Exhibit R-2, RDT&E Budget Item Justification May 2009 UNCLASSIFIED

advertisement

UNCLASSIFIED

PE NUMBER: 0604015F

PE TITLE: Next Generation Long Range Strike (NGLRS)

BUDGET ACTIVITY

04 Advanced Component Development and Prototypes (ACD&P)

3308

Cost ($ in Millions)

Total Program Element (PE) Cost

Next Generation Bomber

FY 2008

Actual

7.000

7.000

FY 2009

Estimate

0.000

0.000

FY 2010

Estimate

0.000

0.000

DATE

Exhibit R-2, RDT&E Budget Item Justification

May 2009

PE NUMBER AND TITLE

0604015F Next Generation Long Range Strike (NGLRS)

FY 2011

Estimate

0.000

0.000

FY 2012

Estimate

0.000

0.000

FY 2013

Estimate

0.000

0.000

FY 2014

Estimate

0.000

0.000

FY 2015

Estimate

Cost to

Complete

0.000

Continuing

0.000

Continuing

Total

TBD

TBD

(U) A. Mission Description and Budget Item Justification

This program develops and demonstrates a next generation Long Range Strike capability in support of Air Force Global Strike and Global Persistent Attack Concept of

Operations. Program efforts support the Air Force three-phase long range strike strategy. This program will provide capability improvements in the areas of strike responsiveness, persistence, survivability, lethality, connectivity, and affordability. Activities include design tradeoffs and analyses, requirements definition, requirements review, operational and system architecture development, and integrated system development and demonstration. This program is categorized as Budget

Activity 4, Advanced Component Development and Prototypes, since advanced technologies will be explored and integrated for demonstration in a realistic operating environment applicable to Long Range Strike.

(U) B. Program Change Summary ($ in Millions)

(U) Previous President's Budget

(U) Current PBR/President's Budget

(U) Total Adjustments

(U) Congressional Program Reductions

Congressional Rescissions

Congressional Increases

Reprogrammings

SBIR/STTR Transfer

FY 2008

0.000

7.000

7.000

7.000

FY 2009

0.000

0.000

0.000

FY 2010

0.000

0.000

(U) Significant Program Changes:

FY08 $7.0M funding received from AF source to initiate Phase 2 of Automated Aerial Refueling, an associated technology demonstration program supporting Long Range

Strike. FY11 funding reprogrammed.

R-1 Line Item No. 50

Page-1 of 5

165

UNCLASSIFIED

Exhibit R-2 (PE 0604015F)

UNCLASSIFIED

Exhibit R-2a, RDT&E Project Justification

BUDGET ACTIVITY

04 Advanced Component Development and Prototypes (ACD&P)

Cost ($ in Millions)

3308 Next Generation Bomber

Quantity of RDT&E Articles

FY 2008

Actual

7.000

0

FY 2009

Estimate

0.000

0

FY 2010

Estimate

0.000

0

PE NUMBER AND TITLE

0604015F Next Generation Long

Range Strike (NGLRS)

FY 2011

Estimate

0.000

0

FY 2012

Estimate

0.000

0

FY 2013

Estimate

0.000

0

FY 2014

Estimate

0.000

0

DATE

May 2009

PROJECT NUMBER AND TITLE

3308 Next Generation Bomber

FY 2015

Estimate

Cost to

Complete

0.000

Continuing

0

Total

TBD

(U) A. Mission Description and Budget Item Justification

This program develops and demonstrates a next generation Long Range Strike capability in support of Air Force Global Strike and Global Persistent Attack Concept of

Operations. Program efforts support the Air Force three-phase long range strike strategy. This program will provide capability improvements in the areas of strike responsiveness, persistence, survivability, lethality, connectivity, and affordability. Activities include design tradeoffs and analyses, requirements definition, requirements review, operational and system architecture development, and integrated system development and demonstration. This program is categorized as Budget

Activity 4, Advanced Component Development and Prototypes, since advanced technologies will be explored and integrated for demonstration in a realistic operating environment applicable to Long Range Strike.

