DEPARTMENT OF THE ARMY Fiscal Year (FY) 2010 BUDGET ESTIMATE SUBMISSION May 2009 MILITARY CONSTRUCTION, ARMY RESERVE TABLE OF CONTENTS TAB DESCRIPTION --- ----------- 1. 2. 3. 4. 5. 6. 7. TABLE OF CONTENTS............................. STATE LIST.................................... BUDGET APPENDIX EXTRACT....................... BUDGET SUMMARY.............................. APPROPRIATION LANGUAGE...................... SPECIAL PROGRAM CONSIDERATIONS................ INSIDE THE UNITED STATES...................... California.................................. Colorado.................................... Connecticut................................. Florida..................................... Georgia..................................... Illinois.................................... Minnesota................................... New York.................................... Ohio........................................ Pennsylvania................................ Texas....................................... Wisconsin................................... OUTSIDE THE UNITED STATES..................... Puerto Rico................................. WORLDWIDE..................................... Worldwide Various........................... PAGE NUMBER ----------- i iii vii ix x xi 1 1 13 19 25 37 43 49 55 61 67 91 115 115 121 121 127 PAGE NO. i THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. ii DEPARTMENT OF THE ARMY FISCAL YEAR 2010 MILITARY CONSTRUCTION, ARMY RESERVE (DOLLARS ARE IN THOUSANDS) INSIDE THE UNITED STATES STATE ----- PROJECT NUMBER ------ California 69623 INSTALLATION/CITY (COMMAND) ----------------------------PROJECT TITLE ------------- AR Center, Los Angeles (USAR) Army Reserve Center 29,000 29,000 ------------- ------------$ 29,000 29,000 N 1 1 N 7 7 Subtotal Camp Pendleton MCB 19,500 19,500 ------------- ------------$ 19,500 19,500 * TOTAL MCAR FOR California $ N 13 13 N 19 19 7,300 7,300 ------------- ------------$ 7,300 7,300 N 25 25 N 31 31 Subtotal West Palm Beach 26,000 26,000 ------------- ------------$ 26,000 26,000 * TOTAL MCAR FOR Florida $ Subtotal Los Angeles USARC 69603 Colorado 69587 Connecticut 69461 Florida 69470 Camp Pendleton MCB (NMCSWR) Army Reserve Center AR Center, Colorado Springs (USAR) Army Reserve Center/Land 48,500 48,500 Subtotal Colorado Springs 13,000 13,000 ------------- ------------$ 13,000 13,000 * TOTAL MCAR FOR Colorado $ AR Center, Bridgeport (USAR) Army Reserve Center/Land 13,000 13,000 Subtotal Bridgeport 18,500 18,500 ------------- ------------$ 18,500 18,500 * TOTAL MCAR FOR Connecticut $ AR Center, Panama City (USAR) Army Reserve Center/Land Subtotal Panama City 69471 NEW/ AUTHORIZATION APPROPRIATION CURRENT REQUEST REQUEST MISSION PAGE ------------- ------------- ------- ---- AR Center, West Palm Beach (USAR) Army Reserve Center/Land 18,500 33,300 18,500 33,300 PAGE NO. iii DEPARTMENT OF THE ARMY FISCAL YEAR 2010 MILITARY CONSTRUCTION, ARMY RESERVE (DOLLARS ARE IN THOUSANDS) INSIDE THE UNITED STATES STATE ----- PROJECT NUMBER ------ Georgia 69588 Illinois 70553 Minnesota 70487 New York 71277 Ohio 69455 PAGE NO. iv INSTALLATION/CITY (COMMAND) ----------------------------PROJECT TITLE ------------- AR Center, Winder (USAR) Army Reserve Center/Land NEW/ AUTHORIZATION APPROPRIATION CURRENT REQUEST REQUEST MISSION PAGE ------------- ------------- ------- ---- Subtotal Winder 14,000 14,000 ------------- ------------$ 14,000 14,000 * TOTAL MCAR FOR Georgia $ LTA, Joliet (USAR) Army Reserve Center 14,000 Subtotal Joliet * TOTAL MCAR FOR Illinois $ AR Center, Minneapolis (USAR) Army Reserve Center Subtotal Minneapolis * TOTAL MCAR FOR Minnesota $ AR Center, Rochester (USAR) Army Reserve Center/Land Subtotal Rochester * TOTAL MCAR FOR New York $ AR Center, Cincinnati (USAR) Army Reserve Center/Land N 49 49 N 55 55 N 61 61 13,600 Subtotal Cincinnati 13,000 13,000 ------------- ------------$ 13,000 13,000 * TOTAL MCAR FOR Ohio $ 13,000 43 43 12,000 13,600 13,600 ------------- ------------$ 13,600 13,600 13,600 N 23,000 12,000 12,000 ------------- ------------$ 12,000 12,000 12,000 37 37 14,000 23,000 23,000 ------------- ------------$ 23,000 23,000 23,000 N 13,000 DEPARTMENT OF THE ARMY FISCAL YEAR 2010 MILITARY CONSTRUCTION, ARMY RESERVE (DOLLARS ARE IN THOUSANDS) INSIDE THE UNITED STATES STATE ----- PROJECT NUMBER ------ Pennsylvania 69561 INSTALLATION/CITY (COMMAND) ----------------------------PROJECT TITLE ------------- AR Center, Ashley (USAR) Army Reserve Center 9,800 9,800 ------------- ------------$ 9,800 9,800 N 67 67 20,000 20,000 ------------- ------------$ 20,000 20,000 N 73 73 7,600 7,600 ------------- ------------$ 7,600 7,600 N 79 79 N 85 85 Subtotal Uniontown 11,800 11,800 ------------- ------------$ 11,800 11,800 * TOTAL MCAR FOR Pennsylvania $ 20,000 20,000 ------------- ------------$ 20,000 20,000 C 91 91 9,500 9,500 ------------- ------------$ 9,500 9,500 N 97 97 24,000 24,000 ------------- ------------$ 24,000 24,000 N 103 103 N 109 109 Subtotal Ashley 69430 AR Center, Newtown Square (USAR) Army Reserve Center/Land Subtotal Newtown Square 70511 AR Center, Harrisburg (USAR) Army Reserve Center Subtotal Harrisburg 69652 Texas 67667 AR Center, Uniontown (USAR) Army Reserve Center/Land AFRC, Austin (USAR) Armed Forces Reserve Center/AMSA Subtotal Austin 71607 AR Center, Ft Bliss (USAR) Army Reserve Center Subtotal Ft Bliss 69439 AFRC, Houston (USAR) Army Reserve Center/Land Subtotal Houston 71148 NEW/ AUTHORIZATION APPROPRIATION CURRENT REQUEST REQUEST MISSION PAGE ------------- ------------- ------- ---- AR Center, Ft Sam Houston (USAR) Army Reserve Center 49,158 20,000 49,158 20,000 PAGE NO. v DEPARTMENT OF THE ARMY FISCAL YEAR 2010 MILITARY CONSTRUCTION, ARMY RESERVE (DOLLARS ARE IN THOUSANDS) INSIDE THE UNITED STATES STATE ----- PROJECT NUMBER ------ Texas Wisconsin 67687 INSTALLATION/CITY (COMMAND) ----------------------------PROJECT TITLE ------------AR Center, Ft Sam Houston (USAR) (CONT.) NEW/ AUTHORIZATION APPROPRIATION CURRENT REQUEST REQUEST MISSION PAGE ------------- ------------- ------- ---109 Subtotal Ft Sam Houston ------------- ------------$ 20,000 20,000 * TOTAL MCAR FOR Texas $ Ft McCoy (USAR) Combined Arms Collective Training Facility 73,500 73,500 Subtotal Ft McCoy 25,000 25,000 ------------- ------------$ 25,000 25,000 * TOTAL MCAR FOR Wisconsin $ 25,000 25,000 ** TOTAL INSIDE THE UNITED STATES FOR MCAR $ 336,600 336,600 PAGE NO. vi C 115 115 DEPARTMENT OF THE ARMY FISCAL YEAR 2010 MILITARY CONSTRUCTION, ARMY RESERVE (DOLLARS ARE IN THOUSANDS) OUTSIDE THE UNITED STATES STATE ----- PROJECT NUMBER ------ Puerto Rico 69568 INSTALLATION/CITY (COMMAND) ----------------------------PROJECT TITLE ------------- AR Center, Caguas (USAR) Army Reserve Center/Land NEW/ AUTHORIZATION APPROPRIATION CURRENT REQUEST REQUEST MISSION PAGE ------------- ------------- ------- ---- Subtotal Caguas 12,400 12,400 ------------- ------------$ 12,400 12,400 * TOTAL MCAR FOR Puerto Rico $ 12,400 12,400 $ 12,400 12,400 ** TOTAL OUTSIDE THE UNITED STATES FOR MCAR N 121 121 PAGE NO. vii DEPARTMENT OF THE ARMY FISCAL YEAR 2010 MILITARY CONSTRUCTION, ARMY RESERVE (DOLLARS ARE IN THOUSANDS) WORLDWIDE STATE ----- INSTALLATION/CITY (COMMAND) ----------------------------PROJECT TITLE ------------- PROJECT NUMBER ------ Worldwide Various 67726 Planning and Design (PLNGDES) Planning and Design AUTHORIZATION APPROPRIATION REQUEST REQUEST ------------- ------------- PAGE ---- 22,262 22,262 ------------- ------------$ 22,262 22,262 127 128 Subtotal Minor Construction 3,600 3,600 ------------- ------------$ 3,600 3,600 * TOTAL MCAR FOR Worldwide Various $ 25,862 25,862 ** TOTAL WORLDWIDE FOR MCAR $ 25,862 25,862 MILITARY CONSTRUCTION, ARMY RESERVE TOTAL $ 374,862 374,862 Subtotal Planning and Design 67721 Minor Construction (MINOR) Unspecified Minor Construction Total Total Total Total PAGE NO. viii Cost Cost Cost Cost of of of of New Mission Projects Current Mission Projects other line items FY 2010 MCAR Projects (19) (2) (2) (23) $ $ $ $ 304,000 45,000 25,862 374,862 MILITARY CONSTRUCTION, ARMY RESERVE FY2010 BUDGET SUMMARY The military construction program for the Army Reserve shown in the schedules of this title is summarized in the following tabulation: FISCAL YEAR 2010 2009 2008 2007 MILITARY CONSTRUCTION, ARMY RESERVE APPROPRIATIONS ($) 374,862,000 282,607,000 148,133,000 166,000,000 1. Major Construction. The MCAR major construction program is one of the most visible means of improving the working conditions of the Army Reserve. This program provides for military construction projects in the United States and Territories as authorized in the currently effective Military Construction Acts and in this year’s request for Authorization and Appropriations. This request funds the Army Reserve most critical facilities needs within the context of transformation of the Army Reserve from a strategic reserve to an operational force. The Army Reserve has realigned its generating forces to operational forces to provide increasedcombat service and combat service support units in support of the additional Brigade Combat Teams in the Active Component and National Guard. 2. Minor Construction. Provision is made for construction of future unspecified projects that have not been individually authorized by law but are determined to be urgent requirement and do not cost more than the amounts specified in 10 USC 2805. Projects awarded with these funds may not exceed $2.0 million or $3.5 million if there is a threat to life, health, and safety. 3. Planning & Design. This provides for necessary planning of military construction projects including design, surveys, studies, and other related activities. In general, design funds requested in fiscal year 2010 will be used to design projects in the Army Reserve Fiscal Years 2011 and 2012 programs. PAGE NO. ix MILITARY CONSTRUCTION, ARMY RESERVE FY2010 BUDGET ESTIMATE APPROPRIATION LANGUAGE For construction, acquisition, expansion, rehabilitation, and conversion of facilities for the training and administration of the Army Reserve as authorized by Chapter 1803 of Title 10, United States Code and Military Construction Authorization Act, $374,862,000 to remain available until September 30, 2014. PAGE NO. x MILITARY CONSTRUCTION, ARMY RESERVE FY 2010 BUDGET ESTIMATE SPECIAL PROGRAM CONSIDERATIONS Pollution Abatement Military construction projects proposed in this program will be designed to meet environmental standards. Projects proposed primarily for abatement of existing pollution problems have been reviewed to ensure that corrective design is accomplished in accordance with specific standards and criteria. This submission contains no projects specific to pollution abatement. Energy Conservation Military construction projects specifically for energy conservation have been developed, reviewed, and selected with prioritization by energy savings per investment cost. Any project proposed primarily for energy conservation includes improvements to existing facilities and utilities systems to upgrade design, eliminate waste, and install energy savings devices. Projects are designed for minimum energy consumption. Flood Plain Management and Wetlands Protection Proposed land acquisitions, disposals, and installation construction projects have been planned to allow for the proper management of flood plains and the protection of wetlands by avoiding long and short term adverse degradation of wetlands. Project planning is in accordance with the requirements of Executive Order Nos. 11988 and 11990. Design for Accessibility of Physically Handicapped Personnel In accordance with Public Law 90-480, provision for physically handicapped personnel will be provided for, where appropriate in the design of facilities included in this program. Environmental Protection In accordance with Section 102 (2) (c) of the National Environmental Policy Act of 1969 (PL 91-190), the environmental impact analysis process has been completed or is actively underway for all projects in the Military Construction Program. PAGE NO. xi SPECIAL PROGRAM CONSIDERATIONS (Continued) Reserve Potential/Placement of Reserve Component Units in Local Communities The Reserve potential to meet and maintain authorized strengths of all Reserve flying/nonflying units in those areas in which these facilities are to be located has been reviewed. It has been determined, in coordination with all other Services having Reserve flying/nonflying units in these areas, that the number of units of the Reserve Components of the Armed forces presently located in those areas, and those which have been allocated to the areas for future activation, is not and will not be larger than the number that reasonably can be expected to be maintained at authorized strength considering the number of persons living in the areas who are qualified for membership in those Reserve units. Preservation of Historical Sites and Structures Facilities included in this program do not directly or indirectly affect a district, site, building, structure, object, or setting listed in the National Register of Historical Places, except as noted on DD Form 1391. Use of Excess Schools and Other Buildings Considerations were made to utilize available commercial or academic buildings but none were suitable except as identified by specific projects in this request. Congressionally Directed Projects No projects were directed by any congressional committee for inclusion in the FY 2010 budget. Other Congressional – Planning and Design No considerations are made for directed planning and design projects in the FY 2010 budget. PAGE NO. xii MAY 2009 Military Construction, Army Reserve FY2010 PRESIDENT BUDGET PROGRAM ASSESSMENT RATING TOOL In accordance with the President’s Management Agenda, Budget and Performance Integration initiative, this program has been assessed using the Program Assessment Rating Tool (PART). Remarks regarding program performance and plans for performance improvement can be located at the Expectmore.gov website. PAGE NO. xiii THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. xiv 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center Los Angeles, California 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX 1.13 3 weekends/month 2 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS USAR Garden Grove, CA 6.00 miles Center USAR Long Beach, CA 7.00 miles Center ARNG Long Beach, CA 8.00 miles Center _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center 8,233 m2 (88,614 SF) 29,000 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 15 MAR 2008 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Permit 15.