $ bale bale 500 .4 .36 1 1 1 4.12 .65 application ac. Quantity $ 5.40 9.80 6.25 1.53 6.34 .57 .37 5.88 6.00 5.00 6.00 .08 46.25 11.76 7.80 7.50 19.50 5.00 11.25 3.70 $ 96.20 4.00 28.00 33.00 1 1.5 1 1 1 $ 4.00 28.00 33.00 $ 65.00 $161.20 3. Income Above Variable Costs $104.80 3.45 2.14 .72 25.00 .075 Total Fixed Costs 5 . To t a l C o s t s 6. Net Returns 7. Government Payments (500 lbs. @ 12.69c/lb.) 1/ 8. Net Return Including Government Payment $240.00 26.00 $266.00 2.00 1.30 1.50 3.25 5.00 7.50 Total Variable Costs 4. Fixed Costs: Machinery ac< Tractor (1) hr! Tractor (2) hr. Irrigation (water & land tax) ac. Land Charge (Rent) $ Value or Cost 1 4.12 1 750 .57 $ 3.45 8.82 .41 25.00 56.25 $ 93.93 $255.13 $ 10.87 $ 63.45 $ 74.32 1/ Based on planted acres. No allowance made for set-aside acreage of 30.89%, Developed by Extension Economists-Management, TAES, TAMU. (..M-pcrativc Extension Work in Agriculture and Home Economics. Texas A&M University and the United StatesNpw, Department 197?of AKr.cui.ure cooperating. Distributed in furtherance of the Acts of Congress of May 8.\9H. Ts amended and June 30 1014 AECO 6 07070121 PIMA COTTON, IRRIGATED, EL PASO REGION Estimated Costs, And Requirements Per Acre Of Pima Cotton, Typical Management Operation Labor Fuel, Oil, __,. ^N oD. a t e O T F iexr e d Accor set s v iemr e s MHa c Th r. a c t Ho r s .o r *L u b v R P (1) Per Acre Shred Stalks 1,3 Jan 1 .50 .40 $ .08 $ .16 Disc 1,4 Jan 1 .38 .30 .05 .16 Plow 1,5 Feb 1 ,63 .50 .17 .15 Disc 1,4 Feb 1 .38 .30 .05 .16 Float 1,6 Feb 2 1.13 .90 .23 1.17 List 1,7 Mar 1 .31 .25 .10 .13 Fertilize 2 Apr 1 .31 .25 Disc 1,4 Apr 1 .38 .30 .05 .16 List 1,7 Apr 1 .31 .25 .10 .13 Herbicide 1,12 Apr 1 .25 .20 .14 .18 Plant 1,10 May 1.2 .30 .24 .11 .40 Cultivate 2,8 Jun 2 .40 .32 .17 .23 Cultivate 1,11 Jul-Aug 4 .60 .48 .28 .42 5.88 4.69 $ 1.53 $ 3.45 To t a l Irrigation: Preplant 1.00 Postplant 4.00 To t a l 5.00 (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. Developed by Extension Economists-Management, TAES, TAMU- ST_t^?.EXtCn8i0n Work_An Agriculture and Home of Economics. A&MofUniversity and as theamended, United States Department of Agnculture cooperaung. Distributed in furtherance the Acts ofTexas Congress May 8. 1914. and June 30^9?.! AECO 6 /^% 07075112 UPLAND COTTON, IRRIGATED. EL PASO REGION Estimated Costs And Returns Per Acre Of Upland Cotton, High Level Management Item Unit 1. Gross receipts, from production: Lint Seed To t a l 2. Variable Costs: Pre-Harvest: Seed Fertilize (140-60-0) Herbicide Machinery Tractor (1) Tractor (2) Labor, Tractor Labor, Hoeing L a b o r, I r r i g a t i o n Insecticide (custom) Scouting Pickup Expense Hail Insurance Interest on Op. Cap. Subtotal, Pre-Harvest Harvest: Chemicals Machinery (custom) Ginning Subtotal, Harvest lb. ton cwt. ac. qt. ac. h r. h r. h r. h r. h r. application ac. ac. $100 $ ac. bale bale Price or Cost/Unit $ .30 65.00 15.00 11.80 6.25 3.69 1.89 .65 2.00 1.30 1.50 3.25 2.50 5.00 7.50 .08 4.00 28.00 24.00 _ t. Va l u e or Quantity Cost 825 .66 1 1 1 .36 3.18 1.13 5.38 8.00 6.00 4 1 1 1.5 47.90 1 1.65 1.65 Total Variable Costs $ 5.40 11.80 6.25 3.69 6.01 .73 10.76 10.40 9.00 13.00 2.50 5.00 11.25 3.83 $ 99.62 $ 4.00 46.20 39.60 $ 89.80 $189.52 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation (water & land tax) Land Charge (Rent) $247.50 42.90 $290.40 $100.88 ac, h r. h r. ac. 5.80 2.81 .72 25.00 .075 1 3.18 1.13 1 '50 Total Fixed Costs 5. Total Costs 6. Net Returns 7. Government Payment (825 lbs. @ 15c/lb.) 1/ j ^ ^ 8. Net Return Including Government Payment $ 5.80 8.94 .81 25.00 56.25 $ 96.80 $286.32 $ 4.08 $123.75 $127.83 1/ Based on planted acres. No allowance for set-aside acreage of 20%. of 20%. Developed by Extension Economists-Management, TAES, TAMU. New, 1972 07075111 UPLAND COTTON, IRRIGATED, EL PASO REGION Estimated Costs, And Requirements Per Acre of Upland Cotton, High Level Management Labor Fuel, Oil, _,. . Item -. Times u Tractor or T _. » Fixed costs Operation *££ Date ^s Hours ^-h. Hr8. Lub.. Rep. Per Acre Per Acre Shred Stalks 1,3 Jan 1 .50 .40 $ .08 Disc 1,4 Jan 1 .31 .25 .19 .35 Plow 1,5 Jan 1 .31 .25 .21 .27 Disc 1,4 Feb 1 .31 .25 .19 .35 Float 1,6 Feb 2 1.00 .80 .20 1.04 List 1,7 Feb 1 .25 .20 .08 .16 Mulch 1,8 Feb 2 .84 .67 1.73 1.54 Fertilize 2 Mar 1 .31 .25 Cultivate 2,10 Apr 1 .15 .12 .11 .98 Herbicide 2,11 Apr 1 .25 .20 .14 .18 Plant 2,9 May 1.2 .30 .24 .19 .15 Cultivate 2,10 May- Jun 2 .40 .32 .29 .39 Cultivate 1,9 Jun- Aug 3 .45 .36 .28 .23 5.38 4.31 $ 3.69 $ 5.80 To t a l $ .16 Irrigation: Preplant 1.00 Postplant 5.00 To t a l 6.00 ^■\ (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914. as amended, and June SO, 1914. ^ \ UPLAND COTTON, IRRIGATED, EL PASO REGION 07075122 Estimated Costs And Returns Per Acre Of Upland Cotton, Typical Management Unit Item 1. 2. Gross receipts, from production: Lint Seed To t a l Variable Costs: Pre-Harvest: Seed Fertilize (120-60-0) Herbicide Machinery Tractor (1) Tractor (2) Labor, Tractor Labor, Hoeing L a b o r, I r r i g a t i o n Insecticide (custom) Pickup Expense Hail Insurance Interest on Op. Cap. Subtotal, Pre-Harvest lb. ton cwt. ac. qt. ac. h r. h r. h r. h r. hr. application Harvest: Chemicals Machinery (custom) Ginning Subtotal, Harvest ac. $100 $ ac. bale bale Price or Cost/Unit $ .30 65.00 15.00 10.80 6.25 1.53 1.54 Quantity 700 $210.00 36.40 $246.40 .56 .36 1 1 1 4.12 $ 5.40 10.80 6.25 1.53 6.34 .65 .57 2.00 1.30 1.50 3.25 5.00 7.50 5.88 6.00 6.00 6.00 .37 .08 47.50 4.00 28.00 24.00 11.76 7.80 9.00 19.50 5.00 11.25 3.80 $ 98.80 1 1.5 1 1.4 1.4 $ 4.00 39.20 33.60 $ 76.80 Total Variable Costs $175.60 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation (water & land tax) Land Charge (Rent) Value or Cost $ 70.80 ac. hr. hr. ac. $ 3.45 2.14 .72 25.00 .075 1 $ 3.45 8.82 