DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2002 AMENDED BUDGET SUBMISSION JUSTIFICATION OF ESTIMATES JUNE 2001 OTHER PROCUREMENT, NAVY BUDGET ACTIVITY 3 UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM SUMMARY ($ IN MILLIONS) APPROPRIATION: OTHER PROCUREMENT, NAVY ------------------------------------ACTIVITY -------- JUNE 2001 FY 2000 ------- FY 2001 ------- FY 2002 ------- 899.4 619.7 742.0 1,932.7 1,556.7 1,411.9 03. AVIATION SUPPORT EQUIPMENT 246.5 257.7 228.4 04. ORDNANCE SUPPORT EQUIPMENT 629.1 470.4 663.2 63.9 108.4 84.3 06. SUPPLY SUPPORT EQUIPMENT 147.6 150.1 512.0 07. PERSONNEL AND COMMAND SUPPORT EQUIPMENT 104.3 109.9 221.6 08. SPARES AND REPAIR PARTS 260.6 206.4 234.1 4,284.1 3,479.3 4,097.6 01. SHIPS SUPPORT EQUIPMENT 02. COMMUNICATIONS AND ELECTRONICS EQUIPMENT 05. CIVIL ENGINEERING SUPPORT EQUIPMENT TOTAL OTHER PROCUREMENT, NAVY PAGE N-20 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- BUDGET ACTIVITY 01: ------------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - SHIPS SUPPORT EQUIPMENT SHIP PROPULSION EQUIPMENT 1 LM-2500 GAS TURBINE A 6.7 6.9 7.1 U 2 ALLISON 501K GAS TURBINE A 8.2 6.2 6.9 U 3.7 4.5 U PROPELLERS 3 SUBMARINE PROPELLERS A NAVIGATION EQUIPMENT 4 OTHER NAVIGATION EQUIPMENT A 94.5 50.0 45.9 U A 14.5 8.3 1.8 U A 62.2 18.8 29.2 U 7 FIREFIGHTING EQUIPMENT A 15.5 16.7 17.5 U 8 COMMAND AND CONTROL SWITCHBOARD A 17.0 10.4 9.1 U 9 POLLUTION CONTROL EQUIPMENT B 103.7 47.4 67.0 U 10 SUBMARINE SUPPORT EQUIPMENT A 51.2 11.3 6.8 U 11 SUBMARINE BATTERIES A 13.2 12.3 10.9 U 12 STRATEGIC PLATFORM SUPPORT EQUIP A 20.8 18.0 11.3 U 13 DSSP EQUIPMENT A 7.8 5.3 7.5 U 14 LCAC A 4.0 3.5 15 MINESWEEPING EQUIPMENT A 20.5 16.4 UNDERWAY REPLENISHMENT EQUIPMENT 5 UNDERWAY REPLENISHMENT EQUIPMENT PERISCOPES 6 SUB PERISCOPES & IMAGING EQUIP OTHER SHIPBOARD EQUIPMENT U 20.2 PAGE N-21 UNCLASSIFIED U UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------125.1 FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - 64.9 79.3 U 16 ITEMS LESS THAN $5 MILLION A 17 SURFACE IMA A 18 SUBMARINE LIFE SUPPORT SYSTEM A 1.8 4.8 4.9 U A 197.4 201.5 208.8 U 20 DIVING AND SALVAGE EQUIPMENT A 5.4 5.6 5.7 U 21 EOD UNDERWATER EQUIPMENT B * A 3.2 2.7 32.2 U A 3.8 3.3 16.8 U A 7.7 19.5 27.5 U A 108.0 80.1 121.1 U A 6.9 ------899.4 ------619.7 ------742.0 2.0 U REACTOR PLANT EQUIPMENT 19 REACTOR COMPONENTS OCEAN ENGINEERING U SMALL BOATS 22 STANDARD BOATS TRAINING EQUIPMENT 23 OTHER SHIPS TRAINING EQUIPMENT PRODUCTION FACILITIES EQUIPMENT 24 OPERATING FORCES IPE OTHER SHIP SUPPORT 25 NUCLEAR ALTERATIONS DRUG INTERDICTION SUPPORT 26 DRUG INTERDICTION SUPPORT TOTAL SHIPS SUPPORT EQUIPMENT BUDGET ACTIVITY 02: ------------------- U COMMUNICATIONS AND ELECTRONICS EQUIPMENT SHIP RADARS 27 AN/SPS-49 A 2.2 U PAGE N-22 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- 24.8 S E C - 28 RADAR SUPPORT A 19.8 U 29 TISS A 1.8 30 AN/SQQ-89 SURF ASW COMBAT SYSTEM A 31.3 14.2 16.6 U 31 SSN ACOUSTICS A 211.9 111.6 113.0 U 32 UNDERSEA WARFARE SUPPORT EQUIPMENT A 11.5 2.8 4.3 U 33 SURFACE SONAR WINDOWS AND DOME A 34 SONAR SUPPORT EQUIPMENT A 3.0 35 SONAR SWITCHES AND TRANSDUCERS A 13.2 10.6 10.8 U 36 SUBMARINE ACOUSTIC WARFARE SYSTEM A 13.0 10.6 12.6 U 37 FIXED SURVEILLANCE SYSTEM A 16.2 29.6 33.7 U 38 SURTASS A 7.1 5.5 17.7 U 39 ASW OPERATIONS CENTER A 4.3 6.2 6.1 U 40 AN/SLQ-32 A 1.9 2.0 U 41 INFORMATION WARFARE SYSTEMS A 4.0 3.9 2.9 U 42 SHIPBOARD IW EXPLOIT A 50.3 60.5 57.5 U 43 COMMON HIGH BANDWIDTH DATA LINK A 35.3 A 39.3 U SHIP SONARS 5.0 U U ASW ELECTRONIC EQUIPMENT ELECTRONIC WARFARE EQUIPMENT RECONNAISSANCE EQUIPMENT U SUBMARINE SURVEILLANCE EQUIPMENT 44 SUBMARINE SUPPORT EQUIPMENT PROG 17.2 22.9 PAGE N-23 UNCLASSIFIED U UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - OTHER SHIP ELECTRONIC EQUIPMENT 45 NAVY TACTICAL DATA SYSTEM A 28.8 6.9 U 46 COOPERATIVE ENGAGEMENT CAPABILITY B 59.4 33.5 77.1 U 47 GCCS-M EQUIPMENT A 25.6 43.1 61.1 U 48 NAVAL TACTICAL COMMAND SUPPORT SYSTEM A 57.7 54.4 42.8 U 49 ATDLS A 18.4 19.0 10.0 U 50 MINESWEEPING SYSTEM REPLACEMENT A 18.0 12.8 8.9 U 51 SHALLOW WATER MCM B 11.3 16.2 52 NAVSTAR GPS RECEIVERS (SPACE) A 8.6 9.5 9.9 U 53 ARMED FORCES RADIO AND TV A 9.4 9.0 14.6 U 54 STRATEGIC PLATFORM SUPPORT EQUIP A 24.1 15.2 11.4 U 55 OTHER SPAWAR TRAINING EQUIPMENT A 1.0 1.3 1.8 U 56 OTHER TRAINING EQUIPMENT A 50.3 29.1 37.2 U 57 MATCALS A 10.6 4.2 1.0 U 58 SHIPBOARD AIR TRAFFIC CONTROL B 7.4 7.8 8.0 U 59 AUTOMATIC CARRIER LANDING SYSTEM A 17.9 18.2 15.6 U 60 NATIONAL AIR SPACE SYSTEM B 34.3 30.0 43.6 U 61 AIR STATION SUPPORT EQUIPMENT A 8.8 6.6 7.4 U 62 MICROWAVE LANDING SYSTEM A 5.2 5.0 5.4 U 63 FACSFAC A 3.6 4.2 1.2 U 64 ID SYSTEMS A 9.2 14.0 18.3 U U TRAINING EQUIPMENT AVIATION ELECTRONIC EQUIPMENT PAGE N-24 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - 65 SURFACE IDENTIFICATION SYSTEMS A .6 1.5 U 66 TAC A/C MISSION PLANNING SYS(TAMPS) A 20.5 11.8 67 GCCS-M EQUIPMENT ASHORE A 9.1 68 TADIX-B A 18.3 6.0 69 NAVAL SPACE SURVEILLANCE SYSTEM A 7.6 2.7 70 GCCS-M EQUIPMENT TACTICAL/MOBILE A 13.7 71 COMMON IMAGERY GROUND SURFACE SYSTEMS A 40.3 46.2 58.4 U 72 RADIAC A 4.2 8.2 7.9 U 73 GPETE A 7.6 7.3 4.7 U 74 INTEG COMBAT SYSTEM TEST FACILITY A 4.3 4.4 4.5 U 75 EMI CONTROL INSTRUMENTATION A 6.4 8.3 5.2 U 76 ITEMS LESS THAN $5 MILLION A 13.9 11.8 6.3 U 77 SHIPBOARD TACTICAL COMMUNICATIONS A 25.8 78 SHIP COMMUNICATIONS AUTOMATION A 229.1 79 SHIP COMM ITEMS UNDER $5 MILLION A 26.8 80 COMMUNICATIONS ITEMS UNDER $5M A 13.4 U OTHER SHORE ELECTRONIC EQUIPMENT U U 4.9 U U SHIPBOARD COMMUNICATIONS U 184.4 121.2 U U 43.1 24.3 U SUBMARINE COMMUNICATIONS 81 SHORE LF/VLF COMMUNICATIONS A 35.1 31.1 17.5 U 82 SUBMARINE COMMUNICATION EQUIPMENT A 83.2 77.2 89.3 U A 219.4 SATELLITE COMMUNICATIONS 83 SATCOM SHIP TERMINALS (SPACE) U PAGE N-25 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - 201.0 198.1 U 84 SATELLITE COMMUNICATIONS SYSTEMS A 85 SATCOM SHORE TERMINALS (SPACE) A 56.1 86 JCS COMMUNICATIONS EQUIPMENT A 3.6 87 ELECTRICAL POWER SYSTEMS A 88 NSIPS A 4.8 1.8 89 JEDMICS A 16.9 11.9 90 NAVAL SHORE COMMUNICATIONS A 124.1 163.1 66.8 U A 61.6 58.0 78.2 U U SHORE COMMUNICATIONS 2.4 4.6 U 1.3 U 14.2 U U CRYPTOGRAPHIC EQUIPMENT 91 INFO SYSTEMS SECURITY PROGRAM (ISSP) CRYPTOLOGIC EQUIPMENT 92 SPECIAL DCP A 14.8 U 93 CRYPTOLOGIC COMMUNICATIONS EQUIP A 20.6 17.0 15.6 A 3.8 ------1,932.7 ------1,556.7 ------1,411.9 U DRUG INTERDICTION SUPPORT 94 OTHER DRUG INTERDICTION SUPPORT TOTAL COMMUNICATIONS AND ELECTRONICS EQUIPMENT BUDGET ACTIVITY 03: ------------------- U AVIATION SUPPORT EQUIPMENT SONOBUOYS 95 PASSIVE SONOBUOYS (NON-BEAM FORMING) A 20.1 U 96 AN/SSQ-62 (DICASS) A 16.6 U 97 AN/SSQ-101 (ADAR) B 16.6 U 98 SONOBUOYS - ALL TYPES A 57.5 57.9 PAGE N-26 UNCLASSIFIED U UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- 99 MISCELLANEOUS SONOBUOYS LESS THAN $5 M FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - A 2.2 U 100 WEAPONS RANGE SUPPORT EQUIPMENT A 22.8 38.7 10.1 U 101 EXPEDITIONARY AIRFIELDS A .1 3.2 7.6 U 102 AIRCRAFT REARMING EQUIPMENT A 12.2 10.5 12.3 U 103 AIRCRAFT LAUNCH & RECOVERY EQUIPMENT A 39.6 35.8 27.5 U 104 METEOROLOGICAL EQUIPMENT A 31.6 30.6 29.8 U 105 OTHER PHOTOGRAPHIC EQUIPMENT A 1.6 1.7 1.7 U 106 AVIATION LIFE SUPPORT A 36.0 26.2 21.0 U 107 AIRBORNE MINE COUNTERMEASURES A 39.9 31.8 46.9 U 108 OTHER AVIATION SUPPORT EQUIPMENT A 7.3 ------246.5 21.7 ------257.7 13.6 ------228.4 U 6.8 4.4 17.9 U .6 U AIRCRAFT SUPPORT EQUIPMENT TOTAL AVIATION SUPPORT EQUIPMENT BUDGET ACTIVITY 04: ------------------- ORDNANCE SUPPORT EQUIPMENT SHIP GUN SYSTEM EQUIPMENT 109 GUN FIRE CONTROL EQUIPMENT A 110 NAVAL FIRES CONTROL SYSTEM A SHIP MISSILE SYSTEMS EQUIPMENT 111 NATO SEASPARROW A 2.1 8.1 10.7 U 112 RAM GMLS A 37.9 36.5 31.8 U 113 SHIP SELF DEFENSE SYSTEM B 37.3 9.3 34.4 U 114 AEGIS SUPPORT EQUIPMENT A 79.5 29.4 155.1 U 115 SURFACE TOMAHAWK SUPPORT EQUIPMENT A 79.7 69.3 61.2 U PAGE N-27 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - 116 SUBMARINE TOMAHAWK SUPPORT EQUIP A 3.5 2.8 3.1 U 117 VERTICAL LAUNCH SYSTEMS A 5.3 6.9 6.9 U 118 STRATEGIC PLATFORM SUPPORT EQUIP A 9.2 2.9 9.8 U 119 STRATEGIC MISSILE SYSTEMS EQUIP A 236.7 165.1 205.1 U 120 SSN COMBAT CONTROL SYSTEMS A 35.4 19.4 40.7 U 121 SUBMARINE ASW SUPPORT EQUIPMENT A 4.1 3.9 5.9 U 122 SURFACE ASW SUPPORT EQUIPMENT A 6.0 13.1 3.2 U 123 ASW RANGE SUPPORT EQUIPMENT A 6.3 6.8 6.0 U 124 EXPLOSIVE ORDNANCE DISPOSAL EQUIP B 8.8 7.5 9.4 U 125 ITEMS LESS THAN $5 MILLION A 4.3 5.6 5.8 U 126 ANTI-SHIP MISSILE DECOY SYSTEM A 32.1 37.8 27.5 U 127 SURFACE TRAINING DEVICE MODS A 7.0 7.9 7.3 U 128 SUBMARINE TRAINING DEVICE MODS A 27.1 ------629.1 33.7 ------470.4 20.8 ------663.2 U .4 U 1.4 U FBM SUPPORT EQUIPMENT ASW SUPPORT EQUIPMENT OTHER ORDNANCE SUPPORT EQUIPMENT OTHER EXPENDABLE ORDNANCE TOTAL ORDNANCE SUPPORT EQUIPMENT BUDGET ACTIVITY 05: ------------------- CIVIL ENGINEERING SUPPORT EQUIPMENT CIVIL ENGINEERING SUPPORT EQUIPMENT 129 ARMORED SEDANS A 130 PASSENGER CARRYING VEHICLES A .6 .1 PAGE N-28 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - 131 GENERAL PURPOSE TRUCKS A 2.1 1.0 1.5 U 132 CONSTRUCTION & MAINTENANCE EQUIP A 5.0 8.2 9.6 U 133 FIRE FIGHTING EQUIPMENT A 2.3 2.5 5.3 U 134 TACTICAL VEHICLES B 5.9 20.3 20.2 U 135 AMPHIBIOUS EQUIPMENT A 15.9 51.1 14.6 U 136 POLLUTION CONTROL EQUIPMENT A 23.9 22.0 20.0 U 137 ITEMS UNDER $5 MILLION A 8.4 ------63.9 3.4 ------108.4 11.3 ------84.3 U TOTAL CIVIL ENGINEERING SUPPORT EQUIPMENT BUDGET ACTIVITY 06: ------------------- SUPPLY SUPPORT EQUIPMENT SUPPLY SUPPORT EQUIPMENT 138 MATERIALS HANDLING EQUIPMENT A 6.3 7.6 8.8 U 139 OTHER SUPPLY SUPPORT EQUIPMENT A 5.4 5.1 7.5 U 140 FIRST DESTINATION TRANSPORTATION A 3.1 4.0 5.2 U 141 SPECIAL PURPOSE SUPPLY SYSTEMS A 132.7 ------147.6 133.4 ------150.1 490.4 ------512.0 U 3.1 6.7 1.1 U 23.4 22.7 28.8 U TOTAL SUPPLY SUPPORT EQUIPMENT BUDGET ACTIVITY 07: ------------------- PERSONNEL AND COMMAND SUPPORT EQUIPMENT TRAINING DEVICES 142 TRAINING SUPPORT EQUIPMENT A COMMAND SUPPORT EQUIPMENT 143 TRAINING SUPPORT EQUIPMENT A 144 OTHER TRAINING EQUIPMENT A 145 COMMAND SUPPORT EQUIPMENT A PAGE N-29 UNCLASSIFIED UNCLASSIFIED DEPARTMENT OF THE NAVY FY 2002 PROCUREMENT PROGRAM EXHIBIT P-1 APPROPRIATION: 1810N OTHER PROCUREMENT, NAVY DATE: JUNE 2001 MILLIONS OF DOLLARS LINE NO ---- ITEM NOMENCLATURE ----------------- IDENT FY 2000 CODE QUANTITY COST ----- -------- ------- FY 2001 QUANTITY COST -------- ------- FY 2002 QUANTITY COST -------- ------- S E C - 6.6 U 146 EDUCATION SUPPORT EQUIPMENT A 3.5 147 MEDICAL SUPPORT EQUIPMENT A 5.0 7.3 7.7 U 148 INTELLIGENCE SUPPORT EQUIPMENT A 149 OPERATING FORCES SUPPORT EQUIPMENT A 7.3 24.8 15.8 U 150 MOBILE SENSOR PLATFORM A 4.0 U 151 ENVIRONMENTAL SUPPORT EQUIPMENT A 18.2 19.1 25.2 U 152 PHYSICAL SECURITY EQUIPMENT A 7.3 9.5 116.9 U A 4.2 A 13.0 ------104.3 ------109.9 ------221.6 260.6 ------260.6 ------4,284.1 206.4 ------206.4 ------3,479.3 234.1 ------234.1 ------4,097.6 PRODUCTIVITY PROGRAMS 153 JUDGEMENT FUND REIMBURSEMENT U OTHER 154 CANCELLED ACCOUNT ADJUSTMENTS TOTAL PERSONNEL AND COMMAND SUPPORT EQUIPMENT BUDGET ACTIVITY 08: ------------------- U SPARES AND REPAIR PARTS SPARES AND REPAIR PARTS 155 SPARES AND REPAIR PARTS TOTAL SPARES AND REPAIR PARTS TOTAL OTHER PROCUREMENT, NAVY A PAGE N-30 UNCLASSIFIED U UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATUREPASSIVE SONOBUOYS (NON-BEAM FORMING) OTHER PROCUREMENT, NAVY PEO(A) PROGRAM Other Related Program Elements Program Element for Code B Items: Prior Years ID Code FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 NARM#402600 FY 2007 U3QW To Complete Total QUANTITY A 43,125 COST (In Millions) $20.1 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Passive Sonobuoys (Non-Beam Forming) is a family of sonobuoys which provide acoustic target signature information for localization (AN-SSQ-53) and collection purposes (AN/SSQ-57). The AN/SSQ-53 (DIFAR) is a directional sonobuoy which provides acoustic target localization. The AN/SSQ-53E sonobuoy incorporates shallow water performance enhancements over the AN/SSQ-53D. The engineering change proposal (ECP) was developed in FY97 and incorporates (1) a constant shallow Omni Hydrophone, (2) Command Function Select (CFS), (3) additionalDIFAR depth and Automatic Gain Control (AGC). The AN/SSQ-57 is a special purpose calibrated sonobuoy used for determining the level of underwater acoustic energy radiated by submarines, the magnitude of water transmission loss and bottom loss (used with the Signal Underwater Sound (SUS) Sonobuoy) and the level of ambient noise. Prior to FY00 the AN/SSQ-53 and AN/SSQ-57 were budgeted under NARMs 402500 and 403000, respectively. The FY00 contract was awarded to Spartion (11,941) and USSI (31,184). A new configuration combining the functions of the AN/SSQ-53 and AN/SSQ-57 was procured (AN/SSQ-53F). Beginning in FY01 the AN/SSQ-53 and AN/SSQ-57 are combined into a new budget line -- 404800, Sonobuoys All Types RESERVE FUNDING INCLUDED IN TOTAL ($000) FY 00 2,011 FY01 0 FY02 0 FY03 0 FY04 0 FY05 0 FY06 0 FY07 0 P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 95 PAGE NO. CLASSIFICATION: 1 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System PASSIVE SONOBUOYS (NON-BEAM FORMING) ID Code P-1 ITEM NOMENCLATURE/SUBHEAD APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy B.A. 3 - AVIATION SUPPORT EQUIPMENT DATE: JUNE 2001 PEO(A) PROGRAM NARM #402600 SUBHEAD U3QW TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST QW001 HARDWARE AN/SSQ-53 AN/SSQ-53 (Formerly AN/SSQ-57C) ID Code Prior Years Total Cost A FY 2000 FY 2001 Quantity Unit Cost Total Cost 43,125 38,553 4,572 411.59 411.59 17,774 15,892 1,882 QW830 PRODUCTION ENGINEERING AN/SSQ-53 1,250 1,250 QW860 ACCEPTANCE TESTING AN/SSQ-53 1,074 1,074 Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost Beginning in FY00 a new configuration combining the functions of the SSQ-53 and the SSQ-57 was procured. * In addition to hardware, total cost includes $24k for an Industrial Base Plan. $20,098 DD FORM 2446, JUN 86 P-1 SHOPPING LIST ITEM NO. 95 CLASSIFICATION: PAGE NO. 2 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY ECON OTHER PROCUREMENT, NAVY PEO(A) PROGRAM NARM: Other Related Program Elements Program Element for Code B Items: AN/SSQ-62 (DICASS) SONOBUOY #403200 SUBHEAD: U3QF B.A. 3 - AVIATION SUPPORT EQUIPMENT Prior Years QUANTITY COST (In Millions) ID Code A FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 To Complete Total 15,280 $16.6 The AN/SQQ-62 (DICASS) Sonobuoy is a directional active sonobuoy that provides target bearing and range information on the submarine with each echo. The AN/SSQ-62E is an ECP to the AN/SSQ-62D incorporating the following changes: (1) Command Function Select (CFS), and (2) all four sonar channels in one sonobuoy. The FY00 contract has been awarded to USSI (6,041) and Sparton (9,239) for a total quantity of 15,280. Beginning in FY01 the AN/SSQ-62 is combined into a new budget line - 404800 Sonobuoys, All Types. RESERVE FUNDING INCLUDED IN TOTAL ($000) FY00 1,126 FY01 - DD Form 2454, JUN 86 FY02 - FY03 - FY04 - FY05 - FY06 - ITEM NO. FY07 - P-1 SHOPPING LIST 96 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System AN/SSQ-62 (DICASS) SONOBUOY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy B.A. 3 - AVIATION SUPPORT EQUIPMENT DATE: JUNE 2001 PEO(A) PROGRAM NARM #403200 SUBHEAD U3QF TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST QF001 AN/SSQ-62 w/ SLC* QF830 PRODUCTION ENGINEERING QF860 ACCEPTANCE TEST ID Code Prior Years Total Cost A FY 2000 Quantity Unit Cost 15,280 $961.64 FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost ** 14,767 1,036 759 * SONOBUOY LAUNCH CONTAINER ** The FY00 program includes $73k for silver. 16562 DD FORM 2446, JUN 86 P-1 SHOPPING LIST ITEM NO. 96 CLASSIFICATION: PAGE NO. 2 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATUREAN/SSQ-101 (ADAR) OTHER PROCUREMENT, NAVY PEO (A) PROGRAM NARM #403600 Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) U3QT Other Related Program Elements ID Code FY 2000 A 2,483 $16.6 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 $0.0 Continuing Total The AN/SSQ-101 Air Deployable Active Receiver (ADAR) is a commandable, passive A-size sonobuoy with a horizontal planar array that can be deployed at different depths. The ADAR sonobuoy transmits beamformed digital data to all Air ASW platforms and is deployed as the Improved Extended Echo Ranging System’s active receiver. The FY00 contract has been awarded to Erapsco for a total quantity of 2,483. Beginning in FY01 the AN/SSQ-101 budget line is combined into a new budget line -- 404800, Sonobuoys, All Types THERE IS NO RESERVE REQUIREMENT FOR THE SSQ-101. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 97 PAGE NO. CLASSIFICATION: 1 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System AN/SSQ-101 (ADAR) SONOBUOY ID Code P-1 ITEM NOMENCLATURE/SUBHEAD APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy BA3 - AVIATION SUPPORT EQUIPMENT DATE: JUNE 2001 PEO(A) PROGRAM NARM #403600 SUBHEAD U3QT TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost A FY 2000 Quantity 2,483 Unit Cost 6,225.00 FY 2001 Total Cost QT001 AN/SSQ-101 w/SLC* QT830 PRODUCTION ENGINEERING 482 QT860 ACCEPTANCE TESTING 424 Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost 15,717 * SONOBUOY LAUNCH CONTAINER In addition to hardware, total costs include $212k for silver and $48k for a Production Readiness Review. 16,623 DD FORM 2446, JUN 86 P-1 SHOPPING LIST ITEM NO. 97 CLASSIFICATION: PAGE NO. 2 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY PEO(A) PROGRAM NARM 404800 SUBHEAD U3QZ Program Element for Code B Items: Other Related Program Elements Prior Years QUANTITY COST (In Millions) ID Code A FY 2000 FY 2001 FY 2002 54,454 74,583 $57.5 $57.9 FY 2003 FY 2004 FY 2005 SONOBUOYS, ALL TYPES FY 2006 FY 2007 To Complete Total Continuing Beginning in FY01 the Sonobuoy Budget lines are consolidated into one line -- Sonobuoys, All Types, NARM 404800. The AN/SSQ-36 is an air-dropped bathythermographtransmitting set used to provide a vertical temperature profile of the ocean with respect to depth. The data is transmitted to aircraft to assist in the selection of hydrophone depths and tactics for localizing and tracking submarines. The information on ambient water conditions is also used for long-range forecasts of acoustic conditions in the ocean. Prior to FY00 the AN/SSQ-36 was budgeted under NARM 400500. In FY00 the AN/SSQ-36 is budgeted under NARM 405000, Miscellaneous Sonobuoys, Less than $5M. The AN/SSQ-53 (DIFAR) is a directional sonobuoy which provides acoustic target localization. Prior to FY00 the AN/SSQ-53 was budgeted under NARM 402500. In FY00 the AN/SSQ-53 is budgeted under NARM 402600, Passive Sonobuoys, Non-Beamforming. Beginning in FY02 the requirement for the AN/SSQ-53 and AN/SSQ-57 is combined into the AN/SSQ-53. The AN/SSQ-57 is a special purpose calibrated sonobuoy used for determining the level of underwater acoustic energy radiated by submarines, the magnitude of water transmission loss and bottom loss (used with the Signal Underwater Sound (SUS) Sonobuoy) and the level of ambient noise. Prior to FY00 the AN/SSQ-57 was budgeted under NARM 403000. In FY00 the AN/SSQ-57 is budgeted under NARM 402600, Passive Sonobuoys, Non-Beamforming. The AN/SQQ-62 (DICASS) Sonobuoyis a directional active sonobuoy that provides target bearing and range information on the submarine with each echo. The AN/SSQ-62E is an ECP to the AN/SSQ-62D incorporating the following changes: (1) Command Function Select (CFS), and (2) all four sonar channels in one sonobuoy. Prior to FY01 the AN/SSQ-62 was budgeted under NARM 403200. The AN/SSQ-77 is a vertical line array directional Sonobuoy. It employs beamforming technology for use with the EER sensor system; and under specific water conditions increases passive performance. Prior to FY01 the AN/SSQ-77 is budgeted under NARM 403400. CLASSIFICATION: DD Form 2454, JUN 86 ITEM NO. 98 PAGE NO. 1 P-40 Page 1 of 2 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY PEO(A) PROGRAM NARM 404800 SUBHEAD U3QZ Program Element for Code B Items: Other Related Program Elements Prior Years ID Code FY 2000 QUANTITY COST (In Millions) FY 2001 FY 2002 54,454 74,583 $57.5 $57.9 FY 2003 FY 2004 FY 2005 SONOBUOYS, ALL TYPES FY 2006 FY 2007 To Complete Total Continuing The AN/SSQ-101 Air DeployableActive Receiver (ADAR) is a commandable, passive A-size sonobuoy with a horizontal planar array that can be deployed at different depths. The ADAR sonobuoy transmits beamformed digital data to all Air ASW platforms and is deployedas the Improved Extended Echo Ranging System’s active receiver. Prior to FY01 the AN/SSQ-101 is budgeted under NARM 403600. The AN/SSQ-110 is an air-dropped active source buoy to be used in conjunction with the AN/SSQ-77B and AN/SSQ-101 to perform Extended Echo Ranging (EER) system active search. Prior to FY01 the AN/SSQ-110 is budgeted under NARM 403800. Signal, Underwater Sound (SUS) devices are expendable,high energy acoustic sources. The SUS is a Non-explosive,electro-acoustic device which is launched from aircraft and transmits acoustic tones after water entry. The SUS is used for training and exercise signaling to submarines. Prior to FY00 the SUS was budgeted under NARM 404500. In FY00 the SUS was budgeted under NARM 405000, Miscellaneous Sonobuoys Less than $5M. The Hydrostatic Sensor Device is a sensor adaptation enabling use of existing ordnance as shallow water anti-submarine weapons. Prior to FY00 Hydrostatic Device was budgeted under NARM 404400. In FY00 the Hydrostatic Device was budgeted under NARM 405000, Miscellaneous Sonobuoys Less than $5M. The Hydrostatic Device transitions from R&D PE 0604261N in FY03. The FY01 program provides for 5,364 AN/SSQ-36’s awarded to Hermes; 27,985 AN/SSQ-53’s awarded to USSI and Sparton; 15,607 AN/SSQ-62’s awarded to USSI and Sparton; AN/SSQ-77’s ECP and redesign resulting from parts obsolescence awarded to Sparton; 3,473 SUS awarded to Sparton; and 2,025 AN/SSQ-101’s to be awarded to ERAPSCO. Total projected FY01 procurement quantity is 54,454. RESERVE FUNDING INCLUDED IN TOTAL ($000) FY00 - FY01 3,687 FY02 3,476 FY03 FY04 FY05 FY06 FY07 CLASSIFICATION: DD Form 2454, JUN 86 ITEM NO. 98 PAGE NO. 2 P-40 Page 2 of 2 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System Sonobuoys, All Types ID Code P-1 ITEM NOMENCLATURE/SUBHEAD APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY B.A.3 - AVIATION SUPPORT EQUIPMENT DATE: JUNE 2001 PEO(A) PROGRAM NARM 404800 SUBHEAD U3QZ TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST QZ006 QZ007 QZ008 QZ009 HARDWARE AN/SSQ-36 AN/SSQ-53 AN/SSQ-62 AN/SSQ-77 Start-up Nonrecurring costs AN/SSQ-101 AN/SSQ-110 SUS MK 84 Hydrostatic Device QZ831 QZ832 QZ834 QZ835 QZ836 QZ837 QZ838 QZ839 PRODUCTION ENGINEERING AN/SSQ-36 AN/SSQ-53 AN/SSQ-62 AN/SSQ-77 AN/SSQ-101 AN/SSQ-110 SUS MK 84 Hydrostatic Device QZ001 QZ002 QZ004 QZ005 ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost FY 2001 Total Cost A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Quantity Unit Cost 54,454 5,364 27,985 15,607 0 247.91 488.38 1,256.94 0.00 2,025 6,191.86 3,473 237.20 FY 2002 Total Cost 51,629 1,330 13,667 19,617 0 3,653 12,539 0 824 0 2,883 94 821 1,185 261 450 0 72 0 Quantity Unit Cost 74,583 4,468 39,300 15,251 13,170 258.64 373.20 944.18 674.92 2,394 5565.09 Total Cost Quantity Unit Cost Total Cost 52,434 1,156 14,667 14,400 8,889 13,323 0 0 0 2,731 69 880 853 533 396 0 0 0 0 DD FORM 2446, JUN 86 P-1 SHOPPING LIST ITEM NO. 98 CLASSIFICATION: PAGE NO. 3 P-5 Page 1 of 2 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System Sonobuoys, All Types ID Code P-1 ITEM NOMENCLATURE/SUBHEAD APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY B.A.3 - AVIATION SUPPORT EQUIPMENT DATE: JUNE 2001 PEO(A) PROGRAM NARM 404800 SUBHEAD U3QZ TOTAL COST IN THOUSANDS OF DOLLARS COST CODE QZ861 QZ862 QZ864 QZ865 QZ866 QZ867 QZ868 QZ869 ELEMENT OF COST ID Code Prior Years Total Cost ACCEPTANCE TESTING AN/SSQ-36 AN/SSQ-53 AN/SSQ-62 AN/SSQ-77 AN/SSQ-101 AN/SSQ-110 SUS MK 84 Hydrostatic Device FY 2000 Quantity Unit Cost FY 2001 Total Cost 0 0 0 0 0 0 0 0 Subtotals by Buoy Type AN/SSQ-36 AN/SSQ-53 AN/SSQ-62 AN/SSQ-77 AN/SSQ-101 AN/SSQ-110 SUS MK 84 Hydrostatic Device 0 DD FORM 2446, JUN 86 P-1 SHOPPING LIST ITEM NO. 98 Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost Total Cost 3,013 94 879 1,389 161 412 0 78 0 2,721 65 898 874 528 356 0 0 0 1,518 15,367 22,191 4,075 13,401 0 974 0 1,290 16,445 16,127 9,950 14,075 0 0 0 57,525 Quantity Unit Cost Total Cost 57,886 CLASSIFICATION: PAGE NO. 4 P-5 Page 2 of 2 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE JUNE 2001 Sonobuoy, All Types B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD OTHER PROCUREMENT, NAVY U3QZ B.A.3 - AVIATION SUPPORT EQUIPMENT Cost Element/ FISCAL YEAR FY01 AN/SSQ-36 AN/SSQ-53 AN/SSQ-53 AN/SSQ-62 AN/SSQ-62 AN/SSQ-77 AN/SSQ-101 SUS MK 84 FY02 AN/SSQ-36 AN/SSQ-53 AN/SSQ-62 AN/SSQ-77 AN/SSQ-101 QUANTITY UNIT COST PEO(A) PROGRAM NARM 404800 LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY TECH DATA AVAILABLE NOW? 5,364 17,742 10,243 7,308 8,299 0 2,025 3,473 247.91 436.06 579.00 1,201.98 1,305.34 0.00 6,191.86 237.20 NSWC CRANE NSWC CRANE NSWC CRANE NSWC CRANE