UNCLASSIFIED PE NUMBER: 0401218F PE TITLE: KC-135s DATE Exhibit R-2, RDT&E Budget Item Justification February 2005 BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0401218F KC-135s Cost ($ in Millions) 4494 Total Program Element (PE) Cost KC-135 Aging Aircraft Program FY 2004 Actual 3.009 3.009 FY 2005 Estimate 1.070 1.070 FY 2006 Estimate 1.498 1.498 FY 2007 Estimate 1.121 1.121 FY 2008 Estimate 1.138 1.138 FY 2009 Estimate 1.159 1.159 FY 2010 Estimate 0.000 0.000 FY 2011 Estimate 0.000 0.000 Cost to Complete Continuing Continuing Total TBD TBD (U) A. Mission Description and Budget Item Justification This program, in part, supports the aging aircraft corrosion and fatigue project CORAL REACH. CORAL REACH studies include the analysis and testing efforts in the area of aging aircraft, to include structural, corrosion, fatigue, and stress corrosion cracking. Additionally, the Functional System Integrity Program (FSIP) proactively examines individual aircraft systems for potential impacts due to aging components. The USAF will utilize these activities to improve KC-135 Programmed Depot Maintenance efficiency and to provide direction for future aging aircraft efforts to maintain the KC-135 as a viable airframe. Boom Operator Weapon System Trainers (BOWST) - These funds will be used to develop and field two high-fidelity devices which simulate the environment in a KC-135 boom pod and allow realistic training of aerial refueling procedures across the spectrum of operational situations. The devices will be placed at the KC-135 Combat Crew Training School, and will replace the current Boom Operator Part Task Trainers. These efforts are low technical risk supporting a fielded weapon system and, therefore, is assigned to Budget Activity 7, Operational Systems Development. (U) B. Program Change Summary ($ in Millions) FY 2004 3.147 3.009 -0.138 (U) (U) (U) (U) Previous President's Budget Current PBR/President's Budget Total Adjustments Congressional Program Reductions Congressional Rescissions Congressional Increases Reprogrammings SBIR/STTR Transfer (U) Significant Program Changes: FY04 funding includes money for BOWST FY 2005 1.079 1.070 -0.009 FY 2006 1.489 1.498 FY 2007 1.102 1.121 -0.009 -0.054 -0.084 R-1 Shopping List - Item No. 217-1 of 217-5 2113 UNCLASSIFIED Exhibit R-2 (PE 0401218F) UNCLASSIFIED DATE Exhibit R-2a, RDT&E Project Justification February 2005 BUDGET ACTIVITY PE NUMBER AND TITLE PROJECT NUMBER AND TITLE 07 Operational System Development 0401218F KC-135s 4494 KC-135 Aging Aircraft Program Cost ($ in Millions) 4494 KC-135 Aging Aircraft Program Quantity of RDT&E Articles FY 2004 Actual 3.009 0 FY 2005 Estimate 1.070 0 FY 2006 Estimate 1.498 0 FY 2007 Estimate 1.121 0 FY 2008 Estimate 1.138 0 FY 2009 Estimate 1.159 0 FY 2010 Estimate 0.000 0 FY 2011 Estimate 0.000 0 Cost to Complete Continuing Total TBD (U) A. Mission Description and Budget Item Justification This program, in part, supports the aging aircraft corrosion and fatigue project CORAL REACH. CORAL REACH studies include the analysis and testing efforts in the area of aging aircraft, to include structural, corrosion, fatigue, and stress corrosion cracking. Additionally, the Functional System Integrity Program (FSIP) proactively examines individual aircraft systems for potential impacts due to aging components. The USAF will utilize these activities to improve KC-135 Programmed Depot Maintenance efficiency and to provide direction for future aging aircraft efforts to maintain the KC-135 as a viable airframe. Boom Operator Weapon System Trainers (BOWST) - These funds will be used to develop and field two high-fidelity devices which simulate the environment in a KC-135 boom pod and allow realistic training of aerial refueling procedures across the spectrum of operational situations. The devices will be placed at the KC-135 Combat Crew Training School, and will replace the current Boom