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 51 51 5 5 31 31 15 15 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 806 806 49 49 757 757 PAGE NO. 1 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AR Center Los Angeles, California 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Engineer Clearance Company Plans and Operations Team (R5) Platoon 5 (R5 HQ) Platoon 6 (R5 HQ) Team 1 (R5) Team 2 (R5) Team 3 (R5) Team 4 (R5) Team 5 (R5) Team 6 (R5) Cargo Transfer Company CM Platoon 1 (BIDS) CMPlatoon 2 (BIDS) CM Platoon 3 (BIDS) CMPlatoon 4 (BIDS) CM HQ Detachment (BIDS) CM HHD Bn HHC Army Field Support Bde Medium Truck Company (PLS) 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 190 9 8 8 6 6 6 6 6 6 162 190 9 8 8 6 6 6 6 6 6 162 31 31 31 31 31 31 31 31 25 25 64 64 10 10 170 _______ 170 _______ 806 806 Totals _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS TRACKED AUTHORIZED __________ 253 635 7 __________ ACTUAL ______ 160 390 5 __________ TOTALS 895 555 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 2 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Los Angeles California Army Reserve Center 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-69623 29,000 29,000 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Vehicle Parking SDD and EPAct05 Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 2,330) Demo( ) Information Systems Antiterrorism Measures m2 m2 m2 m2 LS LS LS LS LS LS LS LS (SF) (SF) (SF) (SF) QUANTITY 7,117 1,163 578.32 2,630 ( ( ( ( -- -------- UNIT COST 76,612) 12,516) 6,225) 28,310) 2,160 2,817 1,146 474.37 -- -------- COST ($000) 21,444 (15,371) (3,275) (662) (1,248) (426) (462) 4,452 (580) (773) (419) (193) (2,330) (113) (44) ESTIMATED CONTRACT COST 25,896 CONTINGENCY (5.00%) 1,295 _________ SUBTOTAL 27,191 SUPV, INSP & OVERHEAD (5.70%) 1,550 _________ TOTAL REQUEST 28,741 TOTAL REQUEST (ROUNDED) 29,000 INSTALLED EQT-OTHER APPROP (2,920) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include the construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 630 kWr/179 Tons). ________________________________________________________________________________ 11. REQ: 8,363 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Construct an ARC training building, OMS, unheated storage building, ________ and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 3 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Los Angeles, California 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-69623 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ Antiterrorism Measures Building Information Systems LS LS QUANTITY --- Unit COST Cost ($000) --Total (213) (249) _________ 462 REQUIREMENT: This project will provide fifteen acres of existing government ____________ land and a 800-member training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for nineteen Army Reserve units. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 4 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Los Angeles, California 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-69623 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JAN 2012 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 1,560 _________ 818 _________ 2,378 _________ 1,902 _________ 476 _________ PAGE NO. 5 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Los Angeles, California 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-69623 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 6 1,499 1,285 29 107 ______ 2,920 Mike Sugimura, 703-602-3952 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION Camp Pendleton MCB Camp Pendleton, California 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX 1.14 3 weekends/month 2 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Vista, CA 10.00 miles Center ARNG Escondido, CA 18.00 miles Center USN San Diego, CA 43.00 miles Center _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center 6,027 m2 (64,873 SF) 19,500 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 14 MAR 2008 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Permit 11.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 16 16 0 0 9 9 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 7 7 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 500 500 39 39 461 461 PAGE NO. 7 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION Camp Pendleton MCB Camp Pendleton, California 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Clearance Company Company A, Engineer Battalion HHC, Engineer Battalion QM Petroleum Support CO HQ QM Petroleum Support Operations QM Petroleum Support Platoon QM Equipment & Maintenance Support Platoon QM Assault Hoseline AUG Team Totals 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 190 190 92 92 83 83 16 16 8 8 54 54 42 42 15 _______ 15 _______ 500 500 _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS TRACKED AUTHORIZED __________ 187 120 13 __________ ACTUAL ______ 116 76 10 __________ TOTALS 320 202 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 8 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Camp Pendleton MCB California 5.PROGRAM ELEMENT Army Reserve Center 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-69603 19,500 19,500 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Vehicle Parking SDD and EPAct05 Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 1,538) Demo( ) Information Systems Antiterrorism Measures m2 m2 m2 m2 LS LS LS LS LS LS LS LS (SF) (SF) (SF) (SY) QUANTITY 4,790 912.21 324.60 8,988 ( ( ( ( -- -------- UNIT COST 51,560) 9,819) 3,494) 10,750) 2,195 2,926 1,217 46.46 -- -------- COST ($000) 14,594 (10,513) (2,669) (395) (418) (282) (317) 2,938 (384) (512) (170) (128) (1,538) (176) (30) ESTIMATED CONTRACT COST 17,532 CONTINGENCY (5.00%) 877 _________ SUBTOTAL 18,409 SUPV, INSP & OVERHEAD (5.70%) 1,049 _________ TOTAL REQUEST 19,458 TOTAL REQUEST (ROUNDED) 19,500 INSTALLED EQT-OTHER APPROP (2,280) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 517 kWr/147 Tons). ________________________________________________________________________________ 11. REQ: 6,027 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Construct an ARC training building, OMS, unheated storage building, ________ and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 9 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Camp Pendleton MCB, California 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-69603 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ Antiterrorism Measures Building Information Systems LS LS QUANTITY --- Unit COST Cost ($000) --Total (141) (176) _________ 317 REQUIREMENT: This project will provide eleven acres of existing government ____________ land and a 400-member training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for thirteen Army Reserve units. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 10 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Camp Pendleton MCB, California 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-69603 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JAN 2012 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 1,170 _________ 584 _________ 1,754 _________ 1,403 _________ 351 _________ PAGE NO. 11 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Camp Pendleton MCB, California 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-69603 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 12 1,174 1,006 20 80 ______ 2,280 Mike Sugimura, 703-602-3952 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center Colorado Springs, Colorado 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX 1.07 1 weekends/month 1 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS USAF Fort Carson, CO 2.00 miles Base USA Peterson AFB, CO 5.00 miles Base ARNG Aurora, CO 17.00 miles Armory _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center/Land 3,782 m2 (40,706 SF) 13,000 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 09 AUG 2007 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Fee - Simple 10.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 1 1 0 0 0 0 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 1 1 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 151 151 6 6 145 145 PAGE NO. 13 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AR Center Colorado Springs, Colorado 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% QM QM QM QM QM UNIT DESIGNATION ________________ Company Support Headquarters Support Operations Section Subsistence Support Platoon 2nd Area Support Platoon 3rd Area Support Platoon Totals 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 25 25 10 10 64 64 26 26 26 _______ 26 _______ 151 151 _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS AUTHORIZED __________ 109 26 __________ ACTUAL ______ 67 17 __________ TOTALS 135 84 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 14 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Colorado Springs Colorado 5.PROGRAM ELEMENT Army Reserve Center/Land 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-69587 13,000 13,000 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Land Purchase Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Parking Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 943) Demo( ) Information Systems Antiterrorism Measures ha m2 m2 m2 m2 LS LS LS LS LS LS LS (AC) (SF) (SF) (SF) (SY) QUANTITY 4.05 2,878 804.35 98.94 1,965 ( ( ( ( ( -------- UNIT COST COST ($000) 10) 246,914 30,983) 2,122 8,658) 2,772 1,065) 1,306 2,350) 45.76 -------- 9,912 (1,000) (6,109) (2,229) (129) (90) (355) 1,890 (236) (314) (152) (79) (943) (147) (19) ESTIMATED CONTRACT COST 11,802 CONTINGENCY (5.00%) 590 _________ SUBTOTAL 12,392 SUPV, INSP & OVERHEAD (5.70%) 706 _________ TOTAL REQUEST 13,098 TOTAL REQUEST (ROUNDED) 13,000 INSTALLED EQT-OTHER APPROP (1,371) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include land acquisition and construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 278 kWr/79 Tons). ________________________________________________________________________________ 11. REQ: 3,782 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Land acquisition and construction of an ARC training building, OMS, ________ unheated storage building, and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 15 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Colorado Springs, Colorado 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69587 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ SDD and EPAct05 Antiterrorism Measures Building Information Systems LS LS LS QUANTITY ---- Unit COST Cost ($000) ---Total (174) (87) (94) _________ 355 REQUIREMENT: This project will provide ten acres of land and a 200-member ____________ training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for an Army Reserve Engineer Clearance Company. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide for unit storage and adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 16 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Colorado Springs, Colorado 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69587 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JUL 2011 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 720 _________ 360 _________ 1,080 _________ 864 _________ 216 _________ PAGE NO. 17 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Colorado Springs, Colorado 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69587 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 18 705 604 8 54 ______ 1,371 LTC Casiano, 703-602-5153 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center Bridgeport, Connecticut 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX 1.06 2 weekends/month 2 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Camp Hartel, CT 2.00 miles Center USAR Windor Locks, CT 5.00 miles AMSA ARNG Hartford, CT 13.00 miles Center USAR West Hartford, CT 15.00 miles Center _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center/Land 4,803 m2 (51,701 SF) 18,500 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 13 JUL 2008 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Fee - Simple 13.