NSWC CRANE NSWC CRANE NSWC CRANE NSWC CRANE 10/00 10/00 10/00 10/00 10/00 10/00 10/00 10/00 C/FFP C/FFP C/FFP C/FFP C/FFP C/FFP SS/FFP C/FFP HERMES USSI SPARTON USSI SPARTON SPARTON ERAPSCO SPARTON 03/01 03/01 03/01 03/01 03/01 03/01 05/01 03/01 03/02 05/02 05/02 04/02 04/02 * 01/02 05/02 YES YES YES YES YES YES YES YES 4,468 39,300 15,251 258.64 373.20 944.18 NSWC CRANE NSWC CRANE NSWC CRANE 10/01 10/01 10/01 C/FFP C/FFP C/FFP NOT SELECTED NOT SELECTED NOT SELECTED 01/02 01/02 01/02 01/03 01/03 01/03 YES YES YES 13,170 2,394 674.92 5,565.09 NSWC CRANE NSWC CRANE 10/01 10/01 C/FFP SS/FFP NOT SELECTED ERAPSCO, IN 01/02 01/02 01/03 01/03 YES YES D. REMARKS AN/SSQ-77 - The P-5A depicts only hardware quantities and costs. The AN/SSQ-77 has been out of production for six years and required $3.653M ECP for redesign resulting from parts obsolescence. DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 98 PAGE NO. 5 Classification: UNCLASSIFIED P-5A Page 1 of 1 DATE REVISIONS AVAILABLE FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY B.A.3 - AVIATION SUPPORT EQUIPMENT Production Rate Manufacturer’s Item Name and Location MSR ECON MAX AN/SSQ-36B HERMES, CANADA* 0.25 12 12 AN/SSQ-36B, AN/SSQ-53/57 SPARTON, FL 0.25 12 12 AN/SSQ-53/57 USSI, IN 0.25 12 12 AN/SSQ-62 USSI, IN 0.25 2.6 8.0* AN/SSQ-62 SPARTON, FL 0.25 8.0 8.0* AN/SSQ-77 TBD TBD TBD TBD AN/SSQ-101 (ADAR) ERAPSCO, IN TBD TBD TBD SUS MK-84 SPARTON, FL TBD TBD TBD DATE June 2001 Weapon System P-1 ITEM NOMENCLATURE Sonobuoy, All Types PEO(A) PROGRAM NARM 404800 SUBHEAD U3QZ Procurement Leadtimes ALT Prior ALT After Initial Reorder Unit of to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure Month 3 12 15 Month 3 12 15 Month 3 12 15 Month 3 12 15 Month 3 12 15 Month 3 12 15 Month 3 12 15 Month FISCAL YEAR 2001 ITEM / MANUFACTURER AN/SSQ-36 - HERMES (K) AN/SSQ-53 - USSI, IN (K) AN/SSQ-53 - SPARTON, FL (K) AN/SSQ-62 - USSI, IN (K) AN/SSQ-62 - SPARTON, FL (K) AN/SSQ-77 - SPARTON, FL (K) AN/SSQ-101- ERAPSCO, IN (K) SUS MK 84 - SPARTON, FL (K) F Y S V C 01 01 01 01 01 01 01 01 Q D B T Y E L A L 5.4 17.7 10.2 7.3 8.3 0.0 2.0 3.5 0 0 0 0 0 0 0 0 5.4 17.7 10.2 7.3 8.3 0.0 2.0 3.5 Q D B T Y E L A L 5.4 17.7 10.2 7.3 8.3 0.0 2.0 3.5 0 0 0 0 0 0 0 0 5.4 17.7 10.2 7.3 8.3 0.0 2.0 3.5 1999 O C T N O V CALENDAR YEAR 2000 D E C J A N F E B M A R M A Y A P R J U N J U L A U G CALENDAR YEAR 2001 S E P O C T N O V D E C J A N AN/SSQ-36 - HERMES (K) AN/SSQ-53 - USSI, IN (K) AN/SSQ-53 - SPARTON, FL (K) AN/SSQ-62 - USSI, IN (K) AN/SSQ-62 - SPARTON, FL (K) AN/SSQ-77 - SPARTON, FL (K) AN/SSQ-101- ERAPSCO, IN (K) SUS MK 84 - SPARTON, FL (K) Remarks: 01 01 01 01 01 01 01 01 S V C A P R M A Y J U N J U L A U G S E P A A 2001 O C T N O V FISCAL YEAR 2003 CALENDAR YEAR 2002 D E C J A N F E B M A Y J U N J U L A U G CALENDAR YEAR 2003 S E P M A R A P R 1.3 1.3 0.8 1.7 1.7 1.7 1.7 0.8 0.8 1.5 1.7 1.7 1.7 1.7 1.7 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 0.1 0.1 0.2 0.2 0.2 0.2 0.2 0.2 0.2 3.5 Previous editions are obsolete P-1 SHOPPING LIST ITEM NO. 98 B A L 5.4 17.7 10.2 7.3 8.3 0.0 2.0 3.5 * If mobilization is for multiple buoy types then the maximum quantity should be reduced by 30%-50%. DD Form 2445, JUL 87 311 / 244 F Y M A R A A A A A A FISCAL YEAR 2002 ITEM / MANUFACTURER F E B PAGE 6 P-21 Page 1 of 5 Exhibit P-21 Production Schedule B A L FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY B.A.3 - AVIATION SUPPORT EQUIPMENT Production Rate Manufacturer’s Item Name and Location MSR ECON MAX AN/SSQ-36B HERMES, CANADA* 0.25 12 12 AN/SSQ-36B, AN/SSQ-53/57 SPARTON, FL 0.25 12 12 AN/SSQ-53/57 USSI, IN 0.25 12 12 AN/SSQ-62 USSI, IN 0.25 2.6 8.0* AN/SSQ-62 SPARTON, FL 0.25 8.0 8.0* AN/SSQ-77 TBD TBD TBD TBD AN/SSQ-101 (ADAR) ERAPSCO, IN TBD TBD TBD SUS MK-84 SPARTON, FL TBD TBD TBD DATE June 2001 Weapon System P-1 ITEM NOMENCLATURE Sonobuoy, All Types PEO(A) PROGRAM NARM 404800 SUBHEAD U3QZ Procurement Leadtimes ALT Prior ALT After Initial Reorder Unit of to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure 3 3 3 3 3 3 3 12 12 12 12 12 12 12 15 15 15 15 15 15 15 Month Month Month Month Month Month Month FISCAL YEAR 2001 ITEM / MANUFACTURER F Y S V C Q D B T Y E L A L F Y S V C Q D B T Y E L A L 4.5 39.3 15.3 13.2 2.4 0 0 0 0 0 4.5 39.3 15.3 13.2 2.4 1999 O C T N O V CALENDAR YEAR 2000 D E C J A N F E B M A R M A Y A P R J U N J U L A U G CALENDAR YEAR 2001 S E P O C T N O V D E C J A N FISCAL YEAR 2002 ITEM / MANUFACTURER AN/SSQ-36 - NOT SELECTED (K) AN/SSQ-53 - NOT SELECTED (K) AN/SSQ-62 - NOT SELECTED (K) AN/SSQ-77 - NOT SELECTED (K) AN/SSQ-101- ERAPSCO, IN (K) 02 02 02 02 02 2001 O C T N O V F E B J A N F E B M A R A P R M A Y A P R M A Y J U N J U L A U G S E P A U G S E P J U N J U L A U G CALENDAR YEAR 2003 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A A A A A Remarks: DD Form 2445, JUL 87 311 / 244 Previous editions are obsolete P-1 SHOPPING LIST ITEM NO. 98 B A L FISCAL YEAR 2003 CALENDAR YEAR 2002 D E C M A R PAGE 7 P-21 Page 2 of 5 Exhibit P-21 Production Schedule B A L FY 2001/02 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY Production Rate Item AN/SSQ-36B AN/SSQ-36B, AN/SSQ-53/57 AN/SSQ-53/57 AN/SSQ-62 AN/SSQ-62 AN/SSQ-77 AN/SSQ-101 (ADAR) SUS MK-84 Manufacturer’s Name and Location HERMES, CANADA* SPARTON, FL USSI, IN USSI, IN SPARTON, FL TBD ERAPSCO, IN SPARTON, FL MSR 0.25 0.25 0.25 0.25 0.25 TBD TBD TBD ECON 12 12 12 3 8 TBD TBD TBD MAX 12 12 12 8.0* 8.0* TBD TBD TBD DATE JUNE 2001 Weapon System P-1 ITEM NOMENCLATURE Sonobuoy, All Types PEO(A) PROGRAM NARM 404800 SUBHEAD U3QZ Procurement Leadtimes ALT Prior ALT After Initial Reorder Unit of to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure 3 3 3 3 3 3 3 12 12 12 12 12 12 12 15 15 15 15 15 15 15 Month Month Month Month Month Month Month FISCAL YEAR 2005 ITEM / MANUFACTURER AN/SSQ-36 - NOT SELECTED (K) AN/SSQ-53 - NOT SELECTED (K) AN/SSQ-62 - NOT SELECTED (K) AN/SSQ-77 - NOT SELECTED (K) AN/SSQ-101- ERAPSCO, IN (K) F Y S V C 02 02 02 02 02 Q D B T Y E L A L 4.5 39.3 15.3 13.2 2.4 0.0 0.0 0.0 0.0 0.0 4.5 39.3 15.3 13.2 2.4 Q D B T Y E L A L 2003 O C T N O V CALENDAR YEAR 2004 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2005 S E P O C T N O V D E C J A N FISCAL YEAR 2006 ITEM / MANUFACTURER F Y S V C 2005 O C T N O V F E B J A N F E B M A R A P R M A Y A P R M A Y J U N J U L A U G S E P A U G S E P J U N J U L A U G CALENDAR YEAR 2007 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Remarks: DD Form 2445, JUL 87 311 / 244 Previous editions are obsolete P-1 SHOPPING LIST ITEM NO. 98 B A L FISCAL YEAR 2007 CALENDAR YEAR 2006 D E C M A R PAGE 8 P-21 Page 3 of 5 Exhibit P-21 Production Schedule B A L UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE Misc. Sonobuoys Less Than $5M U3QV OTHER PROCUREMENT, NAVY PEO(A) PROGRAM Other Related Program Elements Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) ID Code FY 2000 FY 2001 FY 2002 $0.0 $0.0 FY 2003 FY 2004 FY 2005 FY 2006 NARM#405000 FY 2007 To Complete Total 7,668 A $2.2 Miscellaneous Sonobuoys Less than $5M provide unique functions including measuring ocean temperatures (AN/SSQ-36), Signal Underwater Sound (SUS) and Hydrostatic Sensor Fuses. The AN/SSQ-36 is an air-dropped bathythermograph transmitting set used to provide a vertical temperature profile of the ocean with respect to depth. The data is transmitted to aircraft to assist in the selection of hydrophone depths and tactics for localizing and tracking submarines. The information on ambient water conditions is also used for long-range forecasts of acoustic conditions in the ocean. Signal, Underwater Sound (SUS) devices are expendable,high energy acoustic sources. The SUS is a Non-explosive, electro-acoustic device which is launched from aircraft and transmits acoustic tones after water entry. The SUS is used for training and exercise signaling to submarines. The Hydrostatic Sensor Fuze is a sensor adaptation enabling use of existing ordnance as shallow water anti-submarine weapons. Prior to FY00 the AN/SSQ-36, SUS, and Hydrostatic Fuze were budgeted under NARMs 400500, 404500 and 404400, respectively. The FY00 contract has been awarded to Sparton (3,548) and Hermes (4,120) for a total quantity of 7,668 AN/SSQ-36 sonobuoys. Beginning in FY01 the AN/SSQ-36, SUS, and Hydrostatic Fuze are combined into a new budget line -- 404800 Sonobuoys, All Types. RESERVE FUNDING INCLUDED IN TOTAL ($000) FY00 52 FY01 0 FY02 0 FY03 FY04 FY05 FY06 FY07 P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 99 PAGE NO. CLASSIFICATION: 1 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System MISC Sonobuoys Less Than $5M ID Code P-1 ITEM NOMENCLATURE/SUBHEAD APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy B.A. 3 - AVIATION SUPPORT EQUIPMENT DATE: JUNE 2001 PEO(A) PROGRAM NARM #405000 SUBHEAD U3QV TOTAL COST IN THOUSANDS OF DOLLARS COST CODE QV001 ELEMENT OF COST HARDWARE AN/SSQ-36 SUS MK 84 HYDROSTATIC FUZE QV830 PRODUCTION ENGINEERING AN/SSQ-36 SUS MK 84 HYDROSTATIC FUZE QV860 ACCEPTANCE TESTING AN/SSQ-36 SUS MK 84 HYDROSTATIC FUZE ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost A 7,668 250.63 FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost * 1,937 1,937 0 0 147 77 70 0 89 89 0 0 *In addition to hardware, total cost includes funding for silver ($9k) and a Production Readiness Review ($6k). $2,173 DD FORM 2446, JUN 86 P-1 SHOPPING LIST ITEM NO. 99 CLASSIFICATION: PAGE NO. 2 UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/ BA-3 Aviation Support Equipment Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) $949.5 ID Code FY 2000 FY 2001 FY 2002 $22.6 $33.3 $10.1 DATE: June 2001 P-1 ITEM NOMENCLATURE LI 420400 WEAPONS RANGE SUPPORT EQUIPMENT Other Related Program Elements FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total Cont. Cont. This budget line item provides the resources to implement the Navy Fleet Training Range (FTR) Instrumentation Program Plan. These FTRs provide the primary means of fleet combat readiness training. The plan addresses the following major procurement areas: Electronic Warfare (EW) simulators, Systems Replacement and Modernization (SRAM), Tactical Aircrew Combat Training Systems (TACTS), Southern California (SOCAL) Communications Upgrade, Large Area Tracking Range (LATR), Joint Tactical Combat Training System (JTCTS), Shallow Water Training Ranges (SWTR), Mobile Remote Emitter System (MRES), and generic systems such as range computer systems, simulation, and surveillance systems. The integral parts of these major range programs include but are not limited to the following: voice communications, weapons scoring systems, display consoles, radars, tracking subsystems, control/computation subsystems, display/debriefing subsystems, processors, HF/VHF/UHF receivers, transmitters/transceivers, multiplexers, intercom circuits, encoding devices, frequency interface control, systems, and other specialized equipment. Justification: Operational forces of the Navy’s air, surface, and subsurface units are being equipped with the latest complex and sophisticated weapon systems to achieve and maintain high standards of fleet readiness. The FTRs must be furnished with training equipment capable of simulating, tracking, displaying, and debriefing the latest combat environments (e.g. electronic warfare). This equipment provides the Navy with the capability to: conduct safe fleet training exercises; achieve a high state of readiness; objectively evaluate training effectiveness as well as the strategy and tactics employed; evaluate the performance of equipment; and measure reliability and accuracy of operational weapon systems. MOBILE REMOTE EMITTER SYSTEM (MRES) The MRES is a high power Electronic Warfare simulator system capable of illuminating aircraft, ships, and various other signal collection platforms with emitters from 2 to 18 GHz. The system will also be capable of receiving active Electronic Countermeasures (ECM) transmissions from 500MHz to 18GHz transmissions from 500MHz to 18 GHz for spectrum viewing and evaluation of ECM techniques. The MRES will use the TACTS and/or video and Identification Friend or Foe (IFF) tracking modes for position pointing sources. P-1 SHOPPING LIST Item No. 100 DD Form 2454, JUN 86 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/ BA-3 Aviation Support Equipment Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) $949.5 ID Code FY 2000 FY 2001 FY 2002 $22.6 $33.3 $10.1 DATE: June 2001 P-1 ITEM NOMENCLATURE LI 420400 WEAPONS RANGE SUPPORT EQUIPMENT Other Related Program Elements FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total Cont. Cont. The MRES system will be capable of generating threat scenarios to support non-instrumented test and training sites and also support Navy and Joint exercises. The MRES will be a ruggedized, highly reliable and maintainable system. It will consist of off-the-shelf components incorporating minor modifications as necessary to meet unique mission support areas. It will have a VHF/UHF communications system to provide voice and data exchange with the test platform or exercise coordinator and Range Control facility. The FY 1998 funding procured one MRES system for the Atlantic Test Range (ATR). Funding provided in FY99 is for one MRES variant and integration into PMRF. FY00 Congressional increase of $6.0 million will be utilized for a second MRES for PMRF to include the required communications system to integrate the PMRF MRES. FY01 Congressional increase of $7.5M will be utilized for a second MRES for ATR. NAVAL AIR STRIKE AND AIR WARFARE CENTER: FY01 Congressional increase of $5.0M will be utilized to upgrade and modernize the Fallon Electronic Warfare Range from a Cold War era air defense system to a modern capability that reflects the threats and tactics that have been experienced in the Gulf War and the contingency operations over Bosnia and Iraq. Hardware to be procured includes communications infrastructure required to integrate the simulators into the Tactical Aircrew Combat Training System for control and debrief puposes, and instrumentation required to score weapons deployment. SYSTEMS REPLACEMENT AND MODERNIZATION (SRAM): The SRAM program provides for the procurement of numerous minor equipments/instrumentation needed at all Navy training ranges. SRAM procurements replace and modernize economically unmaintainable systems and equipment in order to increase range efficiency. Funding for installation of minor equipment is required in all years for all ranges. TACTICAL AIRCREW COMBAT TRAINING SYSTEM (TACTS): The TACTS was developed in the early 1970’s in response to the large Aircrew losses in Vietnam. TACTS tracks aircraft and monitors weapon systems during training missions. Weapons simulations are run by the TACTS in response to aircrew actions. Results are displayed in real-time and recorded for post mission P-1 SHOPPING LIST Item No. 100 DD Form 2454, JUN 86 PAGE NO. 2 CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/ BA-3 Aviation Support Equipment Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) $949.5 ID Code FY 2000 FY 2001 FY 2002 $22.6 $33.3 $10.1 DATE: June 2001 P-1 ITEM NOMENCLATURE LI 420400 WEAPONS RANGE SUPPORT EQUIPMENT Other Related Program Elements FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total Cont. Cont. debrief. The original system was installed at Yuma, AZ and a follow-on system was installed at Oceana, VA. The Navy Decision Coordinating Paper W0431-AA established a requirement to continue development of new training techniques and capabilities through TACTS upgrades. The USAF has adopted the TACTS, renamed the Air Combat Maneuvering Instrumentation, and more recently the Air Combat Training System, as their standard aircrew training system. The latest generation 36 A/C system achieved an initial operating capability at Fallon NV in 1985. Other 36 A/C systems have been installed at Cherry Point, NC and Beaufort, SC. The Yuma and Oceana systems have also been upgraded to the 36 A/C configuration. The FY 1999-2000 program will provide a significant upgrade to the Oceana TACTS Master Station at Bodie Island. This is required due to its age and outdated structural standards. Dangerous conditions prohibit the addition of new radio equipment or microwave dishes to support program requirements. Specifically, the LATR and Littoral Warfare Training Center (LWTC) communications needs cannot be served with the state of the existing tower. An upgraded tower will be integrated into a previously established government datalink and will directly support the LWTC communications bandwidth requirements. SHALLOW WATER TRAINING RANGES (SWTR): Existing underwater ranges are situated in deep water and cannot provide training in Anti-Submarine Warfare (ASW) tactics employed in shallow coastal waters. The Operational Requirements Document for Shallow Water training instrumentation has been endorsed by both Atlantic and Pacific fleets and signed by N78. Fixed instrumentation is required to preclude the recurring cost of periodic retrieval and maintenance of portable systems. The Shallow Water Ranges will cover five hundred nautical miles and will be located on the East and West Coasts. Each range will be built in four phases and will be operational at the completion of the first phase. All phases are expected to be completed by FY2013. P-1 SHOPPING LIST Item No. 100 DD Form 2454, JUN 86 PAGE NO. 3 CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/ BA-3 Aviation Support Equipment Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) $949.5 ID Code FY 2000 FY 2001 FY 2002 $22.6 $33.3 $10.1 DATE: June 2001 P-1 ITEM NOMENCLATURE LI 420400 WEAPONS RANGE SUPPORT EQUIPMENT Other Related Program Elements FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total Cont. Cont. INTEGRATED TARGET CONTROL SYSTEM (ITCS) UPGRADE ITCS Upgrade will provide an unmanned target control system designed to replace the legacy drone control systems deployed at Navy Target Training Ranges. The upgrade will provide all command and control, tracking and telemetry functions for the target systems. The upgrade will control the family of subscale Navy targets and provide a range of 400 nautical miles with an over-the-horizon relay. The FY2001 will provide two systems to Fleet Activity Okinawa. The FY2003 program will provide one system for Fleet Composite Squadron Six. FALLON COMMUNICATION UPGRADE The Fallon training range employs a complex communications network consisting of a diverse configuration of radios, telephones, and other audio communications channels required to effectively and safely monitor and control all range activities. These channels are accessed and controlled at the Range Operations Center (ROC) operator stations by using a commercial communications switching system. The existing switching system does not provide the required channels or number of control consoles to support the existing range requirements. Because the current system is no longer in production, it is not possible to upgrade the system to meet these requirements. In addition, spare and vendor support is no longer available. The FY2001 program will provide a state-of-the-art, supportable, commercial communications system that will allow range personnel to access and use all range radio and telephone communications assets. THREAT RADAR UPGRADE (FALLON) The Fallon Training Range Complex Electronic Warfare (EW) capabilities consists of 47 emitters on 37 sites located largely within the Dixie Valley area. The FY07 effort will upgrade the EW range to provide new sites and emitters that reflect real world air defense systems that force the aircrew to detect, identify, and defect or evade the threat. P-1 SHOPPING LIST Item No. 100 DD Form 2454, JUN 86 PAGE NO. 4 CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/ BA-3 Aviation Support Equipment Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) $949.5 ID Code FY 2000 FY 2001 FY 2002 $22.6 $33.3 $10.1 DATE: June 2001 P-1 ITEM NOMENCLATURE LI 420400 WEAPONS RANGE SUPPORT EQUIPMENT Other Related Program Elements FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total Cont. Cont. AN/FPS-67A RADAR REPLACEMENT (AFWTF) This program will replace the FPS-67 Radar located at Pico de Este, Puerto Rico with a newer air traffic control radar. The FPS-67 is no longer supportable and the loss of range radar coverage would result in extreme range safety issues. The FAA will assume responsibility for the operations and maintenance of the system. JOINT TACTICAL COMBAT TRAINING SYSTEM (JTCTS) The Joint Tactical Combat Training System (JTCTS) will procure fixed, transportable, and mobile range instrumentation equipment for the USN and USAF for both shore-based (aircrew training) and deployable (ship/sub/aircrew training) applications. JTCTS instrumentation will transmit exercise scenarios; simulate/stimulate all exercise participants sensors/weapons with the exercise scenario; track all exercise participants and events, e.g., weapons engagements; and provide accurate, realistic, and timely feedback. JTCTS is building on technology developed for existing tactical training range systems. The JTCTS Program is in the process of realigning the acquisition strategy. This action is focused toward a contract in FY02. The Navy, as the lead activity, will award an FY02 contract to satisfy an Air Froce requirement. This summary reflects only the USN funding component of the JTCTS. LOW ALTITUDE SURVEILLANCE RADAR (LASR) Due to the low elevation of the San Clemente radar on Mt. Thirst and the terrain between Mt. Thirst and the water, blind spots exist in the low level and surface radar coverage of the ASW and Range Electronic Warfare Simulator (REWS) range areas. It is in these low level blind areas that much of the work with helicopters and surface craft takes place. Air and surface safety surveillance data is required in the Southern California (SOCAL) Offshore Complex operating area south and west of San Clemente Island from the radar horizon to Mt. Thirst and from the surface to 5,000 feet. FY2000 funded the procurement of one (1) low level surveillance radar to cover existing blind spots at San Clemente. FY01 funding will support final integration at SOCAL. P-1 SHOPPING LIST Item No. 100 DD Form 2454, JUN 86 PAGE NO. 5 CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/ BA-3 Aviation Support Equipment Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) $949.5 ID Code FY 2000 FY 2001 FY 2002 $22.6 $33.3 $10.1 DATE: June 2001 P-1 ITEM NOMENCLATURE LI 420400 WEAPONS RANGE SUPPORT EQUIPMENT Other Related Program Elements FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total Cont. Cont. LATR FREQUENCY CONVERSION TO 433 MHz The LATR was initially delivered with a airborne data link operating at a frequency of 141 MHz. This was found to be operationally unsuitable for the Southern California Off Shore Range due to excessive radio frequency interference. Converting the down link frequency to 433 MHz was found to resolve the problem. Subsequent testing at the Virginia Capes (VACAPES) LATR revealed that performance was significantly improved there by using the 433 MHz frequency. As a result, the VACAPES LATR system is being converted to the 433 MHz frequency. FY00 funded the conversion of 100 participant instrumentation packages (PIPs) for the VACAPES LATR. LATR INTEGRATION FACILITY The existing Software Support Activity (SSA) Facility cannot fully support the development and testing for LATR. FY2001 and FY2002 funding will make the current SSA an integration facility that can function as an operational LATR site capable of developing and testing system changes and upgrading hardware and software to support the PMRF Aircraft Combat Maneuverability (ACM) and planned system upgrades. PACIFIC MISSILE RANGE FACILITY (PMRF) UPGRADES Congressional increases of $10.0 million in FY99, and $5.0 million in FY00 have been provided for training range instrumentation upgrades to the PMRF. FY01 Congressional increase of $10.5M will be utilized for a third MRES for PMRF ($7.5M) and training range instrumentation upgrades ($3.0M). P-1 SHOPPING LIST Item No. 100 DD Form 2454, JUN 86 PAGE NO. 6 CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM OTHER PROCUREMENT, NAVY/ BA-3 Aviation Support Equipment Procurement Items ELECTRONIC WARFARE MRES QUANTITY COST (In Thousands) ID Code NOMENCLATURE WEAPONS RANGE SUPPORT EQUIPMENT Prior Years FY 2000 FY 2001 2 7,075 1 5,200 1 7,286 Naval Air Strike and Air Warfare Center QUANTITY COST (In Thousands) FY 2002 VAR 5,000 THREAT RADAR UPGRADE (FALLON) QUANTITY COST (In Thousands) EW THREAT SYSTEMS QUANTITY COST (In Thousands) MRES SPARES QUANTITY COST (In Thousands) VAR 214 SRAM QUANTITY COST (In Thousands) VAR 51,182 VAR 2,991 TACTS/LWTC Datalink QUANTITY COST (In Thousands) 2 642 1 385 1-PHASE-1 12,464 VAR 2,014 UNDERWATER RANGES SWTR (EC) QUANTITY COST (In Thousands) VAR 4,255 VAR 3,942 SWTR (WC) QUANTITY COST (In Thousands) PORTABLE UNDERWATER TRAINING RANGE QUANTITY COST (In Thousands) P-1 SHOPPING LIST Item No. 100 DD Form 2454, JUN 86 PAGE NO. 7 CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM OTHER PROCUREMENT, NAVY/ BA-3 Aviation Support Equipment Procurement Items COMM UPGRADES ITCS UPGRADES QUANTITY COST (In Thousands) ID Code Prior Years NOMENCLATURE WEAPONS RANGE SUPPORT EQUIPMENT FY 2000 FY 2001 FY 2002 787 2 500 FALLON COMMUNICATION UPGRADE QUANTITY COST (In Thousands) 1 565 AN/FPS-67A RADAR REPLACEMENT (AFWTF) QUANTITY COST (In Thousands) 1 2,800 JTCTS* Mobile Core/2 Debrief QUANTITY COST (In Thousands) 1 2,000 Fixed Core/2 Debrief QUANTITY COST (In Thousands) ECP Retrofit LASR SCORE QUANTITY COST (In Thousands) LATR SYSTEM LATR FREQ CONV TO 433MHz QUANTITY COST (In Thousands) 1 1,650 4,226 47 800 100 1,700 LATR INTEGRATION FACILITY QUANTITY COST (In Thousands) PMRF UPGRADES QUANTITY COST (In Thousands) VAR 10,000 VAR 5,000 1 1 200 200 VAR 3,000 VAR 7,500 QUANTITY (MRES) COST (In Thousands) OTHER COSTS 860,311 3,692 4,792 3,187 TOTAL FUNDING 949,487 22,632 33,312 10,129 P-1 SHOPPING LIST Item No. 100 DD Form 2454, JUN 86 PAGE NO. 8 CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 WEAPONS SYSTEM APPROPRIATION/BUDGET ACTIVITY ID Code Other Procurement, Navy BA-3 Aviation Support Equipment COST CODE SC002 ELEMENT OF COST DATE: June 2001 P-1 ITEM NOMENCLATURE/SUBHEAD 43SC WEAPONS RANGE SUPPORT EQUIPMENT ID Code MRES Prior Years Total Cost FY 2000 Quantity 7,075 1 FY 2001 Unit Cost Total Cost 5,200 Unit Cost Total Cost 1 7,286 7,286 NAVAL AIR STRIKE AND AIR WARFARE VAR VAR 5,000 SC003 MRES SPARES VAR VAR 214 SC004 SRAM VAR VAR 4,255 SC007 TACTS/LWTC DATALINK SC012 SHALLOW WATER TRNG RANGE ITCS UPGRADE 2 250 500 FALLON COMM UPGRADE 1 565 565 SWTR (EC) 5,200 Quantity FY 2002 51,182 VAR VAR 2,991 642 1 385 385 12,464 VAR VAR 2,014 Quantity Unit Cost Total Cost VAR VAR 3,942 1 2,800 2,800 SWTR (WC) SC018 COMMUNICATION UPGRADES 787 AN/FPS-67A RADAR REPLACEMENT (AFWTF) SC020 JTCTS ECP Retrofit 2,000 P-1 SHOPPING LIST Item No. 100 DD Form 2454, JUN 86 PAGE NO. 9 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 WEAPONS SYSTEM APPROPRIATION/BUDGET ACTIVITY ID Code Other Procurement, Navy BA-3 Aviation Support Equipment COST CODE ELEMENT OF COST SC021 LASR SC034 LATR SYSTEM ID Code Prior Years Total Cost N/A FY 2000 P-1 ITEM NOMENCLATURE/SUBHEAD Quantity FY 2001 Unit Cost Total Cost 1 1650 1,650 100 17 1,700 Quantity FY2002 Unit Cost Total Cost FY2003 Quantity Unit Cost Total Cost 1 200 200 800 N/A 10,000 VAR VAR 5,000 PMRF MRES 1 200 200 VAR VAR 3,000 VAR VAR 7,500 SC831 PRODUCTION ENGINEERING, OTHER RANGES N/A 79,353 N/A 3,255 N/A 3,565 N/A 2,602 SC860 ACCEPTANCE TEST & EVALUATION N/A 7,001 N/A 90 N/A 124 N/A 125 SC900 INSTALLATION OF EQUIP-NON FMP N/A 9,328 N/A 125 N/A 728 N/A 300 SC971 ILS, OTHER RANGES N/A 32,477 N/A 222 N/A 375 N/A 160 VARIOUS 1/ Quantity Unit Cost Total Cost 4,226 LATR INTEGRATION FACILITY PMRF UPGRADES DATE: June 2001 43SC WEAPONS RANGE SUPPORT EQUIPMENT LATR FREQ CONVERSION TO 433 MHz SC700 UNCLASSIFIED 732,152 1/ The amount identified against this cost element reflects total prior year funding associated with cost elements no longer financed in FY 1999 and beyond. 