UNCLASSIFIED PE NUMBER: 0604400F PE TITLE: Joint Unmanned Combat Air System (J-UCAS) DATE Exhibit R-2, RDT&E Budget Item Justification February 2006 BUDGET ACTIVITY PE NUMBER AND TITLE 04 Advanced Component Development and Prototypes (ACD&P) 0604400F Joint Unmanned Combat Air System (J-UCAS) Cost ($ in Millions) FY 2005 Actual 0.000 FY 2006 Estimate 227.857 FY 2007 Estimate 0.000 FY 2008 Estimate 0.000 FY 2009 Estimate 0.000 FY 2010 Estimate 0.000 FY 2011 Estimate 0.000 Cost to Complete Continuing Total Total Program Element (PE) Cost TBD Unmanned Combat Air Vehicle 5058 0.000 227.857 0.000 0.000 0.000 0.000 0.000 Continuing TBD (UCAV) Note: In FY06, the Joint Unmanned Combat Air Systems (J-UCAS) program was transferred from the Defense Advanced Research Projects Agency (DARPA) to be a joint Air Force/Navy program. The J-UCAS program is being terminated and $1,830.5M is being realigned to PE0604402N in FY07-11. (U) A. Mission Description and Budget Item Justification The Joint Unmanned Combat Air Systems (J-UCAS) is a joint Air Force/Navy Capabilities Demonstration Program (CDP) to mature technologies to investigate the technical feasibility and operational value of unmanned combat air vehicles to provide the capability for high-threat Suppression of Enemy Air Defenses (SEAD), Electronic Attack, Strike/Persistent Ground Attack and carrier based Persistent Intelligence, Surveillance and Reconnaissance (ISR) missions. The program will demonstrate capabilities that support both Services and enable an operational system development decision in the 2012 timeframe. The 2005 Quadrennial Defense Review (QDR) of the future force requirements for the United States military recommended termination of the J-UCAS CDP. DoD, IAW this recommendation, is terminating the J-UCAS program in FY07. This is a BA 04 program, Advanced Component Development and Prototypes, for development of the common systems and technologies as well as the Boeing and Northrop Grumman demonstrator programs. These funds will also cover the cost of conducting the joint operational assessment, including modeling, simulation, and flight testing. (U) (U) (U) (U) (U) (U) B. Program Change Summary ($ in Millions) FY 2005 FY 2006 Previous President's Budget 272.300 Current PBR/President's Budget 0.000 227.857 Total Adjustments 0.000 -44.443 Congressional Program Reductions -41.150 Congressional Rescissions -3.293 Congressional Increases Reprogrammings SBIR/STTR Transfer Significant Program Changes: As a result of the 2005 QDR, DoD is terminating the J-UCAS program in FY07 and realigning $1,830.5M in outyear funding to PE0604402N. Congressional Program Reductions contains $-1.150M for Defense-wide Change Proposals. R-1 Shopping List - Item No. 58-1 of 58-6 705 UNCLASSIFIED FY 2007 400.100 0.000 Exhibit R-2 (PE 0604400F) UNCLASSIFIED DATE Exhibit R-2a, RDT&E Project Justification February 2006 BUDGET ACTIVITY PE NUMBER AND TITLE PROJECT NUMBER AND TITLE 04 Advanced Component Development and Prototypes (ACD&P) 0604400F Joint Unmanned Combat Air System (J-UCAS) 5058 Unmanned Combat Air Vehicle (UCAV) Cost ($ in Millions) FY 2005 Actual FY 2006 Estimate FY 2007 Estimate FY 2008 Estimate FY 2009 Estimate FY 2010 Estimate FY 2011 Estimate Cost to Complete Total Unmanned Combat Air Vehicle 0.000 227.857 0.000 0.000 0.000 0.000 0.000 Continuing TBD (UCAV) Quantity of RDT&E Articles 0 0 0 0 0 0 0 Note: In FY06, the Joint Unmanned Combat Air Systems (J-UCAS) program was transferred from the Defense Advanced Research Projects Agency (DARPA) to be a joint Air Force/Navy program. The J-UCAS program is being terminated and $1,830.5M in funding is being realigned to PE0604402N in FY07-11. 