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 7 7 0 0 5 5 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 2 2 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 342 342 12 12 330 330 PAGE NO. 19 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AR Center Bridgeport, Connecticut 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Headquarters Support Company Operations Support Section Subsistence Support Platoon Area Support 1st Platoon MHE AUG 1st Team Area Support 2nd Platoon Medium Truck Company 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 25 25 10 10 64 64 26 26 21 21 26 26 170 _______ 170 _______ 342 342 Totals _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS AUTHORIZED __________ 207 461 __________ ACTUAL ______ 126 279 __________ TOTALS 668 405 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 20 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Bridgeport Connecticut Army Reserve Center/Land 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-69461 18,500 18,500 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Land Purchase Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Parking Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 1,021) Demo( ) Information Systems Antiterrorism Measures ha m2 m2 m2 m2 LS LS LS LS LS LS LS (AC) (SF) (SF) (SF) (SY) QUANTITY 5.26 3,668 706.81 197.70 16,419 ( ( ( ( ( -------- UNIT COST COST ($000) 13) 716,730 39,487) 2,067 7,608) 2,783 2,128) 1,198 19,637) 43.18 -------- 14,731 (3,770) (7,582) (1,967) (237) (709) (466) 2,162 (304) (405) (143) (101) (1,021) (164) (24) ESTIMATED CONTRACT COST 16,893 CONTINGENCY (5.00%) 845 _________ SUBTOTAL 17,738 SUPV, INSP & OVERHEAD (5.70%) 1,011 _________ TOTAL REQUEST 18,749 TOTAL REQUEST (ROUNDED) 18,500 INSTALLED EQT-OTHER APPROP (1,806) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include land acquisition and construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 348 kWr/99 Tons). ________________________________________________________________________________ 11. REQ: 4,803 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Land acquisition and construction of an ARC training building, OMS, ________ unheated storage building, and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 21 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Bridgeport, Connecticut 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69461 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ SDD and EPAct05 Antiterrorism Measures Building Information Systems LS LS LS QUANTITY ---- Unit COST Cost ($000) ---Total (224) (112) (130) _________ 466 REQUIREMENT: This project will provide thirteen acres of land and a ____________ 300-member training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for seven Army Reserve units. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 22 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Bridgeport, Connecticut 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69461 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JAN 2012 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 1,080 _________ 525 _________ 1,605 _________ 1,284 _________ 321 _________ PAGE NO. 23 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Bridgeport, Connecticut 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69461 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 24 930 797 12 67 ______ 1,806 LTC McDonald, 703-602-7099 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center Panama City, Florida 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX .93 3 weekends/month 2 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Panama City, FL 3.00 miles Armory USAF Tyndall AFB, FL 11.00 miles Base ARNG Chipley, FL 43.00 miles Armory _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center/Land 2,123 m2 (22,854 SF) 7,300 NOV 2007 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 25 JAN 2008 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Fee - Simple 7.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 2 2 0 0 0 0 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 2 2 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 71 71 3 3 68 68 PAGE NO. 25 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AR Center Panama City, Florida 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Trailer Transfer Point Team Auto Cargo Doc Detachment Auto Cargo Doc Detachment 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 23 23 24 24 24 _______ 24 _______ 71 71 Totals _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS AUTHORIZED __________ 15 14 __________ ACTUAL ______ 10 10 __________ TOTALS 29 20 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 26 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Panama City Florida Army Reserve Center/Land 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-69470 7,300 7,300 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Land Purchase Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Parking Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 486) Demo( ) Information Systems Antiterrorism Measures ha m2 m2 m2 m2 LS LS LS LS LS LS LS (AC) (SF) (SF) (SF) (SY) QUANTITY 2.83 1,651 429.86 42.55 969.91 ( ( ( ( ( -------- UNIT COST COST ($000) 7) 371,025 17,769) 1,947 4,627) 2,561 458) 1,232 1,160) 37.71 -------- 5,644 (1,050) (3,214) (1,101) (52) (37) (190) 958 (122) (162) (18) (41) (486) (119) (10) ESTIMATED CONTRACT COST 6,602 CONTINGENCY (5.00%) 330 _________ SUBTOTAL 6,932 SUPV, INSP & OVERHEAD (5.70%) 395 _________ TOTAL REQUEST 7,327 TOTAL REQUEST (ROUNDED) 7,300 INSTALLED EQT-OTHER APPROP (728) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include land acquisition and construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 169 kWr/48 Tons). ________________________________________________________________________________ 11. REQ: 2,123 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Land acquisition and construction of an ARC training building, OMS, ________ unheated storage building, and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 27 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Panama City, Florida 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69470 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ SDD and EPAct05 Antiterrorism Measures Building Information Systems LS LS LS QUANTITY ---- Unit COST Cost ($000) ---Total (90) (45) (55) _________ 190 REQUIREMENT: This project will provide seven acres of land and a 60-member ____________ training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for three Army Reserve units. The maintenance shop will provide work bays for training and maintenance administrative support. The project will also provide for unit storage and adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 28 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Panama City, Florida 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69470 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: NOV 2007 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JUL 2011 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 438 _________ 222 _________ 660 _________ 528 _________ 132 _________ PAGE NO. 29 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Panama City, Florida 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69470 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 30 365 313 10 40 ______ 728 LTC Griffin, 703-602-8667 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center West Palm Beach, Florida 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX .94 3 weekends/month 2 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG West Palm Beach, FL 3.00 miles Armory USAR West Palm Beach, FL 4.00 miles Center USMCR West Palm Beach, FL 5.00 miles Base USNR West Palm Beach, FL 5.00 miles Base USCG Riviera Beach, FL 7.00 miles Base _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center/Land 5,994 m2 (64,515 SF) 26,000 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 25 JAN 2008 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Fee - Simple 13.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 20 20 0 0 12 12 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 8 8 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 548 548 22 22 526 526 PAGE NO. 31 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AR Center West Palm Beach, Florida 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Clearance Company Terminal Supervision Team Port Management Team Inland Cargo Transfer Company Headquarters Company Support Support Operations Section Subsistence Support Platoon Area Support 1st Platoon Area Support 2nd Platoon 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 190 190 21 21 24 24 162 162 25 25 10 10 64 64 26 26 26 _______ 26 _______ 548 548 Totals _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS TRACKED AUTHORIZED __________ 215 182 7 __________ ACTUAL ______ 132 112 5 __________ TOTALS 404 249 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 32 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE West Palm Beach Florida 5.PROGRAM ELEMENT Army Reserve Center/Land 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-69471 26,000 26,000 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Land Purchase Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Parking Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 1,308) Demo( ) Information Systems Antiterrorism Measures ha m2 m2 m2 m2 LS LS LS LS LS LS LS (AC) (SF) (SF) (SF) (SY) QUANTITY 5.26 4,812 870.78 310.39 10,744 ( ( ( ( ( -------- UNIT COST COST ($000) 13) 1730038 51,801) 1,810 9,373) 2,427 3,341) 1,009 12,850) 44.20 -------- 21,200 (9,100) (8,712) (2,113) (313) (475) (487) 2,551 (327) (436) (182) (109) (1,308) (163) (26) ESTIMATED CONTRACT COST 23,751 CONTINGENCY (5.00%) 1,188 _________ SUBTOTAL 24,939 SUPV, INSP & OVERHEAD (5.70%) 1,422 _________ TOTAL REQUEST 26,361 TOTAL REQUEST (ROUNDED) 26,000 INSTALLED EQT-OTHER APPROP (2,997) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include land acquisition and construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 503 kWr/143 Tons). ________________________________________________________________________________ 11. REQ: 5,994 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Land acquisition and and construction of an ARC training building, ________ OMS, unheated storage building, and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 33 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION West Palm Beach, Florida 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69471 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ SDD and EPAct05 Antiterrorism Measures Building Information Systems LS LS LS QUANTITY ---- Unit COST Cost ($000) ---Total (240) (120) (127) _________ 487 REQUIREMENT: This project will provide thirteen acres of land and a ____________ 600-member training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for two Army Reserve units. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 34 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION West Palm Beach, Florida 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69471 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JAN 2012 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 1,500 _________ 740 _________ 2,240 _________ 1,792 _________ 448 _________ PAGE NO. 35 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION West Palm Beach, Florida 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69471 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 36 1,560 1,337 20 80 ______ 2,997 LTC Griffin, 703-602-8667 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center Winder, Georgia 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX .90 3 weekends/month 2 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Winder, GA 3.00 miles Armory ARNG Monroe, GA 13.00 miles Armory ARNG Lawrenceville, GA 16.00 miles Armory _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center/Land 4,869 m2 (52,409 SF) 14,000 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 10 MAY 2008 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Fee - Simple 12.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 21 21 0 0 14 14 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 7 7 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 423 423 18 18 405 405 PAGE NO. 37 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AR Center Winder, Georgia 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Cargo Transfer Company Terminal Supervision Detachment Trailer Transfer Platoon Trailer Transfer Platoon Port Management Detachment Medium Truck Company Totals 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 162 162 21 21 23 23 23 23 24 24 170 _______ 170 _______ 423 423 _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS AUTHORIZED __________ 165 570 __________ ACTUAL ______ 101 345 __________ TOTALS 735 446 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 38 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Winder Georgia Army Reserve Center/Land 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-69588 14,000 14,000 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Land Purchase Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Vehicle Parking Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 1,048) Demo( ) Information Systems Antiterrorism Measures ha m2 m2 m2 m2 LS LS LS LS LS LS LS (AC) (SF) (SF) (SF) (SY) QUANTITY 4.86 3,961 682.47 225.85 18,913 ( ( ( ( ( -------- UNIT COST COST ($000) 12) 123,457 42,632) 1,753 7,346) 2,387 2,431) 1,001 22,620) 36.69 -------- 10,490 (600) (6,941) (1,629) (226) (694) (400) 2,047 (262) (349) (120) (87) (1,048) (160) (21) ESTIMATED CONTRACT COST 12,537 CONTINGENCY (5.00%) 627 _________ SUBTOTAL 13,164 SUPV, INSP & OVERHEAD (5.70%) 750 _________ TOTAL REQUEST 13,914 TOTAL REQUEST (ROUNDED) 14,000 INSTALLED EQT-OTHER APPROP (1,498) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include land acquisition and construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 380 kWr/108 Tons). ________________________________________________________________________________ 11. REQ: 4,869 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Land acquisition and construction of an ARC training building, OMS, ________ unheated storage building, and organizational parking. (New Mission)) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 39 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Winder, Georgia 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69588 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ SDD and EPAct05 Antiterrorism Measures Building Information Systems LS LS LS QUANTITY ---- Unit COST Cost ($000) ---Total (192) (96) (112) _________ 400 REQUIREMENT: This project will provide twelve acres of land and a 400-member ____________ training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for six Army Reserve units. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide for unit storage and adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 40 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Winder, Georgia 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69588 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JUN 2011 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 840 _________ 425 _________ 1,265 _________ 1,012 _________ 253 _________ PAGE NO. 41 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Winder, Georgia 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69588 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 42 761 652 18 67 ______ 1,498 LTC Griffin, 703-602-8667 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION Joliet LTA Joliet, Illinois 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX 1.23 3 weekends/month 2 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS USAR Arlington Heights, 2.00 miles Center ARNG Des Plaines, IL 6.00 miles Armory USCG Glenview, IL 8.00 miles Base ARNG Chicago, IL 12.00 miles Armory USAFR Chicago, IL 12.00 miles Center _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center 6,165 m2 (66,355 SF) 23,000 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 21 SEP 2007 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Permit 13.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 26 26 1 1 19 19 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 6 6 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 513 513 33 33 480 480 PAGE NO. 43 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION Joliet Local Training Area Joliet, Illinois 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Quartermaster Petrol Co Petrol Team Cargo Transfer Co HHD Mvmt Control Bn (EAC) Truck Co (MDM PLS) Cgo Docu Det (Auto) 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 96 96 2 2 162 162 59 59 170 170 24 _______ 24 _______ 513 513 Totals _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT NONE _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 44 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Joliet Illinois Army Reserve Center 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-70553 23,000 23,000 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Parking SDD and EPAct05 Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 1,830) Demo( ) Information Systems Antiterrorism Measures m2 m2 m2 m2 LS LS LS LS LS LS LS LS (SF) (SF) (SF) (SY) QUANTITY 5,004 850.25 310.39 20,820 ( ( ( ( -- -------- UNIT COST 53,862) 9,152) 3,341) 24,900) 2,374 3,195 1,326 57.59 -- -------- COST ($000) 16,941 (11,879) (2,716) (411) (1,199) (336) (400) 3,475 (458) (610) (265) (153) (1,830) (124) (35) ESTIMATED CONTRACT COST 20,416 CONTINGENCY (5.00%) 1,021 _________ SUBTOTAL 21,437 SUPV, INSP & OVERHEAD (5.70%) 1,222 _________ TOTAL REQUEST 22,659 TOTAL REQUEST (ROUNDED) 23,000 INSTALLED EQT-OTHER APPROP (1,601) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include the construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 591 kWr/168 Tons). ________________________________________________________________________________ 11. REQ: 6,165 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Construct an ARC training building, OMS, unheated storage building, ________ and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 45 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Joliet, Illinois 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-70553 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ Antiterrorism Measures Building Information Systems LS LS QUANTITY --- Unit COST Cost ($000) --Total (168) (232) _________ 400 REQUIREMENT: This project will provide thirteen acres of existing government ____________ land and a 600-member training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for eleven Army Reserve units. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 46 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Joliet, Illinois 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-70553 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ DEC 2012 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 990 _________ 353 _________ 1,343 _________ 1,074 _________ 269 _________ PAGE NO. 47 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Joliet, Illinois 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-70553 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 48 800 686 21 94 ______ 1,601 Mike Sugimura, 703-602-3952 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center Minneapolis, Minnesota 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX 1.14 1 weekends/month 1 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Fort Snelling, MN 1.00 miles Armory USMC Fort Snelling, MN 1.00 miles Center USNR Fort Snelling, MN 1.00 miles Center ARNG St Paul, MN 12.00 miles Armory _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center 3,496 m2 (37,627 SF) 12,000 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 12 OCT 2007 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Permit 8.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 6 6 0 0 5 5 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 1 1 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 170 170 6 6 164 164 PAGE NO. 49 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AR Center Minneapolis, Minnesota 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Medium Truck Company 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 170 _______ 170 _______ 170 170 Totals _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS AUTHORIZED __________ 75 191 __________ ACTUAL ______ 45 115 __________ TOTALS 266 160 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES A. AIR POLLUTION B. WATER POLLUTION C. OCCUPATIONAL SAFETY AND HEALTH PAGE NO. 50 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 0 0 0 DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Minneapolis Minnesota Army Reserve Center 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-70487 12,000 12,000 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Parking SDD and EPAct05 Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 965) Demo( ) Information Systems Antiterrorism Measures m2 m2 m2 m2 LS LS LS LS LS LS LS LS (SF) (SF) (SF) (SY) QUANTITY 2,834 576.56 84.82 6,823 ( ( ( ( -- -------- UNIT COST 30,508) 6,206) 913) 8,160) COST ($000) 2,273 3,070 1,423 35.59 -- -------- 8,935 (6,443) (1,770) (121) (243) (172) (186) 1,899 (230) (306) (146) (77) (965) (156) (19) ESTIMATED CONTRACT COST 10,834 CONTINGENCY (5.00%) 542 _________ SUBTOTAL 11,376 SUPV, INSP & OVERHEAD (5.70%) 648 _________ TOTAL REQUEST 12,024 TOTAL REQUEST (ROUNDED) 12,000 INSTALLED EQT-OTHER APPROP (1,369) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include the construction of an ARC Training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 271 kWr/77 Tons). ________________________________________________________________________________ 11. REQ: 3,496 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Construct an ARC training building, OMS, unheated storage building, ________ and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 51 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Minneapolis, Minnesota 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-70487 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ Antiterrorism Measures Building Information Systems LS LS QUANTITY --- Unit COST Cost ($000) --Total (86) (100) _________ 186 REQUIREMENT: This project will provide eight acres of existing government ____________ land and a 150-member training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for an Army Reserve Transportation Company. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 52 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Minneapolis, Minnesota 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-70487 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JUL 2011 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 720 _________ 364 _________ 1,084 _________ 867 _________ 217 _________ PAGE NO. 53 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Minneapolis, Minnesota 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-70487 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 54 703 603 9 54 ______ 1,369 Mike Sugimura, 703-602-3952 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center Rochester, New York 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX 1.04 3 weekends/month 2 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Rochester, NY 5.00 miles Armory USCG Summerville, NY 5.00 miles Base USAR Webster, NY 10.00 miles Center USMC Webster, NY 10.00 miles Center _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center/Land 4,106 m2 (44,202 SF) 13,600 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 18 JUN 2008 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Fee - Simple 12.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 1 1 0 0 0 0 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 1 1 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 172 172 6 6 166 166 PAGE NO. 55 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AR Center Rochester, New York 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ HQ Company Support Support Operations Section Subsistence Support Platoon Area Support Platoon 1 MHE AUG Team 1 Area Support Platoon 2 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 25 25 10 10 64 64 26 26 21 21 26 _______ 26 _______ 172 172 Totals _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS AUTHORIZED __________ 132 30 __________ ACTUAL ______ 81 20 __________ TOTALS 162 101 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 56 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Rochester New York Army Reserve Center/Land 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-71277 13,600 13,600 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Land Purchase Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Vehicle Parking Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 995) Demo( ) Information Systems Antiterrorism Measures ha m2 m2 m2 m2 LS LS LS LS LS LS LS (AC) (SF) (SF) (SF) (SY) QUANTITY 4.86 3,261 732.26 113.06 4,574 ( ( ( ( ( -------- UNIT COST COST ($000) 12) 205,763 35,103) 2,042 7,882) 2,723 1,217) 1,251 5,470) 42.16 -------- 10,378 (1,000) (6,659) (1,994) (141) (193) (391) 1,962 (249) (332) (140) (83) (995) (143) (20) ESTIMATED CONTRACT COST 12,340 CONTINGENCY (5.00%) 617 _________ SUBTOTAL 12,957 SUPV, INSP & OVERHEAD (5.70%) 739 _________ TOTAL REQUEST 13,696 TOTAL REQUEST (ROUNDED) 13,600 INSTALLED EQT-OTHER APPROP (1,523) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include land acquisition and construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 313 kWr/89 Tons). ________________________________________________________________________________ 11. REQ: 4,106 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Land acquisition and construction of an ARC training building, OMS, ________ unheated storage building, and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 57 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Rochester, New York 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-71277 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ SDD and EPAct05 Antiterrorism Measures Building Information Systems LS LS LS QUANTITY ---- Unit COST Cost ($000) ---Total (184) (92) (115) _________ 391 REQUIREMENT: This project will provide twelve acres of land and a 150-member ____________ training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for six Army Reserve units. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 58 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Rochester, New York 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-71277 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JUL 2011 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 816 _________ 418 _________ 1,234 _________ 987 _________ 247 _________ PAGE NO. 59 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Rochester, New York 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-71277 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 60 779 667 10 67 ______ 1,523 LTC McDonald, 703-602-7099 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center Cincinnati, Ohio 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX .92 3 weekends/month 2 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Cincinnati, OH 5.00 miles Center USAR Sharonville, OH 10.00 miles Center USAR Kings Mills, OH 30.00 miles Center _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center/Land 4,205 m2 (45,261 SF) 13,000 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 31 MAY 2008 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Fee - Simple 12.