The Army Budget • This document will be available on the Assistant Secretary of the Army, Financial Management and Comptroller (ASA (FM&C)) Home Page in February 2005. See address in block below. • Number totals on some charts may not add due to rounding. • Questions concerning the source or interpretation of the information in this booklet may be directed to the Budget Formulation Division, Army Budget Office (SAFM-BUC-F), at Commercial (703) 692-5766 or DSN 222-5766. The FM World Wide Web home page is located at the following address: http://www.asafm.army.mil This Document will be under Army Budget/Budget Materials PAPER COPIES ARE NOT AVAILABLE THROUGH DISTRIBUTION 1 OUR STRATEGIC GOAL The Army’s overarching strategic goal is to remain relevant and ready by providing the Joint Force with essential capabilities to dominate across the full range of military operations. The Army will be: ¾ Relevant to the challenges posted by the global security environment as evidenced by the organization and training of our forces and the design and practices of our institutional support structures. ¾ Ready to provide the Combatant Commanders and the Joint Force with the capabilities, well led, trained and equipped forces, required to achieve operational objectives across the range of military operations. We do this against a future strategic environment that is largely uncertain and will likely remain so. We must be ready to provide relevant capabilities to the Joint Commander in the right mix at the right time. 2 Budget Overview The FY06/07 Budget is another step toward the Future Force while sustaining an Army at war. The FY06/07 Budget Themes are: • Transform and improve Army capabilities • Restructure to a modular design ¾ Rebalance active and reserve ¾ Stabilize units ¾ Improve effectiveness and identify efficiencies • Recruit and retain the all-volunteer force • Generate and sustain a force to prevail in the Global War on Terrorism • Accelerate promising technology to improve force protection and enhance fighting capability • Repair, reset, and recapitalize equipment The FY06/07 Budget provides for: • Active Army End Strength of 482.4K; Army National Guard End Strength of 350K; Army Reserve End Strength of 205K • Across-the-board pay raise of 3.1% for Military • Pay Raise of 2.3% for Civilians • OPTEMPO Ground and Flying Hour Program • 5th SBCT fielding and 6th SBCT equipment • UH-60 Black Hawk recapitalization and upgrade • Spiraling Future Combat Systems Technologies • Training Ammunition 3 The Total Army consists of the following Components: • Active Component Forms the nucleus of the initial forces for combat • Reserve Component Reinforces/augments active forces, individual replacements (Army National Guard and Army Reserve • Civilian Component Provides critical support and sustainment Personnel End Strength FY97- FY07 (K) 600K 482.4 491 484 482.4 479 480 480 480 480 480 482.4 450K 370 300K 243 357 350 350 350 350 350 350 350 350 223 225 223 223 223 223 227 232 233 233 4 FY07 FY06 FY05 FY04 FY03 FY02 FY01 FY00 FY99 FY98 241 208 207 205 207 205 205 205 205 205 205 FY07 150K 362 AC ARNG USAR CIV Civilian Component End Strength (K) Appropriation FY04 FY05 FY06 FY07 O&M, Army O&M, Army Reserve O&M, Army National Guard Research, Development, Test & Evaluation Military Construction, Army Army Family Housing Defense Working Capital Fund, Army 128 10 23 19 5 1 23 126 11 27 18 5 1 26 127 12 28 18 5 1 25 128 12 28 18 5 1 24 Total Direct Hire 209 214 216 216 17 1 18 17 1 18 16 1 17 16 1 17 227 232 233 233 O&M, Army Other Total Indirect Hire Total Civilians 5 Army Total Obligation Authority (TOA) ($M) Appropriation Military Personnel Medicare-Ret Contribution Army Operation and Maintenance, Army Procurement Aircraft Missiles WTCV Ammunition Other Procurement Research, Dev, Test & Evaluation Military Construction, Army Environmental Restoration, Army Army Family Housing Operations Construction Reserve Components National Guard Personnel Operations Construction Medicare-Ret Contribution, NG Army Army Reserve Personnel Operations Construction Medicare-Ret Contribution, AR Army BRAC 4 BRAC 