5058 (U) A. Mission Description and Budget Item Justification The Joint Unmanned Combat Air Systems (J-UCAS) is a joint Air Force/Navy Capabilities Demonstration Program (CDP) to mature technologies to investigate the technical feasibility and operational value of unmanned combat air vehicles to provide the capability for high-threat Suppression of Enemy Air Defenses (SEAD), Electronic Attack, Strike/Persistent Ground Attack and carrier based Persistent Intelligence, Surveillance and Reconnaissance (ISR) missions. The program will demonstrate capabilities that support both Services and enable an operational system development decision in the 2012 timeframe. The 2005 Quadrennial Defense Review (QDR) of the future force requirements for the United States military recommended termination of the J-UCAS CDP. DoD, IAW this recommendation, is terminating the J-UCAS program in FY07. This is a BA 04 program, Advanced Component Development and Prototypes, for development of the common systems and technologies as well as the Boeing and Northrop Grumman demonstrator programs. These funds will also cover the cost of conducting the joint operational assessment, including modeling, simulation, and flight testing. (U) (U) (U) B. Accomplishments/Planned Program ($ in Millions) Continue development of J-UCAS systems, specifically the Boeing and Northrop Grumman demonstrator programs, as well as the common operating system and sensors Total Cost (U) C. Other Program Funding Summary ($ in Millions) FY 2005 FY 2006 Actual Estimate (U) Defense-Wide RDT&E 344.344 0.000 (PE0603400D8Z) (U) Defense-Wide RDT&E 210.944 0.000 (PE0604400D8Z) (U) AF RDT&E (PE0603400F) 0.000 76.691 (U) NAVY RDT&E (PE0604402N) 0.000 0.000 Project 5058 FY 2005 FY 2006 227.857 FY 2007 0.000 0.000 227.857 0.000 FY 2007 Estimate FY 2008 Estimate FY 2009 Estimate FY 2010 Estimate FY 2011 Estimate 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 239.000 0.000 310.000 0.000 369.400 0.000 491.100 0.000 421.000 R-1 Shopping List - Item No. 58-2 of 58-6 706 UNCLASSIFIED Cost to Total Cost Complete Continuing TBD Exhibit R-2a (PE 0604400F) UNCLASSIFIED Exhibit R-2a, RDT&E Project Justification DATE February 2006 BUDGET ACTIVITY PE NUMBER AND TITLE PROJECT NUMBER AND TITLE 04 Advanced Component Development and Prototypes (ACD&P) 0604400F Joint Unmanned Combat Air System (J-UCAS) 5058 Unmanned Combat Air Vehicle (UCAV) (U) D. Acquisition Strategy Not applicable. The J-UCAS program is being terminated in FY07. Project 5058 R-1 Shopping List - Item No. 58-3 of 58-6 707 UNCLASSIFIED Exhibit R-2a (PE 0604400F) UNCLASSIFIED DATE Exhibit R-3, RDT&E Project Cost Analysis February 2006 BUDGET ACTIVITY PE NUMBER AND TITLE PROJECT NUMBER AND TITLE 04 Advanced Component Development and Prototypes (ACD&P) 0604400F Joint Unmanned Combat Air System (J-UCAS) 5058 Unmanned Combat Air Vehicle (UCAV) (U) Cost Categories (Tailor to WBS, or System/Item Requirements) ($ in Millions) (U) Product Development X-45; Common Operating System X-47; Common Operating System Common Operating System Integrator/Broker Common Systems & Technologies Subtotal Product Development Remarks: (U) Support Other Gov't Costs Subtotal Support Remarks: (U) Test & Evaluation Gov't Test Gov't Test Contract Method & Type Performing Activity & Location Section 845, OTA Agreement Section 845, OTA Agreement Section 845, OTA Agreement Boeing Co, St. Louis, MO Multiple Total Prior to FY 2005 Cost FY 2005 Cost FY 2005 Award Date Northrop Grumman, El Segundo, CA Johns Hopkins University Applied Physics Lab, Laurel Md. Various FY 2006 Cost FY 2006 Award Date FY 2007 Cost FY 2007 Award Date Cost to Complete Total Cost Target Value of Contract 98.650 98.650 87.797 87.797 5.310 5.310 0.000 0.000 191.757 0.000 0.000 0.000 191.757 0.000 0.000 0.000 26.720 26.720 0.000 0.000 26.720 26.720 0.000 AFFTC, Edwards AFB Patuxent River, Lakehurst 5.020 5.020 4.360 4.360 Subtotal Test & Evaluation Remarks: (U) Management 0.000 0.000 9.380 