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 12 12 0 0 6 6 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 6 6 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 261 261 13 13 248 248 PAGE NO. 61 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AR Center Cincinnati, Ohio 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Medium Truck Company Terminal Supervision Detachment Port Management Detachment Trailer Transfer Platoon 1 Trailer Transfer Platoon 2 Totals 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 170 170 21 21 24 24 23 23 23 _______ 23 _______ 261 261 _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS AUTHORIZED __________ 97 440 __________ ACTUAL ______ 60 267 __________ TOTALS 537 327 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 62 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Cincinnati Ohio Army Reserve Center/Land 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-69455 13,000 13,000 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Land Purchase Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Parking Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 942) Demo( ) Information Systems Antiterrorism Measures ha m2 m2 m2 m2 LS LS LS LS LS LS LS (AC) (SF) (SF) (SF) (SY) QUANTITY 4.86 3,358 705.78 141.21 13,938 ( ( ( ( ( -------- UNIT COST COST ($000) 12) 172,840 36,144) 1,812 7,597) 2,429 1,520) 1,083 16,670) 37.48 -------- 9,771 (840) (6,086) (1,714) (153) (522) (456) 1,999 (236) (314) (122) (79) (942) (286) (20) ESTIMATED CONTRACT COST 11,770 CONTINGENCY (5.00%) 589 _________ SUBTOTAL 12,359 SUPV, INSP & OVERHEAD (5.70%) 704 _________ TOTAL REQUEST 13,063 TOTAL REQUEST (ROUNDED) 13,000 INSTALLED EQT-OTHER APPROP (1,484) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include land acquisition and construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 313 kWr/89 Tons). ________________________________________________________________________________ 11. REQ: 4,205 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Land acquisition and construction of an ARC training building, OMS, ________ unheated storage building, and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 63 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Cincinnati, Ohio 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69455 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ SDD and EPAct05 Antiterrorism Measures Building Information Systems LS LS LS QUANTITY ---- Unit COST Cost ($000) ---Total (174) (87) (195) _________ 456 REQUIREMENT: This project will provide twelve acres of land and a 300-member ____________ training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for five Army Reserve units. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 64 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Cincinnati, Ohio 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69455 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JUN 2011 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 764 _________ 529 _________ 1,293 _________ 1,034 _________ 259 _________ PAGE NO. 65 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Cincinnati, Ohio 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69455 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 66 711 609 29 135 ______ 1,484 Mike Sugimura, 703-602-3952 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center Ashley, Pennsylvania 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX 1.02 2 weekends/month 1 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Nanticoke, PA 5.00 miles Center ARNG Wilkes-Barre, PA 6.00 miles Center USAR Wilkes-Barre, PA 6.00 miles Center _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center 3,318 m2 (35,716 SF) 9,800 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 01 SEP 2007 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Master Plan 8.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 0 0 0 0 0 0 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 0 0 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 159 159 4 4 155 155 PAGE NO. 67 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AR Center Ashley, Pennsylvania 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Transportation Company Transportation Company 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 90 90 69 _______ 69 _______ 159 159 Totals _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS TOTALS AUTHORIZED __________ 19 17 __________ ACTUAL ______ 13 11 __________ 36 24 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 68 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Ashley Pennsylvania Army Reserve Center 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-69561 9,800 9,800 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Parking SDD and EPAct05 Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 767) Demo( ) Information Systems Antiterrorism Measures m2 m2 m2 m2 LS LS LS LS LS LS LS LS (SF) (SF) (SF) (SY) QUANTITY 2,947 286.42 84.82 1,070 ( ( ( ( -- -------- UNIT COST 31,720) 3,083) 913) 1,280) COST ($000) 2,019 2,890 1,267 43.03 -- -------- 7,238 (5,950) (828) (107) (46) (142) (165) 1,554 (192) (256) (119) (64) (767) (140) (16) ESTIMATED CONTRACT COST 8,792 CONTINGENCY (5.00%) 440 _________ SUBTOTAL 9,232 SUPV, INSP & OVERHEAD (5.70%) 526 _________ TOTAL REQUEST 9,758 TOTAL REQUEST (ROUNDED) 9,800 INSTALLED EQT-OTHER APPROP (1,130) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 281 kWr/80 Tons). ________________________________________________________________________________ 11. REQ: 3,318 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Construct an ARC training building, OMS, unheated storage building, ________ and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 69 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Ashley, Pennsylvania 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-69561 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ Antiterrorism Measures Building Information Systems LS LS QUANTITY --- Unit COST Cost ($000) --Total (71) (94) _________ 165 REQUIREMENT: This project will provide eight acres of existing government ____________ land and a 150-member training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for two Army Reserve units. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 70 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Ashley, Pennsylvania 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-69561 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JUL 2011 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 546 _________ 275 _________ 821 _________ 657 _________ 164 _________ PAGE NO. 71 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Ashley, Pennsylvania 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-69561 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 72 574 492 10 54 ______ 1,130 Troy Hagger, 703-602-8505 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center Newtown Square, Pennsylvania 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX 1.11 3 weekends/month 2 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS USAR Edgemont, PA 1.00 miles Center USAR Folsom, PA 7.00 miles Center USAR Chester, PA 12.00 miles Center _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center/Land 5,767 m2 (62,076 SF) 20,000 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 11 JAN 2008 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Fee - Simple 9.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 24 24 2 2 18 18 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 4 4 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 220 220 13 13 207 207 PAGE NO. 73 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AR Center Newtown Square, Pennsylvania 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Platoon1 Automotive/Armament Maintenance Platoon 2 Wheeled Vehicle Maintenance Platoon 3 Ground Support Equipment Maintenance Platoon 4 Ground Support Equipment Maintenance Platoon 7 GSE Maintenance MOD Platoon 8 GSE Maintenance MOD Platoon 9 GSE Maintenance MOD Platoon 10 Electrical Equipment Maintenance Headquarters Detachment Totals 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 43 43 9 9 27 27 27 27 9 9 9 9 9 9 34 34 53 _______ 53 _______ 220 220 _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS TRACKED AUTHORIZED __________ 60 54 1 __________ ACTUAL ______ 39 34 1 __________ TOTALS 115 74 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 74 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Newtown Square Pennsylvania Army Reserve Center/Land 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532293A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-69430 20,000 20,000 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Land Purchase Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Vehicle Parking Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 1,487) Demo( ) Information Systems Antiterrorism Measures ha m2 m2 m2 m2 LS LS LS LS LS LS LS (AC) (SF) (SF) (SF) (SY) QUANTITY 3.64 3,325 2,273 169.36 4,164 ( ( ( ( ( -------- UNIT COST COST ($000) 9) 432,692 35,789) 2,189 24,464) 2,555 1,823) 1,278 4,980) 45.24 -------- 15,608 (1,575) (7,277) (5,806) (216) (188) (546) 2,844 (372) (495) (184) (124) (1,487) (153) (29) ESTIMATED CONTRACT COST 18,452 CONTINGENCY (5.00%) 923 _________ SUBTOTAL 19,375 SUPV, INSP & OVERHEAD (5.70%) 1,104 _________ TOTAL REQUEST 20,479 TOTAL REQUEST (ROUNDED) 20,000 INSTALLED EQT-OTHER APPROP (2,153) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include land acquisition and construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including entry control points, maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 320 kWr/91 Tons). ________________________________________________________________________________ 11. REQ: 5,767 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Land acquisition and construction of an ARC training building, OMS, ________ unheated storage building, and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 75 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Newtown Square, Pennsylvania 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69430 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ SDD and EPAct05 Antiterrorism Measures Building Information Systems LS LS LS QUANTITY ---- Unit COST Cost ($000) ---Total (273) (137) (136) _________ 546 REQUIREMENT: This project will provide nine acres of land and a 200-member ____________ training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for nine Army Reserve units. The maintenance shop will provide work bays for training and maintenance administrative support. The project will also provide for unit storage and adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 76 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Newtown Square, Pennsylvania 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69430 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JAN 2012 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 1,140 _________ 705 _________ 1,845 _________ 1,476 _________ 369 _________ PAGE NO. 77 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Newtown Square, Pennsylvania 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69430 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 78 1,110 951 12 80 ______ 2,153 Troy Hagger, 703-602-8505 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center Harrisburg, Pennsylvania 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX .94 1 weekends/month 1 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Harrisburg, PA 1.00 miles Armory USN Harrisburg, PA 1.00 miles Center ARNG Annville, PA 10.00 miles Armory ARNG Carlisle, PA 12.00 miles Armory USAR New Cumberland, PA 14.00 miles Center _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center 2,654 m2 (28,567 SF) 7,600 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 24 AUG 2007 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Permit 10.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 2 2 0 0 1 1 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 1 1 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 104 104 5 5 99 99 PAGE NO. 79 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AR Center Harrisburg, Pennsylvania 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Engineer Company 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 104 _______ 104 _______ 104 104 Totals _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS TRACKED TOTALS AUTHORIZED __________ 6 15 15 __________ ACTUAL ______ 4 9 9 __________ 36 22 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 80 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Harrisburg Pennsylvania Army Reserve Center 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-70511 7,600 7,600 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Parking SDD and EPAct05 Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 595) Demo( ) Information Systems Antiterrorism Measures m2 m2 m2 m2 LS LS LS LS LS LS LS LS (SF) (SF) (SF) (SY) QUANTITY 2,164 433.21 56.67 1,095 ( ( ( ( -- -------- UNIT COST 23,294) 4,663) 610) 1,310) COST ($000) 1,922 2,597 1,221 41.96 -- -------- 5,632 (4,159) (1,125) (69) (46) (110) (123) 1,212 (149) (198) (80) (50) (595) (128) (12) ESTIMATED CONTRACT COST 6,844 CONTINGENCY (5.00%) 342 _________ SUBTOTAL 7,186 SUPV, INSP & OVERHEAD (5.70%) 410 _________ TOTAL REQUEST 7,596 TOTAL REQUEST (ROUNDED) 7,600 INSTALLED EQT-OTHER APPROP (1,036) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include the construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 218 kWr/62 Tons). ________________________________________________________________________________ 11. REQ: 2,654 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Construct an ARC training building, OMS, unheated storage building, ________ and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 81 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Harrisburg, Pennsylvania 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-70511 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ Antiterrorism Measures Building Information Systems LS LS QUANTITY --- Unit COST Cost ($000) --Total (55) (68) _________ 123 REQUIREMENT: This project will provide ten acres of existing government land ____________ and a 100-member training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for an Army Reserve Engineer Company. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 82 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Harrisburg, Pennsylvania 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-70511 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JUL 2011 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 454 _________ 391 _________ 845 _________ 676 _________ 169 _________ PAGE NO. 83 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Harrisburg, Pennsylvania 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-70511 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 84 524 450 8 54 ______ 1,036 Troy Hagger, 703-602-8505 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center Uniontown, Pennsylvania 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX 1.02 1 weekends/month 1 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS USAR Brownsville, PA 16.00 miles Center ARNG Connellsville, PA 16.00 miles Armory USAR Morgantown, PA 19.00 miles Center _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center/Land 3,406 m2 (36,666 SF) 11,800 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 20 DEC 2007 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Fee - Simple 10.