949,487 22,632 33,312 10,129 P-1 SHOPPING LIST Item No. 100 DD Form 2454, JUN 86 PAGE NO. 10 CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-3 AVIATION SUPPORT EQUIPMENT SUBHEAD 43SC WEAPONS RANGE SUPPORT EQUIPMENT CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY 8/98 FFP AMHERST 03/99 N/A FFP/OPTION AMHERST 08/99 NAVAIR N/A FFP/OPTION AMHERST 7,286 NAVAIR N/A FFP/OPTION VAR VAR NAVAIR N/A 2000 VAR VAR FED IND SUP CTR 2001 VAR VAR 2002 VAR Cost Element/ FISCAL YEAR SC002 MRES 1998 1999 2000 2001 SC003 MRES SPARES 2001 SC004 SPECS AVAILABLE NOW IF NO WHEN AVAILABLE 03/02 YES N/A 05/02 YES N/A 06/00 06/02 YES N/A AMHERST 06/01 06/03 YES N/A FFP/OPTION AMHERST 06/01 06/03 YES N/A VAR VAR VAR * 08/00 YES N/A FED IND SUP CTR VAR VAR VAR * 08/01 YES N/A VAR FED IND SUP CTR VAR VAR VAR * 08/02 YES N/A 1 385 NAVAIR N/A FFP/OPTION SWAGER COMM. CORP. 06/00 08/01 YES N/A VAR VAR NUWC N/A PX NUWC, NEWPORT 02/00 06/01 N/A N/A QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE 1 4,867 NAVAIR 1 2,208 NAVAIR 1 5,200 1 SYS REPL & MOD SC007 TACTS/LWTC DATALINK 2000 SC012 SWTR 2000 SWTR (EC) D. REMARKS *SRAM consists of approximately 70 projects each FY with award dates starting when funds are released and continuing until 30 APRIL of current FY. P-1 SHOPPING LIST Item No. 100 DD Form 2454, JUN 86 PAGE NO. 11 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P-1 SHOPPING LIST DD Form 2446-1, JUL 87 BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) AVIATION SUPPORT EQUIPMENT UNCLASSIFIED Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-3 Aviation Support Equipment SUBHEAD WEAPONS RANGE SUPPORT EQUIPMENT CONTRACT Cost Element/ QUANTITY FISCAL YEAR DATE OF 43SC SPECS IF NO UNIT LOCATION RFP ISSUE METHOD CONTRACTOR AWARD FIRST AVAILABLE WHEN COST OF PCO DATE & TYPE AND LOCATION DATE DELIVERY NOW AVAILABLE (000) SC018 COMM UPGRADES 2001 ITCS UPGRADES 2 250 NAVAIR N/A FFP/OPTION MICROSYSTEMS 01/01 10/01 YES N/A 2001 FALLON COMM UPGRADE 1 565 SPAWARSYSCEN 12/00 FFP TBD 06/01 12/01 YES N/A 1 2,800 SPAWARSYSCEN N/A PX SPAWARSYSCEN 01/02 12/02 YES N.A 1 1,650 SPAWAR SYS CEN N/A PX SPAWAR SYS CEN 02/00 02/01 YES N/A 06/00 01/01 YES N/A 2002 AN/FPS-67A RADAR REPLAC(AFWTF) SC021 LASR SCORE 2000 SAN DIEGO, CA SAN DIEGO, CA SC034 LATR SYSTEM 2000 LATR FREQ CONV TO 433MHz 100 17 NAVAIR 06/00 FFP L3 COMMUNICATIONS 2001 LATR INTEGRATION FACILITY 1 200 NAWCADPAX N/A PX NAWCADPAX 11/00 05/01 N/A 2002 1 200 NAWCADPAX N/A PX NAWCADPAX 11/01 05/02 N/A D. N/A REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST CLASSIFICATION: UNCLASSIFIED P-1 SHOPPING LIST Item No. 100 DD Form 2454, JUN 86 PAGE NO. 12 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/ BA-3 Aviation Support Equipment EXPEDITIONARY AIRFIELDS Program Element for Code B Items: /43SE Other Related Program Elements 0603512N QUANTITY COST (In Millions) Prior Years ID Code FY 2000 FY 2001 FY 2002 $137.5 A $0.1 $3.2 $7.6 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total EXPEDITIONARY AIRFIELDS (EAF) This program provides for procurement of aircraft recovery equipment, landing mat and accessories, airfield lighting, and Visual Landing Aids for Naval Aviation Expeditionary Airfields (EAF). This core funding level directly supports the procurement and fielding of operationalexpeditionaryairfield systems in the three active duty Marine Aircraft Wings and one Reserve Marine Aircraft Wing, testing and training installations, and provides assets for use by the Marine Expeditionary Forces during contingency operations. A total of twenty-eight (28) mobile arresting gear systems (2 refurbished Engineering DevelopmentModel (EDM)) systems and 26 Other Procurement, Navy (OPN) procured systems), as well as associated equipment, accessories, and service changes are procured and fielded with these funds. Equipment procurements are based on inventory shortfalls, product improvements to fill or correct known deficiencies, modernizingEAF equipment to improve maintainability,reliability,and safety-of-flight, and to keep pace with new aircraft and aircraft systems. Additionally, equipment procurements will facilitate forward deployment of EAF systems aboard Rapid Deployment Force/Maritime Prepositioning Force (RDF/MPF) ships which is an operational requirement under the Maritime Corps Master Plan, the Enhanced Maritime Prepositioning Squadron (EMPS) requirement, and the EAF 2000 concept. The FY 2000 budget provided for Integrated Logistics Support (ILS) for EAF procurement products. The FY 2001 budget provided for service change kit procurements for Minimum Operating Strip Lighting Systems (MOSLS), Minimum Operating Strip Kits (MOSKIT) and Supplementary Airfield Lighting Systems Kits (SALKIT) , Production Engineering (PE), and Integrated Logistics Support (ILS) for EAF procurement products. The FY 2002 budget request provides for service change kit procurements for MOSLS Cable Kits (CABKIT), M-31 Mobile Arresting Gear, PE, ILS, and Acceptance Test and Evaluation (AT&E) for EAF procurement products. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 101 CLASSIFICATION: PAGE NO. 1 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/ BA-3 Aviation Support Equipment ID Code Prior Years Service Change Kits A $16.2 F71/2 AM-2 Mat A Procurement Items FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 3163 QUANTITY COST (In Millions) Flatrack FY 2000 EXPEDITIONARY AIRFIELDS ($11.3) A 785 QUANTITY COST (In Millions) Revetment ($4.9) B QUANTITY COST (In Millions) A $6.6 $3.0 QUANTITY COST (In Millions) 22 ($2.8) 6 ($0.8) QUANTITY COST (In Millions) 26 ($3.8) 14 ($2.2) MOSLS $1.9 MOSKIT SALKIT 2 ($0.3) CABKIT QUANTITY COST (In Millions) M-31 Mobile Arresting Gear QUANTITY COST (In Millions) 7 ($1.6) B 5 $5.4 Other Costs A $16.9 Various 1/ A $97.8 $0.1 $0.3 $0.2 Total Funding $137.5 $0.1 $3.2 $7.6 1/ The amount identified against this cost element reflects total prior year funding associated with cost elements no longer financed in FY1997 and beyond, PE, and ILS. 2/ Totals may not add due to rounding. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 101 PAGE NO. 2 CLASSIFICATION: UNCLASSIFIED / 43SE To Complete Total UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System ID Code APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy BA3 - Aviation Support Equipment EXPEDITIONARY AIRFIELDS / 43SE TOTAL COST IN THOUSANDS OF DOLLARS COST CODE SE010 ELEMENT OF COST ID Code Service Change Kits A F72 / AM-2 Mat Flatrack Revetment SE010 FY 2000 Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost 16,183 (11,304) (4,879) MOSLS MOSKIT SALKIT CABKIT SE210 M-31 Mobile Arresting Gear M-31 Mobile Arresting Gear Refurbishment for 2 EDM Units SE800 Integrated Logistics Support SE830 Production Engineering SE860 Acceptance Test & Evaluation A 6,602 A A A (2,788) (3,814) 2,968 6 14 133 155 (798) (2,170) B 3,767 62 13,133 143 1,941 2 7 155 233 (310) (1,631) 5 2 920 418 4,600 835 145 136 30 Various 1/ DD FORM 2446, JUN 86 Prior Years Total Cost 97,824 137,509 P-1 SHOPPING LIST ITEM NO. 101 62 3,247 7,551 CLASSIFICATION: PAGE NO. 3 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD Other Procurement, Navy BA3 - Aviation Support Equipment EXPEDITIONARY AIRFIELDS QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE MOSLS - MOSKIT 6 133 NAWCADLKE Dec-97 Option-FFP MOSLS - SALKIT 14 155 NAWCADLKE Dec-97 MOSLS - SALKIT 2 0 NAWCADLKE MOSLS - CABKIT 7 233 M-31 Arresting Gear 5 M-31 Arresting Gear Refurbishment 2 Cost Element/ FISCAL YEAR CONTRACTOR AND LOCATION 43SE AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE FY 2001 Dec-00 Jun-01 Yes NA Option-FFP Metalite Aviation Lighting Winster Grove, Birmingham UK Metalite Aviation Lighting Winster Grove, Birmingham UK Dec-00 Jun-01 Yes NA Dec-97 Option-FFP Metalite Aviation Lighting Winster Grove, Birmingham UK Dec-01 Jun-02 Yes NA NAWCADLKE Dec-00 Option-FFP *TBD Jul-01 Aug-02 No NA 920 NAWCADLKE Dec-97 Option-FPI(ST) ESCO - Aston, PA Mar-02 Mar-03 No May-01 418 NAWCADLKE Dec-97 Option-CPAF ESCO - Aston, PA Nov-01 Jul-02 No May-01 FY 2002 D. REMARKS * Contractor has not been selected; several contractors being reviewed for selection. DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 101 PAGE NO. 5 Classification: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED Exhibit P-20, Requirements Study APPROPRIATION/BUDGET ACTIVITY DATE: OTHER PROCUREMENT, NAVY/ BA-3 P-1 ITEM NOMENCLATURE Admin Leadtime (after Oct1): 1 Month EXPEDITIONARY AIRFIELDS TBD M-31 Arresting Gear Buy Summary Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from all prior year funding Deliveries from FY 2000 funding Deliveries from FY 2001 funding Deliveries from FY 2002 funding Deliveries from subsequent years’ funding Other Gains Combat Losses/Usage Training Losses/Usage Test Losses/Usage Other Losses/Usage Disposals/Retirements/Attritions/etc. End of Year Asset Position Inventory Objective or Current Authorized Allowance Inventory Objective Actual Training 28 Expenditures Assets Rqd For Combat FY 2000 thru Loads: XXXXX: WRM Rqmt: FY 1999: Pipeline: FY 1998: Other: FY 1997: TOTAL: Remarks: June 2001 Production Lead Time : FY 2000 2 FY 2001 12 Months FY 2002 5 920 4,600 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 2 28 Other than Training Usage FY 2000 thru XXXXX: FY 1999: FY 1998: FY 1997: 28 2 28 Disposals (Vehicles/Other) FY 2000 thru XXXXX: FY 1999: FY 1998: FY 1997: Vehicles Eligible for FY 2001 Replacement: Vehicles Eligible for FY 2002 Replacement: Vehicle Augment: Aircraft: TOAI: PAA: TAI Attrition Res: BAI Inactive Inv: Storage: Administrative leadtime is 6 Months for FY 2002 and 1 Month for the outyears since first year of production for M-31 Arresting Gear is FY 2002. The contract method for the outyears is with options resulting in a shorter administrative leadtime. P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 101 CLASSIFICATION: PAGE NO. 6 UNCLASSIFIED DATE FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY June 2001 P-1 ITEM NOMENCLATURE Weapon System OTHER PROCUREMENT, NAVY/ BA-3 EXPEDITIONARY AIRFIELDS Production Rate Manufacturer’s Name and Location ESCO - Aston, PA Item M-31 Arresting Gear MSR 0.33 ECON 1 MAX 1.25 Procurement Leadtimes ALT Prior ALT After Initial Reorder to Oct 1 Oct 1 Mfg PLT Mfg PLT 0 1 12 12 FISCAL YEAR 2000 ITEM / MANUFACTURER F Y S V C Q D B T Y E L A L F Y S V C Q D B T Y E L A L 2 5 0 0 2 5 1999 O C T N O V FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2001 S E P O C T N O V D E C J A N FISCAL YEAR 2002 ITEM / MANUFACTURER M-31 Arresting Gear - EMD Refurb M-31 Arresting Gear 2002 2002 2001 O C T N O V F E B J A N F E B M A R A P R M A Y A M A R A P R M A Y J U N J U L A U G S E P A U G S E P J U N J U L A U G 1 CALENDAR YEAR 2003 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L 1 A Remarks: DD Form 2445, JUL 87 311 / 244 Previous editions are obsolete P-1 SHOPPING LIST ITEM NO 101 B A L FISCAL YEAR 2003 CALENDAR YEAR 2002 D E C Unit of Measure E Total 13 PAGE 7 Exhibit P-21 Production Schedule B A L CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE Other Procurement, Navy/BA-3 - Aviation Support Equipment Program Element for Code B Items: Other Related Program Elements QUANTITY COST (In Millions) A/C Rearming Equipment - 43SH Prior Years ID Code FY 2000 FY 2001 FY 2002 $289.0 A $12.2 $10.5 $12.3 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total Continuing Continuing This program funds the procurement of common Armament Support Equipment (ASE), and Weapons Support Equipment (WSE) under the procurement and inventory control of the Naval Inventory Control Point (NAVICP) and the Naval Air Systems Command. This budget line supports: (a) initial outfitting for all in-production weapons systems; (b) procurement of new support equipment (SE), and (c) procurement of Armament Weapon Support Equipment (AWSE). These items support sustained operations ,and surge deployments of the CV battle groups. Shipboard/ShorebasedWSE is utilized by weapons departments to handle, transport, and maintain weapons. Examples of the equipment are the A/S32K-1D Weapons Loader, AERO 74A Adapter, and the A/E32K-4A Munitions Trailer. Shipboard/ShorebasedASE is utilized by squadrons and supporting activities to load and service aircraft weapons and guns. Examples of the equipment are the HLU-196D/E Bomb Hoist, the ADU-722/E Hoist Adapter, the MHU-151/M Trailer and the Next Generation Handler (shipboard). DD Form 2454, JUN 86 PAGE NO. P-1 SHOPPING LIST 102 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P40a APPROPRIATION/BUDGET ACTIVITY 2. HLU-196D/E Bomb Hoist ID Code A Prior Years 36,570 198 A Qty 3. A/S32K-1D Wpns Loader ECP A Qty 4. Cycling Adapter A A Qty 6. ADU-699A/E Sonobuoy Adptr FY 2000 8,144 72 FY 2001 FY 2002 6,347 5,897 6,217 410 199 199 20,122 583 265 39 9 17,692 893 1,821 2,060 1179 56 121 137 A 200 Qty 7. ADU-433/434 Adapter 4 A Qty 8. ADU-514/A/E Missile Adptr 1,055 411 358 144 A 829 Qty 9. Next Generation Handler(ship) A/C Rearming Equipment- 43SH 681 Qty 5. A/M32K-4A Mun Trlr JUNE 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/ BA-3 - Aviation Support Equipment Procurement Items 1. LALS II Qty DATE: 415 A Qty SUB TOTAL DD Form 2454, JUN 86 82,369 ITEM NO. 9,713 7,918 P-1 SHOPPING LIST 102 PAGE NO. 9,106 CLASSIFICATION: 2 UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P40a DATE: APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/ BA-3 - Aviation Support Equipment A/C Rearming Equipment- 43SH Procurement Items 10. A/M32U-13B Maint Trlr ID Code Prior Years FY 2000 A 420 14 A 252 394 Qty 11. ADU-722/E Hoist Adptr Qty 12. A/F32K-1A Bomb Table FY 2002 520 26 A Qty 13. AERO-91A Adapter FY 2001 JUNE 2001 A Qty 14. LME A Qty 15. MHU-151/M Trailer A Qty 16. AERO-74A Adapter A Qty 17. ADU-400/E Adapter A 666 18 Qty 18. A/S32K-1D CILOP A Qty 1/ The amount identified against this cost element reflects total prior year funding associated with cost elements no longer financed in FY1997 and beyond. SUB TOTAL Other TOTAL DD Form 2454, JUN 86 57,456 243,554 301,010 9,713 2,444 12,157 ITEM NO. 8,590 10,292 1,901 1,973 10,491 12,265 P-1 SHOPPING LIST 102 PAGE NO. 3 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: JUNE 2001 ID Code APPROPRIATION/BUDGET ACTIVITY A/C Rearming Equipment - 43SH A OTHER PROCUREMENT, NAVY/BA-3 - Aviation Support Equipment TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost Quantity FY 2000 Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost Total Cost SH004 Shipboard/Shorebased AWSE 1. LALS II A 36,570 2. HLU-196D/E Bomb Hoist A 1,263 3. A/S32K-1D Weapons Loader ECP A 293 4. Cycling Adapter A 583 9 29.44 265 5. A/M32K-4A Munitions Trailer A 17,692 56 15.95 893 6. ADU-699A/E Sonobuoy Adapter A 7. ADU-433/434 Adapter A 8. ADU-514A/E Missile Adapter A 9. Next Generation Munitions Handler-Ship A 10. A/M32U-13B Maint Trailer A 14 30.00 420 11. ADU-722/E Hoist Adapter A 394 0.64 252 12. A/F32K-1A Bomb table A 15. MHU-151/M Trailer A 17. ADU-400/E Adapter A 18. A/S32K-1D CILOP A SH830 Production Engineering SH860 Acceptance Test and Evaluation Other* 1,055 72 113.11 144 2.85 8,144 199 29.63 5,897 199 31.24 6,217 121 15.05 1,821 137 15.04 2,060 4 50.00 200 415 2.00 829 26 20.00 520 18 37.00 666 411 23,083 1,954 1,501 1,553 3,402 410 400 420 217,069 80 301,010 12,157 P-1 SHOPPING LIST DD FORM 2446, JUN 86 ITEM NO. 102 10,491 PAGE NO. 12,265 CLASSIFICATION: 4 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE JUNE 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy/BA-3 - Aviation Support Equipment A/C Rearming Equipment - 43SH Cost Element/ FISCAL YEAR AWARD DATE DATE OF FIRST DELIVERY TECH DATA AVAILABLE NOW? FP/OPTION Hydraulics International 03/01/00 05/01/01 Yes FP/OPTION FP/OPTION BREEZE EASTERN BREEZE EASTERN 12/01/00 12/01/01 10/01/01 10/01/02 Yes Yes 04/00 C/FFP FP/OPTION TBD TBD 12/15/00 12/01/01 08/30/01 11/01/02 Yes Yes NAWC Lakehurst 05/00 C/FFP TBD 12/01/00 10/01/01 Yes 30.00 NAWC Lakehurst 04/00 C/FFP DYNCORP 12/15/00 08/01/01 Yes 394 0.64 NAWC Lakehurst 06/00 C/FFP TBD 12/01/00 05/01/01 Yes 415 2.00 NAWC Lakehurst 06/01 C/FFP TBD 12/01/01 11/01/02 Yes UNIT COST SH004 LALS II FY 2000 72 113.11 NAWC Lakehurst HLU-196D/E Bomb Hoist FY 2001 FY 2002 199 199 29.63 31.24 NAWC Lakehurst NAWC Lakehurst A/M32K-4A Munitions Trailer FY 2001 FY 2002 121 137 15.05 15.04 NAWC Lakehurst NAWC Lakehurst ADU-699A/E Adapter FY 2001 4 50.00 A/M32U-13B Maintenance Trailer FY 2001 14 ADU-722/E Adapter FY 2001 ADU-514A/E Missile Adapter FY 2002 D. 43SH CONTRACTOR AND LOCATION QUANTITY LOCATION OF PCO RFP ISSUE DATE 07/98 01/00 CONTRACT METHOD & TYPE SUBHEAD DATE REVISIONS AVAILABLE REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 102 PAGE NO. 5 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE JUNE 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy/BA-3 - Aviation Support Equipment A/C Rearming Equipment Cost Element/ FISCAL YEAR QUANTITY UNIT COST LOCATION OF PCO RFP ISSUE DATE A/F32K-1A Bomb Table FY 2002 26 20.00 NAWC Lakehurst 01/00 ADU-400/E Adapter FY 2002 18 37.00 NAWC Lakehurst 06/01 CONTRACT METHOD & TYPE SUBHEAD 43SH CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY TECH DATA AVAILABLE NOW? C/FFP TBD 12/01/01 11/01/02 Yes C/FFP TBD 12/01/01 11/01/02 Yes DATE REVISIONS AVAILABLE SH004 D. REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 102 PAGE NO. 6 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED Exhibit P-20, Requirements Study APPROPRIATION/BUDGET ACTIVITY Date: P-1 ITEM NOMENCLATURE Other Procurement, Navy/ BA-3 Aviation Support Equipment Admin Leadtime (after Oct 1): Production Leadtime: 3 months HLU-196D/E Bomb Hoist FY 2000 Buy Summary Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from all prior year funding Deliveries from FY 2001 funding Deliveries from FY 2002 funding Deliveries from FY 2003 funding Deliveries from subsequent years’ funding Other Gains Combat Losses/Usage Training Losses/Usage Test Losses/Usage Other Losses/Usage Disposals/Retirements/Attritions/etc. End of Year Asset Position Inventory Objective or Current Authorized Allowance Inventory Objective Actual Training 566 Expenditures Assets Rqd For Combat FY 1998 thru Loads: XXXXX: WRM Rqmt: FY 1997: Pipeline: FY 1996: Other: FY 1995: TOTAL: Remarks: DD Form 2454, JUN 86 JUNE 2001 10 months FY 2001 199 29.63 5,897 FY 2002 199 31.24 6,217 3 3 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 3 199 3 566 Other than Training Usage FY 1998 thru XXXXX: FY 1997: FY 1996: FY 1995: 3 566 ITEM NO. 202 566 Disposals (Vehicles/Other) FY 1998 thru XXXXX: FY 1997: FY 1996: FY 1995: P-1 SHOPPING LIST 102 PAGE NO. Vehicles Eligible for FY 2000 Replacement: Vehicles Eligible for FY 2001 Replacement: Vehicle Augment: Aircraft: TOAI: PAA: TAI Attrition Res: BAI Inactive Inv: Storage: CLASSIFICATION: 7 UNCLASSIFIED FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY BA-3 - Aviation Support Equipmen Production Rate Manufacturer’s Item Name and Location MSR ECON MAX HLU-196D/E Breeze Eastern Union NJ 15 20 30 DATE Weapon System ALT Prior to Oct 1 June 2001 NOMENCLATURE A/C Rearming Equipment P-1 ITEM Procurement Leadtimes ALT After Initial Oct 1 Mfg PLT 7 16 Reorder Mfg PLT 11 FISCAL YEAR 2000 ITEM / MANUFACTURER HLU-196D/E OPTION 1 FISCAL YEAR 2001 F Y S V C Q D B T Y E L A L 01 N 199 0 199 F Y S V C Q D B T Y E L A L O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 01 02 N N 199 199 0 0 199 199 16 16 16 A 16 16 17 17 17 17 17 17 17 1999 O C T N O V CALENDAR YEAR 2000 D E C J A N F E B M A R A P R J U N M A Y J U L A U G CALENDAR YEAR 2001 S E P O C T N O V D E C J A N HLU-196D/E OPTION 1 OPTION 2 F E B M A R A P R M A Y J U N J U L A U G S E P A 2001 FISCAL YEAR 2003 CALENDAR YEAR 2002 CALENDAR YEAR 2003 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Remarks: DD Form 2445, JUL 87 311 / 244 P-1 SHOPPING LIST ITEM NO 102 PAGE B A L 199 FISCAL YEAR 2002 ITEM / MANUFACTURER Unit of Measure MONTHS Total 23 8 Exhibit P-21 Production Schedule B A L UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY / BA 3 AVIATION SUPPORT EQUIPMENT AIRCRAFT LAUNCH AND RECOVERY EQUIPMENT (ALRE) - 43SJ 421600 Other Related Program Elements Program Element for Code B Items: 0204261N, 0204112N, and 0204161N Prior Years QUANTITY COST (In Millions) $568.6 ID Code NOT APPLICABLE FY 2000 FY 2001 FY 2002 $39.6 $35.8 $27.5 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total CONTINUING CONTINUING This program provides for procurement of major aircraft Launch, Recovery, and Visual Landing Aids (VLA) equipment as well as ancillary items required for installation aboard aircraft carriers, air capable combatant vessels, amphibious assault ships, and shore stations. Most procurements are initiated due to one of the following reasons: (1) urgent fleet problems associated with the safe and reliable operation of existing equipment; (2) expanding responsibilities in support of helicopter operations on Air Capable Ships (ACS) and Vertical / Short Take-Off and Landing (V/STOL) aircraft, and; (3) the demand for increased launch and recovery equipment reliability, availability, and maintainability (RAM); capability; and margin of safety. Shipboard installed items procured under this program are for operational fleet aircraft carriers, air capable combatant vessels, and amphibious assault ships. Major equipment and service changes procured in support of the Fleet Modernization Program (FMP) are generally installed by shipyard personnel during routine or restricted availabilities and regular overhauls. Non-FMP installations include minor equipments and service changes that are installed by Alteration Installation Teams (AIT) or Voyage Repair Teams (VRT) from the Naval Aviation Depots (NADEPs) under the direction of Fleet Type Commanders and the Naval Air Warfare Center, Aircraft Division (NAWCAD), Lakehurst, NJ. Type Commanders determine shorebased installed item requirements The FY 2000 program request consists of Aircraft Carrier (Launcher, Arresting gear and Visual Landing Aids) and Air Capable Ships (Helicopter Landing System) service change procurements. Also, included is funding for LRLS, ADMACS / ISIS, IFLOLS, PE, ILS, ATE, and FMP/NFMP installations for FY 1999 and prior years procurements. The FY 2001 budget request consists of Aircraft Carrier (Launcher, Arresting gear and Visual Landing Aids) and Air Capable Ships (Helicopter Landing System) service change procurements. Also, included is funding for ADMACS / ISIS, IFLOLS, PE, ILS, ATE, and FMP/NFMP installations for FY 2000 and prior years procurements. The FY 2002 budget request consists of Aircraft Carrier (Launcher, Arresting gear and Visual Landing Aids) and Air Capable Ships (Helicopter Landing System) service change procurements. Also, included is funding for IFLOLS, MORIAH, PE, ILS, ATE, and FMP/NFMP installations for FY 2001 and prior years procurements. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 103 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY Procurement Items ID Code SERVICE CHANGE KITS Various 1/ QUANTITY COST (In Millions) A LRLS - CV(N) QUANTITY COST (In Millions) B LRLS - Shore QUANTITY COST (In Millions) B ADMACS-ISIS CV(N) QUANTITY COST (In Millions) B IFLOLS - CV(N) QUANTITY COST (In Millions) B IFLOLS - Shore QUANTITY COST (In Millions) B AS/32P-25 Fire Truck QUANTITY COST (In Millions) A Prior Years FY 2000 FY 2001 FY 2002 69.4 9.5 5.3 6.3 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 357.4 5 5 1.0 1.2 4 0.6 1 2 3 2.1 4.2 6.5 5 5 7.1 4.9 3 8 6 2.5 4.0 3.0 11.3 CLASSIFICATION: DD Form 2454, JUN 86 ITEM NO. 103 PAGE NO. 2 UNCLASSIFIED To Complete Total UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY Prior Years FY 2000 FY 2001 FY 2002 QUANTITY COST (In Millions) 4.5 1.1 0.8 0.8 QUANTITY COST (In Millions) 12.6 3.3 2.6 1.7 QUANTITY COST (In Millions) 0.2 1.1 0.0 0.0 Installation - NFMP QUANTITY COST (In Millions) 71.2 8.3 7.3 9.3 Installation - FMP QUANTITY COST (In Millions) 31.2 3.5 9.2 6.4 Procurement Items ID Code MORIAH - CV(N) QUANTITY COST (In Millions) B MORIAH - Shore QUANTITY COST (In Millions) B VISUAL - CV(N) QUANTITY COST (In Millions) FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 B VISUAL - Shore QUANTITY COST (In Millions) ILS PE ATE * * Transfer to NAVSEA 1/ The amount identified against this cost element reflects total prior year funding associated with cost elements no longer financed in FY 1999 and beyond. TOTAL 568.6 39.6 35.8 27.5 CLASSIFICATION: DD Form 2454, JUN 86 ITEM NO. 103 *Acceptance Test and Evaluation funding is less than $50K for FY2001 & FY2003 PAGE NO. 3 UNCLASSIFIED To Complete Total UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System ID Code APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy OTHER PROCUREMENT, NAVY / BA 3 AVIATION SUPPORT EQUIPMENT AIRCRAFT LAUNCH AND RECOVERY EQUIPMENT (ALRE) - 43SJ TOTAL COST IN THOUSANDS OF DOLLARS COST CODE SJ040 ELEMENT OF COST Service Change Kits ID Code Prior Years Total Cost A FY 2000 Quantity Unit Cost 69,361 LAUNCHER Catapults - CV(N) VISUAL LANDING AIDS Visual Landing Aids - CV(N) Visual Landing Aids - ACS RECOVERY Arresting Gear - CV(N) Helicopter Landing System (HLS) - ACS FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity 9,525 5,288 6,285 9,138 2,659 4,032 55 338 365 223 497 1,082 844 847 686 332 N/A Various 1/ SJ210 SJ220 SJ230 LRLS - CV(N) LRLS - Shorebased ADMACS / ISIS - CV(N) B B B 1,030 612 2,100 5 240 1,200 2 2,113 4,226 3 2,177 6,530 SJ240 SJ250 SJ260 TBD TBD TBD TBD IFLOLS - CV(N) IFLOLS - Shorebased P-25 FIRE TRUCK Moriah - CV(N) & L Class Moriah - Shorebased VISUAL - CV(N) VISUAL - Shorebased B B A B B B B 7,109 5 3 986 818 4,930 2,453 8 500 4,000 SJ800 SJ830 SJ860 Integrated Logistics Suppport Production Engineering Acceptance, Test & Evaluation 4,457 12,649 184 1,128 3,271 1,100 822 2,606 45 764 1,693 37 SJ900 SJ910 Installation - NFMP Installation - FMP 71,224 31,270 8,279 3,506 7,284 9,226 9,322 6,399 39,618 35,801 27,500 CLASSIFICATION: Unit Cost Total Cost 357,390 6 500 3,000 11,319 1/ The amount identified against this cost element reflects total prior year funding associated with cost elements no longer financed in FY 1997 and beyond. DD FORM 2446, JUN 86 568,705 P-1 SHOPPING LIST ITEM NO. 103 PAGE NO. 4 UNCLASSIFIED 10:09 AM7/18/01 CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD Other Procurement, Navy OTHER PROCUREMENT, NAVY / BA 3 AVIATION SUPPORT EQUIPMENT Cost Element/ FISCAL YEAR AIRCRAFT LAUNCH AND RECOVERY EQUIPMENT (ALRE) CONTRACT METHOD CONTRACTOR AWARD & TYPE AND LOCATION DATE 43SJ DATE OF FIRST DELIVERY TECH DATA AVAILABLE NOW ? DATE REVISIONS AVAILABLE QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE SJ240 IFLOLS - CV(N) 5 986 NAWCAD PAX Not Applicable Project Order Raytheon Systems Company Indianapolis, IN 6/00 10/01 Yes N/A SJ250 IFLOLS - Shorebased 3 818 NAWCAD PAX Not Applicable FP-LOE Raytheon Systems Company Indianapolis, IN 6/00 7/01 Yes N/A SJ230 ADMACS / ISIS 3 2,177 NAWCAD LKE Not Applicable Project Order NAWCAD LKE*** 12/00 1/02 Yes N/A SJ250 IFLOLS - Shorebased 8 500 NAWCAD LKE Not Applicable FFP Raytheon Systems Company Indianapolis, IN 12/00 1/02 Yes N/A 6 500 NAWCAD PAX Not Applicable FFP Raytheon Systems Company Indianapolis, IN 12/01 1/03 Yes N/A FY2000 FY 2001 FY 2002 SJ250 IFLOLS - Shorebased D. REMARKS ***NAWCAD LKE performs system procurement and integration of these components to create ADMACS/ISIS. DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 103 PAGE NO. 6 Classification: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: CATAPULTS RELIABILITY / MAINTAINABILITY MODIFICATION TITLE: LAUNCH - TROUGH COVERS DESCRIPTION/JUSTIFICATION: This Launcher Service replaces the two piece steel trough covers with a Corrosion Resistant Steel / Material one piece Inconel clad trough cover. For Service Change 408, 68 Class ships apply and for Service Change 622, 72 Class ships apply. This is a Type Commander funded for hardware and installation. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ Not Applicable FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - Non-FMP TOTAL PROCUREMENT 14 38.867 2.776 2 0.249 0.080 13 16.250 55.446 0.024 1 1.172 1.196 7.619 3.810 0.130 0.039 2 2.959 10.747 16 0.002 46.486 2.905 0.405 0.119 16 0.002 ITEM 103 PAGE 8 20.381 67.391 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued) CATAPULTS MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: Shipyard ADMINISTRATIVE LEADTIME: 2 Months CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A Cost: INSTALLATION SUPPORT PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - Non-FMP Prior Years Qty $ 0.750 13 15.500 13 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 16 Out 16 16.250 FY 2001 2 3 PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A FY 1999 Qty $ 1 1 4 LAUNCH - TROUGH COVERS FY 2000 Qty $ * 1 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ FY 2004 Qty $ N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ 1.172 1.172 1 Total $ 0.7 14 16. Qty 2 2.959 2 2.9 2 2.959 16 20. FY 2002 2 3 4 1 FY 2003 2 3 4 1 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL 16 16 * Assets available in supply system. ITEM 103 PAGE 9 P-3A CLASSIFICATION: UNCLASSIFIED 50 672 59 381 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: C13-2 CATAPULT RELIABILITY / MAINTAINABILITY MODIFICATION TITLE: LAUNCH- IMPROVED PISTON DESCRIPTION/JUSTIFICATION: Launcher Service Change 633 replaces existing C13-2 catapult pistons with an improved design and titanium material which extends service life and decreases maintenance man-hours. This is a Type Commander funded installation. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ In Production First Article Test Completed 03/00 FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - Non-FMP TOTAL PROCUREMENT 11 4.378 0.398 3 1.379 0.460 0.250 0.161 0.065 0.012 0.064 0.018 4.789 0.077 1.461 6 2.335 0.389 7 0.069 0.018 8 0.015 2.437 2.786 0.398 27 0.025 8 0.473 0.209 0.015 2.826 ITEM 103 10.878 0.403 16 PAGE 10 0.030 11.590 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued) C13-2 CATAPULT MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: Ships Force (By Attrition) ADMINISTRATIVE LEADTIME: 5 Months CONTRACT DATES: FY 2000: Mar-00 DELIVERY DATE: FY 2000: Aug-01 Cost: Prior Years Qty $ FY 1999 Qty $ PRODUCTION LEADTIME: FY 2001: Mar-01 FY 2001: Aug-02 FY 2000 Qty $ FY 2001 Qty $ 0.015 8 * INSTALLATION SUPPORT PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - Non-FMP INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 11 Out 2 8 2 2 4 3 2 1 2 FY 2002 2 3 2 2 4 6 2 1 0.015 FY 2003 2 3 4 17 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ 0.015 0.015 3 * 3 2 FY 2001 2 3 LAUNCH- IMPROVED PISTON 8 1 FY 2004 Qty $ 0.015 Mar-02 Aug-03 FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ 0.015 FY 2004 2 3 4 3 2 * * * 0.015 0.015 1 FY 2005 2 3 4 1 16 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL 20 16 * Ship's Force Installation ITEM 103 PAGE Total $ 0.060 11 * * Qty 11 P-3A CLASSIFICATION: UNCLASSIFIED 0.060 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: VARIOUS VARIOUS MODIFICATION TITLE: LAUNCH - VARIOUS FY 2006 QTY $ QTY DESCRIPTION/JUSTIFICATION: Summary page of all Launcher Service Changes that do not exceed $5 million in either budget year or $10 million in all years. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ Not Applicable FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2007 QTY $ TC $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - Non-FMP TOTAL PROCUREMENT 15.440 0.926 0.140 0.324 1.246 18.076 1.806 0.680 0.079 0.071 0.045 0.308 0.106 0.295 0.005 0.105 0.040 2.295 0.871 0.374 46.950 64.955 3.187 4.229 1.671 2.520 3.365 3.694 4.163 5.554 59.336 80.952 CLASSIFICATION: UNCLASSIFIED ITEM 103 PAGE 16 CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued) VARIOUS INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: VARIOUS ADMINISTRATIVE LEADTIME: N/A CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: Prior Years FY Qty $ Qty INSTALLATION SUPPORT 1.621 PRIOR YEARS 45.329 FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - Non-FMP 46.950 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In Out FY 2001 2 3 4 MODIFICATION TITLE: PRODUCTION LEADTIME: FY 2001: VARIOUS FY 2001: VARIOUS VARIOUS VARIOUS 1999 $ 0.470 2.717 FY 2000 Qty $ 0.721 0.950 3.187 1 FY 2002 2 3 LAUNCH - VARIOUS 1.671 4 1 FY 2001 Qty $ 1.054 2.169 N/A FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ 0.835 2.864 FY 2004 Qty $ VARIOUS VARIOUS FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty Total $ 4.701 54.029 0.142 0.314 0.150 0.456 0.150 3.365 4.163 59.336 FY 2003 2 3 4 1 ITEM 103 FY 2004 2 3 4 1 PAGE FY 2005 2 3 17 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: ACS ASGSI ENVIRONMENTAL MODIFICATION TITLE: VLA - ASGSI - ACS DESCRIPTION/JUSTIFICATION: The Advanced Stabilized Glide Slope Indicator (ASGSI) provides environmentally friendly, and lower cost replacement for the current Stabilized Glide Slope Indicator (SGSI) System on Air Capable Ships. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ FY 1999 QTY $ NOT APPLICABLE FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY TOTAL QTY $ $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - Non-FMP TOTAL PROCUREMENT #DIV/0! 0.167 0.083 0.167 0.083 * 0.250 ITEM 103 PAGE * Inventory Object decreased from 225 units to 183 units due to the decommsioning of ships which will be replaced by new construction. 18 0.250 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued) ACS ASGSI MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIPYARD - VRT ADMINISTRATIVE LEADTIME: 5 Months CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A Cost: Prior Years Qty $ VLA-ASGSI - ACS PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A FY 1999 Qty $ FY 2000 FY 2001 Qty $ Qty $ FY 2002 Qty $ 12 Months FY 2002: FY 2002: ($ in Millions) FY 2003 FY 2004 Qty $ Qty $ Qty N/A N/A FY 2005 $ Qty FY 2006 $ Qty FY 2007 $ To Complete Qty $ INSTALLATION SUPPORT PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - Non-FMP INSTALLATION SCHEDULE: FY 2000 & Prior In Out 1 FY 2001 2 3 4 1 FY 2002 2 3 4 1 FY 2003 2 3 4 1 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL 183 * Inventory Object decreased from 225 units to 183 units due to the decommsioning of ships which will be replaced by new construction. ITEM 103 PAGE 19 P-3A CLASSIFICATION: UNCLASSIFIED Total Qty $ CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: VLA VARIOUS MODIFICATION TITLE: VLA VARIOUS VLA VARIOUS DESCRIPTION/JUSTIFICATION: The equipment and installation costs represented on this P-3a are for individual modification programs that do not exceed $5 million in either budget year or $10 million in all years. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ Not Applicable FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - Non-FMP TOTAL PROCUREMENT 1.201 1.069 0.055 0.703 0.720 3.748 0.503 0.173 0.382 0.140 0.043 0.022 0.546 0.204 0.156 0.056 1.630 0.595 0.912 2.789 0.844 2.435 1.092 1.212 2.025 3.478 2.432 3.364 ITEM 103 PAGE 20 7.305 13.278 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued) VLA VARIOUS MODIFICATION TITLE: VLA VARIOUS INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: VARIOUS ADMINISTRATIVE LEADTIME: VARIOUS CONTRACT DATES: FY 2000: VARIOUS DELIVERY DATE: FY 2000: VARIOUS Cost: Prior Years Qty $ INSTALLATION SUPPORT 0.642 PRIOR YEARS 0.270 FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - Non-FMP 0.912 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In Out FY 2001 2 3 PRODUCTION LEADTIME: VARIOUS FY 2001: VARIOUS FY 2001: VARIOUS FY 1999 Qty $ 0.602 0.109 0.133 FY 2000 Qty $ 0.667 0.110 0.166 0.149 0.844 4 1 FY 2002 3 1.092 4 FY 2001 Qty $ 0.805 0.865 ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ 0.857 1.280 FY 2002: FY 2002: FY 2004 Qty $ FY 2005 Qty $ VARIOUS VARIOUS FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Total 0.065 0.290 0.295 $ 3.573 2.634 0.299 0.214 0.585 2.025 2.432 7.305 FY 2003 2 3 4 1 FY 2004 2 4 1 FY 2005 2 3 4 1 FY 2006 2 3 1 FY 2007 2 3 Qty TC 4 TOTAL The equipment and installation costs represented on this P-3a are for individual modification programs that do not exceed $5 million in either budget year or $10 million in all years. ITEM 103 PAGE 21 P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: Mark 7 Mod 2, 3, 4 Safety/Cost Reduction MODIFICATION TITLE: REC-CROV Retract Sys Upgrade DESCRIPTION/JUSTIFICATION: This new CROV / Retract System will accomplish the objectives of the CV OAG Priority #10 Arresting Gear Improvements (CV OAG Air Dept Priority #3 to restore margins of safety to the Mark 7 Arresting Gear System). The new system will also reduce system life cycle cost by reducing "O" level maintenance. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1999 FY 1998 & Prior QTY $ QTY $ Not Applicable FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY TOTAL $ QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST-Non-FMP TOTAL PROCUREMENT 0.300 2.870 5.444 8.614 #DIV/0! ITEM 103 PAGE 22 * Inventory Objective decreased from 65 units to 64 units. This is a result of the service change occuring on the CV(N) 77 (4 engines) instead of the CV(N) 63 (5 engines). CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued) INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: MODIFICATION TITLE: Mark 7 Mod 2, 3, 4 VRT/Shipyard 2 Months N/A N/A Prior Years Qty $ FY 1999 Qty $ REC-CROV Retract Sys Upgrade PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A FY 2000 Qty $ 10 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ FY 2004 Qty $ N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Total Qty $ Qty $ INSTALLATION SUPPORT PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST-Non-FMP INSTALLATION SCHEDULE: FY 2000 & Prior 1 In Out * FY 2001 2 3 4 1 FY 2002 2 3 4 1 FY2003 2 3 4 1 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL * Inventory Objective decreased from 65 units to 64 units. This is a result of the service change occuring on the CV(N) 77 (4 engines) instead of the CV(N) 63 (5 engines). ITEM 103 PAGE 23 P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION REC - VARIOUS TYPE MODIFICATION: REC - VARIOUS MODIFICATION TITLE: REC - VARIOUS DESCRIPTION/JUSTIFICATION: The equipment and installation costs represented on this P-3a are for individual modification programs that do not exceed $5 million in eithe r budget year or $10 million in all years. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ Not Applicable FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - Non-FMP TOTAL PROCUREMENT 0.075 0.110 0.025 6.510 1.483 0.831 0.332 1.926 1.533 6.105 1.770 0.359 0.596 0.102 0.471 0.084 0.100 0.553 0.182 0.921 0.149 4.311 0.876 0.100 0.724 4.336 1.185 2.714 2.378 3.365 1.491 4.152 1.916 4.519 7.694 19.086 CLASSIFICATION: UNCLASSIFIED ITEM 103 PAGE 24 CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued REC - VARIOUS MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: VARIOUS ADMINISTRATIVE LEADTIME: VARIOUS CONTRACT DATES: FY 2000: VARIOUS DELIVERY DATE: FY 2000: VARIOUS Cost: INSTALLATION SUPPORT PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - Non-FMP Prior Years Qty $ 0.554 0.170 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In Out FY 1999 FY 2000 FY 2001 Qty $ Qty $ Qty $ 0.443 0.761 0.870 0.430 0.640 0.202 0.312 0.977 0.419 0.724 FY 2001 2 3 PRODUCTION LEADTIME: FY 2001: VARIOUS FY 2001: VARIOUS 1.185 4 1 2.378 FY 2002 2 3 4 1 VARIOUS FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ 0.831 1.491 FY 2003 2 3 4 REC - VARIOUS 1 FY 2004 Qty $ VARIOUS VARIOUS FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Total 0.005 $ 3.459 1.442 1.713 1.080 0.000 1.080 0.000 1.916 7.694 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL * Less than $500 per install The equipment and installation costs represented on this P-3a are for individual modification programs that do not exceed $5 million in either budget year or $10 million in all years. P-3A CLASSIFICATION: UNCLASSIFIED ITEM 103 PAGE 25 Qty CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: New System Recapitalization MODIFICATION TITLE: Moriah - Shorebased DESCRIPTION/JUSTIFICATION: Moriah integrates the measuring and display of Wind and Meterological information into one integrated system. Systems will be installed at Naval Training Center - Great Lakes, IL; Naval Aviation Technical Training Center (NATTC) - Lakehurst, NJ; and Naval Technical Training Unit - Keesler AFB. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ FY 1999 QTY $ MS I/11 FY2001 FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - Non-FMP TOTAL PROCUREMENT #DIV/0! 0.040 0.030 0.040 0.030 0.070 ITEM 103 PAGE 26 0.070 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: New System MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT/VRT ADMINISTRATIVE LEADTIME: 4 Months CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A Cost: Prior Years Qty $ Moriah - Shorebased * PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A FY 1999 Qty $ FY 2000 Qty $ 8 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ FY 2004 Qty $ N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty INSTALLATION SUPPORT PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - Non-FMP INSTALLATION SCHEDULE: FY 2000 & Prior 1 In Out FY 2001 2 3 4 1 FY 2002 2 3 4 1 FY 2003 2 3 4 1 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL * Production Leadtime decreased from 12 months to 8 months as a result of the components becoming commercially available. ITEM 103 PAGE 27 P-3A CLASSIFICATION: UNCLASSIFIED Total $ CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: New System Recapitalization MODIFICATION TITLE: Moriah - CV(N) & L Class DESCRIPTION/JUSTIFICATION: Morian integrates the measuring and display of Wind and Meterological information into one integrated system. Applicable platforms include 12 CV(N)s, 2 AGF, 2 LCC, 5 LHA and 7 LHD. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ FY 1999 QTY $ MS I/II FY2001 FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY TOTAL QTY $ $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - FMP TOTAL PROCUREMENT 1.559 1.400 0.645 3.604 #DIV/0! 0.140 0.070 0.238 0.448 0.140 0.070 ** 0.238 0.448 ITEM 103 PAGE 28 CLASSIFICATION: UNCLASSIFIED * The twelve CV(N) systems will be procured in FY2003, FY2004, and FY2005 at a higher unit cost than the following LHA, LHD, LCC, and AGF systems. Therefore, unit costs decrease in FY2005 and FY2006. **Inventory Objective increased from 27 units to 28 units with the addition of the CV(N)76. CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued New System MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT/VRT ADMINISTRATIVE LEADTIME: 4 Months CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A Cost: INSTALLATION SUPPORT PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - FMP Prior Years Qty $ FY 1999 Qty $ PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A FY 2000 Qty $ FY 2001 Qty $ Moriah - CV(N) & L Class * 8 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ 0.050 * 0.188 FY 2004 Qty $ N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ ** INSTALLATION SCHEDULE: FY 2002 FY 2003 FY 2004 FY 2005 FY 2000 FY 2001 & Prior 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 In Out * Installation funding based upon FY of start of availability vice hardware deliver, includes Design Services and Advance Planning. **Inventory Objective increased from 27 units to 28 units with the addition of the CV(N)76. * Production Leadtime decreased from 12 months to 8 months as a result of the components becoming commercially available. PAGE 29 1 FY 2006 2 3 4 1 FY 2007 2 3 0.188 28 0.238 TC 4 Total $ 0.050 5 6 9 8 * * 0.238 ITEM 103 Qty TOTAL P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION LSO Heads Up Display - CV(N)/LHA/LHD TYPE MODIFICATION: ENHANCED CAPABILITY MODIFICATION TITLE: VISUAL - CV(N) & L Class DESCRIPTION/JUSTIFICATION: The Virtual Imaging System for Approach and Landing (VISUAL) will provide ship’s company launch and recovery personnel with enhanced images of aircraft in day, night, and low visibility conditions. VISUAL will utilize electro-optical sensors, advanced displays, and advance information / data networks. VISUAL will replace stand alone, aging systems/components currently found in ILARTS and LSO workstations. This is a modified Non-Developmental Item (NDI) procurement. 11 CV(N) - 12 L Class. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ MS III FY2003 * FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY TOTAL QTY $ $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - FMP TOTAL PROCUREMENT 5.166 1.623 5.593 6.329 25.782 #DIV/0! ** ITEM 103 **Inventory Objective increased from 22 units to 23 units with the addition of the CV(N)76. * MSIII for CV(N) is 3QTR FY2003; MSIII for the L Class is 3QTR FY2004. PAGE 30 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: LSO HUD - CV(N)/NEW SYSTEM LHA/LHD INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIPYARD / AIT ADMINISTRATIVE LEADTIME: 7 Months CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A Cost: Prior Years Qty $ MODIFICATION TITLE: PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A FY 1999 Qty $ FY 2000 Qty $ 12 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ INSTALLATION SUPPORT PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - FMP INSTALLATION SCHEDULE: FY 2000 & Prior 1 In Out VISUAL - CV(N) & L Class * * * FY 2004 Qty $ N/A N/A FY 2005 Qty $ * * FY 2006 Qty $ * * * * FY 2007 Qty $ To Complete Qty $ Qty 2 1 1 8 8 * **20 FY 2001 2 3 4 1 FY 2002 2 3 4 1 FY 2003 2 3 4 1 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL * Installation funding based upon FY of availability vice hardware delivery, includes Design Services Allocation and advance planning. ITEM 103 PAGE 31 P-3A CLASSIFICATION: UNCLASSIFIED Total $ CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: LSO School Simulator ENHANCED CAPABILITIES MODIFICATION TITLE: VISUAL LSO W/S DESCRIPTION/JUSTIFICATION: The purpose of this procurement is to acquire two Landing Signal - Officers (LSO) Virtual Imaging System for Approach and Landing (VISUAL) Workstations and associated software integration efforts for the LSO School at NAS Oceana. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ FY 1999 QTY $ MS III FY2004 FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - Non-FMP TOTAL PROCUREMENT #DIV/0! ITEM 103 PAGE 32 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: LSO School Simulator INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: Cost: Prior Years Qty $ MODIFICATION TITLE: AIT/VRT 2 Months N/A N/A VISUAL LSO W/S PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A FY 1999 Qty $ FY 2000 Qty $ 6 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ FY 2004 Qty $ N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty INSTALLATION SUPPORT PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - Non-FMP INSTALLATION SCHEDULE: FY 2000 & Prior 1 In Out FY 2001 2 3 4 1 FY 2002 2 3 4 1 FY 2003 2 3 4 1 ITEM 103 FY 2004 2 3 4 1 PAGE FY 2005 2 3 33 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL 2 2 P-3A CLASSIFICATION: UNCLASSIFIED Total $ 2 0.760 2 1.000 CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: LRLS MK16 MODO-Shore Improved Capabilities MODIFICATION TITLE: LRLS - Shorebased DESCRIPTION/JUSTIFICATION: The Long Range Line-Up System (LRLS) improves night aircraft carrier landing performance training at shore stations by providing the pilot with more precised line-up information at a greater range. Installation funded and scheduled include NALF Fentress, NALF San Clemente, NAS Whidbey Island, and NAS Lemore. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ FY 1999 QTY $ MS III FY1999 FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - Non-FMP TOTAL PROCUREMENT 4 0.612 0.153 4 0.358 0.078 0.358 0.078 4 1.048 0.612 0.153 0.200 0.200 4 ITEM 103 PAGE 34 0.200 1.248 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: LRLS MK16 MODO-Shore MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT/VRT ADMINISTRATIVE LEADTIME: 2 Months CONTRACT DATES: FY 2000: N/A DELIVERY DATE: FY 2000: N/A Cost: Prior Years Qty $ INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 4 Out 4 FY 2001 2 3 PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A FY 1999 Qty $ INSTALLATION SUPPORT PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - Non-FMP 4 1 LRLS - Shorebased FY 2000 Qty $ 12 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ FY 2004 Qty $ N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty Total $ 4 0.200 4 0.200 4 0.200 4 0.200 FY 2002 2 3 4 1 FY 2003 2 3 4 1 ITEM 103 FY 2004 2 3 4 1 PAGE FY 2005 2 3 35 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL 4 4 P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: LRLS MK-15 MOD O-CV(N) New Capabilities MODIFICATION TITLE: LRLS CV(N) DESCRIPTION/JUSTIFICATION: The Long Range Line-Up System (LRLS) will improve night aircraft carrier landing performance by providing the pilot with more precise line-up information at a greater range. Ship Alteration numbers 8632 for CVs and 8633 for CVNs apply. Installation of foundation, cabling and power supply will occur prior to hardware delivery. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ MS III FY1999 FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - FMP TOTAL PROCUREMENT 3.470 0.365 5 1.030 0.206 0.312 0.204 0.132 0.196 0.035 0.220 0.736 0.493 1.886 3.835 5 1.200 0.240 10 0.026 0.025 0.035 1 0.244 1.530 0.060 4 0.916 0.976 2.230 0.223 0.530 0.425 0.070 4 0.723 0.723 ITEM 103 9 PAGE 36 2.596 5.851 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: MODIFICATION TITLE: LRLS MK-15 MOD O-CV(N) INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT/VRT ADMINISTRATIVE LEADTIME: 2 Months 12/99 CONTRACT DATES: FY 2000: DELIVERY DATE: FY 2000: 12/00 Cost: Prior Years Qty $ INSTALLATION SUPPORT PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - FMP INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 1 Out 1 0.220 FY 2001 2 3 2 2 2 PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A FY 1999 Qty $ 0.220 4 2 FY 2000 Qty $ 0.405 0.088 1 0.493 1 1 LRLS CV(N) FY 2002 2 3 2 2 2 4 0.244 4 4 1 2 1 FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ FY 2001 Qty $ 0.150 0.094 12 Months FY 2004 Qty $ N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty Total $ 0.500 0.416 4 0.723 5 4 1.275 1.321 0.916 4 0.723 9 2.376 FY 2003 2 3 4 1 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL 10 9 * Installation funding based upon start of availability vice hardware delivery; includes Design Services Allocation and Advance Planning. ITEM 103 PAGE 37 P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: MK14 MOD O (SHORE) Enhancement MODIFICATION TITLE: IFLOLS - Shorebased DESCRIPTION/JUSTIFICATION: The Improved Fresnel Lens Optical Landing System (IFLOLS) replaces the existing shore based Fresnel Lens Optical Landing System (FLOLS) with an improved design that will provide increased scope display sensitivity with improved optics and stabilization. Installations funded and scheduled for FY01 are NAS Oceana, NAS Lemoore, and NALF San Clemente. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ MS III FY2000 FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - Non-FMP TOTAL PROCUREMENT 0.400 1.800 3 2.453 0.818 0.146 0.200 0.098 0.423 0.220 0.146 0.298 3.096 2.200 8 4.000 0.500 6 0.290 0.103 0.040 3 0.330 4.763 3.000 0.500 17 0.205 0.086 0.037 5 1.118 0.653 0.077 0.550 3.878 ITEM 103 9.453 0.556 8 PAGE 38 0.880 12.181 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: MK 14 MOD O (Shore) MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: AIT/VRT ADMINISTRATIVE LEADTIME: 2 Months CONTRACT DATES: FY 2000: Jun-00 DELIVERY DATE: FY 2000: Jul-01 Cost: Prior Years Qty $ PRODUCTION LEADTIME: FY 2001: Dec-00 FY 2001: Jan-02 FY 1999 Qty $ FY 2000 Qty $ FY 2001 Qty $ 0.045 INSTALLATION SUPPORT PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - Non-FMP INSTALLATION SCHEDULE: FY 2000 & Prior 1 In Out 3 3 FY 2001 2 3 4 3 3 1 IFLOLS - Shorebased FY 2002 2 3 2 2 1 2 4 2 2 1 13 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ 0.075 FY 2004 Qty $ Dec-01 Jan-03 FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty Total $ 0.120 0.285 0.330 FY 2003 2 3 4 5 0.475 3 5 0.285 0.475 5 0.550 8 0.880 1 ITEM 103 FY 2004 2 3 4 1 PAGE FY 2005 2 3 39 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL 9 8 P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: MK 13 MOD O - CV(N) Enhancement MODIFICATION TITLE: IFLOLS - CV(N) DESCRIPTION/JUSTIFICATION: The Improved Fresnel Lens Optical Landing System (IFLOLS) replaces the existing aircraft carrier Fresnel Lens Optical Landing System (FLOLS) with an improved design that will provide increased glide scope display sensitivity with improved optics and stabilization. Ship Alteration numbers 8634 for CVs and 8635 for CVNs apply. The funded installation in FY2000 is for USS JOHN S STENNIS (CVN 74) for their FY01 availability. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: IOC - March 2001 FY 1998 & Prior FY 1999 QTY $ QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - FMP TOTAL PROCUREMENT 5.920 0.685 5 7.109 1.422 6.605 5 4.930 0.986 1.156 0.297 1.838 0.545 0.035 0.525 0.210 0.037 0.111 1.564 0.353 9.880 1.088 6.790 10 0.459 0.120 0.005 4 2.795 3.379 0.171 0.059 4 4.149 1.231 0.077 2.565 2.795 ITEM 103 12.039 1.204 8 PAGE 40 6.912 24.408 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) INDIVIDUAL MODIFICATION (Continued MODELS OF SYSTEMS AFFECTED: MODIFICATION TITLE: MK 13 MOD O - CV(N) INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIPYARD - Ship Alteration ADMINISTRATIVE LEADTIME: 2 Months Jun-00 CONTRACT DATES: FY 2000: Oct-01 DELIVERY DATE: FY 2000: Cost: Prior Years Qty $ INSTALLATION SUPPORT PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - FMP INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 2 Out 2 FY 1999 Qty $ IFLOLS - CV(N) PRODUCTION LEADTIME: FY 2001: N/A FY 2001: N/A FY 2000 Qty $ 0.030 FY 2001 Qty $ 0.030 16 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ 0.030 FY 2004 Qty $ N/A N/A FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ Qty Total $ 0.090 0.111 0.353 0.572 0.486 4 2.696 0.069 1 3 0.634 1.901 5 3 4.366 3.130 0.111 0.353 1.088 4 2.795 4 2.565 8 7.586 FY 2001 2 3 2 1 1 1 4 1 1 1 1 FY 2002 2 3 1 1 2 1 4 1 1 FY 2003 2 3 4 1 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL 10 8 * Installation funding based upon FY of start of availability vice hardware delivery; includes Design Services Allocation and Advance Planning. ITEM 103 PAGE 41 P-3A CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION NEW SYSTEM - CV(N) TYPE MODIFICATION: IMPROVED CAPABILITIES MODIFICATION TITLE: ADMACS / ISIS - CV(N) DESCRIPTION/JUSTIFICATION: The Aviation Data Management and Control System / Integrated Shipboard Information System (ADMACS / ISIS) is a real-time configuration managed, tactical system providing connectivity among all Air Operations and Aircraft Launch and Recovery Equipment (ALRE) work spaces aboard CV(N)s. Ship Alteration numbers 8623 for CVs and 8624 for CVNs apply. Installations funded and scheduled in FY01 include USS ABRAHAM LINCOLN (CVN 72), USS GEORGE WASHINGTON (CVN 73), USS JOHN STENNIS (CVN 74), and USS HARRY S. TRUMAN (CVN 75). DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: MS III FY1999 FY 1998 & Prior FY 1999 QTY $ QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2006 QTY $ FY 2007 QTY $ TC QTY TOTAL $ QTY $ 6 12.856 2.143 FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT PE ILS ATE INTERIM CONTRACTOR SUPPORT INSTALL COST - FMP TOTAL PROCUREMENT 1 0.302 0.302 2.100 2.100 2 4.226 2.113 2.937 0.839 0.035 1.320 0.404 0.633 0.379 6.290 2.114 8.697 3 6.530 2.177 0.595 0.195 4 5.600 12.920 0.125 0.091 2 4.977 1.831 0.668 2.479 2.695 ITEM 103 6 PAGE 42 10.572 30.904 CLASSIFICATION: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued) NEW SYSTEM - CV(N) MODIFICATION TITLE: INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: SHIPYARD / Alterative Installation Team ADMINISTRATIVE LEADTIME: 2 Month CONTRACT DATES: FY 2000: Mar-00 DELIVERY DATE: FY 2000: Apr-01 Cost: Prior Years Qty $ INSTALLATION SUPPORT PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE INSTALL COST - FMP INSTALLATION SCHEDULE: FY 2000 & Prior In Out FY 1999 Qty $ 0.379 0.379 1 1 1 FY 2001 2 3 2 2 4 1 1 1 FY 2000 Qty $ 1.240 ** FY 2002 2 3 1 1 1 1 PRODUCTION LEADTIME: FY 2001: Dec-00 FY 2001: Jan-02 FY 2001 Qty $ 0.956 1 2 1 1.161 2.322 1.161 2 2.114 4 5.600 2 1 FY 2003 2 3 4 13 Months FY 2002: FY 2002: ($ in Millions) FY 2002 FY 2003 Qty $ Qty $ 0.375 0.174 0.360 0.340 4 ADMACS/ISIS - CV(N) 1 FY 2004 Qty $ FY 2005 Qty $ FY 2006 Qty $ FY 2007 Qty $ To Complete Qty $ $ 2.950 2.104 1 2 3 1.335 2.682 3.605 2.479 6 10.572 FY 2004 2 3 4 1 FY 2005 2 3 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL 6 6 * Installation funding based upon FY of start of availability vice hardware delivery; includes Design Services Allocation and Advance Planning. **662K charged as non-fmp install, currently reversing and charging appropriate cost code ITEM 103 Total Qty PAGE 43 P-3A CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION BUDGET ITEM JUSTIFICATION SHEET APPROPRIATION/BUDGET ACTIVITY OP,N - BA3 AVIATION SUPPORT EQUIPMENT PY June 2001 DATE P-1 ITEM NOMENCLATURE METEOROLOGICAL EQUIPMENT FY 2000 FY 2001 FY 2002 $31.6 $30.6 $29.8 FY 2003 FY 2004 FY 2005 SUBHEAD 53SP 4226 FY 2006 FY 2007 TO COMP TOTAL QUANTITY COST (in millions) PROGRAM COVERAGE/JUSTIFICATION FOR BUDGET YEAR REQUIREMENTS: This item provides new and replacement meteorological equipment for all Navy and Marine Corps Air Stations and all Navy ships and other activities required to take weather observations and provide safety of flight information. The procurement has been thoroughly coordinated with the other DOD and civilian agencies. Equipment is funded under the following programs: Satellite Receiver Upgrades (AN/SMQ-11 and AN/FMQ-17) are environmental satellite receivers that are used to receive and process remotely sensed data from the Defense Meteorological Satellite Program (DMSP) satellites, the National Oceanic and Atmospheric Administration (NOAA) satellites, the National Polar-orbiting Operational Environmental Satellite System (NPOESS) satellites, the Geostationary Operational Environmental Satellites (GOES), and the GEOSAT Follow-On (GFO) satellite. The evolutionary upgrades will allow the system to receive and preprocess additional environmental satellites, comply with open systems architecture standards, and provide for antenna replacement. The Tactical Environmental Support System (TESS) Upgrade - Procures workstations, servers, input/output control devices, and software to support the evolutionary acquisition of TESS. TESS Upgrades include Fleet Numerical Meteorology and Oceanography Center (FNMOC) and Naval Oceanographic Office (NAVO), the five regional centers at Guam, Pearl Harbor, Norfolk, Suitland and Rota Spain, and afloat and ashore sites. The Shipboard Meteorological and Oceanographic Observing System Replacement (SMOOS(R)) consists of various configurations of environmental sensors, automated data acquisition and processing systems, multiple system interfaces, and displays. The SMOOS(R) system will provide a tailorable METOC sensor suite for all identified ship classes and selected Air Stations, and will provide for all required METOC observations. Fleet Marine Force Meteorological Equipment - Meteorological Equipment required to upgrade and replace the Meteorological Mobile Facilities (METMF). The METMF Replacement (METMF (R)) will be a fully integrated, single van system capable of automatic data acquisition from communications channels providing METOC data, meteorological satellite, meteorological Doppler radar, and local and remote meteorological sensors. The METMF (R) will be equipped to support Marine Air-Ground Task Force (MAGTF) operations world wide. The Supplemental Weather Radar (SWR) is a small, light weight, COTS Doppler radar system that will be located at sites where NEXRAD coverage is not available to Navy/USMC activities. The SWR will provide real-time surveillance and advance warning of potentially severe weather phenomena that are developing near or moving towards USN and USMC units. Aviation Safety System Upgrades are GOTS/COTS hardware and associated software upgrades to installed, procured safety of flight equipment, such as Next Generation Radar (NEXRAD), Automated Surface Observing System (ASOS), Supplemental Weather Radar (SWR) and Mini-Rawin System (MRS) installed at all Navy and Marine Corps Air facilities worldwide. The Aviation Safety System Upgrades project will provide required system upgrades developed by the lead agency (in most cases, the National Weather Service). These periodic GOTS/COTS upgrades are essential to the continued use of the equipments. Installation of Equipment - Installation efforts include plans, site surveys, BESEPS, equipment installation and checkout. P-1 Shopping List-Item No - 104 - 1 of 10 Exhibit P-40, Budget Item Justification Unclassified Classification UNCLASSIFIED CLASSIFICATION DATE June 2001 COST ANALYSIS APPROPRIATION ACTIVITY P-1 ITEM NOMENCLATURE OP,N - BA3 AVIATION SUPPORT EQUIPMENT METEOROLOGICAL EQUIPMENT COST CODE ELEMENT OF COST ID CODE PY TOTAL COST QTY FY99 UNIT COST TOTAL COST QTY FY 2000 UNIT COST TOTAL COST QTY SUBHEAD 53SP 4226 TOTAL COST IN THOUSANDS OF DOLLARS FY 2001 FY 2002 FY 2003 UNIT TOTAL UNIT TOTAL UNIT COST COST QTY COST COST QTY COST SP051 Satellite Receiver Upgrades (Space) A VAR 2,404 VAR 2,071 VAR 2,190 SP190 TESS Upgrades A VAR 14,862 VAR 14,040 VAR 14,079 SP200 SMOOS(R) B 1 900 SP300 Met Equipment (METMF(R)) Met Equipment (METMF(R)) Retrofits A 2 3,029 SP500 Supplemental Weather Radar (SWR) A 1 752 SP550 Aviation Safety System Upgrades A VAR SP777 Installation Non-FMP FMP 6,057 A VAR VAR FMP DSA 900 16 229 3,633 14 213 3,054 1 VAR 3,373 3,373 856 4,229 1 3,465 3,465 TOTAL COST 752 1,701 VAR 1,312 VAR 1,346 4,914 5,292 5,699 1,968 VAR 2,946 VAR 1,336 VAR 3,956 VAR 2,214 3,485 2,325 621 3,142 838 2,773 712 TOTAL CONTROL 31,590 30,577 30,735 30,860 Remarks: "Various" quantities represent system and subsystem upgrades of various hardware/software configurations that are dependent upon the type of site or platform. The number of installations are identified for each system on the corresponding P-3A exhibits. 29,833 30,924 31,026 P-1 Shopping List-Item No 104-2 of 10 Exhibit P-5, Budget Item Justification DD FORM 2446, JUN 86 Unclassified UNCLASSIFIED CLASSIFICATION A. DATE PROCUREMENT HISTORY AND PLANNING June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE OP,N - BA3 AVIATION SUPPORT EQUIPMENT COST CODE ELEMENT OF COST SP200 SMOOS(R) SP300 Met Equipment (METMF(R)) CONTRACTOR AND LOCATION CONTRACT & TYPE LOCATION OF PCO 01 02 TBD TBD TBD May-01 Aug-01 Sep-01 TBD TBD TBD May-01 Dec-01 May-02 01 02 VAR VAR SSC-San Diego N/A Nov-00 VAR VAR SSC-San Diego N/A Nov-01 FY METHOD SUBHEAD METEOROLOGICAL EQUIPMENT 4226 RFP DATE ISSUE AWARD OF FIRST QTY DATE DATE Delivery 53SP SPECS DATE UNIT COST AVAILABLE REVISIONS NOW AVAILABLE 16 229,000 Yes N/A 14 213,000 Yes N/A Jul-01 1 3,373,000 Yes N/A Jul-02 1 3,465,000 Yes N/A D. REMARKS SP300 - COTS equipment is delivered to SSC-SD for integration into the METMF(R). P-1 Shopping List-Item No 104-3 of 10 Exhibit P-5a, Procurement History and Planning Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: SATELLITE RECEIVER UPGRADES (SPACE) - (SHIP) June 2001 COST CODE SP051 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Receiver Upgrades (AN/SMQ-11 and AN/FMQ-17) are environmental satellite receivers that are used to receive and process remotely sensed data from the Defense Meteorological Satellite Program (DMSP) satellites, the National Oceanic and Atmospheric Administration (NOAA) satellites, the National Polar-orbiting Operational Environmental Satellite System (NPOESS) satellites, the Geostationary Operational Environmental Satellites (GOES), and the GEOSAT Follow-On (GFO) satellite. The evolutionary upgrades will allow the system to receive and preprocess additional environmental satellites, comply with open systems architecture standards, and provide for antenna replacement. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment VAR 2.1 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware 21 0.7 PRIOR YR EQUIP 21 0.7 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ Qty FY 01 $ VAR 1.2 VAR 0.0 VAR 1.3 7 7 0.7 0.7 28 0.4 0 0.0 28 0.4 0 0.0 0.7 1.9 0.4 0.4 FY 02 Qty $ $ FY 04 Qty $ ADMINISTRATIVE LEADTIME: FY 2000 Nov-99 FY 2001 DELIVERY DATES: FY 2000 Aug-00 FY 2001 1 2 FY 01 3 Nov-00 Aug-01 4 1 2 FY 02 3 4 FY 06 Qty FY 07 $ Qty TC $ Qty 1 month Total $ PRODUCTION LEADTIME: FY 2002: Nov-01 FY 2003: FY 2002: Aug-02 FY 2003: FY 03 INPUT 28 7 7 7 8 0 0 0 0 OUTPUT 28 7 7 7 8 0 0 0 0 1 2 FY 05 3 4 1 2 3 4 INSTALLATION SCHEDULE: FY 05 Qty $ Qty 0.0 1.3 CONTRACT DATES: PY FY 03 Qty 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 2 FY 04 3 10 months 4 TOTAL INPUT OUTPUT Notes/Comments: P-1 Shopping List-Item No 104-4 of 10 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: SATELLITE RECEIVER UPGRADES (SPACE) - (SHORE) June 2001 COST CODE SP051 MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: Satellite Receiver Upgrades (AN/SMQ-11 and AN/FMQ-17) are environmental satellite receivers that are used to receive and process remotely sensed data from the Defense Meteorological Satellite Program (DMSP) satellites, the National Oceanic and Atmospheric Administration (NOAA) satellites, the National Polar-orbiting Operational Environmental Satellite System (NPOESS) satellites, the Geostationary Operational Environmental Satellites (GOES), and the GEOSAT Follow-On (GFO) satellite. The evolutionary upgrades will allow the system to receive and preprocess additional environmental satellites, comply with open systems architecture standards, and provide for antenna replacement. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment VAR 0.5 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware 9 0.1 PRIOR YR EQUIP 9 0.1 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: FY 00 Qty $ Qty FY 01 $ VAR 1.2 VAR 2.1 VAR 0.9 8 8 0.57 0.57 19 0.36 13 0.18 9 10 0.17 0.19 3 10 0.02 0.16 0.6 1.7 0.4 2.5 FY 03 Qty $ FY 04 Qty $ FY 2000 Nov-99 DELIVERY DATES: FY 2000 Sep-00 1 2 FY 01 3 SMQ-11 FY 06 Qty FY 07 $ Qty TC $ Qty Total $ Qty $ 0.2 1.1 FY 2001 Nov-00 FY 2001 Sep-01 Feb-01 SMQ-11 FMQ-17 4 1 2 FY 02 3 4 1 month PRODUCTION LEADTIME: FY 2002: Nov-01 FY 2003: FY 2002: Sep-02 SMQ-11 Feb-02 FMQ-17 FY 2003: FY 03 INPUT 17 5 5 5 4 4 3 3 3 OUTPUT 17 5 5 5 4 4 3 3 3 1 2 FY 05 3 4 1 2 3 4 INSTALLATION SCHEDULE: FY 05 Qty $ ADMINISTRATIVE LEADTIME: CONTRACT DATES: PY FY 02 Qty $ 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 2 FY 04 3 SMQ-11 = 10 months FMQ-17 = 3 months 4 TOTAL INPUT OUTPUT Notes/Comments: P-1 Shopping List-Item No 104-5 of 10 Exhibit P-3a, Individual Modification Program Unclassified Classification UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: TESS UPGRADES PROCURES TERMINALS, INPUT/OUTPUT CONTROL DEVICES AND SOFTWARE TO SUPPORT THE EVOLUTIONARY ACQUISITION OF TESS. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 3 8.4 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware 3 1.2 PRIOR YR EQUIP 3 1.2 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: June 2001 TACTICAL ENVIRONMENTAL SUPPORT SYSTEM (TESS) UPGRADES (SHIP) SP190 FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ 9 9.9 8 11.1 6 7.5 9 3 6 2.2 0.7 1.5 9 2.7 8 2.0 3 6 1.0 1.7 2 6 0.2 1.8 2.2 12.1 2.7 13.8 Nov-99 FY 2001 DELIVERY DATES: FY 2000 Jan-00 - Sep-00 FY 2001 12 OUTPUT 12 Nov-00 Jan-01 - Sep-01 1 2 FY 01 3 4 1 2 FY 02 3 4 1 4 1 3 2 0 3 3 1 4 1 3 2 0 3 4 1 2 3 4 FY 05 INSTALLATION SCHEDULE: FY 04 Qty $ FY 05 Qty $ ADMINISTRATIVE LEADTIME: FY 2000 INPUT $ 1 2 FY 06 Qty $ FY 07 Qty $ TC Qty $ Total Qty 2.0 9.5 CONTRACT DATES: PY FY 03 Qty 1 month PRODUCTION LEADTIME: FY 2002: Nov-01 FY 2003: FY 2002: Jan-02 - Sep-02 FY 2003: FY 03 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 2 FY 04 3 2 4 TOTAL INPUT OUTPUT Notes/Comments: Equipment is procured just in time for delivery prior to ship installation availability windows. P-1 Shopping List-Item No 104-6 of 10 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: TESS UPGRADES PROCURES TERMINALS, INPUT/OUTPUT CONTROL DEVICES AND SOFTWARE TO SUPPORT THE EVOLUTIONARY ACQUISITION OF TESS. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment 5 6.1 Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware 5 0.9 PRIOR YR EQUIP 5 0.9 FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: INSTALLATION SCHEDULE: June 2001 TACTICAL ENVIRONMENTAL SUPPORT SYSTEM (TESS) UPGRADES (SHORE) SP190 FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ 5 5.0 5 3.0 5 6.6 5 1.2 5 0.9 5 1.8 5 1.2 5 0.9 5 1.8 1.2 6.2 0.9 3.9 FY 03 Qty $ FY 04 Qty $ FY 06 Qty $ FY 07 Qty $ ADMINISTRATIVE LEADTIME: 1 month $ Total Qty PRODUCTION LEADTIME: CONTRACT DATES: FY 2000 Nov-99 FY 2001 Nov-00 FY 2002: Nov-01 FY 2003: DELIVERY DATES: FY 2000 Jan-00 FY 2001 Jan-01 FY 2002: Jan-02 FY 2003: PY TC Qty 1.8 8.4 1 2 FY 01 3 4 1 2 FY 02 3 4 FY 03 INPUT 10 0 2 2 1 0 1 2 2 OUTPUT 10 0 2 2 1 0 1 2 2 1 2 3 4 1 2 3 4 FY 05 INSTALLATION SCHEDULE: FY 05 Qty $ 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 2 FY 04 3 2 4 TOTAL INPUT OUTPUT Notes/Comments: Total I/O = 66 sites (reg/prod centers, facilities, detachments, USMC air stations, etc.). Refresh occurs concurrently with new installations. P-1 Shopping List-Item No 104-7 of 10 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: SHIPBOARD METEOROLOGICAL AND OCEANOGRAPHIC OBSERVING SYSTEM REPLACEMENT - SMOOS(R) SP200 June 2001 (SHIP) The Shipboard Meteorological and Oceanographic Observing System Replacement (SMOOS(R)) consists of various configurations of environmental sensors, automated data acquisition and processing systems, multiple system interfaces, and displays. The SMOOS(R) system will provide a tailorable METOC sensor suite for all identified ship classes and selected Air Stations, and will provide for all required METOC observations. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware 0 0.0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: FY 00 Qty $ FY 01 Qty $ FY 02 Qty $ 1 0.9 13 3.0 12 2.7 0 0.0 7 0.8 13 1.5 1 6 0.1 0.7 7 6 0.8 0.7 0.0 0.9 0.8 3.8 FY 03 Qty $ FY 04 Qty $ ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000 Apr-00 FY 2001 DELIVERY DATES: FY 2000 Aug-00 FY 2001 Jul-01 Oct-01 2 FY 01 3 4 1 2 FY 02 3 4 INPUT 0 0 1 3 4 3 3 3 OUTPUT 0 0 0 0 1 3 4 3 INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 PY FY 06 Qty $ FY 07 Qty $ TC Qty $ Total Qty 1.5 4.2 1 INSTALLATION SCHEDULE: FY 05 Qty $ 4 months - FY 01 1 month - FY 02-07 FY 2002: Nov-01 FY 2003: FY 2002: May-02 FY 2003: FY 03 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 FY 05 PRODUCTION LEADTIME: 2 FY 04 3 6 months 4 TOTAL INPUT OUTPUT Notes/Comments: Equipment procurement/delivery is correlated with ship installation availability windows. P-1 Shopping List-Item No 104-8 of 10 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED MODIFICATION TITLE: COST CODE MODELS OF SYSTEMS AFFECTED: DESCRIPTION/JUSTIFICATION: SHIPBOARD METEOROLOGICAL AND OCEANOGRAPHIC OBSERVING SYSTEM REPLACEMENT - SMOOS(R) SP200 June 2001 (SHORE) The Shipboard Meteorological and Oceanographic Observing System Replacement (SMOOS(R)) consists of various configurations of environmental sensors, automated data acquisition and processing systems, multiple system interfaces, and displays. The SMOOS(R) system will provide a tailorable METOC sensor suite for all identified ship classes and selected Air Stations, and will provide for all required METOC observations. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FINANCIAL PLAN: ($ in millions) Prior Yrs FY 99 Qty $ Qty $ RDT&E PROCUREMENT: Kit Quantity Installation Kits Installation Kits Nonrecurring Equipment Equipment Nonrecurring Engineering Change Orders Data Training Equipment Support Equipment Other Interm Contractor Support Installation of Hardware 0 0.0 PRIOR YR EQUIP FY 00 EQUIP FY 01 EQUIP FY 02 EQUIP FY 03 EQUIP FY 04 EQUIP FY 05 EQUIP FY 06 EQUIP FY 07 EQUIP FY TC EQUIP TOTAL INSTALLATION COST 0.0 TOTAL PROCUREMENT COST 0.0 METHOD OF IMPLEMENTATION: FY 00 Qty $ 0 FY 01 Qty $ 0.0 FY 02 Qty $ 3 0.6 2 0.4 3 0.1 2 0.2 3 0.1 2 0.2 0.0 0.0 0.1 0.7 FY 03 Qty $ FY 04 Qty $ ADMINISTRATIVE LEADTIME: CONTRACT DATES: FY 2000 Nov-99 FY 2001 DELIVERY DATES: FY 2000 Jul-00 FY 2001 Jul-01 Oct-01 2 FY 01 3 4 1 2 FY 02 3 4 INPUT 0 0 0 3 0 0 1 1 OUTPUT 0 0 0 3 0 0 1 1 INSTALLATION SCHEDULE: 1 2 3 4 1 2 3 4 PY FY 06 Qty $ FY 07 Qty $ TC Qty $ Total Qty 0.2 0.6 1 INSTALLATION SCHEDULE: FY 05 Qty $ 4 months - FY 01 1 month - FY 02-07 FY 2002: Dec-01 FY 2003: FY 2002: Jul-02 FY 2003: FY 03 1 2 3 4 1 1 2 FY 07 3 4 TC FY 06 FY 05 PRODUCTION LEADTIME: 2 FY 04 3 6 months 4 TOTAL INPUT OUTPUT Notes/Comments: P-1 Shopping List-Item No 104-9 of 10 Exhibit P-3a, Individual Modification Program Unclassified Classification $ UNCLASSIFIED CLASSIFICATION DATE PRODUCTION SCHEDULE June 2001 (DOD EXHIBIT P-21) APPROPRIATION/BUDGET ACTIVITY OP,N - BA3 Aviation Support Equipment P-1 ITEM NOMENCLATURE METEOROLOGICAL EQUIPMENT ACCEP BAL FISCAL YEAR E PROC PRIOR DUE CY 00 R QTY TO AS OF O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 1-Oct 1-Oct C O E A E A P A U U U E C O E A E A P A U U U E C O E A E A P A U U U E T V C N B R R Y N L G P T V C N B R R Y N L G P T V C N B R R Y N L G P NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP S COST ITEM/MANUFACTURER CODE V FY SP200 SMOOS(R) 01 02 SP300 MET EQUIPMENT 01 02 16 14 9 8 1 1 1 1 01 SUBHEAD NO. 53SP FISCAL YEAR CALENDAR YEAR 7 6 A 01 02 6 6 6 NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV 1 DEC JAN FEB MAR APR PRODUCTION RATE Name and Location SMOOS ( R ) TBD MET EQUIPMENT Various 03 1 MAY JUN JUL AUG SEP OCT PROCUREMENT LEADTIMES Manufacturer’s ITEM 03 CALENDAR YEAR 8 A OCT 02 4 A A FISCAL YEAR CALENDAR YEAR ALT Prior ALT After Initial Reorder MSR 1-8-5 MAX to Oct 1 Oct 1 Mfg PLT Mfg PLT Total Measure 1 1 2 0 Mo 1 Mo 8 Mo 8 Mo 12 Vans P-1 Shopping List-Item No 104-10 of 10 Measure is comprised of a diverse suite of on-board sensors and associated processing systems. The procurement quantity reflects only Tactical Dropsonds. Unit of Exhibit P-21 Production Schedule Unclassified Classification UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA3 OTHER PHOTOGRAPHIC EQUIPMENT - Y3SX Other Related Program Elements Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) ID Code $72.6 FY 2000 FY 2001 FY 2002 $1.6 $1.7 $1.7 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total OTHER PHOTOGRAPHIC EQUIPMENT The Naval Air Systems Command is tasked to fund transition of shipboard photographic labs from traditional film technology to digital imagery technology (CNO Memo Ser 09B/2U2501983 of 23 Oct 92 applies). The main photographic lab supports the full visual imaging program afloat to include: Carrier IntelligenceCenter (CVIC) support (Bomb Damage Assessment (BDA) and target imagery), incidents and accidents at sea, medical media, copy and reproduction, investigation,aerial and surface surveillance, combat camera, safety, training, and Public Affairs Office (PAO). Electronic/digital imagery acquisition media is rapidly expanding (ATARS, TAMPS, JSIPS). It is imperative the photo lab be able to interface with the new electronic media. Hard copy imagery is required in the documentationof real world events (drug interdiction program, humanitarian relief efforts, shipboard and flight operationaldocumentation). This imagery is used at all levels within the Executive Branch of the government including CNO, SECNAV, JCS, National Military Command Center, and the White House. Hard copy photographs are used in the decision making process by the Fleet and Battle Group Commanders and directly impacts the overall Navy mission. Digital imagery can be quickly disseminated via shipboard communication systems to support decision makers at the local, theater, and global levels (CVBG, CINC, and JCS). Digital technology will generate less environmentally damaging effluents than traditional photographic processes and will have no impact on shipboard water consumption. Electronic imaging is less manpower intensive and requires less maintenance and overall support resources than traditional mechanical hardware. In order to fully utilize the film technology employed on ships, a two phase transition plan will be implemented. An interim photo lab will be installed to interface with existing film technology which will allow the ships to maintain 100% mission capability until final digital installation. LANT and PAC deployment schedules and pier-side availability will determine the installation schedule. Digital Photo Lab Phase I includes one hard-mounted electronic work station, one portable backup workstation, one high capacity digital printer, three digital hand-held cameras, and the software to run this equipment. Digital Photo Lab Phase II adds 2 hardmounted Pentium based workstations (comprised of two hard-mounted electronic work stations), one large format digital printer, one high resolution printer, a LAN to tie them together, two digital color cameras, and some miscellaneoussmall equipment/softwarerequired to tie Phase I and Phase II labs together. Phase I equipment installationswere completed in FY95. Phase II began in FY95 and continues beyond the FYDP. As digital camera technology improves the equipment will be upgraded/replaced to provide the latest technology. CLASSIFICATION: DD Form 2454, JUN 86 ITEM NO. 105 PAGE NO. 1 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA3 OTHER PHOTOGRAPHIC EQUIPMENT - Y3SX Other Related Program Elements Program Element for Code B Items: REWSON: Reconnaissance Electronic Warfare Special Operations Navy This line procures photographic film processing, printing and film interpretation equipment for the exclusive support of the on-going intelligence mission of CV/CVNs. Specifically, this equipment primarily supports the mission of the F-14 Tactical Airborne Reconnaissance Pod System (TARPS) as well as related Carrier Intelligence Center (CVIC) photographic requirements, and the hand held intelligencephotography collected by the embarked Airwing (nine squadrons) and deployed Carrier Battle Group (CVBG). The CVBG normally consists of the CV/CVN and its support ships. Also, this equipment supports the photographic intelligence that is disseminated from internal and National sources to the Airwing (CVW) and CVBG. TARPS imagery is often provided t theater NATO forces as well. TARPS remains the only tactical aerial photographic reconnaissance asset in theater and is directly controlled by the Theater Commander. This line also procures digital equipment for the exploitation,interpretation and printing of digital imagery downlinked from TARPS. The digital suites can be expandedinto the future to be used for exploitation of video imagery from tactical and strategic reconnaissance systems (including FLIR). CLASSIFICATION: DD Form 2454, JUN 86 ITEM NO. 105 PAGE NO. 2 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/BA3 OTHER PHOTOGRAPHIC EQUIPMENT - Y3SX Procurement Items DPL Workstation ID Code A Quantity Funding Prior Years FY 2000 FY 2001 FY 2002 31 4,286 3 426 3 432 3 441 65 2,076 2 48 2 48 2 50 19 3,135 4 660 4 672 4 684 Other Costs 63,069 511 501 535 Total P-1 Funding* Includes Rewson 72,566 1,645 1,653 1,710 Digital SLR Color Camera A Quantity Funding DCRS Quantity Funding A *Includes quantities to meet inventory objective plus losses. CLASSIFICATION: DD Form 2454, JUN 86 ITEM NO. 105 PAGE NO. 3 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE/SUBHEAD Other Procurement, Navy/BA3 OTHER PHOTOGRAPHIC EQUIPMENT - Y3SX TOTAL COST IN THOUSANDS OF DOLLARS COST CODE SX008 SX019 SX020 SX021 SX050 SX100 SX830 SX900 ELEMENT OF COST ID Code PHOTO EQUIPMENT UNDER $100K DIGITAL COLOR PRINTER DIGITAL PHOTO LAB WORKSTATION DIGITAL SLR COLOR CAMERA MISC SMALL EQUIP & ECPS (PREVIOUS S4019 OF Y3S4) * DIGITAL CAMERA RECEIVING STATION (PREVIOUS S4100 OF Y3S4) * PRODUCTION ENGINEERING & LOGISTICS SUPPORT INSTALLATION (NON-FMP) VARIOUS OTHER COSTS, FY 97 & PRIOR OTHER PHOTOGRAPHIC EQUIPMENT Prior Years Total Cost FY 2000 Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost Total Cost A A A A A 314 268 4,286 2,076 5 3 2 142 24 426 48 114 3 2 144 24 432 48 3 2 147 25 441 50 A 3,135 4 165 660 4 168 672 4 171 684 749 59 3,296 333 501 535 58,442 * Quantities reflect total number of upgrades - not new procurements. * Cost Codes SX008, SX021, SX050 and SX100 are included in the Support Equipment line on exhibit P-3A. DD FORM 2446, JUN 86 72,566 P-1 SHOPPING LIST ITEM NO. 105 1,645 1,653 1,710 CLASSIFICATION: PAGE NO. 4 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD Other Procurement, Navy/BA3 OTHER PHOTOGRAPHIC EQUIPMENT Cost Element/ FISCAL YEAR Y3SX RFP ISSUE DATE CONTRACT METHOD & TYPE NRAD, Philadelphia NRAD, Philadelphia Apr-01 Apr-02 C/MIPR/FP C/MIPR/FP Various Various Jun-01 Jun-02 Sep-01 Sep-02 YES YES 24 25 NRAD, Philadelphia NRAD, Philadelphia Apr-01 Apr-02 C/MIPR/FP C/MIPR/FP Eastman Kodak, Rochester Eastman Kodak, Rochester Jun-01 Jun-02 Sep-01 Sep-02 YES YES 168 171 SPAWAR Det., Phil SPAWAR Det., Phil Apr-01 Apr-02 C/MIPR/FP C/MIPR/FP Various Various Jun-01 Jun-02 Sep-01 Sep-02 YES YES QUANTITY UNIT COST (000) 3 3 144 147 2 2 4 4 LOCATION OF PCO CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW DIGITAL PHOTO LAB WORKSTATION SX020/FY 2001 SX020/FY 2002 DIGITAL SLR COLOR CAMERA SX021/FY 2001 SX021/FY 2002 DIGITAL CAMERA RECEIVING STATION SX100/FY 2001 SX100/FY 2002 DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 105 PAGE NO. 5 Classification: UNCLASSIFIED DATE REVISIONS AVAILABLE FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/BA3 Production Rate Manufacturer’s Name and Location Various Item Digital Photo Lab Workstation Digital SLR Color Camera Eastman Kodak, Rochester Digital Camera Receiving Station Various June 2001 DATE Weapon System MSR N/A 1-8-5 N/A N/A N/A MAX N/A P-1 ITEM NOMENCLATURE OTHER PHOTOGRAPHIC EQUIP - Y3SX Procurement Leadtimes ALT Prior ALT After Initial Reorder Unit of to Oct 1 Oct 1 Mfg PLT Total Mfg PLT Measure 9 mos 3 mos 3 mos 12 mos EA 9 mos 3 mos 3 mos 12 mos EA 9 mos 3 mos 3 mos 12 mos EA FISCAL YEAR 2000 ITEM / MANUFACTURER FISCAL YEAR 2001 F Y S V C Q D B T Y E L A L Digital Photo Lab Workstation Digital Photo Lab Workstation 00 01 N N 3 3 0 0 3 3 A Digital SLR Color Camera Digital SLR Color Camera 00 01 N N 2 2 0 0 2 2 A Digital Camera Receiving Station Digital Camera Receiving Station 00 01 N N 4 4 0 0 4 4 A F Y S V C Q D B T Y E L A L Digital Photo Lab Workstation 02 N 3 0 3 A 3 Digital SLR Color Camera 02 N 2 0 2 A 2 Digital Camera Receiving Station 02 N 4 0 4 A 4 1999 O C T N O V CALENDAR YEAR 2000 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2001 S E P O C T N O V D E C J A N 2001 O C T N O V J A N F E B M A R A P R M A Y A P R M A Y J U N J U L A U G S E P 3 0 0 A 2 0 0 A 4 0 0 4 FISCAL YEAR 2003 J U N J U L A U G CALENDAR YEAR 2003 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Remarks: DD Form 2445, JUL 87 311 / 244 Previous editions are obsolete P-1 SHOPPING LIST ITEM NO. 105 B A L A 2 CALENDAR YEAR 2002 D E C M A R 3 FISCAL YEAR 2002 ITEM / MANUFACTURER F E B PAGE NO. 6 Exhibit P-21 Production Schedule B A L CLASSIFICATION: P3A UNCLASSIFIED MODELS OF SYSTEM AFFECTED: INDIVIDUAL MODIFICATION TYPE MODIFICATION: CVs, CVNs Added capability MODIFICATION TITLE: Digital Photo Lab (Phase II) FY 2006 QTY $ QTY DESCRIPTION/JUSTIFICATION: This procurement funds the equipment and installation to transition CV/CVN Photo Lab from traditional "wet" film to digital imagery. DEVELOPMENT STATUS/MAJOR DEVELOPMENT MILESTONES: FY 1998 & Prior QTY $ Phase 1 Completed FY 95 FY 1999 QTY $ FY 2000 QTY $ FY 2001 QTY $ FY 2002 QTY $ FY 2003 QTY $ FY 2004 QTY $ FY 2005 QTY $ FY 2007 QTY $ TC $ TOTAL QTY $ FINANCIAL PLAN (IN MILLIONS) RDT&E PROCUREMENT INSTALLATION KITS INSTALLATION KITS - UNIT COST INSTALLATION KITS NONRECURRING EQUIPMENT EQUIPMENT NONRECURRING ENGINEERING CHANGE ORDERS DATA TRAINING EQUIPMENT SUPPORT EQUIPMENT FIELD ACTIVITY SUPPORT OTHER OTHER INTERIM CONTRACTOR SUPPORT INSTALL COST TOTAL PROCUREMENT 29 4.0 0.3 2 64.2 0.7 29 3.1 71.951 0.280 0.140 3 0.081 0.041 2 0.213 0.615 0.426 0.142 3 0.827 0.059 3 0.333 1.645 0.432 0.144 3 0.720 3 0.501 1.653 0.441 0.147 0.734 3 0.535 1.710 CLASSIFICATION: UNCLASSIFIED ITEM NO. 105 PAGE NO. 7 CLASSIFICATION: UNCLASSIFIED P3A (Continued) MODELS OF SYSTEMS AFFECTED: INDIVIDUAL MODIFICATION (Continued) MODIFICATION TITLE: CVs, CVNs, CNET, PNCLA INSTALLATION INFORMATION: METHOD OF IMPLEMENTATION: Depot Field Team ADMINISTRATIVE LEADTIME: 9 Months CONTRACT DATES: FY 2000: June 00 DELIVERY DATE: FY 2000: Sep 00 Cost: PRIOR YEARS FY 1999 EQUIPMENT FY 2000 EQUIPMENT FY 2001 EQUIPMENT FY 2002 EQUIPMENT FY 2003 EQUIPMENT FY 2004 EQUIPMENT FY 2005 EQUIPMENT FY 2006 EQUIPMENT FY 2007 EQUIPMENT TO COMPLETE Prior Years Qty $ 29 3.083 INSTALLATION SCHEDULE: FY 2000 & Prior 1 In 34 0 Out 34 0 FY 1999 Qty $ 2 PRODUCTION LEADTIME: FY 2001: June 01 FY 2001: Sep 01 FY 2000 Qty $ FY 2001 Qty $ FY 2002 Qty $ FY 2002: FY 2002: ($ in Millions) FY 2003 Qty $ Qty FY 2004 $ Qty June 02 Sep 02 FY 2005 $ Qty FY 2006 $ Qty FY 2007 $ To Complete Qty $ 0.333 3 0.501 3 4 3 3 3 Months 0.213 3 FY 2001 2 3 0 0 0 0 Digital Photo Lab (Phase II) 1 0 0 FY 2002 2 3 0 0 0 0 4 3 3 1 FY 2003 2 3 4 1 ITEM NO. 105 0.535 FY 2004 2 3 4 1 PAGE NO. 8 FY 2005 2 3 4 1 FY 2006 2 3 4 1 FY 2007 2 3 TC 4 TOTAL P-3A CLASSIFICATION: UNCLASSIFIED Qty Total $ CLASSIFICATION: UNCLASSIFIED Exhibit P-20, Requirements Study APPROPRIATION/BUDGET ACTIVITY Date: Other Procurement, Navy/Aviation Support Equipment/BA3 June 2001 P-1 ITEM NOMENCLATURE Admin Leadtime (after Oct 1): Production Leadtime: OTHER PHOTOGRAPHIC EQUIPMENT - Y3SX 9 mos 3 mos Digital Photo Lab Workstation Buy Summary Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from all prior year funding Deliveries from FY 2000 funding Deliveries from FY 2001 funding Deliveries from FY 2002 funding Deliveries from subsequent years’ funding Other Gains Combat Losses/Usage Training Losses/Usage Test Losses/Usage Other Losses/Usage Disposals/Retirements/Attritions/etc. End of Year Asset Position Inventory Objective or Current Authorized Allowance Inventory Objective Actual Training 54 Expenditures Assets Rqd For Combat FY 2000 thru Loads: XXXXX: WRM Rqmt: FY 1999: Pipeline: FY 1998: Other: 54 FY 1997: TOTAL: Remarks: FY 2000 3 142 426 FY 2001 3 144 432 FY 2002 3 147 441 31 34 37 FY 2003 FY 2004 FY 2005 FY 2006 3 3 3 34 54 Other than Training Usage FY 2000 thru XXXXX: FY 1999: FY 1998: FY 1997: 37 54 40 54 Disposals (Vehicles/Other) FY 2000 thru XXXXX: FY 1999: FY 1998: FY 1997: Vehicles Eligible for FY 2001 Replacement: Vehicles Eligible for FY 2002 Replacement: Vehicle Augment: Aircraft: TOAI: PAA: TAI Attrition Res: BAI Inactive Inv: Storage: Inventory objective equals: Four workstations per CV/CVN (4*12) Four workstations Navy & Marine Corp Intel Center Two workstations In service engineering activity P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 105 CLASSIFICATION: PAGE NO. 9 UNCLASSIFIED FY 2007 CLASSIFICATION: UNCLASSIFIED Exhibit P-20, Requirements Study APPROPRIATION/BUDGET ACTIVITY Date: Other Procurement, Navy/Aviation Support Equipment/BA3 June 2001 P-1 ITEM NOMENCLATURE Admin Leadtime (after Oct 1): Production Leadtime: OTHER PHOTOGRAPHIC EQUIPMENT - Y3SX 9 mos 3 mos Digital SLR Color Camera Buy Summary Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from all prior year funding Deliveries from FY 2000 funding Deliveries from FY 2001 funding Deliveries from FY 2002 funding Deliveries from subsequent years’ funding Other Gains Combat Losses/Usage Training Losses/Usage Test Losses/Usage Other Losses/Usage Disposals/Retirements/Attritions/etc. End of Year Asset Position Inventory Objective or Current Authorized Allowance Inventory Objective Actual Training 108 Expenditures Assets Rqd For Combat FY 2000 thru Loads: XXXXX: WRM Rqmt: FY 1999: Pipeline: FY 1998: Other: 108 FY 1997: TOTAL: Remarks: Inventory objective: Nine cameras per CV/CVN (9*12) FY 2000 2 24 48 FY 2001 2 24 48 FY 2002 2 25 50 55 46 42 FY 2003 FY 2004 FY 2005 FY 2006 2 2 2 11 46 108 Other than Training Usage FY 2000 thru XXXXX: FY 1999: FY 1998: FY 1997: 6 42 108 6 38 108 Disposals (Vehicles/Other) FY 2000 thru XXXXX: FY 1999: FY 1998: FY 1997: Vehicles Eligible for FY 2001 Replacement: Vehicles Eligible for FY 2002 Replacement: Vehicle Augment: Aircraft: TOAI: PAA: TAI Attrition Res: BAI Inactive Inv: Storage: 108 Attrition based on historical average P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 105 CLASSIFICATION: PAGE NO. 10 UNCLASSIFIED FY 2007 CLASSIFICATION: UNCLASSIFIED Exhibit P-20, Requirements Study APPROPRIATION/BUDGET ACTIVITY Date: Other Procurement, Navy/Aviation Support Equipment/BA3 June 2001 P-1 ITEM NOMENCLATURE Admin Leadtime (after Oct 1): Production Leadtime: OTHER PHOTOGRAPHIC EQUIPMENT - Y3SX 9 mos 3 mos Digital Camera Receiving Station Buy Summary Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from all prior year funding Deliveries from FY 2000 funding Deliveries from FY 2001 funding Deliveries from FY 2002 funding Deliveries from subsequent years’ funding Other Gains Combat Losses/Usage Training Losses/Usage Test Losses/Usage Other Losses/Usage Disposals/Retirements/Attritions/etc. End of Year Asset Position Inventory Objective or Current Authorized Allowance Inventory Objective Actual Training 19 Expenditures Assets Rqd For Combat FY 2000 thru Loads: XXXXX: WRM Rqmt: FY 1999: Pipeline: FY 1998: Other: 19 FY 1997: TOTAL: Remarks: FY 2000 4 165 660 FY 2001 4 168 672 FY 2002 4 171 684 19 19 4 19 19 FY 2003 FY 2004 FY 2005 FY 2006 4 4 4 19 19 Other than Training Usage FY 2000 thru XXXXX: FY 1999: FY 1998: FY 1997: 4 19 19 4 19 19 Disposals (Vehicles/Other) FY 2000 thru XXXXX: FY 1999: FY 1998: FY 1997: Vehicles Eligible for FY 2001 Replacement: Vehicles Eligible for FY 2002 Replacement: Vehicle Augment: Aircraft: TOAI: PAA: TAI Attrition Res: BAI Inactive Inv: Storage: Inventory objective of 19 equals: One DCRS per CV/CVN (1*12) Three shore sites Four mobile digital receiving stations P-1 SHOPPING LIST DD Form 2454, JUN 86 ITEM NO. 105 CLASSIFICATION: PAGE NO. 11 UNCLASSIFIED FY 2007 UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY /BA 3 AVIATION SUPPORT EQUIPMENT Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) $167.0 42440 AVIATION LIFE SUPPORT SYSTEMS Other Related Program Elements ID Code FY 2000 $36.0 FY 2001 FY 2002 $28.7 $21.0 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total CONT. CONT. This account provides for the acquisition, upgrade, and production support of aviation life support systems required for the personal safety and protection of aircrew against the hazards encountered in the aircraft operating environment and for safe recovery of downed aircrew. NEW SURVIVAL RADIO - SY030 - Non-developmentalacquisition to replace the PRC-90 and PRC-90-2 with a state of the art survival radio. This will be a non-combat radio to complement the PRQ-7 (Combat Survivor Evader Locator (CSEL) radio. Historically, the Navy has used the PRC-90 to complement the PRC-112, which the PRQ-7 will replace. Major off the shelf technology insertion will be the addition of Cosmicheskaya Systema Poiska Avariynyich (COSPAS) Search and Rescue Statellite Aided Tracking (SARSAT) 460 MHZ capability. The location of downed aircrew will now be known within 100 meters and 20 minutes of radio beacon activation thereby greatly reducing time to recover downed aircrew and increasing their probability of safe recovery. This purchase also includes a beacon which replaces the antiquated URT-33 ejection seat beacon used to signal when an aircrew has ejected from the aircraft and an adapter which, replaces the PRC125, satisfying the peculiar mission of the in water rescue swimmer. This buy consists of three components: the AN/PRC-149 Radio, AN/URT-140 Radio Beacon, and the Swimmers Control Unit. COMBAT SURVIVOR EVADER LOCATOR (CSEL) - SY060 - The Combat Survivor Evader Locator (CSEL) Radio system provides U.S. combat forces with secure, encrypted, low probability of detection, two-way, over the horizon, near real time databurst communications with integral precise geopositioning; and non-secure, unencrypted line-of-site voice and beacon capability to support survival, evasion, and personnel recovery operations. This is a joint Program with the Air Force as lead. The User segment of the CSEL system is composed of a battery operated hand held radio (HHR) (AN/PRQ-7), a radio set adapter (RSA) (J-6431/PRQ-7), a GPS antenna and coupler, and a laptop CPU with software for loading the HHR (CSEL Planning Computer (CPC)). The HHR will weigh 32 ounces and is of comparablesize to other portable SATCOM radios (8x3.5x1.75"). CSEL will require a key fill device and will have improved jam and spoofing resistance by incorporating the next-generation Selective Availability Anti-Spoofing Module (SAASM) GPS module. LASER EYE PROTECTION IMPROVEMENT PROGRAM (LEPIP) -SY080 -Laser Eye Protection Improvement Program (LEPIP) EDU-5/P Spectacles. This is a USN/USMC Abbreviated Acquisition Program (AAP). The EDU-5/P spectacles are designed to provide day and night multiple wavelength, low energy protection for fixed and rotary wing aircrew in a fixed, multi-wavelengthlaser threat environment. The spectacles are designed to cause minimal visual and physical encumbrance, and be compatible with current Navy Aviation Life Support Equipment (ALSE), aircraft visual displays and night vision systems. The EDU-5/P spectacles will replace the currently available FV2 laser spectacles which have performance limitations which include 1) day use only, 2) significant color perception distortion of the cockpit display or scene being viewed, 3) incompatibilitywith Chemical BiologicalRadiological(CBR) protective assembly, 4) incompatibilitywith night vision goggles (NVGs), 5) significant reduction of cockpit displays light levels, and 6) hot spot discomfort around the ears from the temple arms. In addition, the EDU-5/P spectacles provide seven (7) wavelength protection as opposed to five (5) wavelength protection provided by the FV2 spectacles DD Form 2454, JUN 86 ITEM NO. 106 PAGE NO. 1 OF 14 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY /BA 3 AVIATION SUPPORT EQUIPMENT 42440 Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) $167.0 AVIATION LIFE SUPPORT SYSTEMS Other Related Program Elements ID Code FY 2000 $36.0 FY 2001 FY 2002 $28.7 $21.0 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total CONT. CONT. JOINT SERVICE AIRCREW LOW ENERGY MULTIPLE WAVELENGTH ADVANCED LASER EYE PROTECTION VISOR (JALEPV) - SY085 -Joint Service Aircrew Low Energy Multiple Wavelength Advanced Laser Eye Protection Visor (JALEPV) Program. The JALEPV has been designated as a ACAT IVM Program. The Navy is the lead service for this program. The JALEPV is being developedto provide day and night multiple wavelength, low energy protection to address the needs of fixed and rotary wing aircrew in a fixed multiple wavelength laser threat enviroment. The visor is being developed for compatibility with current Army, and USN/USMC Aviation Life Support Equipment (ALSE) as well as cockpit displays, night vision, and fire control systems. LASER EYE PROTECTION R-TOC - SY087 Congress gave us additionalfunding for FY01 & FY02 for the Reduction in Total Ownership Cost (R-TOC) for hard coating of the lenses. -This Smart Work initiative involves replacing existing hard (scratch resistant) lens coating with one being developedby Triton Systems, Inc. Triton is a Small Business InnovativeResearch (SBIR) contractor that is developingan improved abrasion/scratch resistant and anti-reflective protective lens coating. The expectationis that service life can be increased at least four years for both the spectacles and the visors. Savings/cost avoidance will be realized through procuring fewer replacements and extending the service life of the laser protection spectacles and visors. The effect on readiness will be performance enhancement. The scratch resistant and glare reduced lenses will improve the vision of the pilot inside and outside the cockpit. HELICOPTER AIRCREW BREATHING DEVICE SYSTEM (HABDS) (SRU-40/B/P) - SY 110 - HABDS is a P3I effort to the HEED (Helicopter Emergency Egress Device). It is a compact, lightweight breathing assembly intended for emergency use of helicopter and E-2C aircrew personnel in the event of a crash landing over water. It will aid in the safe egress of the aircrew member from a submerged aircraft. It is a self contained 3000 PSI cylinder breathing device and provides 1-3 minutes of breathing air for use in an emergency aircraft submergency situtation. PASSENGER HELICOPTER AIRCREW BREATHING DEVICE SYSTEM (PHABDS) - SY 115 -PHABDS is a flotation and breathing device system specifically for use by trained troop passengers being transported in USMC rotary wing aircraft. It consists of the SRU-40B/P (HABD), the HABD Holster, and the LPU-32/P Life Perserver Unit. The holster may also be used with the LPP-1/1A or Pouch Type Preservers until sufficient quantities of the LPU-32/P are fielded. Additional support equipment, including the CQU-10/U (Portable Refill Systems), compressors, and tool kits will be procured. AIRCREW INTEGRATED RECOVERY SURVIVAL ARMOR VEST AND EQUIPMENT (AIRSAVE) - SY120 (Replaces Aircrew Integrated Survival/Armor Protection (AISAP) - The AIRSAVE system consists of three components: a survival