Operator Part Task Trainers. These efforts are low technical risk supporting a fielded weapon system and, therefore, is assigned to Budget Activity 7, Operational Systems Development. (U) (U) (U) (U) (U) (U) (U) B. Accomplishments/Planned Program ($ in Millions) Corrosion/crack growth rate and fatigue determination and testing Basic materials test and predictive technique Functional Systems Integrity Program (FSIP) Mission support/contractor support Boom Operator Weapon System Trainer Total Cost FY 2004 0.907 0.120 0.000 0.356 1.626 3.009 (U) C. Other Program Funding Summary ($ in Millions) FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 Actual Estimate Estimate Estimate Estimate (U) Other APPN 2.500 PE#0401218F/KC-135 Squadrons, Aircraft Procurement, AF, BA-5, KC-135 Mods, BOWST, BP-11 (U) FY 2009 Estimate FY 2010 Estimate FY 2005 0.340 0.000 0.479 0.251 0.000 1.070 FY 2011 Estimate FY 2006 0.425 0.000 0.698 0.375 0.000 1.498 FY 2007 0.125 0.000 0.698 0.298 0.000 1.121 Cost to Total Cost Complete 2.500 D. Acquisition Strategy The acquisition strategy consists primarily of separate task orders (with separate statements of work) ranging from fixed price to cost plus contracts. These task orders address a myriad of aging aircraft activities against existing contract vehicles, such as the SPO-managed KC-135 Fleet Support Contract and Design Engineering Program contracts managed through the Air Logistics Centers. Project 4494 R-1 Shopping List - Item No. 217-2 of 217-5 2114 UNCLASSIFIED Exhibit R-2a (PE 0401218F) UNCLASSIFIED DATE Exhibit R-3, RDT&E Project Cost Analysis February 2005 BUDGET ACTIVITY PE NUMBER AND TITLE PROJECT NUMBER AND TITLE 07 Operational System Development 0401218F KC-135s 4494 KC-135 Aging Aircraft Program (U) Cost Categories (Tailor to WBS, or System/Item Requirements) ($ in Millions) (U) Product Development C/KC-135 Fleet Support Total Prior to FY 2004 Cost FY 2004 Cost 1.252 0.757 1.252 0.757 0.119 0.123 0.119 0.123 1.776 2.046 Subtotal Test & Evaluation Remarks: (U) Management 1.776 2.046 0.000 0.000 Subtotal Management Remarks: (U) Total Cost 0.000 0.083 0.083 0.060 0.060 3.147 3.009 1.070 Subtotal Product Development Remarks: (U) Support Design Engineering Program (DEP) Subtotal Support Remarks: (U) Test & Evaluation Testing Project 4494 Contract Method & Type SS/FFP C/FP Performing Activity & Location Boeing, Wichita, KS ARINC, Oklahoma City, other support ctrs. Project Wright Labs, Order/MIP Dayton, OH, R NASA, VA, etc. FY 2004 Award Date Jan-04 Jan-04 Dec-03 FY 2005 Cost 1.010 FY 2005 Award Date Mar-05 FY 2006 Cost 1.208 FY 2006 Award Date TBD Continuing TBD Continuing TBD Continuing TBD 0.000 Continuing TBD 0.000 0.066 0.066 0.071 0.071 Continuing Continuing TBD TBD 0.000 1.498 1.121 Continuing TBD 0.000 0.000 0.224 0.000 0.224 Jan-06 0.000 0.000 R-1 Shopping List - Item No. 217-3 of 217-5 2115 UNCLASSIFIED Target Value of Contract Continuing 1.050 Dec-06 Cost to Total Cost Complete TBD 1.208 1.050 FY 2007 Award Date Continuing 1.010 Nov-05 FY 2007 Cost 0.000 0.000 Exhibit R-3 (PE 0401218F) UNCLASSIFIED Exhibit R-4, RDT&E Schedule Profile DATE February 2005 BUDGET ACTIVITY PE NUMBER AND TITLE PROJECT NUMBER AND TITLE 07 Operational System Development 0401218F KC-135s 4494 KC-135 Aging Aircraft Program Project 4494 R-1 Shopping List - Item No. 217-4 of 217-5 2116 UNCLASSIFIED Exhibit R-4 (PE 0401218F) UNCLASSIFIED DATE Exhibit R-4a, RDT&E Schedule Detail February 2005 BUDGET ACTIVITY PE NUMBER AND TITLE PROJECT NUMBER AND TITLE 07 Operational System Development 0401218F KC-135s 4494 KC-135 Aging Aircraft Program (U) (U) (U) (U) (U) Schedule Profile Corrosion & Fatigue Testing Materials Test & Predictive Tech FSIP Boom Operator Weapon System Trainer Project 4494 FY 2004 1-4Q 1Q 1-4Q 2Q R-1 Shopping List - Item No. 217-5 of 217-5 2117 UNCLASSIFIED FY 2005 1-4Q FY 2006 1-4Q FY 2007 1-4Q 1-4Q 1Q 1-4Q 1-4Q Exhibit R-4a (PE 0401218F)