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 6 6 0 0 5 5 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 1 1 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 170 170 6 6 164 164 PAGE NO. 85 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AR Center Uniontown, Pennsylvania 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Medium Truck Company (PLS) 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 170 _______ 170 _______ 170 170 Totals _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS AUTHORIZED __________ 75 431 __________ ACTUAL ______ 45 259 __________ TOTALS 506 304 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES A. AIR POLLUTION B. WATER POLLUTION C. OCCUPATIONAL SAFETY AND HEALTH PAGE NO. 86 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 0 0 0 DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Uniontown Pennsylvania Army Reserve Center/Land 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-69652 11,800 11,800 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Land Purchase Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Vehicle Parking Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 852) Demo( ) Information Systems Antiterrorism Measures ha m2 m2 m2 m2 LS LS LS LS LS LS LS (AC) (SF) (SF) (SF) (SY) QUANTITY 4.05 2,872 449.74 84.82 12,843 ( ( ( ( ( -------- UNIT COST COST ($000) 10) 222,222 30,912) 2,023 4,841) 2,799 913) 1,267 15,360) 41.36 -------- 8,934 (900) (5,811) (1,259) (107) (531) (326) 1,712 (213) (284) (135) (71) (852) (140) (17) ESTIMATED CONTRACT COST 10,646 CONTINGENCY (5.00%) 532 _________ SUBTOTAL 11,178 SUPV, INSP & OVERHEAD (5.70%) 637 _________ TOTAL REQUEST 11,815 TOTAL REQUEST (ROUNDED) 11,800 INSTALLED EQT-OTHER APPROP (1,179) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include land acquisition and construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 274 kWr/78 Tons). ________________________________________________________________________________ 11. REQ: 3,406 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Land acquisition and construction of an ARC training building, OMS, ________ unheated storage building, and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 87 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Uniontown, Pennsylvania 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69652 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ SDD and EPAct05 Antiterrorism Measures Building Information Systems LS LS LS QUANTITY ---- Unit COST Cost ($000) ---Total (158) (79) (89) _________ 326 REQUIREMENT: This project will provide ten acres of land and a 150-member ____________ training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for an Army Reserve Medium Truck Company. The maintenance shop will provide work bays for training and maintenance administrative support. The project will also provide organizational storage and adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 88 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Uniontown, Pennsylvania 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69652 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JUL 2011 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 648 _________ 327 _________ 975 _________ 780 _________ 195 _________ PAGE NO. 89 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Uniontown, Pennsylvania 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69652 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 90 601 515 9 54 ______ 1,179 Troy Hagger, 703-602-8505 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT ARMY FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AFRC Austin, Texas 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX .87 3 weekends/month 3 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Austin, TX 2.00 miles Armory USAF Austin, TX 10.00 miles Base USAR Austin, TX 11.00 miles Center _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 171 Armed Forces Reserve Center/A 7,966 m2 (85,740 SF) 20,000 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 09 AUG 2007 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) JOINT CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Permit 11.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 77 57 8 7 39 29 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 30 21 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 448 467 76 60 372 407 PAGE NO. 91 1. COMPONENT ARMY FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AFRC Austin, Texas 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 104% UNIT DESIGNATION ________________ Retention Office 22nd Trial Defense Team 17 22nd Trial Defense Team 24 1st Legal Services Team 4 321st Detachment 2, Company A 321st HHD Military Intelligence Battalion (RSTA UEX) 980th HSC Battalion 980th Company A Battalion (FWD SPT) 344th Company (TAC) 17th Bn (TAC) Totals 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 3 3 5 3 5 3 13 9 23 12 55 77 83 134 92 114 104 57 65 _______ 55 _______ 448 467 AMSA 26 (G) supports 259 vehicles _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS TRACKED AUTHORIZED __________ 146 120 4 __________ ACTUAL ______ 90 75 3 __________ TOTALS 270 168 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 92 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Austin Texas Armed Forces Reserve Center/AMSA 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-67667 20,000 20,000 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Army Reserve Center Building Vehicle Maintenance Shop Organizational Storage Facility Organizational Vehicle Parking SDD and EPAct05 Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 1,574) Demo( ) Information Systems Antiterrorism Measures m2 m2 m2 m2 LS LS LS LS LS LS LS LS (SF) (SF) (SF) (SY) QUANTITY 6,369 1,300 296.36 8,579 ( ( ( ( -- -------- UNIT COST 68,552) 13,998) 3,190) 10,260) 1,732 2,231 978.01 42.28 -- -------- COST ($000) 15,255 (11,031) (2,901) (290) (363) (299) (371) 2,897 (403) (521) (151) (138) (1,574) (80) (30) ESTIMATED CONTRACT COST 18,152 CONTINGENCY (5.00%) 908 _________ SUBTOTAL 19,060 SUPV, INSP & OVERHEAD (5.70%) 1,086 _________ TOTAL REQUEST 20,146 TOTAL REQUEST (ROUNDED) 20,000 INSTALLED EQT-OTHER APPROP (1,895) 10.Description of Proposed Construction Construct an Armed Forces Reserve Center (AFRC). Primary facilities include an joint training building, Area Maintenance Support Activity (AMSA), Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 489 kWr/139 Tons). ________________________________________________________________________________ 11. REQ: 7,966 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Construct a joint reserve component training facility, AMSA, OMS, ________ unheated storage building, and organizational parking. The Texas Army National DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 93 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Austin, Texas 4.PROJECT TITLE 5.PROJECT NUMBER Armed Forces Reserve Center/AMSA CAR 10-67667 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ Antiterrorism Measures Building Information Systems LS LS QUANTITY --- Unit COST Cost ($000) --Total (150) (221) _________ 371 PROJECT: (CONTINUED) _____________________ Guard is the host of the joint facility(Current Mission) REQUIREMENT: This project will provide eleven acres of existing State of ____________ Texas land and a 400-member training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for ten Army Reserve units. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Austin Memorial Armed Forces Reserve Center (AFRC) is __________________ located on 13.4 acres of State of Texas land. The AFRC consists of a 55,408 square feet training building and 17,117 square feet maintenance shop. The AFRC is a joint facility with the Navy and Marine Corps Reserve. The Army Reserve portion of the facility was constructed in 1958. The Navy and Marine Reserve portion of the facility was constructed in 1975. The facility is extremely overcrowded and does not provide the units adequate space to perform the necessary pre-mobilization training tasks in an efficient manner. The physical plant of the facility also impacts the units ability to perform training and operations efficiently. A large portion of this facility is either not air conditioned or is cooled by a cooling coil cold water circulation system that is a maintenance liability. The kitchen is very small and in a poor state of repair that cannot be brought up to required standards, which significantly impacts the training of unit dining facility operations personnel. IMPACT IF NOT PROVIDED: If this project is not provided, the units will be _______________________ forced to operate and train in facilities not properly configured to allow the most effective training to complete mission requirements. This will continue to have a negative impact on training and retention objectives. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. Mission requirements, operational considerations, and location are incompatible with use by other components. A PAGE NO. 94 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Austin, Texas 4.PROJECT TITLE 5.PROJECT NUMBER Armed Forces Reserve Center/AMSA CAR 10-67667 ADDITIONAL: (CONTINUED) __________________________ parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ JAN 2010 (5) Construction Start................................... _________ FEB 2010 (6) Construction Completion.............................. _________ FEB 2012 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 1,020 _________ 523 _________ 1,543 _________ 1,234 _________ 309 _________ PAGE NO. 95 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Austin, Texas 4.PROJECT TITLE 5.PROJECT NUMBER Armed Forces Reserve Center/AMSA CAR 10-67667 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2011 2011 2011 TOTAL Point of Contact: PAGE NO. 96 895 767 42 191 ______ 1,895 MAJ Scott, 703-602-7099 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center Ft Bliss, Texas 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX 1.03 2 weekends/month 2 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS USMCR El Paso, TX 1.00 miles Center ARNG El Paso, TX 3.00 miles Center USAR El Paso, TX 6.00 miles Center USAF El Paso, TX 6.00 miles Center _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center 3,037 m2 (32,690 SF) 9,500 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 10 JAN 2008 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Master Plan 8.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 4 4 0 0 3 3 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 1 1 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 159 159 4 4 155 155 PAGE NO. 97 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION Ft Bliss, Texas 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ MP Co (GD) MP Co (GD) STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 90 90 69 _______ 69 _______ 159 159 Totals _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS TOTALS AUTHORIZED __________ 19 17 __________ ACTUAL ______ 13 11 __________ 36 24 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 98 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Ft Bliss Texas Army Reserve Center 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-71607 9,500 9,500 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Vehicle Parking SDD and EPAct05 Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 767) Demo( ) Information Systems Antiterrorism Measures m2 m2 m2 m2 LS LS LS LS LS LS LS LS (SF) (SF) (SF) (SY) QUANTITY 2,820 297.66 84.82 1,070 ( ( ( ( -- -------- UNIT COST 30,352) 3,204) 913) 1,280) COST ($000) 2,052 2,841 1,278 41.68 -- -------- 7,096 (5,787) (846) (108) (45) (142) (168) 1,493 (192) (256) (120) (64) (767) (79) (15) ESTIMATED CONTRACT COST 8,589 CONTINGENCY (5.00%) 429 _________ SUBTOTAL 9,018 SUPV, INSP & OVERHEAD (5.70%) 514 _________ TOTAL REQUEST 9,532 TOTAL REQUEST (ROUNDED) 9,500 INSTALLED EQT-OTHER APPROP (1,064) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 253 kWr/72 Tons). ________________________________________________________________________________ 11. REQ: 3,037 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Construct an ARC training building, OMS, unheated storage building, ________ and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 99 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Ft Bliss, Texas 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-71607 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ Antiterrorism Measures Building Information Systems LS LS QUANTITY --- Unit COST Cost ($000) --Total (71) (97) _________ 168 REQUIREMENT: This project will provide eight acres of existing government ____________ land and a 150-member training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for two Army Reserve units. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 100 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Ft Bliss, Texas 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-71607 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JUL 2011 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 550 _________ 354 _________ 904 _________ 723 _________ 181 _________ PAGE NO. 101 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Ft Bliss, Texas 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-71607 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 102 539 462 9 54 ______ 1,064 MAJ Scott, 703-602-7099 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AFRC Houston, Texas 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX .93 3 weekends/month 1 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS USAR Houston, TX 3.00 miles Center ARNG Houston, TX 9.00 miles Armory USAR Houston, TX 12.00 miles Center USNR Houston, TX 13.00 miles Base USNR Houston, TX 14.00 miles Base _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center/Land 7,710 m2 (82,992 SF) 24,000 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 02 JUL 2007 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Fee - Simple 15.