UNCLASSIFIED

advertisement
UNCLASSIFIED
Date: March 2014
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force
Appropriation/Budget Activity
3600: Research, Development, Test & Evaluation, Air Force / BA 5: System
Development & Demonstration (SDD)
COST ($ in Millions)
Prior
Years
FY 2013
FY 2014
R-1 Program Element (Number/Name)
PE 0604933F / ICBM Fuze Modernization
FY 2015
Base
FY 2015
#
OCO
FY 2015
Total
FY 2016
FY 2017
FY 2018
Cost To
FY 2019 Complete
Total
Cost
Total Program Element
49.457
65.370
118.411
59.826
- 59.826
88.473
124.882
196.040
223.436
266.905
1,192.800
655082: ICBM FUZE SUPPORT
49.457
65.370
118.411
59.826
- 59.826
88.473
124.882
196.040
223.436
266.905
1,192.800
- - - - - - - - - - Quantity of RDT&E Articles
#
The FY 2015 OCO Request will be submitted at a later date.
Note
A. Mission Description and Budget Item Justification
The ICBM Fuze program replaces the Mk21 (W87) fuze. The Mk21 replacement project scope includes the design and development of a form, fit, function replacement
fuze associated with the legacy W87 warhead. The legacy Mk21 fuze is three times past its design life and ongoing Mk21 refurbishment does not meet Nuclear Weapon
Stockpile Plan requirements.
The United States Air Force (USAF) will develop the Mk21 fuze in cooperation with the National Nuclear Security Administration (NNSA), US Navy (USN) and United
Kingdom. The ICBM Fuze program will leverage technologies, parts, components and development/production capabilities resulting from extensive fuze work performed
by the USN and NNSA. The ICBM Fuze program will also develop associated Minuteman III weapon system modifications, support equipment, data, flight test
hardware, and training. It will also conduct required system testing (including ground and flight tests) and fielding efforts. The program coordinates USAF Mk21 Fuze
replacement development efforts to synchronize USAF arming and fuzing and Department of Energy (DOE) warhead requirements. When prudent, the ICBM Fuze
Modernization program will conduct trade studies and initiate conceptual designs to address operational system issues and meet future requirements.
As a cooperative USAF, USN and NNSA weapon sustainment acquisition, the USAF will implement joint Department of Defense (DoD)-DOE Nuclear Weapons Life
Cycle Activities. The ICBM Fuze Modernization program will be tailored to use joint DoD-DOE phase 6.X processes for routine nuclear stockpile activities to align with
USN and NNSA operations.
In FY15, the ICBM Fuze Modernization program was rebaselined due to fiscal constraints. The Mk21 (W87) Fuze Replacement design and development efforts were
extended to shift the First Production Unit (FPU) delivery from FY19 to FY22. In addition, previous plans to integrate and test the Mk21 fuze replacement with the NNSA
W78/88-1 Life Extension Program (LEP) warhead have been deferred beyond the Future Years Defense Plan (FYDP).
This program is in Budget Activity 5, System Development and Demonstration (SDD) because it has passed Milestone B equivalent approval and is conducting
engineering and manufacturing development tasks aimed at meeting validated requirements prior to full-rate production.
PE 0604933F: ICBM Fuze Modernization
Air Force
UNCLASSIFIED
Page 1 of 9
R-1 Line #79
UNCLASSIFIED
Date: March 2014
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force
Appropriation/Budget Activity
3600: Research, Development, Test & Evaluation, Air Force / BA 5: System
Development & Demonstration (SDD)
FY 2013
B. Program Change Summary ($ in Millions)
Previous President's Budget
Current President's Budget
Total Adjustments
• Congressional General Reductions
• Congressional Directed Reductions
• Congressional Rescissions
• Congressional Adds
• Congressional Directed Transfers
• Reprogrammings
• SBIR/STTR Transfer
• Other Adjustments
73.512
65.370
-8.142
-0.098
- - - - - -2.005
-6.039
R-1 Program Element (Number/Name)
PE 0604933F / ICBM Fuze Modernization
FY 2014
FY 2015 Base
FY 2015 OCO
FY 2015 Total
129.411
118.411
-11.000
-11.000
- - - - - - - 214.836
59.826
-155.010
- - - 214.836
59.826
-155.010
-155.010
- -155.010
Change Summary Explanation
FY 2013 funding reflects a decrease of $0.098M due to Congressional reductions, $2.005M due to SBIR transfer, and a decrease of $6.039M due to
sequestration.