(U) B. Accomplishments/Planned Program ($ in Millions)

(U) Technology Maturation & Risk Mitigation

(U) Requirements Definition

(U) Design tradeoffs and analyses

(U) System Requirements Review

(U) Preliminary system development and demonstration

(U) Program Support

(U) Total Cost

FY 2008

7.000

7.000

FY 2009

0.000

FY 2010

0.000

(U) C. Other Program Funding Summary ($ in Millions)

FY 2008

Actual

FY 2009

Estimate

FY 2010

Estimate

FY 2011

Estimate

FY 2012

Estimate

FY 2013

Estimate

FY 2014

Estimate

FY 2015

Estimate

Cost to

Complete

Total Cost

(U) AF RDT&E, PE 0604830F,

Automated Air-to-Air 9.862

43.898

47.454

14.515

Refueling

Associated RDT&E funding provided by PE 0604830F, Automated Air-to-Air Refueling, develops, demonstrates and validates the ability to air refuel an aircraft without pilot intervention, in support of Next Generation Long Range Strike development strategies.

(U) D. Acquisition Strategy

To be determined.

Project 3308

R-1 Line Item No. 50

Page-2 of 5

166

UNCLASSIFIED

Exhibit R-2a (PE 0604015F)

UNCLASSIFIED

Exhibit R-3, RDT&E Project Cost Analysis

BUDGET ACTIVITY

04 Advanced Component Development and Prototypes (ACD&P)

PE NUMBER AND TITLE

0604015F Next Generation Long

Range Strike (NGLRS)

Contract

Method &

Type

Performing

Activity &

Location

(U) Cost Categories

(Tailor to WBS, or System/Item Requirements)

($ in Millions)

(U) Long Range Strike

Concept Exploration and Refinement

Technology Maturation & Risk Reduction

Design Tradeoffs & Analyses

Requirements Definition

System Requirements Review

System Development and Demonstration

Program Support

Subtotal Long Range Strike

Remarks:

(U) Total Cost

Various

TBD

TBD

TBD

TBD

TBD

TBD

Various

WPAFB

TBD

TBD

TBD

TBD

TBD

DATE

May 2009

PROJECT NUMBER AND TITLE

3308 Next Generation Bomber

Total

Prior to FY

2008

Cost

90.461

0.000

0.000

0.000

0.000

0.000

0.000

90.461

90.461

FY 2008

Cost

FY 2008

Award

Date

7.000

Nov-08

0.000

0.000

0.000

0.000

0.000

0.000

7.000

7.000

FY 2009

Cost

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

FY 2009

Award

Date

FY 2010

Cost

FY 2010

Award

Date

Cost to

Complete

Total Cost Target Value of Contract

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

Continuing

Continuing

Continuing

Continuing

Continuing

Continuing

Continuing

97.461

TBD

TBD

TBD

0.000

TBD

TBD

TBD

TBD

0.000

0.000

Project 3308

R-1 Line Item No. 50

Page-3 of 5

167

UNCLASSIFIED

Exhibit R-3 (PE 0604015F)

UNCLASSIFIED

Exhibit R-4, RDT&E Schedule Profile

BUDGET ACTIVITY

04 Advanced Component Development and Prototypes (ACD&P)

PE NUMBER AND TITLE

0604015F Next Generation Long

Range Strike (NGLRS)

DATE

May 2009

PROJECT NUMBER AND TITLE

3308 Next Generation Bomber

Project 3308

R-1 Line Item No. 50

Page-4 of 5

168

UNCLASSIFIED

Exhibit R-4 (PE 0604015F)

UNCLASSIFIED

Exhibit R-4a, RDT&E Schedule Detail

BUDGET ACTIVITY

04 Advanced Component Development and Prototypes (ACD&P)

PE NUMBER AND TITLE

0604015F Next Generation Long

Range Strike (NGLRS)

(U) Schedule Profile

(U) AAR Phase II Initiation (continued in FY09-12 in PE 0604830F)

FY 2008

1Q

DATE

May 2009

PROJECT NUMBER AND TITLE

3308 Next Generation Bomber

FY 2009 FY 2010

Project 3308

R-1 Line Item No. 50

Page-5 of 5

169

UNCLASSIFIED

Exhibit R-4a (PE 0604015F)