5 Chemical Demilitarization Defense Working Capital Fund, A Other Total * FY04 Actuals FY05 Apprp'd FY05 w/ Title IX FY06 PB Request FY07 PB Request 40,364 0 55,871 14,694 29,381 0 25,435 13,085 30,325 0 38,979 13,057 28,400 2,705 25,316 11,755 29,291 2,871 26,058 13,522 (2,172) (1,517) (1,998) (1,482) (7,525) 10,202 1,646 0 1,480 (1,081) (399) 10,020 (2,843) (1,302) (2,458) (1,585) (4,897) 10,541 1,771 400 1,565 (929) (636) 10,605 (2,815) (1,302) (2,458) (1,585) (4,897) 10,558 1,981 400 1,396 (928) (468) 10,863 (2,801) (1,271) (1,660) (1,721) 4,303 9,734 1,480 408 1,363 (813) (550) 9,960 (3,553) (1,386) (1,488) (1,949) (5,146) 10,333 1,700 427 1,117 (639) (478) 10,899 (5,249) (4,459) (312) 0 (5,902) (4,437) (266) 0 (5,967) (4,449) (446) 0 (5,123) (4,510) (327) 1,219 (5,626) (4,807) (466) 1,298 5,481 5,737 5,795 5,342 5,851 (3,358) (2,035) (88) 0 (3,664) (1,986) (87) 0 (3,706) (1,988) (101) 0 (3,249) (1,987) (106) 717 (3,470) (2,217) (164) 763 73 0 1,500 219 0 100 0 1,373 0 0 100 0 1,373 184 0 94 0 0 107 0 50 883 0 16 5,000 99,994 115,011 98,600 110,081 141,550 *Totals may not add due to rounding 6 Military Personnel (MILPERS) z Funding mans the force with end strengths of 482,400 Active Component, 350,000 Army National Guard, and 205,000 Army Reserve soldiers – and provides them with better pay and incentives. z Budgeted a basic across-the-board 3.1% pay raise in FY06 and 3.4% in FY07. z Housing allowance funding maintains zero out of pocket expenses in FY06 for those soldiers and families living on the economy. z Continues Residential Communities Initiative. 7 People – Our Most Valuable Resource AC Subsistence AC PCS 5% 4% AC Pay, Cad 0% AC Other MILPERS 0% AC Pay, Off 27% AC Pay, Enl 62% Military Personnel, Army (MPA) MPA TOA ($M) BA1 AC Pay, Officer BA2 AC Pay, Enlisted BA3 AC Pay, Cadet BA4 AC Subsistence BA5 AC PCS-Travel BA6 AC Other MILPERS Costs Total Medicare-Ret Contribution, Army* *Separate Appropriation (Not included in chart above) Note: FY04 includes Supplemental Funding. 8 FY04 FY05 FY06 FY07 9,728 8,205 7,987 8,172 25,474 19,587 17,611 18,269 50 51 54 56 3,666 1,396 1,357 1,431 1,138 947 1,109 1,072 308 139 282 291 40,364 30,325 28,400 29,291 0 0 2,705 2871 National Guard Personnel, Army (NGPA) Special Tng 4% GI Bill 5% Bonuses 3% Annual Training (AT) 11% Other <1% Schools 6% Inactive Duty Trng (IDT 20% IDT Awaiting Trng <1% Active Guard Reserves (AGR) 44% Initial Entry Trng (IET) 6% The National Guard Personnel, Army (NGPA) Appropriation’s budget activities (BA1 and BA2) were consolidated in FY06. The use of a single budget activity provides greater flexibility to execute missions. The budget supports Annual Training (AT), Inactive Duty Training (IDT), Pay Group P (soldiers awaiting training), Pay Group F (Initial Entry Training), Full Time Support, and Schools Training (e.g. professional development, duty military occupational skill qualification (DMOSQ), refresher and proficiency training). The budget also funds retired pay accrual and supports bonus and incentives to recruit and retain qualified soldiers such as the Montgomery GI Bill program as well as the selective incentive bonus programs. Active Guard/Reserve (AGR) Annual Training (AT) Inactive Duty Training (IDT) Initial Entry Training (IET) IDT - Awaiting Training Bonuses GI Bill Schools Special Training Other Defense Health Program Accrual NGPA TOA ($M) FY05 FY04 1,770 2,056 555 560 922 1,063 256 292 22 37 119 157 106 162 291 219 485 255 18 20 705 1,146 Total Medicare-Ret Contrib, NG Army* 5,249 0 *Separate Appropriation (not included in chart above). 