FY 2014 funding reflects a decrease of $11.000M due to Congressional reductions.
FY 2015 funding reflects a decrease of $155.010 due to program restructure delaying Mk21 replacement fuze FPU to FY22 consistent with related NNSA and
USN efforts, and deferring the NNSA W78/88-1 LEP warhead beyond the FYDP.
C. Accomplishments/Planned Programs ($ in Millions)
FY 2013
42.588
Title: Fuze Design and Development
Description: Design and develop the Mk21 fuze required to support the W87 warhead on the MM III weapon system. Coordinate
design and development efforts with MM III weapon system integrator and support flight testing.
FY 2013 Accomplishments:
Continued conceptual design development of common parts, components, and technology for Mk21 fuze application and planned
for design reuse applicable to the fuze for the W78/88-1 Life Extension Program. Analyzed and assessed customer requirements
for the Mk21 replacement fuze. Conducted trades of nuclear surety themes as directed by National Security Presidential
Directives (NSPD)-28. Provided development components, hardware and software for assessment. Developed and produced
ground test integration test beds. Supported integration and flight test planning.
FY 2014 Plans:
PE 0604933F: ICBM Fuze Modernization
Air Force
UNCLASSIFIED
Page 2 of 9
R-1 Line #79
FY 2014
83.189
FY 2015
48.694
UNCLASSIFIED
Date: March 2014
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force
Appropriation/Budget Activity
3600: Research, Development, Test & Evaluation, Air Force / BA 5: System
Development & Demonstration (SDD)
R-1 Program Element (Number/Name)
PE 0604933F / ICBM Fuze Modernization
C. Accomplishments/Planned Programs ($ in Millions)
Mature development of common parts, components, and technology for application to Mk21 replacement fuze. Implement nuclear
surety themes informed by trades as directed by NSPD-28. Support integration and flight test planning. Conduct trade studies and
initiate conceptual designs to address operational system issues and meet future requirements.
FY 2013
FY 2014
FY 2015
FY 2015 Plans:
Continue to mature development of common parts, components, and technology for application to Mk21 replacement fuze.
Continue component conceptual design development of common and unique parts. Continue to perform the required systems
engineering tasks associated with fuze design, development, test, and the required documentation. Implement nuclear surety
themes informed by trades as directed by NSPD-28. Support integration and flight test planning. Conduct trade studies and
initiate conceptual designs to address operational system issues and meet future requirements.
Title: Weapon System Integration
14.481
20.638
9.011
3.458
4.087
2.121
Description: Design and develop MM III weapon system modifications to support Mk21 fuze and warhead designs. Integrate
Mk21 fuze and warhead designs and the MM III weapon system. Validate designs through ground test and integration test beds.
Plan and conduct necessary ground and flight testing. Coordinate design, development and flight test efforts with fuze developer.
FY 2013 Accomplishments:
Finalized conceptual designs for MM III weapon system hardware and software modifications to support Mk21 replacement fuze
and application of this fuze to the W78/88-1 LEP program. Assessed MM III weapon system modification requirements to support
the Mk21 replacement fuze and W78/88-1 LEP warhead. Coordinated activities in preparation for integration and future flight
testing of fuzes and related weapon system modifications.
FY 2014 Plans:
Continue developing MM III weapon system hardware and software modifications to support Mk21 replacement fuze designs.
Create a flight test plan for fuze related developmental hardware including extended range tests.
FY 2015 Plans:
Continue to provide Systems Engineering, Integration, and Management expertise in support of USAF and Sandia National Lab
(SNL) development of the Mk21 replacement fuze.