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 27 27 0 0 8 8 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 19 19 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 742 742 29 29 713 713 PAGE NO. 103 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AFRC Houston, Texas 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Clearance Company Supply Company Trailer Transfer Point Team Terminal Supervision Team Port Management Team Medium Truck Company PLS Inland Cargo Transfer Company 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 191 191 151 151 23 23 21 21 24 24 170 170 162 _______ 162 _______ 742 742 Totals _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS TRACKED AUTHORIZED __________ 299 615 7 __________ ACTUAL ______ 183 373 5 __________ TOTALS 921 561 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 104 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Houston Texas Army Reserve Center/Land 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-69439 24,000 24,000 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Land Purchase Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Vehicle Parking Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 1,698) Demo( ) Information Systems Antiterrorism Measures ha m2 m2 m2 m2 LS LS LS LS LS LS LS (AC) (SF) (SF) (SF) (SY) QUANTITY 6.07 6,152 1,149 409.24 24,005 ( ( ( ( ( -------- UNIT COST 15) 494,234 66,222) 1,786 12,365) 2,335 4,405) 976.07 28,710) 43.37 -------- COST ($000) 18,730 (3,000) (10,986) (2,682) (399) (1,041) (622) 3,283 (425) (566) (328) (142) (1,698) (91) (33) ESTIMATED CONTRACT COST 22,013 CONTINGENCY (5.00%) 1,101 _________ SUBTOTAL 23,114 SUPV, INSP & OVERHEAD (5.70%) 1,317 _________ TOTAL REQUEST 24,431 TOTAL REQUEST (ROUNDED) 24,000 INSTALLED EQT-OTHER APPROP (2,685) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include land acquisition and construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 306 kWr/87 Tons). ________________________________________________________________________________ 11. REQ: 7,710 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Land acquisition and construction of an ARC training building, OMS, ________ unheated storage building, and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 105 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Houston, Texas 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69439 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ SDD and EPAct05 Antiterrorism Measures Building Information Systems LS LS LS QUANTITY ---- Unit COST Cost ($000) ---Total (312) (156) (154) _________ 622 REQUIREMENT: This project will provide fifteen acres of land in the vicinity ____________ of Ellington Field, TX and a 800-member training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for eleven Army Reserve units. The maintenance shop will provide work bays for training and maintenance administrative support. The project will also provide for unit storage and adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 106 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Houston, Texas 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69439 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JAN 2012 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 1,440 _________ 761 _________ 2,201 _________ 1,761 _________ 440 _________ PAGE NO. 107 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Houston, Texas 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69439 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 108 1,387 1,189 16 93 ______ 2,685 MAJ Scott, 703-602-7099 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION Fort Sam Houston Texas 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX .94 3 weekends/month 2 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS USAF Brooks AFB, TX 3.00 miles Base USAF Kelly AFB, TX 4.00 miles Base USAF Lackland AFB, TX 7.00 miles Base USA Ft Sam Houston, TX 8.00 miles Base USAR San Antonio, TX 8.00 miles Center _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center 7,791 m2 (83,863 SF) 20,000 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 01 AUG 2007 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Permit 10.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 108 108 40 40 28 28 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 40 40 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 317 317 128 128 189 189 PAGE NO. 109 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION Ft Sam Houston Texas 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% ESC DET HHC HHC UNIT DESIGNATION ________________ MSC (Press Camp HQ) Army Field Support BDE Sustainment Command (EXPED) Totals 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 22 22 31 31 10 10 254 _______ 254 _______ 317 317 _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS AUTHORIZED __________ 66 13 __________ ACTUAL ______ 41 9 __________ TOTALS 79 50 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 110 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Fort Sam Houston, Texas 5.PROGRAM ELEMENT Army Reserve Center 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-71148 20,000 20,000 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Vehicle Parking SDD and EPAct05 Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 1,597) Demo( ) Information Systems Antiterrorism Measures m2 m2 m2 m2 LS LS LS LS LS LS LS LS (SF) (SF) (SF) (SY) QUANTITY 7,096 511.43 183.48 2,224 ( ( ( ( -- -------- UNIT COST 76,383) 5,505) 1,975) 2,660) 1,796 2,561 1,072 38.32 -- -------- COST ($000) 15,074 (12,745) (1,310) (197) (85) (294) (443) 3,027 (399) (532) (177) (133) (1,597) (159) (30) ESTIMATED CONTRACT COST 18,101 CONTINGENCY (5.00%) 905 _________ SUBTOTAL 19,006 SUPV, INSP & OVERHEAD (5.70%) 1,083 _________ TOTAL REQUEST 20,089 TOTAL REQUEST (ROUNDED) 20,000 INSTALLED EQT-OTHER APPROP (2,513) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include the construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 679 kWr/193 Tons). ________________________________________________________________________________ 11. REQ: 7,791 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Construct an ARC training building, OMS, unheated storage building, ________ and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 111 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Ft Sam Houston, Texas 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-71148 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ Antiterrorism Measures Building Information Systems LS LS QUANTITY --- Unit COST Cost ($000) --Total (147) (296) _________ 443 REQUIREMENT: This project will provide ten acres of existing government land ____________ within the San Antonio area and a 300-member training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for four Army Reserve units. The maintenance shop will provide work bays and maintenance administrative support. The project will also provide adequate parking space for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 112 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Ft Sam Houston, Texas 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-71148 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JAN 2012 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 1,200 _________ 610 _________ 1,810 _________ 1,448 _________ 362 _________ PAGE NO. 113 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Ft Sam Houston, Texas 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center CAR 10-71148 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 114 1,204 1,032 50 227 ______ 2,513 MAJ Scott, 703-602-7099 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT ARMY FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION Ft McCoy Wisconsin 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX 1.13 3 weekends/month 2 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Sparta, WI 3.00 miles Armory ARNG Tomah, WI 14.00 miles Armory ARNG Black River Falls, 21.00 miles Armory _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 171 Combined Arms Collective Trai 1,526 m2 (16,425 SF) 25,000 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 16 OCT 2007 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED NONE 0 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ 171 721 NCO Academy Phase II Annual Training/Mobilization Barracks 3,525 m2 2,782 m2 DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): (37,946 SF) (29,945 SF) 10,600 10,800 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 6,740 6,740 1390s1 1,019 1,019 2,821 2,821 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 2,900 2,900 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 1,662 1,662 502 502 1,160 1,160 PAGE NO. 115 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Ft McCoy Wisconsin Combined Arms Collective Training Facility 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 179 8.PROJECT COST ($000) Auth Approp CAR 10-67687 25,000 25,000 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Urban Structures (Intact) Streets, Parking & Turn Pads Operations & Storage Building Covered Mess Range Operations & Control Area Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Information Systems Antiterrorism Measures LS LS m2 (SF) m2 (SF) LS LS LS LS LS LS QUANTITY --74.32 ( 74.32 ( -- ------ UNIT COST 800) 800) --1,287 992.68 -- ------ COST ($000) 21,801 (14,281) (2,234) (96) (74) (137) (4,979) 883 (31) (43) (338) (418) (53) ESTIMATED CONTRACT COST 22,684 CONTINGENCY (5.00%) 1,134 _________ SUBTOTAL 23,818 SUPV, INSP & OVERHEAD (5.70%) 1,358 _________ TOTAL REQUEST 25,176 TOTAL REQUEST (ROUNDED) 25,000 INSTALLED EQT-OTHER APPROP (4,504) 10.Description of Proposed Construction Construct a standard Combined Arms Collective Training Facility (CACTF) consisting of structures and mock utilities to simulate an urban setting. Primary Facilities are located within the perimeter of the range complex and include structures simulating an urban setting (Schools, Church/cemetery, Police Station/Jail, Hotel, Residences, Businesses, Townhouses, Bank, Warehouses, Government Building, Offices, Service Station), Large Range Operation Center, Operations/Storage Building, Latrine, Covered Mess, Large After Action Review Facility, safety cameras, service roads, site improvements and associated range power and data transfer cablings. Supporting facilities include electric service and information systems. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 35 kWr/10 Tons). ________________________________________________________________________________ 11. REQ: 1 EA ADQT: NONE SUBSTD: NONE ________ PROJECT: Construct a standard design Combined Arms Collective Training ________ Facility (CACTF). (Current Mission) REQUIREMENT: This project is required to comply with the Training and ____________ Doctrine Command (TRADOC) training strategy. These facilities will provide a Combined Arms Collective Training facility for Active Army, Army Reserve, Army National Guard, Air Force, Navy, Marines and federal and local law enforcement DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 117 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Ft McCoy, Wisconsin 4.PROJECT TITLE 5.PROJECT NUMBER Combined Arms Collective Training Facility CAR 10-67687 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ Range Operations Center, Large Latrine, Dual Sex, Wet After Action Review Bldg, Large Downrange Electrical Grading & Drainage Clearing & Grubbing SDD and EPAct05 Antiterrorism Measures Building Information Systems m2 (SF) m2 (SF) m2 (SF) LS LS LS LS LS LS Unit COST QUANTITY 188.59 ( 32.98 ( 263.29 ( ------- 2,030) 355) 2,834) Cost ($000) 1,267 (239) 3,371 (111) 1,048 (276) -(2,345) -(1,199) -(744) -(12) -(12) -(41) _________ Total 4,979 REQUIREMENT: (CONTINUED) __________________________ agencies in tactics, techniques and procedures required for training in an urban environment under simulated full spectrum operational conditions. This CACTF Range Complex will support the Army’s combined arms urban operations training strategy for conducting operations (offense, defense, stability, and support). This project will support squad and platoon training, multiple scenarios, and close quarters marksmanship skills. CURRENT SITUATION: Facilities of this type do not exist at Fort McCoy or the __________________ surrounding area that are capable of supporting the urban operations training needs for this installation’s customer base. Current training occurs in substandard facilities and the training does not meet the requirements for urban assault training. IMPACT IF NOT PROVIDED: If this project is not provided, the installation _______________________ and tenant organization’s ability to comply with the Army’s current urban operations training strategy will be severely degraded. Units throughout the Midwest will have to travel longer distances to conduct required training. The increase in travel time will greatly reduce the time available for urban operations training. The reduction in urban operations training will negatively impact operational readiness at a time when an increasing number of Army Reserve and National Guard units are mobilized to conduct real world missions abroad. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project PAGE NO. 118 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Ft McCoy, Wisconsin 4.PROJECT TITLE 5.PROJECT NUMBER Combined Arms Collective Training Facility CAR 10-67687 ADDITIONAL: (CONTINUED) __________________________ engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JAN 2012 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 1,485 _________ 620 _________ 2,105 _________ 1,620 _________ 485 _________ PAGE NO. 119 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Ft McCoy, Wisconsin 4.PROJECT TITLE 5.PROJECT NUMBER Combined Arms Collective Training Facility CAR 10-67687 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Targetry System OPA 2010 TOTAL Point of Contact: PAGE NO. 120 4,504 ______ 4,504 LTC Casiano, 703-602-0649 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 2. DATE 11 MAY 2009 3. INSTALLATION AND LOCATION AR Center Caguas, Puerto Rico 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - Full-Time Personnel - 4. AREA CONSTRUCTION COST INDEX 1.28 1 weekends/month 1 nights/week 5 days/week _______________________________________________________________________________________________________________ 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Caguas, PR 3.00 miles Armory ARNG Gurabo, PR 5.00 miles Armory ARNG Juncos, PR 10.00 miles Armory _______________________________________________________________________________________________________________ 7. PROJECTS REQUESTED IN THIS PROGRAM: CATEGORY COST DESIGN STATUS _____________ CODE _____________ PROJECT TITLE SCOPE ($000) START CMPL ________ _____ ______ _____ ____ 17140 Army Reserve Center/Land 2,666 m2 (28,699 SF) 12,400 JUL 2008 SEP 2009 _______________________________________________________________________________________________________________ 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 21 JUN 2008 ___________ FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. _______________________________________________________________________________________________________________ 9. LAND ACQUISITION REQUIRED Fee - Simple 10.00 _________________ (Number of acres) _______________________________________________________________________________________________________________ 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) ________ _____________ _____ ______ NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. _______________________________________________________________________________________________________________ 11. PERSONNEL STRENGTH AS OF 01 SEP 2008 PERMANENT ___________________________________________ TOTAL OFFICER ________ ENLISTED ________ CIVILIAN _____ _______ AUTHORIZED ACTUAL DD FORM MAY 78 1390s1 6 6 1 1 5 5 GUARD/RESERVE _____________________________ TOTAL OFFICER ________ ENLISTED _____ _______ 0 0 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED 122 122 4 4 118 118 PAGE NO. 121 1. COMPONENT AR FY 2010 GUARD AND RESERVE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION AR Center Caguas, Puerto Rico 12. RESERVE UNIT DATA AUTHORIZED Assigned/Authorized: 100% UNIT DESIGNATION ________________ Field Services Modular Company Totals 2. DATE 11 MAY 2009 STRENGTH ___________________ AUTHORIZED ______ ACTUAL __________ 122 _______ 122 _______ 122 122 _______________________________________________________________________________________________________________ 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE ____ WHEELED TRAILERS AUTHORIZED __________ 30 24 __________ ACTUAL ______ 18 15 __________ TOTALS 54 33 _______________________________________________________________________________________________________________ 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PAGE NO. 122 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Caguas Puerto Rico Army Reserve Center/Land 5.PROGRAM ELEMENT 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 171 8.PROJECT COST ($000) Auth Approp CAR 10-69568 12,400 12,400 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Land Purchase Army Reserve Center Building Vehicle Maintenance Shop Unheated Storage Building Organizational Parking Total from Continuation page SUPPORTING FACILITIES _____________________ Electric Service Water, Sewer, Gas Paving, Walks, Curbs & Gutters Storm Drainage Site Imp( 936) Demo( ) Information Systems Antiterrorism Measures ha m2 m2 m2 m2 LS LS LS LS LS LS LS (AC) (SF) (SF) (SF) (SY) QUANTITY 4.05 2,309 286.42 70.70 1,447 ( ( ( ( ( -------- UNIT COST COST ($000) 10) 444,444 24,855) 2,587 3,083) 3,627 761) 1,621 1,730) 52.61 -------- 9,319 (1,800) (5,975) (1,039) (115) (76) (314) 1,773 (199) (266) (118) (66) (936) (171) (17) ESTIMATED CONTRACT COST 11,092 CONTINGENCY (5.00%) 555 _________ SUBTOTAL 11,647 SUPV, INSP & OVERHEAD (6.50%) 757 _________ TOTAL REQUEST 12,404 TOTAL REQUEST (ROUNDED) 12,400 INSTALLED EQT-OTHER APPROP (1,195) 10.Description of Proposed Construction Construct an Army Reserve Center (ARC). Primary facilities include land aquisition and construction of an ARC training building, Organizational Maintenance Shop (OMS), unheated storage building, and organizational parking. Buildings will be of permanent construction with reinforced concrete foundations, concrete floor slabs, structural steel frames, masonry veneer walls, standing seam metal roof, Heating, Ventilation, and Air Conditioning (HVAC), plumbing, mechanical systems, security systems, and electrical systems. Supporting facilities include land clearing, paving, fencing, general site improvements, and extension of utilities to serve project. Accessibility for the disabled will be provided. Physical security measures will be incorporated into design including maximum standoff distance from roads, parking areas, and vehicle unloading areas. Berms, heavy landscaping, and bollards will be used to prevent access when standoff distances cannot be maintained. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Air Conditioning (Estimated 236 kWr/67 Tons). ________________________________________________________________________________ 11. REQ: 2,666 m2 ADQT: NONE SUBSTD: NONE ________ PROJECT: Land aquisition and construction of an ARC training building, OMS, ________ unheated storage building, and organizational parking. (New Mission) DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 123 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Caguas, Puerto Rico 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69568 9. COST ESTIMATES (CONTINUED) ______________________________ Item UM (M/E) PRIMARY FACILITY (CONTINUED) ____________________________ SDD and EPAct05 Antiterrorism Measures Building Information Systems LS LS LS QUANTITY ---- Unit COST Cost ($000) ---Total (148) (74) (92) _________ 314 REQUIREMENT: This project will provide ten acres of land and a 100-member ____________ training facility with administrative, educational, assembly, library, learning center, vault, weapons simulator, and physical fitness areas for one Army Reserve unit. The maintenance shop will provide work bays for training and maintenance administrative support for military equipment stored at this facility. This project will also provide an organizational storage building and adequate parking spaces for all military and privately-owned vehicles. CURRENT SITUATION: The Army Reserve is undergoing a transformation of the __________________ existing force structure to support the additional Brigade Combat Teams (BCTs) currently activating within the Active Component. The unit(s) required in this project are part the Army’s Combat Service Support (CSS) Reset Initiative to support the BCTs. The Army Reserve is activating new units currently not in the inventory to support the CSS reset. Existing facilities in the area do not have the capacity to house the unit personnel and equipment. IMPACT IF NOT PROVIDED: The Army Reserve will not be able to provide _______________________ facilities to support the activation of the new unit(s). The Army Reserve will not be able to support the new activating BCTs when they are deployed to meet current and future war fighting missions. ADDITIONAL: This project has been coordinated with the installation physical ___________ security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include Life Cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802(c), and other applicable laws and Executive Orders. PAGE NO. 124 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Caguas, Puerto Rico 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69568 12. SUPPLEMENTAL DATA: _______________________ A. Estimated Design Data: (1) Status: (a) Date Design Started............................. (b) Percent Complete As Of January 2009............. (c) Date 35% Designed............................... (d) Date Design Complete............................ (e) Parametric Cost Estimating Used to Develop Costs (f) Type of Design Contract: Design-bid-build (2) DD Basis: (a) Standard or Definitive Design: JUL 2008 _________ 15.00 _________ MAY 2009 _________ SEP 2009 _________ YES _________ NO (3) Total Design Cost (c) = (a)+(b) OR (d)+(e): (a) Production of Plans and Specifications.......... (b) All Other Design Costs.......................... (c) Total Design Cost............................... (d) Contract........................................ (e) In-house........................................ (4) Construction Contract Award.......................... _________ DEC 2009 (5) Construction Start................................... _________ JAN 2010 (6) Construction Completion.............................. _________ JUL 2011 FORM 1 DEC 76 1391C PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED ($000) 648 _________ 312 _________ 960 _________ 768 _________ 192 _________ PAGE NO. 125 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION Caguas, Puerto Rico 4.PROJECT TITLE 5.PROJECT NUMBER Army Reserve Center/Land CAR 10-69568 12. SUPPLEMENTAL DATA: (CONTINUED) _______________________ B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) ____________ _____________ ____________ ______ Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP OMAR OMAR OPA OMAR 2011 2010 2010 2011 TOTAL Point of Contact: PAGE NO. 126 610 523 8 54 ______ 1,195 Troy Hagger, 703-602-8505 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391C 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Planning and Design Worldwide Various 5.PROGRAM ELEMENT Planning and Design 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 000 8.PROJECT COST ($000) Auth Approp CAR 10-67726 22,262 22,262 9.COST ESTIMATES ITEM PRIMARY FACILITY ________________ Planning and Design UM (M/E) LS QUANTITY -- UNIT COST -- COST ($000) 22,262 (22,262) SUPPORTING FACILITIES _____________________ ESTIMATED CONTRACT COST 22,262 CONTINGENCY (.00 %) 0 _________ SUBTOTAL 22,262 SUPV, INSP & OVERHEAD (.00 %) 0 _________ TOTAL REQUEST 22,262 TOTAL REQUEST (ROUNDED) 22,262 INSTALLED EQT-OTHER APPROP (0) 10.Description of Proposed Construction This item provides for parametric, concept, and final design of major and unspecified minor military construction projects; value engineering; and the development of standards and criteria for Army Reserve projects. ________________________________________________________________________________ 11. REQ: NONE ADQT: NONE SUBSTD: NONE ________ REQUIREMENT: This funding is required to provide design and engineering ____________ services for Military Construction, Army Reserve (MCAR), and Unspecified Minor projects, including value engineering, and continued development of design criteria and standard (conventional) functional layouts. Funds will be used by the US Army Corps of Engineers (USACE) districts for in-house designs, Architect-Engineer (A-E) contractors, and administrative support functions. These funds are required for accomplishment of initial correction, review, reproduction and advertisement of projects in the FY 10 program; for advancement to final design of projects in FY 11; for initiation of design of projects in FY 12; and for initiation of preconcept design activities for projects in FY 13. The funds request for the annual planning and design requirement includes value engineering, the costs to update standards and criteria, guide specifications, and technical manuals. DD FORM 1 DEC 76 1391 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 127 1.COMPONENT 2.DATE FY 2010 MILITARY CONSTRUCTION PROJECT DATA AR 11 MAY 2009 3.INSTALLATION AND LOCATION 4.PROJECT TITLE Minor Construction Worldwide Various 5.PROGRAM ELEMENT Unspecified Minor Construction 6.CATEGORY CODE 0532292A 7.PROJECT NUMBER 000 8.PROJECT COST ($000) Auth Approp CAR 10-67721 3,600 3,600 9.COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY ________________ Unspecified Minor Construction LS QUANTITY -- UNIT COST COST ($000) -- 3,600 (3,600) SUPPORTING FACILITIES _____________________ ESTIMATED CONTRACT COST 3,600 CONTINGENCY (.00 %) 0 _________ SUBTOTAL 3,600 SUPV, INSP & OVERHEAD (.00 %) 0 _________ TOTAL REQUEST 3,600 TOTAL REQUEST (ROUNDED) 3,600 INSTALLED EQT-OTHER APPROP (0) 10.Description of Proposed Construction Unspecified minor construction projects which have a funding cost of $2,000,000 or less, including construction, alteration, or conversion of permanent or temporary facilities as authorized under 10 USC 18233a(a)(1). The funded cost limit can be $3,000,000 if the project is intended solely to correct a deficiency that is life, health, or safety threatening. ________________________________________________________________________________ 11. REQ: NONE ADQT: NONE SUBSTD: NONE ________ REQUIREMENT: This line item is needed to provide for Unspecified Minor ____________ Military Construction Program projects for which the need cannot be reasonably foreseen nor justified in time to be included in this Military Construction, Army Reserve Program. CURRENT SITUATION: These unforeseen projects address high priorities such as __________________ critical mission requirements, environmental protection, and life, health, or safety threatening conditions. These projects cannot wait until the next budget submission. PAGE NO. 128 PREVIOUS EDITIONS MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM 1 DEC 76 1391