9 5,967 0 FY06 2,248 574 1,029 315 31 166 226 300 211 23 - FY07 2,405 667 1,202 327 28 176 227 340 231 23 - 5,123 1,219 5,626 1,298 Reserve Personnel, Army (RPA) Other Training 2% School Training 6% Education Benefits 3% Paid Drill Strength 39% Active Guard/Reserves 41% Special Training 5% Admin & Support 4% The Reserve Personnel, Army Appropriation provides pay, benefits and allowances for soldiers of the Army Reserve while on annual training (AT), inactive duty for training, initial active duty for training, school training, special training and special work. It also provides funding for Army Reserve soldiers in the Active Guard and Reserve (AGR) Program (similar to MPA, e.g., pay benefits, PCS, etc.) to enhance readiness of army reserve units. The FY06 RPA funding levels focus on the army reserve’s preparedness to meet wartime combatant commanders’ support and contingency missions. RPA TOA ($M) Paid Drill Strength School Training Special Training Active Guard/Reserve (AGR) Other Training Admin & Support Education Benefits ROTC Defense Health Program Accrual FY04 1,178 113 175 1,178 65 81 36 103 430 FY05 1,089 133 167 1,257 74 109 81 123 673 FY06 1,252 179 160 1,360 71 119 108 0 0 FY07 1,362 196 180 1,431 83 118 100 0 0 Total 3,358 3,706 3,249 3,470 0 0 717 763 Medicare-Ret Contrib, AR Army* *Separate Appropriation (Not included in chart above) 10 Operation & Maintenance, Army (OMA) Log Opns 7% Spares 12% Spt of Other Nations 1% Land Forces 15% LF-Readiness 15% Security 4% Recruiting 5% Basic Skill Trng 8% Accessions Trng 2% Mobilization 1% LF-Readiness Spt 30% The Operation and Maintenance, Army budget supports readiness objectives by funding ground and air operating tempo (OPTEMPO), institutional training, mobilization operations, installation management, training, and recruiting missions. The FY06/07 budget supports ground OPTEMPO at an overall rate of 850 training miles and a flying hour program funded at 13.1 flying hours per crew per month. Base Operation Support is funded at 71.6% of requirements, while Sustainment, Restoration & Modernization (SRM) is funded at 91% of requirements. Facilities sustainment, a subsection of SRM, is funded at 91.3%. OMA TOA ($M) BA 1: Operating Forces Land Forces Land Forces Readiness Land Forces Readiness Support Subtotal BA 2: Mobilization Mobility Operations Subtotal BA 3: Training & Recruiting Accession Tng Basic Skill & Advanced Tng Recruiting & Other Tng & Ed Subtotal BA 4: Adm in & Svc-Wide Activities Security Programs Log Operations Svc-Wide Support (spares) Spt of Other Nations Subtotal Total Note: FY04 includes Supplemental Funding 11 FY04 FY05 FY06 FY07 3,945 4,307 35,777 44,029 4,564 3,519 21,236 29,319 3,861 3,715 7,726 15,302 4,086 3,756 7,792 15,634 536 536 412 412 357 357 452 452 422 1,663 1,067 3,152 393 1,746 1,123 3,262 443 1,930 1,161 3,534 434 1,918 1,154 3,506 915 4,002 2,895 342 8,154 55,871 957 1,851 2,868 310 5,986 38,979 920 1,895 2,978 330 6,123 25,316 881 2,105 3,146 334 6,466 26,058 Operation & Maintenance, Army National Guard (OMNG) Flying Hour Recruiting Program 5% 2% BOS 13% Depot Maintenance 6% SRM 9% Civilian Pay and Benefits 35% Ground OPTEMPO 16% Mission Support 14% The Operation and Maintenance, Army National Guard (OMNG) budget supports readiness objectives by funding air and ground operating tempo (OPTEMPO), institutional training, base operations support, sustainment of equipment and facilities, full time support, as well as recruiting and retention missions. The FY06/07 budget supports Ground OPTEMPO at an overall rate of 241 training miles and a flying hour program funded at 7.6 flying hours per crew per month. Recruiting is funded at 97% of requirements; Base Operation Support is funded at 73%; Depot Maintenance is funded at 79%, and Facilities Sustainment is funded at 94%. OMNG TOA ($M) Civilian Pay & Benefits Ground OPTEMPO Flying Hour Program Depot Maintenance Base Operations Support (BOS) Sustainment, Restoration & Modernization (SRM) Recruiting Mission Support Business Reengineering Initiatives Total 12 FY04 1,501 728 294 191 721 319 160 545 - FY05 1,711 783 224 231 586 397 101 416 - FY06 1,783 768 265 255 610 392 125 637 (325) FY07 1,856 807 230 339 634 418 133 718 (328) 4,459 4,449 4,510 4,807 Operation & Maintenance, Army Reserve (OMAR) Land Forces Readiness Support 30% Service Wide Activities 8% Land Forces 47% Land Forces Readiness 15% The Operation and Maintenance, Army Reserve budget supports readiness objectives by funding air and ground operating tempo (OPTEMPO), institutional training, mobilization operations, sustainment of equipment and facilities, as well as recruiting and advertising missions. OMAR TOA ($M) FY04 