Title: Systems Engineering
Description: Provide Systems Engineering/Technical Assistance (SETA), support and training to the ICBM Fuze Modernization
program in performing development, integration, sustaining engineering, and program management.
FY 2013 Accomplishments:
PE 0604933F: ICBM Fuze Modernization
Air Force
UNCLASSIFIED
Page 3 of 9
R-1 Line #79
UNCLASSIFIED
Date: March 2014
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force
Appropriation/Budget Activity
3600: Research, Development, Test & Evaluation, Air Force / BA 5: System
Development & Demonstration (SDD)
R-1 Program Element (Number/Name)
PE 0604933F / ICBM Fuze Modernization
C. Accomplishments/Planned Programs ($ in Millions)
Provided engineering analyses and support services to ICBM Fuze Modernization program working groups, including systems
engineering and integration, requirements, test and evaluation, and planning and assessment support.
FY 2013
FY 2014
FY 2015
FY 2014 Plans:
Provide engineering analyses and support services to ICBM Fuze Modernization program working groups, including systems
engineering and integration, requirements, test and evaluation, and planning and assessment support.
FY 2015 Plans:
Provide engineering analyses and support services to ICBM Fuze Modernization program working groups, including systems
engineering and integration, requirements, test and evaluation, and planning and assessment support.
Title: Lead Project Office (AFNWC)
4.843
10.497
- 65.370
118.411
59.826
Description: Coordinate USAF ICBM Fuze Modernization program efforts with NNSA W78/88-1 LEP developmental efforts.
Synchronize USAF arming and fuzing and DOE warhead requirements. Study and assess weapon system cost, schedule and
performance impacts.
FY 2013 Accomplishments:
Continued to evaluate performance requirements, physical characteristics, logistical and operational concepts and physical
environments. Continued to develop common Military Characteristics and Stockpile-to-Target Sequence requirements. Continued
to develop and validate modeling and simulation and support developmental planning. Continued to develop engineering
design models and examined nuclear surety themes as directed by NSPD-28. Conducted Mk21 Conceptual Design Review and
Integrated Baseline Review. Prepared for W78/88-1 LEP Customer Requirements Review.
FY 2014 Plans:
Continue to evaluate performance requirements, physical characteristics, logistical and operational concepts and physical
environments. Continue to develop common Military Characteristics and Stockpile-to-Target Sequence requirements. Continue
to develop and validate modeling and simulation and support developmental planning. Continue to develop engineering design
models and examine nuclear surety themes as directed by NSPD-28. Support Mk21 Conceptual Design Review and Sandia
Baseline Review. The Sandia Baseline Review will serve as the tailored 6.X process for an Integrated Baseline Review. Conduct
W78/88-1 LEP Customer Requirements Review.
FY 2015 Plans:
This effort has been discontinued as a result of the deferral of the W78/88-1 LEP effort beyond the FYDP.
Accomplishments/Planned Programs Subtotals
PE 0604933F: ICBM Fuze Modernization
Air Force
UNCLASSIFIED
Page 4 of 9
R-1 Line #79
UNCLASSIFIED
Date: March 2014
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force
Appropriation/Budget Activity
3600: Research, Development, Test & Evaluation, Air Force / BA 5: System
Development & Demonstration (SDD)
R-1 Program Element (Number/Name)
PE 0604933F / ICBM Fuze Modernization
D. Other Program Funding Summary ($ in Millions)
FY 2015
FY 2015
FY 2015
Cost To
Line Item
FY 2013
FY 2014
Base
OCO
Total
FY 2016
FY 2017
FY 2018
FY 2019 Complete Total Cost
• MPAF: BA05: Line
- - 4.700
- 4.700
6.800
4.300
6.900
13.847
695.353
731.900
Item # M30MLG:
Minuteman III Modifications
Remarks
Other Program Funding Summary reflects equipment buys in FY15-19 will address Diminishing Manufacturing Sources and Material Shortages (DMSMS) that will
enable the ICBM Fuze Modernization program to continue leveraging from the Navy's design, development and production activities.