0.000 0.000 9.380 0.000 Subtotal Management Remarks: (U) Total Cost 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 227.857 0.000 0.000 227.857 0.000 Project 5058 R-1 Shopping List - Item No. 58-4 of 58-6 708 UNCLASSIFIED Exhibit R-3 (PE 0604400F) UNCLASSIFIED Exhibit R-4, RDT&E Schedule Profile DATE February 2006 BUDGET ACTIVITY PE NUMBER AND TITLE PROJECT NUMBER AND TITLE 04 Advanced Component Development and Prototypes (ACD&P) 0604400F Joint Unmanned Combat Air System (J-UCAS) 5058 Unmanned Combat Air Vehicle (UCAV) Project 5058 R-1 Shopping List - Item No. 58-5 of 58-6 709 UNCLASSIFIED Exhibit R-4 (PE 0604400F) UNCLASSIFIED DATE Exhibit R-4a, RDT&E Schedule Detail February 2006 BUDGET ACTIVITY PE NUMBER AND TITLE PROJECT NUMBER AND TITLE 04 Advanced Component Development and Prototypes (ACD&P) 0604400F Joint Unmanned Combat Air System (J-UCAS) 5058 Unmanned Combat Air Vehicle (UCAV) (U) (U) (U) (U) (U) Schedule Profile X-45A Flight Demonstrations Conclude Common Operating System Build 1 Begin Common Operating System Build 0 Complete X-47B Critical Design Review Complete Project 5058 FY 2005 4Q 4Q FY 2006 FY 2007 1Q 3Q R-1 Shopping List - Item No. 58-6 of 58-6 710 UNCLASSIFIED Exhibit R-4a (PE 0604400F) UNCLASSIFIED TERMINATION OF INVESTMENT-RELATED PROGRAMS FY 2007 President's Budget (Dollars in Millions) PE BPAC APPN 0604400F 645058 3600 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 COST QTY COST QTY COST QTY COST QTY COST QTY COST QTY COST QTY 0.000 0 227.857 0 0.000 0 0.000 0 0.000 0 0.000 0 0.000 0 Effort Title Unmanned Combat Air Vehicle (UCAV) Program Description The Joint Unmanned Combat Air Systems (J-UCAS) is a joint Air Force/Navy Capabilities Demonstration Program (CDP) to mature technologies to investigate the technical feasibility and operational value of unmanned combat air vehicles to provide the capability for high-threat Suppression of Enemy Air Defenses (SEAD), Electronic Attack, Strike/Persistent Ground Attack and carrier based Persistent Intelligence, Surveillance and Reconnaissance (ISR) missions. The program will demonstrate capabilities that support both Services and enable an operational system development decision in the 2012 timeframe. Status to Date First flight of the X-45A took place in May 2002. In March 2004 the X-45A successfully completed an inert GPS-guided bomb demonstration and went on to demonstrate a multi-vehicle flight test in August 2004. In December 2004 the X-45A successfully demonstrated a beyond line-of-sight SATCOM handoff and a multi-vehicle taxi demonstration. The X-45A demonstration program, which included 63 test flights and 63.4 flight hours, was successfully completed in August 2005. The X-45C passed mid-term design review in December 2003, the first X-45C airframe was jig loaded in June 2004 and the Final Design Review was completed in July 2005. The first flight of the X-47A occurred in February 2003. The X-47B preliminary design review was held in March 2005 and technical baseline review occurred in October 2005. Rationale for Termination The 2005 Quadrennial Defense Review (QDR) of the future force requirements for the United States military recommended termination of the Joint Unmanned Combat Air Systems (J-UCAS) Capability Demonstration Program. The Department of Defense is focusing its resources on delivering required capabilities to combatant commanders and the J-UCAS CDP does not directly deliver a combat capability. Accordingly, the Department will focus on specific areas of the overall joint capabilities portfolio to deliver capability to the warfighter. The Department of the Air Force will focus resources on delivering a new long-range strike capability. The Department of the Navy will conduct an aircraft carrier demonstration of a low-observable unmanned combat air system. 710-A UNCLASSIFIED