FY05 FY06 FY07 Land Forces 945 951 795 892 Land Forces Readiness 300 289 356 422 Land Forces Readiness Support 551 588 673 732 1,796 1,828 1,824 2,047 239 160 163 170 239 160 163 171 2,035 1,988 1,987 2,217 BA 1: Operating Forces Subtotal BA 4: Admin & Service-Wide Activities Admin & Service-Wide Activities Subtotal Total 13 Research, Development and Acquisition As the Army continues its Transformation, funding an affordable, fully integrated modernization and recapitalization program is essential to ensure decisive and comprehensive full-spectrum ground combat capabilities supporting the National Military Strategy. To accomplish this goal, the Army has: Continued research and development of the Future Combat Systems (FCS), a strategically responsive, networked system-of-systems that will ensure “position advantage” over the enemy. Mature FCS capabilities will be spiraled in two-year increments to the current force. z Ensured the funding to purchase Stryker vehicles for a 6th Stryker Brigade Combat Team. z Accelerated acquisition and fielding of soldier items to provide deployed troops the latest available equipment, enhancing their combat capability. z 14 Procurement Summary The FY06/07 budget maintains the momentum of Army Transformation by funding Stryker. The Army continues to fund upgrades for the Abrams Tank directly supporting battlefield digitization; continues procurement of PAC-3, Javelin, HIMARS Launchers, ATACMS Block I Quick Reaction Unitary Missile, GMLRS Rocket, Hellfire, and SLAMRAAM. The budget funds procurement of 41 Black Hawk helicopters in FY06. Satellite communication systems, including the Defense Satellite Communication System (DSCS), Secure Mobile Anti-Jam Reliable Tactical Terminal (SMART-T), Artillery Accuracy Equipment, Tactical Unmanned Aerial Vehicle, Distributed Common Ground System (DCGS-A), and NAVSTAR Global Positioning System (GPS) were funded along with other command, control, and communication programs such as Force XXI, Battle Command Brigade and Below (FBCB2), All-Source Analysis System (ASAS), Maneuver Control System (MCS), and the Army Global Command and Control System (GCCS-A). The FY06/07 budget is increasing force protection systems and modifications to better protect soldiers from the emerging threats, including up-armored HMMWVs and physical security equipment. Budget Request ($B) 13.5 12.2 11.2 11.8 10.8 10.4 9.4 8.1 8.6 6.3 6.6 FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 Procurement TOA ($M) Appropriations Aircraft Missiles Weapons & Tracked Combat Vehicles Ammunition Other Procurement Total FY04 2,172 1,517 1,998 1,482 7,525 14,694 FY05 2,815 1,302 2,458 1,585 4,897 13,057 Note: FY04 and FY05 include Congressional Adds and Supplemental Funding. 15 FY06 2,801 1,271 1,660 1,721 4,303 11,756 FY07 3,553 1,386 1,488 1,949 5,146 13,522 Aircraft Budget Request ($B) Aircraft ($B) 3.6 2.8 1.9 2.0 1.3 1.0 1.0 1.2 2.1 1.8 1.3 FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 Aircraft TOA ($M) FY04 Aircraft Utility F/W (MR) Aircraft UH-60 Black Hawk (MYP) TH-67 Training Helicopter Helicopter, Observation Helicopter, Light Utility FY05 FY06 FY07 QTY $M QTY $M QTY $M QTY $M 2 17 52 254 1 38 12 454 13 41 5 585 45 108 846 23 70 108 Modifications Guardrail/ARL 20 AH-64 MODS 70 CH-47 Cargo Helicopter Mods (MYP 510 Longbow 755 UH-60 Mods 32 Kiowa Warrior 51 Airborne Avionics 73 Airborne Digitization 2 Other Mods 29 2 40 857 647 77 39 49 0 73 0 599 676 85 33 24 106 0 47 Spares Spare Parts (AIR) 11 11 4 4 127 26 60 16 22 62 2,172 283 27 55 56 13 84 2,815 222 28 62 70 0 77 2,801 295 30 78 84 Support Equipment & Facilities Aircraft Survivability Equip Airborne Cmd & Control Air Traffic Control Common Ground Equipment Airborne Communications Other Support Equipment Total Note: FY05 includes Supplemental Funding. 