vest, a soft body armor system and a hard body armor system. The Survival vest is flame retardant and has modular/removablepockets to hold various survival items. It integrates with all Navy, Marine and Army cockpits, chemical systems, oxygen systems, floatation systems as well as other Aviation Life Support Systems (ALSS) survival equipment. The soft body armor system is made up of 36 plys of KM-2 Kevlar and is designed to provide fragmentation protection. The hard body armor system is composed of a ceramic material that can provide ballistic protection from .30 caliber armor piercing rounds. This is the next generationof a survival vest and body armor ensemble, it will enhance the performance of all Navy, Marine and Army aircrew. DD Form 2454, JUN 86 ITEM NO. 106 PAGE NO. 2 OF 14 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY /BA 3 AVIATION SUPPORT EQUIPMENT 42440 Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) $167.0 AVIATION LIFE SUPPORT SYSTEMS Other Related Program Elements ID Code FY 2000 $36.0 FY 2001 FY 2002 $28.7 $21.0 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total CONT. CONT. PASSENGER ANTI-EXPOSURE SURVIVAL SYSTEM (PAESS) NDI - SY140 - PAESS is a constant wear cold weather immersion protection system which will be used to protect non-aircrew personnel being transported as passengers in Carrier on Board Delivery/Vertical on Board Delivery (COD/VOD) aircraft, to, from and between ships at sea. This system will increase the survivability of these passengers by fulfilling such requirements as providing protection from hypothermia, being easily donned and doffed, and capable of underwater egress. This is a new Non-Developmental Item Purchase. AVIATION RESCUE SWIMMERS’ DRY SUIT (ARSD) PROGRAM - SY155 -The Aviation Rescue Swimmers’ Dry Suit Program (ARSD) is a non developmental acquisition program, designed to provide the Aviation Rescue Swimmers constant wear, dry suit antiexposure system, which is capable of: (1) providing protection to the wearer from adverse environment and physiological factors, (2) being compatible with existing survival equipment, and (3) being worn while the aircrew performs collateral duties (vertical replenishments, passenger transfers). NAVY COMBAT EDGE [NCE] - SY-170 - The NCE is an integrated aircrew flight ensemble designed to increase aircrew protection from the physiological hazards associated with high positive acceleration (+G) forces. During exposure to +G acceleration, blood pooling occurs in the lower portions of the body depriving the brain of an adequate supply of oxygenated blood and causing a loss of vision followed by loss of consciousness. The NCE provides enhanced acceleration protection through the use of Assisted Positive Pressure Breathing (APPB), a counter pressure vest and an anti-G-garment. The NCE system consists of several individual components (HGU-87/P helmet and KMU-561 modification kit; MBU-24/P oxygen mask; CSU-21/P counter pressure vest; CRU-103/PG compression oxygen breathing regulator; CSU-120/P lower anti -G garment; and Anti-G valve). NIGHT VISION DEVICES (NVD) TACTICAL - SY210 -These Night Vision Devices (NVD) provide U.S. Navy personel with a helmet-mounted night vision system that enhances aircrew performance at night. The system is battery powered and amplifies ambient light sources which increases visual acuity at night. The system is fitted with a light emitting diode (LED) indicator on the helmet mounting plate assembly that blinks if battery voltage drops below operational limits. The system incorporates a high gain, high resolution image intensifier assembly, 3/4-turn focus mechanism, objective lens with a leaky green filter that enables fixed wing aviators to view heads-up displays (HUD) while wearing the system, and comes with a detachable helmet mount. The system is fully adjustable by the operator to accomodate the distance between the eyes, vertical distance, tilt, eye relief, diopter setting, and focus. Additionally, the system can be flipped up and stored away from the operator’s eyes in emergency situations and when not in use. DD Form 2454, JUN 86 ITEM NO. 106 PAGE NO. 3 OF 14 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: JUNE 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY /BA 3 AVIATION SUPPORT EQUIPMENT 42440 Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) $167.0 AVIATION LIFE SUPPORT SYSTEMS Other Related Program Elements ID Code FY 2000 $36.0 FY 2001 FY 2002 $28.7 $21.0 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total CONT. CONT. NIGHT VISION GOGGLES (NVG) ROTARY -SY 212 - This Night Vision Goggles (NVG) provides U.S. Navy rotary wing personnel with a helmet-mountedvision system that enhances aircrew performance at night. The system is battery powered and amplifies ambient light sources which increases visual acuity at night. The system is fitted with a light emitting diode (LED) indicator on the helmet mounting plate assembly that blinks if battery voltage drops below operating limits. The system incorporates a high gain, high resolution image intensifier assembly, 3/4-turn focus mechanism and comes with a detachable helmet mount. The system is fully adjustable by the operator to accommodatethe distance between the eyes, vertical distance, tilt, eye relief, diopter setting and focus. Additionally, the system can be flipped up and stored away from the operator’s eyes in emergency situations and when not in use. LOW PROFILE FLOTATION COLLAR (LPFC) - SY220 - The LPU-33/P and the LPU-34/P (LPFC) are the replacementsfor the LPU-21/23/P Life Preservers. The LPU-33/P is being replaced by the LPU-36 under an ECP to improve the aircrews head movement. The LPU-36/P will replace the LPU-33/P by retrofit. The LPU-36/P utilizes two FLU-8B/P automatic/manual inflation assemblies, one for each bladder. The LPU-34/P utilizes two manual inflation assemblies. The packed assembly is worn around the users neck and rests on his upper chest. The LPU-34/36 Flotation assemblies consist of two independent inflatable bladders that when inflated, provides 65 pounds of positive buoyancy. This configuration is light weight and compact and allows pockets for survival items to be mounted where the LPU-21/23 waist lobes used to be. MA-16 INERTIA REEL - SY300 - The MA-16 is a multi-directional locking reel that automatically reacts to airframe deceleration from either one or all axis simultaneously. The MA-16 also features a strap acceleration-locking feature and incorporates a lock/unlock handle assembly. The MA-16 was dynamically tested to 10 years service life, utilizes an identical footprint and profiles to nearly all its predecessorsand is the only available inertia reel that is compliant to MIL-R-8236, Revision F. LOX TO OBOGS (TOC) - SY400 - The Navy plans to eliminate Liquid Oxygen (LOX) from all aircraft, carriers, and naval air stations by FY 2010. LOX systems have an extensive logistics footprint, limit aircraft mission duration, present a significant safety hazard, and require over $50M per year of maintenance. OBOGS generates oxygen on-board the aircraft directly from engine bleed air via the Pressure-Swing Adsorption (PSA) process, eliminating the deficiencies associated with LOX. This program will evaluate candidate aircraft, develop aircraft retrofit packages, and replace LOX with OBOGS under a Total Ownership Cost (TOC) savings initiative. CLASSIFICATION: DD Form 2454, JUN 86 ITEM NO. 106 PAGE NO. 4 OF 14 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY Procurement Items NEW SURVIVAL RADIO TOTAL COST ($K) QUANTITY C-SEL FY 2000 FY 2001 FY 2002 4,890 726 4,193 2,200 7,811 4,454 8,719 4,800 0 0 0 0 0 0 2,965 255 2,380 2,240 1,773 1,390 0 0 0 0 0 0 0 0 945 135 1,048 600 0 0 0 0 930 0 1,170 0 0 0 0 351 1,075 303 786 0 0 0 0 3,223 6,420 0 0 3,987 3,021 682 562 185 162 228 155 1,074 0 563 750 75 100 580 800 42440 FY 2003 FY 2004 AVIATION LIFE SUPPORT SYSTEMS FY 2005 FY 2006 FY 2007 A TOTAL COST ($K) QUANTITY JALEPV Prior Years B TOTAL COST ($K) QUANTITY LASER EYE PROTECT. JUNE 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY /BA 3 AVIATION SUPPORT EQUIPMENT ID Code A DATE: A TOTAL COST ($K) QUANTITY LASER EYE PROTECT. R-TOC A TOTAL COST ($K) QUANTITY HABDS A TOTAL COST ($K) QUANTITY PHABDS A TOTAL COST ($K) QUANTITY AIRSAVE A TOTAL COST ($K) QUANTITY PAESS (NDI) TOTAL COST ($K) QUANTITY DD Form 2454, JUN 86 A ITEM NO. 106 PAGE NO. 5 OF 14 UNCLASSIFIED To Complete Total UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a APPROPRIATION/BUDGET ACTIVITY Procurement Items SWIMMERS DRY SUIT TOTAL COST ($K) QUANTITY A NAVY COMBAT EDGE TOTAL COST ($K) QUANTITY A NVD (TACTICAL) TOTAL COST ($K) QUANTITY A NVG (ROTARY) TOTAL COST ($K) QUANTITY A LOW PROFILE FLOTATION COLLAR TOTAL COST ($K) QUANTITY A MA-16 INERTIA REEL TOTAL COST ($K) QUANTITY A LOX TO OBOGS (TOC) TOTAL COST ($K) QUANTITY B OTHER COSTS PRODUCTION SUPPORT TEST AND EVALUATION TOTAL FUNDING JUNE 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY /BA 3 AVIATION SUPPORT EQUIPMENT ID Code DATE: Prior Years FY 2000 FY 2001 FY 2002 33 51 47 68 194 281 0 0 3,858 633 1,477 409 876 246 0 0 7,971 1,130 1,264 195 656 101 434 67 8,214 1,266 13,668 2,329 8,104 1,309 1,547 250 2,548 7,498 1,840 3,718 967 2,538 0 0 0 0 5,219 4,910 0 0 0 0 0 0 0 0 0 0 0 0 4,894 361 35,981 4,347 0 28,664 4,041 0 21,035 42440 FY 2003 FY 2004 AVIATION LIFE SUPPORT SYSTEMS FY 2005 FY 2006 FY 2007 110,901 20,817 410 167,083 CLASSIFICATION: DD Form 2454, JUN 86 ITEM NO. 106 PAGE NO. 6 OF 14 UNCLASSIFIED To Complete Total UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: JUNE 2001 ID Code APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE/SUBHEAD OTHER PROCUREMENT, NAVY BA 3 AVIATION SUPPORT EQUIPMENT 42440 AVIATION LIFE SUPPORT SYSTEMS TOTAL COST IN THOUSANDS OF DOLLARS COST CODE SY030 SY060 SY080 SY085 SY087 SY110 SY115 SY120 SY140 SY155 SY170 SY210 SY212 SY220 SY300 SY400 SY830 SY860 ELEMENT OF COST ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost FY 2003 Total Cost Quantity Unit Cost Total Cost NEW SURVIVAL RADIO A 4,890 2,200 1,906 4,193 4,454 1,754 7,811 4,800 1,816 8,719 CSEL * B 0 0 0 0 0 0 0 255 11,627 2,965 LASER EYE PROTECTION (LEPIP) A 2,380 1,390 1,276 1,773 0 0 0 0 0 0 JALEPV A 0 0 0 0 135 7,000 945 600 1,747 1,048 LASER EYE PROTECTION (LEPIP) - R-TOC** A 0 0 0 0 0 0 930 0 0 1,170 HABDS A 0 0 0 0 1,075 326 351 786 386 303 PHABDS A 0 0 0 0 6,420 502 3,223 0 0 0 AIRSAVE A 3,987 562 1,214 682 162 1,142 185 155 1,471 228 PAESS (NDI) A 1,074 750 751 563 100 751 75 800 725 580 RESCUE SWIMMERS’ DRY SUIT (ARSD) A 33 68 692 47 281 692 194 0 0 0 NAVY COMBAT EDGE (NCE) A 3,858 409 3,613 1,477 246 3,560 876 0 0 0 NIGHT VISION DEVICES (TACTICAL) A 7,971 195 6,480 1,264 101 6,482 656 67 6,482 434 NIGHT VISION GOGGLES (ROTARY) A 8,214 2,329 5,869 13,668 1,309 6,188 8,104 250 6,188 1,547 LOW PROFILE FLOTATION COLLAR *** A 2,548 3,718 495 1,840 2,538 381 967 0 0 0 MA-16 INERTIA REEL A 0 4,910 1,063 5,219 0 0 0 0 0 0 LOX TO OBOGS (TOC) B 0 0 0 0 0 0 0 0 0 0 PRODUCTION SUPPORT SERVICES 20,817 4,894 4,347 4,041 TEST AND EVALUATION 410 361 0 0 OTHER COSTS 110,901 * SY060 - The Unit Cost is NOT the actual individual cost of a single CSEL HHR - it is the total hardware "fly away" cost computed by dividing the toal yearly hardware cost by the number of radios procured. It includes the cost of the HHR, the required CSEL Planning Equipment (CPC + RSA + Crypto Loader, on a 12:1 HHR-CPE ratio), batteries, 10-year HHR warranty and ancillary equipment. ** SY087 - Funding is a TOC intiative that will be for hard coating of the lens, no additional quanties will be procured. In FY-01 Presidental Budget it was combined with SY080. *** SY220 - Funding for FY01 is added for the shortfall stated in NAVCOMPT Budget. There is a letter from N88 authorizing this shortfall to be funded. DD FORM 2446, JUN 86 167,083 P-1 SHOPPING LIST ITEM NO.106 36,492 PAGE NO. 28,664 21,035 CLASSIFICATION: 7 OF 14 UNCLASSIFIED 10:09 AM7/18/01 CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE JUNE 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA 3 AVIATION SUPPORT EQUIPMENT UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE 680 2,200 4,454 4,800 2.89 1.906 1.754 1.816 NAVAIR NAVAIR NAVAIR NAVAIR N/A N/A N/A N/A 255 11.627 AFMS/SMC 1,390 1.276 SY085 JALEPV FY-2001 FY-2002 135 600 SY110 HABDS FY-2001 SY030 NEW SURVIVAL RADIO FY-1999 FY-2000 FY-2001 FY-2002 SY060 COMBAT SURVIVOR EVADER LOCATOR FY-2002 SY080 LASER EYE PROTECTION FY-2000 FY-2002 D. 43SY 42440 AVIATION LIFE SUPPORT SYSTEMS QUANTITY Cost Element/ FISCAL YEAR SUBHEAD CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE OPTION OPTION OPTION OPTION TADIRAN SPECTRALINK HOLON, ISRAEL 09/99 12/99 03/01 12/01 06/00 08/00 07/01 08/02 YES YES YES YES N/A N/A N/A N/A N/A FFP BOEING, NORTH 12/01 10/02 YES N/A NAVAIR N/A OPTION KAISER OPTICAL ANN ARBOR, MI 05/00 01/01 YES N/A 7 1.747 NAVAIR NAVAIR N/A N/A CPFF CPFF AOTEC SOUTHBRIDGE, MASS TBD 07/01 04/02 09/01 06/02 YES YES N/A N/A 1,075 0.326 NAVAIR N/A OPTION U.S. DIVERS 03/01 09/01 YES N/A 786 0.386 NAVAIR N/A OPTION VISTA, CA 03/02 09/02 YES N/A REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 106 PAGE NO. 8 OF 14 Classification: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE JUNE 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA 3 AVIATION SUPPORT EQUIPMENT SUBHEAD 43SY 42440 AVIATION LIFE SUPPORT SYSTEMS QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE 6420 0.502 NAVAIR N/A FFP U.S. DIVERS VISTA, CA 01/01 02/01 YES N/A AIRSAVE FY-2000 FY-2001 FY-2002 562 162 155 1.214 1.142 1.471 DSC-P, PHIL DSC-P, PHIL DSC-P, PHIL N/A N/A N/A MILSTRIPS MILSTRIPS MILSTRIPS VARIOUS VARIOUS VARIOUS 05/00 03/01 01/02 08/00 06/01 04/02 YES YES YES N/A N/A N/A SY140 PAESS (NDI) FY-2000 FY-2001 FY-2002 750 100 800 0.751 0.751 0.725 NAWCAD/PAX NAWCAD/PAX NAWCAD/PAX N/A N/A N/A C/FP OPTION OPTION Concorde AeroSales Ft. Lauderdale, FL 11/00 04/01 03/02 01/01 06/01 06/02 YES YES YES N/A N/A N/A SY155 SWIMMERS DRY SUIT FY-2000 FY-2001 68 281 0.692 0.692 NAWCAD/PAX DSC-P,PHIL N/A N/A SS/FP C/FP MUSTANG SURVIVAL BELLINGHAM, WA TBD 08/00 06/01 11/00 09/01 YES YES N/A N/A SY170 NAVY COMBAT EDGE FY-2000 FY-2001 409 246 3.613 3.56 VARIOUS VARIOUS N/A N/A OPTION OPTION VARIOUS VARIOUS 11/99 11/00 08/00 08/01 YES YES N/A N/A Cost Element/ FISCAL YEAR SY115 PHABDS FY-2001 SY120 D. REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 106 PAGE NO. 9 OF 14 Classification: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE JUNE 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA 3 AVIATION SUPPORT EQUIPMENT UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE 195 101 67 6.48 6.482 6.482 NAVAIR,PAX NAVAIR NAVAIR N/A N/A N/A OPTION OPTION OPTION (ROTARY) FY-2000 FY-2000 (Plus Up) FY-2001 FY-2002 77 2,252 1,309 250 6.466 5.848 6.188 6.188 NAVAIR NAVAIR NAVAIR NAVAIR N/A 3/00 N/A N/A OPTION C/FP OPTION OPTION SY220 LOW PROFILE FLOTATION COLLAR FY-2000 FY-2001 3,718 2,538 0.495 0.381 NAWC, CL NAWC, CL N/A N/A OPTION OPTION SY300 MA-16 INERTIA REEL FY-2000 4,910 1.063 NAWCAD/PAX N/A SS/FP SY210 NIGHT VISION DEVICES (TACTICAL) FY-2000 FY-2001 FY-2002 43SY 42440 AVIATION LIFE SUPPORT SYSTEMS QUANTITY Cost Element/ FISCAL YEAR SUBHEAD CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE ITT, ROANOKE, VA 02/00 05/01 02/02 08/00 11/01 08/02 YES YES YES N/A N/A N/A 02/00 08/00 05/01 02/02 10/00 01/01 01/02 01/03 YES YES YES YES N/A N/A N/A N/A SEI, ASHEVILLE, NC 04/00 12/00 05/00 09/01 YES YES N/A N/A H KOCH & SONS 09/00 03/01 YES N/A SY212 NIGHT VISION GOGGLES D. REMARKS DD Form 2446-1, JUL 87 P-1 SHOPPING LIST ITEM NO. 106 PAGE NO. 10 OF 14 Classification: UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED Exhibit P-20, Requirements Study APPROPRIATION/BUDGET ACTIVITY Date: OTHER PROCUREMENT, NAVY /BA 3 AVIATION SUPPORT EQUIPMENT P-1 ITEM NOMENCLATURE Admin Leadtime (after Oct 1): NEW SURVIVAL RADIO Buy Summary Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from all prior year funding Deliveries from FY 2000 funding Deliveries from FY 2001 funding Deliveries from FY 2002 funding Deliveries from subsequent years’ funding Other Gains Combat Losses/Usage Training Losses/Usage Test Losses/Usage Other Losses/Usage Disposals/Retirements/Attritions/etc. End of Year Asset Position Inventory Objective or Current Authorized Allowance Inventory Objective Actual Training 20000 Expenditures Assets Rqd For Combat FY 2000 thru Loads: XXXXX: WRM Rqmt: FY 1999: Pipeline: FY 1998: Other: FY 1997: TOTAL: Remarks: DD Form 2454, JUN 86 JUNE 2001 Production Leadtime: 2 MONTHS 10 MONTHS FY 2000 2200 1.91 4,193 FY 2001 4454 1.75 7,811 FY 2002 4800 1.82 8,719 46 220 600 0 0 0 866 460 1600 1850 0 0 4776 0 0 2604 800 0 866 20000 Other than Training Usage FY 2000 thru XXXXX: FY 1999: FY 1998: FY 1997: 4776 20000 ITEM NO.106 FY 2003 8180 20000 Disposals (Vehicles/Other) FY 2000 thru XXXXX: FY 1999: FY 1998: FY 1997: P-1 SHOPPING LIST PAGE NO. 11 OF 14 FY 2004 FY 2005 Vehicles Eligible for FY 2001 Replacement: Vehicles Eligible for FY 2002 Replacement: Vehicle Augment: FY 2006 Aircraft: TOAI: PAA: TAI Attrition Res: BAI Inactive Inv: Storage: CLASSIFICATION: UNCLASSIFIED FY 2007 CLASSIFICATION: UNCLASSIFIED Exhibit P-20, Requirements Study APPROPRIATION/BUDGET ACTIVITY Date: OTHER PROCUREMENT, NAVY /BA 3 AVIATION SUPPORT EQUIPMENT P-1 ITEM NOMENCLATURE Admin Leadtime (after Oct 1): 2 MONTHS COMBAT SURVIVOR EVADER LOCATOR (CSEL) FY 2000 Buy Summary Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from all prior year funding Deliveries from FY 2000 funding Deliveries from FY 2001 funding Deliveries from FY 2002 funding Deliveries from subsequent years’ funding Other Gains Combat Losses/Usage Training Losses/Usage Test Losses/Usage Other Losses/Usage Disposals/Retirements/Attritions/etc. End of Year Asset Position Inventory Objective or Current Authorized Allowance Inventory Objective Actual Training 9028 Expenditures Assets Rqd For Combat FY 2000 thru Loads: XXXXX: WRM Rqmt: FY 1999: Pipeline: FY 1998: Other: FY 1997: TOTAL: Remarks: DD Form 2454, JUN 86 JUNE 2001 Production Leadtime: FY 2001 FY 2002 255 11.63 2,965 4 MONTHS FY 2003 FY 2004 FY 2005 FY 2006 0 0 0 0 0 0 9028 Other than Training Usage FY 2000 thru XXXXX: FY 1999: FY 1998: FY 1997: 9028 ITEM NO.106 0 9028 Disposals (Vehicles/Other) FY 2000 thru XXXXX: FY 1999: FY 1998: FY 1997: P-1 SHOPPING LIST PAGE NO. 12 OF 14 Vehicles Eligible for FY 2001 Replacement: Vehicles Eligible for FY 2002 Replacement: Vehicle Augment: Aircraft: TOAI: PAA: TAI Attrition Res: BAI Inactive Inv: Storage: CLASSIFICATION: UNCLASSIFIED FY 2007 CLASSIFICATION: UNCLASSIFIED Exhibit P-20, Requirements Study APPROPRIATION/BUDGET ACTIVITY Date: OTHER PROCUREMENT, NAVY /BA 3 AVIATION SUPPORT EQUIPMENT P-1 ITEM NOMENCLATURE Admin Leadtime (after Oct 1): 2 MONTHS NIGHT VISION GOGGLES (ROTARY) Buy Summary Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from all prior year funding Deliveries from FY 2000 funding Deliveries from FY 2001 funding Deliveries from FY 2002 funding Deliveries from subsequent years’ funding Other Gains Combat Losses/Usage Training Losses/Usage Test Losses/Usage Other Losses/Usage Disposals/Retirements/Attritions/etc. End of Year Asset Position Inventory Objective or Current Authorized Allowance Inventory Objective Actual Training 5572 Expenditures Assets Rqd For Combat FY 2000 thru Loads: XXXXX: WRM Rqmt: FY 1999: Pipeline: FY 1998: Other: FY 1997: TOTAL: Remarks: 7 MONTHS FY 2000 2329 5.87 13,668 FY 2001 1309 6.19 8,104 FY 2002 250 6.19 1,547 FY 2003 0 930 0 0 0 0 930 336 1765 0 0 0 3031 0 564 981 0 0 4576 0 0 328 250 0 930 5572 Other than Training Usage FY 2000 thru XXXXX: FY 1999: FY 1998: FY 1997: 3031 5572 4576 5572 Disposals (Vehicles/Other) FY 2000 thru XXXXX: FY 1999: FY 1998: FY 1997: FY 2004 ITEM NO.106 FY 2005 FY 2006 5154 5572 Vehicles Eligible for FY 2001 Replacement: Vehicles Eligible for FY 2002 Replacement: Vehicle Augment: P-1 SHOPPING LIST DD Form 2454, JUN 86 JUNE 2001 Production Leadtime: Aircraft: TOAI: PAA: TAI Attrition Res: BAI Inactive Inv: Storage: CLASSIFICATION: PAGE NO. 13 OF 14 UNCLASSIFIED FY 2007 FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY /BA 3 AVIATION SUPPORT EQUIPMENT Production Rate Manufacturer’s Item Name and Location MSR 1-8-5 MAX SY030, New Survival Radio TADIRAN SPECTRALINK/HOLON ISRAEL 50 550 1000 SY060, C-SEL BOEING, NORTH AMER, ANAHEIM,CA 50 700 750 SY212, NVG (ROTARY) ITT, ROANOKE, VA 50 300 500 DATE JUNE 2001 P-1 ITEM NOMENCLATURE Weapon System 4244O AVIATION LIFE SUPPORT SYSTEMS Procurement Leadtimes ALT Prior ALT After Initial to Oct 1 Oct 1 Mfg PLT 10 2 6 10 2 10 10 2 5 Reorder Mfg PLT 8 2 5 FISCAL YEAR 2000 ITEM / MANUFACTURER F Y S V C Q D B T Y E L A L 99 00 01 N N N 680 2200 4454 0 0 0 680 2200 4454 00 00 01 N N N 77 2252 1309 0 0 0 77 2252 1309 F Y S V C Q D B T Y E L A L 01 02 N N 4454 4800 1850 0 SY060, C-SEL/Boeing 02 N 255 0 SY212, Night Vision Goggles (Rotary) 00 01 02 N N N 2252 1309 250 1688 0 0 SY030, New Survival Radio/Tadiran SY212, Night Vision Goggles (Rotary) 1999 O C T N O V FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C J A N F E B M A R A P R M A Y J U N J U L 55 55 A CALENDAR YEAR 2001 S E P A U G O C T N O V D E C J A N SY030, New Survival Radio/Tadiran M A R A P R M A Y 57 57 61 J U N A 77 O C T N O V J A N F E B M A R A P R M A Y S E P B A L 750 550 550 2604 FISCAL YEAR 2003 CALENDAR YEAR 2002 D E C A U G 0 187 187 187 187 188 188 188 188 188 564 A A 2001 J U L 0 0 A J U N 2604 550 550 550 954 4800 A 255 F E B 55 55 57 57 57 57 57 300 300 400 400 300 420 80 FISCAL YEAR 2002 ITEM / MANUFACTURER Unit of Measure months months months Total 10 4 7 J U L A U G CALENDAR YEAR 2003 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L 400 400 A 564 188 188 188 1309 109 109 109 109 109 109 109 109 109 250 A Remarks: DD Form 2445, JUL 87 311 / 244 Previous editions are obsolete P-1 SHOPPING LIST ITEM NO 106 PAGE NO. 14 OF 14 Exhibit P-21 Production Schedule UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY BA-3: NAVY/AVIATION SUPPORT EQUIPMENT Airborne Mine Countermeasures Program Element for Code B Items: Other Related Program Elements 0604373N BLI # 424800 0204302N Prior Years QUANTITY COST (In Millions) SPARES COST (In Millions) ID Code FY 2000 FY 2001 FY 2002 To Complete Total B $39.9 $31.8 $38.4 Cont. Cont. $3.6 $1.6 $2.4 Cont. Cont. FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Airborne Mine Countermeasures (AMCM) Equipment is currently used by MH-53E helicopters to counter the threat of sea mines. The MH-60S helicopter will be adapted for the AMCM mission in suppport of the development of an Organic Fleet AMCM program. The equipment is divided into two broad categories -- minesweeping and minehunting. (1) Minesweeping is performed by mechanical or influence sweeps. In mechanical sweeping, the mine mooring is severed by the sweep gear allowing the mine to float to the surface where it is destroyed. In influence sweeping, a magnetic or acoustic field which simulates the magnetic/acoustic signature of a ship is introduced into the water. This field causes the mine mechanism to actuate. (2) In mine hunting, the object is to actually locate and classify minelike objects (usually by means of high resolution sonar) and mark or neutralize mines using explosive devices. AMCM squadrons currently have mechanical, magnetic, and acoustic sweeping capabilities, and mine surveillance and marking capabilities. Their mission is to locate, classify and neutralize moored and bottom mines. S0020 - Funds provided are for the modification of systems to accommodate replacement of subsystems/components because of obsolescence. ECP’s are analyzed, prioritized and screened to accommodate replacement of subsystems/components. Funding for this effort is designated in all fiscal years. S0061 - The MK-105 Mod 4 magnetic minesweeping system is a hydrofoil platform that carries a turbo-generator power pack and is towed by a MH-53E helicopter, allowing for safe, high speed sweeping of coarse magnetic influence mines at twice the output of the current MK-105. The technological upgrade increases supportability, reliability and maintainability (R&M), and increases operational effectiveness. S0065 - Airborne Mine Neutralization System (AMNS) is an expendable remote controlled neutralizer vehicle deployed from the helicopter platform to reacquire, identify, and neutralize moored or proud bottom sea mines. FY 2002 procurement supports the MH-53E airframe. S0071 - AN/AQS-14A LLSS provides a mine identification deployment contingency capability to significantly increase the speed of mine clearing operations. It involves integration of an off-the-shelf SM2000 Laser Line Scanner into the AN/AQS-14A minehunting system. S0073 - AN/AQS-20 funding provided in FY 2000 - FY 2002 supports Limited Production (MH-53E) . The AN/AQS-20 will provide a minehunting deployment contingency capability to the MH53E. FY00/FY01 includes two AN/AQS-20 systems which will be provided to the Remote Minehunting System (RMS) program as Government Furnished Equipment (GFE). DD Form 2454, JUN 86 P-1 SHOPPING LIST ITEM NO. 107 PAGE NO. 1 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET -Cont. P-40 APPROPRIATION/BUDGET ACTIVITY DATE: June 2001 P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY/ BA-3: NAVY/AVIATION SUPPORT EQUIPMENT Code B items PE #0604373N DT OT AMNS (MH-53E APR 01 SEPT 01 TDP JUL 01 DD Form 2454, JUN 86 AMNS (MH-60S) JUL 02 JAN 03 SEP 02 ITEM NO. Airborne Mine Countermeasures AN/AQS-20X MAR 02 JUL 02 APR 02 P-1 SHOPPING LIST 107 PAGE NO. CLASSIFICATION: 2 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY Airborne Mine Countermeasures BLI# 424800 Procurement Items Mission Kits ID Code Modifications FY 2002 $3.1 $2.1 $2.8 2 $14.7 $1.8 $1.8 2 $22.1 3 $23.7 3 $22.4 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total A Qty Cost AN/AQS-20/X FY 2003 A Qty Cost AN/AQS-14A LLSS FY 2001 A Qty Cost AN/AQS-20 FY 2000 A Qty Cost MK 105 Mod 4 Prior Years 4 $4.2 B Qty Cost AMNS B Qty Cost ALMDS 6 $11.4 B Qty Cost OASIS B Qty Cost Total DD Form 2454, JUN 86 $39.9 $31.8 $38.4 P-1 SHOPPING LIST ITEM NO. 107 PAGE NO. 3 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET P-40 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY Program Element for Code B Items: Prior Years QUANTITY COST (In Millions) ID Code FY 2000 FY 2001 FY 2002 B 0 0 3 B $0.0 $0.0 $8.5 FY 2003 DATE: June 2001 P-1 ITEM NOMENCLATURE Airborne Mine Countermeasures BLI# 424800 Other Related Program Elements FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total Mission and Description: Airborne Mine Countermeasures (AMCM) mission kits are currently being employed by the MH-53 helicopters to counter the threat of sea mines. Based on the Helicopter Master Plan, the MH-53E will be replaced by the MH-60S helicopter in performing the AMCM mission. The AMCM MH-60S helicopter incorporates fleet requirements for an Organic AMCM helicopter, capable of rapidly detecting identifying and neutralizing bottom, moored and floating sea mines. Because of the transition to a smaller helicopter, all five AMCM weapon systems will have to be integrated into the aircraft, use the same user console interface, and transmit data through the Tactical Common Data Link (TCDL). The user console interface will allow for one set of displays and keysets to be used with all of the AMCM systems, the Carriage, Stream, Tow and Recovery System (CSTRS) will be modular and also capable of working with all of the AMCM systems, and TCDL will be capable of providing near real time transfer of AMCM mission data. The FY 2002 program will procure Organic AMCM Common Console User Interface and OAMCM Carriage, Stream, Tow & Recovery System mission kits required to physically integrate the organic AMCM sensors into the MH-60S aircraft. 