4.12 1 750 .57 .41 25.00 56.25 Total Fixed Costs $ 93.93 5 . To t a l C o s t s $269.53 6. Net Returns $(23.13) 7. Government Payment (700 lbs. @ 15c/lb.) 1/ $105.00 8. Net Return Including Government Payment $ 81.87 20%, 1/ Based on planted acres. No allowance for set-aside acreage ofof 20%. f Developed by Extension Economists-Management, TAES, TAMU. New, 1972 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914, as amended, and June 30. 1914. AECO 6 07075121 UPLAND COTTON, IRRIGATED, EL PASO REGION Estimated Costs, And Requirements Per Acre Of Upland Cotton, Typical Management Operation Labor Fuel, Oil, Item _._..._. Times u Tractor or T__-_ -_ Fixed costs No. Date oCeT Ho"" tachTHrs. ^b. Rep. *£?££ (1) Per Acre Shred Stalks 1,3 Jan 1 .50 .40 $ .08 $ .16 Disc 1,4 Jan 1 .38 .30 .05 .16 Plow 1,5 Feb 1 .63 .50 .17 .15 Disc 1,4 Feb 1 .38 .30 .05 .16 Float 1,6 Feb 2 1.13 .90 .23 1.17 List 1,7 Mar 1 .31 .25 .10 .13 Fertilize 2 Apr 1 .31 .25 Disc 1,4 Apr 1 .38 .30 .05 .16 List 1,7 Apr 1 .31 .25 .10 .13 Herbicide 1,12 Apr 1 .25 .20 .14 .18 Plant 1,10 May 1.2 .30 .24 .11 .40 Cultivate 2,8 Jun 2 .40 .32 .17 .23 Cultivate 1 , 11 Jul-Aug 4 .60 .48 .28 .42 5.88 4.69 $ 1.53 $ 3.45 To t a l Irrigation: Preplant 1.00 Postplant 5.00 To t a l 6.00 (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30/1914. AECO 6 /J""\ 07095112 GRAIN SORGHUM, IRRIGATED. EL PASO REGION r Estimated Costs And Returns Per Acre Of Grain Sorghum, High Level Management Item Unit 1. Gross receipts, from production: Grain sorghum cwt. Price or Cost/Unit Quantity Value or Cost $ 2.25 50 $112.50 .17 8 1 1 $ 1.36 9.00 1.17 3.74 2. Variable Costs: Pre-Harvest: Seed Fertilize (100-50-0) Machinery Tractor.(1) Tractor (2) Labor, Tractor Labor, Irrigation Pickup Expense Insecticide (custom) Interest on Op. Cap. Subtotal, Pre-Harvest lb. ac. ac. h r. h r. h r. hr. ac. application $ 9.00 1.17 1.89 .65 1.98 .24 2.00 1.50 5.00 3.00 2.77 4.00 .08 17.49 1 1 .16 5.54 6.00 5.00 3.00 1.40 $ 36.37 Harvest: r Machinery (custom) Haul Subtotal, Harvest ac. cwt. 7.00 .10 1 50 Total Variable Costs $ 48.37 3. Income Above Variable Costs 4. Fixed Costs: Machinery Tractor (1) Tractor (2) Irrigation (water & land tax) Land Charge (Rent) 7.00 5.00 12.00 $ $ $ 64.13 ac. h r. h r. ac. $ Total Fixed Costs 5 . To t a l C o s t s 6. Net Returns 3.56 2.81 .72 25.00 .075 1 1 . 98 24 1 750 $ 3.56 5.56 .17 25.00 56.25 $ 90.54 $138.91 $(26.41) r Developed by Extension Economists-Management. TAES, TAMU. New, 1972 S E E S % ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ AECO ^ ^fi GRAIN SORGHUM, IRRIGATED, EL PASO REGION 07095111 Estimated Costs, And Requirements Per Acre Of Grain Sorghum, High Level Management Operation Labor Fuel. Oil, IN J j oe .B O D va e t er T, i„m s aHc hT.r aH c tr osr. o"r« « Lu . eM • »b . , «R~e =p .f Fp iex re dA cc or se t s (1) Per Acre Shred Stalks 1,3 Dec 1 .50 .40 Disc 1,4 Dec 1 .31 .25 .19 .35 Float 1,6 Jan 1 .50 .40 .20 .52 List 1,7 Feb 1 .25 .20 .08 .16 Mulch 2,10 Apr 1 .20 .16 .15 .20 Fertilize 2 Apr 1 .31 .25 Plant 2,9 Jun 1 .25 .20 .16 .13 Cultivate 2,10 Jun 2 .30 .24 .22 1.96 Cultivate 1,9 Jul 1 .15 .12 .09 .08 2.77 2.22 $ 1.17 $ 3.56 To t a l $ .08 $ .16 /*'^% Irrigation: Preplant 1.00 Postplant 3.00 To t a l 4.00 (1) Labor hours calculated at 1.25 times tractor hours except where noted by * Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amendeS, aS7une^0??9M AECO 6 0/095122 GRAIN SORGHUM, IRRIGATED, EL PASO REGION Estimated Costs And Returns Per Acre Of Grain Sorghum, Typical Management Item Unit 1. Gross receipts, from production: Grain Sorghum cwt. $ Price or Cost/Unit Quantity 2.25 30 .17 8 1 1 Value or Cost $ 67.50 2. Variable Costs: Pre-Harvest: Seed Fertilize (100-50-0) Machinery Tr a c t o r. ( 1 ) Tractor (2) Labor, Tractor L a b o r, I r r i g a t i o n Insecticide (custom) Pickup Expense Interest on Op. Cap. Subtotal, Pre-Harvest lb. ac. ac. h r. h r. h r. h r. application Harvest: Machinery (custom) Haul cwt. Subtotal, Harvest ac. $ ac. 9.00 .83 $ .83 1.54 1.84 2.83 .65 .73 .47 2.00 1.50 3.00 5.00 3.21 4.00 .08 17.46 6.42 6.00 3.00 5.00 1.40 $ 36.31 7.00 .10 1 1 1 30 7.00 3.00 $ 10.00 $ Total Variable Costs $ 46.31 3. Income Above Variable Costs 4. Fixed Costs: Machinery ac. 1.93 Tractor (1) hr. 2.14 Tractor (2) hr. .72 Irrigation (water and land tax) ac. 25.00 Land Charge (Rent) $ .075 Total Fixed Costs 1.36 9.00 $ 21.19 1 $ 1.84 1 750 .73 1.93 3.94 .53 25.00 56.25 $ 87.65 5. Total Costs $123.96 6. Net Returns $(56.46) Jffp^ Oeveloped by Extension Economists-Management, TAES, TAMU. New, 1972 Cooperative Extension Work in Agriculture and Home Economics. Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8. 1914. as amended, and June 30, ?914. AECO 6 07095121 GRAIN SORGHUM, IRRIGATED, EL PASO REGION Estimated Costs, And Requirements Per Acre Of Grain Sorghum, Typical Management Labor Fuel, Oil, Item ^_ _ _ _ Ti m e s uH_o uTr a cS t ocrh .o° r5 r,s_!" . L • _u_b . '. tR. e' p .F i *xpe -d~ Ac ~ o s~t s r s Date Over No. Per Acre (1) Operation Shred Stalks Disc 1,4 Float List 1,3 1 .50 .40 $ .08 $ .16 Jan 1 .38 .30 .05 .16 Feb 1 .56 .45 .12 .59 .31 .25 .10 .13 .16 .08 .12 1,6 1,7 Jan Mar 1 Cultivate 2,8 Fertilize 2 Apr 1 .31 .25 1,10 Jun 1 .25 .20 .09 .33 Plant Cultivate 2,8 Cultivate 1 , 11 To t a l Mar 1 .20 Jun 2 .40 .32 .17 .23 Jul 2 .30 .24 .14 .21 2.57 $ .83 $ 1.93 3.21 /rt^ ^X Irrigation: Preplant Postplant To t a l 1 3 1.00 3.00 4.00 (1) Labor hours calculated at 1.25 times tractor hours except where noted by *. Developed by Extension Economists-Management, TAES, TAMU. Cooperative Extension Work in Agriculture and Home Economics, Texas A&M University and the United States Department of Agriculture cooperating. Distributed in furtherance of the Acts of Congress of May 8, 1914, as amended, and June 30, 1914. AECO 6