16 199 191 820 622 30 43 120 41 42 3,553 Missiles Budget Request ($B) 1.9 1.6 1.4 1.2 1.2 1.3 1.4 1.3 1.3 1.4 0.8 FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 Missiles TOA ($M) FY05 QTY $M 108 487 FY04 Missiles QTY $M Patriot PAC-3 135 617 Stinger 3 Surface-Launched AMRAAM System 7 Hellfire 25 Advanced Precision Kill Weapon Sys (APKWS) Javelin 991 141 LOSAT 34 34 TOW 2 System 200 26 Guided MLRS Rockets 786 107 8 MLRS Reduced Range Practice Rock 1,176 MLRS Launchers 38 HIMARS 24 122 ATACMS 60 58 Modifications of Missiles Patriot Javelin Stinger ITAS/TOW MLRS Hellfire HIMARS Spares & Repair Parts Support Equipment & Facilities Air Defense Targets Production Base Support Other Total 1,038 12 500 954 822 37 50 225 1 27 20 2 49 2 108 7 117 15 26 112 7 21 169 61 Note:FY05 includes Supplemental Funding. 17 600 300 800 1,026 900 35 45 19 80 28 58 46 125 8 21 175 58 88 77 14 10 19 10 10 15 34 3 3 1 1,517 FY06 QTY $M 108 490 6 3 0 1,302 8 30 6 3 0 1,271 FY07 QTY 108 $M 495 22 3,000 300 88 66 1,698 1,908 3,336 64 210 21 47 43 227 60 69 12 7 0 9 25 7 4 0 1,386 Weapons & Tracked Combat Vehicles (WTCV) Budget Request ($B) 2.5 2.2 2.2 1.9 1.6 1.4 FY99 FY00 FY01 FY02 FY03 1.6 1.7 1.5 FY04 FY05 FY06 FY07 WTCV TOA ($M) FY04 QTY Tracked Combat Vehicles Abrams Bradley STRYKER 371 Mods of Tracked Combat Veh Carrier Mods 113 FIST Vehicle Mod BFVS Mod Howitzer M109A6 Paladin Mod of In-Service Equipment, FIST Veh FAASV PIP to Fleet M1 Abrams Mod & Retrofit SEP M1A2 37 Other Weapons & Other Combat Vehicles Integrated Air Burst Weapon Sys Armored Machine Gun 7.62 M240 1,442 Machine Gun, 5.56mm (SAW) 1,982 M16 Rifle Grenade Launcher, MK-19-3 Mortar Systems 577 Sniper Rifle XM107, Cal .50 600 Carbine M4, 5.56mm 8,158 Common Remotely Optd Wpns Sta (CROWS) Howitzer, 155mm, Lt Wt Modifications of Weapons and Other Combat Vehicles Spares and Repair Parts Support Equipment & Facilities Total $M 6 348 963 41 37 42 34 3 11 111 180 11 17 8 8 9 9 8 FY05 QTY $M 576 64 2,025 577 600 8,849 28 18 11 226 1,524 FY06 QTY $M FY07 QTY $M 7 44 878 2 5 719 240 10 1 73 18 1 7 116 291 11 25 5 9 9 9 37 45 15 369 41 12 11 1,197 33 14 694 33 12 14,500 352 8 9 2,950 2 600 2,106 10 3 545 8 23 47 67 131 31 20 24 69 1,998 2,458 18 77 29 6 443 103 18 31 Note: FY04 and FY05 include Congressional Adds and Supplemental Funding. 130 35 3 0 15 13 1,660 1,488 Ammunition Budget Request ($B) 1.9 1.7 1.3 1.0 FY99 1.1 1.1 1.1 1.2 FY00 FY01 FY02 FY03 FY04 1.4 FY05 FY06 FY07 Ammunition TOA ($M) FY05 FY04 Small and Medium Cal. Mortars Tank Artillery Artillery Fuzes Mines/Countermine Rockets Other Miscellaneous Production Base Support Total 562 135 190 168 46 22 55 87 41 176 1,482 433 97 216 233 41 21 144 132 52 216 1,585 FY06 FY07 523 162 227 262 23 37 165 119 58 145 1,721 654 134 212 270 4 154 166 125 67 163 1,949 Training/War Reserve Breakout ($M) Training War Reserve Other Production Base Support Total 992 286 28 176 1,482 1134 200 35 216 1,585 1317 227 32 145 1,721 Note: FY04 and FY05 include Congressional Adds and Supplemental Funding. 19 1423 334 29 163 1,949 Other Procurement, Army (OPA) Budget Request ($B) 5.2 3.2 2.6 3.4 3.8 5.1 4.2 4.2 4.3 4 2.5 FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 OPA TOA ($M) FY04 FY05 Tactical & Support Vehicles Wheeled Vehicles (HMMWV) Family of Med Tactical Veh Family of Hvy Tactical Veh All Other Vehicles & Trailers Subtotal Communication & Electronic Equip Joint Communications Satellite Communications C3 System Combat Communications Intel Communications Information Security Long Haul Communications Base Communications Elect Equip--TIARA Elect Equip--Electronic Warfare (EW) Elect Equip--TAC SURV Elect Equip--Tactical C-2 Elect Equip--Automation Elect Equip--Audio Visual Sys (A/V) Elect Equip--Mods Tact Sys/Eq Subtotal QTY 7,800 2,305 2,350 2,448 $M 1,338 325 219 1,021 2,903 QTY 3,254 3,776 2,689 1,372 FY06 $M 433 594 208 118 1,353 QTY 2,065 3,529 2,002 1,809 FY07 $M 224 450 207 144 1,025 12 263 16 436 1 115 224 451 292 99 752 335 229 9 4 282 19 398 1 116 108 376 236 126 168 17 211 1 73 62 342 174 396 278 212 6 514 402 207 12 3,234 2,432 2,309 20 QTY 3,242 4,737 4,124 1,338 $M 331 634 292 240 1,497 113 237 17 78 1 69 70 377 278 20 488 439 274 9 15 2,485 Other Procurement, Army (Cont’d) Other Support Equipment Smoke Generators Bridging Equipment Engineer Equip (Non-Construct) Combat Service Spt Equipment Petroleum Equipment Water Equipment Medical Equipment Maintenance Equipment Construction Equipment Rail Float Containerization Equip Generators Materiel Handling Equipment Training Equipment Test Meas & Diag Equipment Other Support Equipment Subtotal Initial Spares Communications and Electronics Other Support Subtotal Total FY04 FY05 FY06 FY07 31 99 54 74 39 33 22 36 22 72 29 425 60 347 1,343 4 61 31 91 38 13 24 15 69 6 57 6 514 16 121 1,066 3 33 42 117 67 9 11 10 27 23 43 380 22 147 934 13 40 53 126 66 8 13 3 71 45 34 16 386 63 191 1,128 43 2 45 7,525 44 2 46 4,897 33 2 35 4,303 33 2 35 5,146 Note: FY04 and FY05 include Congressional Adds and Supplemental Funding. 