E. Acquisition Strategy
The Mk21 fuze will be modernized in a collaborative effort with the US Navy Mk5 fuze reducing total program cost and development time by leveraging potential
compatibility and commonality of ICBM and Submarine Launched Ballistic Missile warheads and fuze components. The US Navy Mk5 fuze will be developed first,
followed by Mk21. The US Navy Mk5 fuze entered Phase 6.3 Development Engineering in Aug 2012. USAF Mk21 fuze entered Phase 6.3 in Aug 2013. Both Services
participate in all design and development efforts to ensure use of adaptable components, subassemblies and technology. Both services will use NNSA/SNL to perform
fuze design and development. The USAF will separately compete and contract for MM III unique missile modification and fuze integration efforts utilizing a combination
of the Integration Support Contract (ISC) for SETA and the Reentry System/Reentry Vehicle Integration Contract for weapons system integration. Both services will use
Kansas City Production Plant (KCPP) to perform production and sustainment.
F. Performance Metrics
Please refer to the Performance Base Budget Overview Book for information on how Air Force resources are applied and how those resources are contributing to Air
Force performance goals and most importantly, how they contribute to our mission.
PE 0604933F: ICBM Fuze Modernization
Air Force
UNCLASSIFIED
Page 5 of 9
R-1 Line #79
UNCLASSIFIED
Date: March 2014
Exhibit R-3, RDT&E Project Cost Analysis: PB 2015 Air Force
Appropriation/Budget Activity
3600 / 5
R-1 Program Element (Number/Name)
PE 0604933F / ICBM Fuze Modernization
Product Development ($ in Millions)
Cost Category Item
Contract
Method
& Type
Preliminary Design
Development
MIPR
EMD
FY 2013
Performing
Activity & Location
Sandia National
Labs : Albuquerque,
NM
Prior
Years
FY 2014
Award
Date
Cost
Award
Date
Cost
- 148.210
TBD
16.076 Nov 2014
- 16.076
691.767
734.099
TBD
- - - 32.945
- - 8.500
111.274
121.774
TBD
- 54.431
803.041 1,037.028
- 24.250 Dec 2013
C/CPAF
1.250
13.641 Nov 2012
18.054 Nov 2013
Weapon System
Integration - RS/RV SSC
C/TBD
TBD : ,
0.000
- 24.910
53.759
Support ($ in Millions)
Integration Support - BAE
C/CPAF
BAE : Clearfield, UT
Subtotal
Prior
Years
16.803
Cost Category Item
Finite Element Model
Validation
100.887
Contract
Method
& Type
MIPR
C/CPFF
Cost
3.257 Nov 2012
0.000
- 3.257
FY 2013
Performing
Activity & Location
Prior
Years
Cost
Award
Date
Cost
8.500 Nov 2014
FY 2015
Base
FY 2015
OCO
Award
Date
Cost
- Award
Date
Cost
- FY 2015
Total
Cost To
Complete
Cost
Total
Cost
Target
Value of
Contract
- - - 20.060
TBD
3.971 Nov 2013
2.000 Nov 2014
- 2.000
17.969
23.940
TBD
3.971
2.000
- 2.000
17.969
44.000
- FY 2014
Award
Date
- 54.431
FY 2014
Award
Date
16.803
Test and Evaluation ($ in Millions)
Lead Project Office
Support
2.000 Sep 2014
FY 2013
C/FP
Target
Value of
Contract
29.855
2.006 Dec 2012
Integration Support - BAH
Cost
Total
Cost
- 0.000
Booz Allen
Hamilton : Salt Lake
City, UT
Cost
Cost To
Complete
29.855 Nov 2014
Northrop Grumman :
Clearfield, UT
Cost Category Item
Cost
Award
Date
56.583 Nov 2013
Various : ,
Performing