23223 AMCM Common Console - Funds for the procurement of the Organic AMCM Common Console mission kits required to physically integrate the organic AMCM sensors into the MH-60S aircraft.. 23224 MH-60S AMCM CSTRS - Funds for the procurement of the Organic AMCM Carriage, Stream, Tow and Recovery System (CSTARS) mission kits required to physically integrate the organic AMCM sensors into the MH-60S aircraft. The FY 2003 program will procure Organic AMCM Common Console User Interface, OAMCM Carriage, Stream, Tow & Recovery System, and Tactical Common Data Link mission kits required to physically integrate the organic AMCM sensors into the MH-60S aircraft. 23225 MH-60S TCDL - Funds for the procurement of Tactical Common Data Link mission kits for the MH-60S aircraft. The OAMCM mission requires a tactical data link to provide near real-time MCM data to the Mine Warfare Commander. DD Form 2454, JUN 86 ITEM NO. P-1 SHOPPING LIST 107 PAGE NO. 4 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: BUDGET ITEM JUSTIFICATION SHEET FOR AGGREGATED ITEMS P-40a DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY Airborne Mine Countermeasures BLI# 424800 Procurement Items Mission Kits ID Code CSTRS FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total B Qty Cost TCDL Prior Years 3 $2.5 B Qty Cost Common Console Qty Cost Total DD Form 2454, JUN 86 B 3 $6.0 $8.5 P-1 SHOPPING LIST ITEM NO. 107 PAGE NO. 5 CLASSIFICATION: UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy/BA-3: NAVY/AVIATION SUPPORT EQUIPMENT P-1 ITEM NOMENCLATURE/SUBHEAD B Airborne Mine Countermeasures/73S0 TOTAL COST IN THOUSANDS OF DOLLARS COST CODE S0020 S0061 ELEMENT OF COST MODIFICATION Unit Cost - MK-105 Mod 4 ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost A A 2 NON-RECURRING ENGINEERING 5,013 FY 2001 Total Cost Quantity Unit Cost FY2002 Total Cost Quantity Unit Cost Total Cost 3,118 2,089 2,798 10,026 0 0 0 346 0 PUBLICATIONS/TECHNICAL DATA 1,420 0 0 STRUTS-RECURRING 1,235 0 0 SUPPORT EQUIPMENT 202 331 258 CONVERSION 1,442 1,461 1,513 S0061 TOTAL 14,671 1,792 1,771 S0065 Unit Cost - AMNS B Unit Cost - EXPENDABLES NON-RECURRING ENGINEERING 6 1,169 7,012 60 51 3,049 0 SUPPORT EQUIPMENT 600 ILS/PUBS/TECH DATA 364 TRAINING EQUIPMENT 332 S0065 TOTAL Subtotal DD FORM 2446, JUN 86 11,357 17,789 3,881 P-1 SHOPPING LIST ITEM NO. 107 PAGE NO. 15,926 CLASSIFICATION: 6 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy/BA-3 NAVY/AVIATION SUPPORT EQUIPMENT P-1 ITEM NOMENCLATURE/SUBHEAD Airborne Mine Countermeasures/73S0 B TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST S0073 Unit Cost - AQS-20 ID Code Prior Years Total Cost B FY 2000 Quantity 2 NON-RECURRING ENGINEERING FY 2001 Unit Cost Total Cost 5,890 11,780 Quantity 3 Unit Cost 5,788 FY2002 Total Cost 17,364 Quantity 3 Unit Cost 6,312 Total Cost 18,936 10,314 0 0 ENGINEERING CHANGE PROPOSALS 0 2,469 0 ILS/PUBS/TECH DATA 0 3,842 2,125 TRAINING EQUIPMENT 0 0 1,364 22,094 23,675 22,425 S0073 TOTAL S0074 Unit Cost - AQS-20X B NON-RECURRING ENGINEERING SUPPORT EQUIPMENT ILS/PUBS/TECH DATA TRAINING S0074 TOTAL S0071 Unit Cost - AN/AQS-14A LLSS B 4 ILS/PUBS/TECH DATA 3,760 473 S0063 TOTAL Subtotal DD FORM 2446, JUN 86 940 4,233 39,883 31,789 P-1 SHOPPING LIST ITEM NO. 107 PAGE NO. 38,351 CLASSIFICATION: 7 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy COST CODE ELEMENT OF COST Weapon System CH-60S VERTREP ID Code P-1 ITEM NOMENCLATURE/SUBHEAD DATE: June 2001 B Airborne Mine Countermeasures BLI# 424800 TOTAL COST IN THOUSANDS OF DOLLARS ID Code Prior Years Total Cost Quantity FY 2000 Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost Total Cost Quantity AM3S0 CSTRS B AM3S0 TCDL B AM3S0 Common Console B SJ830 Production Engineering B 1,000 SJ860 Acceptance, Test & Evaluation B 590 DD FORM 2446, JUN 86 P-1 SHOPPING LIST ITEM NO. 107 3 567 1,701 3 1,733 5,199 Unit Cost Total Cost 8,490 CLASSIFICATION: UNCLASSIFIED PAGE NO. 8 CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE Other Procurement, Navy BA-3: NAVY/AVIATION SUPPORT EQUIPMENT Cost Element/ FISCAL YEAR QUANTITY SUBHEAD Airborne Mine Countermeasures 73S0 BLI 424800 UNIT COST (000) LOCATION OF PCO 5013 RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY SPECS AVAILABLE NOW DATE REVISIONS AVAILABLE FISCAL YEAR (00) MK-105 MOD 4-S0061 AQS-20 - S0073 2 2 5890 NAVSEA NAVSEA 5/99 1/00 SS/FP SS/FP EDO CORP, N. AMITYVILLE, NY RAYTHEON, PORTSMOUTH, RI 4/00 8/00 2/02 8/02 YES YES 3 4 5788 940 NAVSEA NAVSEA 10/00 1/01 SS/FP OPTION RAYTHEON, PORTSMOUTH, RI NORTHROP-GRUMMAN, 11/00 1/01 11/02 11/01 YES YES 3 6 6312 1169 NAVSEA NAVSEA 10/01 9/01 OPTION SS/FP RAYTHEON, PORTSMOUTH, RI LM/STN ATLAS, SYRACUSE, NY 11/01 10/01 11/03 10/02 YES NO FISCAL YEAR (01) AQS-20 - S0073 AN/AQS-14A LLSS - S0071 FISCAL YEAR (02) AQS-20 - S0073 AMNS - S0065 D. REMARKS FY00 AN/AQS-20 is LRIP from a RMS decision April 00. FY01 & FY02 will be LRIP from a AN/AQS-20 decision scheduled for SEPT 00. FY02 AMNS funding will be used to procure a total of eight systems from a PDM proof of production decision April 01. P-1 SHOPPING LIST DD Form 2446-1, JUL 87 ITEM NO. 107 PAGE NO. 9 Classification: UNCLASSIFIED 7/01 UNCLASSIFIED CLASSIFICATION: BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System CH-60S VERTREP C. P-1 ITEM NOMENCLATURE B. APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy Cost Element/ FISCAL YEAR A. DATE June 2001 SUBHEAD Airborne Mine Countermeasures BLI# 424800 CONTRACT DATE OF METHOD CONTRACTOR AWARD FIRST & TYPE AND LOCATION DATE DELIVERY U3S0 Tech data AVAILABLE NOW DATE REVISIONS AVAILABLE QUANTITY UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE 3 1,733 NAVAIR 03/01 FFP TBD 11/01 09/02 Yes N/A 3 567 NAVAIR 03/01 FFP TBD 11/01 09/02 Yes N/A AM3S0 Common Console FY02 AM3S0 CSTRS FY02 D. REMARKS DD Form 2446-1, JUL 87 ITEM NO. P-1 SHOPPING LIST 107 CLASSIFICATION: UNCLASSIFIED PAGE NO. 10 UNCLASSIFIED CLASSIFICATION: Exhibit P-20, Requirements Study P-1 ITEM NOMENCLATURE Airborne Mine Countermeasures BLI# 424800 Buy Summary Unit Cost Total Cost Asset Dynamics Beginning Asset Position Deliveries from all prior year funding Deliveries from FY 2000 funding Deliveries from FY 2001 funding Deliveries from FY 2002 funding Deliveries from subsequent years’ funding Other Gains Combat Losses/Usage Training Losses/Usage Test Losses/Usage Other Losses/Usage Disposals/Retirements/Attritions/etc. End of Year Asset Position Inventory Objective or Current Authorized Allowance Inventory Objective Actual Training 42 Expenditures 0 Assets Rqd For Combat FY 2000 thru Loads: WRM Rqmt: FY 1999: Pipeline: FY 1998: Other: FY 1997: TOTAL: Remarks: DD Form 2454, JUN 86 APPROPRIATION/BUDGET ACTIVITY Other Procurement, Navy/BA3 Admin Leadtime (after Oct 1): 2 Months FY 2000 0 0 0 0 0 0 0 0 0 0 0 0 Other than Training Usage 0 FY 2000 thru FY 1999: FY 1998: FY 1997: ITEM NO. FY 2001 0 0 0 0 0 0 0 0 0 0 FY 2002 3 1,733 5,199 0 0 0 0 0 3 0 0 0 3 3 Disposals (Vehicles/Other FY 2000 thru Date: June 2001 Production Leadtime: 9 Months FY 2003 FY 2004 Vehicles Eligible for FY 2001 Replacement: Vehicles Eligible for FY 2002 Replacement: Vehicle Augment: 0 FY 1999: FY 1998: FY 1997: P-1 SHOPPING LIST 107 FY 2005 FY 2006 FY 2007 Aircraft: TOAI: PAA: TAI Attrition Res: BAI Inactive Inv: Storage: CLASSIFICATION: UNCLASSIFIED 11 FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/ BA-3 Navy/Aviation Support Equipment Production Rate Manufacturer’s Item Name and Location MSR 1-8-5 MAX MK-105 Mod 4 EDO, N. Amityville, NY 1 6 6 MK-105 Mod 4 June 2001 DATE Weapon System P-1 ITEM NOMENCLATURE Airborne Mine Countermeasures Procurement Leadtimes ALT Prior ALT After Initial to Oct 1 Oct 1 Mfg PLT 6 3 22 3 1 Reorder Mfg PLT 22 FISCAL YEAR 2000 ITEM / MANUFACTURER MK-105 Mod 4 F Y S V C Q D B T Y E L A L 00 N 2 0 2 F Y S V C Q D B T Y E L A L 00 N 2 0 2 1999 O C T N O V FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2001 S E P O C T N O V D E C J A N MK-105 Mod 4 F E B M A R A P R M A Y J U N J U L A U G S E P A 2001 O C T N O V FISCAL YEAR 2003 CALENDAR YEAR 2002 D E C J A N F E B 1 M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2003 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1 311 / 244 Previous editions are obsolete P-1 SHOPPING LIST ITEM NO 107 PAGE 12 B A L 0 Remarks: DD Form 2445, JUL 87 B A L 2 FISCAL YEAR 2002 ITEM / MANUFACTURER Unit of Measure E E Total 25 23 Exhibit P-21 Production Schedule FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/ BA-3 Navy/Aviation Support Equipment Production Rate Manufacturer’s Item Name and Location MSR 1-8-5 MAX AMNS (MH-53E) Lockheed, Syracuse, NY 1 6 6 June 2001 DATE Weapon System P-1 ITEM NOMENCLATURE Airborne Mine Countermeasures Procurement Leadtimes ALT Prior ALT After Initial to Oct 1 Oct 1 Mfg PLT 2 1 12 Reorder Mfg PLT FISCAL YEAR 2000 ITEM / MANUFACTURER AMNS (MH-53E) F Y S V C Q D B T Y E L A L 02 N 6 0 6 F Y S V C Q D B T Y E L A L O C T 02 N 6 0 6 A 1999 O C T N O V FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2001 S E P O C T N O V D E C J A N AMNS (MH-53E) Remarks: M A R A P R M A Y J U N J U L A U G S E P B A L 2001 N O V FISCAL YEAR 2003 CALENDAR YEAR 2002 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2003 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P From a PDM proof of production decision April 01, FY02 will procure six MH-53E systems. DD Form 2445, JUL 87 311 / 244 F E B 6 FISCAL YEAR 2002 ITEM / MANUFACTURER Unit of Measure E Total 13 Previous editions are obsolete P-1 SHOPPING LIST ITEM NO 107 PAGE 13 Exhibit P-21 Production Schedule B A L FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/ BA-3 Navy/Aviation Support Equipment Production Rate Manufacturer’s Item Name and Location MSR 1-8-5 MAX AN/AQS-14A LLSS Northrop-Grumman, , 1 12 26 Annapolis. MD June 2001 DATE Weapon System P-1 ITEM NOMENCLATURE Airborne Mine Countermeasures Procurement Leadtimes ALT Prior ALT After Initial to Oct 1 Oct 1 Mfg PLT 3 4 9 3 1 0 Reorder Mfg PLT 0 9 FISCAL YEAR 2000 ITEM / MANUFACTURER AN/AQS-14A LLSS F Y S V C Q D B T Y E L A L 01 N 4 0 4 F Y S V C Q D B T Y E L A L 01 N 4 0 4 1999 O C T N O V FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2001 S E P O C T N O V D E C J A N AN/AQS-14A LLSS F E B M A R A P R M A Y J U N J U L A U G S E P A FISCAL YEAR 2002 ITEM / MANUFACTURER Unit of Measure E E Total 13 10 2001 O C T 4 FISCAL YEAR 2003 CALENDAR YEAR 2002 N O V D E C J A N F E B 1 1 1 1 M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2003 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 311 / 244 Previous editions are obsolete B A L 0 Remarks: DD Form 2445, JUL 87 B A L P-1 SHOPPING LIST ITEM NO 107 PAGE 14 Exhibit P-21 Production Schedule FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/ BA-3 Navy/Aviation Support Equipment Production Rate Manufacturer’s Item Name and Location MSR 1-8-5 MAX AN/AQS-20 Raytheon, Portsmouth, RI 1 12 26 June 2001 DATE Weapon System P-1 ITEM NOMENCLATURE Airborne Mine Countermeasures Procurement Leadtimes ALT Prior ALT After Initial to Oct 1 Oct 1 Mfg PLT 3 1 24 3 1 0 Reorder Mfg PLT 0 24 FISCAL YEAR 2000 ITEM / MANUFACTURER AN/AQS-20 AN/AQS-20 AN/AQS-20 F Y S V C Q D B T Y E L A L 00 01 02 N N N 2 3 3 0 0 0 2 3 3 F Y S V C Q D B T Y E L A L 00 01 02 N N N 2 3 3 0 0 0 2 3 3 1999 O C T N O V FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2001 S E P O C T N O V D E C J A N AN/AQS-20 AN/AQS-20 AN/AQS-20 Remarks: M A R A P R M A Y J U N J U L A U G S E P 2001 O C T N O V FISCAL YEAR 2003 CALENDAR YEAR 2002 D E C J A N F E B M A R A P R M A Y J U N J U L CALENDAR YEAR 2003 A U G S E P 1 1 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P A Previous editions are obsolete B A L 2 3 3 A FY 00 AN/AQS-20 was approved for Limited Rate Initial Production under RMS approval, FY01 & FY02 requesting LRIP approval September 00. DD Form 2445, JUL 87 311 / 244 F E B A FISCAL YEAR 2002 ITEM / MANUFACTURER Unit of Measure E E Total 25 25 P-1 SHOPPING LIST ITEM NO 107 PAGE 15 Exhibit P-21 Production Schedule B A L FY 2000/01 BUDGET PRODUCTION SCHEDULE, P-21 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY/ BA-3 Navy/Aviation Support Equipment Production Rate Manufacturer’s Item Name and Location MSR 1-8-5 MAX AN/AQS-20 Raytheon, Portsmouth, RI 1 12 12 June 2001 DATE Weapon System P-1 ITEM NOMENCLATURE Airborne Mine Countermeasures Procurement Leadtimes ALT Prior ALT After Initial to Oct 1 Oct 1 Mfg PLT 3 1 24 3 1 24 Reorder Mfg PLT 0 0 FISCAL YEAR 2004 ITEM / MANUFACTURER AN/AQS-20 F Y S V C Q D B T Y E L A L 02 N 3 0 3 S V C Q D B T Y E L A L 2003 O C T N O V FISCAL YEAR 2005 CALENDAR YEAR 2004 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2005 S E P O C T N O V D E C J A N FISCAL YEAR 2006 ITEM / MANUFACTURER F Y 2005 O C T N O V F E B J A N F E B M A R A P R M A Y M A R A P R M A Y J U N J U L A U G S E P A U G S E P J U N J U L A U G CALENDAR YEAR 2007 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Remarks: DD Form 2445, JUL 87 311 / 244 Previous editions are obsolete B A L FISCAL YEAR 2007 CALENDAR YEAR 2006 D E C Unit of Measure E E Total 25 25 P-1 SHOPPING LIST ITEM NO 107 PAGE 16 Exhibit P-21 Production Schedule B A L FY 2002/2003 Department of the Navy Budget Production Schedule, P-21 APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY Production Rate Item CH-60S AMCM Common Console Manufacturer’s Name and Location MSR 1 TBD DATE June 2001 P-1 ITEM NOMENCLATURE Airborne Mine Counter Measures BLI# 424800 Weapon System CH-60S VERTREP Econ 5 MAX 6 ALT Prior to Oct 1 0 Procurement Leadtimes ALT After Initial Oct 1 Mfg PLT 2 9 Reorder Mfg PLT 9 FISCAL YEAR 2000 ITEM / MANUFACTURER F Y S V C Q D B T Y E L A L F Y S V C Q D B T Y E L A L 02 N 3 0 3 1999 O C T N O V FISCAL YEAR 2001 CALENDAR YEAR 2000 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2001 S E P O C T N O V D E C J A N FISCAL YEAR 2002 ITEM / MANUFACTURER CH-60S AMCM Common Console 2001 O C T N O V F E B J A N F E B M A R A P R M A Y M A R A P R M A Y J U N J U L A U G S E P A U G S E P J U N A J U L A U G CALENDAR YEAR 2003 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L 3 Remarks: P-1 SHOPPING LIST DD Form 2445, JUL 87 311 / 244 Previous editions are obsolete ITEM NO. 107 B A L FISCAL YEAR 2003 CALENDAR YEAR 2002 D E C Unit of Measure E Total 11 CLASSIFICATION: UNCLASSIFIED PAGE NO. 17 B A L FY 2002/2003 Department of the Navy Budget Production Schedule, P-21 Production Rate Item CH-60S AMCM Common Console CH-60S AMCM CSTRS June 2001 DATE: P-1 ITEM NOMENCLATURE Airborne Mine Counter Measures BLI# 424800 Procurement Leadtimes ALT Prior ALT After Initial Reorder Unit of to Oct 1 Oct 1 Mfg PLT Total Mfg PLT Measure 0 2 9 9 11 E 0 2 9 9 11 E Weapon System APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY Manufacturer’s Name and Location MSR 1 1 TBD TBD ECON 5 5 MAX 6 6 FISCAL YEAR 2004 ITEM / MANUFACTURER CH-60S AMCM Common Console CH-60S AMCM Common Console CH-60S AMCM CSTARS F Y S V C Q D B T Y E L A L S V C Q D B T Y E L A L 2003 O C T N O V FISCAL YEAR 2005 CALENDAR YEAR 2004 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2005 S E P O C T N O V D E C J A N CH-60S AMCM Common Console CH-60S AMCM Common Console CH-60S AMCM CSTRS CH-60S AMCM CSTRS M A R A P R M A Y J U N J U L A U G S E P A U G S E P F Y 2005 O C T N O V FISCAL YEAR 2007 CALENDAR YEAR 2006 D E C J A N F E B M A R A P R M A Y J U N J U L A U G CALENDAR YEAR 2007 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L 06 07 06 07 Remarks: P-1 SHOPPING LIST DD Form 2445, JUL 87 311 / 244 Previous editions are obsolete B A L 04 05 05 FISCAL YEAR 2006 ITEM / MANUFACTURER F E B ITEM NO. 107 CLASSIFICATION: UNCLASSIFIED PAGE NO. 18 B A L CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY BA3 - AVIATION SUPPORT EQUIPMENT Program Element for Code B Items: QUANTITY COST (In Millions) OTHER AVIATION SUPPORT EQUIPMENT Other Related Program Elements Prior Years ID Code FY 2000 FY 2001 FY 2002 $239.4 A $7.3 $21.7 $13.6 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total CONT CONT The following items are funded in this line: 1. NAVAIR Office Information System (OIS) Headquarters Support Equipment (S7020): This program finances the procurement of investment items critical to the efficient and effective execution of NAVAIR Headquarters mission needs. Funding for the NAVAIR Electronic Acquisition efforts for FY 2000 through 2007 are financed in this line. Funding for Enterprise Resource Planning (ERP) efforts for FY2000 ONLYare financed in this line. ERP funding FY2001 through FY2004 are identified in the Command Support Equipment BLI 81060. Electronic Acquisition - The NAVAIR Electronic Acquisition funding provides for the procurement of necessary upgrades to the NAVAIR Team-wide computer infrastructure to support the rapid deployment schedule associated with the stand-up of Electronic Acquisition Iniatives. The OSD mandate/initiatives include, but are not limited to the following: Electronic Tools (hardware/software/infrastructure) to integrate e-Procurement/e-Commerce/e-Business, Standard Procurement Systems, Electronic Procurement Collaboration, Electronic Invoicing and Entitlement (e.g., Wide Area Workflow Receipt and Acceptance), Electronic Document Access and Interfaces to achieve an end-to-end state. 2. PEO (A) Industrial Facilities Equipment (S7030): Procures upgrades for the sonobouy test equipment at Naval Surface Warfare Center (NSWC) Crane, IN. 3. Naval Aviation Logistics Data Analysis (NALDA) Support Upgrade to NALDA II (S7040): NAVAIR was directed by the CNO to extend NALDA accessibility to all USN and USMC aviation supportability and maintenance reporting activities and NAVAIR Team sites. This is being accomplished by upgrading current Naval Aviation logistics reporting mechanisms through the procurement and installation of a fully-licensed, warranted, secure, standardized, COTS, user-friendly, Client-Server and relational database environment. Additionally, Life-Cycle Management (LCM) dollar resource requirements have been identified for hardware, software and process technology upgrades (refreshment), which have also been incorporated above. CLASSIFICATION: DD Form 2454, JUN 86 ITEM NO. 108 PAGE NO. 1 UNCLASSIFIED CLASSIFICATION: UNCLASSIFIED BUDGET ITEM JUSTIFICATION SHEET P-40 DATE: June 2001 APPROPRIATION/BUDGET ACTIVITY P-1 ITEM NOMENCLATURE OTHER PROCUREMENT, NAVY BA3 - AVIATION SUPPORT EQUIPMENT Program Element for Code B Items: QUANTITY COST (In Millions) OTHER AVIATION SUPPORT EQUIPMENT Other Related Program Elements Prior Years ID Code FY 2000 FY 2001 FY 2002 $239.4 A $7.3 $21.7 $13.6 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 To Complete Total CONT CONT 3. Naval Aviation Logistics Data Analysis (NALDA) Support Upgrade to NALDA II (S7040): CONT’D Congressionally added funds in FY 2001 are required to deploy Joint Tactical Data Integration (JTDI) for the joint warfighter maintenance community to procure hardware and software necessary for the warfighter with a production system. This system fully integrates access to digital technical data, and provides the DoD with the weapon system data and component databases required to efficiently support life cycle logistics, it’s attendant chain of supply and maintenance digitized, integrated and managed program data while reducing Total Ownership Costs (TOC) in support of the warfighter. Funding budgeted in FY 2002 and FY 2003 is required to provide the additional hardware, networking, systems and applications software and infrastructure necessary to deploy Total Cost of Ownership and affordable readiness functional capabilities described above to additional TEAM/Fleet activities. NALDA information and tools will enable significant cost reductions in naval aviation logistics, achieving more affordable readiness, eliminating redundant logistics information systems, improving aircraft configuration management and safety of flight, and permitting improved aircraft inventory and life extension management needed to permit recapitalization and modernization. Data reporting requirements for the NALDA system are directed by OPNAV and NAVAIR as defined primarily by the Naval Aviation Maintenance Program (NAMP) manual. Users of the NALDA system are located at all TEAM/Fleet, TYCOMS, Wings, Intermediate Maintenance Activities, and other aviation logistics activities. The NALDA system architecture is compliant with the DISA TAFIM and Common Operating Environment (COE). CLASSIFICATION: DD Form 2454, JUN 86 ITEM NO. 108 PAGE NO. 2 UNCLASSIFIED UNCLASSIFIED CLASSIFICATION: WEAPONS SYSTEM COST ANALYSIS P-5 Weapon System DATE: June 2001 ID Code APPROPRIATION/BUDGET ACTIVITY OTHER PROCUREMENT, NAVY BA3 - AVIATION SUPPORT EQUIPMENT P-1 ITEM NOMENCLATURE/SUBHEAD OTHER AVIATION SUPPORT EQUIPMENT 43S7/U3S7 A TOTAL COST IN THOUSANDS OF DOLLARS COST CODE ELEMENT OF COST ID Code Prior Years Total Cost FY 2000 Quantity Unit Cost FY 2001 Total Cost Quantity Unit Cost FY 2002 Total Cost Quantity Unit Cost Total Cost S7020 NAVAIR OIS Headquarters SE A 46,565 2,899 S7030 PEO (A) Industrial Facilities Equipment A 2,777 208 208 204 S7040 S7040 NALDA NALDA - hardware and software in support of NALCOMIS Optimization. A A 19,304 4,182 4,520 10,084 3,357 S7040 NALDA Joint Tactical Data Integration (JTDI) A Various 1/ 17,000 170,706 1/ The amount identified against this cost element reflects total prior year funding associated with cost elements no longer financed in FY2000 and beyond. 239,352 P-1 SHOPPING LIST DD FORM 2446, JUN 86 ITEM NO. 108 7,289 21,728 13,645 CLASSIFICATION: PAGE NO. 3 UNCLASSIFIED 10:10 AM7/18/01 CLASSIFICATION: UNCLASSIFIED BUDGET PROCUREMENT HISTORY AND PLANNING EXHIBIT (P-5A) Weapon System A. DATE June 2001 B. APPROPRIATION/BUDGET ACTIVITY C. P-1 ITEM NOMENCLATURE SUBHEAD OTHER PROCUREMENT, NAVY BA3 - AVIATION SUPPORT EQUIPMENT OTHER AVIATION SUPPORT EQUIPMENT 43S7/U3S7 Cost Element/ FISCAL YEAR QUANTITY * UNIT COST (000) LOCATION OF PCO RFP ISSUE DATE CONTRACT METHOD & TYPE CONTRACTOR AND LOCATION AWARD DATE DATE OF FIRST DELIVERY TECH DATA AVAILABLE NOW? DATE REVISIONS AVAILABLE S7040-NALDA FY 2001 FY 2002 1 LOT 1 LOT 4,520 13,441 NICP/NAWCAD NICP/NAWCAD N/A FP/IDIQ OPTION InterGraph InterGraph 11/00 12/02 12/00 2/03 YES YES N/A N/A S7040-JTDI FY 2001 FY 2001 1 LOT 1 LOT 15,000 2,000 NICP/NAWCAD NAWC/NADEP N/A N/A FP/IDIQ OGA InterGraph Government 4/01 5/01 6/01 6/01 YES YES N/A N/A D. REMARKS * Quantitites reflect complete systems comprised of several components. **KPMG/SAP-Software License **Sun Microsystems- Hardware/Servers/Processors DD Form 2446-1, JUL 87 Classification: P-1 SHOPPING LIST ITEM NO. 108 PAGE NO. 4 UNCLASSIFIED