21 Research, Development, Test & Evaluation (RDTE) Summary Budget Request ($B) 10.4 9.1 9.7 10.3 6.7 6.8 4.3 4.5 4.8 4.4 5.2 FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 The FY06 RDTE Program funds the Science and Technology Program consistent with the Army Vision and ensures timely development and transition of mature technologies into current weapon systems via system upgrades. It funds system development and demonstration for Future Combat Systems to enable an Initial Operational Capability of an FCS-equipped Unit of Action in 2014 and a Full Operational Capability of the first FCS-equipped Unit of Action in 2016. The FY06/07 budget also reflects the combining of the Patriot and MEADS programs into a single program funding line to continue System Development and Demonstration activities. The continued development of the Aerial Common Sensor (ACS) and Stryker; the recapitalization and upgrade of the UH-60 Black Hawk helicopter; and continued development of the Joint Tactical Radio System development are also funded. RDTE TOA ($M) Basic Research Applied Research Advanced Technology Dev Adv Component Dev & Prototypes System Dev & Demonstration Management Support Operational Systems Dev Total FY04 369 1,046 1,187 874 4,500 1,140 1,086 10,202 FY05 393 1,118 1,385 874 4,580 1,174 1,034 10,558 FY06 308 671 756 365 5,226 1,093 1,315 9,734 Note: FY04 and FY05 include Congressional Adds and Supplemental Funding. 22 FY07 318 700 743 425 5,592 1,171 1,384 10,333 Research, Development, Test & Evaluation (Cont’d) RDTE TOA ($M) Technology Base BA 1 Basic Research BA 2 Applied Research Subtotal BA 3 Advanced Tech Development Warfighter Advanced Technology Medical Aviation Weapons & Munitions Cbt Veh & Auto Command, Control & Communication Missile & Rocket Adv Technology Landmine Warfare & Barrier Night Vision Electronic Warfare Advanced Technology Adv Tac Computer Sci & Sensor Tech Other Subtotal BA 4 Adv Component Dev & Prototypes Landmine Warfare & Barrier Army Missile Defense Sys Integration Air & Missile Defense Systems Eng Advanced Tank Armament Sys (ATAS) Soldier Support & Survivability Warfighter Info Network - Tact (Dem/Val) Aviation - Adv Dev CSSCS Eval and Analysis Medical Systems-Adv Dev Meads Concepts - Dem/Val Logistics & Eng Equipment - Adv Dev Other Subtotal BA 5 System Dev & Demonstration Electronic Warfare Development Joint Tactical Radio System Armored Sys Mod (ASM)-Eng Dev Non Line of Sight Launch System Non Line of Sight Cannon Non-System Tng Devices-Eng Dev Weapons & Munitions Eng Dev Command, Control & Communication Landmine Warfare/Barrier - Eng Dev Artillery Muntions EMD Patriot/MEADS Combined Aggregat Pgm Other Subtotal 23 FY04 369 1,046 1,415 FY05 393 1,118 1,511 FY06 308 671 979 FY07 318 700 1,018 66 214 84 53 267 11 119 29 83 58 24 178 1,186 77 300 96 83 279 10 115 34 102 58 46 185 1,385 64 45 48 75 143 12 70 25 52 45 42 135 756 48 50 67 81 123 11 43 30 49 48 49 144 743 35 135 115 58 13 77 14 8 13 237 12 158 875 16 144 109 50 13 95 16 6 20 251 16 138 874 0 24 83 27 3 131 6 11 10 0 13 57 365 8 30 129 13 3 152 7 8 12 0 13 50 425 32 129 1,373 0 251 68 152 209 93 118 0 2,075 4,500 17 117 2,268 56 477 50 154 218 57 133 0 1,033 4,580 32 157 3,066 232 108 61 87 393 81 113 289 607 5,226 36 111 3,150 329 262 124 100 321 81 99 326 653 5,592 Research, Development, Test & Evaluation (Cont’d) RDTE TOA ($M) BA 6 Management Support Major Test & Evaluation Army Kwajalein Atoll Concept Experimentation Army Test Ranges/Facilities Army Tech Test Instrumentation & Targets Survivability/Lethality