Activity & Location
Award
Date
FY 2015
Total
38.112 Nov 2012
Various
Contract
Method
& Type
FY 2015
OCO
23.660
Weapon System
Integration - ICBM Prime
Subtotal
FY 2015
Base
Project (Number/Name)
655082 / ICBM FUZE SUPPORT
Cost
Award
Date
FY 2015
Base
Award
Date
Cost
FY 2015
OCO
Award
Date
Cost
FY 2015
Total
Cost To
Complete
Cost
Total
Cost
Target
Value of
Contract
NNSA :
Albuquerque, NM
1.870
4.407 Nov 2012
9.460 Nov 2013
- - - - 15.737
- Little Mountain : , UT
0.620
0.155 Nov 2012
0.740 Nov 2013
- - - - 1.515
- 2.490
4.562
- - - - 17.252
- Subtotal
PE 0604933F: ICBM Fuze Modernization
Air Force
10.200
UNCLASSIFIED
Page 6 of 9
R-1 Line #79
UNCLASSIFIED
Date: March 2014
Exhibit R-3, RDT&E Project Cost Analysis: PB 2015 Air Force
Appropriation/Budget Activity
3600 / 5
R-1 Program Element (Number/Name)
PE 0604933F / ICBM Fuze Modernization
Management Services ($ in Millions)
Cost Category Item
Cost and Financial
Management
Program Management
Administration
Contract
Method
& Type
FY 2013
Performing
Activity & Location
Prior
Years
Cost
FY 2014
Award
Date
Cost
Award
Date
FY 2015
Base
Cost
Project (Number/Name)
655082 / ICBM FUZE SUPPORT
FY 2015
OCO
Award
Date
Award
Date
Cost
FY 2015
Total
Cost
Cost To
Complete
Total
Cost
Target
Value of
Contract
C/FFP
Tecolote : Salt Lake
City, UT
1.000
0.350 Nov 2012
0.350 Nov 2013
0.395 Nov 2014
- 0.395
11.809
13.904
TBD
Various
Various : Various, UT
4.254
3.442 Dec 2012
3.003 Nov 2013
3.000 Nov 2014
- 3.000
66.917
80.616
TBD
Subtotal
5.254
3.792
3.353
3.395
- 3.395
78.726
94.520
- Prior
Years
Project Cost Totals
49.457
FY 2013
65.370
FY 2014
118.411
FY 2015
Base
59.826
FY 2015
OCO
- Remarks
PE 0604933F: ICBM Fuze Modernization
Air Force
UNCLASSIFIED
Page 7 of 9
R-1 Line #79
FY 2015 Cost To
Total
Complete
59.826
Total
Cost
899.736 1,192.800
Target
Value of
Contract
- UNCLASSIFIED
Date: March 2014
Exhibit R-4, RDT&E Schedule Profile: PB 2015 Air Force
Appropriation/Budget Activity
3600 / 5
PE 0604933F: ICBM Fuze Modernization
Air Force
R-1 Program Element (Number/Name)
PE 0604933F / ICBM Fuze Modernization
UNCLASSIFIED
Page 8 of 9
Project (Number/Name)
655082 / ICBM FUZE SUPPORT
R-1 Line #79
UNCLASSIFIED
Date: March 2014
Exhibit R-4A, RDT&E Schedule Details: PB 2015 Air Force
Appropriation/Budget Activity
3600 / 5
R-1 Program Element (Number/Name)
PE 0604933F / ICBM Fuze Modernization
Project (Number/Name)
655082 / ICBM FUZE SUPPORT
Schedule Details
Start
Quarter
1
Year
2013
Quarter
1
Year
2013
Nuclear Weapons Council 6.3 Entry Approval
4
2013
4
2013
Developmental Engineering
4
2013
3
2017
Performance Requirements Review
1
2014
1
2014
Component Conceptual Design Review
4
2014
4
2014
Sandia Baseline Review
2
2015
2
2015
Prototype Design Review
4
2015
4
2015
Baseline Design Review
1
2017
1
2017
Nuclear Weapons Council 6.4 Entry Approval
3
2017
3
2017
Production Engineering
3
2017
4
2019
Flight Test Unit 1
3
2017
3
2017
Preliminary DoD Independent Peer Review
2
2018
2
2018
Flight Test Unit 2
1
2019
1
2019
Conceptual Design Review
PE 0604933F: ICBM Fuze Modernization
Air Force
Events
End
UNCLASSIFIED
Page 9 of 9
R-1 Line #79
Download