Analysis Dod High Energy Laser Test Facility Support of Operation Testing Army Evaluation Center Program-wide Activities Other Subtotal BA 7 Operational Systems Development MLRS PIP JLENS AFATDS Cbt Vehicles Improvement Prgm Maneuver Control Aircraft Mods/PIPs Horizontal Battlefield Digitization/FBCB2 Missile/Air Defense PIP Other Missile PIP Global Combat Support System SATCOM Ground Environment Tactical Unmanned Aerial Vehicles Distributed Common Ground Sys (JMIP) Other Subtotal Total FY04 FY05 FY06 FY07 77 177 39 233 73 53 23 85 59 80 241 1,140 59 140 24 192 60 48 15 72 61 58 445 1,174 64 155 32 370 63 38 18 76 57 54 166 1,093 64 140 32 390 82 40 18 79 65 79 182 1,171 83 58 28 31 39 273 65 46 1 55 86 68 37 216 1,086 10,202 105 79 17 17 23 243 52 32 5 90 52 54 54 211 1,034 10,557 114 106 16 12 45 409 33 16 24 80 59 140 92 169 1,315 9,734 80 257 17 13 15 421 23 11 25 54 56 113 119 180 1,384 10,333 Note: FY04 and FY05 include Congressional Adds and Supplemental Funding. 24 Military Construction (MILCON) Budget Request ($B) 2.1 2.3 2.1 1.8 1.9 1.6 0.5 0.7 1.0 0.9 0.7 FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 The Military Construction budget continues to improve facilities across the Army by making whole barracks renewal its top priority. It also supports transformation and readiness by recapitalizing military facilities and provides facilities for training, deployment, revitalizes infrastructure and provides Reserve component readiness facilities. MILCON TOA ($M) Appropriations Military Construction, Army Military Construction, Army Nat'l Guard Military Construction, Army Reserve Total FY04 FY05 FY06 FY07 1,646 1,981 1,480 1,700 312 447 327 466 88 101 106 164 2,046 2,529 1,913 2,330 Note: FY04 and FY05 include Congressional Adds and Supplemental Funding. 25 Military Construction, Army (MCA) The Active Component Military Construction budget focuses on providing facilities that upgrade the quality of life of Soldiers and families, improves readiness, and supports Transformation. New facilities include modern barracks, training ranges, deployment facilities, and physical fitness training centers. MCA TOA (M) By Facility Categories ($M) Operation & Training Maintenance & Production Research & Development Supply & Administration Medical Center/Hospitals Troop Housing/Community Support Utilities/Real Estate Minor Construction Planning & Design Total By Region/Program ($M) United States Pacific Europe Iraq Minor Construction Planning & Design Worldwide Various Total FY04 FY05 FY06 FY07 348 129 19 27 0 803 154 33 133 1,646 505 166 56 143 0 834 99 21 157 1,981 322 113 0 40 0 764 60 20 161 1,480 330 81 0 3 25 967 42 23 229 1,700 1,123 86 153 118 33 133 0 1,646 1,688 12 103 0 21 157 0 1,981 1,080 116 103 0 20 161 0 1,480 857 92 461 0 23 228 39 1,700 Note: FY04 includes Supplemental Funding. 26 Military Construction, Army National Guard (MCNG) The Army National Guard military construction budget continues the goal of providing stateof-the art, community-based installations and training sites that facilitate communications, operations, training, and equipment sustainment from which to station, sustain and deploy the force. The program focuses on six investment areas: ranges, training facilities, maintenance support shops, readiness centers, minor construction, and planning and design. These projects are mission-focused and are centered on the quality of life of our soldiers. The Army National Guard’s FY06/07 Military Construction request is focused on Current Readiness and transformation to the Future Force. Current Readiness. In FY06, these funds will provide facilities our Soldiers need as they train, mobilize, and deploy. They include Readiness Centers, maintenance facilities, training projects, and a wetlands crossing. These funds will also provide projects needed to transform from Current to Future Force. These include projects for the Army Division Redesign Study, Aviation Transformation, the Range Modernization Program, and the Stryker Brigade Combat Team initiative. MCNG TOA ($M) FY04 FY05 FY06 FY07 Operation and Training 132 188 163 152 Maintenance & Production 110 195 102 240 Facility Categories Adm inis trative Infras tructure Minor Cons truction Planning & Des ign Total 0 0 3 0 24 8 16 9 5 8 5 9 38 39 46 60 312 447 327 466 FY04 and FY05 include Congressional Adds and Suppl Funding. 27 Military Construction, Army Reserve (MCAR) The Army Reserve Military Construction budget provides essential military construction resources for the critical needs of RC Force Support package units; facility deterioration; modernization of the total facilities inventory; and careful management of Army Reserve-operated installations. Our goal is to provide essential facilities that improve readiness, ensure quality of life, preserve and enhance the Army’s image across America, and conserve and protect the facilities resources for which the Army Reserve is responsible. MCAR TOA ($M) Facility Categories Army Facility Strategy Revitalization Training Ranges Minor Construction Planning & Design Total FY04 FY05 FY06 FY07 37 55 44 112 40 26 32 24 0 4 13 5 3 3 3 3 8 88 13 101 14 106 20 164 Note: FY04 and FY05 include Congressional Adds and Suppl Funding. 28 Army Family Housing (AFH) The FY06/07 Army Family Housing budget supports soldier quality of life with funding for over 120,000 military family housing units worldwide. Budget Request ($B) 1.3 1.3 1.4 1.4 1.4 1.6 1.4 1.2 1.1 1.1 1.1 New/Replace Construction Improvement Planning & Design Privatization Investment** Subtotal AFH Construction FY04 221 146 32 [ 119] 399 FY05 395 212 29 -168 468 FY06 232 300 18 [138] 550 FY07 243 221 14 [22] 478 Operation & Utilities Maintenance Leasing Privatization Subtotal AFH Operations Total AFH 365 481 206 29 1,081 1,480 282 402 218 26 928 1,396 270 309 214 20 813 1,363 207 192 215 25 639 1,117 FY04 includes Congressional Adds. **FY04 and FY 05 RCI equity transferred to DoD FH Investment Fund FY97 FY98 FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 Army Family Housing New Construction FY04 Fort Wainwright, AK Fort Huachuca, AZ Fort Riley, KS Fort Knox, KY White Sand M. Range, NM Fort Sill, OK Fort Lee, VA Total FY05 Fort Richardson, AK Fort Wainwright, AK Fort Wainwright, AK Fort Wainwright, AK Fort Huachuca, AZ Yuma, AZ Fort Riley, KS White Sands M. Range, NM Fort Sill, OK Fort Lee, VA Fort Monroe, VA Total 29 Units ($M) 140 220 62 178 58 120 90 868 64.0 41.0 16.7 41.0 14.6 25.4 18.0 220.7 92 100 60 86 205 55 126 156 247 218 68 1,413 42.0 41.0 37.0 46.0 41.0 14.9 33.0 31.0 47.0 46.0 16.0 394.9 Army Family New Construction (Cont’d) Army Family Housing New Construction Units ($M) FY06 Fort Richardson, AK Fort Wainwright, AK Fort Wainwright, AK Fort Huachula, AZ Yuma, AZ Fort Sill, OK Fort Lee, VA Fort Monroe, VA TOTAL 107 96 84 131 35 129 96 21 709 49.0 49.0 42.0 31.0 11.2 24.0 19.5 6.0 231.7 FY07 Fort Richardson, AK Fort Richardson, AK Fort Wainwright, AK Fort Wainwright, AK Fort Huachuca, AZ Fort Lee, VA Fort Wainwright, AK Pine Bluff, AR Fort McCoy TOTAL 105 57 90 90 119 58 54 10 13 596 45.0 24.0 49.0 48.0 30.0 13.4 27.0 2.6 4.3 243.3 30 Army Family Housing Privatization (Residential Communities Initiative) FY04 Fort Sam Houston, TX Fort Bliss, TX Fort Drum, NY Carlisle Barracks, PA Total 925 2,752 2,809 747 7,233 FY05 Ft Benning, GA Fort Rucker, AL Fort Gordon, GA Fort Knox, KY Fort Leavenworth, KS Redstone Arsenal, AL Total 3,959 1,516 876 3,099 1,586 459 11,495 FY06 Fort McPherson, GA Fort Riley, KS White Sands Missile Range, NM Fort Campbell, KY (Increment) Fort Irwin/Moffett Federal Airfield/ Parks Res Forces Tng Area, CA (Increment) Total FY07 U.S. Military Academy, NY Total 31 112 3,042 452 200 120 3,926 1,001 1,001 FY06 Summary America is a Nation at war. Our Nation, the Joint Force, and our Army are engaged in one of the most challenging periods in our history. Identifying and mitigating the risks associated with our mission of fulfilling current and future strategic commitments will ensure we remain relevant and ready – allowing us to sustain our aggressive support of the Global War on Terror while Transforming. We are creating a Joint and Expeditionary Army. The FY06/07 Budget is another step toward the Future Force, while sustaining an Army at War. 32